RA-09-073, Letter from Exelon, Subj: Updated Final Safety Analysis Report, Rev. 16, Fire Hazards Analysis Report, Rev. 15: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:I                                                                   lExelon,o Exelon Nuclear 20o Exelon Way                    www.exeloncorp.com                                       N ule ar Kennett Square, PA 19348 10 CFR 50.71(e)
{{#Wiki_filter:I lExelon,o Exelon Nuclear www.exeloncorp.com 20o Exelon Way N ule ar Kennett Square, PA 19348 10 CFR 50.71(e)
RA-09-073 October 23, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket No. 50-219
RA-09-073 October 23, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket No. 50-219


==Subject:==
==Subject:==
Updated Final Safety Analysis Report (UFSAR), Revision 16 Fire Hazards Analysis Report (FHAR), Revision 15 UFSAR and FHAR Reference Drawings In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), enclosed is Revision 16 of the Updated Final Safety Analysis Report (UFSAR) for Oyster Creek Nuclear Generating Station (OCNGS). The enclosed UFSAR Revision 16 is being provided to the NRC in electronic format on CD-ROM. This electronic version of the UFSAR is being submitted in its entirety and constitutes a total replacement copy. In addition, as required by 10CFR50.71(e)(2)(ii),
Updated Final Safety Analysis Report (UFSAR), Revision 16 Fire Hazards Analysis Report (FHAR), Revision 15 UFSAR and FHAR Reference Drawings In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), enclosed is Revision 16 of the Updated Final Safety Analysis Report (UFSAR) for Oyster Creek Nuclear Generating Station (OCNGS). The enclosed UFSAR Revision 16 is being provided to the NRC in electronic format on CD-ROM. This electronic version of the UFSAR is being submitted in its entirety and constitutes a total replacement copy. In addition, as required by 10CFR50.71(e)(2)(ii), to this letter identifies changes made under the provision of 10CFR50.59, and included in Revision 16 of the UFSAR, but not previously submitted to the NRC.
Attachment 1 to this letter identifies changes made under the provision of 10CFR50.59, and included in Revision 16 of the UFSAR, but not previously submitted to the NRC.
By {{letter dated|date=July 7, 2004|text=letter dated July 7, 2004}}, the NRC granted an exemption for OCNGS permitting UFSAR updates to be submitted up to 12 months after each refueling outage. 10 CFR 50.71(e)(4) requires that the UFSAR update reflect changes made up to a maximum of six months prior to the submittal. UFSAR Revision 16 reflects changes made at OCNGS at least up to June 30, 2009. UFSAR sections revised in this update are delineated by "REV. 16, OCTOBER 2009" in the lower right portion of the section pages, and a vertical bar is located in the right margin of the page, which identifies the specific changes.
By letter dated July 7, 2004, the NRC granted an exemption for OCNGS permitting UFSAR updates to be submitted up to 12 months after each refueling outage. 10 CFR 50.71(e)(4) requires that the UFSAR update reflect changes made up to a maximum of six months prior to the submittal. UFSAR Revision 16 reflects changes made at OCNGS at least up to June 30, 2009. UFSAR sections revised in this update are delineated by "REV. 16, OCTOBER 2009" in the lower right portion of the section pages, and a vertical bar is located in the right margin of the page, which identifies the specific changes.
Also included is Revision 15 of the Fire Hazards Analysis Report (FHAR) for OCNGS. Revision 15 includes changes to the FHAR in accordance with the requirements of License Condition 2.C.(3) of the OCNGS Facility Operating License No. DPR-16, but not previously submitted to the NRC. The enclosed FHAR Revision 15 copy is being provided to the NRC in electronic format (CD-ROM) in its entirety. Attachment 2 to this letter includes a summary of changes made to the FHAR in Revision 15. 10 CFR 50.71 (e)(4) requires that the FHAR revision reflect changes made up to a maximum of six months prior to the submittal. Revision 15 of the FHAR includes changes made at OCNGS at least up to June 30, 2009.
Also included is Revision 15 of the Fire Hazards Analysis Report (FHAR) for OCNGS. Revision 15 includes changes to the FHAR in accordance with the requirements of License Condition 2.C.(3) of the OCNGS Facility Operating License No. DPR-16, but not previously submitted to the NRC. The enclosed FHAR Revision 15 copy is being provided to the NRC in electronic format (CD-ROM) in its entirety. Attachment 2 to this letter includes a summary of changes made to the FHAR in Revision 15. 10 CFR 50.71 (e)(4) requires that the FHAR revision reflect changes made up to a maximum of six months prior to the submittal. Revision 15 of the FHAR includes changes made at OCNGS at least up to June 30, 2009.
Also enclosed is a CD-ROM containing copies of controlled drawings currently referenced but not included in the OCNGS UFSAR. This CD also contains the associated drawings for the FHAR. These drawings were current at least up to August 30, 2009.
Also enclosed is a CD-ROM containing copies of controlled drawings currently referenced but not included in the OCNGS UFSAR. This CD also contains the associated drawings for the FHAR. These drawings were current at least up to August 30, 2009.


U. S. Nuclear Regulatory Commission OCNGS UFSAR Revision16 / FHAR Revision15 October 23, 2009 Page 2 The following enclosures contain the CD-ROMs with the updated files for the UFSAR, FHAR, and Reference Drawings in PDF format.
U. S. Nuclear Regulatory Commission OCNGS UFSAR Revision16 / FHAR Revision15 October 23, 2009 Page 2 The following enclosures contain the CD-ROMs with the updated files for the UFSAR, FHAR, and Reference Drawings in PDF format.
* Enclosure 1 - Oyster Creek UFSAR Revision 16 updated files and Oyster Creek FHAR Revision 15 updated files
* - Oyster Creek UFSAR Revision 16 updated files and Oyster Creek FHAR Revision 15 updated files
* Enclosure 2 - Oyster Creek Reference Drawings files for UFSAR and FHAR and Attachment 4 include file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CDs.
* - Oyster Creek Reference Drawings files for UFSAR and FHAR and Attachment 4 include file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CDs.
As required by 1 OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, the information contained in the Enclosures and Attachments to this letter accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.
As required by 1 OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, the information contained in the Enclosures and Attachments to this letter accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.
If you have any questions or require further information, please contact Mr. Richard Gropp at (610) 765-5557.
If you have any questions or require further information, please contact Mr. Richard Gropp at (610) 765-5557.
Line 34: Line 33:


==Enclosures:==
==Enclosures:==
Enclosure 1 - CD-ROM, OCNGS UFSAR, Revision 16 and FHAR, Revision 15 Enclosure 2 - CD-ROM, UFSAR and FHAR Reference Drawings Attachments: Attachment 1 -     Summary of Changes Made Under the Provisions of 10CFR50.59 Attachment 2 - FHAR Summary of Changes, Revision 15 Attachment 3 - Electronic File Directory Structure - UFSAR / FHAR Attachment 4 - Electronic File Directory Structure - UFSAR / FHAR Drawings cc:   NRC Regional Administrator - NRC Region I                   w/ enclosures and attachments NRC Senior Resident Inspector - Oyster Creek NRC Project Manager, NRR - Oyster Creek
Attachments: - CD-ROM, OCNGS UFSAR, Revision 16 and FHAR, Revision 15 - CD-ROM, UFSAR and FHAR Reference Drawings - Summary of Changes Made Under the Provisions of 10CFR50.59 - FHAR Summary of Changes, Revision 15 - Electronic File Directory Structure - UFSAR / FHAR - Electronic File Directory Structure - UFSAR / FHAR Drawings cc:
NRC Regional Administrator - NRC Region I NRC Senior Resident Inspector - Oyster Creek NRC Project Manager, NRR - Oyster Creek w/ enclosures and attachments


Page 1 of 2 ATTACHMENT 1 Oyster Creek UFSAR Summary of Changes - Revision 16 10CFR50.71 (e)(2)(ii) requires that revisions to the UFSAR include changes made under the provisions of 10CFR50.59, but not previously submitted to the NRC. Accordingly, the list below identifies these plant modifications and projects included in Revision 16 of the Updated Final Safety Analysis Report (UFSAR) that were not previously submitted to the NRC. The list does not represent a complete list of UFSAR change packages incorporated.
Page 1 of 2 ATTACHMENT 1 Oyster Creek UFSAR Summary of Changes - Revision 16 1 OCFR50.71 (e)(2)(ii) requires that revisions to the UFSAR include changes made under the provisions of 10CFR50.59, but not previously submitted to the NRC. Accordingly, the list below identifies these plant modifications and projects included in Revision 16 of the Updated Final Safety Analysis Report (UFSAR) that were not previously submitted to the NRC. The list does not represent a complete list of UFSAR change packages incorporated.
Change Number                   Revision                 Description E Cd0 5-00 59... 4I...  ............
Change Number Revision E Cd 0 5 -
                                    ,2...........     .Conde-nsate Pre-Filters System Installation                               -
00 5 9 4...
Air Dryer Improvement Changes per Vender ECR 05-00672                      3 Recommendation 0                System-ym Hydraulic Design Pareers               e          for -Contain-men ..py y ...
I............
ECR 05-00877                                                *_a~n.£!
, 2...........
e.rg_E and Emergency_  en~cy..S__erv.i.e...a m Service Water          t (ESW)
ECR 05-00672 ECR 05-00877 06-056 ECR 06-00562 3
                                                                                                      .E.e
0 0
                                                                                                        -- W- .) .............
.C O - 0 3 0
  .... 06-056 ECR 06-00562                      0                Update UFSAR Sections 13.2.1 and 13.2.6 Outdated Information
ECR 06-01146 0
      .CO.................
ECR 07-00305 fC-R 67:9Q39O7 -
      .....- 0 3                    0                Update Various UFSAR Sections for Discrepancies Update UFSAR Table 9.3-4 with Correct Drywell Equipment ECR 06-01146                      0                  r........
ECR 07-00329 ECR 07-00336 ECR 07-00647 0
                                                            ..~
00-£,III-0 Description
                                                                    .... . . . . . T Caa.
.Conde-nsate Pre-Filters System Installation Air Dryer Improvement Changes per Vender Recommendation System-ym Hydraulic Design e
                            ....-.                        gUpat_ UFSAR for Isolation Condenser Valve Discrepancies Update UFSAR Section 6.2.1.1.1 Design Basis for ILRT ECR 07-00305                      0 Requirement fC-R 67:9Q39O7 -                                  Update UFSAR Figure for Torus Penetration Discrepancy ..
Pareers for -Con tain-men y
ECR 07-00329                      0                Update UFSAR Table 6.2-12 with Correct Valve Information ECR 07-00336 0-£,III-        Revise UFSAR Section 7.2 to Reflect TS Amendment 263 0                Revise UFSAR to Add Reference to Table 6.3-1 (IR 627299-ECR 07-00647 ECtRO--07---'006-8"9              0                CDBI - UFSAR Clarification CDBI - Control Room EDG Frequency Meters and FSAR ECR 07-00745                      0 Table 8.3-1 Update UFAR Secti~o~n 11..3 fo~r C-harco-al -Del~ay BePd~s ..
py and Emergency_ Service Water (ESW)
EICR 07-700848.-.
*_a~n.£!
I.II.....................
_E m
                              .....01.
: e. rg en~cy..S__erv.i.e...a t  
                            ..          .....I.I.
.e E W.).............
II....
Update UFSAR Sections 13.2.1 and 13.2.6 Outdated Information Update Various UFSAR Sections for Discrepancies Update UFSAR Table 9.3-4 with Correct Drywell Equipment r.~
FSAR Update to Section 6.5 Generate Action Request (AR) for Control Room Recorder ECR 07-00920                      1                Rep~lacement (TR-RD0046A/B/C)-                              --
T C aa.
i...
gUpat_ U FSAR for Isolation Condenser Valve Discrepancies Update UFSAR Section 6.2.1.1.1 Design Basis for ILRT Requirement Update U FSAR Figure for Torus Penetration Discrepancy..
                          ... .......o.. .......             tur .....
Update UFSAR Table 6.2-12 with Correct Valve Information Revise UFSAR Section 7.2 to Reflect TS Amendment 263 Revise UFSAR to Add Reference to Table 6.3-1 (IR 627299-CDBI - UFSAR Clarification CDBI - Control Room EDG Frequency Meters and FSAR Table 8.3-1 Update UFAR Secti~o~n 11..3 fo~r C-harco-al -Del~ay BePd~s..
Moisture      ....
FSAR Update to Section 6.5 Generate Action Request (AR) for Control Room Recorder Rep~lacement (TR-RD0046A/B/C)-
Hygrometer  r~ i....
Moisture Hygrometer is Not Functioning tur....  
r is..
-r~ i r
                                                                                      .... Not- .Functioning
-...... u n
                                                                                          ....   -u.n. ... n....................... ...................
n p-0-dat e UFSAiR tto Dele te R-ef eerence to Ra d iation Zone-II and n-IV
p-0-date UFSAiR tto Dele te R-efeerence to Ra diation Zone- II and                            n-ECR. 7-01034                     0             IV 0-8-900-05 CR...
'UFSAR Change for Lab Drain Tank Pumpp(P.-22-3)-,
  -----...                          0-             'UFSAR Change for Lab Drain Tank Pumpp(P.-22-3)-,                                                  ._
UF*-s;AA-R-Update for--EW Cross-Connect to Service Water (SW) for Reactor_Bui.ding Closed Cooling Water (RBCCW)
UF*-s;AA-R-Update for--EW Cross-Connect to Service Water ECRO08-00037                     0               (SW) for Reactor_Bui.ding Closed Cooling Water (RBCCW)
ECtRO--07---'006-8"9 0
ECR 07-00745 EICR 07-700848.-.
0
....... 1.
0...........
I.I I.....................  
.. I.I.
I I....
ECR 07-00920 1
i.....  
..........o.........
ECR. 7-01034 0
CR...
0-8-900-05 0-ECRO08-00037 0


Page 2 of 2 Change t~~~~~~~~~~~
Page 2 of 2 t~~~~~~~ ~~~~
1..        ......  .....
Change Number ECR 08-00254 ECR 08-00299
                                                                                  ..          Description Number                                                   Revision 0                    Update Dry Shielded Canister (DSC)/Transfer Cask (TC)
-ECR 08-600422
ECR 08-00254                                                                                               n..gn          gr H...............i-
[.ECR 08-00637 ECR 08-00781 ECR 0 0113..
                                                                                                                                ...a i .n...
1........
SAR..C...................h.ap.e Chapter      .. 9. 9..................... ........................-
R...  
Handling_ Information                                  in UFSAR LLRT - Installation, Storage of Test Enclosure for X-4A, X-ECR 08-00299                                                 ..
..09.-00.1. 94 I.EC. R0..O900227 ECR 09-00141 IECR 09-00379 ic-FEC  
                                                              .......  .0..
-o09-00395.....
                                                                          .... 4B-
".
-ECR 08-600422                                                         0                    Revise UFSAR Table 6.2-12 for Valves V-27-1, 2, 3, and 4
* i-
[.ECR 08-00637                                                                               Correct Error in FSAR Fuel Pool -gStorae.Capacity 0
: 9.
Isolation Condenser Clean Water Makeup - Appendix R ECR 08-00781                                                           60........................
E..
Impacts
0 0 IECRO09-004227
        ... ...-.....    .......    . ....        ..............................                                                                                                                      fange-for    Security Seciion ...
. a.
ECR 8-0               - 0113 1........       ..                                           Site to Initiate UFSAR Generic C
ECR 09-00439 ECR 09-00448
. .....R...   ..09.-00.1.94                 ..... .... ..... 2.............. .......... ...Repla.e M-1 A Transformer with Eddystone Transformer ..
0.........          ..
                                                                            . ......            s.  . _P.. ha se . Bu.U.pd..at.e          .t.....c.9 .ooling. u...S.AR s ...Du ct                                                              at .................................................................
I.EC.R0..O900227...... ..............                                      0                  Revse. U.FSARRSection__3.10.1 on Seimic Q                                                                                                      n....
                                                                                                                                                                                                                                  ..u.a..li.f.icat...
0 ....... . ....
ECR 09-00141                                                                                 Update UFSAR with New Supplement (Appendix A) for
  ...... i- 9.                                                          0                ... ense R.e..                  n..e.wa..  . App.lCaton_ L.RA_) -... ..........                                                                          .
IECR 09-00379                                                                                 Update            UFSAR                  for    New            Radwaste                      Service              Water            Pump IECRO09-004227                                                                                U pg ra de s                                                                                                                      ......
ic-FEC       -o09-00395.....                                                                 Update            to    FSAR              Section              5.2  for          Recirculation                            Pump        Flow
.E....... 0 ..0....                  ...        .............
_.                      0                  Revise UFSAR Section 15.2.1
    . ...a ..........
                        -.. . ... ... ......................                                ..Revi..se-..    .. sA- Se                  ... c-on-1--5.7.4.5
                                                                                                                                                ..                                  to Cl..... e.
ea.rl.y-R
                                                                                                                                                                                                -....              R e.....        tM  ..... ..................
ECR to Incorporate Multiple Radwaste Changes to.sR ....
ECR 09-00439                                                             0                  Update UFSAR to Document Penetration Seals in Corner Rooms .
ECR 09-00448                                                             0                  Update the UFSAR as Required per Enforcement Guidance
[ECRO09-00439
[ECRO09-00439
                      .9-C-R0-
-C-R
                            .. 4............. 0                                              Memorandum (EGM)_0.7-0o6 0                  Update F.S.AR....Section 9.2 to.Inc-orp.o.rate_.ECR 08-00041_______.
.9..0 4.............
ECR 09-00664                                                                                        pdate.FSAR for Met Tower Table . ........
ECR 09-00664 1
Revision 0
0 0
0 0
6........................
2 0.........
0 0
0 0
0 0
0 0
Description Update Dry Shielded Canister (DSC)/Transfer Cask (TC)
Handling_ Information in UFSAR Chapter 9 H...............i-n..gn gr a i n....
SAR..C...................h.ap.e
.. 9.
LLRT - Installation, Storage of Test Enclosure for X-4A, X-4B-Revise UFSAR Table 6.2-12 for Valves V-27-1, 2, 3, and 4 Correct Error in FSAR Fuel Pool
-gStorae.Capacity Isolation Condenser Clean Water Makeup - Appendix R Impacts Site to Initiate UFSAR Generic C fange-for Security Seciion...
... Repla.e M-1 A Transformer with Eddystone Transformer..
..s.
. _P..
h a s e..B u s...D u ct
.t.....c.9.oo ling. u...S.A R
.U.pd..at.e a t Revse. U.FSAR RSection__3.10.1 on Seimic Q
.u.a..li.f.icat...
n....
Update UFSAR with New Supplement (Appendix A) for
... ense R.e..
n..e.wa..
App.lCaton_ L. RA_)
Update UFSAR for New Radwaste Service Water Pump U p g ra d e s Update to FSAR Section 5.2 for Recirculation Pump Flow Revise UFSAR Section 15.2.1
..Revi..se-..
sA-.....
Se -.
c-on-1--5.7.4.5 to Cl.....
ea.rl. y-R e.....
R t M
: e.
ECR to Incorporate Multiple Radwaste Changes to.sR....
Update UFSAR to Document Penetration Seals in Corner Rooms Update the UFSAR as Required per Enforcement Guidance Memorandum (EGM)_0.7-0o6 Update F.S.AR....Section 9.2 to.Inc-orp.o.rate_.ECR 08-00041_______.
pdate.FSAR for Met Tower Table.


