L-PI-12-026, Day Response to the March 12, 2012 Information Request

From kanterella
Jump to navigation Jump to search
Day Response to the March 12, 2012 Information Request
ML12103A008
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/11/2012
From: Schimmel M
Northern States Power Co, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-PI-12-026
Download: ML12103A008 (2)


Text

Prairie Island Nuclear Generating Plant I717 Wakonade Drive East Welch, MN 55089-9642 April 11, 2012 L-PI-12-026 10 CFR 50.54(f)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie lsland Nuclear Generating Plant Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 30-Dav Response to the March 12, 2012 lnformation Request On March 12, 2012, the NRC issued "Request for lnformation Pursuant to Title 10 of the Code of Federal Regulafions 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident"

("lnformation Request") to all NRC power reactor licensees and holders of construction permits in active or deferred status (ADAMs Accession No. ML12056A046). The lnformation Request requires licensees to confirm receipt of the letter within 30 days.

The response must be written and signed under oath or affirmation.

In accordance with this requirement, Northern States Power Company, a Minnesota corporation, d/b/a Xcel Energy (hereafter "NSPM"), hereby submits notice to the NRC on behalf of the Prairie Island Nuclear Generating Plant that it has received the lnformation Request. NSPM is currently assessing its contents and evaluating its responses. Future responses will be provided to the NRC consistent with the terms of the lnformation Request.

If there are any questions or if additional information is needed, please contact Ms.

Jennie Eckholt, Licensing Engineer, at 612-330-5788.

Document Control Desk Page 2 Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on APR 1 1 2012 Mark A. Schimmel Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: Administrator, Region Ill, USNRC Director of Nuclear Reactor Regulation (NRR), USNRC NRR Project Manager, PINGP, USNRC Senior Resident Inspector, PINGP, USNRC