JAFP-99-0097, Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:#m:s & [ht2atric::
{{#Wiki_filter:#m:s & [ht2atric::
* Nuclear Power Pfarit 268 Lak) Road
Nuclear Power Pfarit 268 Lak) Road
  /           P O Box 41 -
/
Lycoming. New York 13093 l
P O Box 41 -
315 342 3840                                                                               l
Lycoming. New York 13093 315 342 3840
      #> NewWrkPbwer                                                                 '#*
#> NewWrkPbwer M80%
M80%                                                                 ite exNutiv$iIeI March 17,1999 JAFP-99-OO97 United States Nuclear Regulatory Commission Director, Office of Nuclear Reactor Regulation Washington, D.C. 20555                                                                           l
ite exNutiv$iIeI March 17,1999 JAFP-99-OO97 United States Nuclear Regulatory Commission Director, Office of Nuclear Reactor Regulation Washington, D.C. 20555


==Subject:==
==Subject:==
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333                                                               l Four Year Performance Testing Report l
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Four Year Performance Testing Report


==Dear Sir:==
==Dear Sir:==
 
The New York Power Authority submits Attachment 1, James A. FitzPatrick Plant Referenced Simulation Facility Four Year Performance Testing Report, pursuant to 10 CFR 55.45(b)ii, certifying that there are no uncorrected simulator performance test failures.
1 The New York Power Authority submits Attachment 1, James A. FitzPatrick Plant Referenced Simulation Facility Four Year Performance Testing Report, pursuant to 10 CFR 55.45(b)ii, certifying that there are no uncorrected simulator performance test failures.
The reports includes a description of the performance testing completed during the past four years and a description of the testing scheduled to be performed during the next four years.
The reports includes a description of the performance testing completed during the past four years and a description of the testing scheduled to be performed during the next four years.
Should you or your staff have any questions regarding this report, please contact Mr.           I James Klinger, Simulator and Training Support Supervisor, at (315) 349-6446.
Should you or your staff have any questions regarding this report, please contact Mr.
I James Klinger, Simulator and Training Support Supervisor, at (315) 349-6446.
Very truly yours, N
Very truly yours, N
s MICHAEL J. COLOMB                                                                               {
s MICHAEL J. COLOMB
{
MJC:JK:las
MJC:JK:las


==Attachment:==
==Attachment:==
Four Year Performance Testing Report Cc:     next page I
Four Year Performance Testing Report Cc:
l n40151 k
next page l
9903250345 990317                                                                                 !
n40151 k
PDR     ADOCK 05000333 R                       PDP.                                                                    .
9903250345 990317 PDR ADOCK 05000333 R
PDP.
a
a


r A'                                                     I,
r A'
    ,    Cc:   D cum 2nt Contrcl Disk Unit:d Statas Nucirtr R:gul: tory Commission Mail Station P1-137 Washington, D.C. 20555 Regional Administrator United States Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector United States Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Joseph Williams, Project Manager Project Directorate 1-1 Division of Licensing Project Management United States Nuclear Regulatory Commission Mail Stop 14B2 Washington, D.C. 20555 1
I Cc:
D cum 2nt Contrcl Disk Unit:d Statas Nucirtr R:gul: tory Commission Mail Station P1-137 Washington, D.C. 20555 Regional Administrator United States Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector United States Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Joseph Williams, Project Manager Project Directorate 1-1 Division of Licensing Project Management United States Nuclear Regulatory Commission Mail Stop 14B2 Washington, D.C. 20555 1
i 1
i 1
l
l
Line 56: Line 59:


==SUMMARY==
==SUMMARY==
 
EasiutI:
EasiutI:       James A. FitzPatrick Nuclear Power Plant - Docket Number 50-333 Lissangg:       New York Power Authority Location:       New York Power Authority James A. FitzPatrick Nuclear Power Plant P.O. Box 41 Lycoming, New York 13093 Performance Testina Comoleted The testing program described in the "Four Year Performance Testing Report" submitted to the commission on March 17,1995 has been completed. Performance testing has been conducted in accordance with the requirements of ANSI /ANS 3.51985. Pursuant to 10CFR55.45(bX5Xii), all test performance failures during this repon period have been corrected.
James A. FitzPatrick Nuclear Power Plant - Docket Number 50-333 Lissangg:
New York Power Authority Location:
New York Power Authority James A. FitzPatrick Nuclear Power Plant P.O. Box 41 Lycoming, New York 13093 Performance Testina Comoleted The testing program described in the "Four Year Performance Testing Report" submitted to the commission on March 17,1995 has been completed. Performance testing has been conducted in accordance with the requirements of ANSI /ANS 3.51985. Pursuant to 10CFR55.45(bX5Xii), all test performance failures during this repon period have been corrected.
Pursuant to 10CFR55.45(bX5Xvi), a report is attached (Tab 2), describing the testing completed during this report period. The report lists each test that has been performed, grouped by test type, and includes the test number and test title. Changes to the testing program due to plant modifications, plant and simulator procedure changes, and training value assessments are annotated on the report as follows:
Pursuant to 10CFR55.45(bX5Xvi), a report is attached (Tab 2), describing the testing completed during this report period. The report lists each test that has been performed, grouped by test type, and includes the test number and test title. Changes to the testing program due to plant modifications, plant and simulator procedure changes, and training value assessments are annotated on the report as follows:
: 1) " deleted" - indicates the function and test are no longer applicable to the simulator.
: 1) " deleted" - indicates the function and test are no longer applicable to the simulator.
Line 64: Line 69:
: 3) " inactivated"-indicates the function is no longer used in simulator training. The test has been flagged as inactive in the testing database and on the Instructor Station. The test will no longer be performed. The function may be reactivated in the future, after successful re-performance of the test.
: 3) " inactivated"-indicates the function is no longer used in simulator training. The test has been flagged as inactive in the testing database and on the Instructor Station. The test will no longer be performed. The function may be reactivated in the future, after successful re-performance of the test.