Page 1 of 1 ATTACHMENT 2 Oyster Creek FHAR Summary of Changes - Revision 15 The list below provides a summary of the changes included in Revision 15 of the Oyster Creek Fire Hazards Analysis Report (FHAR).
Page 1 of 1 ATTACHMENT 2 Oyster Creek FHAR Summary of Changes - Revision 15 The list below provides a summary of the changes included in Revision 15 of the Oyster Creek Fire Hazards Analysis Report (FHAR).
Items #
Items #
: 1.       ECR OC 06-00798 000 Added new reference ECR 06-00798 for OB-FZ-5 and OB-FZ-8C in Section 7.
: 1.
: 2.       ECR OC 05-00196 000 Updated Section 6.2.2 to delete service water pump as one of the pumps that utilize firewater for cooling.
ECR OC 06-00798 000 Added new reference ECR 06-00798 for OB-FZ-5 and OB-FZ-8C in Section 7.
: 3.       ECR OC 08-00465 000 Corrected some erroneous fire loading information, updated CW-FA-14 FSSD section to indicate that EDG 1 and 2 would provide power for safe shutdown and updated conventional thermal detection to rate compensated/fixed temperature thermal detection.
: 2.
: 4.       ECR OC 07-00428 000 Added new reference AR A2161442 evaluation 02 for TB-FZ-1 1D in Section 7.
ECR OC 05-00196 000 Updated Section 6.2.2 to delete service water pump as one of the pumps that utilize firewater for cooling.
: 5.       ECR OC 07-00376 000
: 3.
          ,Documented the combustible loading for the Chlorination/Condensate Transfer Building in MT-FA-12 and for the Standby Gas Treatment System Ventilation Tunnel in SGTS-FZ-31. Also, documented that the airlock ceiling in RB-FZ-1 D is a minimum of 11/2 hour.
ECR OC 08-00465 000 Corrected some erroneous fire loading information, updated CW-FA-14 FSSD section to indicate that EDG 1 and 2 would provide power for safe shutdown and updated conventional thermal detection to rate compensated/fixed temperature thermal detection.
: 6.       ECR OC 08-00426 000 Referenced recent technical evaluations that have been performed for fire protection deviations or concerns and eliminated historical information errors, and added clarification to some areas that were vague.
: 4.
ECR OC 07-00428 000 Added new reference AR A2161442 evaluation 02 for TB-FZ-1 1 D in Section 7.
: 5.
ECR OC 07-00376 000
,Documented the combustible loading for the Chlorination/Condensate Transfer Building in MT-FA-12 and for the Standby Gas Treatment System Ventilation Tunnel in SGTS-FZ-31. Also, documented that the airlock ceiling in RB-FZ-1 D is a minimum of 11/2 hour.
: 6.
ECR OC 08-00426 000 Referenced recent technical evaluations that have been performed for fire protection deviations or concerns and eliminated historical information errors, and added clarification to some areas that were vague.


ATnACHMENT 3                                                                                                   Page 1 of 2 Electronic File Directory Structure UFSAR / FHAR 3M     . ý   -- I :*                  ,-              "*                      e           "                  .'n                                                       . I d:\01 UFSAR R16                   1000 Table of contents                                                                                                                   68,693 d.\01 UFSARR16                 _    001 List of Figures                                                                                                                   111,964 (dA01 UFSAR R16         _            00201 Intro and Gen Descrip.pdf                                                                                                       226,797 Sd:*01 UFSAR R1 6                   003 01 Intro and Gen DescripFig.p                                                                                                       33,169 d:\01 UFSAR R16                     004 02 Site Characteristics.pdf   -                                                                                                    473,052               (
ATnACHMENT 3 Page 1 of 2 Electronic File Directory Structure UFSAR / FHAR 3M  
d:\01 UFSAR RI 6                   00502 Site Characteristics A_p.pdf                                                                                                   7,593,362 d\1UFSAR R16                 1006 02 Site Characteristics Fig.pdf_                                                                                                 1,331,278             ,
ý I
d:\01 UFSAR R16                     007 03 Design of Struct, Comp, Equippdf                                   _            _863,779 d:\01 UFSAR R16                     600803 D-esign of Struct, comp, EquipApp.pdf                                                               -....                  10,000,457....
e I
d:\01 UFSAR Ri6     _              00903 Design of Struct, Comp,_Equip F!g.pdf-----------------------------                                                           .3,239,488 dA01 UFSAR   R1_6                   010 04 Reactor..df               .                                                                                                  327,447               1
.'n d:\\01 UFSAR R16 1
_d-01_UFSAR R16         .          01104 Reactor Fig.pdf                                                                                               i                 678,916             J d:\01 UFSAR R16                     012 05 RCS and Connected S._pdf                                   __255,309 d:\01 UFSAR R16                     01305 RCS and Connected Sys Fig.pýdf             _                                                                                  124,405 dA\1-UFSAR R16                       014 06 Eng Safety Features.pdf                     _---_..............                                                                637,139     -
000 Table of contents 68,693 d.\\01 UFSARR16 001 List of Figures 111,964 (dA01 UFSAR R16 00201 Intro and Gen Descrip.pdf 226,797 Sd:*01 UFSAR R1 6 003 01 Intro and Gen DescripFig.p 33,169 d:\\01 UFSAR R16 004 02 Site Characteristics.pdf 473,052
d:\01 UFSAR R16                     015 06 Enq Safety Features Fig.pdf                     ......                                  .....                              1,058,354 d.\01 UFSAR R16                     016 07 Instr and Controls.pdf                                                   .                                                    427,934 d:\01 UFSAR R16                     017"078-and       Controls Fi..pd...............................cf                                                                   432,587 dA01 UFSAR   R1 6             -      018 08 Electric Power. p--df-__                                                                             -    --        _          147,801 dA01 UFSAR   R16                   .019008 Electric Power Figlpdf                                                                                                         399,731 d:\01 UFSAR R16                 1 020_09 Auxilla-S-stems.-pdf                                                                                                           767,761 d:\01 UFSAR R16                     021 09 Auxilliary Systems Fig.pdf-----------...-....                             ...................                  ...            998,179 d:-01 UFSAR R16                     o2210Steam 0...           and Power Conv.pdf                                                                                                   215,310 d:\01 UFSAR R16           --        023 10 Steam and Power Cony Fig.pdf...........                                                           .    -                        57,031       _
(
d:\01 UFSAR R16                     02411 Radioactive Waste gmt.pdf                                                                                     ..................466,345 ...
d:\\01 UFSAR RI 6 00502 Site Characteristics A_p.pdf 7,593,362 d\\1UFSAR R16 1006 02 Site Characteristics Fig.pdf_
d:\01 UFSAR R16                 ,025   11 Radioactive WasteMgrmtFig.pdf t          ...........                                                                               48,194     ___Q d:\01 UFSAR R16                     026 12 Radiation Protection.pdf                                     _                                                              196,943         -.
1,331,278 d:\\01 UFSAR R16 007 03 Design of Struct, Comp, Equippdf
_d_\01UFSAR R16                   4027     12 Radiation Protection Fig.pd .                                                                                 .        . 31,335         -
_863,779 d:\\01 UFSAR R16 6 00803 D-esign of Struct, comp, EquipApp.pdf 10,000,457....
d01 UFSAR R16                     I028    13 Conduct of Operations.d                                                                       "                              170,315 d--01 UFSAR Ri6                     029 13 Conduct of Operations Fig.pdf                                         .                                                        46,439 d:\01 UFSAR R16       ........ _014 Initial Test Program.pdf                                           ____                                                          184,995
d:\\01 UFSAR Ri6 00903 Design of Struct, Comp,_Equip F!g.pdf-----------------------------  
.3,239,488 dA01 UFSAR R1_6 010 04 Reactor..df 327,447 1
_d-01_UFSAR R16 01104 Reactor Fig.pdf i
678,916 J
d:\\01 UFSAR R16 012 05 RCS and Connected S._pdf
__255,309 d:\\01 UFSAR R16 01305 RCS and Connected Sys Fig.pýdf 124,405 dA\\1-UFSAR R16 014 06 Eng Safety Features.pdf 637,139 d:\\01 UFSAR R16 015 06 Enq Safety Features Fig.pdf 1,058,354 d.\\01 UFSAR R16 016 07 Instr and Controls.pdf 427,934 d:\\01 UFSAR R16 017"07 8-and Controls Fi..pd...............................cf 432,587 dA01 UFSAR R1 6 018 08 Electric Power. p--df-__
147,801 dA01 UFSAR R16  
.019008 Electric Power Figlpdf 399,731 d:\\01 UFSAR R16 1 020_09 Auxilla-S-stems.-pdf 767,761 d:\\01 UFSAR R16 021 09 Auxilliary Systems Fig.pdf-----------...-....
998,179 d:-01 UFSAR R16 0...
o2210Steam and Power Conv.pdf 215,310 d:\\01 UFSAR R16 023 10 Steam and Power Cony Fig. pdf...........
57,031 d:\\01 UFSAR R16 02411 Radioactive Waste gmt.pdf  
..................466,345...
d:\\01 UFSAR R16  
,025 11 Radioactive WasteMgrmtFig.pdf...........
48,194 t
___Q d:\\01 UFSAR R16 026 12 Radiation Protection.pdf 196,943
_d_\\01UFSAR R16 4027 12 Radiation Protection Fig.pd.
31,335 d01 UFSAR R16 I 028 13 Conduct of Operations.d 170,315 d--01 UFSAR Ri6 029 13 Conduct of Operations Fig.pdf 46,439 d:\\01 UFSAR R16  
........ _014 Initial Test Program.pdf 184,995


ATTACHMENT 3                                               Page 2 of 2 Electronic File Directory Structure UFSAR / FHAR d:\i UFSAR R616 _           031 14 Initial Test P~rogram App.pdf                                               713,942.  .      .
ATTACHMENT 3 Page 2 of 2 Electronic File Directory Structure UFSAR / FHAR d:\\i UFSAR R6 _
                                                                                                                              --- _1394 d:\01 UFSAR R16               032 15 Accident Analysis.pdf                                                       318,267 d-.O. UFSAR R16               033 5-Accident Analysis Ap.p .          ..                    _  ---            835,262 ___       -_
16 031 14 Initial Test P~rogram App.pdf 713,942.
d:\01 UFSAR R16               034 15 Accident Analysis Figpdf                                                   853,184 I d:\0i UFSAR R1               035 16 Technical Specifications. d3                                               65,704
_1394 d:\\01 UFSAR R16 032 15 Accident Analysis.pdf 318,267 d-.O. UFSAR R16 033 5 -Accident Analysis Ap.p 835,262 ___
[d:\O1.                         036 1     arA. Assurance.pdf               .    ..      . .  .  .  .  .Quality 68,601 Sd:\O1_UFSAR Ri6   _037           App A FSAR Supplement.pdf                                           .          364,077 Ld4-\2 F!AR RS-     -      _ j01Fire Hazards Analysis.pd__                                                       763,260
d:\\01 UFSAR R16 034 15 Accident Analysis Figpdf 853,184 I d:\\0i UFSAR R1 035 16 Technical Specifications. d3 65,704
[d:\\O1.
arA.
036 1  
.Quality Assurance.pdf 68,601 Sd:\\O1_UFSAR Ri6
_037 App A FSAR Supplement.pdf 364,077 Ld4-\\2 F!AR RS-j01Fire Hazards Analysis.pd__
763,260


Page 1 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings Fde~~~~~NA 'IV                 ;=         . V ie     ie D:OYS   FSAR REF DWGS I AM 20451-H, Sheet 1, Rev 013, SPEC SHEET.pdf                                                                             1 750,743 D:*OYS   FSAR REF DWGS AM 20451-H, Sheet 2, Rev 013, 24 IN GLOBE BODY MAIN STEAM IS.pdf                                                             595,223 D:\OYS   FSAR REF DWGS AM 20451-H, Sheet 3, Rev 015,24 INCH GLOBE BODY MAIN STEAM .pdf                                                             903,5915 D:\OYS   FSAR REF DWGS BR 2002, Sheet 1, Rev 059, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf                                                             i. 721,261 D:\OYS   FSAR REF DWGS BR 2002, Sheet 2, Rev 065, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf                                       __766,40 D:\OYS   FSAR REF DWGS BR 2002, Sheet 3, Rev 054, EXTRACTION (BLEED) STEAM SYSTEM F.pdf                                               _        _775,126 D:\OYS   FSAR REF DWGS BR 2002, Sheet 4, Rev 062, REHEAT STEAM SYSTEM FLOW DIAGRAM.pdf                                                           1828,913 D:\OYS   FSAR REF DWGS BR 2003, Sheet 1, Rev 090, CONDENSATE FEED SYSTEM FLOW DIAGRAM.pdf                                                         ,914,811 D:\OYS   FSAR REF DWGS BR 2004, Sheet 1, Rev 103, DEMINERALIZED TRANSFER SYSTEM FLOW DIAG.pdf                                       _              947,491.
Page 1 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings Fde~~~~~NA  
D:\OYS   FSAR REF DWGS_ BR 2004, Sheet 2, Rev 092, CONDENSATE TRANSFER SYSTEM FLOW DIAGRAM.pdf                                                   *, 1 164_,023 D:\OYSFSAR REF DWGS . BR 2005, Sheet 1, Rev 043, VACUUM PRIMING SYSTEM FLOWDIAGRAd..f                                                     _      574,988_j
'IV  
_SAR__EFDWGS RDEFYS    BR 2005, Sheet 2, Rev 099, REACTOR AND TURBINE BLDG.pdf                                                                 1 771,905 D:\OYS   FSAR REF DWGS   BR 2005, Sheet 3, Rev 059, NEW RADWASTE SERVICE WATER SYSTEM FLOW DIAGf                                                     633,033 D:\OYS   FSAR REF DWGS   BR 2005, Sheet 4, Rev 080, EMERGENCY SERVICE WATER SYSTEM FLOW DIAGRAM.pdf                                               i 742,840 D:\OYS   FSAR REF DWGS   BR 2005, Sheet 5, Rev 057, SCREEN WASH SYSTEM FLOW DIAGRAM.pdf                                                   _        719,514 I D:\OYS   FSAR REF DWGS   BR 2005, Sheet 6, Rev 061, CIRCULATING WATER SYSTEM FLOW DIA.pdf                                                         i_851,325         1.
;=
D:\OYS  FSAR  REF DWGS  BR1*------~~~~~~~~~~~~~~~~~
V ie ie D:OYS FSAR REF DWGS I AM 20451-H, Sheet 1, Rev 013, SPEC SHEET.pdf 1 750,743 D:*OYS FSAR REF DWGS AM 20451-H, Sheet 2, Rev 013, 24 IN GLOBE BODY MAIN STEAM IS.pdf 595,223 D:\\OYS FSAR REF DWGS AM 20451-H, Sheet 3, Rev 015,24 INCH GLOBE BODY MAIN STEAM.pdf 5
2006, Sheet 1, Rev 072, REACTOR BLDG CLOSED COOLINGWATER.pdf I 826,213     _7 D:\OYS   FSAR REF DWGS   BR 2006, Sheet 2, Rev 044, REACTOR BLDG CLOSED COOLING WATERpdf                                               _            455,111 D:\OYS   FSAR REF DWGS   BR 2006, Sheet 3, Rev 056, REACTOR BLDG CLOSED COOLING WATER.pdf                                                         1739,609 D:\OYS   FSAR REF DWGS   BR 2006, Sheet 4, Rev 063, TURBINE BLDG CLOSED COOLING WATER.pdf                                                           744,505
903,591 D:\\OYS FSAR REF DWGS BR 2002, Sheet 1, Rev 059, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf
_.D:\OYS FSAR REF DWGS     BR 2006, Sheet 5, Rev 056, TURBINE BLDG CLOSED COOLING WATER .pdf                                                           732,010 1.D:.\OYS EFSAR REF DWGS   BR 2006, Sheet 6, Rev 050, RADWASTE -CLOSED COOLING WATER SYS.pdf-                                                         564,964
: i. 721,261 D:\\OYS FSAR REF DWGS BR 2002, Sheet 2, Rev 065, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf
_D:_OYS FSAR REF DWGS .BR       2006, Sheet 7, Rev 050, RADWASTE CLOSED COOLING WATER SYS.pdf.                                                         1,056,202 DAOYS FSAR REF DWG S     BR20,Set8_e_5,AUMNE                                               FGS(O)COE           COO                               j   6089 D:\OYS   FSAR REF DWGS   BR 2007, Sheet 1, Rev           028, HEATER DRAIN VENT AND PRESSURE RE.pdf                                                 _817,764 D:\OYS   FSAR REF DWGS   BR 2007, Sheet 2, Rev           032, HEATER DRAIN VENT AND PRESSURE RE.pdf                                             J830,016 D:\OYS   FSAR REF DWGS   BR 2007, Sheet 3, Rev           034, HEATER DRAIN VENT AND PRESSURE RE.pdf                                       _          677,096 D:\OYS  FSAR  REF DWGS  BR 2007, Sheet 4, Rev           024, HEATER DRAIN VENT AND PRESSURE RE.pdf                                                 610,120
__766,40 D:\\OYS FSAR REF DWGS BR 2002, Sheet 3, Rev 054, EXTRACTION (BLEED) STEAM SYSTEM F.pdf
                            ._BR 20_08,_Sheet. 1, Rev       0_440, AIR EXTRACTION AND                 FFGASS S.STE   p.                                 74 D:\OYS  FSAR  REF DWGS  BR 2008, Sheet 2, Rev           038, AIR EXTRACTION AND OFFGAS SYSTEM .pdf                                                       87539,092 D:\OYS  FSAR  REF DWGS                    ..
_775,126 D:\\OYS FSAR REF DWGS BR 2002, Sheet 4, Rev 062, REHEAT STEAM SYSTEM FLOW DIAGRAM.pdf 1828,913 D:\\OYS FSAR REF DWGS BR 2003, Sheet 1, Rev 090, CONDENSATE FEED SYSTEM FLOW DIAGRAM.pdf  
                                .......              Rev          TE                 B...... H-3 I   AT..     ...    .....                            , 008
,914,811 D:\\OYS FSAR REF DWGS BR 2004, Sheet 1, Rev 103, DEMINERALIZED TRANSFER SYSTEM FLOW DIAG.pdf 947,491.
                                                                                                                                                      . 1..........1.....
D:\\OYS FSAR REF DWGS_ BR 2004, Sheet 2, Rev 092, CONDENSATE TRANSFER SYSTEM FLOW DIAGRAM.pdf 1
                                                                                                                                                        .,2 D:\OYS  FSAR  REF DWGS  BR 2009, Sheet 1, Rev           043. TURBINE BLDG HEATING AND VENTILAT.pdf                                               i1,008,248
164_,023 D:\\OYSFSAR REF DWGS.
BR 2005, Sheet 1, Rev 043, VACUUM PRIMING SYSTEM FLOWDIAGRAd..f 574,988_j RDEFYS
_SAR__EFDWGS BR 2005, Sheet 2, Rev 099, REACTOR AND TURBINE BLDG.pdf 1 771,905 D:\\OYS FSAR REF DWGS BR 2005, Sheet 3, Rev 059, NEW RADWASTE SERVICE WATER SYSTEM FLOW DIAGf 633,033 D:\\OYS FSAR REF DWGS BR 2005, Sheet 4, Rev 080, EMERGENCY SERVICE WATER SYSTEM FLOW DIAGRAM.pdf i 742,840 D:\\OYS FSAR REF DWGS BR 2005, Sheet 5, Rev 057, SCREEN WASH SYSTEM FLOW DIAGRAM.pdf 719,514 I D:\\OYS FSAR REF DWGS BR 2005, Sheet 6, Rev 061, CIRCULATING WATER SYSTEM FLOW DIA.pdf i_851,325 1.
1*------~~~~~~~~~~~~~~~~~ --
_7 D:\\OYS FSAR REF DWGS BR 2006, Sheet 1, Rev 072, REACTOR BLDG CLOSED COOLINGWATER.pdf I 826,213 D:\\OYS FSAR REF DWGS BR 2006, Sheet 2, Rev 044, REACTOR BLDG CLOSED COOLING WATERpdf 455,111 D:\\OYS FSAR REF DWGS BR 2006, Sheet 3, Rev 056, REACTOR BLDG CLOSED COOLING WATER.pdf 1 739,609 D:\\OYS FSAR REF DWGS BR 2006, Sheet 4, Rev 063, TURBINE BLDG CLOSED COOLING WATER.pdf 744,505
_.D:\\OYS FSAR REF DWGS BR 2006, Sheet 5, Rev 056, TURBINE BLDG CLOSED COOLING WATER.pdf 732,010 1.D:.\\OYS EFSAR REF DWGS BR 2006, Sheet 6, Rev 050, RADWASTE -CLOSED COOLING WATER SYS.pdf-564,964
_D:_OYS FSAR REF DWGS.BR 2006, Sheet 7, Rev 050, RADWASTE CLOSED COOLING WATER SYS.pdf.
1,056,202 DAOYS FSAR REF DWG S BR20,Set8_e_5,AUMNE FGS(O)COE COO j 6089 D:\\OYS FSAR REF DWGS BR 2007, Sheet 1, Rev 028, HEATER DRAIN VENT AND PRESSURE RE.pdf
_817,764 D:\\OYS FSAR REF DWGS BR 2007, Sheet 2, Rev 032, HEATER DRAIN VENT AND PRESSURE RE.pdf J830,016 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2007, Sheet 3, Rev 034, HEATER DRAIN VENT AND PRESSURE RE.pdf 677,096 BR 2007, Sheet 4, Rev 024, HEATER DRAIN VENT AND PRESSURE RE.pdf 610,120
._BR 20_08,_Sheet. 1, Rev 0_440, AIR EXTRACTION AND FFGASS S.STE
: p.
74 BR 2008, Sheet 2, Rev 038, AIR EXTRACTION AND OFFGAS SYSTEM.pdf 87539,092 Rev
-3 TE B......
H I
AT..
1..........1.....  
, 008
.,2 BR 2009, Sheet 1, Rev 043. TURBINE BLDG HEATING AND VENTILAT.pdf i1,008,248


