ML20092C827: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:s9----
{{#Wiki_filter:s9----
          ;i     .
;i OPERATING DATA REPORT DOCKET NO.
OPERATING DATA REPORT DOCKET NO. 50-285 DATE   September 12, 1{
50-285 DATE September 12, 1{
COMPLETED BY     T. P. ilatthews TELEPHONE     (402)536-4733 OPERATING STATUS"
COMPLETED BY T. P. ilatthews TELEPHONE (402)536-4733 OPERATING STATUS"
: 1. Unit Name:       Fort Calhoun Station                               N"'''
: 1. Unit Name:
: 2. Reporting Period:       August, 1983
Fort Calhoun Station N"'''
: 3. Licensed Thermal Power (MWt):             1500
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):             501
August, 1983
: 3. Licensed Thermal Power (MWt):
1500 501
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capaci'y (Gross MWe):       461
: 6. Maximum Dependable Capaci'y (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):         438
461
: 7. Maximum Dependable Capacity (Net MWe):
438
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
IVA
IVA
: 9. Power Level To Which Restricted,if Any (Net MWe):         N/A 10J Reasons For Restrictions.lf Any:           None l
: 9. Power Level To Which Restricted,if Any (Net MWe):
This Month             Yr. to Date         Cumulative i1. Hours in Reporting Period                                   744.0               5,832.0             87,073.0
N/A 10J Reasons For Restrictions.lf Any:
: 12. Number Of Hours Reactor Was Critical                         744.0               3,574.9             66,964.9
None l
: 13. Reactor Reserve Shutdown Hours                                 0.0                     0.0             1,309.5
This Month Yr. to Date Cumulative i1. Hours in Reporting Period 744.0 5,832.0 87,073.0
: 14. Hours Generator On-Line                                   '744.0               3.476.0             66.473.5
: 12. Number Of Hours Reactor Was Critical 744.0 3,574.9 66,964.9
: 15. Unit Reserve Shutdown Hours                                     0.0                     0.0                   0.0
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
: 16. Gross Thermal Energy Generated (MWH)               1,096,899.4           4,825.058.0           82,440,606.4 17f Gross Electrical Energy Generated (MWil) .             338,624.0,         1,511,476.0 26.934.9552
: 14. Hours Generator On-Line
: 18. Net Electrical Energy Generated (MWH) 321,777.2           1,433,408.5           25,763,442.9 19, Unit Service Factor -                                       100.0                   53.7                   76.1
'744.0 3.476.0 66.473.5
: 20. Unit Availability Factor                                     100.0                   53.7                   76.1 98.7                    56.1                  64.5
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH) 1,096,899.4 4,825.058.0 82,440,606.4 17f Gross Electrical Energy Generated (MWil).
338,624.0, 1,511,476.0 26.934.9552 321,777.2 1,433,408.5 25,763,442.9
: 18. Net Electrical Energy Generated (MWH) 19, Unit Service Factor -
100.0 53.7 76.1
: 20. Unit Availability Factor 100.0 53.7 76.1 f
: 21. Unit Capacity Factor (Using MDC Net!
: 21. Unit Capacity Factor (Using MDC Net!
90.5 f
98.7 56.1 64.5
: 22. Unit Capacity Factor (Using DER Net)                                                 51.4                   62.2
: 22. Unit Capacity Factor (Using DER Net) 90.5 51.4 62.2 0.0 1.4 3.8
: 23. Unit Forced Outage Rate                                        0.0                     1.4                   3.8
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht 1984 refueling outage scheduled to start around March 16. 1994 and last for approximately two months.
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht 1984 refueling outage scheduled to start around March 16. 1994 and last for approximately two months.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operationi:                         Forecast           Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMM ERCI A L OPER A TION Pl/77 8496210339 840614 (W ADOCK 05000285             PDR
: 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMM ERCI A L OPER A TION Pl/77 8496210339 840614 (W ADOCK 05000285 PDR
__}}
__}}

Latest revision as of 11:28, 13 December 2024

Revised Monthly Operating Rept for Aug 1983
ML20092C827
Person / Time
Site: Fort Calhoun 
Issue date: 08/31/1983
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20092C793 List:
References
NUDOCS 8406210339
Download: ML20092C827 (1)


Text

s9----

i OPERATING DATA REPORT DOCKET NO.

50-285 DATE September 12, 1{

COMPLETED BY T. P. ilatthews TELEPHONE (402)536-4733 OPERATING STATUS"

1. Unit Name:

Fort Calhoun Station N"

2. Reporting Period:

August, 1983

3. Licensed Thermal Power (MWt):

1500 501

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capaci'y (Gross MWe):

461

7. Maximum Dependable Capacity (Net MWe):

438

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

IVA

9. Power Level To Which Restricted,if Any (Net MWe):

N/A 10J Reasons For Restrictions.lf Any:

None l

This Month Yr. to Date Cumulative i1. Hours in Reporting Period 744.0 5,832.0 87,073.0

12. Number Of Hours Reactor Was Critical 744.0 3,574.9 66,964.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
14. Hours Generator On-Line

'744.0 3.476.0 66.473.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,096,899.4 4,825.058.0 82,440,606.4 17f Gross Electrical Energy Generated (MWil).

338,624.0, 1,511,476.0 26.934.9552 321,777.2 1,433,408.5 25,763,442.9

18. Net Electrical Energy Generated (MWH) 19, Unit Service Factor -

100.0 53.7 76.1

20. Unit Availability Factor 100.0 53.7 76.1 f
21. Unit Capacity Factor (Using MDC Net!

98.7 56.1 64.5

22. Unit Capacity Factor (Using DER Net) 90.5 51.4 62.2 0.0 1.4 3.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht 1984 refueling outage scheduled to start around March 16. 1994 and last for approximately two months.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed INITI A L CRITICALITY INITIAL ELECTRICITY COMM ERCI A L OPER A TION Pl/77 8496210339 840614 (W ADOCK 05000285 PDR

__