Pages that link to "PNO-III-89-055, on 890817,security Guard Arrested for Robbery.Guard Site Access Badge Terminated on 890817 After Plant Police Notified Licensee of Planned Interview of Suspect Re Robberies"
Jump to navigation
Jump to search
The following pages link to PNO-III-89-055, on 890817,security Guard Arrested for Robbery.Guard Site Access Badge Terminated on 890817 After Plant Police Notified Licensee of Planned Interview of Suspect Re Robberies:
Displayed 16 items.
- ML20236J732 (← links)
- ML20236J727 (← links)
- ML20236J715 (← links)
- PNO-III-87-129, on 871002,facility Shut Down to Repair Packing Leaks on Both Pressurizer Spray Valves.Cause of Packing Leaks Not Stated.Valve Repairs Now Completed & Repair of Position Indicator on One Valve Underway (← links)
- ML20216K153 (← links)
- PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes (← links)
- PNO-III-89-033A, on 890508 & 09,gaseous Release Occurred from Coolant Vol Control Sys Mixed Bed Demineralizer 1A Through Floor Drains to Auxiliary Bldg Vent Stack.Region III Monitoring Licensee Investigation (← links)
- PNO-III-89-033, on 890308,high Radiation Alarm Received When Vent & Drain Valves of Coolant Vol Control Sys 1A Mixed Bed Demineralizer Opened.Caused by Use of Erroneous Stack Flow Rate.New Calculations Determined Release Rate within Limits (← links)
- PNO-III-87-061, on 870425,generator Shutdown to Reduce Frame Vibrations & Repair Hydrogen Leak Into Stator Water Cooling Sys.Inspectors Monitoring Licensee Activities.Reactor Will Be Kept Critical to Support Generator Balance Runs (← links)
- PNO-III-86-098, on 860911,small Unplanned Release of Radioactive Noble Gas Detected in Auxiliary Bldg & Control Room.Caused by Malfunctioning Level Indicator on Spent Resin Storage Tank.Gas Cleared by Ventilation Sys (← links)
- PNO-III-87-018, on 870130,telegram Addressed to HR Denton Received Carrying Final Warning That Zion Nuclear Plant Shall Be Closed, Unless Info Made Available.Responsible Individual Located by FBI & Agreed to Psychiatric Treatment (← links)
- PNO-I-86-038, on 860515,current Contract W/Local Unions Will Expire & Strike of Operators,Maint Personnel & Clerical Staff May Occur.Unions Recommend Rejection of Util Proposal. Plant Shut Down Since 860412 Containment Isolation Occurred (← links)
- PNO-III-97-010B, on 970221,plant Containment Spray Pump Found to Be Inoperable During Routine Testing.On 970307,AIT Held Exit Meeting W/Licensee.Ait Concluded That Significant Deficiencies in Oversight of Control Room Found (← links)
- PNO-III-97-010A, on 970221,AIT Dispatched to Zion Station to Review Improper Control Rod Movement Occurred,During Reactor Shutdown.Licensee Also Formed Event Investigation Team Led by J Brons,Comm Ed Vice-President Nuclear Support (← links)
- PNO-III-80-063A, 800402,ltr from Mayor of Waukegan,Il, Demanded Actions as Result of 800331 Unplanned Gaseous Release.Region 3 Is Continuing Investigation & Evaluation (← links)
- PNO-III-80-063, on 800331,unplanned Gaseous Radiation Release Occurred Because of Operator Error in Operating Valves. Preliminary Analysis Indicates Release Rates Did Not Exceed Tech Spec Limits (← links)