{{#Wiki_filter:CATEGORYREGULATINFORMATION DISTRIBUTIO YSTEM(RIDS)ACCESSION NBR:9708250397 DOC.DATE:
{{#Wiki_filter:CATEGORY REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9708250397 DOC.DATE: 97/08/15 NOTARIZED:
97/08/15NOTARIZED:
NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIAT:ON PFITRER,B.
NODOCKETIFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIAT:ON PFITRER,B.
Washington Public Power Supply System BEMIS,P.R.
Washington PublicPowerSupplySystemBEMIS,P.R.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER97-008-00:on 970716,wire sealusedtolockcontainment instrument airpressurecontrolvalve,CIA-PCV-2B,found notintact.Causeofmisadjustment ofCIA-PCV-2B unknown.Eventwil'ecommunicar,ed toplaneemployees.W/970815 itr.DZSTRIBDTZON CODE:ZE22TCOPIESRECEIVED:LTR 1ENCL1SIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:RECIPIENT IDCODE/NAME PD4-2PDINTERNAL:
LER 97-008-00:on 970716,wire seal used to lock containment instrument air pressure control valve,CIA-PCV-2B,found not intact.Cause of misadjustment of CIA-PCV-2B unknown.Event wil'e communicar,ed to plane employees.W/970815 itr.DZSTRIBDTZON CODE: ZE22T COPIES RECEIVED:LTR 1 ENCL 1 SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POOREEW.NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD PD B FIGE CENTE EEI B NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN4 FILE 01 LITCO BRYCE,J H NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 N NOTE TO ALL"RIDS" RECIPIENTS:
ACRSAEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 WASHIi JGTON PUBLIC POWER SUPPLY SYSTEM'O.13ox 968~ltichlond, tt'isshiwgton 99352-0968 August 15, 1997 G02-97-157 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen:
LSTLOBBYWARDNOACPOOREEW.NRCPDRCOPIESLTTRENCL1111111111111111111'11111RECIPIENT IDCODE/NAME COLBURN,T AEODPDBFIGECENTEEEIBNRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN4FILE01LITCOBRYCE,JHNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL112211111111111111111111D0NNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LTTR25ENCL25 WASHIiJGTONPUBLICPOWERSUPPLYSYSTEM'O.13ox968~ltichlond, tt'isshiwgton 99352-0968 August15,1997G02-97-157 DocketNo.50-397DocumentControlDeskU.S.NuclearRegulatory Commission Washington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
NUCLIARPLANTWNP-2,OPERATING LICENSENPF-21,LICENSEEE&~2lTREPORTNO.97-008-00 Transmitted herewithisLicenseeEventReportNo.97-008-00 forWNP-2.Thisreportissubmitted pursuantto10CFR50.73anddiscusses theitemsofreportability, corrective action-taken,andactiontoprecluderecurrence.
NUCLIAR PLANT WNP-2, OPERATING LICENSE NPF-21, LICENSEE E&~2lT REPORT NO.97-008-00 Transmitted herewith is Licensee Event Report No.97-008-00 for WNP-2.This report is submitted pursuant to 10 CFR 50.73 and discusses the items of reportability, corrective action-taken, and action to preclude recurrence.
Shouldyouhaveanyquestions ordesireadditional information regarding thismatter,pleasecallmeorMr.PaulInserraat(509)377-4147.
Should you have any questions or desire additional information regarding this matter, please call me or Mr.Paul Inserra at (509)377-4147.R tfully,~~s Vice President, Nuclear Operations Mail Drop PE23 Enclosure cc: EW Merschoff, NRC RIV KE Perkins, Jr., NRC RIV, WCFO TG Colburn, NRR PD Robinson, Winston&Strawn NRC Sr.Resident Inspector, MD927N (2)INPO Records Center-Atlanta, GA DL Williams, BPA, MD399 9708250397 9708i5 PDR ADOCK 0500OS'P7 S PDR llllllllllllllllllllllllllillllllllll LICE SEE EVENT REPORT LER FACILITY NAME{1)Washin ton Nuclear Plant-Unit 2 DOCKET NUMBER (2)50-397 PAGE (3)1OF3 TITLE{4)INOPERABILITY OF FOUR AUTOMATIC DEPRESSURIZATION SYSTEM VALVES DUE TO CIA-PCV-2B PRESSURE SETPOINT DISCOVERED SET LESS THAN REQUIRED EVENT DATE{5)OAY 07 16 97 97 LER NUMBER{61 SEOUENRAL NUMBER REPORT DATE{71 REV.NUMBER 00 08 OAY YEAR FACILffY NAME 15 97 F AC)L)TY NAME N/A DOCKET NUMBER DOCKET NUMBER 05000 OTHER FACILITIES INVOLVED IBI OPERATING MODE THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OP 10 CPR 5: (Check one or motel Ill)90%20.402{b)20.405(a)(1)
