| Title = Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
| Title = Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
| Plant =  
| Plant =  
| Reporting criterion =  
| Reporting criterion = 10 CFR 50.73(a)(2)(i), 10 CFR 50.73(a)(2)(ii)
| Power level =  
| Power level =  
| Mode =  
| Mode =  
| Docket = 05000245
| Docket = 05000245
| LER year = 2097
| LER year = 1997
| LER number = 25
| LER number = 25
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:.   , . . . - . . - - .            . - - - . - .    - . . . . .~     -  . . . . ~ , . - - -          . . . -  ~ .     .    - ..- ~ - ~
{{#Wiki_filter:.
.~
.... ~,
~.
-..- ~ - ~
}-
}-
hhd.                                                                 M& tone ffices e lhq.c Ferry Hd., Waterford, CT Utilities System                                                       P.o.no 128 Waterford. CT 0638',-0128 (860) 447-1791 i
hhd.
i MAY 27 sgr Docket No. 50-245                                 .
M& tone ffices e lhq.c Ferry Hd., Waterford, CT Utilities System P.o.no 128 Waterford. CT 0638',-0128 (860) 447-1791 i
B16436 e        Re: 10CFR50.73(a)(2)(i) i             . U.S. Nuclear Regulatory Commission .
MAY 27 sgr i
;-  1
Docket No. 50-245 B16436 Re: 10CFR50.73(a)(2)(i) e i
              " Document Control Desk Washington, DC 20555 i
. U.S. Nuclear Regulatory Commission.
t
" Document Control Desk 1
;                This letter forwards Licensee Event Report (LER) 97-025-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on April 24, 1997. This LER is                                                 ]
Washington, DC 20555 i
;                submitted pursuant to 10CFR50.73(a)(2)(ii).
t This letter forwards Licensee Event Report (LER) 97-025-00, documenting an event that
!-                                                                                                                                                      1 The following are Northeast Nuclear Energy Company's (NNECO's) commitments'made within                                                 )
]
occurred at Millstone Nuclear Power Station, Unit No.1 on April 24, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).
1 The following are Northeast Nuclear Energy Company's (NNECO's) commitments'made within
)
this letten. All ofner statements made within this letter are for information only.
this letten. All ofner statements made within this letter are for information only.
B16436-1 NNECO commits to submit to the NRC for approval, a revision to Technical Specification 3.6.G and Technical Specification Surveillance Requirement 4.6.G prior                                   j to startup for operating cycle 16. The new specifications and requirements, relating to jet pump integrity and operability, will be similar to those established by the industry in the Standard Technical Specifications, NUREG-1433.
B16436-1 NNECO commits to submit to the NRC for approval, a revision to Technical Specification 3.6.G and Technical Specification Surveillance Requirement 4.6.G prior j
to startup for operating cycle 16. The new specifications and requirements, relating to jet pump integrity and operability, will be similar to those established by the industry in the Standard Technical Specifications, NUREG-1433.
B16436-2 NNECO commits that a review of the Technical Specifications requirements will be performed to ensure procedures exist to adequately implement all requirements in the Technical Specifications prior to startup for operating cycle 16.
B16436-2 NNECO commits that a review of the Technical Specifications requirements will be performed to ensure procedures exist to adequately implement all requirements in the Technical Specifications prior to startup for operating cycle 16.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY                                                   !
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I
I For:   P. D. Hinnenkamp Director, Unit Operations
For:
                                                                                                        . l By:   W. G. Noll Manager, Operations                                                     ;    _
P. D. Hinnenkamp Director, Unit Operations l
s b               a (
By:
l 9705290095 970527 PDR       ADOCK 05000245           <
W. G. Noll Manager, Operations s
S                              PDR ,
b a
owl 422-9 REV.12-95.
(
9705290095 970527 PDR ADOCK 05000245 S
PDR owl 422-9 REV.12-95.
j
j


      '                                                                                                        e U.S. Nuclear Regulatory Commission                                                                   i B16436\Page 2 of 2                                                                                   '
e U.S. Nuclear Regulatory Commission i
 
B16436\\Page 2 of 2 Attachment: LER 97-025-00 I
==Attachment:==
cc: Dr. W. D. Travers, Director, Special Projects l
LER 97-025-00                                                                             '
H. J. Miller, Region I Administrator S. Dembek, NRC. Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I i
I cc: Dr. W. D. Travers, Director, Special Projects l
t r
H. J. Miller, Region I Administrator S. Dembek, NRC. Project Manager, Millstone Unit No.1                                           :
t I
T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I                                 !
E A
i t
1 I
r t
I E
A 1
I
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 12:06, 11 December 2024

Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
ML20148C792
Person / Time
Site: Millstone 
Issue date: 05/27/1997
From: Noll W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148C795 List:
References
B16436, NUDOCS 9705290095
Download: ML20148C792 (2)


LER-1997-025, Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(ii)
2451997025R00 - NRC Website

text

.

.~

.... ~,

~.

-..- ~ - ~

}-

hhd.

M& tone ffices e lhq.c Ferry Hd., Waterford, CT Utilities System P.o.no 128 Waterford. CT 0638',-0128 (860) 447-1791 i

MAY 27 sgr i

Docket No. 50-245 B16436 Re: 10CFR50.73(a)(2)(i) e i

. U.S. Nuclear Regulatory Commission.

" Document Control Desk 1

Washington, DC 20555 i

t This letter forwards Licensee Event Report (LER) 97-025-00, documenting an event that

]

occurred at Millstone Nuclear Power Station, Unit No.1 on April 24, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

1 The following are Northeast Nuclear Energy Company's (NNECO's) commitments'made within

)

this letten. All ofner statements made within this letter are for information only.

B16436-1 NNECO commits to submit to the NRC for approval, a revision to Technical Specification 3.6.G and Technical Specification Surveillance Requirement 4.6.G prior j

to startup for operating cycle 16. The new specifications and requirements, relating to jet pump integrity and operability, will be similar to those established by the industry in the Standard Technical Specifications, NUREG-1433.

B16436-2 NNECO commits that a review of the Technical Specifications requirements will be performed to ensure procedures exist to adequately implement all requirements in the Technical Specifications prior to startup for operating cycle 16.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I

For:

P. D. Hinnenkamp Director, Unit Operations l

By:

W. G. Noll Manager, Operations s

b a

(

9705290095 970527 PDR ADOCK 05000245 S

PDR owl 422-9 REV.12-95.

j

e U.S. Nuclear Regulatory Commission i

B16436\\Page 2 of 2 Attachment: LER 97-025-00 I

cc: Dr. W. D. Travers, Director, Special Projects l

H. J. Miller, Region I Administrator S. Dembek, NRC. Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I i