IR 05000397/2009001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N rch 4, 2009
{{#Wiki_filter:March 4, 2009


==SUBJECT:==
==SUBJECT:==
Line 38: Line 38:
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Energy Northwest -2-If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8249 with any questions you may have regarding this letter or the inspection plan.
Energy Northwest-2-  
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8249 with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Sincerely,
/RA/
/RA/  
George D. Replogle, Chief Reactor Projects Branch A Division of Reactor Projects Docket: 50-397 License: NPF-21 Enclosure: Columbia Generating Station Inspection/Activity Plan cc w/Enclosure:   Lynn Albin Gregory Cullen   Department of Health Energy Northwest Regulatory Programs Office of Radiation Protection P.O. Box 968  P.O. Box 47827 Richland, WA 99352-0968  Olympia, WA 98504-7827 Gary Robertson, Director  Mike Hammond Division of Radiation Protection  Department of Homeland Security Department of Health  FEMA/REP P.O. Box 47827  130 228th Street S.W.
 
George D. Replogle, Chief Reactor Projects Branch A Division of Reactor Projects  
 
Docket: 50-397 License: NPF-21  
 
Enclosure: Columbia Generating Station Inspection/Activity Plan  
 
cc w/Enclosure:
Gregory Cullen Energy Northwest Regulatory Programs P.O. Box 968 Richland, WA 99352-0968
 
Gary Robertson, Director Division of Radiation Protection Department of Health P.O. Box 47827 Olympia, WA 98504-7827
 
James R. Beaver Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350
 
Chair Board of Franklin County Commissioners 1016 North 4th Street Pasco, WA 99301
 
Susan Reinertson, Regional Director FEMA Region X 130 228th Street, SW Bothell, WA 98021-8627
 
Lynn Albin Department of Health Office of Radiation Protection P.O. Box 47827 Olympia, WA 98504-7827  
 
Mike Hammond Department of Homeland Security FEMA/REP 130 228th Street S.W.
 
Bothell, WA 98021-8627
 
The Honorable Thomas Moak Mayor of Kennewick City Hall 210 West 6th Avenue Kennewick, WA 99336
 
Bob Hammond City of Kennewick City Managers Office P.O. Box 6108 Kennewick, WA 99336
 
Gary Crutchfield Pasco City Manager P.O. Box 293 Pasco, WA 99301
 
Energy Northwest-3-
 
Cindy Johnson City of Richland City Hall 975 George Washington Way Richland, WA 99352
 
The Honorable Joyce Olson Mayor of Pasco P.O. Box 293 Pasco, WA 99301
 
Larry Jecha, M.D., M.P.H.
 
District Health Officer Benton Franklin District Health Dept.
 
471 Williams Blvd.
 
Richland, WA 99354
 
The Honorable Dale Jackson Mayor of West Richland City Hall 3801 West Van Giesen West Richland, WA 99353
 
The Honorable John Fox Mayor, City of Richland P.O. Box 190 505 Swift Blvd.
 
Richland, WA 99352
 
Jim Mullen, Director Emergency Management Division Military Department Building 20 (MS TA-20)
Camp Murray, WA 98430-5122
 
Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
 
William A. Horin, Esq.
 
Winston & Strawn 1700 K Street Washington, DC 20006-3817
 
Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3742
 
Special Hazards Program Manager Washington Emergency Management Division 127 W. Clark Street Pasco, WA 99301
 
Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
 
Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190


Olympia, WA 98504-7827  Bothell, WA 98021-8627 James R. Beaver  The Honorable Thomas Moak Benton County Board of Commissioners  Mayor of Kennewick P.O. Box 190  City Hall Prosser, WA 99350  210 West 6th Avenue Kennewick, WA 99336 Chair Board of Franklin County Commissioners Bob Hammond 1016 North 4th Street  City of Kennewick Pasco, WA 99301  City Managers Office P.O. Box 6108 Susan Reinertson, Regional Director  Kennewick, WA 99336 FEMA Region X 130 228th Street, SW  Gary Crutchfield Bothell, WA 98021-8627  Pasco City Manager P.O. Box 293 Pasco, WA 99301
Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113


