RA-18-0139, Response to Request for Additional Information Related to Proposed Revisions to the Duke Energy Physical Security Plan License Amendment Request No. 2018-01, Supplement 2: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:(,DUKE | ||
(,DUKE | ~iENERGY SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled. | ||
RA-18-0139 August 23, 2018 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Duke Energy Carolinas, LLC Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 J. Ed Burchfield, Jr. | |||
Vice Presidenl* | Vice Presidenl* | ||
Oconee Nuclear Station Duke Energy ON01VP / 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 | |||
Duke Energy ON01VP / 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 | : f. 864.873.4208 Ed.Burchfield@duke-energy.com | ||
: f. 864.873.4208 | |||
==Subject:== | ==Subject:== | ||
| Line 29: | Line 29: | ||
which proposes to revise the Duke Energy Physical Security Plan for Oconee Nuclear Station, on February 12, 2018. On August 3, 2018, NRC requested that Duke Energy respond to a Request for Additional Information (RAI) associated with the LAR. The enclosure (Safegµards Information) provides the requested information. This is the second set of RAI responses for the LAR. Supplement 1 to the LAR was submitted on August 8, 2018 to provide the first set of RAI responses. | which proposes to revise the Duke Energy Physical Security Plan for Oconee Nuclear Station, on February 12, 2018. On August 3, 2018, NRC requested that Duke Energy respond to a Request for Additional Information (RAI) associated with the LAR. The enclosure (Safegµards Information) provides the requested information. This is the second set of RAI responses for the LAR. Supplement 1 to the LAR was submitted on August 8, 2018 to provide the first set of RAI responses. | ||
This submittal contains Safeguards lnfonnation and this information is being protected pursuant to 10 CFR 73.21. The affected enclosure has been appropriately identified and marked to reflect the Safeguards Information content. | This submittal contains Safeguards lnfonnation and this information is being protected pursuant to 10 CFR 73.21. The affected enclosure has been appropriately identified and marked to reflect the Safeguards Information content. | ||
Inquiries on this proposed amendment request should be directed to Sam Adams, ONS Regulatory Affairs Group, at (864) 873-3348. | |||
SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. | SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. | ||
When separated this page is decontrolled. | When separated this page is decontrolled. | ||
www.duke-energy.com | www.duke-energy.com | ||
U. S. Nuclear Regulatory Commission August 23, 2018 Page2 SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled. | |||
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 23, 2018. | I declare under penalty of perjury that the foregoing is true and correct. Executed on August 23, 2018. | ||
Sincerely, | Sincerely, | ||
}Ll~ | |||
J. Ed Burchfield, Jr. | J. Ed Burchfield, Jr. | ||
Vice President Oconee Nuclear Station | Vice President Oconee Nuclear Station | ||
==Enclosure:== | ==Enclosure:== | ||
Duke Energy Response to NRC Request for Additional Information SAFEGUARDS INFORMA T/ON Enclosure contains Safeguards Information. | Duke Energy Response to NRC Request for Additional Information SAFEGUARDS INFORMA T/ON Enclosure contains Safeguards Information. | ||
When separated this page is decontrolled. | When separated this page is decontrolled. | ||
U. S. Nuclear Regulatory Commission August 23, 2018 Page 3 cc (cover letter only): | |||
cc (cover letter only): | Ms. Catherine Haney Adm'inistrator Region II U.S. Nuclear Regulatory Commission Marquis One Tower SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled. | ||
Ms. Catherine Haney Adm'inistrator Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett Senior Project Manager (by electronic mail only) | 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett Senior Project Manager (by electronic mail only) | ||
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Ms. Lynne Garner (by electronic mail only: garnerld@dhec.sc.gov) | Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Ms. Lynne Garner (by electronic mail only: garnerld@dhec.sc.gov) | ||
Manager, Infectious and Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201 | Manager, Infectious and Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201 | ||
* SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. | * SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. | ||
When separated this page is decontrolled.}} | When separated this page is decontrolled.}} | ||
Latest revision as of 13:23, 5 January 2025
| ML18239A112 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/23/2018 |
| From: | Burchfield J Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RA-18-0139 | |
| Download: ML18239A112 (3) | |
Text
(,DUKE
~iENERGY SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled.
RA-18-0139 August 23, 2018 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Duke Energy Carolinas, LLC Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 10 CFR 50.90 Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 J. Ed Burchfield, Jr.
Vice Presidenl*
Oconee Nuclear Station Duke Energy ON01VP / 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478
- f. 864.873.4208 Ed.Burchfield@duke-energy.com
Subject:
Response to Request for Additional Information Related to Proposed Revisions to the Duke Energy Physical Security Plan License Amendment Request No. 2018-01, Supplement 2 Duke Energy Carolinas, LLC (Duke Energy) submitted a License Amendment Request (LAR),
which proposes to revise the Duke Energy Physical Security Plan for Oconee Nuclear Station, on February 12, 2018. On August 3, 2018, NRC requested that Duke Energy respond to a Request for Additional Information (RAI) associated with the LAR. The enclosure (Safegµards Information) provides the requested information. This is the second set of RAI responses for the LAR. Supplement 1 to the LAR was submitted on August 8, 2018 to provide the first set of RAI responses.
This submittal contains Safeguards lnfonnation and this information is being protected pursuant to 10 CFR 73.21. The affected enclosure has been appropriately identified and marked to reflect the Safeguards Information content.
Inquiries on this proposed amendment request should be directed to Sam Adams, ONS Regulatory Affairs Group, at (864) 873-3348.
SAFEGUARDS INFORMATION Enclosure contains Safeguards Information.
When separated this page is decontrolled.
www.duke-energy.com
U. S. Nuclear Regulatory Commission August 23, 2018 Page2 SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 23, 2018.
Sincerely,
}Ll~
J. Ed Burchfield, Jr.
Vice President Oconee Nuclear Station
Enclosure:
Duke Energy Response to NRC Request for Additional Information SAFEGUARDS INFORMA T/ON Enclosure contains Safeguards Information.
When separated this page is decontrolled.
U. S. Nuclear Regulatory Commission August 23, 2018 Page 3 cc (cover letter only):
Ms. Catherine Haney Adm'inistrator Region II U.S. Nuclear Regulatory Commission Marquis One Tower SAFEGUARDS INFORMATION Enclosure contains Safeguards Information. When separated this page is decontrolled.
245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett Senior Project Manager (by electronic mail only)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Ms. Lynne Garner (by electronic mail only: garnerld@dhec.sc.gov)
Manager, Infectious and Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201
- SAFEGUARDS INFORMATION Enclosure contains Safeguards Information.
When separated this page is decontrolled.