Page 2 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings III_                                      awfgh.         WEW7"' QINeNýf AIAJ D:\OYS FSAR REF DWGS   BR 2009, Sheet 2, Rev 037, HV MAIN STACK FLOW DIAGRAM.pdf                                                   519,150     _
Page 2 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings awfgh.
D:\OYS FSAR REF DWGS   BR 2009, Sheet 3, Rev 027, MACHINE SHOP AND STORAGE BLDG HV .pdf         _        -609,990 D:\OYS FSAR  REF DWGS  BR 2010, Sheet 1, Rev 029, OFFICE BLDG CHEMISTRY LABS FLOW D..pdf               _____                      649,259 D:\OYS FSAR  REF DWGS  BR 2010, Sheet 2, Rev 021, OFFICE BLDG HVAC SOUTH END FLOW D.pdf .                                     _ 816,593 D:\OYS FSAR  REF DWGS  BR 2010, Sheet 3, Rev 023, OFFICE BLDG HVAC (480V SWITCHGEAR.pdflf                                         465,869'86 D:\OYS FSAR  REF DWGS  BR 2010, Sheet 4, Rev 029, CONTROL AND CABLE SPREADING ROOMS HVAC FLOW D.pdf                               557,938 D:\OYS FSAR REF DWGS   BR 2010, Sheet 5, Rev 023, BATTERY AND MOTOR GENERATOR SET R.pdf                           __477,355 D:\OYS FSAR REF DWGS   BR 2011, Sheet 1, Rev 041, DRYWELL COOLING SYSTEM FLOW DIAGR.pdf                                             656,122 D:\OYSFSAR.REF.DWGS     BR 2011, Sheet 2, Rev 060, REACTOR BUILDING VENTILATION FLOW.pdf .                   ..                    911,810 D:\OYS FSAR REF DWGS   BR 2011, Sheet 3, Rev 047, REACTOR BLDG VENTILATION FLOW DIA.pdf           __706,274 D:\OYS FSAR REF DWGS   BR 2012, Sheet 1, Rev 014, OLD RADWASTE BLDG HV FLOW DIAGRAM.pdf                                           1,013,960:
WEW7"'
D:\OYS FSAR REF DWGS   BR 2013, Sheet 1, Rev 073, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf       _-97,084 D:\OYS FSAR REF DWGS   BR 2013, Sheet 10, Rev 053, INSTRUMENT (CONTROL) AIR SYSTEM .pdf                                           1,474,182 D:OYS FSAR R     DwGs   BR 2013, Sheet 2, Rev 080, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf                                           .667,332-D:\OYS FSAR RF   DWGS   BR9013, Sheet 3, Rev 068, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf                           -1     943,232 D:\OYS FSAR REF DWGS   BR 2013, Sheet 4, Rev 062, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf                                 1930,952 D:\OYS FSAR REF DWGS   BR 2013, Sheet 5, Rev 068, INSTRUMEýNT_(CONTROL) AIR SYSTEM FLWDAGA                           d           11,119,6081 D:\OYS FSAR REF DWGS   BR 2013, Sheet 6, Rev 083, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf                               1,014,287 D:\OYS FSAR REF DWGS   BR 2013, Sheet 7, Rev 065, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf                             1 592,543 D:\OYS FSAR REF DWGS   BR 2013, Sheet 8, Rev 63, INSTRUMENT CONTROL AIR SYSTEM FLOW DIAGRAM.pdf                               11,128,978 D:\OYS__FSAR REF DWGS   BR 2013, Sheet 9, Rev 057, INSTRUMENT (CONTROL) AIR SYSTEM.pdf               ..                        1. 499,237 D:\OYS FSAR REF DWGS _PBR 2014, Sheet 1, Rev 030, TURBINE LUBE OIL SYSTEM FLOW DIAG.pdf                                 -            563,319   -
III_
D:\OYS FSAR REF DWGS   IBR 2192, Sheet 1, Rev 012, COMPOSITE YARD PIPING KEY PLAN.pdf D:\OYS FSAR REF DWGS   BR 2192, Sheet 2, Rev 000, COMPOSITE YARD PIPING KEY PLAN.pdf_______
Q AIAJ INeNýf D:\\OYS FSAR REF DWGS BR 2009, Sheet 2, Rev 037, HV MAIN STACK FLOW DIAGRAM.pdf 519,150 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2009, Sheet 3, Rev 027, MACHINE SHOP AND STORAGE BLDG HV.pdf  
D:\OYS FSAR REF DWGS   BR 3001, Sheet 1, Rev 013, PLANT ELECT GENERATION MAIN ONE LINE DIAGRAM.pf                                   653,469 D:\OYS FSAR REF DWGS_   BR 3001, Sheet 2, Rev 004, EMERGENCY POWER SYSTEM ONE LINE D.pdf_                                           _631,867       i D:\OYS FSAR REF DWGS   BR 3002, Sheet 1, Rev 012, 480V SYSTEM ONE LINE DIAGRAM 460V.p                                               553,927 -
-609,990 BR 2010, Sheet 1, Rev 029, OFFICE BLDG CHEMISTRY LABS FLOW D..pdf 649,259 BR 2010, Sheet 2, Rev 021, OFFICE BLDG HVAC SOUTH END FLOW D.pdf.
D:\OYS FSAR REF DWGS   BR 3002, Sheet 2, Rev 011, 480V SYSTEM ONE LINE DIAGRAM 460V_.pdf_ ..                                       ._.584,581 D:\OYS FSAR REF DWGS   BR 3002, Sheet 3, Rev 009, 480V SYSTEM ONE LINE DIAGRAM 460V UNIT SUBSTA.pdf                               i460,761 D:\OYS FSAR REF DWGS   BR 3002, Sheet 4, Rev 007,480V (JCPL) NON VITAL POWER ONE LINE DIAGRAM.pdf                                   504,017 D:\OYS FSAR REF DWGS   BR 3013, Sheet 1, Rev 013, AC VITAL POWER SYSTEM ONE LINE DI.pdf                                           1728,028 D:\OYS FSAR REF DWGS       3013, Sheet 2,_ Rev 017, AC VITAL POWER SYSTEM ONE LINE DI.pdf D3\e.e.F.ARREF.DWG.BR                                                                                .      627,087
_ 816,593 BR 2010, Sheet 3, Rev 023, OFFICE BLDG HVAC (480V SWITCHGEAR.pdflf 465,869'86 BR 2010, Sheet 4, Rev 029, CONTROL AND CABLE SPREADING ROOMS HVAC FLOW D.pdf 557,938 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2010, Sheet 5, Rev 023, BATTERY AND MOTOR GENERATOR SET R.pdf
__477,355 D:\\OYS FSAR REF DWGS BR 2011, Sheet 1, Rev 041, DRYWELL COOLING SYSTEM FLOW DIAGR.pdf 656,122 D:\\OYSFSAR.REF.DWGS BR 2011, Sheet 2, Rev 060, REACTOR BUILDING VENTILATION FLOW.pdf.
911,810 D:\\OYS FSAR REF DWGS BR 2011, Sheet 3, Rev 047, REACTOR BLDG VENTILATION FLOW DIA.pdf
__706,274 D:\\OYS FSAR REF DWGS BR 2012, Sheet 1, Rev 014, OLD RADWASTE BLDG HV FLOW DIAGRAM.pdf 1,013,960:
D:\\OYS FSAR REF DWGS BR 2013, Sheet 1, Rev 073, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf
_-97,084 D:\\OYS FSAR REF DWGS BR 2013, Sheet 10, Rev 053, INSTRUMENT (CONTROL) AIR SYSTEM.pdf 1,474,182 D:OYS FSAR R DwGs BR 2013, Sheet 2, Rev 080, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf  
.667,332-D:\\OYS FSAR RF DWGS BR9013, Sheet 3, Rev 068, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf  
-1 943,232 D:\\OYS FSAR REF DWGS BR 2013, Sheet 4, Rev 062, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1930,952 D:\\OYS FSAR REF DWGS BR 2013, Sheet 5, Rev 068, INSTRUMEýNT_(CONTROL) AIR SYSTEM FLWDAGA d
1 1, 119,6081 D:\\OYS FSAR REF DWGS BR 2013, Sheet 6, Rev 083, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1,014,287 D:\\OYS FSAR REF DWGS BR 2013, Sheet 7, Rev 065, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1 592,543 D:\\OYS FSAR REF DWGS BR 2013, Sheet 8, Rev 63, INSTRUMENT CONTROL AIR SYSTEM FLOW DIAGRAM.pdf 11,128,978 D:\\OYS__FSAR REF DWGS BR 2013, Sheet 9, Rev 057, INSTRUMENT (CONTROL) AIR SYSTEM.pdf 1.
499,237 D:\\OYS FSAR REF DWGS _PBR 2014, Sheet 1, Rev 030, TURBINE LUBE OIL SYSTEM FLOW DIAG.pdf 563,319 D:\\OYS FSAR REF DWGS IBR 2192, Sheet 1, Rev 012, COMPOSITE YARD PIPING KEY PLAN.pdf D:\\OYS FSAR REF DWGS BR 2192, Sheet 2, Rev 000, COMPOSITE YARD PIPING KEY PLAN.pdf_______
D:\\OYS FSAR REF DWGS BR 3001, Sheet 1, Rev 013, PLANT ELECT GENERATION MAIN ONE LINE DIAGRAM.pf 653,469 D:\\OYS FSAR REF DWGS_
BR 3001, Sheet 2, Rev 004, EMERGENCY POWER SYSTEM ONE LINE D.pdf_
_631,867 i
D:\\OYS FSAR REF DWGS BR 3002, Sheet 1, Rev 012, 480V SYSTEM ONE LINE DIAGRAM 460V.p 553,927 -
D:\\OYS FSAR REF DWGS BR 3002, Sheet 2, Rev 011, 480V SYSTEM ONE LINE DIAGRAM 460V_.pdf_..  
._.584,581 D:\\OYS FSAR REF DWGS BR 3002, Sheet 3, Rev 009, 480V SYSTEM ONE LINE DIAGRAM 460V UNIT SUBSTA.pdf i460,761 D:\\OYS FSAR REF DWGS BR 3002, Sheet 4, Rev 007,480V (JCPL) NON VITAL POWER ONE LINE DIAGRAM.pdf 504,017 D:\\OYS FSAR REF DWGS BR 3013, Sheet 1, Rev 013, AC VITAL POWER SYSTEM ONE LINE DI.pdf 1728,028 D:\\OYS FSAR REF DWGS D3\\e.e.F.ARREF.DWG.BR 3013, Sheet 2,_ Rev 017, AC VITAL POWER SYSTEM ONE LINE DI.pdf 627,087


Page 3 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawincis 1250L,`,býf;g   P&M9mm iFý D:\OYS FSAR   REF DWGS   BR 3028, Sheet 1, Rev 016, 125V STATION SYSTEM ONE LINE DIAGRAM 125V.pdf                                       774,303 D:\OYS FSAR    REF DWGS    BR 3028, Sheet 2, Rev 008, 24V STATION DC SYSTEM ONE LINE DIAGRAM BATTER.pdf                     ___           606,295 D:\OYS FSAR    REF DWGS    BR 4006, Sheet 1, Rev 002, INTAKE AND TURBINE AREA EXCAVATIO.pdf                                               655,859J 4
Page 3 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawincis 1250L,`,býf;g P&M9 mm iFý D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS 4
D:\OYS FSAR    REF DWGS    BR M0012, Sheet 1, Rev 040, POST ACCIDENT SAMPLING FLOW DIAG.pdf_                                               875,107 D:\OYS FSAR    REF DWGS    BR M61 1, Sheet 1, Rev 34, NEW RADWASTE BLDG HVAC FLOW DIAGRAM.pdf                         _                    1,088,567 D:\OYS FSAR    REF DWGS    BR M61 1, Sheet 2, Rev 028, HEATING BOILER HOUSE HV FLOW DIAG.pdf                               _              480,060 D:\OYS FSAR   REF DWGS   EB D-3033, Rev 031,125V STATION DC SYSTEM ONE LINE DIAGRAM.pdf           -                                      574,040 D:\OYS FSAR REF DWGS      GE 107C5339, Sheet 1, Rev 018, RECIRCULATION PUMPS AND MG SE.p             .        ....                . 873,018 D:\OYS FSAR REF DWGS      GE 148F262, Sheet   1, Rev 53, EMERGENCY CONDENSER FLOW DIAGRAM.pdf                                             863,099 D:\OYS FSAR REF DWGS      GE 148F437, Sheet   1, Rev 048, LIQUID RADWASTE COLLECTION AND.pd         ...........                          743,091 D:\OYS FSAR REF DWGS GE 148F437 Sheet   10. Rev 037. LIQUID RADWASTE COLLECTION AN.Ddf                                             1,905,389 D:\OYS FSAR REF DWGS       GE 148F437, Sheet   11, Rev 036, LIQUID RADWASTE COLLECTION AN.pdf               _                              649,547 D:\OYS FSAR REF DWGS       GE 148F437, Sheet   12, Rev 038, RADIOACTIVE WASTE PROCESSING .pdf                                             553,941 D:\OYSFSAR REF DWGS       GE 148F437, Sheet   13, Rev 040, RADIOACTIVE WASTE PROCESSING .pdf                                           I 477,392 D:\OYS....FSAR REF
BR 3028, Sheet 1, Rev 016, 125V STATION SYSTEM ONE LINE DIAGRAM 125V.pdf 774,303 BR 3028, Sheet 2, Rev 008, 24V STATION DC SYSTEM ONE LINE DIAGRAM BATTER.pdf ___
          ..        DW GS IG E 148F437, Sheet --.-
606,295 BR 4006, Sheet 1, Rev 002, INTAKE AND TURBINE AREA EXCAVATIO.pdf 655,859J BR M0012, Sheet 1, Rev 040, POST ACCIDENT SAMPLING FLOW DIAG.pdf_
                .........                      14, Rev 055
875,107 BR M61 1, Sheet 1, Rev 34, NEW RADWASTE BLDG HVAC FLOW DIAGRAM.pdf 1,088,567 BR M61 1, Sheet 2, Rev 028, HEATING BOILER HOUSE HV FLOW DIAG.pdf 480,060 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS EB D-3033, Rev 031,125V STATION DC SYSTEM ONE LINE DIAGRAM.pdf 574,040 GE 107C5339, Sheet 1, Rev 018, RECIRCULATION PUMPS AND MG SE.p 873,018 GE 148F262, Sheet 1, Rev 53, EMERGENCY CONDENSER FLOW DIAGRAM.pdf 863,099 GE 148F437, Sheet 1, Rev 048, LIQUID RADWASTE COLLECTION AND.pd 743,091 GE 148F437 Sheet 10. Rev 037. LIQUID RADWASTE COLLECTION AN.Ddf 1,905,389 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 11, Rev 036, LIQUID RADWASTE COLLECTION AN.pdf 649,547 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 12, Rev 038, RADIOACTIVE WASTE PROCESSING.pdf 553,941 D:\\OYSFSAR REF DWGS GE 148F437, Sheet 13, Rev 040, RADIOACTIVE WASTE PROCESSING.pdf I 477,392 D:\\OYS FSAR REF DW GS IG E 148F437, Sheet 14, Rev 055 SOLID RADW ASTE PRO CESSING FLOW....
                                                      . .. SOLID..........
D p..................f........
                                                          ....      RADW   ASTE
1794......
                                                                          ...... PRO CESSING
                                                                            ............ ..      Dp..................f........
FLOW....                ..  .....        1794......
202.
202.
_:OSFA       REF DWGS GE 148F437.,-Sheet 15, Rev 042, SOLID RDOCIEWSE ..0Ept-----3.
_:OSFA REF DWGS GE 148F437., -Sheet 15, Rev 042, SOLID RDOCIEWSE..0Ept-----3.
D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 16, Rev 034, OBSOLETE SOLID RADIOACTIVE WA.pdf               _                              414,307 D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 17, Rev 038, LIQUID RADWASTE COLLECTION AN.pdf                                         1 683,233 D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 18, Rev 036, SOLID RADIOACTIVE WASTE PROCE.pdf                                           1668,803 D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 2, Rev 040, LIQUID RADWASTE COLLECTION AND.pdf                           -                  556,079 D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 3, Rev 045, LIQUID RADWASTE WATER COLLECTION AND PR.pdf                                     729,064 D:\OYS FSAR   REF DWGS   GE 148F437, Sheet 4, Rev 054, LIQUID RADWASTE COLLECTIONAND PROCESSINGpd ...                               1.648 883 D:\OYS   FSAR REF DWGS   GE 148F437, Sheet   5, Rev 046, LIQUID RADWASTE COLLECTION AND.pdf                                             85,561 D:\OYS   FSAR REF DWGS   GE 148F437, Sheet   6, Rev 039, LIQUID RADIOACTIVE WASTE COLLE.pdf                                             557,924 D:\OYS   FSAR REF DWGS   GE 148F444, Sheet   1, Rev 099, CLEAN-UP DEMINERALIZER SYSTEM FLOW DIAGRAM.pdf                             i 952,264 D:\OYS   FSAR REF DWGS   GE 148F71 1, Sheet 1, Rev 043, REACTOR SHUTDOWN COOLING SYSTE.pdf                                   -865,612 D:\OYS   FSAR REF DWGS   GE 148F723, Sheet 1, Rev 036, LIQUID POISON SYSTEM FLOW DIAG.pdf                                             676,757_
D:\\OYS FSAR REF DWGS GE 148F437, Sheet 16, Rev 034, OBSOLETE SOLID RADIOACTIVE WA.pdf 414,307 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 17, Rev 038, LIQUID RADWASTE COLLECTION AN.pdf 1 683,233 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 18, Rev 036, SOLID RADIOACTIVE WASTE PROCE.pdf 1668,803 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 2, Rev 040, LIQUID RADWASTE COLLECTION AND.pdf 556,079 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 3, Rev 045, LIQUID RADWASTE WATER COLLECTION AND PR.pdf 729,064 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 4, Rev 054, LIQUID RADWASTE COLLECTIONAND PROCESSINGpd...
D:\OYS   FSAR REF DWGS   GE 148F740, Sheet 1, Rev 043, CONTAINMENT SPRAY SYSTEM FLOW .pdf                                           i 812,266 D:\OYS   FSAR REF DWGS   GE 197E871, Sheet 1, Rev 029, SCRAM DISCHARGE VOLUME SYSTEM CONTROL ROD.pdf                                   581,124     IT D:-OYS   FSAR REF DWGS   GE 234R166, Sheet   1, Rev 025, GENERATOR STATOR COOLING SYSTE.pdf                 -                          707,226 D:\OYS   FSAR REF DWGS   GE 237E487, Sheet 1, Rev 067, CONTROL ROD DRIVE SYSTEM FLOW DIAGRAM.pdf                                     _651,552 D:\OYS FSAR REF DWG S 1GE237E516, Sheet 1, Rev 008, ARRANGEMENT OF FUEL STORAGE PO.pdf                                                 12,026,091
1.648 883 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 5, Rev 046, LIQUID RADWASTE COLLECTION AND.pdf 85,561 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 6, Rev 039, LIQUID RADIOACTIVE WASTE COLLE.pdf 557,924 D:\\OYS FSAR REF DWGS GE 148F444, Sheet 1, Rev 099, CLEAN-UP DEMINERALIZER SYSTEM FLOW DIAGRAM.pdf i 952,264 D:\\OYS FSAR REF DWGS GE 148F71 1, Sheet 1, Rev 043, REACTOR SHUTDOWN COOLING SYSTE.pdf  
-865,612 D:\\OYS FSAR REF DWGS GE 148F723, Sheet 1, Rev 036, LIQUID POISON SYSTEM FLOW DIAG.pdf 676,757_
D:\\OYS FSAR REF DWGS GE 148F740, Sheet 1, Rev 043, CONTAINMENT SPRAY SYSTEM FLOW.pdf i 812,266 D:\\OYS FSAR REF DWGS GE 197E871, Sheet 1, Rev 029, SCRAM DISCHARGE VOLUME SYSTEM CONTROL ROD.pdf 581,124 IT D:-OYS FSAR REF DWGS GE 234R166, Sheet 1, Rev 025, GENERATOR STATOR COOLING SYSTE.pdf 707,226 D:\\OYS FSAR REF DWGS GE 237E487, Sheet 1, Rev 067, CONTROL ROD DRIVE SYSTEM FLOW DIAGRAM.pdf
_651,552 D:\\OYS FSAR REF DWG S 1GE237E516, Sheet 1, Rev 008, ARRANGEMENT OF FUEL STORAGE PO.pdf 12,026,091