Energy Northwest  -3-Cindy Johnson City of Richland  Nuclear Safety and Energy Siting Division City Hall  Oregon Department of Energy 975 George Washington Way  625 Marion Street NE Richland, WA 99352  Salem, OR 97301-3742 The Honorable Joyce Olson  Special Hazards Program Manager Mayor of Pasco  Washington Emergency Management P.O. Box 293  Division Pasco, WA 99301  127 W. Clark Street Pasco, WA 99301 Larry Jecha, M.D., M.P.H.
Ken Niles Assistant Director Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3737


District Health Officer  Chairman Benton Franklin District Health Dept. Energy Facility Site Evaluation Council 471 Williams Blvd. P.O. Box 43172 Richland, WA 99354  Olympia, WA 98504-3172 The Honorable Dale Jackson  Chairman Mayor of West Richland  Benton County Board of Commissioners City Hall  P.O. Box 190 3801 West Van Giesen  Prosser, WA 99350-0190 West Richland, WA 99353 Matt Steuerwalt The Honorable John Fox  Executive Policy Division Mayor, City of Richland  Office of the Governor P.O. Box 190  P.O. Box 43113 505 Swift Blvd. Olympia, WA 98504-3113 Richland, WA 99352 Ken Niles Jim Mullen, Director  Assistant Director Emergency Management Division Nuclear Safety and Energy Siting Division Military Department  Oregon Department of Energy Building 20 (MS TA-20)  625 Marion Street NE Camp Murray, WA 98430-5122  Salem, OR 97301-3737 Chairman  Chief, Technological Hazards Branch Energy Facility Site Evaluation Council c/o FEMA Region X P.O. Box 43172  Federal Regional Center Olympia, WA 98504-3172  130 228th Street, SW Bothell, WA 98021-9796 William A. Horin, Esq.
Chief, Technological Hazards Branch c/o FEMA Region X Federal Regional Center 130 228th Street, SW Bothell, WA 98021-9796  


Winston & Strawn 1700 K Street Washington, DC 20006-3817
Energy Northwest-4-  


Energy Northwest  -4-Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
Line 79: Line 146:
RIV OEDO Coordinator, Primary (Shawn.Williams@nrc.gov)
RIV OEDO Coordinator, Primary (Shawn.Williams@nrc.gov)
RIV OEDO Coordinator, Backup (Eugene.Guthrie@nrc.gov)
RIV OEDO Coordinator, Backup (Eugene.Guthrie@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org File located: R:\_REACTORS\EOC\EOCAssessmentLetters\2008\CGS.doc SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials GR Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials GR C:DRP/ D:DRS D:DRP C:DRP/Signature GReplogle RJCaniano DDChamberlain GReplogle
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org  
/RA/ /RA/ /RA/ /RA/
 
2/18/2009 2/18/2009 2/23/2009 2/23/2009 OFFICIAL RECORD COPY   T=Telephone E=E-mail F=Fax
File located: R:\\_REACTORS\\EOC\\EOCAssessmentLetters\\2008\\CGS.doc SUNSI Rev Compl.
 
7 Yes No ADAMS 7 Yes No Reviewer Initials GR Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials GR C:DRP/
D:DRS D:DRP C:DRP/Signature GReplogle RJCaniano DDChamberlain GReplogle  
/RA/  
/RA/  
/RA/  
/RA/
2/18/2009 2/18/2009 2/23/2009 2/23/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax  
 
Inspection / Activity Plan Page 1 of 2 02/23/2009 12:40:28 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Columbia Generating Stati EXAM
- INITIAL EXAMINATION
 
2 COLUMBIA GENERATING-INITIAL EXAM (2/2009)
X02376 03/16/2009 03/20/2009 EB1-08
- INSERVICE INSPECTION
 
2 IP Inservice Inspection Activities - BWR 7111108G 05/11/2009 06/12/2009 RP-ORS4
- OCCUPATIONAL RADIATION SAFETY - ACCESS
 
2 IP Access Control to Radiologically Significant Areas 7112101 05/18/2009 05/22/2009
 
IP ALARA Planning and Controls 7112102 05/18/2009 05/22/2009
 
IP Performance Indicator Verification 71151 05/18/2009 05/22/2009 RPTEAM
- RADIATION SAFETY TEAM INSPECTION
 
