| {{#Wiki_filter:0I PL.10 CFR 50.90L-2014-060 MAR 2 6 2014U. S. Nuclear Regulatory Commission Attn.: Document Control DeskWashington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4Docket Nos. 50-250 and 50-251Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action andSurveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems | | {{#Wiki_filter:0 I PL.10 CFR 50.90 L-2014-060 MAR 2 6 2014 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems |
|
| |
|
| ==References:== | | ==References:== |
|
| |
|
| (1) Florida Power & Light Company letter L-2012-368, "License Amendment Request No. 212Regarding Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems," | | (1) Florida Power & Light Company letter L-2012-368, "License Amendment Request No. 212 Regarding Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems," dated October 30, 2012.(2) Email from Audrey Klett, NRC Project Manager for Turkey Point Nuclear Plant, to Turkey Point Licensing Department, "Request for Additional Information (RAI) for Turkey Point LAR 212 (TACs MF0084 and MF0085)," dated November 7, 2013.In Reference 1, Florida Power & Light Company (FPL) applied for changes to the Technical Specifications (TS) contained in Appendix A to the Renewed Operating Licenses for Turkey Point Units 3 and 4, DPR-31 and DPR-41 respectively. |
| dated October 30, 2012.(2) Email from Audrey Klett, NRC Project Manager for Turkey Point Nuclear Plant, to TurkeyPoint Licensing Department, "Request for Additional Information (RAI) for Turkey PointLAR 212 (TACs MF0084 and MF0085)," | | The proposed changes concern Emergency Core Cooling Systems (ECCS) TS 3/4.5.2, ECCS Subsystems |
| dated November 7, 2013.In Reference 1, Florida Power & Light Company (FPL) applied for changes to the Technical Specifications (TS) contained in Appendix A to the Renewed Operating Licenses for Turkey PointUnits 3 and 4, DPR-31 and DPR-41 respectively. | | -Tayg Greater Than or Equal To 350'F and TS 3/4.8.1.1, Electrical Power Systems -A.C. Sources -Operating. |
| The proposed changes concern Emergency CoreCooling Systems (ECCS) TS 3/4.5.2, ECCS Subsystems | | FPL submitted the Reference I application to address nonconservative TS contained in TS 3/4.5.2. In addition, changes were proposed to TS 3/4.8.1.1 and TS 3/4.5.2 to address overlapping requirements for electrical power supply to the high head safety injection pumps. The NRC staff forwarded to FPL a Request for Additional Information (RAI) via Reference 2 regarding the FPL application. |
| -Tayg Greater Than or Equal To 350'F andTS 3/4.8.1.1, Electrical Power Systems -A.C. Sources -Operating. | | As a result of subsequent discussions with the NRC staff regarding the RAI and proposed TS changes, FPL is withdrawing the Reference 1 application to restructure the request and proposed changes. FPL will submit a revised application at a later date.In the interim, until the non-conservative TS are revised, compensatory administrative controls will remain in place.This letter contains no new commitments and no revisions to existing commitments. |
| FPL submitted the Reference I application to address nonconservative TS contained in TS 3/4.5.2. | | In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida. |
| Inaddition, changes were proposed to TS 3/4.8.1.1 and TS 3/4.5.2 to address overlapping requirements for electrical power supply to the high head safety injection pumps. The NRC staff forwarded to FPLa Request for Additional Information (RAI) via Reference 2 regarding the FPL application.
