=Text= | =Text= | ||
{{#Wiki_filter:==SUBJECT:== | {{#Wiki_filter:May 3, 2019 | ||
==SUBJECT:== | |||
CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501 | CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501 | ||
| Line 29: | Line 31: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Randal D. Baker, Chief Operations Branch Docket No.: 05000461 License No.: NPF-62 | |||
Randal D. Baker, Chief Operations Branch | |||
Docket No.: 05000461 License No.: NPF-62 | |||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000461/2019501 | IR 05000461/2019501 | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number: 05000461 License Number: NPF-62 Report Number: 05000461/2019501 Enterprise Identifier: I-2019-501-0014 Licensee: Exelon Generation Company, LLC Facility: Clinton Power Station Location: Clinton, IL Inspection Dates: March 18, 2019, to March 22, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Sr. Emergency Preparedness Inspector T. Ospino, Reactor Engineer F. Tran, Health Physicist (Licensing) | Docket Number: | ||
Approved By: Randal D. Baker, Chief Operations Branch Division of Reactor Safety | 05000461 | ||
License Number: | |||
NPF-62 | |||
Report Number: | |||
05000461/2019501 | |||
Enterprise Identifier: I-2019-501-0014 | |||
Licensee: | |||
Exelon Generation Company, LLC | |||
Facility: | |||
Clinton Power Station | |||
Location: | |||
Clinton, IL | |||
Inspection Dates: | |||
March 18, 2019, to March 22, 2019 | |||
Inspectors: | |||
M. Garza, Emergency Preparedness Inspector | |||
G. Hansen, Sr. Emergency Preparedness Inspector | |||
T. Ospino, Reactor Engineer | |||
F. Tran, Health Physicist (Licensing) | |||
Approved By: | |||
Randal D. Baker, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below. | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below. | ||
List of Findings and Violations No findings were identified. | ===List of Findings and Violations=== | ||
No findings were identified. | |||
Additional Tracking Items None. | ===Additional Tracking Items=== | ||
None. | |||
=INSPECTION SCOPES= | =INSPECTION SCOPES= | ||
| Line 51: | Line 92: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71114.01 - Exercise Evaluation== | |||
==71114.01 - Exercise Evaluation | ===Inspection Review (IP Section 02.01-02.11) (1 Sample)=== | ||
The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies. | The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies. | ||
==71114.08 - Exercise Evaluation Scenario Review | ==71114.08 - Exercise Evaluation Scenario Review== | ||
===Inspection Review (IP Section 02.01 - 02.04) (1 Sample)=== | |||
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15, | The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15, | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71151 - Performance Indicator Verification | |||
The inspectors verified licensee performance indicators submittals listed below: | |||
Alert & Notification System Reliability (IP Section 02.14) === | |||
Alert & Notification System Reliability (IP Section 02.14)=== | |||
{{IP sample|IP=IP 71151|count=1}} | {{IP sample|IP=IP 71151|count=1}} | ||
3rd quarter - 4th quarter 2018 | |||
3rd quarter - 4th quarter 2018 | |||
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ===Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ||
3rd quarter - 4th quarter 2018 | 3rd quarter - 4th quarter 2018 | ||
===ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ===ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ||
| Line 84: | Line 125: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type | Inspection | ||
Procedure | |||
71114.01 Corrective Action AR 0231242 | Type | ||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71114.01 | |||
Corrective Action | |||
Documents | |||
AR 0231242 | |||
NOS ID: A Used Protective Clothing Container Not Staged | |||
03/19/19 | |||
71114.01 | |||
Corrective Action | |||
Documents | |||
AR 03985112 | |||
EP Drill Critique Items | |||
03/14/17 | |||
71114.01 | |||
Corrective Action | |||
Documents | |||
AR 04007063 | |||
EP Drill Evaluation Results | |||
05/05/17 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04067474 | |||
Drive In Drill Critique Items | |||
09/27/17 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
71114.01 Corrective Action | AR 04074715 | ||
Clinton 2017 NRC EP Exercise EOF ERO Performance | |||
Demonstration Criteria Failures | |||
11/14/17 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04130446 | |||
EP Drill Critique Items | |||
04/24/18 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04168991 | |||
Clinton EP Off-Year Exercise - CR Simulator Performance | |||
71114.01 Corrective Action | Issues | ||