2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 07/20/2009 07/24/2009
 
IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/20/2009 07/24/2009
 
IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/20/2009 07/24/2009
 
IP Radioactive Material Processing and Transportation 7112202 07/20/2009 07/24/2009
 
IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/20/2009 07/24/2009 PSB2-52B
- BIENNIAL PI&R INSPECTION
 
2 IP Identification and Resolution of Problems 71152B 08/17/2009 08/21/2009
 
IP Identification and Resolution of Problems 71152B 08/31/2009 09/04/2009 EP1
- BIENNIAL EP PROGRAM INSPECTION
 
2 IP Alert and Notification System Testing 7111402 08/07/2009 08/21/2009
 
IP Emergency Action Level and Emergency Plan Changes 7111404 08/17/2009 08/17/2009
 
IP Emergency Response Organization Augmentation Testing 7111403 08/17/2009 08/21/2009
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/17/2009 08/21/2009
 
IP Performance Indicator Verification 71151 08/17/2009 08/21/2009 EXAM
- INITIAL EXAM
 
2 INITIAL EXAM-CGS (10/2009)
X02405 08/24/2009 08/28/2009
 
INITIAL EXAM-CGS (10/2009)
X02405 10/05/2009 10/09/2009 EB2-05T
- TRIENNIAL FIRE PROTECTION
 
2 IP Fire Protection [Triennial]
7111105T 09/21/2009 09/24/2009
 
IP Fire Protection [Triennial]
7111105T 10/05/2009 10/09/2009 RP-ORS5
- OCCUPATIONAL RADIATION SAFETY - ALARA
 
2 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009
 
IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009
 
IP Performance Indicator Verification 71151 10/26/2009 10/30/2009 EB2-07T
- TRIENNIAL HEAT SINK PERFORMANCE


Page 1 of 2     Columbia Generating Stati 02/23/2009 12:40:28    Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EXAM - INITIAL EXAMINATION      7 2 03/16/2009 03/20/2009 X02376 COLUMBIA GENERATING-INITIAL EXAM (2/2009)
2 IP Heat Sink Performance 7111107T 03/01/2010 03/05/2010 This report does not include INPO and OUTAGE activities.
EB1-08 - INSERVICE INSPECTION      2 2 05/11/2009 06/12/2009 IP 7111108G Inservice Inspection Activities - BWR RP-ORS4 - OCCUPATIONAL RADIATION SAFETY - ACCESS    1 2 05/18/2009 05/22/2009 IP 7112101 Access Control to Radiologically Significant Areas 2 05/18/2009 05/22/2009 IP 7112102 ALARA Planning and Controls 2 05/18/2009 05/22/2009 IP 71151  Performance Indicator Verification RPTEAM - RADIATION SAFETY TEAM INSPECTION      4 2 07/20/2009 07/24/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2 07/20/2009 07/24/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 2 07/20/2009 07/24/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 2 07/20/2009 07/24/2009 IP 7112202 Radioactive Material Processing and Transportation 2 07/20/2009 07/24/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program PSB2-52B - BIENNIAL PI&R INSPECTION      5 2 08/17/2009 08/21/2009 IP 71152B Identification and Resolution of Problems 2 08/31/2009 09/04/2009 IP 71152B Identification and Resolution of Problems EP1 - BIENNIAL EP PROGRAM INSPECTION      1 2 08/07/2009 08/21/2009 IP 7111402 Alert and Notification System Testing 2 08/17/2009 08/17/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 08/17/2009 08/21/2009 IP 7111403 Emergency Response Organization Augmentation Testing 2 08/17/2009 08/21/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 08/17/2009 08/21/2009 IP 71151  Performance Indicator Verification EXAM - INITIAL EXAM      3 2 08/24/2009 08/28/2009 X02405 INITIAL EXAM-CGS (10/2009)
2 10/05/2009 10/09/2009 X02405 INITIAL EXAM-CGS (10/2009)
EB2-05T - TRIENNIAL FIRE PROTECTION      4 2 09/21/2009 09/24/2009 IP 7111105T Fire Protection [Triennial]
2 10/05/2009 10/09/2009 IP 7111105T Fire Protection [Triennial]
RP-ORS5 - OCCUPATIONAL RADIATION SAFETY - ALARA    1 2 10/26/2009 10/30/2009 IP 7112101 Access Control to Radiologically Significant Areas 2 10/26/2009 10/30/2009 IP 7112102 ALARA Planning and Controls 2 10/26/2009 10/30/2009 IP 71151  Performance Indicator Verification EB2-07T - TRIENNIAL HEAT SINK PERFORMANCE      1 2 03/01/2010 03/05/2010 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2     Columbia Generating Stati 02/23/2009 12:40:28   Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates     No. of Staff Number Start End Inspection Activity   Title on Site EB1-21 - COMPONENT DESIGN BASIS INSPECTION   6 2 05/17/2010 05/21/2010 IP 7111121 Component Design Bases Inspection 2 06/01/2010 06/11/2010 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
Inspection / Activity Plan Page 2 of 2 02/23/2009 12:40:28 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Columbia Generating Stati EB1-21
- COMPONENT DESIGN BASIS INSPECTION
 