Page 4 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\OYS FSAR REF DWGS GE 237E516, Sheet 2, Rev 007, WALL MOUNT DETAIL FUEL STORAGE.pdf                       _11,033,848 D:\OYS FSAR REF DWGS GE 237E516, Sheet 3, Rev 005, ARRANGEMENT OF FUEL STORAGE PO.pdf                                 "    __        1,134,080 D:\OYS FSAR REF DWGS I GE 237E516, Sheet 4, Rev 003, ARRANGEMENT OF FUEL STORAGE PO.pdf                           ' -                810,337 D\OYS FSAR REF DWGS       GE 237E566, Sheet 1, Rev 044, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf                             1774,393 D:\OYS-FSAR REF DWGS       GE 237E566, Sheet 10, Rev 003, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME pdf ..                           720,386 D-\OYS-FSAR-REF-DWGS_     GE 237E566, Sheet 11, Rev 008, REACTOR PROTECTION SYSTEM ELE.pdf                                         1......639,332...
Page 4 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FSAR REF DWGS GE 237E516, Sheet 2, Rev 007, WALL MOUNT DETAIL FUEL STORAGE.pdf
DAOYS FSAR REF DWGS       GE 237E566, Sheet 12, Rev 006, REACTOR     PROTECTION   SYSTEM ELECTRICAL ELEME.pdf             --      871,773 DAOYS FSAR REF DWGS .     GE 237E566, Sheet 13, Rev 007, REACTOR     PROTECTION   SYSTEM_ELECTRICAL ELEME.pdf                       632,205 D:\OYS FSAR REF DWGS       GE 237E566, Sheet 14, Rev 010, REACTOR     PROTECTION   SYSTEM ELECTRICAL ELEME.pdf                       665,385_
_11,033,848 D:\\OYS FSAR REF DWGS GE 237E516, Sheet 3, Rev 005, ARRANGEMENT OF FUEL STORAGE PO.pdf 1,134,080 D:\\OYS FSAR REF DWGS I GE 237E516, Sheet 4, Rev 003, ARRANGEMENT OF FUEL STORAGE PO.pdf 810,337 D\\OYS FSAR REF DWGS GE 237E566, Sheet 1, Rev 044, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 1 774,393 D:\\OYS-FSAR REF DWGS GE 237E566, Sheet 10, Rev 003, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME pdf..
-D-\OYS FSAR REF DWGS     GE 237E566, Sheet 15, Rev 007, REACTOR     PROTECTION   SYSTEM ELE                                       635,471 DAOYS-/SR REF DWGS         GE 237E566, Sheet 16, Rev 002, REACTOR PROTECTION SYSTEM ELE.pdf                                           771,092         -
720,386 D-\\OYS-FSAR-REF-DWGS_ GE 237E566, Sheet 11, Rev 008, REACTOR PROTECTION SYSTEM ELE.pdf 1......639,332...
D:\OYS FSAR REF DWG.S     GE237E566, Sheet 17, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdf                                             717,5543_
DAOYS FSAR REF DWGS GE 237E566, Sheet 12, Rev 006, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 871,773 DAOYS FSAR REF DWGS.
D:YSFSAR__REF DWG.S .. GE_237.E_566,.SheetRev 003.,_       R.EACTO     ROTECTIONSYSTEM_.ELEC.p         E_._M__d_         f           76,7.!
GE 237E566, Sheet 13, Rev 007, REACTOR PROTECTION SYSTEM_ELECTRICAL ELEME.pdf 632,205 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 14, Rev 010, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 665,385_
D:\OYS FSAR REF DWGS GE 237E566, Sheet 19, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdfTRICA E                           p             648,396 D:\OYS FSAR REF DWGS       GE 237E566, Sheet 29,Rev 045, REACTOR PROTECTION SYSTEM EL.ECTRICALELEME_.pdf                             765,40 D:\OYS FSAR REF DWGS       GE 237E566, Sheet 2, Rev 003,REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf                                 7.,4,4132 D:\OYS FSAR REF DWGS       GE 237E566, Sheet 3, Rev 011, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf .                             76,386 ..
-D-\\OYS FSAR REF DWGS GE 237E566, Sheet 15, Rev 007, REACTOR PROTECTION SYSTEM ELE 635,471 DAOYS-/SR REF DWGS GE 237E566, Sheet 16, Rev 002, REACTOR PROTECTION SYSTEM ELE.pdf 771,092 D:\\OYS FSAR REF DWG.S GE237E566, Sheet 17, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdf 717,5543_
D:\OYS FSAR REF DWGS       GE 237E566, Sheet 4, Rev 027, REACTORPROTECTION SYSTEM ELECTRICAL ELEME.pdf                                 796,403 D:\OYS FSAR REF DWGS       GE 237E566, Sheet 5, Rev 047, REACTOR_ PROTECTION SYSTEM ELECTRICAL ELEM.pdf                               70,39,7 D:\OYS FSAR REF DWGS iGE 237E566,_Sheet 6, Rev 039, REACTOR PROTECTION SYSTEM ELECTRdICAL                                                 6270 LR\OYS FSAR REF DWGS_
D:YSFSAR__REF DWG.S.. GE_237.E_566,.SheetRev 003.,_
._D:__Y__F.ARRREFDWGS_      GE 237E566, Sheet GE.237E5_6_      7, Rev_008, REACTOR PROTECTIONSYSTEM Sheeth8,_Revv005,_REACTOR                           ELEC.pdf PROTECTION'SYSTEMELECTRICAL.ELEME..                             .731,810 83,957 ....
R.EACTO ROTECTIONSYSTEM_.ELEC.p E_._M__d_
D:\OYS FSAR REF DWGS       GE 237E566, Sheet 9, Rev 006, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf                               630,488 8
f 76,7.!
lP:\OYS FSAR REF DWGS       GE 237E726, Sheet 1, Rev 074, DRYWELL AND SUPPRESSION SYSTEM.pdf .                                         819,024 D:\OYS FSAR REF DWGS       GE 237E756, Sheet 1, Rev 0049, SPENT FUEL POOL COOLING FLOW DIAGRAM.Pdf                                     82,127 DAOYS   FSAR REF DWGS     GE 237E798, Sheet 1, Rev 033, RECIRCULATION SYSTEM FLOW DIAG.pdf                                           895,647.
D:\\OYS FSAR REF DWGS GE 237E566, Sheet 19, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdfTRICA E p
D\OYS   FSAR REF DWGS     GE 237E901, Sheet 1, Rev 034, CONTAINMENT SPRAY LOGIC ELECTR.pdf                                         i 783,919 D\OYS   FEANM FSAR REF DWGS     GE 237E901, Sheet 2, Rev 019, CONTAINMENT SPRAY LOGIC ELECTR.pdf                         ........... 792,419 D\OYS   FSAR REF DWGS     GE 237E912, Sheet 2, Rev 019, REACTOR MANUAL CONTROL SYSTEMELECTRICAL E.pdf                                 721,166 D:\OYS FSAR REF DWGS     GE 237E912, Sheet 3, Rev 003, REACTOR MANUAL CONTROL SYSTEM .pdf     ELC_.                                   38, 123,16 D:\OYS FSAR REF DWGS 1 GE 237E912, Sheet 4, Rev 001, REACTOR MANUAL CONTROL SYSTEM .pdf                                             I 618,108
648,396 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 29, Rev 045, REACTOR PROTECTION SYSTEM EL.ECTRICALELEME_.pdf 765,40 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 2, Rev 003, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 7.,4,4132 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 3, Rev 011, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf.
76,386..
D:\\OYS FSAR REF DWGS GE 237E566, Sheet 4, Rev 027, REACTORPROTECTION SYSTEM ELECTRICAL ELEME.pdf 796,403 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 5, Rev 047, REACTOR_ PROTECTION SYSTEM ELECTRICAL ELEM.pdf 70,39,7 D:\\OYS FSAR REF DWGS iGE 237E566,_Sheet 6, Rev 039, REACTOR PROTECTION SYSTEM ELECTRdICAL 6270 LR\\OYS FSAR REF DWGS_
GE 237E566, Sheet 7, Rev_008, REACTOR PROTECTIONSYSTEM ELEC.pdf
.731,810
._D:__Y__F.ARRREFDWGS_
GE.237E5_6_ Sheeth8,_Revv005,_REACTOR PROTECTION'SYSTEMELECTRICAL.ELEME..
83,957 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 9, Rev 006, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 8
630,488 lP:\\OYS FSAR REF DWGS GE 237E726, Sheet 1, Rev 074, DRYWELL AND SUPPRESSION SYSTEM.pdf.
819,024 D:\\OYS FSAR REF DWGS GE 237E756, Sheet 1, Rev 0049, SPENT FUEL POOL COOLING FLOW DIAGRAM.Pdf 82,127 DAOYS FSAR REF DWGS GE 237E798, Sheet 1, Rev 033, RECIRCULATION SYSTEM FLOW DIAG.pdf 895,647.
D\\OYS FSAR REF DWGS GE 237E901, Sheet 1, Rev 034, CONTAINMENT SPRAY LOGIC ELECTR.pdf i 783,919 D\\OYS FSAR REF DWGS GE 237E901, Sheet 2, Rev 019, CONTAINMENT SPRAY LOGIC ELECTR.pdf  
........... 792,419 FEANM D\\OYS FSAR REF DWGS GE 237E912, Sheet 2, Rev 019, REACTOR MANUAL CONTROL SYSTEMELECTRICAL E.pdf 721,166 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 3, Rev 003, REACTOR MANUAL CONTROL SYSTEM.pdf ELC_.
38, 123,16 D:\\OYS FSAR REF DWGS 1 GE 237E912, Sheet 4, Rev 001, REACTOR MANUAL CONTROL SYSTEM.pdf I 618,108


Page 5 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\OYS FSAR REF DWGS         GE 237E912, Sheet 5, Rev 000, REACTOR MANUAL CONTROL SYSTEM .pdf                                                 !732,353 D:\OYS FSAR REF DWGS         GE 237E912, Sheet 6, Rev 002, REACTOR MANUAL CONTROL SYSTEM .pdf                                                   634,485 D..OYS SAR REF DWGS           GE 237E912, Sheet 7, Rev 000, REACTOR MANUAL CONTROL SYSTEM                 .pdf ..                               635,0 D:\OYS       FSAR REF DWGS   GE 237E912, Sheet 8, Rev 004, REACTOR MANUAL CONTROL SYSTEM.pdf                                                     6 523,054 D:\OYS       FSAR REF DWGS   GE 706E206, Sheet 1, Rev 000, ARRANGEMENT OF DRYWELL EQUIPME.pdf                                                   2,134,228 D:\OYS       FSAR REF DWGS   GE 706E206, Sheet 2, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf                                                   ,1 769,284 D:\OYS       FSAR REF DWGS   GE 706E206, Sheet 3, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf                                                   905,311 D:\OYS FSAR REF DWGS         GE 718E644, Sheet 2, Rev 018, CORE SPRAY SYSTEM ELECTRICALE. pd                                                     568,890_
Page 5 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FSAR REF DWGS GE 237E912, Sheet 5, Rev 000, REACTOR MANUAL CONTROL SYSTEM.pdf  
D'\OYS FSAR       REF DWGS   GE 729E1.82,     Sheet 1, Rev 033, AUTOMATIC DEPRESSURIZATION SYS..                    .        .            .        _.
!732,353 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 6, Rev 002, REACTOR MANUAL CONTROL SYSTEM.pdf 634,485 D..OYS SAR REF DWGS GE 237E912, Sheet 7, Rev 000, REACTOR MANUAL CONTROL SYSTEM  
rD:\OYS FSAR       REF DWGS   GE 729E182,     Sheet 2, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf                                             ,430,514 D:\OYS FSAR       REF DWGS   GE 729E182,     Sheet 3, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf                                               630,254
.pdf..
_____________REF_         IGE   729E182,Sheet       4,Rv02_UTERSUIZTOYTM__1,4 616,440 D:\OYS FSAR       REF DWGS   GE 729E182,     Sheet 4, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf D:\OYS FSAR       REF DWGS   GE 729E182,     Sheet 5, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf                                             i 690,395 D:\OYS FSAR REF DWGS         GE 798D807, Sheet 1, Rev 002, PLANT HEAT BALANCE.pdf                     _          _825,972 D:\OYS       FSAR REF DWGS   GE 846D640, Sheet 1, Rev 000, HEAT BALANCE 3 HEATER 670 MW.pdf                 _            ____                  923,055 D:\OYS       FSAR REF DWGS   GE 846D686, Sheet 1, Rev 021, PROCESS RADIATION MONITOR SYSTEM.pdf                                               j 621,615 D:\OYS       FSAR REF DWGS   GE 846D686, Sheet 2, Rev 004, PROCESS RADIATION MONITOR SYST.pdf                                                   633,486 D:\OYS       FSAR REF DWGS   GE 885D781, Sheet 1, Rev 071, CORE SPRAY SYSTEM FLOW DIAGRAM.pdf                                                   977,482 D:\OYS       FSAR REF DWGS   GF JCP-19431, Sheet 1, Rev 002, SYMBOLS AND LEGEND FOR INSER.pdf                                                   757,51
635,0 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 8, Rev 004, REACTOR MANUAL CONTROL SYSTEM.pdf 6 523,054 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 1, Rev 000, ARRANGEMENT OF DRYWELL EQUIPME.pdf 2,134,228 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 2, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf  
_D-.YS       FSARRF__DWGS_   GU_3C-SKS-1 10, Rev 001, ISFSI SPENT FUEL CASK SAFE LOAD PATH.pdf--------                               ....
,1 769,284 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 3, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf 905,311 D:\\OYS FSAR REF DWGS GE 718E644, Sheet 2, Rev 018, CORE SPRAY SYSTEM ELECTRICALE. pd 568,890_
                                                                                                                                        -    __562,364 D:\OYS FSAR REF DWGS         GU 3D-151-07-001, Sheet 1, Rev 001, GENERAL ARRANGEMENT FLOO.pdf                                                 1 663,806 D:\OYS FSAR REF DWGS       I GU 3D-1 51-07-001,     Sheet 2, Rev 002, GENERAL ARRANGEMENT FLOO.p_.f                                             692,351 D:\OYS FSAR REF DWGS       I GU 3-153-07-001, Sheet 1, Rev 000, GENERAL ARRANGEMENT FLOO.pdf                                                     678,968 D:\OYS FSAR REF DWGS         GU 3D-153-07-001, Sheet 2, Rev 000, GENERAL ARRANGEMENT FLOO.pdf                                                   769,152 r D:\OYS FSAR REF DWGS         GU 3D-154-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf                                                   689,237 D'\OYSFSARFREFDWGS           GU 3D-155-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf                                                   863,832 .
D'\\OYS FSAR REF DWGS GE 729E1.82, Sheet 1, Rev 033, AUTOMATIC DEPRESSURIZATION SYS..
D:\OYS FSAR REF DWGS             3D-576-07-001,_Rev 000, GENERAL ARRANGEMENT ROOF           RGU DRAINS A.pdf ---            -...        .      680,319
rD:\\OYS FSAR REF DWGS GE 729E182, Sheet 2, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf  
_D:\OYS FSAR       REF DWGS GU 3E-1 51-02-001,       Rev 012,   GENERAL ARRANGEMENT TURBINE BLDG pdf .              -                          960,718
,430,514 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 3, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf 630,254
[D:\OYS FSAR       REF DWGS GU 3E-151-02-003,         Rev 011,   GENERAL       ARRANGEMENT TURBINE BLDG PLAN FLOOR Epdf                   _     989,769 D:\OYS FSAR       REF DWGS GU 3E-151-02-005,         Rev 012,   GENERAL       ARRANGEMENT TURBINE BLDG .pdf                       _              1,097,346 D:\OYS FSAR       REF DWGS [GU 3E-151-02-006,       Rev 007,   GENERAL       ARRANGEMENT TURBINE BLDG .pdf                                 i__900,569
_____________REF_
  -D.'YS     FSAR REF DWGS GU 3E-151-02-007,         Rev 005,   GENERAL       ARRANGEMENT TURBINE BLDG .pdf                                 , 821,510
IGE 729E182,Sheet 4,Rv02_UTERSUIZTOYTM__1,4 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 4, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf 616,440 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 5, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf i 690,395 D:\\OYS FSAR REF DWGS GE 798D807, Sheet 1, Rev 002, PLANT HEAT BALANCE.pdf
_825,972 D:\\OYS FSAR REF DWGS GE 846D640, Sheet 1, Rev 000, HEAT BALANCE 3 HEATER 670 MW.pdf 923,055 D:\\OYS FSAR REF DWGS GE 846D686, Sheet 1, Rev 021, PROCESS RADIATION MONITOR SYSTEM.pdf j 621,615 D:\\OYS FSAR REF DWGS GE 846D686, Sheet 2, Rev 004, PROCESS RADIATION MONITOR SYST.pdf 633,486 D:\\OYS FSAR REF DWGS GE 885D781, Sheet 1, Rev 071, CORE SPRAY SYSTEM FLOW DIAGRAM.pdf 977,482 D:\\OYS FSAR REF DWGS GF JCP-19431, Sheet 1, Rev 002, SYMBOLS AND LEGEND FOR INSER.pdf 757,51
_D-.YS FSARRF__DWGS_
GU_3C-SKS-1 10, Rev 001, ISFSI SPENT FUEL CASK SAFE LOAD PATH.pdf--------
__562,364 D:\\OYS FSAR REF DWGS GU 3D-151-07-001, Sheet 1, Rev 001, GENERAL ARRANGEMENT FLOO.pdf 1 663,806 D:\\OYS FSAR REF DWGS I GU 3D-1 51-07-001, Sheet 2, Rev 002, GENERAL ARRANGEMENT FLOO.p_.f 692,351 D:\\OYS FSAR REF DWGS I GU 3-153-07-001, Sheet 1, Rev 000, GENERAL ARRANGEMENT FLOO.pdf 678,968 D:\\OYS FSAR REF DWGS GU 3D-153-07-001, Sheet 2, Rev 000, GENERAL ARRANGEMENT FLOO.pdf 769,152 r D:\\OYS FSAR REF DWGS GU 3D-154-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf 689,237 D'\\OYSFSARFREFDWGS GU 3D-155-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf 863,832.
D:\\OYS FSAR REF DWGS RGU 3D-576-07-001,_Rev 000, GENERAL ARRANGEMENT ROOF DRAINS A.pdf 680,319
_ D:\\OYS FSAR REF DWGS GU 3E-1 51-02-001, Rev 012, GENERAL ARRANGEMENT TURBINE BLDG pdf 960,718
[D:\\OYS FSAR REF DWGS GU 3E-151-02-003, Rev 011, GENERAL ARRANGEMENT TURBINE BLDG PLAN FLOOR Epdf _
989,769 D:\\OYS FSAR REF DWGS GU 3E-151-02-005, Rev 012, GENERAL ARRANGEMENT TURBINE BLDG.pdf 1,097,346 D:\\OYS FSAR REF DWGS [GU 3E-151-02-006, Rev 007, GENERAL ARRANGEMENT TURBINE BLDG.pdf i__900,569
-D.'YS FSAR REF DWGS GU 3E-151-02-007, Rev 005, GENERAL ARRANGEMENT TURBINE BLDG.pdf  
, 821,510


