| | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs |
| | page count = 17 | | | page count = 17 |
| | project = TAC:MF2872, TAC:MF2871, TAC:MF2873 | | | project = TAC:MF2871, TAC:MF2872, TAC:MF2873 |
| | stage = Meeting | | | stage = Meeting |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:PaloVerdeNuclearGeneratingStation'sPalo Verde Nuclear Generating Stations Proposed Change to the Quality AssuranceProgramAssurance ProgramPre-Submittal Conference to NRCDate: 11/05/20131 Purposeupose*Present and discuss with the NRC planned Quality AssuranceProgramchangesAssurance Program changes.-ModifyPVNGScommitmenttoRegulatoryGuide133Modify PVNGS commitment to Regulatory Guide 1.33, Revision 2, to adopt Regulatory Guide 1.28, Revision 4, (NQA 2008 with 2009 Addenda) and NEI 11-04A in lieu of ANSIN1871976ANSI N18.7-1976.2 TopicsWhtWADiopcs*What We Are Doing *Why NEI 11-04A and NQA-1yQ*Overview of NRC Regulatory Guides*Outline of Submittal PackageVariousMatrices-Various Matrices *Proposed Schedule*Summary and Discussion3 What We Are Doing*Designated as a Projectateeoggj*CompleterewriteconsistentwiththeformatandComplete rewrite consistent with the format and content of NEI 11-04A*Consolidating other UFSAR sections that describe QA and administrative requirements into UFSAR Section q13.1 and 17.2*Adopting Regulatory Guide 1.28, Rev 4 (NQA 2008 with 2009 Addenda) as the basis for the QA Program4 Why These Standards?yeseStadads*They represent the latest NRC-accepted guidance forcontentofQAProgramsfor content of QA Programs*Theyrepresent40yearsofadvancementin*They represent 40 years of advancement in Nuclear QA Standards5 Overview of NRC Regulatory Guides*Current Commitments to be maintained OeeoCeguatoyGudes-Regulatory Guide 1.8 / ANS 3.1-1978, Personnel Selection and Training-Regulatory Guide 1.26, Revision 1-1974, Quality Group Classifications and Standards for Water, Steam, And Radioactive -Waste-Containing Componentsgp-Regulatory Guide 1.29, Revision 3 -1978, Seismic Design Classifications -Regulatory Guide 1.54, Revision 0 -1973, Quality Assurance Requirements for Protective Coatings Applied to Water-CooledNclearPoerPlantsCooled Nuclear Power Plants-Regulatory Guide 1.94, Revision 1 -1976 -Civil / Structural Design(SteelandConcreteconstruction)Design (Steel and Concrete construction)6 Overview of NRC Regulatory Guides*PVNGSdoesnotintendtoadoptOeeoCeguatoyGudes*PVNGS does not intend to adopt Regulatory Guide 1.33, Revision 3, which endorsesANS322012endorses ANS 3.2-2012-Regulatory Guide 1.33, Revision 3, was gy,,issued June 2013 [just after NRC endorsement of NEI 11-04A]-The change would require a Technical SpecificationchangeSpecification change.7 Outline of PVNGS Submittal Package*CoverLetterOuteoGSSubttaacageCover Letter*Revised PVNGS Quality Assurance Program DitiDescription*NEI 11-04A Deviation Matrix*QA Regulatory Guide Comparison Matrix*Matrix identifying perceived Increases and Decreases in regulatory commitments 8 Revised QAPD Overview*OverviewesedQOee*Overview-Consolidates PVNGS QAPD into PVNGS UFSAR sections 13.1 and 17.2-AddressesQArequirementsof10CFR71Addresses QA requirements of 10 CFR 71, Subpart H and 10 CFR 72, Subpart G.IltdtdQAlt-Implements an updated QA regulatory structure based on Reg. Guide 1.28, Revision 4andNEI11-04A4 and NEI 11-04A9 NEI 11-04A Deviation Matrix*OrganizedusingNEI11-04Atemplatesections0eatoatOrganized using NEI 11-04A template sections which emulate 10 CFR 50, Appendix B, 18 Criteria plus additional operational phase pppadministrative controls*Identifies existing PVNGS UFSAR sections and new UFSAR sections describing similar requirements*IdentifiesdeviationsfromNEI1104Atemplate*Identifies deviations from NEI 11-04A template content and the basis for the deviation10 NEI 11-04 Deviation Matrix -Sample0eatoatSapeThis sample shows a deviation from NEI 11-04 regarding scope. 10CFR71, SubpartHand10CFR7211Subpart H, and 10CFR72, Subpart G are considered in scope of the PVNGS QAP. | | {{#Wiki_filter:PaloVerdeNuclearGeneratingStation |
