{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga , Tennessee 37402 CNL-14-156 September 18, 2014 | {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-156 September 18, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 | ||
==Subject:== | ==Subject:== | ||
Technical Specifications (TS) Changes TS-431 and TS-418- Extended Power Uprate (EPU) -Withdrawal of Requests and Update to EPU Plans and Schedules | Technical Specifications (TS) Changes TS-431 and TS-418-Extended Power Uprate (EPU) -Withdrawal of Requests and Update to EPU Plans and Schedules | ||
==References:== | ==References:== | ||
: 1. Letter from TVA to NRC, "Browns Ferry Nuclear Plant (BFN)- Unit 1 - | : 1. Letter from TVA to NRC, "Browns Ferry Nuclear Plant (BFN)- Unit 1 - | ||
Proposed Technical Specifications (TS) Change TS-431 - Request for License Amendment- Extended Power Uprate (EPU) Operation," dated . | Proposed Technical Specifications (TS) Change TS-431 - Request for License Amendment-Extended Power Uprate (EPU) Operation," dated. | ||
June 28, 2004 (ADAMS Accession No. ML042800186) | June 28, 2004 (ADAMS Accession No. ML042800186) | ||
: 2. Letter from TVA to NRC , "Browns Ferry Nuclear Plant (BFN)- Units 2 and 3 | : 2. Letter from TVA to NRC, "Browns Ferry Nuclear Plant (BFN)- Units 2 and 3 | ||
-Proposed Technical Specifications (TS) Change TS-418-Request for License Amendment-Extended Power Uprate (EPU) Operation," dated June 25, 2004 (ADAMS Accession No. ML041840301) | |||
: 3. Letter from TVA to NRC , "Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Schedule for CY2013 (TAC Nos. MD5262, MD5263, and MD5264) ," dated February 11 , 2013 (ADAMS Accession No. ML13044A498) | : 3. Letter from TVA to NRC, "Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Schedule for CY2013 (TAC Nos. MD5262, MD5263, and MD5264)," dated February 11, 2013 (ADAMS Accession No. ML13044A498) | ||
By letters dated June 28, 2004 (Reference 1) and June 25, 2004 (Reference 2) , the Tennessee Valley Authority (TVA) submitted license amendment requests (LARs) for the Extended Power Up rate (EPU) of Browns Ferry Nuclear Plant (BFN) Unit 1, and BFN Units 2 and 3, respectively. The proposed amendments would modify the operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts. | By letters dated June 28, 2004 (Reference 1) and June 25, 2004 (Reference 2), the Tennessee Valley Authority (TVA) submitted license amendment requests (LARs) for the Extended Power Up rate (EPU) of Browns Ferry Nuclear Plant (BFN) Unit 1, and BFN Units 2 and 3, respectively. The proposed amendments would modify the operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts. | ||
U.S. Nuclear Regulatory Commission Page 2 September 18, 2014 This letter provides TVA's current plans and schedules for the BFN EPU project. In addition , | U.S. Nuclear Regulatory Commission Page 2 September 18, 2014 This letter provides TVA's current plans and schedules for the BFN EPU project. In addition, this letter updates and supersedes the plans and schedules discussed by TVA in its {{letter dated|date=February 11, 2013|text=letter dated February 11, 2013}} (Reference 3). | ||
this letter updates and supersedes the plans and schedules discussed by TVA in its letter dated February 11 , 2013 (Reference 3). | Currently, TVA is developing a new, consolidated EPU LAR for BFN Units 1, 2, and 3. The new BFN EPU LAR will supersede all previous BFN EPU submittals. The new BFN EPU LAR will address current BFN conditions and will reflect the use of new replacement steam dryers and a revised containment accident pressure (CAP) analysis that incorporates current NRC review criteria. The new BFN EPU LARwill be developed using the guidance in NRC review standard (RS)-001, "Review Standards for Extended Power Uprates," dated December 2003, and will incorporate previous applicable NRC requests for additional information. | ||
Currently, TVA is developing a new, consolidated EPU LAR for BFN Units 1, 2, and 3. The new BFN EPU LAR will supersede all previous BFN EPU submittals. The new BFN EPU LAR will address current BFN conditions and will reflect the use of new replacement steam dryers and a revised containment accident pressure (CAP) analysis that incorporates current NRC review criteria. The new BFN EPU LARwill be developed using the guidance in NRC review standard (RS)-001 , "Review Standards for Extended Power Uprates," dated December 2003, and will incorporate previous applicable NRC requests for additional information. | |||
Due to the age of the previous BFN EPU submittals, TVA is withdrawing the previous BFN EPU LARs, TS-431 (Reference 1) and TS-418 (Reference 2) at this time. The new consolidated BFN EPU LAR will replace References 1 and 2 and is expected to be submitted by October 2015. | Due to the age of the previous BFN EPU submittals, TVA is withdrawing the previous BFN EPU LARs, TS-431 (Reference 1) and TS-418 (Reference 2) at this time. The new consolidated BFN EPU LAR will replace References 1 and 2 and is expected to be submitted by October 2015. | ||
