|
|
Line 13: |
Line 13: |
| | page count = 1 | | | page count = 1 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:REED COLLEGE*.*L ..<. *.. ... .. ..... ..,. .January 30, 2014:...-....: |
| | ......... |
| | REACTOR FACILITY 7..- ...- ".,3203 Southeast a :Woodstock Boulevard U.S..Nuclear Regulatory Commission |
| | .. .ATTN: Document Control DeskPortland, Oregon Washington, D.C. 20555-0001 97202-8199 telepone RE: Reply to Notice ofV.iolation 503/777-7222 Docket No. 50-288License No. R- 112fax503/777-7274 emailreactor@reed.edu webhttp://reactor.reed.edu The. Notice sof Violation dated Jan 14, 2014 states that the following Technical Specifications (TS) were violated: |
| | *. TS 6.1.3, Staffing, which requires, in part, that the minimum staffing when thereactor is operating shall be a licensed reactor operator in the control room.* TS 1, .Definitions, which defines the reactor as operating whenever it is not shutdown or secured.1. The :licensee self-reported. |
| | this yiolation on Nov. 18, 2013 to the NRC Operations Center with a follow-up letter to the Document Control Desk dated Nov. 25, 2013. Aroot cause investigation was initiated as required by internal procedures. |
| | Thisinvestigation! |
| | indicated that distraction at the end of a reactor power run resulted in thekey being left in the console unattended. |
| | The control room was locked and no reactivity manipulations took place while the key was unattended. |
| | : 2. The corrective action taken to date is retraining. |
| | : 3. Over the years, Reed College has introduced actions designed to prevent this andsimilar events from occurring. |
| | These actions include: |
| | name tags, swinging doors,signage and lights interlocked with the key switch. Over time, these stimuli loose theireffectiveness. |
| | Although several engineered solutions have been discussed none of thesesolutions are fail-safe and still fall into the realm of audio and visual stimulus. |
| | However,a new key control system will also serve as a visual reminder to secure the console key.4. By August 29, 2014, a new key control system will be installed. |
| | Additionally, we willcontinue to evaluate Radio-frequency identification (RFID) and proximity systems forapplicability and compatibility. |
| | Respectfully, Melinda Krahenbuhl, Ph.D.Director, Reed Research ReactorpJ4&}} |
Revision as of 20:41, 2 July 2018
|
---|
Category:Letter
MONTHYEARML24282A7832024-09-18018 September 2024 Reed College, Submittal of 2023 Financial Assurance for Cost of Decommissioning Activities Self-Guarantee Agreement ML24257A1892024-09-13013 September 2024 Reed College, Submittal of Annual Report for the July 1, 2023 Through June 30, 2024 ML24197A0542024-07-23023 July 2024 Examination Confirmation Letter No. 50-288/OL-25-01, Reed College ML24052A2432024-06-0404 June 2024 Examination Result Letter No. 50-288 OL-24-02, Reed College ML24052A2412024-06-0404 June 2024 Examination Report Letter No. 50-288 OL-24-02, Reed College ML24052A2202024-05-0808 May 2024 Examination Report Letter No. 50-288/OL-24-01, Reed College ML24052A2212024-05-0808 May 2024 Examination Result Letter No. 50-288/OL-24-01, Reed College IR 05000288/20242012024-05-0606 May 2024 Reed College - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000288/2024201 ML24092A3502024-04-15015 April 2024 Reed College - Change of Facility Project Manager ML24018A0862024-02-0101 February 2024 Examination Confirmation Letter No. 50-288/Ol-24-02, Reed College ML24017A0312024-01-18018 January 2024 Reed College, Examination Confirmation Letter 50-288/Ol-24-01 ML23289A1562023-10-25025 October 2023 Reed College 2022 Financial Test for Self-Guarantee for Decommissioning Funding ML23263B1622023-09-20020 September 2023 Reed Research Reactor 2022-2023 Annual Report ML23163A0132023-07-18018 July 2023 Examination Result Letter No. 50-288/OL-23-03, Reed College ML23163A0122023-07-18018 July 2023 Examination Report Letter No. 50-288/OL-23-03, Reed College ML23165A2312023-06-14014 June 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance Update ML23139A1322023-05-16016 May 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance ML23053A2402023-03-0606 March 2023 Examination Confirmation Letter No. 50-288/OL-23-03, Reed College ML23024A1732023-02-27027 February 2023 Examination Confirmation Letter No. 50-288/OL-23-02, Reed College ML23020A9372023-01-20020 January 2023 Reed College, Letter Intended to Fulfill the 14-day Written Report Requirement of Technical Specification 6.7.2, Special Reports, Following Operation in Violation of Limiting Conditions of Operation ML22241A1382022-09-0606 September 2022 Us Nuclear Regulatory Commission Staff Review Re Reed College 2021 Financial Test for Self-Guarantee for Decommissioning Funding ML22230B8022022-08-18018 August 2022 Annual Report for Reed College (Docket 50-288, License No. R-112) for the Period July 1, 2021 Through June 30, 2022 ML22229A5632022-08-17017 August 2022 Reed Research Reactor 2021-2022 Annual Report ML22199A2932022-07-28028 July 2022 Examination Confirmation Letter No. 50-288. OL-23-01, Reed College IR 05000288/20222022022-06-15015 June 2022 Reed College - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000288/2022202 IR 05000288/20222012022-06-14014 June 2022 Cover Letter - Reed College Nuclear Regulatory Commission Inspection Report No. 05000288/2022201 (Public) ML22019A1022022-02-0707 February 2022 Examination Confirmation Letter No. 50-288/OL-22-02, Reed College