Page 6 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings W A1      .1           .N"e.       I.                  .n:i '        '
Page 6 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings W A 1
D:\OYS FSAR REF DWGS   GU 3E-151-02-008, Rev 007, GENERAL ARRANGEMENT TURBINE BLDG .pdf             -            763,359 D_\OYS FSAR REF DWGS_ GU 3E-151-02-009, Rev 004, GENERAL ARRANGEMENT TURBINE BLDG .Rdf                       .617,067 DAOYSFSAR REF DWGS     GU 3E-1 53-02-001, Rev 008, GENERAL ARRANGEMENT REACTOR BLDG PLAN FLOOR E. pf             844,7637 1 D:\OYS FSAR REF DWGS   GU 3E-153-02-003, Rev 007, GENERAL   ARRANGEMENT       REACTOR   BLDG .pdf             8 913,492 D:\OYS FSAR REF DWGS   GU 3E-153-02-004, Rev 009, GENERAL   ARRANGEMENT       REACTOR   BLDG .pdf             627 402 D:\OYS FSAR REF DWGS   GU 3E-153-02-005, Rev 007, GENERAL   ARRANGEMENT       REACTOR   BLDG .pdf             67652 362 D:\OYS FSAR REFDWGS   GU 3E-153-02-006, Rev 007, GENERAL   ARRANGEMENT       REACTOR   BLDG   pdf             613 784 D:\OYS FSAR REF DWGS   GU 3E-153-02-007, Rev 004, GENERAL   ARRANGEMENT       REACTOR   BLDG .pdf             832 6984 D:\OYS FSAR REF DWGS   GU 3E-153-02-008, Rev 003, GENERAL   ARRANGEMENT       REACTOR   BLDG .pdf               3717142 D:\OYS FSAR REF DWGS   GU 3E-153-02-008, Rev 004, GENERAL   ARRANGEMENT       REACTOR BLDG .pdf                 7984 18 D:\OYS FSAR REF DWGS   GU 3E-154-02-001, Rev 008, GENERAL   ARRANGEMENT       OLD RADWASTE .pdf         _  -94,08 D:OYS FSAR REF DWGS   GU 3E-154-02-001, Rev 005, GENERAL   ARRANGEMENT       OLD RADWASTE .pdf ..         __5,708 D:\OYS FSAR REF DWGS   GU 3E-154-02-002, Rev 004, GENERAL   ARRANGEMENT       OLD RADWASTE.pdf                   250,765 D:\OYS FSAR REF DWGS   GU 3E-155-02-003, Rev 008, GENERAL   ARRANGEMENT       NEW RADWASTE.pdf                 612,365 D:\OYS FSAR REF DWGS   GU 3E-155-02-001, Rev 005, GENERAL   ARRANGEMENT       NEW RADWASTE-p                   6DPANFO.820,389 D:\OYS FSAR REF DWGS   GU 3E-155-02-002, Rev 005, GENERAL   ARRANGEMENT       NEW RADWASTE .pLA FL203,08             3 D:\OYS FSAR REF DWGS   GU 3E-1 55-02-004, Rev 005, GENERAL   ARRANGEMENT       NEW RADWASTE .pdf               8150736 D:\OYS FSAR REF DWGS -GU 3E-1 55-02-005, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE .pdL                               81 077 703,60__
.1 I.
D:\OYS FSAR REF DWGS   GU 3E-156-02-001, Rev 005, GENERAL ARRANGEMENT OFFICE BLDG P.pdf                           729,459 D:\OYS FSAR REF DWGS   GU 3E-156-02-002, Rev 004, GENERAL ARRANGEMENT OFFICE BLDG P.pdf                           734,633 D:\OYS FSAR REF DWGS   GU 3E-1 56-02-002, Rev 004, GENERAL ARRANGEMENT DFICESELD       GEE.pdf                   5731,604 D:\OYS FSAR REF DWGS   GU 3E-158-02-001, Rev 009, GENERAL   ARRANGEMENT       HEATING BOILE.pdf                 641,641 D:\OYS FSAR REF DWGS   GU 3E-162-02-001, Rev 004, GENERAL   ARRANGEMENT       MAINTENANCE B.pdf                 684,422 D:\OYS FSAR REF DWGS   GU 3E-162-02-002, Rev 003, GENERAL   ARRANGEMENT       MAINTENANCE B.pdf             I 467,260 D:\OYS FSAR REF DWGS   GU 3E-162-02-003, Rev 005, GENERAL   ARRANGEMENT       MAINTENANCE B.pdf               1529,715 D:\OYS FSAR REF DWGS   GU 3E-167-02-001, Rev 007, GENERAL   ARRANGEMENT       PRETREATMENT .pdf             i 528,782 D:\OYS FSAR REF DWGS   GU 3E-168-02-001, Rev 010, GENERAL   ARRANGEMENT       INTAKE STRUCT.pdf                 730,267 DOYS   FSAR REF DWGS   GU 3E-169-02-001, Rev 008, GENERAL   ARRANGEMENT       CHLOR       N d537,770 D:\OYS FSAR REF DWGS   GU 3E-1 70-02-001, Rev 007, GENERAL   ARRANGEMENT       DILUTION PUMP.pdf                 764,999 D:\OYS FSAR REF DWGS   GU 3E-175-02-001, Rev 005, GENERAL   ARRANGEMENT       AUGMENTED OFF.pdf       _        670,253
.N"e.  
!D:\OYS FSAR REF DWGS   GU 3E-175-02-002, Rev 003, GENERAL ARRANGEMENT AUGMENTED OFF.pdf                           565,008,5
.n: i '
D:\\OYS FSAR REF DWGS GU 3E-151-02-008, Rev 007, GENERAL ARRANGEMENT TURBINE BLDG.pdf 763,359 D_\\OYS FSAR REF DWGS_
GU 3E-151-02-009, Rev 004, GENERAL ARRANGEMENT TURBINE BLDG.Rdf  
.617,067 DAOYSFSAR REF DWGS GU 3E-1 53-02-001, Rev 008, GENERAL ARRANGEMENT REACTOR BLDG PLAN FLOOR E. pf 844,7637 1 D:\\OYS FSAR REF DWGS GU 3E-153-02-003, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG.pdf 8 913,492 D:\\OYS FSAR REF DWGS GU 3E-153-02-004, Rev 009, GENERAL ARRANGEMENT REACTOR BLDG.pdf 627 402 D:\\OYS FSAR REF DWGS GU 3E-153-02-005, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG.pdf 67652 362 D:\\OYS FSAR REFDWGS GU 3E-153-02-006, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG pdf 613 784 D:\\OYS FSAR REF DWGS GU 3E-153-02-007, Rev 004, GENERAL ARRANGEMENT REACTOR BLDG.pdf 832 698 4 D:\\OYS FSAR REF DWGS GU 3E-153-02-008, Rev 003, GENERAL ARRANGEMENT REACTOR BLDG.pdf 3717142 D:\\OYS FSAR REF DWGS GU 3E-153-02-008, Rev 004, GENERAL ARRANGEMENT REACTOR BLDG.pdf 7984 18 D:\\OYS FSAR REF DWGS GU 3E-154-02-001, Rev 008, GENERAL ARRANGEMENT OLD RADWASTE.pdf  
-94,08 D:OYS FSAR REF DWGS GU 3E-154-02-001, Rev 005, GENERAL ARRANGEMENT OLD RADWASTE.pdf..
__5,708 D:\\OYS FSAR REF DWGS GU 3E-154-02-002, Rev 004, GENERAL ARRANGEMENT OLD RADWASTE.pdf 250,765 D:\\OYS FSAR REF DWGS GU 3E-155-02-003, Rev 008, GENERAL ARRANGEMENT NEW RADWASTE.pdf 612,365 D:\\OYS FSAR REF DWGS GU 3E-155-02-001, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE-p 6DPANFO.820,389 D:\\OYS FSAR REF DWGS GU 3E-155-02-002, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pLA F L203,08 3
D:\\OYS FSAR REF DWGS GU 3E-1 55-02-004, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pdf 8150736 D:\\OYS FSAR REF DWGS  
-GU 3E-1 55-02-005, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pdL 703,60__
81 077 D:\\OYS FSAR REF DWGS GU 3E-156-02-001, Rev 005, GENERAL ARRANGEMENT OFFICE BLDG P.pdf 729,459 D:\\OYS FSAR REF DWGS GU 3E-156-02-002, Rev 004, GENERAL ARRANGEMENT OFFICE BLDG P.pdf 734,633 D:\\OYS FSAR REF DWGS GU 3E-1 56-02-002, Rev 004, GENERAL ARRANGEMENT DFICESELD GEE.pdf 5731,604 D:\\OYS FSAR REF DWGS GU 3E-158-02-001, Rev 009, GENERAL ARRANGEMENT HEATING BOILE.pdf 641,641 D:\\OYS FSAR REF DWGS GU 3E-162-02-001, Rev 004, GENERAL ARRANGEMENT MAINTENANCE B.pdf 684,422 D:\\OYS FSAR REF DWGS GU 3E-162-02-002, Rev 003, GENERAL ARRANGEMENT MAINTENANCE B.pdf I 467,260 D:\\OYS FSAR REF DWGS GU 3E-162-02-003, Rev 005, GENERAL ARRANGEMENT MAINTENANCE B.pdf 1529,715 D:\\OYS FSAR REF DWGS GU 3E-167-02-001, Rev 007, GENERAL ARRANGEMENT PRETREATMENT.pdf i 528,782 D:\\OYS FSAR REF DWGS GU 3E-168-02-001, Rev 010, GENERAL ARRANGEMENT INTAKE STRUCT.pdf 730,267 DOYS FSAR REF DWGS GU 3E-169-02-001, Rev 008, GENERAL ARRANGEMENT CHLOR N
d537,770 D:\\OYS FSAR REF DWGS GU 3E-1 70-02-001, Rev 007, GENERAL ARRANGEMENT DILUTION PUMP.pdf 764,999 D:\\OYS FSAR REF DWGS GU 3E-175-02-001, Rev 005, GENERAL ARRANGEMENT AUGMENTED OFF.pdf 670,253
!D:\\OYS FSAR REF DWGS GU 3E-175-02-002, Rev 003, GENERAL ARRANGEMENT AUGMENTED OFF.pdf 565,008,5


Page 7 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings l~i~1o~atb     ~                         ~                                                           ~           [~ile Size D:\OYS FSAR REF DWGS I GU 3E-1 76-02-001. Rev 006. GENERAL ARRANGEMENT FRESH WATER P.Ddf                                     1632,725 D:\OYS FSARREF DWGS.                                                                                                         .. 2,6 .21 GU 3E-185-02-001, Rev 002, GENERAL ARRANGEMENTNNEW SAMPLE PU.p.d.f.! ... .......5....................8..
Page 7 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings l~i~1o~atb  
D:\OYS FSAR REF DWGS       GU 3E-186-02-001, Rev 003, GENERAL ARRANGEMENT MACHINE SHOP .pdf                                 i 629,543 D:\OYS FSAR REF DWGS_       GU 3E-661-21 -1000, Sheet 1, Rev 008, RADIATION MONITORING SY.pd D:\OYS FSAR REF     DWGS GU 3E-743-11-001, Rev 3, EMERGENCY POWER SYSTEM ONE LINE DIA.pdf                     _                717,673 D:\OYS FSAR REF     DWGS GU 3E-822-21 -1000, Sheet 1, Rev 011, STANDBY GAS TREATMENT-F.pi-f                 -                  620,413 D:\OYSFSARREF_     DW GS IGU 3E-862-21-1000, Sheet 1, Rev 024, EMERGENCY DIESEL GENERA.pdf   __494,r:645 D:\OYS FSAR REF     DWGS GU 3E-871-21-1000, Sheet 1, Rev 054, DOMESTIC WATER AND PRETREATMENT SYS.pdf               -.         670,865__
~  
D:\OYS FSAR REF     DWGS . GU 3E-871-21 -1000, Sheet 2, Rev 041, DOMESTIC WATER AND PRET.pdf                   -              819,121 D:\OYS FSAR REF     DWGS i GU 3E-871-21-1000, Sheet 3, Rev 038, DOMESTIC WATER AND PRETREATMENT SYS.pdf                       541,011 D:\OYS FSAR REF     DWGS I GU 3E-882-06-001, Rev 001, RADWASTE CASK FSV-1 SAFE LOAD PAT.pdf                                   619,441 D:\OYS FSAR REF         I DWGS GU 3E-882-06-002, Rev 000, RADWASTE CASK VNDB-355 SAFE LOAD .pdf                                   [2583,583 D:\OYS FSAR REF     DWGS JC 19479, Sheet 1, Rev 038, FIRE PROTECTION WATER SYSTEM FLO.pdf                                   1_620,300 D:\OYS FSARREF     DWGS JC 19479, Sheet 2, Rev 036, FIRE PROTECTION WATER SYSTEM FLO.pdf                                     1,540,840 D:\OYS FSAR REF     DWGS   JC 19479, Sheet 3, Rev 067, FIRE PROTECTION WATER SYSTEM FLOW DIAGRAM.                             501,445 .
~  
D:OY FARREF DWGS     JC149     he 4, Rev 030, FIRE PROTECTION WATER SYSTEM FLO.pdf                                   1-614,473 D:\OYS     FSAR REF DWGS   JC 19702, Sheet 1, Rev 026, SITE PLAN OYSTER CREEK NUCLEAR GENERATING ST.pdf                     i 744,023 D:\OYS     FSAR REF DWGS IilU 5060E6003, Sheet 1, Rev 036, CORE SPRAYRBCCW DRYWELL ISOL.pdf                                 1900,456 D:\OYS     FSAR REF DWGS   NU 5060E6003, Sheet 2, Rev 025, CORE SPRAYRBCCW DRYWELL ISOL.pdf                     _          903,887 D:\OYS     FSAR REF DWGS   NU 5060E6003, Sheet 3, Rev 019, CORE SPRAYRBCCW DRYWELL ISOL.d     -        -          -        904,899     1 D:\OYS     FSAR REF DWGS   NU 506.E6003,.Sheet 4, Rev 014, CORE SPRAYRBCCWDRYWELL..OL.pdf                                 "892 902 D:\OYS     FSAR REF DWGS   NU 5060E6003, Sheet 5, Rev 004, CORE SPRAYRBCCW DRYWELL ISOL.pdf                     _            606,868 D:\OYS     FSAR REF DWGS   SN 15050-110-PID-050, Rev 005, NORTH YARD DOMESTIC AND POTAB.pdf                                   701,824
~
[~ile Size D:\\OYS FSAR REF DWGS I GU 3E-1 76-02-001. Rev 006. GENERAL ARRANGEMENT FRESH WATER P.Ddf 1 632,725 D:\\OYS FSARREF DWGS.
GU 3E-185-02-001, Rev 002, GENERAL ARRANGEMENTN NEW SAMPLE PU.p.d.f.!...
D:\\OYS FSAR REF DWGS GU 3E-186-02-001, Rev 003, GENERAL ARRANGEMENT MACHINE SHOP.pdf D:\\OYS FSAR REF DWGS_
GU 3E-661-21 -1000, Sheet 1, Rev 008, RADIATION MONITORING SY.pd
.......5....................8..
2,6.21 i 629,543 D:\\OYS FSAR REF DWGS GU 3E-743-11-001, Rev 3, EMERGENCY POWER SYSTEM ONE LINE DIA.pdf 717,673 D:\\OYS FSAR REF DWGS GU 3E-822-21 -1000, Sheet 1, Rev 011, STANDBY GAS TREATMENT-F.pi-f 620,413 D:\\OYSFSARREF_
DW GS IGU 3E-862-21-1000, Sheet 1, Rev 024, EMERGENCY DIESEL GENERA.pdf
__494,r:645 D:\\OYS FSAR REF DWGS GU 3E-871-21-1000, Sheet 1, Rev 054, DOMESTIC WATER AND PRETREATMENT SYS.pdf -.
670,865__
D:\\OYS FSAR REF DWGS. GU 3E-871-21 -1000, Sheet 2, Rev 041, DOMESTIC WATER AND PRET.pdf 819,121 D:\\OYS FSAR REF DWGS i GU 3E-871-21-1000, Sheet 3, Rev 038, DOMESTIC WATER AND PRETREATMENT SYS.pdf 541,011 D:\\OYS FSAR REF DWGS I GU 3E-882-06-001, Rev 001, RADWASTE CASK FSV-1 SAFE LOAD PAT.pdf 619,441 D:\\OYS FSAR REF DWGS I GU 3E-882-06-002, Rev 000, RADWASTE CASK VNDB-355 SAFE LOAD.pdf
[2583,583 D:\\OYS FSAR REF DWGS JC 19479, Sheet 1, Rev 038, FIRE PROTECTION WATER SYSTEM FLO.pdf 1_ 620,300 D:\\OYS FSARREF DWGS JC 19479, Sheet 2, Rev 036, FIRE PROTECTION WATER SYSTEM FLO.pdf 1,540,840 D:\\OYS FSAR REF DWGS JC 19479, Sheet 3, Rev 067, FIRE PROTECTION WATER SYSTEM FLOW DIAGRAM.
501,445.
D:OY FARREF DWGS JC149 he 4, Rev 030, FIRE PROTECTION WATER SYSTEM FLO.pdf 1-614,473 D:\\OYS FSAR REF DWGS JC 19702, Sheet 1, Rev 026, SITE PLAN OYSTER CREEK NUCLEAR GENERATING ST.pdf i 744,023 D:\\OYS FSAR REF DWGS IilU 5060E6003, Sheet 1, Rev 036, CORE SPRAYRBCCW DRYWELL ISOL.pdf 1 900,456 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 2, Rev 025, CORE SPRAYRBCCW DRYWELL ISOL.pdf 903,887 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 3, Rev 019, CORE SPRAYRBCCW DRYWELL ISOL.d 904,899 1
D:\\OYS FSAR REF DWGS NU 506.E6003,.Sheet 4, Rev 014, CORE SPRAYRBCCWDRYWELL..OL.pdf "892 902 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 5, Rev 004, CORE SPRAYRBCCW DRYWELL ISOL.pdf 606,868 D:\\OYS FSAR REF DWGS SN 15050-110-PID-050, Rev 005, NORTH YARD DOMESTIC AND POTAB.pdf 701,824