Rtfully,~~sVicePresident, NuclearOperations MailDropPE23Enclosure cc:EWMerschoff, NRCRIVKEPerkins,Jr.,NRCRIV,WCFOTGColburn,NRRPDRobinson, Winston&StrawnNRCSr.ResidentInspector, MD927N(2)INPORecordsCenter-Atlanta,GADLWilliams, BPA,MD3999708250397 9708i5PDRADOCK0500OS'P7 SPDRllllllllllllllllllllllllllillllllllll LICESEEEVENTREPORTLERFACILITYNAME{1)WashintonNuclearPlant-Unit2DOCKETNUMBER(2)50-397PAGE(3)1OF3TITLE{4)INOPERABILITY OFFOURAUTOMATIC DEPRESSURIZATION SYSTEMVALVESDUETOCIA-PCV-2B PRESSURESETPOINTDISCOVERED SETLESSTHANREQUIREDEVENTDATE{5)OAY07169797LERNUMBER{61SEOUENRAL NUMBERREPORTDATE{71REV.NUMBER0008OAYYEARFACILffYNAME1597FAC)L)TYNAMEN/ADOCKETNUMBERDOCKETNUMBER05000OTHERFACILITIES INVOLVEDIBIOPERATING MODETHISREPORTISSUBMITTED PURSUANTTOTHEREQUIREMENTS OP10CPR5:(CheckoneormotelIll)90%20.402{b)20.405(a)(1)
Q 20.405(a)(1)(ii)20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v)
Q20.405(a)
X 20.405(c)$0.36(c)(1)$036(c)(2)50 73(a){2){))50.73(a)(2)(ii) 50.73(a)(2)(iii)50.73{a)(2)
(1)(ii)20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v)
{iv)50.73(a)(2)(v) 50.73(a)(2)(vii)50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B)50.73(a)(2)(x) 73.71{b).73.71(c)OTHER NAME Bill Pfitzer, Licensing Engineer LICENSEE CONTACT FOR THIS LER{12)TELEPHONE NUMBER{Include Area Code)509-377-2419 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT M))I)FAcTT)RER REPORTABLE TO NPROS CAUS F SYSTEM COMPONENT MANUFACTURER REPORTABLE TO NPRDS SUPPLEMENTAL REPORT EXPECTED (14)YES corn Ieted EXPECTED SUBMISSION DAT NO EXPECTED MONTH DAY YEAR ABSTRACT: On July 16, 1997, with the plant operating at 90%power, the wire seal used to lock containment instrument air pressure control valve, CIA-PCV-2B, was found not intact.This valve controls backup nitrogen pressure (actuating medium)to the four subsystem B automatic depressurization system (ADS)valves.Subsequent maintenance troubleshooting activities revealed the setpoint for CIA-PCV-2B was set to approximately 63 psig, well below the intended setpoint of 180+/-2 psig.Security and Operations have conducted an investigation into this event.It was determined that this valve was set to its required setpoint during CIA system startup following system maintenance during the last outage.No clear evidence of tampering was found since that time, and the cause of the misadjustment of CIA-PCV-2B is unknown.As a corrective action, the setpoint for CIA-PCV-2B has been readjusted to 180+/-2 psig and a new locking wire seal was installed.
X20.405(c)
This condition is reported per 10 CFR 50.73(a)(2)(ii) as a condition prohibited by Technical Specifications.
$0.36(c)(1)$036(c)(2)5073(a){2){))50.73(a)(2)(ii) 50.73(a)(2)
Due to the redundant design features of ADS, both the long term and short term functions of ADS would have been accomplished during the period when CIA-PCV-2B was misadjusted.
(iii)50.73{a)(2)
Therefore, the safety significance of this event is minimal.
{iv)50.73(a)(2)(v) 50.73(a)(2)(vii)50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)
