ML15133A125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:CONNECTICUT YANKEE ATOMIC POWER COMPANYHADDAM NECK PLANT362 INJUN HOLLOW ROAD
{{#Wiki_filter:CONNECTICUT YANKEE ATOMIC POWER COMPANYHADDAM NECK PLANT362 INJUN HOLLOW ROAD
* EAST HAMPTON, CT 06424-3099April 29, 2015CY- 15-02110 CFR 50.4 and 10 CFR 50.36a(a)(2)ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, DC 20555 -0001Connecticut Yankee Atomic Power CompanyHaddam Neck Plant Independent Spent Fuel Storage InstallationNRC License Nos. DPR-61 and SFGL-21 (NRC Docket Nos. 50-213 and 72-39)
* EAST HAMPTON, CT 06424-3099 April 29, 2015CY- 15-02110 CFR 50.4 and 10 CFR 50.36a(a)(2)
ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555 -0001Connecticut Yankee Atomic Power CompanyHaddam Neck Plant Independent Spent Fuel Storage Installation NRC License Nos. DPR-61 and SFGL-21 (NRC Docket Nos. 50-213 and 72-39)


==Subject:==
==Subject:==
Annual Radioactive Effluent Release Report, Annual Radiological EnvironmentalOperating Report, and Revisions to the Offsite Dose Calculation Manual for theHaddam Neck ISFSI for 201410 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic PowerCompany (CYAPCO) Quality Assurance Program (QAP) for the Haddam Neck IndependentSpent Fuel Storage Installation (ISFSI), and Section F.2 of the Off-Site Dose Calculation Manual(ODCM) for the Haddam Neck ISFSI require CYAPCO to submit an Annual RadioactiveEffluent Release Report. Enclosure 1 provides the report for the period of January 1 throughDecember 31, 2014.Section 2.3.1 of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI and Section F. 1of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual RadiologicalEnvironmental Operating Report. Enclosure 2 provides the report for the period of January 1through December 31, 2014.Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI requiresCYAPCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of orconcurrent with the annual Radioactive Effluent Release Report. Enclosures 3 and 4 provideRevisions 24 and 25 to the ODCM for the Haddam Neck ISFSI that were issued in calendar year2014. In addition, Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam NeckISFSI requires that a summary of each change to be submitted. A summary of the changes madein Revisions 24 and 25 to the ODCM for the Haddam Neck ISFSI is provided in Appendix C ofEnclosure 1.ADo L[A5Sz-AP Connecticut Yankee Atomic Power CompanyCY- 15-02 1/April 29, 2015/Page 2If you have any questions regarding this submittal, please do not hesitate to contact me at(860) 267-6426 ext. 303.Respectfully,Brantley B erger, P.E.ISFSI Man ger
 
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Revisions to the Offsite Dose Calculation Manual for theHaddam Neck ISFSI for 201410 CFR 50.36a(a)(2),
Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic PowerCompany (CYAPCO)
Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI),
and Section F.2 of the Off-Site Dose Calculation Manual(ODCM) for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 throughDecember 31, 2014.Section 2.3.1 of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI and Section F. 1of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1through December 31, 2014.Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI requiresCYAPCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of orconcurrent with the annual Radioactive Effluent Release Report. Enclosures 3 and 4 provideRevisions 24 and 25 to the ODCM for the Haddam Neck ISFSI that were issued in calendar year2014. In addition, Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam NeckISFSI requires that a summary of each change to be submitted.
A summary of the changes madein Revisions 24 and 25 to the ODCM for the Haddam Neck ISFSI is provided in Appendix C ofEnclosure 1.ADo L[A5Sz-AP Connecticut Yankee Atomic Power CompanyCY- 15-02 1/April 29, 2015/Page 2If you have any questions regarding this submittal, please do not hesitate to contact me at(860) 267-6426 ext. 303.Respectfully, Brantley B erger, P.E.ISFSI Man ger


==Enclosures:==
==Enclosures:==
: 1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive EffluentRelease Report, January -December 2014.2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological EnvironmentalOperating Report, January -December 2014.3. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 244. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 25cc: D. Dorman, NRC Region I AdministratorM. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1J. Goshen, NRC Project Manager, Haddam NeckJ. Semancik, Director, CT DEEP, Radiation Division}}
: 1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive EffluentRelease Report, January -December 2014.2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January -December 2014.3. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 244. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 25cc: D. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1J. Goshen, NRC Project Manager, Haddam NeckJ. Semancik,  
: Director, CT DEEP, Radiation Division}}

Revision as of 01:18, 1 July 2018

Haddam Neck ISFSI - Submittal of Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Revisions to the Offsite Dose Calculation Manual for 2014
ML15133A125
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/29/2015
From: Buerger B
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML15133A118 List:
References
CY-15-021
Download: ML15133A125 (2)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANYHADDAM NECK PLANT362 INJUN HOLLOW ROAD

ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555 -0001Connecticut Yankee Atomic Power CompanyHaddam Neck Plant Independent Spent Fuel Storage Installation NRC License Nos. DPR-61 and SFGL-21 (NRC Docket Nos. 50-213 and 72-39)

Subject:

Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Revisions to the Offsite Dose Calculation Manual for theHaddam Neck ISFSI for 201410 CFR 50.36a(a)(2),

Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic PowerCompany (CYAPCO)

Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI),

and Section F.2 of the Off-Site Dose Calculation Manual(ODCM) for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 throughDecember 31, 2014.Section 2.3.1 of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI and Section F. 1of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1through December 31, 2014.Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI requiresCYAPCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of orconcurrent with the annual Radioactive Effluent Release Report. Enclosures 3 and 4 provideRevisions 24 and 25 to the ODCM for the Haddam Neck ISFSI that were issued in calendar year2014. In addition, Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam NeckISFSI requires that a summary of each change to be submitted.

A summary of the changes madein Revisions 24 and 25 to the ODCM for the Haddam Neck ISFSI is provided in Appendix C ofEnclosure 1.ADo L[A5Sz-AP Connecticut Yankee Atomic Power CompanyCY- 15-02 1/April 29, 2015/Page 2If you have any questions regarding this submittal, please do not hesitate to contact me at(860) 267-6426 ext. 303.Respectfully, Brantley B erger, P.E.ISFSI Man ger

Enclosures:

1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive EffluentRelease Report, January -December 2014.2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January -December 2014.3. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 244. Offsite Dose Calculation Manual for the Haddam Neck ISFSI, Revision 25cc: D. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1J. Goshen, NRC Project Manager, Haddam NeckJ. Semancik,
Director, CT DEEP, Radiation Division