NEW YORK POWER AUTHORITY                                           j JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                   {
NEW YORK POWER AUTHORITY j
PLANT REFERENCED SIMULATION FACILITY                                     l REPORT SUMMAav
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
{
PLANT REFERENCED SIMULATION FACILITY l
REPORT SUMMAav
: 4) "added"-indicates additional testing performed not required by the testing plan submitted in 1995 (includes newly developed tests added to the testing program).
: 4) "added"-indicates additional testing performed not required by the testing plan submitted in 1995 (includes newly developed tests added to the testing program).
The simulator hardware and software platforms were upgraded during this report period. The changes involved replacing the Encore /MPX based computer platform with a Pentium/W'         m dows NT platform and porting the simulation software from the original Singer-Link executive to OpenSim NT. The upgrade acceptance testing appears in the report with other modification testing.
The simulator hardware and software platforms were upgraded during this report period. The changes involved replacing the Encore /MPX based computer platform with a Pentium/W' dows m
NT platform and porting the simulation software from the original Singer-Link executive to OpenSim NT. The upgrade acceptance testing appears in the report with other modification testing.
Discrepancies identified during performance testing have been documented and controlled in accordance with the Simulator Configuration Management Control Procedure (STP-1). Testing related discrepancy reports and all performance test results are on file and available for review in the Simulator.
Discrepancies identified during performance testing have been documented and controlled in accordance with the Simulator Configuration Management Control Procedure (STP-1). Testing related discrepancy reports and all performance test results are on file and available for review in the Simulator.
Performance Testine Plan 1999-2002:
Performance Testine Plan 1999-2002:
Simulator performance testing for the next four years will continue to be conducted in accordance with the requirements of ANSI /ANS 3.51985. The program to implement the testing for the next         .
Simulator performance testing for the next four years will continue to be conducted in accordance with the requirements of ANSI /ANS 3.51985. The program to implement the testing for the next four years is the same as that used for the last four years and is described in the procedure entitled
l four years is the same as that used for the last four years and is described in the procedure entitled
" Simulator Test Program" (STP-3). The specific listing of tests to be perfonned is now maintained in a testing database and has been revised to reflect simulator changes implemented during the past four year period (as described in this report).
" Simulator Test Program" (STP-3). The specific listing of tests to be perfonned is now maintained in a testing database and has been revised to reflect simulator changes implemented during the past four year period (as described in this report).
Pursuant to 10CFR55.45(b)(5)vi, a description of the tests to be performed and a testing schedule for the next four year period is attached (Tab 3).
Pursuant to 10CFR55.45(b)(5)vi, a description of the tests to be performed and a testing schedule for the next four year period is attached (Tab 3).


NEW YORK POWER AUIRORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE                               TEST TITLE CHANGES               NUMBER                                               PERFORMED NOP       ST-01B   MSIV Fast Closure and Main Steam Line       11-Mar-98 Drain Isolation Valve Test (IST)
NEW YORK POWER AUIRORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITLE CHANGES NUMBER PERFORMED NOP ST-01B MSIV Fast Closure and Main Steam Line 11-Mar-98 Drain Isolation Valve Test (IST)
NOP       ST-01E   Main Turbine Stop Valves Limit Switch       05-May-97 Instrument Functional Test NOP       ST-01G   Main Steam Radiation Monitor (17RM-251A,   03-Mar-99 B, C and D) Functional Test NOP       ST-01I   Main Steam Isolation valves Limit Switch   11-Mar-99 Instrument Functional Test NOP       ST-01K   Main Steam Line Isolation Valves, Main     10-Mar-99 Steam Drain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP       ST-01L   Main Turbine control Valve Instrument       01-Dec-97 j Channel and Valve Operability Check NOP       ST-Ols   shutdown Cooling Containment Isolation     10-Mar-99 I Valve Testing (IST)
NOP ST-01E Main Turbine Stop Valves Limit Switch 05-May-97 Instrument Functional Test NOP ST-01G Main Steam Radiation Monitor (17RM-251A, 03-Mar-99 B, C and D) Functional Test NOP ST-01I Main Steam Isolation valves Limit Switch 11-Mar-99 Instrument Functional Test NOP ST-01K Main Steam Line Isolation Valves, Main 10-Mar-99 Steam Drain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP ST-01L Main Turbine control Valve Instrument 01-Dec-97 j
Deleted     NOP       ST-01Y   MSIV Partial Closure Exercise Test             N/A Added     NOP       ST-02AL   RHR Loop A Quarterly Operability Test       05-Mar-99 (IST)                                                 !
Channel and Valve Operability Check NOP ST-Ols shutdown Cooling Containment Isolation 10-Mar-99 Valve Testing (IST)
I Added     NOP       ST-02AM   RHR Loop B Quarterly Operability Test       07-Mar-99 (IST)
Deleted NOP ST-01Y MSIV Partial Closure Exercise Test N/A Added NOP ST-02AL RHR Loop A Quarterly Operability Test 05-Mar-99 (IST)
NOP       ST-02AN   RHR Loop A Pump an'd MOV Operability and   05-Mar-99 t LPCI Keep-Full Level Switch Functional               j Test                                                 j
I Added NOP ST-02AM RHR Loop B Quarterly Operability Test 07-Mar-99 (IST)
                                                                                          ~
NOP ST-02AN RHR Loop A Pump an'd MOV Operability and 05-Mar-99 t
NOP       ST-02AO   RHR Loop B Pump and MOV Operability and     07-Mar-99 LPCI Keep-Full Level Switch Functional Test                                                 !
LPCI Keep-Full Level Switch Functional j
NOP       ST-02J     One RHR Service Water Pump or One           10-Mar-99 Containment Cooling subsystem inoperable             ;
Test j
Test                                                 !
NOP ST-02AO RHR Loop B Pump and MOV Operability and 07-Mar-99
1 NOP       ST-02N     LPCI Mode Inoperable Test                   10-Mar-99 f
~
I Replaced   NOP       ST-02R     RHR Service Water Pump and MOV Operability     N/A   j Test (Now in 02RA & 02RB) l Rev. 1 Tab 2-1 I
LPCI Keep-Full Level Switch Functional Test NOP ST-02J One RHR Service Water Pump or One 10-Mar-99 Containment Cooling subsystem inoperable Test 1
NOP ST-02N LPCI Mode Inoperable Test 10-Mar-99 f
I Replaced NOP ST-02R RHR Service Water Pump and MOV Operability N/A j
Test (Now in 02RA & 02RB) l Rev. 1 Tab 2-1 I
1 I
1 I


