{{#Wiki_filter:Perry Nuclear Power PlantFE VO61 PO. Box 97F10 Center RoadFirstEnergy Nuclear Operating Company Perry Ohio 44081Ernest J. Harkness 440-280-5382Vice President Fax: 440-280-8029April 30, 2015, 2014L-15-143 1 OCFR50.36(a)ATTN: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001
==SUBJECT:==
Perry Nuclear Power PlantDocket No. 50-440Annual Environmental and Effluent Release ReportEnclosed is the Annual Environmental and Effluent Release Report for the PerryNuclear Power Plant (PNPP) for the period of January 1, 2014 through December 31,2014. This document includes the radiological environmental operating report,radioactive effluent release report, and the non-radiological environmental operatingreport which satisfies the requirements of the PNPP Technical Specifications (TS), thePNPP Offsite Dose Calculation Manual (ODCM), and the Environmental ProtectionPlan, Appendix B of the PNPP Operating License. Also included are the ODCMrevisions 19 and 20 with revisions identified by PNPP Technical Specifications whichcorrects previous submittals that did not include annotated revisions.There are no regulatory commitments contained in this letter. If there are any questionsor if additional information is required, please contact Mr. Nicola Conicella, Manager -Regulatory Compliance, at (440) 280-5415.Sincerely,Ernest J. Harkness
==Enclosure:==
PNPP 2014 Annual Environmental and Effluent Release Reportcc: NRC Project Manager Ao0cNRC Resident Inspector -4 eNRC Region III}}

Revision as of 22:36, 11 June 2018

Perry - Annual Environmental and Effluent Release Report
ML15125A119
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/30/2015
From: Harkness E J
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15125A117 List:
References
L-15-143
Download: ML15125A119 (1)


Text

Perry Nuclear Power PlantFE VO61 PO. Box 97F10 Center RoadFirstEnergy Nuclear Operating Company Perry Ohio 44081Ernest J. Harkness 440-280-5382Vice President Fax: 440-280-8029April 30, 2015, 2014L-15-143 1 OCFR50.36(a)ATTN: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001

SUBJECT:

Perry Nuclear Power PlantDocket No. 50-440Annual Environmental and Effluent Release ReportEnclosed is the Annual Environmental and Effluent Release Report for the PerryNuclear Power Plant (PNPP) for the period of January 1, 2014 through December 31,2014. This document includes the radiological environmental operating report,radioactive effluent release report, and the non-radiological environmental operatingreport which satisfies the requirements of the PNPP Technical Specifications (TS), thePNPP Offsite Dose Calculation Manual (ODCM), and the Environmental ProtectionPlan, Appendix B of the PNPP Operating License. Also included are the ODCMrevisions 19 and 20 with revisions identified by PNPP Technical Specifications whichcorrects previous submittals that did not include annotated revisions.There are no regulatory commitments contained in this letter. If there are any questionsor if additional information is required, please contact Mr. Nicola Conicella, Manager -Regulatory Compliance, at (440) 280-5415.Sincerely,Ernest J. Harkness

Enclosure:

PNPP 2014 Annual Environmental and Effluent Release Reportcc: NRC Project Manager Ao0cNRC Resident Inspector -4 eNRC Region III