fACILITY NAME Il)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION DOCKET NUMBER (2)YEAR LER NUMBER I6)SEQUENTIAL NUMBER REVr S 10M WNBSA PAGE (3)Washington Nuclear Plant-Unit 2 50-397 97 008 00 2 OF 3 TEXT (If more space is required, Use additional copies of NRC Form 366A)(17)Event De cri tion On July 16, 1997, with the plant operating at 90%power, the wire seal used to lock containment instrument air[LD]pressure control valve[PCV], CIA-PCV-2B, was found not intact.This valve controls backup nitrogen pressure (actuating medium)to the four B subsystem ADS valves.Subsequent maintenance troubleshooting activities revealed the setpoint for CIA-PCV-2B was set to approximately 63 psig, well below the intended setpoint of 180+/-2 psig.This regulating valve was set to its required setpoint during CIA system startup following system maintenance during the last outage.Reactor startup from the last refueling outage occurred on July 4, 1997.CIA nitrogen bottles supply the backup actuating medium to the ADS valves via CIA-PCV-2B.
(B)50.73(a)(2)(x) 73.71{b).73.71(c)OTHERNAMEBillPfitzer,Licensing EngineerLICENSEECONTACTFORTHISLER{12)TELEPHONE NUMBER{IncludeAreaCode)509-377-2419 COMPLETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED INTHISREPORT(13)CAUSESYSTEMCOMPONENT M))I)FAcTT)RER REPORTABLE TONPROSCAUSFSYSTEMCOMPONENT MANUFACTURER REPORTABLE TONPRDSSUPPLEMENTAL REPORTEXPECTED(14)YEScornIetedEXPECTEDSUBMISSION DATNOEXPECTEDMONTHDAYYEARABSTRACT:
Throughout the event, including the maintenance activities to reset CIA-PCV-2B, all seven ADS valves were supplied by the containment nitrogen system (CN)[LK]which supplies the normal actuating medium to the ADS valves.Immedia e orrective Action On July 18, 1997, the CIA supply to ADS subsystem B was isolated in preparation for verifying the setpoint of CIA-PCV-2B, and accordingly entry was made into Technical Specification Action Statement (TSAS)3.5.1.G.The setpoint for CIA-PCV-2B was found to be 63 psig and was readjusted to 180+/-2 psig and a new locking wire seal was installed.
OnJuly16,1997,withtheplantoperating at90%power,thewiresealusedtolockcontainment instrument airpressurecontrolvalve,CIA-PCV-2B, wasfoundnotintact.Thisvalvecontrolsbackupnitrogenpressure(actuating medium)tothefoursubsystem Bautomatic depressurization system(ADS)valves.Subsequent maintenance troubleshooting activities revealedthesetpointforCIA-PCV-2B wassettoapproximately 63psig,wellbelowtheintendedsetpointof180+/-2psig.SecurityandOperations haveconducted aninvestigation intothisevent.Itwasdetermined thatthisvalvewassettoitsrequiredsetpointduringCIAsystemstartupfollowing systemmaintenance duringthelastoutage.Noclearevidenceoftampering wasfoundsincethattime,andthecauseofthemisadjustment ofCIA-PCV-2B isunknown.Asacorrective action,thesetpointforCIA-PCV-2B hasbeenreadjusted to180+/-2psigandanewlockingwiresealwasinstalled.
After restoration of the CIA supply, TSAS 3.5.1.G was exited.F r her Evaluati n The normal ADS valve actuating medium is supplied by the CN system.If CN pressure to the ADS valves falls to less than 160 psig, the CN supply is automatically isolated, and CIA-PCV-2A and-2B function to regulate backup nitrogen to ADS subsystems A and B from pressurized bottles in the CIA system.Of these two supplies, the CIA bottles (the backup supply)is a safety related system, and the CN system (the normal supply)is not safety related.Thus, the CIA supply must be operable to support ADS operability.
Thiscondition isreportedper10CFR50.73(a)(2)(ii) asacondition prohibited byTechnical Specifications.
Therefore, this event rendered the four ADS valves in the B subsystem inoperable.
Duetotheredundant designfeaturesofADS,boththelongtermandshorttermfunctions ofADSwouldhavebeenaccomplished duringtheperiodwhenCIA-PCV-2B wasmisadjusted.