i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST ,        TEST                                                 IAST DATE CNANGES         NtadRER                                               PERSCOGED Added   NOP   ST-02RA     RHR Service Water Loop A Monthly           10-Mar-99 operability Test Added   NOP   ST-02RB     RHR Service Water Loop B Monthly           10-Mar-99 operability Test NOP     ST-02T     LPCI Cross Connect Position Functional     10-Mar-99 Test NOP   ST-02Y     RHR Heat Exchanger Performance Test       07-Mar-99 Replaced NOP     ST-03A     Core Spray Pump and Valve operability           N/A Test (Now in ST-3PA & PB)
i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CNANGES NtadRER PERSCOGED Added NOP ST-02RA RHR Service Water Loop A Monthly 10-Mar-99 operability Test Added NOP ST-02RB RHR Service Water Loop B Monthly 10-Mar-99 operability Test NOP ST-02T LPCI Cross Connect Position Functional 10-Mar-99 Test NOP ST-02Y RHR Heat Exchanger Performance Test 07-Mar-99 Replaced NOP ST-03A Core Spray Pump and Valve operability N/A Test (Now in ST-3PA & PB)
Added   NOP     ST-3PA     Core Spray Loop A Quarterly Operability     11-Mar-99 (IST)
Added NOP ST-3PA Core Spray Loop A Quarterly Operability 11-Mar-99 (IST)
Added   NOP     ST-3PB     Core Spray Loop B Quarterly Operability     11-Mar-99 (IST)
Added NOP ST-3PB Core Spray Loop B Quarterly Operability 11-Mar-99 (IST)
Deleted NOP     ST-03M     Core Spray Testable Check Valve Testing         N/A (IST)
Deleted NOP ST-03M Core Spray Testable Check Valve Testing N/A (IST)
NOP     ST-04B     HPCI Pump and MOV operability Test         21-May-96 Added   NOP     ST-04K     HPCI Turb Slow Roll & Overspeed Test       02-Feb-97 NOP     ST-04L     HPCI Class 2 Piping Functional Test (ISI)   28-Sep-97 NOP     ST-04M     HPCI Torus Suction Operability Test (IST)   03-Mar-99 NOP     ST-04N     HPCI Flow Rate and Inservice Test (IST)     16-Dec-97 Added   NOP     ST-04P   HPCI Annual Transient Monitoring Test       21-Apr-97 NOP     ST-05B   APRM Instrument Functional Test (Run Mode) 11-Mar-99 NOP     ST-05C     IRM-APRM Instrument Range Overlap Check     01-May-97 Added   NOP     ST-05D   APRM Calibration
NOP ST-04B HPCI Pump and MOV operability Test 21-May-96 Added NOP ST-04K HPCI Turb Slow Roll & Overspeed Test 02-Feb-97 NOP ST-04L HPCI Class 2 Piping Functional Test (ISI) 28-Sep-97 NOP ST-04M HPCI Torus Suction Operability Test (IST) 03-Mar-99 NOP ST-04N HPCI Flow Rate and Inservice Test (IST) 16-Dec-97 Added NOP ST-04P HPCI Annual Transient Monitoring Test 21-Apr-97 NOP ST-05B APRM Instrument Functional Test (Run Mode) 11-Mar-99 NOP ST-05C IRM-APRM Instrument Range Overlap Check 01-May-97 Added NOP ST-05D APRM Calibration
* 01-Jun-97 Added   NOP     ST-OSE   Core Performance Daily Surveillance         27-Jan-97 Added   NOP     ST-05F   Turb First Stage Press Secam Byp setpt       24-Mar-97 Determination                                           I 1
* 01-Jun-97 Added NOP ST-OSE Core Performance Daily Surveillance 27-Jan-97 Added NOP ST-05F Turb First Stage Press Secam Byp setpt 24-Mar-97 Determination I
Rev. 1 Tab 2-2
1 Rev. 1 Tab 2-2


7 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                 IAST DATE 37 CEANGES         NUMBER                                                 PE32000SD NOP     ST-05N     APRM Instrument Functional Test (Refuel,     24-Sep-97 Startup, or Shutdown Mode)
7 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE 37 CEANGES NUMBER PE32000SD NOP ST-05N APRM Instrument Functional Test (Refuel, 24-Sep-97 Startup, or Shutdown Mode) f NOP ST-050 SRM Functional Test 28-Sep-97 NOP ST-OSP Source Range Channel checks 08-Mar-99 NOP ST-05Q APRM Flow Bias Functional Test (Run Mode) 31-May-97 NOP ST-05R RBM Upscale and Downscale Instrument 02-Mar-99 Functional Test Deleted NOP ST-OST RPS Channel A APRM Downscale Functional N/A Test (Run Mode)
ST-050                                                           f NOP                SRM Functional Test                         28-Sep-97   '
Deleted NOP ST-05U RPS Channel B APRM Downscule Functional N/A Test (Run Mode)
NOP     ST-OSP     Source Range Channel checks                 08-Mar-99 NOP     ST-05Q   APRM Flow Bias Functional Test (Run Mode)   31-May-97 NOP     ST-05R   RBM Upscale and Downscale Instrument         02-Mar-99 Functional Test Deleted   NOP     ST-OST   RPS Channel A APRM Downscale Functional         N/A Test (Run Mode)
NOP ST-08C ESW Motor Operated Valves Operability Test 02-Mar-99 Replaced NOP ST-09B EDG Gull Load Test and ESW Pump N/A Operability Test (Now in ST-09BA & Sr-09BB)
Deleted   NOP     ST-05U   RPS Channel B APRM Downscule Functional         N/A Test (Run Mode)
Added NOP ST-09BA EDG A & C Full Load Test & ESW Pump 03-Mar-99 operability Test I
NOP     ST-08C   ESW Motor Operated Valves Operability Test 02-Mar-99 Replaced NOP     ST-09B   EDG Gull Load Test and ESW Pump                 N/A Operability Test (Now in ST-09BA & Sr-09BB)
Added NOP ST-09BB EDG B & D Full Load Test & ESW Pump 03-Mar-99 I
Added   NOP     ST-09BA   EDG A & C Full Load Test & ESW Pump         03-Mar-99 operability Test I
operability Test NOP ST-09C Emergency AC Power Load Sequencing Test 10-Mar-99 and 4 KV Emergency Power System Voltage Relays Instrument Functional Test NOP ST-09D EDG, ll5KV Reserve Power, Station Battery, ll-Jun-98 or ESW Pump Inoperable Test i
Added   NOP     ST-09BB   EDG B & D Full Load Test & ESW Pump         03-Mar-99   I operability Test l
NOP ST-10B Off-Gas System Automatic Isolation and 09-Mar-99 j
NOP     ST-09C     Emergency AC Power Load Sequencing Test     10-Mar-99 and 4 KV Emergency Power System Voltage Relays Instrument Functional Test NOP     ST-09D     EDG, ll5KV Reserve Power, Station Battery, ll-Jun-98 or ESW Pump Inoperable Test i
Closure Test j
NOP     ST-10B   Off-Gas System Automatic Isolation and       09-Mar-99   j Closure Test                                               j NOP     ST-ll   Off-Gas Process Rad Monitor Instrument       25-Apr-97 Functional Test i
NOP ST-ll Off-Gas Process Rad Monitor Instrument 25-Apr-97 Functional Test i
Deleted   NOP     ST-12B   Reactor Building Exhaust RAD Monitor             N/A       j Instrument Response Test Deleted   NOP     ST-12F   Main CR ventilation Rad Monitor Instrument       N/A       l Response Test                                             !
Deleted NOP ST-12B Reactor Building Exhaust RAD Monitor N/A j
l Rev. 1 Tab 2-3
Instrument Response Test Deleted NOP ST-12F Main CR ventilation Rad Monitor Instrument N/A l
Response Test l
Rev. 1 Tab 2-3


