GNRO-2014/00087, Transmittal of Page 16f

From kanterella
Jump to navigation Jump to search
Transmittal of Page 16f
ML14345A117
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/11/2014
From: Nadeau J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2014/00087
Download: ML14345A117 (4)


Text

~

~Entergy Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel. (601) 437-2103 GNRO-2014/00087 December 11,2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Transmittal of Page 16f of the Grand Gulf Nuclear Station Unit 1 Facility Operating License Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCES:

1. Letter: Grand Gulf Nuclear Station Unit 1, Application for Technical Specification Changes; Technical Specification Task Force (TSTF)

Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specification End States (GNRO-2013/00065)

(ML13316B024)

Dear Sir or Madam:

Entergy Operations Inc. (Entergy) is submitting as requested per telecom with the NRC Project Manager, Page 16f of the Grand Gulf Nuclear Station (GGNS) Unit 1 Facility Operating License.

This page is being submitted in support of the NRC's approval of GGNS' application for technical specification changes to support the adoption of TSTF-423, Technical Specification End States (Reference 1).

This letter contains no new commitments. If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.

Sincerely, JJN/ram

Attachment:

Page 16f of the Grand Gulf Nuclear Station (GGNS) Unit 1 Facility Operating License cc: (Next page)

GNRO-2014/00087 Page 2 of 2 cc: with Attachment U.S. Nuclear Regulatory Commission ATTN: Mr. A. Wang, NRRlDORL Mail Stop OWFN/8 G14 11555 Rockville Pike Rockville, MD 20852-2378 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Marc L. Dapas (w/2)

Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

Attachment to GNRO-2014/00087 Page 16f of the Grand Gulf Nuclear Station (GGNS) Unit 1 Facility Operating License

(h) This license condition shall expire upon satisfaction of the requirements in paragraph (f) provided that a visual inspection of the steam dryer does not reveal any new unacceptable flaw or unacceptable flaw growth that is caused by fatigue.

(47) Commitments made as required by standard TSTF safety evaluation, as discussed in the notice of availability, will be maintained as described in UFSAR Section 16, Technical Specifications. This condition applies to the following TSTFs as approved.

TSTF-423 Changes to the commitments can be made in accordance with 10FR50.59.

D. The facility required exemptions from certain requirements of Appendices A and J to 10 CFR Part 50 and from certain requirements of 10 CFR Part 100. These include: (a) exemPtion from General Design Criterion 17 of Appendix A until startup following the first refueling outage, for (1) the emergency override of the test mode for the Division 3 diesel engine, (2) the second level undervoltage protection for the Division 3 diesel engine, and (3) the generator ground over current trip function for the Division 1 and 2 diesel generators (Section 8.3.1 of SSER #7) and (b) exemption from the requirements of Paragraph III.D.2(b) (ii) of Appendix J for the containment airlock testing following normal door opening when containment integrity is not required (Section 6.2.6 of SSER #7). These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. In addition, by exemption dated December 20, 1986, the Commission exempted licensees from 10 CFR 100.11(a) (1), insofar as it incorporates the definition of ekclusion area in 10 CFR 100.3(a),

until April 30, 1987 regarding demonstration of authority to control all activities within the exclusion area (safety evaluation accompanying Amendment No. 27 to License (NPF-29). This exemption is authorized by law, and will not present an undue risk to the public health and safety, and is consistent with the common defense and security. In addition, special circumstances have been found justifying the exemption. Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12. with the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act and the rules and regulations of the Commission.

E. The licensee shall fully implement and maintain in effect all provision of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security, Safeguards Contingency and Training and Qualification Plan," and were submitted to the NRC on May 18, 2006.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 192.

16f Amendment No. +W,++&, 186 .J.9.l-, -lW, _ _