2 IP Component Design Bases Inspection 7111121 05/17/2010 05/21/2010
 
IP Component Design Bases Inspection 7111121 06/01/2010 06/11/2010 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 12:58, 14 January 2025

Annual Assessment Letter and Inspection Plan 2008 - Columbia Generating Station (NRC Report 05000397/2009001)
ML090630702
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/04/2009
From: Replogle G
NRC/RGN-IV/DRP/RPB-A
To: Parrish J
Energy Northwest
References
IR-09-001
Download: ML090630702 (6)


Text

March 4, 2009

SUBJECT:

ANNUAL ASSESSMENT LETTER - COLUMBIA GENERATING STATION (REPORT 05000397/2009001)

Dear Mr. Parrish:

On February 10, 2009, the NRC staff completed its performance review of the Columbia Generating Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2008.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Columbia Generating Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Energy Northwest-2-

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8249 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

George D. Replogle, Chief Reactor Projects Branch A Division of Reactor Projects

Docket: 50-397 License: NPF-21

Enclosure: Columbia Generating Station Inspection/Activity Plan

cc w/Enclosure:

Gregory Cullen Energy Northwest Regulatory Programs P.O. Box 968 Richland, WA 99352-0968

Gary Robertson, Director Division of Radiation Protection Department of Health P.O. Box 47827 Olympia, WA 98504-7827

James R. Beaver Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350

Chair Board of Franklin County Commissioners 1016 North 4th Street Pasco, WA 99301

Susan Reinertson, Regional Director FEMA Region X 130 228th Street, SW Bothell, WA 98021-8627

Lynn Albin Department of Health Office of Radiation Protection P.O. Box 47827 Olympia, WA 98504-7827

Mike Hammond Department of Homeland Security FEMA/REP 130 228th Street S.W.

Bothell, WA 98021-8627

The Honorable Thomas Moak Mayor of Kennewick City Hall 210 West 6th Avenue Kennewick, WA 99336

Bob Hammond City of Kennewick City Managers Office P.O. Box 6108 Kennewick, WA 99336

Gary Crutchfield Pasco City Manager P.O. Box 293 Pasco, WA 99301

Energy Northwest-3-

Cindy Johnson City of Richland City Hall 975 George Washington Way Richland, WA 99352

The Honorable Joyce Olson Mayor of Pasco P.O. Box 293 Pasco, WA 99301

Larry Jecha, M.D., M.P.H.

District Health Officer Benton Franklin District Health Dept.

471 Williams Blvd.

Richland, WA 99354

The Honorable Dale Jackson Mayor of West Richland City Hall 3801 West Van Giesen West Richland, WA 99353

The Honorable John Fox Mayor, City of Richland P.O. Box 190 505 Swift Blvd.

Richland, WA 99352

Jim Mullen, Director Emergency Management Division Military Department Building 20 (MS TA-20)

Camp Murray, WA 98430-5122

Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172

William A. Horin, Esq.

