ML13346A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:A ~DEPARTMENT OF MECHANICAL, Rensselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF-1 3-04December 3, 2013U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Re: Change in Level 2 personnel at RPI Reactor critical Facility:
License CX -22
==Dear Sir,==
This letter notifies you, in accordance with our Technical Specifications of license CX -22,change in Level 2 personnel (Director, Reactor Critical Facility).
Effective January 1, 2014Dr. Peter Caracappa is appointed as Director of Walthousen Reactor Critical
: Facility, by theDean, School of Engineering.
A copy of the letter of Appointment is attached herewith.
Effective January Ist 2014 Dr.Caracappa will replace Dr. Sreepada as the Director, Reactor Critical Facility.j.Prof Sastry R. SreepadaDirector, Walthousen Reactor Critical FacilityProfessor of Practice, Rensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180cc:Dr. Joe Chow,Dean of School of Engineering Dr. Suvranu De, Chairman, MANEDr. Yaron Danon, Chairman NSRBDr. Peter Caracappa, RPI, MANEMs. Annette Chism, Director EHSDr. George Xu, Head, Nuclear Engineering ProgramMr. Glenn Winters, Reactor Operations Supervisor Sgt. Marcie DelVecchio Ms. Leslie A NortonRensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering CenterPhone (518) 276-6351 1 Fax (518) 276-6025 1 email: mane@rpi.edu (I~A)1 SCHOOL OF ENGINEERING OFFICE OF THE DEANJune 10, 2013Dr. Peter Caracappa Department of Mechanical, Aerospace, andNuclear Engineering Rensselaer Polytechnic Institute Troy, NY 12180-3590
==Dear Dr. Caracappa:==
Based on the recommendation of Dr. Suvranu De, Head of the Department ofMechanical, Aerospace, and Nuclear Engineering, it is a pleasure to offer you anappointment as Director of the Reactor Critical
: Facility, part time, at Rensselaer Polytechnic Institute, effective January 1, 2014. There is no salary associated with thisresponsibility.
Your acceptance of this appointment should be made by signing the enclosed copy ofthis letter and returning to this office.I appreciate your willingness to serve in this capacity and stand ready to assist you inthis role.Sincerely, David V. Rosowsky, Ph.D., P.E., F.ASCEDean, School of Engineering ACCEPTED:
DATE: 2-11Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA I 3004 Jonsson Engineering CenterPhone (518) 276-6203 I Fax (518) 276-8788}}

Revision as of 11:59, 3 July 2018

Change Update in Level 2 Pesonnel at Rpi Reactor Critical Facility
ML13346A018
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 12/03/2013
From: Sreepada S R
Rensselaer Polytechnic Institute
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RCF-13-04
Download: ML13346A018 (2)


Text

A ~DEPARTMENT OF MECHANICAL, Rensselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF-1 3-04December 3, 2013U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555Re: Change in Level 2 personnel at RPI Reactor critical Facility:

License CX -22

Dear Sir,

This letter notifies you, in accordance with our Technical Specifications of license CX -22,change in Level 2 personnel (Director, Reactor Critical Facility).

Effective January 1, 2014Dr. Peter Caracappa is appointed as Director of Walthousen Reactor Critical

Facility, by theDean, School of Engineering.

A copy of the letter of Appointment is attached herewith.

Effective January Ist 2014 Dr.Caracappa will replace Dr. Sreepada as the Director, Reactor Critical Facility.j.Prof Sastry R. SreepadaDirector, Walthousen Reactor Critical FacilityProfessor of Practice, Rensselaer Polytechnic Institute, 110 8th Street, Troy NY 12180cc:Dr. Joe Chow,Dean of School of Engineering Dr. Suvranu De, Chairman, MANEDr. Yaron Danon, Chairman NSRBDr. Peter Caracappa, RPI, MANEMs. Annette Chism, Director EHSDr. George Xu, Head, Nuclear Engineering ProgramMr. Glenn Winters, Reactor Operations Supervisor Sgt. Marcie DelVecchio Ms. Leslie A NortonRensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 1 Jonsson Engineering CenterPhone (518) 276-6351 1 Fax (518) 276-6025 1 email: mane@rpi.edu (I~A)1 SCHOOL OF ENGINEERING OFFICE OF THE DEANJune 10, 2013Dr. Peter Caracappa Department of Mechanical, Aerospace, andNuclear Engineering Rensselaer Polytechnic Institute Troy, NY 12180-3590

Dear Dr. Caracappa:

Based on the recommendation of Dr. Suvranu De, Head of the Department ofMechanical, Aerospace, and Nuclear Engineering, it is a pleasure to offer you anappointment as Director of the Reactor Critical

Facility, part time, at Rensselaer Polytechnic Institute, effective January 1, 2014. There is no salary associated with thisresponsibility.

Your acceptance of this appointment should be made by signing the enclosed copy ofthis letter and returning to this office.I appreciate your willingness to serve in this capacity and stand ready to assist you inthis role.Sincerely, David V. Rosowsky, Ph.D., P.E., F.ASCEDean, School of Engineering ACCEPTED:

DATE: 2-11Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA I 3004 Jonsson Engineering CenterPhone (518) 276-6203 I Fax (518) 276-8788