Pages that link to "L-2022-052, Core Operating Limits Report"
Jump to navigation
Jump to search
The following pages link to L-2022-052, Core Operating Limits Report:
Displayed 50 items.
- L-2018-136, L-2018-136-Attachment 43 Enclosure 6 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Fourth Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 5 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Forty-Third Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 4 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Forty-Second Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 3 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Forty-First Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 2 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Fortieth Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 1 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Thirty-Ninth Quarterly Well Report (← links)
- L-2018-136, L-2018-136-Attachment 32 Enclosure 1 - Exhibit B-1 - Detailed Scope of Work for Grounds Keeping Duties in Support of the Turkey Point Land Utilization Services and Cooling Canal System Maintenance Group (← links)
- L-2007-111, Florida Power & Light Company, Proposed Voluntary Response to NRC Regulatory Issue Summary (RIS) 2007-08 Updated Licensing Submittal Information to Support the Design-Centered Licensing Review Approach (← links)
- L-2006-004, January 2006 Monthly Operating Report for Turkey Point Units 3 & 4 (← links)
- L-2006-006, December 2005 Monthly Operating Report for Turkey Point Units 3 and 4 (← links)
- L-2006-028, Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (← links)
- L-2005-253, November 2005 Operating Report, Turkey Point, Units 3 and 4 (← links)
- L-2002-243, Price Anderson Guarantees/Annual Financial Report (← links)
- L-2016-016, FPL, Turkey Point Units 3 and 4, Sixth Six-Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-2014-244, Florida Power and Light Company'S, Turkey Point, Units 3 and 4 - Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation(Order Number EA- 12-0 (← links)
- L-2014-028, LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process (← links)
- L-2014-232, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit (← links)
- L-2014-216, License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit (← links)
- L-2014-041, Florida Power and Light Company'S Turkey Point Units 3 & 4, Second Six-Month Status Report in Response to 03/12/2012, Commission Order Modifying Licenses with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Exte (← links)
- L-2013-340, Commitment Revision for L-2013-256, Florida Power & Light Company'S Turkey Point Units 3 and 4, Supplemental Response to NRC 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insigh (← links)
- L-2013-288, Response to Request for Additional Information and Re-submittal of Relief Request No. 12 (← links)
- L-2013-256, Florida Power & Light Co'S, Turkey Point Units 3 & 4, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Flooding Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai (← links)
- L-2013-061, Florida Power and Light Company'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12- (← links)
- L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues (← links)
- L-2010-021, Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request (← links)
- L-2006-240, Presentation Material Pertaining to Regulatory Conference on Turkey Point Preliminary White Finding Held on 10/10/06 (← links)
- L-2018-181, Revised Figure 3.a.1-1 for Turkey Point and Point Beach Updated Final Response to GL 2004-02 (← links)
- L-2018-195, Core Operating Limits Report (← links)
- L-77-367, Forwards Florida Power & Light Co.'S Response to IE Bulletins 77-05 and 77-05A (← links)
- L-2017-213, License Amendment Request 256, One-Time Extension of 3A Containment Spray (CS) Pump Completion Time (← links)
- L-2017-148, Special Report - Accident Monitoring Instrumentation (← links)
- L-2017-132, Inservice Inspection Program Owner'S Activity Reports (← links)
- L-2017-090, LER Special Report Regarding Accident Monitoring Instrumentation (← links)
- L-2017-036, Core Operating Limits Report, Cycle 29 (← links)
- L-2017-069, Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction (← links)
- L-2017-050, Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 5 (← links)
- L-2017-034, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report (← links)
- L-2017-028, Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction (← links)
- L-2016-178, Submittal of Cycle 29 Refueling Outage Steam Generator Tube Inspection Report (← links)
- L-2016-138, Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval (← links)
- L-2016-081, Core Operating Limits Report (← links)
- L-2016-044, Inservice Inspection Program Owner'S Activity Report (← links)
- L-2015-313, Special Report - Accident Monitoring Instrumentation (← links)
- L-2015-271, Core Operating Limits Report, Cycle 28 (← links)
- L-2015-225, Inservice Inspection Plan - Fifth Inspection Interval Relief Request No. 1, Response to Request for Additional Information (← links)
- L-2015-200, FPL Records - Letters L-2003-255 and L-2013-218 (← links)
- L-2015-122, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report (← links)
- L-2015-012, Inservice Inspection Program Owner'S Activity Report (OAR-1) (← links)
- L-2014-362, Request for Schedule Relaxation from NRC Order EA-12-049 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) (← links)