ML21258A3962021-10-0404 October 2021 U. S. Nuclear Regulatory Commission Staff Review Re Reed College 2020 Financial Test for Self-Guarantee for Decommission Funding NRC Ltr Rrr 2020 Financial Self Guarantee Draft ML21242A2362021-09-0808 September 2021 Reed College Regarding U.S. Nuclear Regulatory Commission Staff Review and Approval of the Revised Reed Research Reactor Requalification Plan ML21224A2032021-08-16016 August 2021 Examination Confirmation Letter No. 50-288/OL-22-01, Reed College ML21216A4392021-08-0404 August 2021 Reed College - Reed Research Reactor, Annual Report, July 1, 2020 - June 30, 2021 ML21174A1942021-06-23023 June 2021 Revised Reed Research Reactor Requalification Plan in ML21202A1792021-06-0808 June 2021 Reed College - Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) ML21160A1792021-06-0808 June 2021 Reed College, Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) IR 05000288/20212012021-06-0303 June 2021 Reed College U.S. Nuclear Regulatory Commission Routine Safety Inspection Report 05000288/2021201 ML21028A0922021-01-27027 January 2021 Examination Confirmation Letter No. 50-288/OL-21-02, Reed College ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20304A3152020-10-28028 October 2020 Self-report of a Violation of Reed Research Reactor'S Requalification Plan ML21014A4372020-10-28028 October 2020 Reed College - Financial Assurance for Reed Institute Dba Reed College and Financial Statements for the Reed Institute June 30, 2020 and 2011 9 ML20290A6802020-10-27027 October 2020 U.S. Nuclear Regulatory Commission Staff Review Reed College 2019 Financial Assurance (Self-Guarantee)(EPID No. L-2019-LLL-0034 ML20266G5442020-09-21021 September 2020 Reed College - Change of Management Staff ML20265A3972020-09-21021 September 2020 Reed College - Response to Notice of Violation 05000288/2020201 ML20247J6032020-09-0303 September 2020 Examination Confirmation Letter No. 50-288/OL-21-001, Reed College IR 05000288/20202012020-09-0202 September 2020 Reed College - U.S. Nuclear Regulatory Commission Routine and Confirmatory Order Follow-Up Inspection Report No. 05000288/2020201 ML20216A6772020-08-0303 August 2020 Reed Research Reactor Annual Report July 1, 2019 -- June 30, 2020 (Rev. 1) ML20189A3002020-07-0808 July 2020 Completion of Required Actions Under Confirmatory Order EA-19-071 Related to U.S. Nuclear Regulatory Commission Investigation Reports 4-2016-022 and 4-2017-023 ML20175A8322020-06-23023 June 2020 Reed College - Change of Management Staff ML20162A1902020-06-10010 June 2020 Reed College - Actions Under Confirmatory Order EA-19-071 ML20136A4062020-04-27027 April 2020 Transmittal of Proposed Security Plan at Reed College ML20098F1312020-04-0202 April 2020 NRC Reed TR 20200402 Request for Rvw Officials Ellis and Sams 4.2.20 2024-09-18
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML20265A3972020-09-21021 September 2020 Reed College - Response to Notice of Violation 05000288/2020201 ML17139D3532017-05-0808 May 2017 Reed College, Request for Action Item from Reply to Notice of Violation Dated 01/26/2017 ML17030A4092017-01-26026 January 2017 Reed College - Reply to Notice of Violation ML14037A1062014-01-30030 January 2014 Reed College, Reply to Notice of Violation ML13032A0052013-01-30030 January 2013 Reed College - Reply to Notice of Violation 2020-09-21
[Table view] |
Text
REED COLLEGE*.*L ..<. *.. ... .. ..... ..,. .January 30, 2014:...-....:
.........
REACTOR FACILITY 7..- ...- ".,3203 Southeast a :Woodstock Boulevard U.S..Nuclear Regulatory Commission
.. .ATTN: Document Control DeskPortland, Oregon Washington, D.C. 20555-0001 97202-8199 telepone RE: Reply to Notice ofV.iolation 503/777-7222 Docket No. 50-288License No. R- 112fax503/777-7274 emailreactor@reed.edu webhttp://reactor.reed.edu The. Notice sof Violation dated Jan 14, 2014 states that the following Technical Specifications (TS) were violated:
- . TS 6.1.3, Staffing, which requires, in part, that the minimum staffing when thereactor is operating shall be a licensed reactor operator in the control room.* TS 1, .Definitions, which defines the reactor as operating whenever it is not shutdown or secured.1. The :licensee self-reported.
this yiolation on Nov. 18, 2013 to the NRC Operations Center with a follow-up letter to the Document Control Desk dated Nov. 25, 2013. Aroot cause investigation was initiated as required by internal procedures.
Thisinvestigation!
indicated that distraction at the end of a reactor power run resulted in thekey being left in the console unattended.
The control room was locked and no reactivity manipulations took place while the key was unattended.
- 2. The corrective action taken to date is retraining.
- 3. Over the years, Reed College has introduced actions designed to prevent this andsimilar events from occurring.
These actions include:
name tags, swinging doors,signage and lights interlocked with the key switch. Over time, these stimuli loose theireffectiveness.
Although several engineered solutions have been discussed none of thesesolutions are fail-safe and still fall into the realm of audio and visual stimulus.
However,a new key control system will also serve as a visual reminder to secure the console key.4. By August 29, 2014, a new key control system will be installed.
Additionally, we willcontinue to evaluate Radio-frequency identification (RFID) and proximity systems forapplicability and compatibility.
Respectfully, Melinda Krahenbuhl, Ph.D.Director, Reed Research ReactorpJ4&