05000336/LER-1997-018, Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
| Title = Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted
| Title = Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(ii)(B)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000336
| Docket = 05000336
| LER year = 2097
| LER year = 1997
| LER number = 18
| LER number = 18
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 34: Line 34:
=text=
=text=
{{#Wiki_filter:.-
{{#Wiki_filter:.-
t Northe st                                           Hope Feny Rd. (Houte Wh Watnford Cm385
t Northe st Hope Feny Rd. (Houte Wh Watnford Cm385
        /p Nuclear Energy                                             uuutone soa,ar Po.,r station Northeast Nuclear Energy Company P.O. Ibx 128 Waterford, LT Ot>385-0128 (860) 447 1791 Fax (860) 444-4277 The Northeast I;tilitie System May 21,1997 Docket No. 50-336 B16430 Re: 10 CFR 50.73(a)(2)(ii)(B)
/p Nuclear Energy uuutone soa,ar Po.,r station Northeast Nuclear Energy Company P.O. Ibx 128 Waterford, LT Ot>385-0128 (860) 447 1791 Fax (860) 444-4277 The Northeast I;tilitie System May 21,1997 Docket No. 50-336 B16430 Re: 10 CFR 50.73(a)(2)(ii)(B)
U.S. Nuclear Regulatory Commission Document Control Desk                                                 ,
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-018-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 21,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B).
Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-018-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 21,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B).
The following are NNECO's commitments made within this letter.
The following are NNECO's commitments made within this letter.
B16430-01:       Complete the RG 1.97 Rev. 2 compliance review including NNECO commitments and resubmit the results to the NRC before entering MODE 4 from the current outage.
B16430-01:
Complete the RG 1.97 Rev. 2 compliance review including NNECO commitments and resubmit the results to the NRC before entering MODE 4 from the current outage.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price
+
+
Director - Millstone Unit 2 BY:     MA       zw           Wb/
Director - Millstone Unit 2 Wb/
H. W. Antifes                                                                                 ,
BY:
7 Assistant Director Planning and                                                           i cc: see page 2 Maintenance - Millstone Unit 2                                                           g,a
MA zw H. W. Antifes 7
                                                                                                                                        /
Assistant Director Planning and i
9705280409 970521 PDR       ADOCK 05000336 0634?J.3 HEV.12 45
Maintenance - Millstone Unit 2 g,a cc: see page 2
/
9705280409 970521 PDR ADOCK 05000336 0634?J.3 HEV.12 45


      ,        ' I.,-.
' I..
l <.
l <.
1               U. S. Nuclear Regulatory Commission B16430/Page 2
1 U. S. Nuclear Regulatory Commission B16430/Page 2 Attachment: LER 97-018-00 cc:
 
W. D. Travers, Director of Special Projects H. J. Miller, Region 1 Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 l
==Attachment:==
LER 97-018-00 cc:   W. D. Travers, Director of Special Projects H. J. Miller, Region 1 Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 l
l l
l l
l-i l
l-i l
Line 60: Line 60:
i
i
?
?
                                                                                                                    - ..
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 15:28, 11 December 2024

Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted
ML20141K253
Person / Time
Site: Millstone 
Issue date: 05/21/1997
From: Anthes H
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141K255 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 B16430, NUDOCS 9705280409
Download: ML20141K253 (2)


LER-1997-018, Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
3361997018R00 - NRC Website

text

.-

t Northe st Hope Feny Rd. (Houte Wh Watnford Cm385

/p Nuclear Energy uuutone soa,ar Po.,r station Northeast Nuclear Energy Company P.O. Ibx 128 Waterford, LT Ot>385-0128 (860) 447 1791 Fax (860) 444-4277 The Northeast I;tilitie System May 21,1997 Docket No. 50-336 B16430 Re: 10 CFR 50.73(a)(2)(ii)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-018-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 21,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B).

The following are NNECO's commitments made within this letter.

B16430-01:

Complete the RG 1.97 Rev. 2 compliance review including NNECO commitments and resubmit the results to the NRC before entering MODE 4 from the current outage.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price

+

Director - Millstone Unit 2 Wb/

BY:

MA zw H. W. Antifes 7

Assistant Director Planning and i

Maintenance - Millstone Unit 2 g,a cc: see page 2

/

9705280409 970521 PDR ADOCK 05000336 0634?J.3 HEV.12 45

' I..

l <.

1 U. S. Nuclear Regulatory Commission B16430/Page 2 Attachment: LER 97-018-00 cc:

W. D. Travers, Director of Special Projects H. J. Miller, Region 1 Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 l

l l

l-i l

l t

i I

i

?