Page 8 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings
Page 8 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings lleN
_    '__  '__,._..;___.                                                    lleN        ".                    °                 i*
° i*
D:\OYS FHAR REF DWGS               GU 3D-911-01-001, Rev 0006, FIRE AREA LAYOUT SITE PLAN TOPOG.pdf                                       1,567,267 j D:\OYS FHAR REF DWGS               GU 30-911-02-001, Rev 006, FIRE AREA LAYOUT TURBINE BLDG BA1,df                                       1,082,791 1 D:\OYS   FHAR REF DWGS             GU 3D-911-02-002, Rev 004, FIRE AREA LAYOUT TURBINE BLDG BAS.pdff1,017,203                            985,856 D:OYSFHARREF DWGS                 GU 3D-911-02-003, Rev 005, FIRE AREA LAYOUT TURBINE BLDG M D:\OYS   FHAR     REF     DWGS   GU 3D-911-02-004, Rev 005, FIRE AREA LAYOUT   TURBINE BLDG MEZ.pdf                                 1,017,13 D:\OYS   FHAR     REF     DWGS   GU 3D-911-02-005, Rev 003, FIRE AREA LAYOUT   TURBINE BLDGOPE.pdf                                   957101,189 D:\OYS   FHAR     REF     DWGS   GU 3D-911-02-005, Rev 005, FIRE AREA LAYOUT   TURBINE BLDGOPE.pdf                                   5 1,012,029 D:\OYS   FHAR     REF     DWGS   GU 3D-911-02-006, Rev 002, FIRE AREA LAYOUT   TURBINE BLDG PC-.pdf                                 1,172,029 D:\OYS FHAR REF DWGS               GU 3D-911-02-007, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-C.pdf                                       1,18,826 D:\OYS FHAR REF DWGS               GU 3D-91.1-02-009, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-E.pdf                         --        A!918,893 D:\OYS FHAR REF DWGS               GU 30-911-02-010, Rev 006, FIRE AREA LAYOUT OFFICE BLDG FIRS.pdf                                       882,864__
D:\\OYS FHAR REF DWGS GU 3D-911-01-001, Rev 0006, FIRE AREA LAYOUT SITE PLAN TOPOG.pdf 1,567,267 j D:\\OYS FHAR REF DWGS GU 30-911-02-001, Rev 006, FIRE AREA LAYOUT TURBINE BLDG BA1,df 1,082,791 1 D:\\OYS FHAR REF DWGS GU 3D-911-02-002, Rev 004, FIRE AREA LAYOUT TURBINE BLDG BAS.pdf 985,856 D:OYSFHARREF DWGS GU 3D-911-02-003, Rev 005, FIRE AREA LAYOUT TURBINE BLDG M f1,017,203 D:\\OYS FHAR REF DWGS GU 3D-911-02-004, Rev 005, FIRE AREA LAYOUT TURBINE BLDG MEZ.pdf 1,017,13 D:\\OYS FHAR REF DWGS GU 3D-911-02-005, Rev 003, FIRE AREA LAYOUT TURBINE BLDG OPE.pdf 957101,189 D:\\OYS FHAR REF DWGS GU 3D-911-02-005, Rev 005, FIRE AREA LAYOUT TURBINE BLDG OPE.pdf 1,012,029 5
D:\OYS FHAR REFDWGS GU 3D-91 1-02-011, Rev 005, FIRE AREA LAYOUT                   OFFICE BLDG THIR.pdf .....-                     . 739,976 D:\OYS FHAR REF DWGS GU 3D-911-02-012, Rev 006, FIRE AREA LAYOUT                   EMERGENCY DIESEL.pdf _           ____                696,843 D:\OYS FHAR REF DWGS GU 3D-911-02-013, Rev 003, FIRE AREA LAYOUT                   REACTOR BLDG PLA.pdf                                 1,137,040 D:\OYS FHAR REF DWGS GU 30-91                         Rev 006, FIRE AREA LAYOUT     REACTOR BLDG PLA.pdf                   _              1112,403 D:\OYS FHAR REF DWGS IGU 3D-911-02-015, Rev 008, FIRE-AREA LAYOUT                   RE ACTORBLDG_ P* pd_.         .        ..              020,022 D:\OYS FHAR REF DWGS GU 3D-911-02-016, Rev 005, FIRE AREA LAYOUT                   REACTOR BLDG PLA. df                                   0820,396 1 D:\OYS FHAR REF DWGS GU 3D-911-02-017, Rev 004, FIRE AREA LAYOUT                   REACTOR BLDG PLA.pdf                               1804,548 D:\OYS FHAR REF DWGS               GU 3D-911-02-018, Rev 004, FIRE   AREA LAYOUT REACTOR BLDG PLA.pdf           __698,971                       5 D:\OYS   FHAR     REF DWGS         GU 3D-91 1-02-019, Rev 001, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf                                     915,098 1 D:\OYS   FHAR     REF DWGS         GU 3D-911-02-020, Rev 003, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf                                   9744,851 D:\OYS   FHAR     REF DWGS         GU 3D-911-02-021, Rev 002, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf                                     895,860 D:\OYS   FHAR     REF DWGS         GU 3D-911-02-022, Rev 004, FIRE AREA LAYOUTOLD RADWASCTE BLDG     pdf                               898,*61,7_83 D:\OYS FHAR REF DWG             I   U -91 1-02-022, Rev 004, FIRE AREA LAYOUT OLD RADWASTE BLD.Pdf                                     i1  8,61,83 D:\OYS FHAR REF DWGS               GU 3D-911-02-024, Rev 001, FIRE AREA LAYOUT OLD RADWASTE BLD.pdf                                       5778664 D:\OYS FHAR REF DWGS               GU 3D-911-02-025, Rev 002, FIRE AREA LAYOUT INTAKE STRUCTURE.pdf                                       897,417 D:\OYS FHAR REF DWGS               GU 3D-911-02-027, Rev 002, FIRE AREA LAYOUT AUGMENTED OFFGAS.pdf                                       65,710420 D:\_O~YS__FHAR REoF DWG_{G_       -U3D--9-11-02*-027,Rev01,   FI*R-EAR*EALA`YO-uT--AUG-M-ENTED--FF-GAspd-f ........................... 6_5_3_,4_26..
D:\\OYS FHAR REF DWGS GU 3D-911-02-006, Rev 002, FIRE AREA LAYOUT TURBINE BLDG PC-.pdf 1,172,029 D:\\OYS FHAR REF DWGS GU 3D-911-02-007, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-C.pdf 1,18,826 D:\\OYS FHAR REF DWGS GU 3D-91.1-02-009, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-E.pdf A! 918,893 D:\\OYS FHAR REF DWGS GU 30-911-02-010, Rev 006, FIRE AREA LAYOUT OFFICE BLDG FIRS.pdf 882,864__
D:\OYS FHAR REF DWG S.GU. 30-911-02-030, Rev 003, FIRE AREA LAYOUT FRESH WATER PUMP_.pdf .....                                           871,138
D:\\OYS FHAR REFDWGS GU 3D-91 1-02-011, Rev 005, FIRE AREA LAYOUT OFFICE BLDG THIR.pdf.....-
_D_\OYS   FHAR REF DWGS I GU 3D-911-02-031, Rev 002, FIRE AREA LAYOUT NEW RADWASTEBL.pdf..                                                 9523 D:\OYS FHAR REF DWGS GU 3D-911-02-032, Rev 002, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf                                                     777,414
739,976 D:\\OYS FHAR REF DWGS GU 3D-911-02-012, Rev 006, FIRE AREA LAYOUT EMERGENCY DIESEL.pdf _
696,843 D:\\OYS FHAR REF DWGS GU 3D-911-02-013, Rev 003, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1,137,040 D:\\OYS FHAR REF DWGS GU 30-91 Rev 006, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1112,403 D:\\OYS FHAR REF DWGS IGU 3D-911-02-015, Rev 008, FIRE-AREA LAYOUT RE ACTORBLDG_ P* pd_.
020,022 D:\\OYS FHAR REF DWGS GU 3D-911-02-016, Rev 005, FIRE AREA LAYOUT REACTOR BLDG PLA. df 0820,396 1
D:\\OYS FHAR REF DWGS GU 3D-911-02-017, Rev 004, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1 804,548 D:\\OYS FHAR REF DWGS GU 3D-911-02-018, Rev 004, FIRE AREA LAYOUT REACTOR BLDG PLA. pdf
__698,971 5
D:\\OYS FHAR REF DWGS GU 3D-91 1-02-019, Rev 001, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 915,098 1 D:\\OYS FHAR REF DWGS GU 3D-911-02-020, Rev 003, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 9 744,851 D:\\OYS FHAR REF DWGS GU 3D-911-02-021, Rev 002, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 895,860 D:\\OYS FHAR REF DWGS GU 3D-911-02-022, Rev 004, FIRE AREA LAYOUTOLD RADWASCTE BLDG pdf 898,*6 1,7_83 D:\\OYS FHAR REF DWG I U  
-91 1-02-022, Rev 004, FIRE AREA LAYOUT OLD RADWASTE BLD.Pdf 8,
i1 61,83 D:\\OYS FHAR REF DWGS GU 3D-911-02-024, Rev 001, FIRE AREA LAYOUT OLD RADWASTE BLD.pdf 5778664 D:\\OYS FHAR REF DWGS GU 3D-911-02-025, Rev 002, FIRE AREA LAYOUT INTAKE STRUCTURE.pdf 897,417 D:\\OYS FHAR REF DWGS GU 3D-911-02-027, Rev 002, FIRE AREA LAYOUT AUGMENTED OFFGAS.pdf 65,710420 D:\\_O~YS__FHAR REoF DWG_{G_  
-U3D--9-11-02*-027,Rev01, FI*R-EAR*EALA`YO-uT--AUG-M-ENTED--FF-GAspd-f........................... 6_5_3_,4_26..
D:\\OYS FHAR REF DWG S.GU. 30-911-02-030, Rev 003, FIRE AREA LAYOUT FRESH WATER PUMP_.pdf.....
871,138
_D_\\OYS FHAR REF DWGS I GU 3D-911-02-031, Rev 002, FIRE AREA LAYOUT NEW RADWASTEBL.pdf..
9523 D:\\OYS FHAR REF DWGS GU 3D-911-02-032, Rev 002, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf 777,414


Page 9 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\OYS FHAR REF DWGS GU 3D-911-02-033, Rev 004, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf   _  1,015,080 FHAR REF DWGS
Page 9 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FHAR REF DWGS GU 3D-911-02-033, Rev 004, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf 1,015,080
      -OYS          GU 3D-91"1-02-034, Rev 006, FIRE AREA LAYOUT AUXILIARY BOILER.pdf "    940,657 LD\YHRRF DWG S GU 3D-911-02-039, Rev 004, FIRE AREA LAYOUT LEGEND AND NOTES.pd         1545,451}}
-OYS FHAR REF DWGS GU 3D-91"1-02-034, Rev 006, FIRE AREA LAYOUT AUXILIARY BOILER.pdf 940,657 LD\\Y HRRF DWG S GU 3D-911-02-039, Rev 004, FIRE AREA LAYOUT LEGEND AND NOTES.pd 1545,451}}

Latest revision as of 23:31, 13 January 2025

Letter from Exelon, Subj: Updated Final Safety Analysis Report, Rev. 16, Fire Hazards Analysis Report, Rev. 15
ML110691283
Person / Time
Site: Oyster Creek
Issue date: 10/23/2009
From: Cowan P
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FOIA/PA-2011-0069, RA-09-073
Download: ML110691283 (16)


Text

I lExelon,o Exelon Nuclear www.exeloncorp.com 20o Exelon Way N ule ar Kennett Square, PA 19348 10 CFR 50.71(e)

RA-09-073 October 23, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket No. 50-219

Subject:

Updated Final Safety Analysis Report (UFSAR), Revision 16 Fire Hazards Analysis Report (FHAR), Revision 15 UFSAR and FHAR Reference Drawings In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), enclosed is Revision 16 of the Updated Final Safety Analysis Report (UFSAR) for Oyster Creek Nuclear Generating Station (OCNGS). The enclosed UFSAR Revision 16 is being provided to the NRC in electronic format on CD-ROM. This electronic version of the UFSAR is being submitted in its entirety and constitutes a total replacement copy. In addition, as required by 10CFR50.71(e)(2)(ii), to this letter identifies changes made under the provision of 10CFR50.59, and included in Revision 16 of the UFSAR, but not previously submitted to the NRC.

By letter dated July 7, 2004, the NRC granted an exemption for OCNGS permitting UFSAR updates to be submitted up to 12 months after each refueling outage. 10 CFR 50.71(e)(4) requires that the UFSAR update reflect changes made up to a maximum of six months prior to the submittal. UFSAR Revision 16 reflects changes made at OCNGS at least up to June 30, 2009. UFSAR sections revised in this update are delineated by "REV. 16, OCTOBER 2009" in the lower right portion of the section pages, and a vertical bar is located in the right margin of the page, which identifies the specific changes.

Also included is Revision 15 of the Fire Hazards Analysis Report (FHAR) for OCNGS. Revision 15 includes changes to the FHAR in accordance with the requirements of License Condition 2.C.(3) of the OCNGS Facility Operating License No. DPR-16, but not previously submitted to the NRC. The enclosed FHAR Revision 15 copy is being provided to the NRC in electronic format (CD-ROM) in its entirety. Attachment 2 to this letter includes a summary of changes made to the FHAR in Revision 15. 10 CFR 50.71 (e)(4) requires that the FHAR revision reflect changes made up to a maximum of six months prior to the submittal. Revision 15 of the FHAR includes changes made at OCNGS at least up to June 30, 2009.

Also enclosed is a CD-ROM containing copies of controlled drawings currently referenced but not included in the OCNGS UFSAR. This CD also contains the associated drawings for the FHAR. These drawings were current at least up to August 30, 2009.

U. S. Nuclear Regulatory Commission OCNGS UFSAR Revision16 / FHAR Revision15 October 23, 2009 Page 2 The following enclosures contain the CD-ROMs with the updated files for the UFSAR, FHAR, and Reference Drawings in PDF format.

  • - Oyster Creek UFSAR Revision 16 updated files and Oyster Creek FHAR Revision 15 updated files
  • - Oyster Creek Reference Drawings files for UFSAR and FHAR and Attachment 4 include file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CDs.

As required by 1 OCFR50.71 (e)(2)(i), I certify that to the best of my knowledge, the information contained in the Enclosures and Attachments to this letter accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.

If you have any questions or require further information, please contact Mr. Richard Gropp at (610) 765-5557.

Very truly yours, Pamela B. Cowan Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC

Enclosures:

Attachments: - CD-ROM, OCNGS UFSAR, Revision 16 and FHAR, Revision 15 - CD-ROM, UFSAR and FHAR Reference Drawings - Summary of Changes Made Under the Provisions of 10CFR50.59 - FHAR Summary of Changes, Revision 15 - Electronic File Directory Structure - UFSAR / FHAR - Electronic File Directory Structure - UFSAR / FHAR Drawings cc:

NRC Regional Administrator - NRC Region I NRC Senior Resident Inspector - Oyster Creek NRC Project Manager, NRR - Oyster Creek w/ enclosures and attachments

Page 1 of 2 ATTACHMENT 1 Oyster Creek UFSAR Summary of Changes - Revision 16 1 OCFR50.71 (e)(2)(ii) requires that revisions to the UFSAR include changes made under the provisions of 10CFR50.59, but not previously submitted to the NRC. Accordingly, the list below identifies these plant modifications and projects included in Revision 16 of the Updated Final Safety Analysis Report (UFSAR) that were not previously submitted to the NRC. The list does not represent a complete list of UFSAR change packages incorporated.

Change Number Revision E Cd 0 5 -

00 5 9 4...

I............

, 2...........

ECR 05-00672 ECR 05-00877 06-056 ECR 06-00562 3

0 0

.C O - 0 3 0

ECR 06-01146 0

ECR 07-00305 fC-R 67:9Q39O7 -

ECR 07-00329 ECR 07-00336 ECR 07-00647 0

00-£,III-0 Description

.Conde-nsate Pre-Filters System Installation Air Dryer Improvement Changes per Vender Recommendation System-ym Hydraulic Design e

Pareers for -Con tain-men y

py and Emergency_ Service Water (ESW)

  • _a~n.£!

_E m

e. rg en~cy..S__erv.i.e...a t

.e E W.).............

Update UFSAR Sections 13.2.1 and 13.2.6 Outdated Information Update Various UFSAR Sections for Discrepancies Update UFSAR Table 9.3-4 with Correct Drywell Equipment r.~

T C aa.

gUpat_ U FSAR for Isolation Condenser Valve Discrepancies Update UFSAR Section 6.2.1.1.1 Design Basis for ILRT Requirement Update U FSAR Figure for Torus Penetration Discrepancy..

Update UFSAR Table 6.2-12 with Correct Valve Information Revise UFSAR Section 7.2 to Reflect TS Amendment 263 Revise UFSAR to Add Reference to Table 6.3-1 (IR 627299-CDBI - UFSAR Clarification CDBI - Control Room EDG Frequency Meters and FSAR Table 8.3-1 Update UFAR Secti~o~n 11..3 fo~r C-harco-al -Del~ay BePd~s..

FSAR Update to Section 6.5 Generate Action Request (AR) for Control Room Recorder Rep~lacement (TR-RD0046A/B/C)-

Moisture Hygrometer is Not Functioning tur....

-r~ i r

-...... u n

n p-0-dat e UFSAiR tto Dele te R-ef eerence to Ra d iation Zone-II and n-IV

'UFSAR Change for Lab Drain Tank Pumpp(P.-22-3)-,

UF*-s;AA-R-Update for--EW Cross-Connect to Service Water (SW) for Reactor_Bui.ding Closed Cooling Water (RBCCW)

ECtRO--07---'006-8"9 0

ECR 07-00745 EICR 07-700848.-.

0

....... 1.

0...........

I.I I.....................

.. I.I.

I I....

ECR 07-00920 1

i.....

..........o.........

ECR. 7-01034 0

CR...

0-8-900-05 0-ECRO08-00037 0

Page 2 of 2 t~~~~~~~ ~~~~

Change Number ECR 08-00254 ECR 08-00299

-ECR 08-600422

[.ECR 08-00637 ECR 08-00781 ECR 0 0113..

1........

R...

..09.-00.1. 94 I.EC. R0..O900227 ECR 09-00141 IECR 09-00379 ic-FEC

-o09-00395.....

".

  • i-
9.

E..

0 0 IECRO09-004227

. a.

ECR 09-00439 ECR 09-00448

[ECRO09-00439

-C-R

.9..0 4.............

ECR 09-00664 1

Revision 0

0 0

0 0

6........................

2 0.........

0 0

0 0

0 0

0 0

Description Update Dry Shielded Canister (DSC)/Transfer Cask (TC)

Handling_ Information in UFSAR Chapter 9 H...............i-n..gn gr a i n....

SAR..C...................h.ap.e

.. 9.

LLRT - Installation, Storage of Test Enclosure for X-4A, X-4B-Revise UFSAR Table 6.2-12 for Valves V-27-1, 2, 3, and 4 Correct Error in FSAR Fuel Pool

-gStorae.Capacity Isolation Condenser Clean Water Makeup - Appendix R Impacts Site to Initiate UFSAR Generic C fange-for Security Seciion...

... Repla.e M-1 A Transformer with Eddystone Transformer..

..s.

. _P..

h a s e..B u s...D u ct

.t.....c.9.oo ling. u...S.A R

.U.pd..at.e a t Revse. U.FSAR RSection__3.10.1 on Seimic Q

.u.a..li.f.icat...

n....

Update UFSAR with New Supplement (Appendix A) for

... ense R.e..

n..e.wa..

App.lCaton_ L. RA_)

Update UFSAR for New Radwaste Service Water Pump U p g ra d e s Update to FSAR Section 5.2 for Recirculation Pump Flow Revise UFSAR Section 15.2.1

..Revi..se-..

sA-.....

Se -.

c-on-1--5.7.4.5 to Cl.....

ea.rl. y-R e.....

R t M

e.

ECR to Incorporate Multiple Radwaste Changes to.sR....

Update UFSAR to Document Penetration Seals in Corner Rooms Update the UFSAR as Required per Enforcement Guidance Memorandum (EGM)_0.7-0o6 Update F.S.AR....Section 9.2 to.Inc-orp.o.rate_.ECR 08-00041_______.

pdate.FSAR for Met Tower Table.

Page 1 of 1 ATTACHMENT 2 Oyster Creek FHAR Summary of Changes - Revision 15 The list below provides a summary of the changes included in Revision 15 of the Oyster Creek Fire Hazards Analysis Report (FHAR).

Items #

1.

ECR OC 06-00798 000 Added new reference ECR 06-00798 for OB-FZ-5 and OB-FZ-8C in Section 7.

2.

ECR OC 05-00196 000 Updated Section 6.2.2 to delete service water pump as one of the pumps that utilize firewater for cooling.

3.

ECR OC 08-00465 000 Corrected some erroneous fire loading information, updated CW-FA-14 FSSD section to indicate that EDG 1 and 2 would provide power for safe shutdown and updated conventional thermal detection to rate compensated/fixed temperature thermal detection.

4.

ECR OC 07-00428 000 Added new reference AR A2161442 evaluation 02 for TB-FZ-1 1 D in Section 7.

5.

ECR OC 07-00376 000

,Documented the combustible loading for the Chlorination/Condensate Transfer Building in MT-FA-12 and for the Standby Gas Treatment System Ventilation Tunnel in SGTS-FZ-31. Also, documented that the airlock ceiling in RB-FZ-1 D is a minimum of 11/2 hour.

6.

ECR OC 08-00426 000 Referenced recent technical evaluations that have been performed for fire protection deviations or concerns and eliminated historical information errors, and added clarification to some areas that were vague.

ATnACHMENT 3 Page 1 of 2 Electronic File Directory Structure UFSAR / FHAR 3M

ý I

e I

.'n d:\\01 UFSAR R16 1

000 Table of contents 68,693 d.\\01 UFSARR16 001 List of Figures 111,964 (dA01 UFSAR R16 00201 Intro and Gen Descrip.pdf 226,797 Sd:*01 UFSAR R1 6 003 01 Intro and Gen DescripFig.p 33,169 d:\\01 UFSAR R16 004 02 Site Characteristics.pdf 473,052

(

d:\\01 UFSAR RI 6 00502 Site Characteristics A_p.pdf 7,593,362 d\\1UFSAR R16 1006 02 Site Characteristics Fig.pdf_

1,331,278 d:\\01 UFSAR R16 007 03 Design of Struct, Comp, Equippdf

_863,779 d:\\01 UFSAR R16 6 00803 D-esign of Struct, comp, EquipApp.pdf 10,000,457....

d:\\01 UFSAR Ri6 00903 Design of Struct, Comp,_Equip F!g.pdf-----------------------------

.3,239,488 dA01 UFSAR R1_6 010 04 Reactor..df 327,447 1

_d-01_UFSAR R16 01104 Reactor Fig.pdf i

678,916 J

d:\\01 UFSAR R16 012 05 RCS and Connected S._pdf

__255,309 d:\\01 UFSAR R16 01305 RCS and Connected Sys Fig.pýdf 124,405 dA\\1-UFSAR R16 014 06 Eng Safety Features.pdf 637,139 d:\\01 UFSAR R16 015 06 Enq Safety Features Fig.pdf 1,058,354 d.\\01 UFSAR R16 016 07 Instr and Controls.pdf 427,934 d:\\01 UFSAR R16 017"07 8-and Controls Fi..pd...............................cf 432,587 dA01 UFSAR R1 6 018 08 Electric Power. p--df-__

147,801 dA01 UFSAR R16

.019008 Electric Power Figlpdf 399,731 d:\\01 UFSAR R16 1 020_09 Auxilla-S-stems.-pdf 767,761 d:\\01 UFSAR R16 021 09 Auxilliary Systems Fig.pdf-----------...-....

