Pages that link to "L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1"
Jump to navigation
Jump to search
The following pages link to L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1:
Displayed 50 items.
- L-HU-08-024, Northern States Power Company - Minnesota Confirmation of Compliance with Confirmation Order EA-06-178 (← links)
- L-HU-08-021, ISFSI and Monticello, Confirmation of Transition Readiness as of September 22, 2008 (← links)
- L-HU-08-018, Units 1 and 2, Request for Extension of Enforcement Discretion for a Revised Date for 10 CFR 50.48(C) License Amendment Request Submittal (← links)
- L-HU-08-016, Corrected Operating License Pages Regarding Transfer of Operating Authority (← links)
- L-HU-08-014, Planned Initial License Operator Examination Data (← links)
- L-HU-08-012, Units 1 and 2, Corporate Merger of Decommissioning Trustee (← links)
- L-HU-08-005, Application for Order and Conforming License Amendments to Transfer Operating Authority Under Facility Operating Licenses (← links)
- L-HU-08-008, Units 1 & 2, Summary of Nuclear Property Insurance as of April 1, 2008 (← links)
- L-HU-08-007, Units 1 & 2 - Fitness for Duty Performance Data for the Period Ending December 31, 2007 (← links)
- L-HU-08-003, Units 1 and 2, Revision to Correspondence Mailing List for Nuclear Management Company, LLC (← links)
- L-HU-07-029, Generic Letter 2003-01, Control Room Habitability, Commitment Change (← links)
- L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan (← links)
- L-HU-07-020, Generic Letter 2003-01, Control Room Habitability, Commitment Change (← links)
- L-PI-12-050, Day Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Lnsights from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-049, Emergency Preparedness Information Requested by NRC Letter, Pursuant to 10CFR50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-051, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-037, Day Response to NRC Letter, Request for Information Pursuant to 10CFR50.54(f) Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Dated 03/12/2012 (← links)
- L-PI-12-038, Westinghouse, Affidavit - CE-12-3 16, Revision 1, Westingliouse Suggested Responses to the Requests for Additional Information Presented in ML120620389. (← links)
- L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits (← links)
- L-PI-12-027, Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2, Cvcle 27, Revision 0 (← links)
- L-PI-12-026, Day Response to the March 12, 2012 Information Request (← links)
- L-PI-12-022, Answer to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- L-PI-12-021, Prairie Lsland Nuclear Generating Plant, Answer to March 12, 2012 Commission Order Modifying License with Regarding to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-12-007, Response to Requests for Additional Information for License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8, Cooling Water System & 3.8.3, Diesel Fuel Oil. (← links)
- L-PI-12-010, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term Methodology (← links)
- L-PI-12-006, Notification of Changes to the Emergency Response Data System (ERDS) Data Point Library (Dpl) (← links)
- L-PI-12-005, Readiness for Supplemental 95001 Inspection (← links)
- L-PI-11-096, Response to NRC Bulletin 2011-01, Mitigating Strategies, Request for Additional Information (RAI) (TAC Nos. ME6471 and ME64720) (← links)
- L-PI-11-100, License Renewal Commitment Change (← links)
- L-PI-11-098, Submittal of 50.59 Evaluation Summary Report (← links)
- L-PI-11-099, Response to Requests for Additional Information Regarding Regulatory Guide 1.97 Instrumentation Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-11-044, Lnservice Testing Program Fourth Ten-Year Interval Relief Request 12 - Proposed Alternative for Pump Vibration Testing (← links)
- L-PI-11-087, Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-2011 (← links)
- L-PI-11-075, Letter from Xcel Energy License Amendment Request for Spent Fuel Pool Criticality Changes (← links)
- L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil (← links)
- L-PI-11-070, Supplement to License Amendment Request to Exclude Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI (← links)
- L-PI-11-080, Reactor Internals Inspection Commitment Change (← links)
- L-PI-11-069, Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-PI-11-043, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- L-PI-11-063, Core Operating Limits Report (Colr), Cycle 27, Revision 1 (← links)
- L-PI-11-057, Request for Extension of Enforcement Discretion and Commitment to Submittal Date for 10 CFR 50.48(c) License Amendment Request (← links)
- L-PI-11-060, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-11-055, Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-PI-11-053, Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant Unit 1, Cycle 27, Revision 0 (← links)
- L-PI-11-040, Independent Spent - 2010 Annual Radiological Environmental Monitoring Program (REMP) Report (← links)
- L-PI-11-036, 2010 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM) (← links)
- L-PI-11-034, Annual Update of the Application for Renewed Operating Licenses (← links)
- L-PI-11-035, Annual Report of Personnel Radiation Exposure for the Prairie Lsland Nuclear Generating Plant (PINGP) (← links)
- L-PI-11-038, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology (← links)