{{#Wiki_filter:NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question# 23 Question: The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response: Assume the monitor has failed full scale. Question# 34 Question: I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response: No Response given, self answered by candidate. Question# 62 Question: Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, = 0 psig? Response: Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. Question # 63 Question: Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem) Response: Yes Question# 7 Question: Asked about the status of the other pressurizer heaters. Response: Reminded the candidate to assume all systems function as designed. Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question# 55 Question: Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated. Am I to assume that automatic CIB failed to actuate? Response: You have enough information to answer the question. Question# 94 Question: Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? Response: Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion) Question# 65 Question: Can you assume the transformer faults if doused with water? Response: Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner) Question # 37 Question: For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response: Assume NSA for the given power level. Question # 65 Question: Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment? Response: Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question# 7 SRO Question: PC-1 RC-445 is in Auto at 45% in the initial conditions. Am I understanding # 13 that after the 1st stage failure it stayed at 45% demand? Response: Yes, just as it is stated 1424 Question# 67 RO Question: Is this diamond symbol actually in the procedure? # R3 Response: Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I}} | {{#Wiki_filter:NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question# | ||
23 Question: | |||
The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response: | |||
Assume the monitor has failed full scale. Question# | |||
34 Question: | |||
I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response: | |||
No Response given, self answered by candidate. | |||
Question# | |||
62 Question: | |||
Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, | |||
= 0 psig? Response: | |||
Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. | |||
Question | |||
# 63 Question: | |||
Am I to determine the impact on TV-1CN-100 solely on the indications received? | |||
(in the question stem) Response: | |||
Yes Question# | |||
7 Question: | |||
Asked about the status of the other pressurizer heaters. | |||
Response: | |||
Reminded the candidate to assume all systems function as designed. | |||
Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question# | |||
55 Question: | |||
Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated. | |||
Am I to assume that automatic CIB failed to actuate? | |||
Response: | |||
You have enough information to answer the question. | |||
Question# | |||
94 Question: | |||
Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? | |||
Response: | |||
Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion) | |||
Question# | |||
65 Question: | |||
Can you assume the transformer faults if doused with water? Response: | |||
Assume there are no other failures of detection or plant equipment. | |||
(also informed other candidates, via white board of the status, per discussion with chief examiner) | |||
Question | |||
# 37 Question: | |||
For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response: | |||
Assume NSA for the given power level. Question | |||
# 65 Question: | |||
Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment? | |||
Response: | |||
Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question# | |||
7 SRO Question: | |||
PC-1 RC-445 is in Auto at 45% in the initial conditions. | |||
Am I understanding | |||
# 13 that after the 1st stage failure it stayed at 45% demand? Response: | |||
Yes, just as it is stated 1424 Question# | |||
67 RO Question: | |||
Is this diamond symbol actually in the procedure? | |||
# R3 Response: | |||
Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I}} |
Revision as of 06:35, 1 July 2018
ML15008A101 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 09/04/2014 |
From: | FirstEnergy Nuclear Operating Co |
To: | Brian Fuller Operations Branch I |
Shared Package | |
ML14058A120 | List: |
References | |
U01884 | |
Download: ML15008A101 (4) | |
Text
NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
23 Question:
The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response:
Assume the monitor has failed full scale. Question#
34 Question:
I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response:
No Response given, self answered by candidate.
Question#
62 Question:
Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure,
= 0 psig? Response:
Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure.
Question
- 63 Question:
Am I to determine the impact on TV-1CN-100 solely on the indications received?
(in the question stem) Response:
Yes Question#
7 Question:
Asked about the status of the other pressurizer heaters.
Response:
Reminded the candidate to assume all systems function as designed.
Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
55 Question:
Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.
Am I to assume that automatic CIB failed to actuate?
Response:
You have enough information to answer the question.
Question#
94 Question:
Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor?
Response:
Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)
Question#
65 Question:
Can you assume the transformer faults if doused with water? Response:
Assume there are no other failures of detection or plant equipment.
(also informed other candidates, via white board of the status, per discussion with chief examiner)
Question
- 37 Question:
For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:
Assume NSA for the given power level. Question
- 65 Question:
Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?
Response:
Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question#
7 SRO Question:
PC-1 RC-445 is in Auto at 45% in the initial conditions.
Am I understanding
- 13 that after the 1st stage failure it stayed at 45% demand? Response:
Yes, just as it is stated 1424 Question#
67 RO Question:
Is this diamond symbol actually in the procedure?
- R3 Response:
Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I