Immediately after discovery of the broken wire seal it was not recognized that the valve setpoint may have been changed, or that ADS operability had been affected.The setpoint of CIA-PCV-2B was not verified until approximately two days after discovery of the broken wire seal when necessary work documents were developed and approved.For purpose of this report, it is assumed that CIA-PCV-2B was misadjusted from the time of discovery of the broken wire seal to the time the valve was readjusted to the required value of 180 psig, a period of approximately 52 hours.TSAS 3.5.1.G requires the plant to be placed in Mode 3 within 12 hours when two or more ADS valves are inoperable.
Therefore, thesafetysignificance ofthiseventisminimal.
Therefore, this condition is reported per 10 CFR 50.73(a)(2)(ii) as a condition prohibited by Technical Specifications.  
fACILITYNAMEIl)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION DOCKETNUMBER(2)YEARLERNUMBERI6)SEQUENTIAL NUMBERREVrS10MWNBSAPAGE(3)Washington NuclearPlant-Unit250-39797008002OF3TEXT(Ifmorespaceisrequired, Useadditional copiesofNRCForm366A)(17)EventDecritionOnJuly16,1997,withtheplantoperating at90%power,thewiresealusedtolockcontainment instrument air[LD]pressurecontrolvalve[PCV],CIA-PCV-2B, wasfoundnotintact.Thisvalvecontrolsbackupnitrogenpressure(actuating medium)tothefourBsubsystem ADSvalves.Subsequent maintenance troubleshooting activities revealedthesetpointforCIA-PCV-2B wassettoapproximately 63psig,wellbelowtheintendedsetpointof180+/-2psig.Thisregulating valvewassettoitsrequiredsetpointduringCIAsystemstartupfollowing systemmaintenance duringthelastoutage.Reactorstartupfromthelastrefueling outageoccurredonJuly4,1997.CIAnitrogenbottlessupplythebackupactuating mediumtotheADSvalvesviaCIA-PCV-2B.
Throughout theevent,including themaintenance activities toresetCIA-PCV-2B, allsevenADSvalvesweresuppliedbythecontainment nitrogensystem(CN)[LK]whichsuppliesthenormalactuating mediumtotheADSvalves.Immediaeorrective ActionOnJuly18,1997,theCIAsupplytoADSsubsystem Bwasisolatedinpreparation forverifying thesetpointofCIA-PCV-2B, andaccordingly entrywasmadeintoTechnical Specification ActionStatement (TSAS)3.5.1.G.ThesetpointforCIA-PCV-2B wasfoundtobe63psigandwasreadjusted to180+/-2psigandanewlockingwiresealwasinstalled.
Afterrestoration oftheCIAsupply,TSAS3.5.1.Gwasexited.FrherEvaluatinThenormalADSvalveactuating mediumissuppliedbytheCNsystem.IfCNpressuretotheADSvalvesfallstolessthan160psig,theCNsupplyisautomatically
: isolated, andCIA-PCV-2A and-2BfunctiontoregulatebackupnitrogentoADSsubsystems AandBfrompressurized bottlesintheCIAsystem.Ofthesetwosupplies, theCIAbottles(thebackupsupply)isasafetyrelatedsystem,andtheCNsystem(thenormalsupply)isnotsafetyrelated.Thus,theCIAsupplymustbeoperabletosupportADSoperability.
Therefore, thiseventrenderedthefourADSvalvesintheBsubsystem inoperable.
Immediately afterdiscovery ofthebrokenwiresealitwasnotrecognized thatthevalvesetpointmayhavebeenchanged,orthatADSoperability hadbeenaffected.
ThesetpointofCIA-PCV-2B wasnotverifieduntilapproximately twodaysafterdiscovery ofthebrokenwiresealwhennecessary workdocuments weredeveloped andapproved.
Forpurposeofthisreport,itisassumedthatCIA-PCV-2B wasmisadjusted fromthetimeofdiscovery ofthebrokenwiresealtothetimethevalvewasreadjusted totherequiredvalueof180psig,aperiodofapproximately 52hours.TSAS3.5.1.GrequirestheplanttobeplacedinMode3within12hourswhentwoormoreADSvalvesareinoperable.
Therefore, thiscondition isreportedper10CFR50.73(a)(2)(ii) asacondition prohibited byTechnical Specifications.  