| Regulatory Guide Commitment Change Matrixgyg*Identifies existing PVNGS Regulatory Guide commitmentsandrelatedindustrystandardscommitments and related industry standards adopted *Identifies proposed Regulatory Guide commitments, industry standards to be adopted, coes,dusysadadsobeadoped,and the basis 12 Regulatory Guide Commitment Change Matrix -SamplegygpThis sample shows PVNGS will maintain existing commitmentstoRegulatory13commitments to Regulatory Guide 1.26. | | 'sPalo Verde Nuclear Generating Stations Proposed Change to the Quality AssuranceProgram Assurance ProgramPre-Submittal Conference to NRCDate: 11/05/2013 1 |
| Increases and Decreases in Commitment*Matrix showing perceived Increases and DecreasesincommitmentasaresultofadoptingDecreases in commitment as a result of adopting NEI 11-04A and NQA 2008 with 2009 Addenda-Identifies current QAPD section, new QAPD section, differences, our classification (N, I, or R) and basis for acceptabilityacceptability14 Sample of Increase and Reduction in Commitment Matrix:ReductionMatrix: ReductionThis sample shows a reduction in commitment relatedtoNuclearAssuranceDepartmentrelated to Nuclear Assurance Department concurrence of lowering classification of systems, structures, and components.15 Proposed Schedule for submittal*Completionofsubmittaldevelopmentinternalp*Completion of submittal development, internal review, and approval in first quarter of 2014*Submittal to NRC is expected by April 2014*Due to the extent of changes requested, PVNGS willrequestimplementationperiodof180dayswill request implementation period of 180 days from the date of NRC approval16 Summary and Discussion*CompleterewriteofthePVQualityAssurancey*Complete rewrite of the PV Quality Assurance Program.*Adopting Regulatory Guide 1.28, Revision 4, (NQA 2008 with 2009 Addenda) and NEI 11-04A04A*NoplantoadoptlatestrevisionofRG1.33No plan to adopt latest revision of RG 1.33*Plan to submit for approval 2ndQrt. 2014*PV will implement 180 days from NRC approval17 | | Purposeupose*Present and discuss with the NRC planned Quality AssuranceProgramchanges Assurance Program changes.-ModifyPVNGScommitmenttoRegulatoryGuide133 Modify PVNGS commitment to Regulatory Guide 1.33, Revision 2, to adopt Regulatory Guide 1.28, Revision 4, (NQA-1-2008 with 2009 Addenda) and NEI 11-04A in lieu of ANSIN1871976ANSI N18.7-1976.2 TopicsWhtWADiopcs*What We Are Doing *Why NEI 11-04A and N QA-1yQ*Overview of NRC Regulatory Guides*Outline of Submittal PackageVariousMatrices |
| }} | | -Various Matrices *Proposed Schedule*Summary and Discussion 3 |
| | What We Are Doing*Designated as a Pro jectateeoggj*Completerewriteconsistentwiththeformatand Complete rewrite consistent with the format and content of NEI 11-04A |
| | *Consolidating other UFSAR sections that describe QA |
| | |
| | and administrative re quirements into UFSAR Section q13.1 and 17.2 |
| | *Adopting Regulatory Guide 1.28, Rev 4 (NQA-1-2008 with 2009 Addenda) as the basis for the QA Program 4 |
| | Why These Standards?yeseStadads |
| | *They represent the latest NRC-accepted guidance forcontentofQAPrograms for content of QA Programs*Theyrepresent40yearsofadvancementin |
| | *They represent 40 years of advancement in Nuclear QA Standards 5 |
| | Overview of NRC Regulatory Guides*Current Commitments to be maintained OeeoCeguatoyGudes |
| | -Regulatory Guide 1.8 / ANS 3.1-1978, Personnel Selection and Training |
| | -Regulatory Guide 1.26, Revision 1-1974, Quality Group Classifications and Standards for Water, Steam, And |
| | |
| | Radioactive |
| | -Waste-Containin g Componentsgp-Regulatory Guide 1.29, Revision 3 -1978, Seismic Design Classifications |