| | Florida Power & Light Company Page 2 of 2 Turkey Point Nuclear Plant L-2014-060 Withdrawal of License Amendment Request No. 212 Should you have any questions regarding this submission, please contact Mr. Robert J. Tomonto, Licensing Manager at 305-246-7327. |
| As aresult of subsequent discussions with the NRC staff regarding the RAI and proposed TS changes, FPLis withdrawing the Reference 1 application to restructure the request and proposed changes. | | Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health}} |
| FPL willsubmit a revised application at a later date.In the interim, until the non-conservative TS are revised, compensatory administrative controlswill remain in place.This letter contains no new commitments and no revisions to existing commitments. | |
| In accordance with 10 CFR 50.91(b)(1), | |
| a copy of this letter is being forwarded to the StateDesignee of Florida. | |
| Florida Power & Light Company Page 2 of 2Turkey Point Nuclear Plant L-2014-060 Withdrawal of License Amendment Request No. 212Should you have any questions regarding this submission, please contact Mr. Robert J. Tomonto,Licensing Manager at 305-246-7327. | |
| Very truly yours,Michael KileySite Vice President Turkey Point Nuclear Plantcc: USNRC Regional Administrator, Region IIUSNRC Project Manager, Turkey Point Nuclear PlantUSNRC Senior Resident Inspector, Turkey Point Nuclear PlantMs. Cindy Becker, Florida Department of Health}} | |
Letter Sequence Withdrawal |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARL-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 ML24087A1992024-04-0505 April 2024 Achp Section 106 Letter Re Notice of Availability of the Final Environmental Impact Statement for Turkey Point Units 3 & 4 Subsequent License Renewal Application ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point ML24087A2002024-04-0505 April 2024 Letter to Miami-Dade County Office of Historic Preservation Re Section 106 on Turkey Point Units 3 & 4 EIS ML24087A2012024-04-0505 April 2024 Letter to Talbert Cypress, Miccosukee Tribe of Indians of Florida; Re., Section 106 Letters for Turkey Point ML24072A2832024-04-0101 April 2024 Ltr to Dianne Strand-Notice of Avail.-Final Site-Specific Supp. 5a, 2nd Renewal to the GEIS for License Renewal L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda ML24073A1712024-03-26026 March 2024 Correction of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24064A1642024-03-11011 March 2024 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final ML24058A1182024-03-0101 March 2024 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 L-2024-014, Turkey Points, Units 3 and 4 - 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 Turkey Points, Units 3 and 4 - 2023 Annual Radioactive Effluent Release Report IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation ML24051A1442024-02-20020 February 2024 NRC Response to Turkey Point Appeal of Initial Disputed Item 05000250,251-2024-01 2024-08-05
[Table view] |
Text
0 I PL.10 CFR 50.90 L-2014-060 MAR 2 6 2014 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Withdrawal of License Amendment Request No. 212: Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems
References:
(1) Florida Power & Light Company letter L-2012-368, "License Amendment Request No. 212 Regarding Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems," dated October 30, 2012.(2) Email from Audrey Klett, NRC Project Manager for Turkey Point Nuclear Plant, to Turkey Point Licensing Department, "Request for Additional Information (RAI) for Turkey Point LAR 212 (TACs MF0084 and MF0085)," dated November 7, 2013.In Reference 1, Florida Power & Light Company (FPL) applied for changes to the Technical Specifications (TS) contained in Appendix A to the Renewed Operating Licenses for Turkey Point Units 3 and 4, DPR-31 and DPR-41 respectively.
The proposed changes concern Emergency Core Cooling Systems (ECCS) TS 3/4.5.2, ECCS Subsystems
-Tayg Greater Than or Equal To 350'F and TS 3/4.8.1.1, Electrical Power Systems -A.C. Sources -Operating.
FPL submitted the Reference I application to address nonconservative TS contained in TS 3/4.5.2. In addition, changes were proposed to TS 3/4.8.1.1 and TS 3/4.5.2 to address overlapping requirements for electrical power supply to the high head safety injection pumps. The NRC staff forwarded to FPL a Request for Additional Information (RAI) via Reference 2 regarding the FPL application.
As a result of subsequent discussions with the NRC staff regarding the RAI and proposed TS changes, FPL is withdrawing the Reference 1 application to restructure the request and proposed changes. FPL will submit a revised application at a later date.In the interim, until the non-conservative TS are revised, compensatory administrative controls will remain in place.This letter contains no new commitments and no revisions to existing commitments.
In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.
Florida Power & Light Company Page 2 of 2 Turkey Point Nuclear Plant L-2014-060 Withdrawal of License Amendment Request No. 212 Should you have any questions regarding this submission, please contact Mr. Robert J. Tomonto, Licensing Manager at 305-246-7327.
Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health