Winston & Strawn 1700 K Street Washington, DC 20006-3817

Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3742

Special Hazards Program Manager Washington Emergency Management Division 127 W. Clark Street Pasco, WA 99301

Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172

Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190

Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113

Ken Niles Assistant Director Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3737

Chief, Technological Hazards Branch c/o FEMA Region X Federal Regional Center 130 228th Street, SW Bothell, WA 98021-9796

Energy Northwest-4-

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRP Director (Roy.Caniano@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ron.Cohen@nrc.gov)

Branch Chief, DRP/A (George.Replogle@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

OEDO, TRPB (Stephen.Campbell@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)

Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Fred Lyon@nrc.gov)

RIV OEDO Coordinator, Primary (Shawn.Williams@nrc.gov)

RIV OEDO Coordinator, Backup (Eugene.Guthrie@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org

File located: R:\\_REACTORS\\EOC\\EOCAssessmentLetters\\2008\\CGS.doc SUNSI Rev Compl.

7 Yes No ADAMS 7 Yes No Reviewer Initials GR Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials GR C:DRP/

D:DRS D:DRP C:DRP/Signature GReplogle RJCaniano DDChamberlain GReplogle

/RA/

/RA/

/RA/

/RA/

2/18/2009 2/18/2009 2/23/2009 2/23/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Inspection / Activity Plan Page 1 of 2 02/23/2009 12:40:28 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Columbia Generating Stati EXAM

- INITIAL EXAMINATION

2 COLUMBIA GENERATING-INITIAL EXAM (2/2009)

X02376 03/16/2009 03/20/2009 EB1-08

- INSERVICE INSPECTION

2 IP Inservice Inspection Activities - BWR 7111108G 05/11/2009 06/12/2009 RP-ORS4

- OCCUPATIONAL RADIATION SAFETY - ACCESS

2 IP Access Control to Radiologically Significant Areas 7112101 05/18/2009 05/22/2009

IP ALARA Planning and Controls 7112102 05/18/2009 05/22/2009

IP Performance Indicator Verification 71151 05/18/2009 05/22/2009 RPTEAM

- RADIATION SAFETY TEAM INSPECTION

2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 07/20/2009 07/24/2009

IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/20/2009 07/24/2009

IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/20/2009 07/24/2009

IP Radioactive Material Processing and Transportation 7112202 07/20/2009 07/24/2009

IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/20/2009 07/24/2009 PSB2-52B

- BIENNIAL PI&R INSPECTION

2 IP Identification and Resolution of Problems 71152B 08/17/2009 08/21/2009

IP Identification and Resolution of Problems 71152B 08/31/2009 09/04/2009 EP1

- BIENNIAL EP PROGRAM INSPECTION

2 IP Alert and Notification System Testing 7111402 08/07/2009 08/21/2009

IP Emergency Action Level and Emergency Plan Changes 7111404 08/17/2009 08/17/2009

IP Emergency Response Organization Augmentation Testing 7111403 08/17/2009 08/21/2009

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/17/2009 08/21/2009

IP Performance Indicator Verification 71151 08/17/2009 08/21/2009 EXAM

- INITIAL EXAM

2 INITIAL EXAM-CGS (10/2009)

X02405 08/24/2009 08/28/2009

INITIAL EXAM-CGS (10/2009)

X02405 10/05/2009 10/09/2009 EB2-05T

- TRIENNIAL FIRE PROTECTION

2 IP Fire Protection [Triennial]

7111105T 09/21/2009 09/24/2009

IP Fire Protection [Triennial]

7111105T 10/05/2009 10/09/2009 RP-ORS5

- OCCUPATIONAL RADIATION SAFETY - ALARA

2 IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009

IP ALARA Planning and Controls 7112102 10/26/2009 10/30/2009

IP Performance Indicator Verification 71151 10/26/2009 10/30/2009 EB2-07T

- TRIENNIAL HEAT SINK PERFORMANCE

2 IP Heat Sink Performance 7111107T 03/01/2010 03/05/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 02/23/2009 12:40:28 Report 22 03/01/2009 - 06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Columbia Generating Stati EB1-21

- COMPONENT DESIGN BASIS INSPECTION

2 IP Component Design Bases Inspection 7111121 05/17/2010 05/21/2010

IP Component Design Bases Inspection 7111121 06/01/2010 06/11/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.