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                               l PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST             TEST                                                   IAST DATE CRAINES           NUMBER                                                   PERFOURED NOP     ST-12K     Main CR ventilation Rad Monitor Instrument 10-Feb-98 channel Functional Test Deleted     NOP     ST-13     Main btack Rad Monitor Response Test             N/A Added   NOP     ST-13A     Stack Gas Rad Mon Instr Channel Functional 10-Mar-99 Test Deleted   NOP     ST-14A     Normal Service Water Radiation Monitor           N/A Functional Test NOP     ST-20A     Rod Worth Minimizer Functional Test           23-Apr-97 NOP     ST-20C     Control Rod Operability and HCU Cooling       10-Mar-99 Water Supply Check Valve Reverse Flow Check (IST)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT l
Deleted   NOP     ST-20J   Verification of Scram Discharge Volume             N/A Vents and Drains NOP     ST-20K   Pre-Control Rod Withdrawal checklist         07-Mar-99 NOP     ST-20M     Scram Discharge Volume Vent and Drain         10-Mar-99 Valves Full Stroke and Timing Test (IST)
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRAINES NUMBER PERFOURED NOP ST-12K Main CR ventilation Rad Monitor Instrument 10-Feb-98 channel Functional Test Deleted NOP ST-13 Main btack Rad Monitor Response Test N/A Added NOP ST-13A Stack Gas Rad Mon Instr Channel Functional 10-Mar-99 Test Deleted NOP ST-14A Normal Service Water Radiation Monitor N/A Functional Test NOP ST-20A Rod Worth Minimizer Functional Test 23-Apr-97 NOP ST-20C Control Rod Operability and HCU Cooling 10-Mar-99 Water Supply Check Valve Reverse Flow Check (IST)
NOP     ST-20N     Control Rod Exercise / Timing / Stall Flow   07-Mar-99 Test NOP     ST-21A   Main Turbine Overspeed Trip Test (Actual       02-Mar-99 overspeed Trip Test - Valves Remain Open)
Deleted NOP ST-20J Verification of Scram Discharge Volume N/A Vents and Drains NOP ST-20K Pre-Control Rod Withdrawal checklist 07-Mar-99 NOP ST-20M Scram Discharge Volume Vent and Drain 10-Mar-99 Valves Full Stroke and Timing Test (IST)
NOP     ST-21C   Main Tura ne Combined Intermediate Valve       02-Mar-99 Test NOP     ST-21E   Main Turbine Backup overspeed Trip System 02-Mer-99 Test (Actual Overspeed)
NOP ST-20N Control Rod Exercise / Timing / Stall Flow 07-Mar-99 Test NOP ST-21A Main Turbine Overspeed Trip Test (Actual 02-Mar-99 overspeed Trip Test - Valves Remain Open)
NOP     ST-21F   Main Turbine overspeed Trip Device and         02-Mar-99 Mechanical Trip Valve Test NOP     ST-21I   Main Turbine Thrust Bearing Wear Detector     02-Mar-99 Test
NOP ST-21C Main Tura ne Combined Intermediate Valve 02-Mar-99 Test NOP ST-21E Main Turbine Backup overspeed Trip System 02-Mer-99 Test (Actual Overspeed)
* NOP     ST-21K   Main Turbine Overspeed Trip System Test       02-Mar-99 (Actual Overspeed)
NOP ST-21F Main Turbine overspeed Trip Device and 02-Mar-99 Mechanical Trip Valve Test NOP ST-21I Main Turbine Thrust Bearing Wear Detector 02-Mar-99 Test
Added   NOP     ST-22B   Manual Safety Relief Vlv operation & Vlv       29-Jun-97 Monitoring Sys Rev. 1 Tab 2-4       -
* NOP ST-21K Main Turbine Overspeed Trip System Test 02-Mar-99 (Actual Overspeed)
I
Added NOP ST-22B Manual Safety Relief Vlv operation & Vlv 29-Jun-97 Monitoring Sys Rev. 1 Tab 2-4 I