08/28/18 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04179787 | |||
CPS Off-Year Exercise: Other Issues Identified | |||
71114.01 Corrective Action | 08/28/18 | ||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04204932 | |||
Gaitronics Speaker Volume Too Low | |||
2/20/18 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04224505 | |||
EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration | |||
71114.01 Corrective Action | Criteria | ||
2/19/19 | |||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
AR 04230949 | |||
Procedure Enhancement for 4110.10 | |||
71114.01 Corrective Action | 03/19/19 | ||
71114.01 | |||
Corrective Action | |||
Documents | Documents | ||
71114.01 Miscellaneous | AR 04230961 | ||
PA Announcement not Immediately Heard 781 Aux During | |||
Drill | |||
03/19/19 | |||
71114.01 | |||
Corrective Action | |||
Documents | |||
AR 04231080 | |||
EP ID: PA Announcements Not Heard in OCC | |||
03/19/19 | |||
71114.01 | |||
Miscellaneous | |||
2018 Off-Year | |||
Exercise | Exercise | ||
71114.01 | Clinton 2018 Off Year Exercise Evaluation Report | ||
08/28/18 | |||
71114.01 | |||
Miscellaneous | |||
2019 Pre- | |||
Exercise | Exercise | ||
Evaluation | Evaluation | ||
71114.01 | Clinton 2019 Pre-Exercise Evaluation Report | ||
Inspection Type | 2/19/19 | ||
71114.01 | |||
Miscellaneous | |||
PowerPoint | |||
Clinton Biennial Exercise - Exercise Evaluation Results | |||
03/21/19 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Presentation | Presentation | ||
71114.01 | 71114.01 | ||
71114.01 | Procedures | ||
EP-AA-1000 | |||
Exelon Nuclear Standardized Radiological Emergency Plan | |||
71114.01 | |||
Procedures | |||
EP-AA-1003 | |||
Exelon Nuclear Radiological Emergency Plan Annex for | |||
Clinton Station | Clinton Station | ||
71114.01 | 71114.01 | ||
Procedures | |||
EP-AA-1003, | |||
Addendum 1 | Addendum 1 | ||
71114.01 | Clinton Station On-Shift Staffing Technical Basis | ||
71114.01 | |||
Procedures | |||
EP-AA-1003, | |||
Addendum 3 | Addendum 3 | ||
71114.01 | Exelon Nuclear Emergency Action Levels for Clinton Station | ||
71114.01 | 71114.01 | ||
71114.01 | Procedures | ||
EP-AA-110-200 | |||
Dose Assessment | |||
71114.01 | |||
Procedures | |||
EP-AA-110-301 | |||
Core Damage Assessment (BWR) | |||
71114.01 | |||
Procedures | |||
EP-AA-111 | |||
Emergency Classification and Protective Action | |||
Recommendations | Recommendations | ||
71114.01 | 71114.01 | ||
Procedures | |||
EP-AA-112 | |||
Emergency Response Organization (ERO)/Emergency | |||
Response Facility Activation and Operation | Response Facility Activation and Operation | ||
71114.01 | 71114.01 | ||
71114.01 | Procedures | ||
71114.08 | EP-AA-113 | ||
71151 | Personnel Protective Actions | ||
71151 | 71114.01 | ||
Procedures | |||
71151 | EP-AA-114 | ||
Notifications | |||
71151 | 71114.08 | ||
Miscellaneous | |||
RS-19-007 | |||
Clinton 2019 NRC Graded Exercise Manual | |||
01/17/19 | |||
71151 | |||
Miscellaneous | |||
NEI 99-02 | |||
Regulatory Assessment Performance Indicator Guideline | |||
71151 | |||
Miscellaneous | |||
NRC PI Data | |||
Sheets | |||
NRC Indicator ANS Reliability | |||
07/01/18 - | |||
2/31/18 | |||
71151 | |||
Miscellaneous | |||
NRC PI Data | |||
Sheets | |||
ERO Readiness | |||
07/01/18 - | |||
2/31/18 | |||
71151 | |||
Miscellaneous | |||
NRC PI Data | |||
Sheets | |||
Drill/Exercise Performance | |||
07/01/18 - | |||
2/31/18 | |||
}} | }} | ||
Latest revision as of 03:39, 5 January 2025
| ML19126A076 | |
| Person / Time | |
|---|---|
| Site: | Clinton (NPF-062) |
| Issue date: | 05/03/2019 |
| From: | Randy Baker NRC/RGN-III |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2019501 | |
| Download: ML19126A076 (8) | |
Text
May 3, 2019
SUBJECT:
CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501
Dear Mr. Hanson:
On March 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Clinton Power Station, Unit 1, and discussed the results of this inspection with Mr. J. Kowalski and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Randal D. Baker, Chief Operations Branch
Docket No.: 05000461 License No.: NPF-62
Enclosure:
Inspection Report
Docket Number:
05000461
License Number:
Report Number:
Enterprise Identifier: I-2019-501-0014
Licensee:
Exelon Generation Company, LLC
Facility:
Clinton Power Station
Location:
Clinton, IL
Inspection Dates:
March 18, 2019, to March 22, 2019
Inspectors:
M. Garza, Emergency Preparedness Inspector
G. Hansen, Sr. Emergency Preparedness Inspector
T. Ospino, Reactor Engineer
F. Tran, Health Physicist (Licensing)
Approved By:
Randal D. Baker, Chief
Operations Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.