| | -Regulatory Guide 1.54, Revision 0 -1973, Quality Assurance Requirements for Protective Coatings Applied to Water-CooledNclearPoerPlants Cooled Nuclear Power Plants-Regulatory Guide 1.94, Revision 1 -1976 -Civil / Structural Design(SteelandConcreteconstruction) |
| | Design (Steel and Concrete construction) 6 Overview of NRC Regulatory Guides*PVNGSdoesnotintendtoadoptOeeoCeguatoyGudes |
| | *PVNGS does not intend to adopt Regulatory Guide 1.33, Revision 3, which endorsesANS32 2012endorses ANS 3.2-2012-Regulatory Guide 1.33 |
| | , Revision 3 |
| | , was gy,,issued June 2013 [just after NRC endorsement of NEI 11-04A] |
| | -The change would require a Technical Specificationchange Specification change.7 Outline of PVNGS Submittal Package*CoverLetterOuteoGSSubttaacage Cover Letter*Revised PVNGS Quality Assurance Program DitiDescription*NEI 11-04A Deviation Matrix |
| | *QA Regulatory Guide Comparison Matrix |
| | *Matrix identifying perceived Increases and Decreases in regulatory commitments 8 |
| | Revised QAPD Overview*OverviewesedQOee*Overview-Consolidates PVNGS QAPD into PVNGS UFSAR sections 13.1 and 17.2 |
| | -AddressesQArequirementsof10CFR71 Addresses QA requirements of 10 CFR 71, Subpart H and 10 CFR 72, Subpart G.IltdtdQAlt |
| | -Implements an updated QA regulatory structure based on Reg. Guide 1.28, Revision 4andNEI11 |
| | -04A4 and NEI 11-04A9 NEI 11-04A Deviation Matrix*OrganizedusingNEI11 |
| | -04Atemplatesections0eatoatOrganized using NEI 11-04A template sections which emulate 10 CFR 50, Appendix B, 18 |
| | |
| | Criteria plus additional o perational phase pppadministrative controls |
| | *Identifies existing PVNGS UFSAR sections and |
| | |
| | new UFSAR sections describing similar requirements |
| | *IdentifiesdeviationsfromNEI1104Atemplate |
| | *Identifies deviations from NEI 11-04A template content and the basis for the deviation 10 NEI 11-04 Deviation Matrix -Sample0eatoatSapeThis sample shows a deviation from NEI 11-04 |
| | |
| | regarding scope. 10CFR71, SubpartHand10CFR72 11Subpart H, and 10CFR72, Subpart G are considered in scope of the PVNGS QAP. |
| | Regulatory Guide Commitment Chan ge Matrixgyg*Identifies existing PVNGS Regulatory Guide commitmentsandrelatedindustrystandards commitments and related industry standards adopted *Identifies proposed Regulatory Guide commitments, industry standards to be adopted, coes,dusysadadsobeadoped, and the basis 12 Regulatory Guide Commitment Chan ge Matrix -Sam plegygpThis sample shows PVNGS will maintain existing commitmentstoRegulatory 13commitments to Regulatory Guide 1.26. |
| | Increases and Decreases in Commitment |
| | *Matrix showing perceived Increases and Decreasesincommitmentasaresultofadopting Decreases in commitment as a result of adopting NEI 11-04A and NQA-1-2008 with 2009 Addenda |
| | -Identifies current QAPD section, new QAPD section, differences, our classification (N, I, or R) and basis for acceptability acceptability 14 Sample of Increase and Reduction in Commitment Matrix:Reduction Matrix: ReductionThis sample shows a reduction in commitment relatedtoNuclearAssuranceDepartment related to Nuclear Assurance Department concurrence of lowering classification of systems, structures, and components. |
| | 15 Proposed Schedule for submittal |
| | *Completionofsubmittaldevelopmentinternal p*Completion of submittal development |
| | , internal review, and approval in first quarter of 2014 |
| | *Submittal to NRC is expected by April 2014 |
| | *Due to the extent of changes requested, PVNGS willrequestimplementationperiodof180days will request implementation period of 180 days from the date of NRC approval 16 Summary and Discussion |
| | *CompleterewriteofthePVQualityAssurance y*Complete rewrite of the PV Quality Assurance Program.*Adopting Regulatory Guide 1.28, Revision 4, |