fACILITYNAMEII)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION DOCKETNUMBERI2)YEARLERNUMBERI6)SEQUENTIAL NUNBERAsslISINt NUttBERPAGEI3)Washington NuclearPlant-Unit250-39797"003OF3TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)~RootCausSecurityandOperations haveconducted aninvestigation intothisevent.Itwasrevealedthatthisregulating valvewassettoitsrequiredsetpointduringCIAsystemstartupduringthelastoutage.Noclearevidenceoftampering sincethattimewasfound,andthecauseofthemisadjustment ofCIA-PCV-2B isunknown.FrtherrreciveAcionInformation concerning thiseventwillbecommunicated toplantemployees.
fACILITY NAME II)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION DOCKET NUMBER I2)YEAR LER NUMBER I6)SEQUENTIAL NUNBER AsslISINt NUttBER PAGE I 3)Washington Nuclear Plant-Unit 2 50-397 97"00 3 OF 3 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)~Root Caus Security and Operations have conducted an investigation into this event.It was revealed that this regulating valve was set to its required setpoint during CIA system startup during the last outage.No clear evidence of tampering since that time was found, and the cause of the misadjustment of CIA-PCV-2B is unknown.F rther rrec ive Ac ion Information concerning this event will be communicated to plant employees.
Guidancewillbeaddedtoplantprocedure(s) tospecifythatifthereisreasontosuspectaplantcomponent isimproperly configured, promptcorrective actionwillbetakentoverifytheproperconfiguration.
Guidance will be added to plant procedure(s) to specify that if there is reason to suspect a plant component is improperly configured, prompt corrective action will be taken to verify the proper configuration.
AemnffetnsuencesTheshorttermfunctionoftheADSsystemistoprovidepost-LOCA vesseldepressurization capability topermituseofthelowpressureemergency corecoolingsystem(ECCS)spray/injection subsystems forvesselinjection.
A e m n f fet ns uences The short term function of the ADS system is to provide post-LOCA vessel depressurization capability to permit use of the low pressure emergency core cooling system (ECCS)spray/injection subsystems for vessel injection.
Thisfunctionwasunaffected byCIA-PCV-2B beingmisadjusted becauseallsevenADSvalvesweresuppliedthroughout theeventbythenormalnitrogensupplyprovidedbytheCNsystem,andeachADSvalveisprovidedwithapressureaccumulator which,ifthenitrogensupplyweretofail,wouldsupporttheshorttermfunctionofADSbyproviding pressureforapproximately fivevalveoperations.
This function was unaffected by CIA-PCV-2B being misadjusted because all seven ADS valves were supplied throughout the event by the normal nitrogen supply provided by the CN system, and each ADS valve is provided with a pressure accumulator which, if the nitrogen supply were to fail, would support the short term function of ADS by providing pressure for approximately five valve operations.
ThelongtermfunctionoftheADSsystemistosupplyaflowpathforalternate shutdowncooling.ThiswouldJsobesupported bythenormalCNsupplytotheADSvalves.But,iftheCNsupplyweretofail,nitrogenleakagefromtheADSvalveactuators andassociated pipingmaybesuchthatpressureintheaccumulators wouldbeinsufficient toholdtheADSvalvesopenforthelongperiodsnecessary tosupportthealternate shutdowncoolingflowpath.Inthecaseofthisevent,theresultofaCNfailurewouldbethatthefourBsystemADSvalveswouldbeunavailable forthelongtermfunctionofalternate shutdowncooling,andonlythethreeAsubsystem ADSvalveswouldbeavailable toprovideanalternate shutdowncoolingflowpath.However,analysisshowsthatonlytwoADSvalvesarerequiredtoprovideaflowpathforalternate shutdowncooling.Therefore, thelongtermfunctionofADScouldbeaccomplished withthethreevalvesintheAsubsystem ofADS.Perthisanalysis, boththelongtermandshorttermfunctions ofADSwouldhavebeenaccomplished duringtheperiodwhenCIA-PCV-2B wassetto63psig.Therefore, thesafetysignificance ofthiseventisminimal.SimilarEventNone
The long term function of the ADS system is to supply a flow path for alternate shutdown cooling.This would Jso be supported by the normal CN supply to the ADS valves.But, if the CN supply were to fail, nitrogen leakage from the ADS valve actuators and associated piping may be such that pressure in the accumulators would be insufficient to hold the ADS valves open for the long periods necessary to support the alternate shutdown cooling flow path.In the case of this event, the result of a CN failure would be that the four B system ADS valves would be unavailable for the long term function of alternate shutdown cooling, and only the three A subsystem ADS valves would be available to provide an alternate shutdown cooling flow path.However, analysis shows that only two ADS valves are required to provide a flow path for alternate shutdown cooling.Therefore, the long term function of ADS could be accomplished with the three valves in the A subsystem of ADS.Per this analysis, both the long term and short term functions of ADS would have been accomplished during the period when CIA-PCV-2B was set to 63 psig.Therefore, the safety significance of this event is minimal.Similar Event None
~0}}
~0}}