List of Findings and Violations
No findings were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
Alert & Notification System Reliability (IP Section 02.14)===
3rd quarter - 4th quarter 2018
Drill/Exercise Performance (IP Section 02.12) (1 Sample)
3rd quarter - 4th quarter 2018
ERO Drill Participation (IP Section 02.13) (1 Sample)
3rd quarter - 4th quarter
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 21, 2019, the inspector presented the NRC Emergency Preparedness Exercise Inspection results to Mr. J. Kowalski and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
NOS ID: A Used Protective Clothing Container Not Staged
03/19/19
Corrective Action
Documents
EP Drill Critique Items
03/14/17
Corrective Action
Documents
EP Drill Evaluation Results
05/05/17
Corrective Action
Documents
Drive In Drill Critique Items
09/27/17
Corrective Action
Documents
Clinton 2017 NRC EP Exercise EOF ERO Performance
Demonstration Criteria Failures
11/14/17
Corrective Action
Documents
EP Drill Critique Items
04/24/18
Corrective Action
Documents
Clinton EP Off-Year Exercise - CR Simulator Performance
Issues
08/28/18
Corrective Action
Documents
CPS Off-Year Exercise: Other Issues Identified
08/28/18
Corrective Action
Documents
Gaitronics Speaker Volume Too Low
2/20/18
Corrective Action
Documents
EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration
Criteria
2/19/19
Corrective Action
Documents
Procedure Enhancement for 4110.10
03/19/19
Corrective Action
Documents
PA Announcement not Immediately Heard 781 Aux During
Drill
03/19/19
Corrective Action
Documents
EP ID: PA Announcements Not Heard in OCC
03/19/19
Miscellaneous
2018 Off-Year
Exercise
Clinton 2018 Off Year Exercise Evaluation Report
08/28/18
Miscellaneous
2019 Pre-
Exercise
Evaluation
Clinton 2019 Pre-Exercise Evaluation Report
2/19/19
Miscellaneous
PowerPoint
Clinton Biennial Exercise - Exercise Evaluation Results
03/21/19
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Presentation
Procedures
Exelon Nuclear Standardized Radiological Emergency Plan
Procedures
Exelon Nuclear Radiological Emergency Plan Annex for
Clinton Station
Procedures
Addendum 1
Clinton Station On-Shift Staffing Technical Basis
Procedures
Addendum 3
Exelon Nuclear Emergency Action Levels for Clinton Station
Procedures
Dose Assessment
Procedures
Core Damage Assessment (BWR)
Procedures
Emergency Classification and Protective Action
Recommendations
Procedures
Emergency Response Organization (ERO)/Emergency
Response Facility Activation and Operation
Procedures
Personnel Protective Actions
Procedures
Notifications
Miscellaneous
Clinton 2019 NRC Graded Exercise Manual
01/17/19
71151
Miscellaneous
Regulatory Assessment Performance Indicator Guideline
71151
Miscellaneous
NRC PI Data
Sheets
NRC Indicator ANS Reliability
07/01/18 -
2/31/18
71151
Miscellaneous
NRC PI Data
Sheets
ERO Readiness
07/01/18 -
2/31/18
71151
Miscellaneous
NRC PI Data
Sheets
Drill/Exercise Performance
07/01/18 -
2/31/18