| | |
| | (NQA-1-2008 with 2009 Addenda) and NEI 11-04A04A*NoplantoadoptlatestrevisionofRG1.33 No plan to adopt latest revision of RG 1.33*Plan to submit for approval 2 ndQrt. 2014 |
| | *PV will implement 180 days from NRC approval 17}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage Project stage: Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Project stage: Meeting ML13312A5402013-11-18018 November 2013 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 Project stage: Meeting 2013-11-18
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23296A0162023-10-20020 October 2023 October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22312A5952022-11-0808 November 2022 Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2021 ML22299A1812022-10-26026 October 2022 Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21165A1832021-06-14014 June 2021 RR-67 6-16-21 Pre-Submittal Public Meeting Presentation Slides ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21130A6462021-05-13013 May 2021 Pre-Submittal Meeting with NRC on May 13, 2021 Application for Transfer of Minority Interests in Palo Verde Nuclear Generating Station, Units 1 and 2 Subject to Expiring Leases ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML21011A2752021-01-0606 January 2021 License Amendment Request (LAR) to Revise Containment Leakage Rate Testing Program Frequencies - NRC Pre-Submittal Meeting, January 6, 2021 (Presentation Slides) ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19060A2982019-03-0101 March 2019 Transmittal of Audit Presentation Slides Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome CE16HTP Fuel ML17003A0762017-01-10010 January 2017 Regulatory Audit Report for the November 2-3, 2016, Audit at the Westinghouse Facility in Rockville, MD, for the License Amendment and Exemption Requests Associated with Next Generation Fuel (CAC Nos. MF8076-MF8081) ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13197A0952013-07-11011 July 2013 7/11/13 Meeting Slides - Implementation of STAR Program and Replacement of the 2/3 Cycle Mtc Measurement 2024-02-07
[Table view] |
Text
PaloVerdeNuclearGeneratingStation
'sPalo Verde Nuclear Generating Stations Proposed Change to the Quality AssuranceProgram Assurance ProgramPre-Submittal Conference to NRCDate: 11/05/2013 1
Purposeupose*Present and discuss with the NRC planned Quality AssuranceProgramchanges Assurance Program changes.-ModifyPVNGScommitmenttoRegulatoryGuide133 Modify PVNGS commitment to Regulatory Guide 1.33, Revision 2, to adopt Regulatory Guide 1.28, Revision 4, (NQA-1-2008 with 2009 Addenda) and NEI 11-04A in lieu of ANSIN1871976ANSI N18.7-1976.2 TopicsWhtWADiopcs*What We Are Doing *Why NEI 11-04A and N QA-1yQ*Overview of NRC Regulatory Guides*Outline of Submittal PackageVariousMatrices
-Various Matrices *Proposed Schedule*Summary and Discussion 3
What We Are Doing*Designated as a Pro jectateeoggj*Completerewriteconsistentwiththeformatand Complete rewrite consistent with the format and content of NEI 11-04A
- Consolidating other UFSAR sections that describe QA
and administrative re quirements into UFSAR Section q13.1 and 17.2
Why These Standards?yeseStadads
- They represent the latest NRC-accepted guidance forcontentofQAPrograms for content of QA Programs*Theyrepresent40yearsofadvancementin
- They represent 40 years of advancement in Nuclear QA Standards 5
Overview of NRC Regulatory Guides*Current Commitments to be maintained OeeoCeguatoyGudes
-Regulatory Guide 1.8 / ANS 3.1-1978, Personnel Selection and Training
-Regulatory Guide 1.26, Revision 1-1974, Quality Group Classifications and Standards for Water, Steam, And
Radioactive
-Waste-Containin g Componentsgp-Regulatory Guide 1.29, Revision 3 -1978, Seismic Design Classifications