Revision as of 12:04, 6 July 2018

LER 97-008-00:on 970716,wire Seal Used to Lock Containment Instrument Air Pressure Control valve,CIA-PCV-2B,found Not Intact.Cause of Misadjustment of CIA-PCV-2B Unknown.Event Will Be Communicated to Plant employees.W/970815 Ltr
ML17292B029
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/15/1997
From: BEMIS P R, PFITZER B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-157, LER-97-008, LER-97-8, NUDOCS 9708250397
Download: ML17292B029 (7)


Text

CATEGORY REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9708250397 DOC.DATE: 97/08/15 NOTARIZED:

NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIAT:ON PFITRER,B.

Washington Public Power Supply System BEMIS,P.R.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 97-008-00:on 970716,wire seal used to lock containment instrument air pressure control valve,CIA-PCV-2B,found not intact.Cause of misadjustment of CIA-PCV-2B unknown.Event wil'e communicar,ed to plane employees.W/970815 itr.DZSTRIBDTZON CODE: ZE22T COPIES RECEIVED:LTR 1 ENCL 1 SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POOREEW.NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD PD B FIGE CENTE EEI B NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN4 FILE 01 LITCO BRYCE,J H NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 WASHIi JGTON PUBLIC POWER SUPPLY SYSTEM'O.13ox 968~ltichlond, tt'isshiwgton 99352-0968 August 15, 1997 G02-97-157 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen:

Subject:

NUCLIAR PLANT WNP-2, OPERATING LICENSE NPF-21, LICENSEE E&~2lT REPORT NO.97-008-00 Transmitted herewith is Licensee Event Report No.97-008-00 for WNP-2.This report is submitted pursuant to 10 CFR 50.73 and discusses the items of reportability, corrective action-taken, and action to preclude recurrence.