r           .                                                    .
r NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE caamans NUbdRER PERF05BdED NOP ST-23B Control Rod Coupling Integrity Test 02-Mar-99 NOP ST-23C Jet Pump Operability Test for Two Loop 24-Feb-98 Operation (EPIC Available)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                               IAST DATE caamans           NUbdRER                                                             PERF05BdED NOP     ST-23B                 Control Rod Coupling Integrity Test         02-Mar-99 NOP     ST-23C                 Jet Pump Operability Test for Two Loop       24-Feb-98 Operation (EPIC Available)
NOP ST-23D Jet Pump Operability Test for Single Loop 12-Mar-99 Operation NOP ST-23E Jet Pump Operability Test for Two Loop 02-Mar-99 Operation (EPIC Not Available)
NOP     ST-23D                 Jet Pump Operability Test for Single Loop   12-Mar-99 Operation NOP     ST-23E               Jet Pump Operability Test for Two Loop         02-Mar-99 Operation (EPIC Not Available)
NOP ST-24A RCIC Pump and MOV Operability Test 10-Mar-99 NOP ST-24F RCIC System Inoperable Test 10-Mar-99 NOP ST-24J RCIC Flow Rate and Inservice Test (IST) 08-Mar-99 Added NOP ST-240 RCIC Turb Slow Roll & Overspeed Test 21-Apr-97 NOP ST-26J Meatup and Cooldown Temperature Checks 08-Mar-99 NOP ST-26K Recirculation Pump Start-un Differential 07-Mar-99 Temperature Check NOP ST-26L Main Turbine Mechanical Trip valve and 07-Mar-99 Master Trip Solenoid A and B Test NOP ST-27A Recire Loop Valve Operability Test (IST) 10-Mar-99 NOP ST-29A Manual Scram Functional Test 19-Aug-97 NOP ST-29B Mode Switch in Shutdown Functional Test 07-Mar-99 NOP ST-29C RPS Channel Test Switch Functional Test 10-Mar-99 NOP ST-40C Computer out of Service Surveillance 07-Mar-99 NOP ST-40D Daily Surveillance and Instrument Check ll-Mar-99 NOP ST-40K Periodic Pump, Valve, and Component Test ll-Mar-99 NOP ST-40X Daily shutdown Surveillance and Instrument 10-Mar-99 l
NOP     ST-24A               RCIC Pump and MOV Operability Test             10-Mar-99 NOP     ST-24F               RCIC System Inoperable Test                   10-Mar-99 NOP     ST-24J             RCIC Flow Rate and Inservice Test (IST)         08-Mar-99 Added   NOP     ST-240               RCIC Turb Slow Roll & Overspeed Test           21-Apr-97 NOP     ST-26J             Meatup and Cooldown Temperature Checks           08-Mar-99 NOP     ST-26K             Recirculation Pump Start-un Differential         07-Mar-99 Temperature Check NOP     ST-26L           Main Turbine Mechanical Trip valve and           07-Mar-99 Master Trip Solenoid A and B Test NOP     ST-27A           Recire Loop Valve Operability Test (IST)         10-Mar-99 NOP     ST-29A           Manual Scram Functional Test                       19-Aug-97 NOP     ST-29B           Mode Switch in Shutdown Functional Test           07-Mar-99 NOP     ST-29C           RPS Channel Test Switch Functional Test           10-Mar-99 NOP     ST-40C         Computer out of Service Surveillance               07-Mar-99 NOP     ST-40D         Daily Surveillance and Instrument Check             ll-Mar-99 NOP     ST-40K           Periodic Pump, Valve, and Component Test           ll-Mar-99 NOP     ST-40X         Daily shutdown Surveillance and Instrument 10-Mar-99 l                                       Check l
Check l
Deleted   NOP     ST-41B       Valve Testing - Reactor Building Closed Loop Cooling Water (IST)
Deleted NOP ST-41B Valve Testing - Reactor Building Closed Loop Cooling Water (IST)
Rev. 1 tab 2-5
Rev. 1 tab 2-5


NEW YORK POWER AUTHORI/Y JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT Tas? LIST ,            Tus?                                                   IAsTzmTs CEAams               MtaEsa                                                 PEIWCORED Added     NOP     ST-50     SRM Functional Test                           14-May-97 NOP     OP-65     Plant Startup (including applicable OP's)     10-Mar-99 NOP     OP-65     Plant Shutdown (including applicable OP's) 12-Mar-99 Added     NOP   RAP-7.3.2.9 Determination of Rated Recirc Flow             11-M*Y-97 Added     NOP   RAP-7.3.7   Core Flow Evaluation and Indication Calcul ll-May-97 MALF       AD01     ADS Timer Fails to Start                     24-Feb-97 MALF       AD02     ADS Inadvertent Timer and Logic Start         28-Dec-98 MALF   AD03:A-H   ADS Valve (s) Fail to Initiate               15-Jan-99 Automatically MALF   AD04:A-K   RX Press Relief Valve Solenoid Failure       28-Jun-98 MALF. ADOS:A-K   RX Press Relief Valve Leak                   23-Aug-98 MALF   AD06:A-K   RX Press Relief Valve Inadvertently Opens     23-Aug-98 MALF   AD07:A-K   RX Press Relief Valve Fails to open           28-Jun-98 i
NEW YORK POWER AUTHORI/Y JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT Tas? LIST Tus?
MALF   AD08:A-K   RX Press Relief Valve Stuck open             24-Feb-97 MALF   AD09:A-K   RX SRV Vacuum Breaker Stuck Open             23-Aug-98 MALF   AN01:A,B   Control Room Annunciator Power Failure       12-Jan-97 MALF   CS01:A,B   Core Spray Pump Trip                         28-Dec-98 MALF   CS02:A,B   Core Spray Injection Valve rails to Auto     29-Dec-98 Open MALF   C503:A,B   core Spray Torus Suction Fails Closed         29-Dec-98 MALF   CSO4:A,B   Core Spray Injection Line Break (non-         26-Jan-99 recoverable)
IAsTzmTs CEAams MtaEsa PEIWCORED Added NOP ST-50 SRM Functional Test 14-May-97 NOP OP-65 Plant Startup (including applicable OP's) 10-Mar-99 NOP OP-65 Plant Shutdown (including applicable OP's) 12-Mar-99 Added NOP RAP-7.3.2.9 Determination of Rated Recirc Flow 11-M*Y-97 Added NOP RAP-7.3.7 Core Flow Evaluation and Indication Calcul ll-May-97 MALF AD01 ADS Timer Fails to Start 24-Feb-97 MALF AD02 ADS Inadvertent Timer and Logic Start 28-Dec-98 MALF AD03:A-H ADS Valve (s) Fail to Initiate 15-Jan-99 Automatically MALF AD04:A-K RX Press Relief Valve Solenoid Failure 28-Jun-98 MALF.
MALF   CS05:A,B   Core Spray Torus Suction Line Pipe Failure 02-Mar-95 MALF     CUOl     RWCU Flow Control Failure                     02-Mar-95 MALT'   CUO2:A,B   RWCU Pump Trip                               02-Mar-95 Rev. 1 Tab 2-6
ADOS:A-K RX Press Relief Valve Leak 23-Aug-98 MALF AD06:A-K RX Press Relief Valve Inadvertently Opens 23-Aug-98 MALF AD07:A-K RX Press Relief Valve Fails to open 28-Jun-98 i
MALF AD08:A-K RX Press Relief Valve Stuck open 24-Feb-97 MALF AD09:A-K RX SRV Vacuum Breaker Stuck Open 23-Aug-98 MALF AN01:A,B Control Room Annunciator Power Failure 12-Jan-97 MALF CS01:A,B Core Spray Pump Trip 28-Dec-98 MALF CS02:A,B Core Spray Injection Valve rails to Auto 29-Dec-98 Open MALF C503:A,B core Spray Torus Suction Fails Closed 29-Dec-98 MALF CSO4:A,B Core Spray Injection Line Break (non-26-Jan-99 recoverable)
MALF CS05:A,B Core Spray Torus Suction Line Pipe Failure 02-Mar-95 MALF CUOl RWCU Flow Control Failure 02-Mar-95 MALT' CUO2:A,B RWCU Pump Trip 02-Mar-95 Rev. 1 Tab 2-6