-Regulatory Guide 1.54, Revision 0 -1973, Quality Assurance Requirements for Protective Coatings Applied to Water-CooledNclearPoerPlants Cooled Nuclear Power Plants-Regulatory Guide 1.94, Revision 1 -1976 -Civil / Structural Design(SteelandConcreteconstruction)
Design (Steel and Concrete construction) 6 Overview of NRC Regulatory Guides*PVNGSdoesnotintendtoadoptOeeoCeguatoyGudes
- PVNGS does not intend to adopt Regulatory Guide 1.33, Revision 3, which endorsesANS32 2012endorses ANS 3.2-2012-Regulatory Guide 1.33
, Revision 3
, was gy,,issued June 2013 [just after NRC endorsement of NEI 11-04A]
-The change would require a Technical Specificationchange Specification change.7 Outline of PVNGS Submittal Package*CoverLetterOuteoGSSubttaacage Cover Letter*Revised PVNGS Quality Assurance Program DitiDescription*NEI 11-04A Deviation Matrix
- QA Regulatory Guide Comparison Matrix
- Matrix identifying perceived Increases and Decreases in regulatory commitments 8
Revised QAPD Overview*OverviewesedQOee*Overview-Consolidates PVNGS QAPD into PVNGS UFSAR sections 13.1 and 17.2
-AddressesQArequirementsof10CFR71 Addresses QA requirements of 10 CFR 71, Subpart H and 10 CFR 72, Subpart G.IltdtdQAlt
-Implements an updated QA regulatory structure based on Reg. Guide 1.28, Revision 4andNEI11
-04A4 and NEI 11-04A9 NEI 11-04A Deviation Matrix*OrganizedusingNEI11
-04Atemplatesections0eatoatOrganized using NEI 11-04A template sections which emulate 10 CFR 50, Appendix B, 18
Criteria plus additional o perational phase pppadministrative controls
new UFSAR sections describing similar requirements
- IdentifiesdeviationsfromNEI1104Atemplate
- Identifies deviations from NEI 11-04A template content and the basis for the deviation 10 NEI 11-04 Deviation Matrix -Sample0eatoatSapeThis sample shows a deviation from NEI 11-04
regarding scope. 10CFR71, SubpartHand10CFR72 11Subpart H, and 10CFR72, Subpart G are considered in scope of the PVNGS QAP.
Regulatory Guide Commitment Chan ge Matrixgyg*Identifies existing PVNGS Regulatory Guide commitmentsandrelatedindustrystandards commitments and related industry standards adopted *Identifies proposed Regulatory Guide commitments, industry standards to be adopted, coes,dusysadadsobeadoped, and the basis 12 Regulatory Guide Commitment Chan ge Matrix -Sam plegygpThis sample shows PVNGS will maintain existing commitmentstoRegulatory 13commitments to Regulatory Guide 1.26.
Increases and Decreases in Commitment
- Matrix showing perceived Increases and Decreasesincommitmentasaresultofadopting Decreases in commitment as a result of adopting NEI 11-04A and NQA-1-2008 with 2009 Addenda
-Identifies current QAPD section, new QAPD section, differences, our classification (N, I, or R) and basis for acceptability acceptability 14 Sample of Increase and Reduction in Commitment Matrix:Reduction Matrix: ReductionThis sample shows a reduction in commitment relatedtoNuclearAssuranceDepartment related to Nuclear Assurance Department concurrence of lowering classification of systems, structures, and components.
15 Proposed Schedule for submittal
- Completionofsubmittaldevelopmentinternal p*Completion of submittal development
, internal review, and approval in first quarter of 2014
- Submittal to NRC is expected by April 2014
- Due to the extent of changes requested, PVNGS willrequestimplementationperiodof180days will request implementation period of 180 days from the date of NRC approval 16 Summary and Discussion
- CompleterewriteofthePVQualityAssurance y*Complete rewrite of the PV Quality Assurance Program.*Adopting Regulatory Guide 1.28, Revision 4,
(NQA-1-2008 with 2009 Addenda) and NEI 11-04A04A*NoplantoadoptlatestrevisionofRG1.33 No plan to adopt latest revision of RG 1.33*Plan to submit for approval 2 ndQrt. 2014
- PV will implement 180 days from NRC approval 17