Should you have any questions or desire additional information regarding this matter, please call me or Mr.Paul Inserra at (509)377-4147.R tfully,~~s Vice President, Nuclear Operations Mail Drop PE23 Enclosure cc: EW Merschoff, NRC RIV KE Perkins, Jr., NRC RIV, WCFO TG Colburn, NRR PD Robinson, Winston&Strawn NRC Sr.Resident Inspector, MD927N (2)INPO Records Center-Atlanta, GA DL Williams, BPA, MD399 9708250397 9708i5 PDR ADOCK 0500OS'P7 S PDR llllllllllllllllllllllllllillllllllll LICE SEE EVENT REPORT LER FACILITY NAME{1)Washin ton Nuclear Plant-Unit 2 DOCKET NUMBER (2)50-397 PAGE (3)1OF3 TITLE{4)INOPERABILITY OF FOUR AUTOMATIC DEPRESSURIZATION SYSTEM VALVES DUE TO CIA-PCV-2B PRESSURE SETPOINT DISCOVERED SET LESS THAN REQUIRED EVENT DATE{5)OAY 07 16 97 97 LER NUMBER{61 SEOUENRAL NUMBER REPORT DATE{71 REV.NUMBER 00 08 OAY YEAR FACILffY NAME 15 97 F AC)L)TY NAME N/A DOCKET NUMBER DOCKET NUMBER 05000 OTHER FACILITIES INVOLVED IBI OPERATING MODE THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OP 10 CPR 5: (Check one or motel Ill)90%20.402{b)20.405(a)(1)

Q 20.405(a)(1)(ii)20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v)

X 20.405(c)$0.36(c)(1)$036(c)(2)50 73(a){2){))50.73(a)(2)(ii) 50.73(a)(2)(iii)50.73{a)(2)

{iv)50.73(a)(2)(v) 50.73(a)(2)(vii)50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B)50.73(a)(2)(x) 73.71{b).73.71(c)OTHER NAME Bill Pfitzer, Licensing Engineer LICENSEE CONTACT FOR THIS LER{12)TELEPHONE NUMBER{Include Area Code)509-377-2419 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT M))I)FAcTT)RER REPORTABLE TO NPROS CAUS F SYSTEM COMPONENT MANUFACTURER REPORTABLE TO NPRDS SUPPLEMENTAL REPORT EXPECTED (14)YES corn Ieted EXPECTED SUBMISSION DAT NO EXPECTED MONTH DAY YEAR ABSTRACT: On July 16, 1997, with the plant operating at 90%power, the wire seal used to lock containment instrument air pressure control valve, CIA-PCV-2B, was found not intact.This valve controls backup nitrogen pressure (actuating medium)to the four subsystem B automatic depressurization system (ADS)valves.Subsequent maintenance troubleshooting activities revealed the setpoint for CIA-PCV-2B was set to approximately 63 psig, well below the intended setpoint of 180+/-2 psig.Security and Operations have conducted an investigation into this event.It was determined that this valve was set to its required setpoint during CIA system startup following system maintenance during the last outage.No clear evidence of tampering was found since that time, and the cause of the misadjustment of CIA-PCV-2B is unknown.As a corrective action, the setpoint for CIA-PCV-2B has been readjusted to 180+/-2 psig and a new locking wire seal was installed.

This condition is reported per 10 CFR 50.73(a)(2)(ii) as a condition prohibited by Technical Specifications.

Due to the redundant design features of ADS, both the long term and short term functions of ADS would have been accomplished during the period when CIA-PCV-2B was misadjusted.

Therefore, the safety significance of this event is minimal.

fACILITY NAME Il)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION DOCKET NUMBER (2)YEAR LER NUMBER I6)SEQUENTIAL NUMBER REVr S 10M WNBSA PAGE (3)Washington Nuclear Plant-Unit 2 50-397 97 008 00 2 OF 3 TEXT (If more space is required, Use additional copies of NRC Form 366A)(17)Event De cri tion On July 16, 1997, with the plant operating at 90%power, the wire seal used to lock containment instrument air[LD]pressure control valve[PCV], CIA-PCV-2B, was found not intact.This valve controls backup nitrogen pressure (actuating medium)to the four B subsystem ADS valves.Subsequent maintenance troubleshooting activities revealed the setpoint for CIA-PCV-2B was set to approximately 63 psig, well below the intended setpoint of 180+/-2 psig.This regulating valve was set to its required setpoint during CIA system startup following system maintenance during the last outage.Reactor startup from the last refueling outage occurred on July 4, 1997.CIA nitrogen bottles supply the backup actuating medium to the ADS valves via CIA-PCV-2B.