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                             i PLANT REFERENCED SIMULATION FACILITY FOUR YEAR IERFORMANCE TESTING REPORT usT LIST   ,,, ,,,,      usT
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT i
                                                    ,,,T TITza me Camens                 manaR                                                 PERF0ERED l MALF     CUO3:A,B   Tube Leak in RWCU HX (non-recoverable)     09-Mar-95 l
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR IERFORMANCE TESTING REPORT usT LIST usT me
MALF     CUO4:A,B   KWCU Resin Intrusion                       09-Mar-95 Inactivated   MALF     COOS:A,B   RWCU 'esin Depletion in Filt/Demin (Ref:   09-Mar-95 JTRG-98-076)
,,,T TITza Camens manaR PERF0ERED l
MALF       CUO6     RWCU Inadvertent Isolation                 09-Mar-95 MALF       CUO7     RWCU Pipe Break Between 12Mov-15 and 12Mov 13-Mar-95 18 MALF       CUO8     RWCU Return Temperature Transmitter         02-Feb-95 Failure HALF       CUO9     RWCU Inlet Pipe Failure (non-recoverable)   13-Mar-95 Added     MALF       CU10     RWCU Valve 12MOV-18 Fails To Auto Isolate   14-Jul-95 MALF     DG01:A-D   EDG Fails to Start                           02-Feb-95 MALF     DG02:A-D   EDG Fails to Trip                           20-Mar-95 MALF     DG03:A-D   EDG Output Breaker Fails to Auto close       02-Feb-95 .
MALF CUO3:A,B Tube Leak in RWCU HX (non-recoverable) 09-Mar-95 MALF CUO4:A,B KWCU Resin Intrusion 09-Mar-95 Inactivated MALF COOS:A,B RWCU 'esin Depletion in Filt/Demin (Ref:
MALF     DG04:A-D   EDG Trip                                     06-Apr-95 MALF     DG05:A-D   EDG Voltage Regulator Oscillations           21-Mar-95 MALF     DG06:A-D   EDG Slow to Start                           20-Mar-95 MA4F     DG07:A-D   EDG Governor Fails High                     06-Apr-95 MALF     DG08:A-D   EDG Governor Fails Low                       02-Feb-95 MALF     ED01:A,B   345/24KV Transformer (T1A, T1B) Failure     22-Mar-95 MALF     ED02:A,B   115/4KV Transformer (T2, T3) Failure         24-Feb-97 MALF     ED03:A-D   4KV/600V Transformer (T13, Tli, T15, T16)   17-Jan-95 Failure MALF     ED04:A,B   Inverter (71INV-3A/B) Failure               16-Jan-95 MALF     EDOS:A-H   4KV/600V Transformer (TS, T6, T7, T8, T9,   17-Apr-95 T10, Rev. 1 Tab 2-7
09-Mar-95 JTRG-98-076)
MALF CUO6 RWCU Inadvertent Isolation 09-Mar-95 MALF CUO7 RWCU Pipe Break Between 12Mov-15 and 12Mov 13-Mar-95 18 MALF CUO8 RWCU Return Temperature Transmitter 02-Feb-95 Failure HALF CUO9 RWCU Inlet Pipe Failure (non-recoverable) 13-Mar-95 Added MALF CU10 RWCU Valve 12MOV-18 Fails To Auto Isolate 14-Jul-95 MALF DG01:A-D EDG Fails to Start 02-Feb-95 MALF DG02:A-D EDG Fails to Trip 20-Mar-95 MALF DG03:A-D EDG Output Breaker Fails to Auto close 02-Feb-95 MALF DG04:A-D EDG Trip 06-Apr-95 MALF DG05:A-D EDG Voltage Regulator Oscillations 21-Mar-95 MALF DG06:A-D EDG Slow to Start 20-Mar-95 MA4F DG07:A-D EDG Governor Fails High 06-Apr-95 MALF DG08:A-D EDG Governor Fails Low 02-Feb-95 MALF ED01:A,B 345/24KV Transformer (T1A, T1B) Failure 22-Mar-95 MALF ED02:A,B 115/4KV Transformer (T2, T3) Failure 24-Feb-97 MALF ED03:A-D 4KV/600V Transformer (T13, Tli, T15, T16) 17-Jan-95 Failure MALF ED04:A,B Inverter (71INV-3A/B) Failure 16-Jan-95 MALF EDOS:A-H 4KV/600V Transformer (TS, T6, T7, T8, T9, 17-Apr-95
: T10, Rev. 1 Tab 2-7