998,179 d:-01 UFSAR R16 0...

o2210Steam and Power Conv.pdf 215,310 d:\\01 UFSAR R16 023 10 Steam and Power Cony Fig. pdf...........

57,031 d:\\01 UFSAR R16 02411 Radioactive Waste gmt.pdf

..................466,345...

d:\\01 UFSAR R16

,025 11 Radioactive WasteMgrmtFig.pdf...........

48,194 t

___Q d:\\01 UFSAR R16 026 12 Radiation Protection.pdf 196,943

_d_\\01UFSAR R16 4027 12 Radiation Protection Fig.pd.

31,335 d01 UFSAR R16 I 028 13 Conduct of Operations.d 170,315 d--01 UFSAR Ri6 029 13 Conduct of Operations Fig.pdf 46,439 d:\\01 UFSAR R16

........ _014 Initial Test Program.pdf 184,995

ATTACHMENT 3 Page 2 of 2 Electronic File Directory Structure UFSAR / FHAR d:\\i UFSAR R6 _

16 031 14 Initial Test P~rogram App.pdf 713,942.

_1394 d:\\01 UFSAR R16 032 15 Accident Analysis.pdf 318,267 d-.O. UFSAR R16 033 5 -Accident Analysis Ap.p 835,262 ___

d:\\01 UFSAR R16 034 15 Accident Analysis Figpdf 853,184 I d:\\0i UFSAR R1 035 16 Technical Specifications. d3 65,704

[d:\\O1.

arA.

036 1

.Quality Assurance.pdf 68,601 Sd:\\O1_UFSAR Ri6

_037 App A FSAR Supplement.pdf 364,077 Ld4-\\2 F!AR RS-j01Fire Hazards Analysis.pd__

763,260

Page 1 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings Fde~~~~~NA

'IV

=

V ie ie D:OYS FSAR REF DWGS I AM 20451-H, Sheet 1, Rev 013, SPEC SHEET.pdf 1 750,743 D:*OYS FSAR REF DWGS AM 20451-H, Sheet 2, Rev 013, 24 IN GLOBE BODY MAIN STEAM IS.pdf 595,223 D:\\OYS FSAR REF DWGS AM 20451-H, Sheet 3, Rev 015,24 INCH GLOBE BODY MAIN STEAM.pdf 5

903,591 D:\\OYS FSAR REF DWGS BR 2002, Sheet 1, Rev 059, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf

i. 721,261 D:\\OYS FSAR REF DWGS BR 2002, Sheet 2, Rev 065, MAIN STEAM SYSTEM FLOW DIAGRAM.pdf

__766,40 D:\\OYS FSAR REF DWGS BR 2002, Sheet 3, Rev 054, EXTRACTION (BLEED) STEAM SYSTEM F.pdf

_775,126 D:\\OYS FSAR REF DWGS BR 2002, Sheet 4, Rev 062, REHEAT STEAM SYSTEM FLOW DIAGRAM.pdf 1828,913 D:\\OYS FSAR REF DWGS BR 2003, Sheet 1, Rev 090, CONDENSATE FEED SYSTEM FLOW DIAGRAM.pdf

,914,811 D:\\OYS FSAR REF DWGS BR 2004, Sheet 1, Rev 103, DEMINERALIZED TRANSFER SYSTEM FLOW DIAG.pdf 947,491.

D:\\OYS FSAR REF DWGS_ BR 2004, Sheet 2, Rev 092, CONDENSATE TRANSFER SYSTEM FLOW DIAGRAM.pdf 1

164_,023 D:\\OYSFSAR REF DWGS.

BR 2005, Sheet 1, Rev 043, VACUUM PRIMING SYSTEM FLOWDIAGRAd..f 574,988_j RDEFYS

_SAR__EFDWGS BR 2005, Sheet 2, Rev 099, REACTOR AND TURBINE BLDG.pdf 1 771,905 D:\\OYS FSAR REF DWGS BR 2005, Sheet 3, Rev 059, NEW RADWASTE SERVICE WATER SYSTEM FLOW DIAGf 633,033 D:\\OYS FSAR REF DWGS BR 2005, Sheet 4, Rev 080, EMERGENCY SERVICE WATER SYSTEM FLOW DIAGRAM.pdf i 742,840 D:\\OYS FSAR REF DWGS BR 2005, Sheet 5, Rev 057, SCREEN WASH SYSTEM FLOW DIAGRAM.pdf 719,514 I D:\\OYS FSAR REF DWGS BR 2005, Sheet 6, Rev 061, CIRCULATING WATER SYSTEM FLOW DIA.pdf i_851,325 1.

1*------~~~~~~~~~~~~~~~~~ --

_7 D:\\OYS FSAR REF DWGS BR 2006, Sheet 1, Rev 072, REACTOR BLDG CLOSED COOLINGWATER.pdf I 826,213 D:\\OYS FSAR REF DWGS BR 2006, Sheet 2, Rev 044, REACTOR BLDG CLOSED COOLING WATERpdf 455,111 D:\\OYS FSAR REF DWGS BR 2006, Sheet 3, Rev 056, REACTOR BLDG CLOSED COOLING WATER.pdf 1 739,609 D:\\OYS FSAR REF DWGS BR 2006, Sheet 4, Rev 063, TURBINE BLDG CLOSED COOLING WATER.pdf 744,505

_.D:\\OYS FSAR REF DWGS BR 2006, Sheet 5, Rev 056, TURBINE BLDG CLOSED COOLING WATER.pdf 732,010 1.D:.\\OYS EFSAR REF DWGS BR 2006, Sheet 6, Rev 050, RADWASTE -CLOSED COOLING WATER SYS.pdf-564,964

_D:_OYS FSAR REF DWGS.BR 2006, Sheet 7, Rev 050, RADWASTE CLOSED COOLING WATER SYS.pdf.

1,056,202 DAOYS FSAR REF DWG S BR20,Set8_e_5,AUMNE FGS(O)COE COO j 6089 D:\\OYS FSAR REF DWGS BR 2007, Sheet 1, Rev 028, HEATER DRAIN VENT AND PRESSURE RE.pdf

_817,764 D:\\OYS FSAR REF DWGS BR 2007, Sheet 2, Rev 032, HEATER DRAIN VENT AND PRESSURE RE.pdf J830,016 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2007, Sheet 3, Rev 034, HEATER DRAIN VENT AND PRESSURE RE.pdf 677,096 BR 2007, Sheet 4, Rev 024, HEATER DRAIN VENT AND PRESSURE RE.pdf 610,120

._BR 20_08,_Sheet. 1, Rev 0_440, AIR EXTRACTION AND FFGASS S.STE

p.

74 BR 2008, Sheet 2, Rev 038, AIR EXTRACTION AND OFFGAS SYSTEM.pdf 87539,092 Rev

-3 TE B......

H I

AT..

1..........1.....

, 008

.,2 BR 2009, Sheet 1, Rev 043. TURBINE BLDG HEATING AND VENTILAT.pdf i1,008,248

Page 2 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings awfgh.

WEW7"'

III_

Q AIAJ INeNýf D:\\OYS FSAR REF DWGS BR 2009, Sheet 2, Rev 037, HV MAIN STACK FLOW DIAGRAM.pdf 519,150 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2009, Sheet 3, Rev 027, MACHINE SHOP AND STORAGE BLDG HV.pdf

-609,990 BR 2010, Sheet 1, Rev 029, OFFICE BLDG CHEMISTRY LABS FLOW D..pdf 649,259 BR 2010, Sheet 2, Rev 021, OFFICE BLDG HVAC SOUTH END FLOW D.pdf.

_ 816,593 BR 2010, Sheet 3, Rev 023, OFFICE BLDG HVAC (480V SWITCHGEAR.pdflf 465,869'86 BR 2010, Sheet 4, Rev 029, CONTROL AND CABLE SPREADING ROOMS HVAC FLOW D.pdf 557,938 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS BR 2010, Sheet 5, Rev 023, BATTERY AND MOTOR GENERATOR SET R.pdf

__477,355 D:\\OYS FSAR REF DWGS BR 2011, Sheet 1, Rev 041, DRYWELL COOLING SYSTEM FLOW DIAGR.pdf 656,122 D:\\OYSFSAR.REF.DWGS BR 2011, Sheet 2, Rev 060, REACTOR BUILDING VENTILATION FLOW.pdf.

911,810 D:\\OYS FSAR REF DWGS BR 2011, Sheet 3, Rev 047, REACTOR BLDG VENTILATION FLOW DIA.pdf

__706,274 D:\\OYS FSAR REF DWGS BR 2012, Sheet 1, Rev 014, OLD RADWASTE BLDG HV FLOW DIAGRAM.pdf 1,013,960:

D:\\OYS FSAR REF DWGS BR 2013, Sheet 1, Rev 073, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf

_-97,084 D:\\OYS FSAR REF DWGS BR 2013, Sheet 10, Rev 053, INSTRUMENT (CONTROL) AIR SYSTEM.pdf 1,474,182 D:OYS FSAR R DwGs BR 2013, Sheet 2, Rev 080, SERVICE AIR SYSTEM FLOW DIAGRAM.pdf

.667,332-D:\\OYS FSAR RF DWGS BR9013, Sheet 3, Rev 068, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf

-1 943,232 D:\\OYS FSAR REF DWGS BR 2013, Sheet 4, Rev 062, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1930,952 D:\\OYS FSAR REF DWGS BR 2013, Sheet 5, Rev 068, INSTRUMEýNT_(CONTROL) AIR SYSTEM FLWDAGA d

1 1, 119,6081 D:\\OYS FSAR REF DWGS BR 2013, Sheet 6, Rev 083, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1,014,287 D:\\OYS FSAR REF DWGS BR 2013, Sheet 7, Rev 065, INSTRUMENT (CONTROL) AIR SYSTEM FLOW DIAGRAM.pdf 1 592,543 D:\\OYS FSAR REF DWGS BR 2013, Sheet 8, Rev 63, INSTRUMENT CONTROL AIR SYSTEM FLOW DIAGRAM.pdf 11,128,978 D:\\OYS__FSAR REF DWGS BR 2013, Sheet 9, Rev 057, INSTRUMENT (CONTROL) AIR SYSTEM.pdf 1.

499,237 D:\\OYS FSAR REF DWGS _PBR 2014, Sheet 1, Rev 030, TURBINE LUBE OIL SYSTEM FLOW DIAG.pdf 563,319 D:\\OYS FSAR REF DWGS IBR 2192, Sheet 1, Rev 012, COMPOSITE YARD PIPING KEY PLAN.pdf D:\\OYS FSAR REF DWGS BR 2192, Sheet 2, Rev 000, COMPOSITE YARD PIPING KEY PLAN.pdf_______

D:\\OYS FSAR REF DWGS BR 3001, Sheet 1, Rev 013, PLANT ELECT GENERATION MAIN ONE LINE DIAGRAM.pf 653,469 D:\\OYS FSAR REF DWGS_

BR 3001, Sheet 2, Rev 004, EMERGENCY POWER SYSTEM ONE LINE D.pdf_

_631,867 i

D:\\OYS FSAR REF DWGS BR 3002, Sheet 1, Rev 012, 480V SYSTEM ONE LINE DIAGRAM 460V.p 553,927 -

D:\\OYS FSAR REF DWGS BR 3002, Sheet 2, Rev 011, 480V SYSTEM ONE LINE DIAGRAM 460V_.pdf_..

._.584,581 D:\\OYS FSAR REF DWGS BR 3002, Sheet 3, Rev 009, 480V SYSTEM ONE LINE DIAGRAM 460V UNIT SUBSTA.pdf i460,761 D:\\OYS FSAR REF DWGS BR 3002, Sheet 4, Rev 007,480V (JCPL) NON VITAL POWER ONE LINE DIAGRAM.pdf 504,017 D:\\OYS FSAR REF DWGS BR 3013, Sheet 1, Rev 013, AC VITAL POWER SYSTEM ONE LINE DI.pdf 1728,028 D:\\OYS FSAR REF DWGS D3\\e.e.F.ARREF.DWG.BR 3013, Sheet 2,_ Rev 017, AC VITAL POWER SYSTEM ONE LINE DI.pdf 627,087

Page 3 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawincis 1250L,`,býf;g P&M9 mm iFý D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS 4

BR 3028, Sheet 1, Rev 016, 125V STATION SYSTEM ONE LINE DIAGRAM 125V.pdf 774,303 BR 3028, Sheet 2, Rev 008, 24V STATION DC SYSTEM ONE LINE DIAGRAM BATTER.pdf ___

606,295 BR 4006, Sheet 1, Rev 002, INTAKE AND TURBINE AREA EXCAVATIO.pdf 655,859J BR M0012, Sheet 1, Rev 040, POST ACCIDENT SAMPLING FLOW DIAG.pdf_

875,107 BR M61 1, Sheet 1, Rev 34, NEW RADWASTE BLDG HVAC FLOW DIAGRAM.pdf 1,088,567 BR M61 1, Sheet 2, Rev 028, HEATING BOILER HOUSE HV FLOW DIAG.pdf 480,060 D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS D:\\OYS FSAR REF DWGS EB D-3033, Rev 031,125V STATION DC SYSTEM ONE LINE DIAGRAM.pdf 574,040 GE 107C5339, Sheet 1, Rev 018, RECIRCULATION PUMPS AND MG SE.p 873,018 GE 148F262, Sheet 1, Rev 53, EMERGENCY CONDENSER FLOW DIAGRAM.pdf 863,099 GE 148F437, Sheet 1, Rev 048, LIQUID RADWASTE COLLECTION AND.pd 743,091 GE 148F437 Sheet 10. Rev 037. LIQUID RADWASTE COLLECTION AN.Ddf 1,905,389 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 11, Rev 036, LIQUID RADWASTE COLLECTION AN.pdf 649,547 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 12, Rev 038, RADIOACTIVE WASTE PROCESSING.pdf 553,941 D:\\OYSFSAR REF DWGS GE 148F437, Sheet 13, Rev 040, RADIOACTIVE WASTE PROCESSING.pdf I 477,392 D:\\OYS FSAR REF DW GS IG E 148F437, Sheet 14, Rev 055 SOLID RADW ASTE PRO CESSING FLOW....

D p..................f........

1794......

202.

_:OSFA REF DWGS GE 148F437., -Sheet 15, Rev 042, SOLID RDOCIEWSE..0Ept-----3.

D:\\OYS FSAR REF DWGS GE 148F437, Sheet 16, Rev 034, OBSOLETE SOLID RADIOACTIVE WA.pdf 414,307 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 17, Rev 038, LIQUID RADWASTE COLLECTION AN.pdf 1 683,233 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 18, Rev 036, SOLID RADIOACTIVE WASTE PROCE.pdf 1668,803 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 2, Rev 040, LIQUID RADWASTE COLLECTION AND.pdf 556,079 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 3, Rev 045, LIQUID RADWASTE WATER COLLECTION AND PR.pdf 729,064 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 4, Rev 054, LIQUID RADWASTE COLLECTIONAND PROCESSINGpd...

1.648 883 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 5, Rev 046, LIQUID RADWASTE COLLECTION AND.pdf 85,561 D:\\OYS FSAR REF DWGS GE 148F437, Sheet 6, Rev 039, LIQUID RADIOACTIVE WASTE COLLE.pdf 557,924 D:\\OYS FSAR REF DWGS GE 148F444, Sheet 1, Rev 099, CLEAN-UP DEMINERALIZER SYSTEM FLOW DIAGRAM.pdf i 952,264 D:\\OYS FSAR REF DWGS GE 148F71 1, Sheet 1, Rev 043, REACTOR SHUTDOWN COOLING SYSTE.pdf

-865,612 D:\\OYS FSAR REF DWGS GE 148F723, Sheet 1, Rev 036, LIQUID POISON SYSTEM FLOW DIAG.pdf 676,757_

D:\\OYS FSAR REF DWGS GE 148F740, Sheet 1, Rev 043, CONTAINMENT SPRAY SYSTEM FLOW.pdf i 812,266 D:\\OYS FSAR REF DWGS GE 197E871, Sheet 1, Rev 029, SCRAM DISCHARGE VOLUME SYSTEM CONTROL ROD.pdf 581,124 IT D:-OYS FSAR REF DWGS GE 234R166, Sheet 1, Rev 025, GENERATOR STATOR COOLING SYSTE.pdf 707,226 D:\\OYS FSAR REF DWGS GE 237E487, Sheet 1, Rev 067, CONTROL ROD DRIVE SYSTEM FLOW DIAGRAM.pdf

_651,552 D:\\OYS FSAR REF DWG S 1GE237E516, Sheet 1, Rev 008, ARRANGEMENT OF FUEL STORAGE PO.pdf 12,026,091

Page 4 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FSAR REF DWGS GE 237E516, Sheet 2, Rev 007, WALL MOUNT DETAIL FUEL STORAGE.pdf

_11,033,848 D:\\OYS FSAR REF DWGS GE 237E516, Sheet 3, Rev 005, ARRANGEMENT OF FUEL STORAGE PO.pdf 1,134,080 D:\\OYS FSAR REF DWGS I GE 237E516, Sheet 4, Rev 003, ARRANGEMENT OF FUEL STORAGE PO.pdf 810,337 D\\OYS FSAR REF DWGS GE 237E566, Sheet 1, Rev 044, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 1 774,393 D:\\OYS-FSAR REF DWGS GE 237E566, Sheet 10, Rev 003, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME pdf..

720,386 D-\\OYS-FSAR-REF-DWGS_ GE 237E566, Sheet 11, Rev 008, REACTOR PROTECTION SYSTEM ELE.pdf 1......639,332...

DAOYS FSAR REF DWGS GE 237E566, Sheet 12, Rev 006, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 871,773 DAOYS FSAR REF DWGS.

GE 237E566, Sheet 13, Rev 007, REACTOR PROTECTION SYSTEM_ELECTRICAL ELEME.pdf 632,205 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 14, Rev 010, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 665,385_

-D-\\OYS FSAR REF DWGS GE 237E566, Sheet 15, Rev 007, REACTOR PROTECTION SYSTEM ELE 635,471 DAOYS-/SR REF DWGS GE 237E566, Sheet 16, Rev 002, REACTOR PROTECTION SYSTEM ELE.pdf 771,092 D:\\OYS FSAR REF DWG.S GE237E566, Sheet 17, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdf 717,5543_

D:YSFSAR__REF DWG.S.. GE_237.E_566,.SheetRev 003.,_

R.EACTO ROTECTIONSYSTEM_.ELEC.p E_._M__d_

f 76,7.!

D:\\OYS FSAR REF DWGS GE 237E566, Sheet 19, Rev 003, REACTOR PROTECTION SYSTEM ELE.pdfTRICA E p

648,396 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 29, Rev 045, REACTOR PROTECTION SYSTEM EL.ECTRICALELEME_.pdf 765,40 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 2, Rev 003, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 7.,4,4132 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 3, Rev 011, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf.

76,386..

D:\\OYS FSAR REF DWGS GE 237E566, Sheet 4, Rev 027, REACTORPROTECTION SYSTEM ELECTRICAL ELEME.pdf 796,403 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 5, Rev 047, REACTOR_ PROTECTION SYSTEM ELECTRICAL ELEM.pdf 70,39,7 D:\\OYS FSAR REF DWGS iGE 237E566,_Sheet 6, Rev 039, REACTOR PROTECTION SYSTEM ELECTRdICAL 6270 LR\\OYS FSAR REF DWGS_

GE 237E566, Sheet 7, Rev_008, REACTOR PROTECTIONSYSTEM ELEC.pdf

.731,810

._D:__Y__F.ARRREFDWGS_

GE.237E5_6_ Sheeth8,_Revv005,_REACTOR PROTECTION'SYSTEMELECTRICAL.ELEME..

83,957 D:\\OYS FSAR REF DWGS GE 237E566, Sheet 9, Rev 006, REACTOR PROTECTION SYSTEM ELECTRICAL ELEME.pdf 8

630,488 lP:\\OYS FSAR REF DWGS GE 237E726, Sheet 1, Rev 074, DRYWELL AND SUPPRESSION SYSTEM.pdf.

