Pages that link to "GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control"
Jump to navigation
Jump to search
The following pages link to GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control:
Displayed 50 items.
- GNRO-2015/00029, License Amendment Request - Cyber Security Plan Implementation (← links)
- GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment (← links)
- GNRO-2015/00041, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- GNRO-2015/00034, Response to Request for Additional Information (RAI) Set 52 Dated April 6, 2015 (← links)
- GNRO-2015/00033, Docketed Letters Regarding Fluence Calculation Methodology Concerning License Renewal Amendment Request for Additional Information Set 47, Question 4.2.1-2c in Entergy Letter GNRO-2013/00069 Dated 9/23/13 (← links)
- GNRO-2015/00031, Response to Request for Additional Information Regarding Fluence License Amendment Request (← links)
- GNRO-2015/00024, Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specification Task Force TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month (← links)
- GNRO-2015/00028, Submittal of 2014 Annual Radioactive Effluent Release Report (← links)
- GNRO-2015/00027, Submittal of 2014 Annual Radiological Environmental Operating Report (AREOR) (← links)
- GNRO-2015/00023, Response to Request for Additional Information Response on Safety Limit Minimum Critical Power Ratio Technical Specification 2.1.1.2 Revision (← links)
- GNRO-2015/00021, Follow-up Response to U.S. Nuclear Regulatory Commission Letter, Updated Fluence Methodology License Amendment Request Unacceptable with Opportunity to Supplement, Dated February 18, 2015, to Provide. (← links)
- GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density (← links)
- GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 (← links)
- GNRO-2015/00012, Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information (← links)
- GNRO-2015/00013, Revision to Letter GNRO-2015/00013 to Change License Condition Number 48 to 49 and to License Condition 48 from Letter GNRO-2013/00012 (← links)
- GNRO-2015/00018, Spent Fuel Storage Radioactive Effluent Release Report for 2014 (← links)
- GNRO-2015/00004, Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- GNRO-2015/00011, Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method (← links)
- GNRO-2015/00005, Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Lnstrumentation (Order Number EA-12-051) (← links)
- GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/2014 (← links)
- GNRO-2014/00088, Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 (← links)
- GNRO-2013/00065, Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065 (← links)
- GNRO-2014/00091, Revision to Technical Specification 5.6.5.b to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density (← links)
- GNRO-2014/00090, Correction to Typographical Error in Entergy Letter GNRO-2014/00053 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using Consolidated Line Item Improvement. (← links)
- GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month (← links)
- GNRO-2014/00083, Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request (← links)
- GNRO-2014/00087, Transmittal of Page 16f (← links)
- GNRO-2014/00086, Revision 72 to Emergency Plan (← links)
- GNRO-2014/00082, Supplemental Reload Licensing Report (SRLR) Grand Gulf Cycle 20 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Analysis Plus (Mellla+) SRLR (← links)
- GNRO-2014/00068, License Amendment Request to Revise Technical Specification 2.1.1.2 (← links)
- GNRO-2014/00084, Clarification of Entergy'S Commitment to the Guidance Contained in NUMARC 93-01 Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants (← links)
- GNRO-2014/00079, Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186) (← links)
- GNRO-2014/00076, Response to Request for Additional (RAI) Set 51 Dated September 11, 2014 (← links)
- GNRO-2014/00074, License Renewal Application 2014 Annual Update (← links)
- GNRO-2014/00052, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/2014 (← links)
- GNRO-2014/00064, Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 (← links)
- GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) (← links)
- GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) (← links)
- GNRO-2014/00055, Entergy'S Third Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- GNRO-2014/00045, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 (← links)
- GNRO-2014/00051, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/2014 (← links)
- GNRO-2014/00054, Status Update on Grand Gulf Nuclear Station'S Commitment to Submit a License Amendment Request for the Adoption of TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints (← links)
- GNRO-2014/00050, Correction of Technical Specification Typographical Error (← links)
- GNRO-2014/00049, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package, Revision 11 (← links)
- GNRO-2014/00048, Correction of Technical Specification Typographical Error (← links)
- GNRO-2014/00046, Revision to Reply to Notice of Violation EA-13-058 (← links)
- GNRO-2014/00043, Inservice Inspection Summary Report (← links)
- GNRO-2014/00042, Response to Request for Additional Information (RAI) for License Amendment Request, Cyber Security Implementation Schedule (← links)
- GNRO-2014/00030, Response to Request for Additional Information (RAI) Dated January 2, 2014 (← links)