NEW YORK POWER AUTHORITY JAMES A. FTrZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY
NEW YORK POWER AUTHORITY JAMES A. FTrZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY
                                                                                        )
)
J FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST             TEST                                               IAST DATE WT M CEAWERS             NtadBER                                               PERFCORED MALF     ED06A     120VAC Bus (RBACAS) Failure               30-Mar-95   1 I
J FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE WT M CEAWERS NtadBER PERFCORED MALF ED06A 120VAC Bus (RBACAS) Failure 30-Mar-95 I
MALF     ED06B   120VAC Bus (TBACA6) Failure                 10-Apr-95 MALF     ED06C   120VAC Bus (SWACA7) Failure                 10-Apr-95
MALF ED06B 120VAC Bus (TBACA6) Failure 10-Apr-95 MALF ED06C 120VAC Bus (SWACA7) Failure 10-Apr-95 MALF ED06D 120VAC Bus (RBACBS) Failure 10-Apr-95 MALF ED06E 120VAC Bus (TBACB6) Failure 10-Apr-95 MALF ED06F 120VAC Bus (RWACB7) Failure 10-Apr-95 MALF ED07A 120VAC Bus (RRACA8) Failure 10-Apr-95 MALF ED07B 120VAC Bus (RRACBS) Failure 13-Apr-95 MALF ED07C 120VAC Bus (RBACCS) Failure 03-May-95 MALF ED07D 120VAC Bus (TBACC6) Failure 16-Jan-95 MALF ED07E 120VAC Bus (SWACC7) Failure 10-Apr-95 MALF ED07F 120VAC Bus (RBACDS) Failure 16-Jan-95 MALF ED07G 120VAC Bus (TBACD6) Failure 06-Apr-95 Deleted MALF ED07H 120VAC Bus (RWACD7) Failure (Ref: JTRG 16-Jan-95 125)
                                                                                        )
MALF ED07I 120VAC Bus (RBACE5) Failure 06-Apr-95 MALF ED07J 120VAC Bus (71ABAC1) Failure 16-Jan-95 MALF ED07K 120VAC Bus (71ACNMS) Failure 16-Jan-95 l
MALF     ED06D   120VAC Bus (RBACBS) Failure                 10-Apr-95 MALF     ED06E     120VAC Bus (TBACB6) Failure                 10-Apr-95 MALF     ED06F     120VAC Bus (RWACB7) Failure                 10-Apr-95   )
MALF ED07L 120VAC Bus (71ACNMS-A) Failure 16-Jan-95 HALF ED07M 120VAC Bus (71ACNMS-B) Failure 16-Jan-95 Deleted MALF ED07N 120VAC Bus (71EBAC1) Failure (Ref: JTRG-97 16-Jan-95 125)
I MALF     ED07A     120VAC Bus (RRACA8) Failure                 10-Apr-95 MALF     ED07B     120VAC Bus (RRACBS) Failure                 13-Apr-95 MALF     ED07C     120VAC Bus (RBACCS) Failure               03-May-95 MALF     ED07D     120VAC Bus (TBACC6) Failure               16-Jan-95 MALF     ED07E     120VAC Bus (SWACC7) Failure               10-Apr-95 MALF     ED07F     120VAC Bus (RBACDS) Failure               16-Jan-95 MALF     ED07G     120VAC Bus (TBACD6) Failure               06-Apr-95 Deleted   MALF     ED07H     120VAC Bus (RWACD7) Failure (Ref: JTRG 16-Jan-95 125)
Added MALF ED08 120V/240VAC Bu' (71AC9/71AC10) Failure 04-May-95 Replaced MALF ED08A 120V/240VAC Bus (71AC9) Failure (Now In N/A ED08)
MALF     ED07I     120VAC Bus (RBACE5) Failure               06-Apr-95 MALF     ED07J     120VAC Bus (71ABAC1) Failure               16-Jan-95 MALF     ED07K     120VAC Bus (71ACNMS) Failure               16-Jan-95 l
l MALF     ED07L     120VAC Bus (71ACNMS-A) Failure             16-Jan-95 HALF     ED07M     120VAC Bus (71ACNMS-B) Failure             16-Jan-95 Deleted   MALF     ED07N     120VAC Bus (71EBAC1) Failure (Ref: JTRG-97 16-Jan-95 125)
Added   MALF       ED08     120V/240VAC Bu' (71AC9/71AC10) Failure     04-May-95   l Replaced   MALF     ED08A     120V/240VAC Bus (71AC9) Failure (Now In       N/A ED08)
Tab 2-8
Tab 2-8


NEW YORK POWER AUTHORITY                                   j JAMES A. FITZPATRICK NUCLEAR POWER PLANT                             l PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT i
NEW YORK POWER AUTHORITY j
TEST LIST           TEST                                                   IAST DATE g
JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT i
cmAmass           wuman                                                   PEarosemD j
TEST LIST TEST IAST DATE g
Replaced MALF     ED08B     120V/240VAC Bus (71AC10) Failure (Now In       N/A   J i.D08)
cmAmass wuman PEarosemD j
MALF     ED09:A,B   UPS MG Drive Failure (AC/DC)                 03-May-95 MALF       ED10       120VAC UPS Bus (71ACUPS) Failure           01-Feb-96 MALF     ED11A       125VDC Eas A (71BCB-2A) Failure             19-Dec-95 I I
Replaced MALF ED08B 120V/240VAC Bus (71AC10) Failure (Now In N/A J
          "Ir       ED11B       125VDC Bus B (71BCB-2B) Failure             19-Dec-95 MALF     ED. *8 :A,B 125VDC Bus Battery Charger Failure           14-Sep-95 Added MALF       ED13     24VDC Bus A(B) System Failure               03-Oct-95 Replaced MALF     ED13A     24VDC Bus A RR24DCA Failure (Now In ED13)       N/A Replaced MALF     ED13B     24VDC Bus B RR24DCB Failure (Now In ED13)       N/A MALF   ED14:A,B     24VDC Battery Charger Failure               08-Feb-95 MALF       ED15     24KV/4KV Transfortner T4 Failure             08-Feb-95 Added MALF       ED16     Power Grid Transient With Load               03-Mar-96 Increasing / Decreasing Replaced MALF     ED16A     Power Grid Transient With Load Increasing       2/A (Now In ED16)
i.D08)
Replaced MALF     ED16B     Power Grid Transient With Load Decreasing       N/A (Now In ED16)
MALF ED09:A,B UPS MG Drive Failure (AC/DC) 03-May-95 MALF ED10 120VAC UPS Bus (71ACUPS) Failure 01-Feb-96 MALF ED11A 125VDC Eas A (71BCB-2A) Failure 19-Dec-95 I
MALF       ED17     Station Blacko'it                           20-Dec-96 MALF   ED18:A,B     4.16KV Emergency Bus (10500, 10600)         31-Mar-96 Failure MALF   ED19:A-E     4.16KV Normal Bus (10100, 10200, 10300,     31-Mar-96 1
I "Ir ED11B 125VDC Bus B (71BCB-2B) Failure 19-Dec-95 MALF ED. *8 :A,B 125VDC Bus Battery Charger Failure 14-Sep-95 Added MALF ED13 24VDC Bus A(B) System Failure 03-Oct-95 Replaced MALF ED13A 24VDC Bus A RR24DCA Failure (Now In ED13)
MALF   ED20:A-H     600VAC Bus (11300, 11400, 12300, 12400,     31-Mar-96 i 13300,                                                 {
N/A Replaced MALF ED13B 24VDC Bus B RR24DCB Failure (Now In ED13)
MALF   ED21:A-D     600VAC Emergency Bus (11500, 12500, 11600, 12-Mar-96 12600)
N/A MALF ED14:A,B 24VDC Battery Charger Failure 08-Feb-95 MALF ED15 24KV/4KV Transfortner T4 Failure 08-Feb-95 Added MALF ED16 Power Grid Transient With Load 03-Mar-96 Increasing / Decreasing Replaced MALF ED16A Power Grid Transient With Load Increasing 2/A (Now In ED16)
MALF   ED22:A-C     600VAC Normal Bus (113100, 113200, 113300) 28-Nov-95 Failure Rev. 1 Tab 2-9     i
Replaced MALF ED16B Power Grid Transient With Load Decreasing N/A (Now In ED16)
MALF ED17 Station Blacko'it 20-Dec-96 MALF ED18:A,B 4.16KV Emergency Bus (10500, 10600) 31-Mar-96 Failure MALF ED19:A-E 4.16KV Normal Bus (10100, 10200, 10300, 31-Mar-96 1
MALF ED20:A-H 600VAC Bus (11300, 11400, 12300, 12400, 31-Mar-96 i
: 13300,
{
MALF ED21:A-D 600VAC Emergency Bus (11500, 12500, 11600, 12-Mar-96 12600)
MALF ED22:A-C 600VAC Normal Bus (113100, 113200, 113300) 28-Nov-95 Failure Rev. 1 Tab 2-9 i