819,024 D:\\OYS FSAR REF DWGS GE 237E756, Sheet 1, Rev 0049, SPENT FUEL POOL COOLING FLOW DIAGRAM.Pdf 82,127 DAOYS FSAR REF DWGS GE 237E798, Sheet 1, Rev 033, RECIRCULATION SYSTEM FLOW DIAG.pdf 895,647.

D\\OYS FSAR REF DWGS GE 237E901, Sheet 1, Rev 034, CONTAINMENT SPRAY LOGIC ELECTR.pdf i 783,919 D\\OYS FSAR REF DWGS GE 237E901, Sheet 2, Rev 019, CONTAINMENT SPRAY LOGIC ELECTR.pdf

........... 792,419 FEANM D\\OYS FSAR REF DWGS GE 237E912, Sheet 2, Rev 019, REACTOR MANUAL CONTROL SYSTEMELECTRICAL E.pdf 721,166 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 3, Rev 003, REACTOR MANUAL CONTROL SYSTEM.pdf ELC_.

38, 123,16 D:\\OYS FSAR REF DWGS 1 GE 237E912, Sheet 4, Rev 001, REACTOR MANUAL CONTROL SYSTEM.pdf I 618,108

Page 5 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FSAR REF DWGS GE 237E912, Sheet 5, Rev 000, REACTOR MANUAL CONTROL SYSTEM.pdf

!732,353 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 6, Rev 002, REACTOR MANUAL CONTROL SYSTEM.pdf 634,485 D..OYS SAR REF DWGS GE 237E912, Sheet 7, Rev 000, REACTOR MANUAL CONTROL SYSTEM

.pdf..

635,0 D:\\OYS FSAR REF DWGS GE 237E912, Sheet 8, Rev 004, REACTOR MANUAL CONTROL SYSTEM.pdf 6 523,054 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 1, Rev 000, ARRANGEMENT OF DRYWELL EQUIPME.pdf 2,134,228 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 2, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf

,1 769,284 D:\\OYS FSAR REF DWGS GE 706E206, Sheet 3, Rev 001, ARRANGEMENT OF DRYWELL EQUIPME.pdf 905,311 D:\\OYS FSAR REF DWGS GE 718E644, Sheet 2, Rev 018, CORE SPRAY SYSTEM ELECTRICALE. pd 568,890_

D'\\OYS FSAR REF DWGS GE 729E1.82, Sheet 1, Rev 033, AUTOMATIC DEPRESSURIZATION SYS..

rD:\\OYS FSAR REF DWGS GE 729E182, Sheet 2, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf

,430,514 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 3, Rev 019, AUTOMATIC DEPRESSURIZATION SYS.pdf 630,254

_____________REF_

IGE 729E182,Sheet 4,Rv02_UTERSUIZTOYTM__1,4 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 4, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf 616,440 D:\\OYS FSAR REF DWGS GE 729E182, Sheet 5, Rev 002, AUTO DEPRESSURIZATION SYSTEM E.pdf i 690,395 D:\\OYS FSAR REF DWGS GE 798D807, Sheet 1, Rev 002, PLANT HEAT BALANCE.pdf

_825,972 D:\\OYS FSAR REF DWGS GE 846D640, Sheet 1, Rev 000, HEAT BALANCE 3 HEATER 670 MW.pdf 923,055 D:\\OYS FSAR REF DWGS GE 846D686, Sheet 1, Rev 021, PROCESS RADIATION MONITOR SYSTEM.pdf j 621,615 D:\\OYS FSAR REF DWGS GE 846D686, Sheet 2, Rev 004, PROCESS RADIATION MONITOR SYST.pdf 633,486 D:\\OYS FSAR REF DWGS GE 885D781, Sheet 1, Rev 071, CORE SPRAY SYSTEM FLOW DIAGRAM.pdf 977,482 D:\\OYS FSAR REF DWGS GF JCP-19431, Sheet 1, Rev 002, SYMBOLS AND LEGEND FOR INSER.pdf 757,51

_D-.YS FSARRF__DWGS_

GU_3C-SKS-1 10, Rev 001, ISFSI SPENT FUEL CASK SAFE LOAD PATH.pdf--------

__562,364 D:\\OYS FSAR REF DWGS GU 3D-151-07-001, Sheet 1, Rev 001, GENERAL ARRANGEMENT FLOO.pdf 1 663,806 D:\\OYS FSAR REF DWGS I GU 3D-1 51-07-001, Sheet 2, Rev 002, GENERAL ARRANGEMENT FLOO.p_.f 692,351 D:\\OYS FSAR REF DWGS I GU 3-153-07-001, Sheet 1, Rev 000, GENERAL ARRANGEMENT FLOO.pdf 678,968 D:\\OYS FSAR REF DWGS GU 3D-153-07-001, Sheet 2, Rev 000, GENERAL ARRANGEMENT FLOO.pdf 769,152 r D:\\OYS FSAR REF DWGS GU 3D-154-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf 689,237 D'\\OYSFSARFREFDWGS GU 3D-155-07-001, Rev 000, GENERAL ARRANGEMENT FLOOR AND EQU.pdf 863,832.

D:\\OYS FSAR REF DWGS RGU 3D-576-07-001,_Rev 000, GENERAL ARRANGEMENT ROOF DRAINS A.pdf 680,319

_ D:\\OYS FSAR REF DWGS GU 3E-1 51-02-001, Rev 012, GENERAL ARRANGEMENT TURBINE BLDG pdf 960,718

[D:\\OYS FSAR REF DWGS GU 3E-151-02-003, Rev 011, GENERAL ARRANGEMENT TURBINE BLDG PLAN FLOOR Epdf _

989,769 D:\\OYS FSAR REF DWGS GU 3E-151-02-005, Rev 012, GENERAL ARRANGEMENT TURBINE BLDG.pdf 1,097,346 D:\\OYS FSAR REF DWGS [GU 3E-151-02-006, Rev 007, GENERAL ARRANGEMENT TURBINE BLDG.pdf i__900,569

-D.'YS FSAR REF DWGS GU 3E-151-02-007, Rev 005, GENERAL ARRANGEMENT TURBINE BLDG.pdf

, 821,510

Page 6 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings W A 1

.1 I.

.N"e.

.n: i '

D:\\OYS FSAR REF DWGS GU 3E-151-02-008, Rev 007, GENERAL ARRANGEMENT TURBINE BLDG.pdf 763,359 D_\\OYS FSAR REF DWGS_

GU 3E-151-02-009, Rev 004, GENERAL ARRANGEMENT TURBINE BLDG.Rdf

.617,067 DAOYSFSAR REF DWGS GU 3E-1 53-02-001, Rev 008, GENERAL ARRANGEMENT REACTOR BLDG PLAN FLOOR E. pf 844,7637 1 D:\\OYS FSAR REF DWGS GU 3E-153-02-003, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG.pdf 8 913,492 D:\\OYS FSAR REF DWGS GU 3E-153-02-004, Rev 009, GENERAL ARRANGEMENT REACTOR BLDG.pdf 627 402 D:\\OYS FSAR REF DWGS GU 3E-153-02-005, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG.pdf 67652 362 D:\\OYS FSAR REFDWGS GU 3E-153-02-006, Rev 007, GENERAL ARRANGEMENT REACTOR BLDG pdf 613 784 D:\\OYS FSAR REF DWGS GU 3E-153-02-007, Rev 004, GENERAL ARRANGEMENT REACTOR BLDG.pdf 832 698 4 D:\\OYS FSAR REF DWGS GU 3E-153-02-008, Rev 003, GENERAL ARRANGEMENT REACTOR BLDG.pdf 3717142 D:\\OYS FSAR REF DWGS GU 3E-153-02-008, Rev 004, GENERAL ARRANGEMENT REACTOR BLDG.pdf 7984 18 D:\\OYS FSAR REF DWGS GU 3E-154-02-001, Rev 008, GENERAL ARRANGEMENT OLD RADWASTE.pdf

-94,08 D:OYS FSAR REF DWGS GU 3E-154-02-001, Rev 005, GENERAL ARRANGEMENT OLD RADWASTE.pdf..

__5,708 D:\\OYS FSAR REF DWGS GU 3E-154-02-002, Rev 004, GENERAL ARRANGEMENT OLD RADWASTE.pdf 250,765 D:\\OYS FSAR REF DWGS GU 3E-155-02-003, Rev 008, GENERAL ARRANGEMENT NEW RADWASTE.pdf 612,365 D:\\OYS FSAR REF DWGS GU 3E-155-02-001, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE-p 6DPANFO.820,389 D:\\OYS FSAR REF DWGS GU 3E-155-02-002, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pLA F L203,08 3

D:\\OYS FSAR REF DWGS GU 3E-1 55-02-004, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pdf 8150736 D:\\OYS FSAR REF DWGS

-GU 3E-1 55-02-005, Rev 005, GENERAL ARRANGEMENT NEW RADWASTE.pdL 703,60__

81 077 D:\\OYS FSAR REF DWGS GU 3E-156-02-001, Rev 005, GENERAL ARRANGEMENT OFFICE BLDG P.pdf 729,459 D:\\OYS FSAR REF DWGS GU 3E-156-02-002, Rev 004, GENERAL ARRANGEMENT OFFICE BLDG P.pdf 734,633 D:\\OYS FSAR REF DWGS GU 3E-1 56-02-002, Rev 004, GENERAL ARRANGEMENT DFICESELD GEE.pdf 5731,604 D:\\OYS FSAR REF DWGS GU 3E-158-02-001, Rev 009, GENERAL ARRANGEMENT HEATING BOILE.pdf 641,641 D:\\OYS FSAR REF DWGS GU 3E-162-02-001, Rev 004, GENERAL ARRANGEMENT MAINTENANCE B.pdf 684,422 D:\\OYS FSAR REF DWGS GU 3E-162-02-002, Rev 003, GENERAL ARRANGEMENT MAINTENANCE B.pdf I 467,260 D:\\OYS FSAR REF DWGS GU 3E-162-02-003, Rev 005, GENERAL ARRANGEMENT MAINTENANCE B.pdf 1529,715 D:\\OYS FSAR REF DWGS GU 3E-167-02-001, Rev 007, GENERAL ARRANGEMENT PRETREATMENT.pdf i 528,782 D:\\OYS FSAR REF DWGS GU 3E-168-02-001, Rev 010, GENERAL ARRANGEMENT INTAKE STRUCT.pdf 730,267 DOYS FSAR REF DWGS GU 3E-169-02-001, Rev 008, GENERAL ARRANGEMENT CHLOR N

d537,770 D:\\OYS FSAR REF DWGS GU 3E-1 70-02-001, Rev 007, GENERAL ARRANGEMENT DILUTION PUMP.pdf 764,999 D:\\OYS FSAR REF DWGS GU 3E-175-02-001, Rev 005, GENERAL ARRANGEMENT AUGMENTED OFF.pdf 670,253

!D:\\OYS FSAR REF DWGS GU 3E-175-02-002, Rev 003, GENERAL ARRANGEMENT AUGMENTED OFF.pdf 565,008,5

Page 7 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings l~i~1o~atb

~

~

~

[~ile Size D:\\OYS FSAR REF DWGS I GU 3E-1 76-02-001. Rev 006. GENERAL ARRANGEMENT FRESH WATER P.Ddf 1 632,725 D:\\OYS FSARREF DWGS.

GU 3E-185-02-001, Rev 002, GENERAL ARRANGEMENTN NEW SAMPLE PU.p.d.f.!...

D:\\OYS FSAR REF DWGS GU 3E-186-02-001, Rev 003, GENERAL ARRANGEMENT MACHINE SHOP.pdf D:\\OYS FSAR REF DWGS_

GU 3E-661-21 -1000, Sheet 1, Rev 008, RADIATION MONITORING SY.pd

.......5....................8..

2,6.21 i 629,543 D:\\OYS FSAR REF DWGS GU 3E-743-11-001, Rev 3, EMERGENCY POWER SYSTEM ONE LINE DIA.pdf 717,673 D:\\OYS FSAR REF DWGS GU 3E-822-21 -1000, Sheet 1, Rev 011, STANDBY GAS TREATMENT-F.pi-f 620,413 D:\\OYSFSARREF_

DW GS IGU 3E-862-21-1000, Sheet 1, Rev 024, EMERGENCY DIESEL GENERA.pdf

__494,r:645 D:\\OYS FSAR REF DWGS GU 3E-871-21-1000, Sheet 1, Rev 054, DOMESTIC WATER AND PRETREATMENT SYS.pdf -.

670,865__

D:\\OYS FSAR REF DWGS. GU 3E-871-21 -1000, Sheet 2, Rev 041, DOMESTIC WATER AND PRET.pdf 819,121 D:\\OYS FSAR REF DWGS i GU 3E-871-21-1000, Sheet 3, Rev 038, DOMESTIC WATER AND PRETREATMENT SYS.pdf 541,011 D:\\OYS FSAR REF DWGS I GU 3E-882-06-001, Rev 001, RADWASTE CASK FSV-1 SAFE LOAD PAT.pdf 619,441 D:\\OYS FSAR REF DWGS I GU 3E-882-06-002, Rev 000, RADWASTE CASK VNDB-355 SAFE LOAD.pdf

[2583,583 D:\\OYS FSAR REF DWGS JC 19479, Sheet 1, Rev 038, FIRE PROTECTION WATER SYSTEM FLO.pdf 1_ 620,300 D:\\OYS FSARREF DWGS JC 19479, Sheet 2, Rev 036, FIRE PROTECTION WATER SYSTEM FLO.pdf 1,540,840 D:\\OYS FSAR REF DWGS JC 19479, Sheet 3, Rev 067, FIRE PROTECTION WATER SYSTEM FLOW DIAGRAM.

501,445.

D:OY FARREF DWGS JC149 he 4, Rev 030, FIRE PROTECTION WATER SYSTEM FLO.pdf 1-614,473 D:\\OYS FSAR REF DWGS JC 19702, Sheet 1, Rev 026, SITE PLAN OYSTER CREEK NUCLEAR GENERATING ST.pdf i 744,023 D:\\OYS FSAR REF DWGS IilU 5060E6003, Sheet 1, Rev 036, CORE SPRAYRBCCW DRYWELL ISOL.pdf 1 900,456 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 2, Rev 025, CORE SPRAYRBCCW DRYWELL ISOL.pdf 903,887 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 3, Rev 019, CORE SPRAYRBCCW DRYWELL ISOL.d 904,899 1

D:\\OYS FSAR REF DWGS NU 506.E6003,.Sheet 4, Rev 014, CORE SPRAYRBCCWDRYWELL..OL.pdf "892 902 D:\\OYS FSAR REF DWGS NU 5060E6003, Sheet 5, Rev 004, CORE SPRAYRBCCW DRYWELL ISOL.pdf 606,868 D:\\OYS FSAR REF DWGS SN 15050-110-PID-050, Rev 005, NORTH YARD DOMESTIC AND POTAB.pdf 701,824

Page 8 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings lleN

° i*

D:\\OYS FHAR REF DWGS GU 3D-911-01-001, Rev 0006, FIRE AREA LAYOUT SITE PLAN TOPOG.pdf 1,567,267 j D:\\OYS FHAR REF DWGS GU 30-911-02-001, Rev 006, FIRE AREA LAYOUT TURBINE BLDG BA1,df 1,082,791 1 D:\\OYS FHAR REF DWGS GU 3D-911-02-002, Rev 004, FIRE AREA LAYOUT TURBINE BLDG BAS.pdf 985,856 D:OYSFHARREF DWGS GU 3D-911-02-003, Rev 005, FIRE AREA LAYOUT TURBINE BLDG M f1,017,203 D:\\OYS FHAR REF DWGS GU 3D-911-02-004, Rev 005, FIRE AREA LAYOUT TURBINE BLDG MEZ.pdf 1,017,13 D:\\OYS FHAR REF DWGS GU 3D-911-02-005, Rev 003, FIRE AREA LAYOUT TURBINE BLDG OPE.pdf 957101,189 D:\\OYS FHAR REF DWGS GU 3D-911-02-005, Rev 005, FIRE AREA LAYOUT TURBINE BLDG OPE.pdf 1,012,029 5

D:\\OYS FHAR REF DWGS GU 3D-911-02-006, Rev 002, FIRE AREA LAYOUT TURBINE BLDG PC-.pdf 1,172,029 D:\\OYS FHAR REF DWGS GU 3D-911-02-007, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-C.pdf 1,18,826 D:\\OYS FHAR REF DWGS GU 3D-91.1-02-009, Rev 002, FIRE AREA LAYOUT TURBINE BLDG E-E.pdf A! 918,893 D:\\OYS FHAR REF DWGS GU 30-911-02-010, Rev 006, FIRE AREA LAYOUT OFFICE BLDG FIRS.pdf 882,864__

D:\\OYS FHAR REFDWGS GU 3D-91 1-02-011, Rev 005, FIRE AREA LAYOUT OFFICE BLDG THIR.pdf.....-

739,976 D:\\OYS FHAR REF DWGS GU 3D-911-02-012, Rev 006, FIRE AREA LAYOUT EMERGENCY DIESEL.pdf _

696,843 D:\\OYS FHAR REF DWGS GU 3D-911-02-013, Rev 003, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1,137,040 D:\\OYS FHAR REF DWGS GU 30-91 Rev 006, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1112,403 D:\\OYS FHAR REF DWGS IGU 3D-911-02-015, Rev 008, FIRE-AREA LAYOUT RE ACTORBLDG_ P* pd_.

020,022 D:\\OYS FHAR REF DWGS GU 3D-911-02-016, Rev 005, FIRE AREA LAYOUT REACTOR BLDG PLA. df 0820,396 1

D:\\OYS FHAR REF DWGS GU 3D-911-02-017, Rev 004, FIRE AREA LAYOUT REACTOR BLDG PLA.pdf 1 804,548 D:\\OYS FHAR REF DWGS GU 3D-911-02-018, Rev 004, FIRE AREA LAYOUT REACTOR BLDG PLA. pdf

__698,971 5

D:\\OYS FHAR REF DWGS GU 3D-91 1-02-019, Rev 001, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 915,098 1 D:\\OYS FHAR REF DWGS GU 3D-911-02-020, Rev 003, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 9 744,851 D:\\OYS FHAR REF DWGS GU 3D-911-02-021, Rev 002, FIRE AREA LAYOUT REACTOR BLDG SEC.pdf 895,860 D:\\OYS FHAR REF DWGS GU 3D-911-02-022, Rev 004, FIRE AREA LAYOUTOLD RADWASCTE BLDG pdf 898,*6 1,7_83 D:\\OYS FHAR REF DWG I U

-91 1-02-022, Rev 004, FIRE AREA LAYOUT OLD RADWASTE BLD.Pdf 8,

i1 61,83 D:\\OYS FHAR REF DWGS GU 3D-911-02-024, Rev 001, FIRE AREA LAYOUT OLD RADWASTE BLD.pdf 5778664 D:\\OYS FHAR REF DWGS GU 3D-911-02-025, Rev 002, FIRE AREA LAYOUT INTAKE STRUCTURE.pdf 897,417 D:\\OYS FHAR REF DWGS GU 3D-911-02-027, Rev 002, FIRE AREA LAYOUT AUGMENTED OFFGAS.pdf 65,710420 D:\\_O~YS__FHAR REoF DWG_{G_

-U3D--9-11-02*-027,Rev01, FI*R-EAR*EALA`YO-uT--AUG-M-ENTED--FF-GAspd-f........................... 6_5_3_,4_26..

D:\\OYS FHAR REF DWG S.GU. 30-911-02-030, Rev 003, FIRE AREA LAYOUT FRESH WATER PUMP_.pdf.....

871,138

_D_\\OYS FHAR REF DWGS I GU 3D-911-02-031, Rev 002, FIRE AREA LAYOUT NEW RADWASTEBL.pdf..

9523 D:\\OYS FHAR REF DWGS GU 3D-911-02-032, Rev 002, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf 777,414

Page 9 of 9 ATTACHMENT 4 Electronic File Directory Structure UFSAR / FHAR Drawings D:\\OYS FHAR REF DWGS GU 3D-911-02-033, Rev 004, FIRE AREA LAYOUT NEW RADWASTE BLD.pdf 1,015,080

-OYS FHAR REF DWGS GU 3D-91"1-02-034, Rev 006, FIRE AREA LAYOUT AUXILIARY BOILER.pdf 940,657 LD\\Y HRRF DWG S GU 3D-911-02-039, Rev 004, FIRE AREA LAYOUT LEGEND AND NOTES.pd 1545,451