Pages that link to "05000348/LER-2004-001"
Jump to navigation
Jump to search
The following pages link to 05000348/LER-2004-001:
Displayed 43 items.
- 05000348/LER-1982-008 (← links)
- 05000348/LER-1982-007 (← links)
- ML041240203 (redirect page) (← links)
- 05000348/LER-1982-030, Forwards LER 82-030/03L-0 (← links)
- 05000348/LER-1982-026, Forwards LER 82-026/03L-0 (← links)
- 05000348/LER-1982-018, Forwards LER 82-018/03L-0 (← links)
- 05000348/LER-1982-021, Forwards LER 82-021/01T-0 (← links)
- 05000348/LER-1983-005, Forwards LER 83-005/01T-0 (← links)
- 05000348/LER-1981-010, Updated LER 81-010/03X-1:on 810429 & 30,containment Atmosphere Radioactivity Monitoring Sys R-11 Declared Inoperable When Filter Paper Did Not Advance.Caused by Paper Spool Slipping on Shaft.Drive Shaft Adjusted (← links)
- 05000348/LER-1978-062, Confirms LER 78-062/01T-0:on 780919 Re Missing Seismic Pipe Restraint on Main Feedwater Line.Lateral Seismic Restraint FW-H49 Being Reinstalled.Investigation Underway.Updated LER Will Follow (← links)
- 05000348/LER-1978-063, Forwards LER 78-063/03L-0 (← links)
- 05000348/LER-1978-065, Forwards LER 78-065/03L-0 (← links)
- 05000348/LER-1978-064, Forwards LER 78-064/03L-0 (← links)
- 05000348/LER-1982-046, Forwards LER 82-046/01T-0 (← links)
- 05000348/LER-1982-040, Forwards LER 82-040/03L-0 (← links)
- 05000348/LER-1983-011, Forwards LER 83-011/03L-0 (← links)
- 05000348/LER-1982-053, Forwards LER 82-053/03L-0 (← links)
- 05000348/LER-1983-008, Forwards LER 83-008/03L-0,83-006/03L-0,83-007/03L-0, 83-008/03L-0 & 83-011/03L-0.W/o LERs 83-006/03L-0, 83-007/03L-0,83-008/03L-0 & 83-011/03L-0 (← links)
- 05000348/LER-1982-057, Forwards LER 82-057/03L-0 (← links)
- 05000348/LER-1993-001, Forwards Rev 12A to Updated FSAR for Jm Farley Nuclear Plant,Units 1 & 2.Rev 12A Submitted to Resolve Issue Reported in Voluntary LER 93-001-00,dtd 930723 (← links)
- 05000348/LER-1982-061, Forwards LER 82-061/03L-0 (← links)
- 05000348/LER-1978-092, Forwards LER 78-092/03L-0 (← links)
- 05000348/LER-1983-038, Forwards LERs 83-060/03L-0,83-061/03L-0,83-037/03L-0 & 83-038/03L-0.W/o LER 83-038/03L-0 (← links)
- 05000348/LER-1983-007, Forwards LER 83-007/03L-0 (← links)
- 05000348/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000348/LER-1983-039, Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-1 (← links)
- 05000348/LER-1983-016, Forwards LER 83-016/03L-0 (← links)
- 05000348/LER-1983-009, Forwards LER 83-009/03L-0 (← links)
- 05000348/LER-1983-006, Forwards LER 83-006/01T-0 (← links)
- 05000348/LER-1982-032, Forwards LER 82-032/03L-0 (← links)
- 05000348/LER-1980-058, Submits Description of Actions Taken Subsequent to Initial 3-yr Containment post-tensioning Sys Testing & Insp,Per LER 80-058/03L-1.Sys Is Performing Design Function W/Margin of Safety,Therefore No Addl Action Necessary (← links)
- 05000348/LER-1985-005, Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptable (← links)
- 05000348/LER-1981-019, Forwards LER 81-019/03L-0 (← links)
- 05000348/LER-1979-030, Forwards LER 79-030/03L-0 (← links)
- 05000348/LER-1998-002, Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed (← links)
- 05000348/LER-1998-006, Forwards LER 98-006-00,re PRF Sys Suction Damper Outside Design & Licensing Basis.First Paragraph in Corrective Action Section Contains NRC Commitments Associated with LER (← links)
- 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed (← links)
- 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel (← links)
- 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift (← links)
- 05000348/LER-2023-003, Emergency Diesel Generator (Eog) Lube Oil Pwnp Outlet Coupling Leak (← links)
- 05000348/LER-2023-002, Residual Heat Removal Pump Inoperable for Longer than Allowed by Technical Specifications (← links)
- 05000348/LER-2023-001, Automatic Reactor Trip Due to DC Ground on Turbine Trip Solenoid (← links)
- 05000348/LER-2022-001, Outdated Relay Settings Resulted in an Automatic Reactor Trip After a Floor Tile Was Dropped in High Voltage Switch House (← links)