{{#Wiki_filter:Perry Nuclear Power PlantFE VO61 PO. Box 97F10 Center RoadFirstEnergy Nuclear Operating Company Perry Ohio 44081Ernest J. Harkness 440-280-5382 Vice President Fax: 440-280-8029 April 30, 2015, 2014L-15-143 1 OCFR50.36(a)
{{#Wiki_filter:Perry Nuclear Power Plant FE VO61 PO. Box 97 F10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Ernest J. Harkness 440-280-5382 Vice President Fax: 440-280-8029 April 30, 2015, 2014 L-15-143 1 OCFR50.36(a)
ATTN: Document Control DeskU. S. Nuclear Regulatory Commission Washington, DC 20555-0001
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power PlantDocket No. 50-440Annual Environmental and Effluent Release ReportEnclosed is the Annual Environmental and Effluent Release Report for the PerryNuclear Power Plant (PNPP) for the period of January 1, 2014 through December 31,2014. This document includes the radiological environmental operating report,radioactive effluent release report, and the non-radiological environmental operating report which satisfies the requirements of the PNPP Technical Specifications (TS), thePNPP Offsite Dose Calculation Manual (ODCM), and the Environmental Protection Plan, Appendix B of the PNPP Operating License.
Perry Nuclear Power Plant Docket No. 50-440 Annual Environmental and Effluent Release Report Enclosed is the Annual Environmental and Effluent Release Report for the Perry Nuclear Power Plant (PNPP) for the period of January 1, 2014 through December 31, 2014. This document includes the radiological environmental operating report, radioactive effluent release report, and the non-radiological environmental operating report which satisfies the requirements of the PNPP Technical Specifications (TS), the PNPP Offsite Dose Calculation Manual (ODCM), and the Environmental Protection Plan, Appendix B of the PNPP Operating License. Also included are the ODCM revisions 19 and 20 with revisions identified by PNPP Technical Specifications which corrects previous submittals that did not include annotated revisions.
Also included are the ODCMrevisions 19 and 20 with revisions identified by PNPP Technical Specifications whichcorrects previous submittals that did not include annotated revisions.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Nicola Conicella, Manager -Regulatory Compliance, at (440) 280-5415.Sincerely, Ernest J. Harkness  
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Nicola Conicella, Manager -Regulatory Compliance, at (440) 280-5415.
Sincerely, Ernest J. Harkness


==Enclosure:==
==Enclosure:==


PNPP 2014 Annual Environmental and Effluent Release Reportcc: NRC Project Manager Ao0cNRC Resident Inspector  
PNPP 2014 Annual Environmental and Effluent Release Report cc: NRC Project Manager Ao0c NRC Resident Inspector  
-4 eNRC Region III}}
-4 e NRC Region III}}

Revision as of 03:39, 9 July 2018

Perry - Annual Environmental and Effluent Release Report
ML15125A119
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/30/2015
From: Harkness E J
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15125A117 List:
References
L-15-143
Download: ML15125A119 (1)


Text

Perry Nuclear Power Plant FE VO61 PO. Box 97 F10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Ernest J. Harkness 440-280-5382 Vice President Fax: 440-280-8029 April 30, 2015, 2014 L-15-143 1 OCFR50.36(a)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440 Annual Environmental and Effluent Release Report Enclosed is the Annual Environmental and Effluent Release Report for the Perry Nuclear Power Plant (PNPP) for the period of January 1, 2014 through December 31, 2014. This document includes the radiological environmental operating report, radioactive effluent release report, and the non-radiological environmental operating report which satisfies the requirements of the PNPP Technical Specifications (TS), the PNPP Offsite Dose Calculation Manual (ODCM), and the Environmental Protection Plan, Appendix B of the PNPP Operating License. Also included are the ODCM revisions 19 and 20 with revisions identified by PNPP Technical Specifications which corrects previous submittals that did not include annotated revisions.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Nicola Conicella, Manager -Regulatory Compliance, at (440) 280-5415.Sincerely, Ernest J. Harkness

Enclosure:

PNPP 2014 Annual Environmental and Effluent Release Report cc: NRC Project Manager Ao0c NRC Resident Inspector

-4 e NRC Region III