Throughout the event, including the maintenance activities to reset CIA-PCV-2B, all seven ADS valves were supplied by the containment nitrogen system (CN)[LK]which supplies the normal actuating medium to the ADS valves.Immedia e orrective Action On July 18, 1997, the CIA supply to ADS subsystem B was isolated in preparation for verifying the setpoint of CIA-PCV-2B, and accordingly entry was made into Technical Specification Action Statement (TSAS)3.5.1.G.The setpoint for CIA-PCV-2B was found to be 63 psig and was readjusted to 180+/-2 psig and a new locking wire seal was installed.

After restoration of the CIA supply, TSAS 3.5.1.G was exited.F r her Evaluati n The normal ADS valve actuating medium is supplied by the CN system.If CN pressure to the ADS valves falls to less than 160 psig, the CN supply is automatically isolated, and CIA-PCV-2A and-2B function to regulate backup nitrogen to ADS subsystems A and B from pressurized bottles in the CIA system.Of these two supplies, the CIA bottles (the backup supply)is a safety related system, and the CN system (the normal supply)is not safety related.Thus, the CIA supply must be operable to support ADS operability.

Therefore, this event rendered the four ADS valves in the B subsystem inoperable.

Immediately after discovery of the broken wire seal it was not recognized that the valve setpoint may have been changed, or that ADS operability had been affected.The setpoint of CIA-PCV-2B was not verified until approximately two days after discovery of the broken wire seal when necessary work documents were developed and approved.For purpose of this report, it is assumed that CIA-PCV-2B was misadjusted from the time of discovery of the broken wire seal to the time the valve was readjusted to the required value of 180 psig, a period of approximately 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br />.TSAS 3.5.1.G requires the plant to be placed in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when two or more ADS valves are inoperable.

Therefore, this condition is reported per 10 CFR 50.73(a)(2)(ii) as a condition prohibited by Technical Specifications.

fACILITY NAME II)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION DOCKET NUMBER I2)YEAR LER NUMBER I6)SEQUENTIAL NUNBER AsslISINt NUttBER PAGE I 3)Washington Nuclear Plant-Unit 2 50-397 97"00 3 OF 3 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)~Root Caus Security and Operations have conducted an investigation into this event.It was revealed that this regulating valve was set to its required setpoint during CIA system startup during the last outage.No clear evidence of tampering since that time was found, and the cause of the misadjustment of CIA-PCV-2B is unknown.F rther rrec ive Ac ion Information concerning this event will be communicated to plant employees.

Guidance will be added to plant procedure(s) to specify that if there is reason to suspect a plant component is improperly configured, prompt corrective action will be taken to verify the proper configuration.

A e m n f fet ns uences The short term function of the ADS system is to provide post-LOCA vessel depressurization capability to permit use of the low pressure emergency core cooling system (ECCS)spray/injection subsystems for vessel injection.

This function was unaffected by CIA-PCV-2B being misadjusted because all seven ADS valves were supplied throughout the event by the normal nitrogen supply provided by the CN system, and each ADS valve is provided with a pressure accumulator which, if the nitrogen supply were to fail, would support the short term function of ADS by providing pressure for approximately five valve operations.

The long term function of the ADS system is to supply a flow path for alternate shutdown cooling.This would Jso be supported by the normal CN supply to the ADS valves.But, if the CN supply were to fail, nitrogen leakage from the ADS valve actuators and associated piping may be such that pressure in the accumulators would be insufficient to hold the ADS valves open for the long periods necessary to support the alternate shutdown cooling flow path.In the case of this event, the result of a CN failure would be that the four B system ADS valves would be unavailable for the long term function of alternate shutdown cooling, and only the three A subsystem ADS valves would be available to provide an alternate shutdown cooling flow path.However, analysis shows that only two ADS valves are required to provide a flow path for alternate shutdown cooling.Therefore, the long term function of ADS could be accomplished with the three valves in the A subsystem of ADS.Per this analysis, both the long term and short term functions of ADS would have been accomplished during the period when CIA-PCV-2B was set to 63 psig.Therefore, the safety significance of this event is minimal.Similar Event None

~0