- RNP-RA/04-0006, Transmittal of Core Operating Limits Report for Cycle 22 (← links)
- RNP-RA/04-0008, Response to Request for Summary Description of Reactor Pressure Vessel Head Inspections Planned for Refueling Outage 22 in Accordance with NRC Bulletin 2002-02 (← links)
- RNP-RA/03-0155, November 2003 Monthly Operating Report for H.B. Robinson, Unit 2 (← links)
- RNP-RA/03-0158, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System (← links)
- RNP-RA/03-0142, Transmittal of Emergency Procedure Revisions (← links)
- RNP-RA/03-0148, Information Related to the Review Priority for Nuhoms Certificate of Compliance No. 1004, Amendment No. 8 (← links)
- RNP-RA/03-0140, October 2003 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 2 (← links)
- RNP-RA/03-0136, Transmittal of Emergency Procedure Revisions (← links)
- RNP-RA/03-0125, Inservice Testing Program, Relief Request IST-RR-8 for Comprehensive Tests (← links)
- RNP-RA/03-0127, Voluntary Response to Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- RNP-RA/03-0132, September 2003 Monthly Operating Report for H. B. Robinson, Unit 2 (← links)
- RNP-RA/03-0115, August 2003 Monthly Operating Report for H. B. Robinson, Unit 2 (← links)
- RNP-RA/03-0105, July 2003 Monthly Operating Report for H.B. Robinson, Unit 2 (← links)
- RNP-RA/03-0096, Transmittal of Emergency Procedure Revisions (← links)
- RNP-RA/03-0093, Comment (4) of C. T. Baucom, Progress Energy, Regarding Draft Supplemental Environmental Impact Statement (← links)
- RNP-RA/03-0084, Response to NRC Request for Additional Information on Steam Generator for Inservice Inspection Results (← links)
- RNP-RA/03-0085, June 2003 Monthly Operating Report for H. B. Robinson, Unit 2 (← links)
- RNP-RA/03-0070, Request for Technical Specifications Change Regarding One-Time Extension of Containment Type a Test Interval (← links)
- RNP-RA/03-0079, May 2003 Monthly Operating Report for H.B. Robinson, Unit 2 (← links)
- RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron (← links)
- RNP-RA/03-0076, Transmittal of Emergency Procedures EPPRO-04, Rev. 4 & EPCLA-02, Rev. 10 (← links)
- RNP-RA/03-0071, Status Update for NRC Bulletin 88-09, Thimble Tube Thinning in Westinghouse Reactors. (← links)
- RNP-RA/03-0055, Radiological Environmental Operating Report - 2002 (← links)
- RNP-RA/03-0067, Withdrawal of Request for Exemption from 10 CFR 54.21(b) (← links)
- RNP-RA/03-0062, April 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No.2 (← links)
- RNP-RA/03-0061, Transmittal of TS Bases Revisions (← links)
- RNP-RA/03-0053, Annual Radioactive Effluent Release Report, Section 3.6 Through Appendix C, Figure D-2 (← links)
- RNP-RA/03-0060, Transmittal of Emergency Procedure Revisions (← links)
- RNP-RA/03-0031, Response to Request for Additional Information Re Application for Renewal of Operating License, Attachment III, Pages 356 - 504 (← links)
- RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements (← links)
- RNP-RA/03-0048, Occupational Radiation Exposure Report (← links)
- RNP-RA/03-0041, Supplemental Pressure Test Information for the Refueling Outage 21 Inservice Inspection Report (← links)
- RNP-RA/03-0043, Additional Information Regarding Adequacy of Delayed Offsite Power Circuit (← links)
- RNP-RA/03-0042, March 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2 (← links)
- RNP-RA/03-0036, Submittal of Renewed National Pollutant Discharge Elimination System Permit No. SC0002925 (← links)
- RNP-RA/03-0033, February 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 (← links)
- RNP-RA/03-0030, Transmittal of Emergency Procedure Revisions for H. B. Robinson Steam Electric Plant, Unit No. 2 (← links)
- RNP-RA/03-0022, Request for Exemption from 10 CFR 54.21(b) (← links)
- RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/03-0012, Request for Relief Pertaining to Examination Coverage Less than Essentially 100 Percent (← links)
- RNP-RA/03-0021, January 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2 (← links)
- RNP-RA/03-0017, Cycle-22 Startup Test Report (← links)
- RNP-RA/03-0020, Transmittal of Emergency Procedure Revisions (← links)
- RNP-RA/03-0008, Schedule for Providing Supplemental Response to Request for Additional Information (← links)
- RNP-RA/03-0004, December 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 (← links)
- RNP-RA/03-0002, Transmittal of Emergency Procedures Revisions (← links)
- RNP-RA/02-0187, Annual Report of Changes to or Errors Discovered in Acceptable Loss-of-Coolant Accident Evaluation Model Application for Emergency Core Cooling System (← links)
- RNP-RA/02-0185, November 2002 Monthly Operating Report for H. B. Robinson, Unit 2 (← links)
- RNP-RA/04-0042, Report of Changes Pursuant to 10 CFR 50.59 Between April 1, 2002 and April 1, 2004 (← links)
- RNP-RA/02-0174, October 2002 Monthly Operating Report for H B Robinson Unit 2 (← links)