| | {{#Wiki_filter:ENCLOSURES 1, 3,4, 5 CONTAIN PROPRIETARY INFORMATIONWITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XcelEnergyMonticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362January 9, 2015L-MT-14-10310 CFR 50.90U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Respond to NRC Staff Questions (TAC No. MF5002)References: 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014. (ADAMS Accession No.ML14283A125)2) Email T. Beltz (NRC) to G. Adams (NSPM), "Monticello NuclearGenerating Plant -Acceptance Review (Opportunity to Supplement)re: AREVA Extended Flow Window License Amendment Request(TAC No. MF5002)," dated December 10, 2014.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM),doing business as Xcel Energy, requested approval of an amendment to the MonticelloNuclear Generating Plant (MNGP) Renewed Operating License (OL) and TechnicalSpecifications (TS). The proposed change would revise TS and would approve certainanalytical methods that together would support operation in the expanded power-flowoperating domain described as the Extended Flow Window (EFW). The purpose of therequested amendment is to transition from the General Electric methodology calledMaximum Extended Load Line Limit Analysis Plus (MELLLA+) to-the AREVAmethodology called EFW.In Reference 2, NRC Staff identified further information that was required to supporttheir acceptance review. The correspondence stated that the submitted LAR could besupplemented to provide the required information. The purpose of this supplement is toprovide the required information.The general approach to this supplement was discussed with NRC Staff in a telephoneconference on December 2, 2014.I)A_( |
| | Document Control DeskPage 2Enclosure 1 provides AREVA Report ANP-3376P, Revision 0, which provides reply tothe questions posed in Reference 2. Enclosure 1 is proprietary to AREVA.Enclosure 2 provides the non-proprietary AREVA Report ANP-3376NP, Revision 0.The nonproprietary report is being provided based on the NRC's expectation that thesubmitter of the proprietary information should provide, if.possible, a nonproprietaryversion of the document with brackets showing where the proprietary information hasbeen deleted.Enclosure 3 provides AREVA FS1 -0008928, FSQA-07-AISHA User and Programmer'sManual for BWR Transient Analysis Including Large Oscillations, Revision 2.0. Thismanual is proprietary in its entirety.Enclosure 4 provides AREVA FS1-0008916, FSQA-07-SINANO User's andProgrammer's Manual, Revision 2.0. This manual is proprietary in its entirety.Enclosure 5 provides AREVA Report EMF-2279(P), Revision 0, STAIF: A ComputerProgram for BWR Stability in the Frequency Domain -Theory Manual, datedSeptember 2001. This manual is proprietary in its entirety.Enclosure 6 provides affidavits executed to support withholding Enclosures 1, 3, 4, and5 from public disclosure. These Enclosures contain proprietary information as definedby 10 CFR 2.390. The affidavit sets forth the basis on which the information may bewithheld from public disclosure by the NRC and addresses with specificity theconsiderations listed in 10 CFR 2.390(b)(4). Accordingly, NSPM respectfully requeststhat the AREVA proprietary information in Enclosures 1, 3, 4, and 5 be withheld frompublic disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of the AREVAinformation in Enclosure 4 or the supporting AREVA affidavits in Enclosure 6 should beaddressed to Mr. Alan Meginnis, Manager- Product Licensing, AREVA Inc.,2101 Horn Rapids Road, Richland, Washington 99354.The information offered herein does not affect the conclusions of the SignificantHazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 LAR.In accordance with 10 CFR 50.91(b), a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures.If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777. |
| | Document Control DeskPage 3Summary of CommitmentsThis letter makes no new commitments and no revisions to existing commitments.I declare under penalty of perjury that the foregoing is true and correct.Executed on: January 9, 2015Kar4- D. FiliSite Vice-PresidentMonticello Nuclear Generating PlantNorthern States Power Company-MinnesotaEnclosures (6)cc: Administrator, Region III, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures) |
| }} | | }} |
Revision as of 01:13, 22 March 2018
Letter Sequence Supplement |
---|
|
|
MONTHYEARML15022A1652015-01-0909 January 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15030A0092015-01-28028 January 2015 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request Transition to Areva Extended Flow Window Methodology Project stage: Acceptance Review ML15195A4472015-08-0505 August 2015 Summary of Public Meeting with Xcel Energy and Areva to Discuss Changes to the Proposed Technical Specifications and COLR in Support of the Areva Extended Flow Window License Amendment Request Project stage: Meeting L-MT-15-057, License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions2015-08-26026 August 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15140A1242015-09-28028 September 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15140A1472015-09-28028 September 2015 Request for Withholding Information from Public Disclosure (GE-Hitachi LLC) Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15274A4732015-09-29029 September 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits Project stage: Response to RAI ML15274A4752015-09-29029 September 2015 Enclosure 6, Areva Report ANP-3435NP, Revision 0 to Are VA Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW LAR (Non-Proprietary) Project stage: Response to RAI ML15274A4742015-09-29029 September 2015 Enclosure 4, Engineering Evaluation, EC 25987, Calculation Framework for the Extended Flow Window Stability (Efws) Setpoints Project stage: Other L-MT-15-081, ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar.2015-12-0808 December 2015 ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI ML15345A4072015-12-0808 December 2015 License Amendment Request for Areva Extended Flow Window, Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement ML16063A0332016-02-29029 February 2016 License Amendment Request for Areva Extended Flow Window Supplement to Disposition Changes to Non-Limiting Transient Analyses Project stage: Supplement L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology2016-04-29029 April 2016 Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology Project stage: Other ML16221A2742016-07-31031 July 2016 ANP-3435NP, Revision 2, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I.2016-07-31031 July 2016 ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I. Project stage: Other ML16221A2752016-07-31031 July 2016 ANP-3274NP, Revision 2, Analytical Methods for Monticello ATWS-I. Project stage: Other ML16221A2732016-08-0404 August 2016 License Amendment Request for Areva Extended Flow Window Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement L-MT-16-041, License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties2016-09-14014 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties Project stage: Supplement L-MT-16-049, License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation2016-09-28028 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation Project stage: Supplement 2015-09-29
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 L-MT-24-012, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24106A1102024-04-24024 April 2024 Mille Lacs Band of Ojibwe -Monticello Sec106 Tribal ML24115A2792024-04-24024 April 2024 Sec106 Tribal, Blaker, Doreen-Keweenaw Bay Indian Community 2024-08-05
[Table view] |
Text
ENCLOSURES 1, 3,4, 5 CONTAIN PROPRIETARY INFORMATIONWITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390XcelEnergyMonticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362January 9, 2015L-MT-14-10310 CFR 50.90U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22License Amendment Request for AREVA Extended Flow WindowSupplement to Respond to NRC Staff Questions (TAC No. MF5002)References: 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window,"L-MT-14-044, dated October 3, 2014. (ADAMS Accession No.ML14283A125)2) Email T. Beltz (NRC) to G. Adams (NSPM), "Monticello NuclearGenerating Plant -Acceptance Review (Opportunity to Supplement)re: AREVA Extended Flow Window License Amendment Request(TAC No. MF5002)," dated December 10, 2014.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM),doing business as Xcel Energy, requested approval of an amendment to the MonticelloNuclear Generating Plant (MNGP) Renewed Operating License (OL) and TechnicalSpecifications (TS). The proposed change would revise TS and would approve certainanalytical methods that together would support operation in the expanded power-flowoperating domain described as the Extended Flow Window (EFW). The purpose of therequested amendment is to transition from the General Electric methodology calledMaximum Extended Load Line Limit Analysis Plus (MELLLA+) to-the AREVAmethodology called EFW.In Reference 2, NRC Staff identified further information that was required to supporttheir acceptance review. The correspondence stated that the submitted LAR could besupplemented to provide the required information. The purpose of this supplement is toprovide the required information.The general approach to this supplement was discussed with NRC Staff in a telephoneconference on December 2, 2014.I)A_(
Document Control DeskPage 2Enclosure 1 provides AREVA Report ANP-3376P, Revision 0, which provides reply tothe questions posed in Reference 2. Enclosure 1 is proprietary to AREVA.Enclosure 2 provides the non-proprietary AREVA Report ANP-3376NP, Revision 0.The nonproprietary report is being provided based on the NRC's expectation that thesubmitter of the proprietary information should provide, if.possible, a nonproprietaryversion of the document with brackets showing where the proprietary information hasbeen deleted.Enclosure 3 provides AREVA FS1 -0008928, FSQA-07-AISHA User and Programmer'sManual for BWR Transient Analysis Including Large Oscillations, Revision 2.0. Thismanual is proprietary in its entirety.Enclosure 4 provides AREVA FS1-0008916, FSQA-07-SINANO User's andProgrammer's Manual, Revision 2.0. This manual is proprietary in its entirety.Enclosure 5 provides AREVA Report EMF-2279(P), Revision 0, STAIF: A ComputerProgram for BWR Stability in the Frequency Domain -Theory Manual, datedSeptember 2001. This manual is proprietary in its entirety.Enclosure 6 provides affidavits executed to support withholding Enclosures 1, 3, 4, and5 from public disclosure. These Enclosures contain proprietary information as definedby 10 CFR 2.390. The affidavit sets forth the basis on which the information may bewithheld from public disclosure by the NRC and addresses with specificity theconsiderations listed in 10 CFR 2.390(b)(4). Accordingly, NSPM respectfully requeststhat the AREVA proprietary information in Enclosures 1, 3, 4, and 5 be withheld frompublic disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of the AREVAinformation in Enclosure 4 or the supporting AREVA affidavits in Enclosure 6 should beaddressed to Mr. Alan Meginnis, Manager- Product Licensing, AREVA Inc.,2101 Horn Rapids Road, Richland, Washington 99354.The information offered herein does not affect the conclusions of the SignificantHazards Consideration and the Environmental Consideration evaluations provided inthe Reference 1 LAR.In accordance with 10 CFR 50.91(b), a copy of this application supplement is beingprovided to the designated Minnesota Official without enclosures.If there are any questions or if additional information is needed, please contact GlennAdams at 612-330-6777.
Document Control DeskPage 3Summary of CommitmentsThis letter makes no new commitments and no revisions to existing commitments.I declare under penalty of perjury that the foregoing is true and correct.Executed on: January 9, 2015Kar4- D. FiliSite Vice-PresidentMonticello Nuclear Generating PlantNorthern States Power Company-MinnesotaEnclosures (6)cc: Administrator, Region III, USNRCProject Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRCMinnesota Department of Commerce (w/o enclosures)