The design and engineering analyses for the new GE Hitachi Nuclear Energy replacement steam dryers are scheduled for completion by the spring of 2015. Upon completion of these activities, TVA proposes meeting with the NRC to discuss the replacement steam dryer analyses. Additionally, the revised EPU CAP analysis is expected to be complete by the spring of 2015 and upon completion , TVA proposes meeting with the NRC to discuss the analysis and results. The TVA will work with the BFN NRC Project Manager to identify appropriate dates for these meetings. | The design and engineering analyses for the new GE Hitachi Nuclear Energy replacement steam dryers are scheduled for completion by the spring of 2015. Upon completion of these activities, TVA proposes meeting with the NRC to discuss the replacement steam dryer analyses. Additionally, the revised EPU CAP analysis is expected to be complete by the spring of 2015 and upon completion, TVA proposes meeting with the NRC to discuss the analysis and results. The TVA will work with the BFN NRC Project Manager to identify appropriate dates for these meetings. | ||
There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Dan Green at (256) 614-6238. | There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Dan Green at (256) 614-6238. | ||
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 18th day of September 2014. | I declare under penalty of perjury that the foregoing is true and correct. Executed on this 18th day of September 2014. | ||
resident, Nuclear Licensing NRC Regional Administrator- Region II NRC Senior Resident Inspector- Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health}} | resident, Nuclear Licensing NRC Regional Administrator-Region II NRC Senior Resident Inspector-Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health}} | ||
Latest revision as of 16:53, 10 January 2025
| ML14265A487 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/18/2014 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-156 | |
| Download: ML14265A487 (2) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-156 September 18, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Technical Specifications (TS) Changes TS-431 and TS-418-Extended Power Uprate (EPU) -Withdrawal of Requests and Update to EPU Plans and Schedules
References:
Proposed Technical Specifications (TS) Change TS-431 - Request for License Amendment-Extended Power Uprate (EPU) Operation," dated.
June 28, 2004 (ADAMS Accession No. ML042800186)
-Proposed Technical Specifications (TS) Change TS-418-Request for License Amendment-Extended Power Uprate (EPU) Operation," dated June 25, 2004 (ADAMS Accession No. ML041840301)
- 3. Letter from TVA to NRC, "Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Schedule for CY2013 (TAC Nos. MD5262, MD5263, and MD5264)," dated February 11, 2013 (ADAMS Accession No. ML13044A498)
By letters dated June 28, 2004 (Reference 1) and June 25, 2004 (Reference 2), the Tennessee Valley Authority (TVA) submitted license amendment requests (LARs) for the Extended Power Up rate (EPU) of Browns Ferry Nuclear Plant (BFN) Unit 1, and BFN Units 2 and 3, respectively. The proposed amendments would modify the operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts.
U.S. Nuclear Regulatory Commission Page 2 September 18, 2014 This letter provides TVA's current plans and schedules for the BFN EPU project. In addition, this letter updates and supersedes the plans and schedules discussed by TVA in its letter dated February 11, 2013 (Reference 3).
Currently, TVA is developing a new, consolidated EPU LAR for BFN Units 1, 2, and 3. The new BFN EPU LAR will supersede all previous BFN EPU submittals. The new BFN EPU LAR will address current BFN conditions and will reflect the use of new replacement steam dryers and a revised containment accident pressure (CAP) analysis that incorporates current NRC review criteria. The new BFN EPU LARwill be developed using the guidance in NRC review standard (RS)-001, "Review Standards for Extended Power Uprates," dated December 2003, and will incorporate previous applicable NRC requests for additional information.
Due to the age of the previous BFN EPU submittals, TVA is withdrawing the previous BFN EPU LARs, TS-431 (Reference 1) and TS-418 (Reference 2) at this time. The new consolidated BFN EPU LAR will replace References 1 and 2 and is expected to be submitted by October 2015.
The design and engineering analyses for the new GE Hitachi Nuclear Energy replacement steam dryers are scheduled for completion by the spring of 2015. Upon completion of these activities, TVA proposes meeting with the NRC to discuss the replacement steam dryer analyses. Additionally, the revised EPU CAP analysis is expected to be complete by the spring of 2015 and upon completion, TVA proposes meeting with the NRC to discuss the analysis and results. The TVA will work with the BFN NRC Project Manager to identify appropriate dates for these meetings.
There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Dan Green at (256) 614-6238.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 18th day of September 2014.
resident, Nuclear Licensing NRC Regional Administrator-Region II NRC Senior Resident Inspector-Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health