l f
f i
i NEW YORK POWER AUTHORITY                                   I JAMES A. FITZPA'IluCK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                 IAST DME CEANGEs           NIBdBER                                               PEMOBBSD MALF   ED23:A-C   600VAC Normal Bus (114100, 114200, 114300) 07-Dec-95 Failure MALF   ED24:A-D   600VAC Emergency Bus (115100, 115200,       14-Dec-95 115300, 115600)                                       l MALF   ED25:A-F   600VAC Bus (116100, 116200, 116300,         12-Mar-96 116400, 116500, MALF   ED26:A,B   600VAC Bus (123100, 123200) Failure         07-Dec-95 MALF   ED27:A,B   600VAC Bus (124100, 124200) Failure         07-Dec-95 MALF   ED28:A-D   ff10VAC Bus (125100, 125200, 125300,       13-Feb-96 125400) Failure MALF   ED29:A-D   600VAC Emergency Bus (126100, 126200,       08-Feb-96 126300, 126400)
NEW YORK POWER AUTHORITY I
MALF   ED30:A-D   600VAC Bus (133100, 133200, 133300,         28-Nov-95 133400) Failure MALF   ED31:A-D   600VAC Bus (134100, 134200, 134300,         07-Du-95 134400) Failure MALF   ED32:A-E   600VAC Bus (113100, 143200, 143300,         19-Mar-96 143400, 143500)
JAMES A. FITZPA'IluCK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DME CEANGEs NIBdBER PEMOBBSD MALF ED23:A-C 600VAC Normal Bus (114100, 114200, 114300) 07-Dec-95 Failure MALF ED24:A-D 600VAC Emergency Bus (115100, 115200, 14-Dec-95 115300, 115600)
MALF   ED33:A-E   600VAC Bus (le 100, 144200, 144300,         07-Mar-96 144400, 144500)
MALF ED25:A-F 600VAC Bus (116100, 116200, 116300, 12-Mar-96 116400, 116500, MALF ED26:A,B 600VAC Bus (123100, 123200) Failure 07-Dec-95 MALF ED27:A,B 600VAC Bus (124100, 124200) Failure 07-Dec-95 MALF ED28:A-D ff10VAC Bus (125100, 125200, 125300, 13-Feb-96 125400) Failure MALF ED29:A-D 600VAC Emergency Bus (126100, 126200, 08-Feb-96 126300, 126400)
MALF     ED34A     120VAC Bus RPS-A Failure                   17-Dec-95 MALF     ED34B     120VAC Bus RPS-B Failure                   17-Dec-95 MALF     ED35A     120VAC Bus (71 ESSA 1) Failure             13-Dec-95 MALF     ED35B     120VAC Bus (71ESSB1) Failure               14-Dec-95 MALF     ED36A     120VAC Bus (71ACA2) Failure                 08-Dec-95 MALF     ED36B     120VAC Bus (71ACA3) Failure                 24-Jan-95 MALF     ED36C     120VAC Bus (71ACA4) Failure                 24-Jan-95 MALF     FD36D     120VAC Bus (71ACB2) Failure                 13-Dec-95 Rev. 1 Tab 2-10
MALF ED30:A-D 600VAC Bus (133100, 133200, 133300, 28-Nov-95 133400) Failure MALF ED31:A-D 600VAC Bus (134100, 134200, 134300, 07-Du-95 134400) Failure MALF ED32:A-E 600VAC Bus (113100, 143200, 143300, 19-Mar-96 143400, 143500)
MALF ED33:A-E 600VAC Bus (le 100, 144200, 144300, 07-Mar-96 144400, 144500)
MALF ED34A 120VAC Bus RPS-A Failure 17-Dec-95 MALF ED34B 120VAC Bus RPS-B Failure 17-Dec-95 MALF ED35A 120VAC Bus (71 ESSA 1) Failure 13-Dec-95 MALF ED35B 120VAC Bus (71ESSB1) Failure 14-Dec-95 MALF ED36A 120VAC Bus (71ACA2) Failure 08-Dec-95 MALF ED36B 120VAC Bus (71ACA3) Failure 24-Jan-95 MALF ED36C 120VAC Bus (71ACA4) Failure 24-Jan-95 MALF FD36D 120VAC Bus (71ACB2) Failure 13-Dec-95 Rev. 1 Tab 2-10


NEW YORK POWER AUIllORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                 LAST DA33 CEANES           NEREBER                                               PERF0EGED MALF     ED36E     120VAC Bus (71ACB3) Failure                 08-Dec-95 MALF     ED36F     120VAC Bus (71ACB4) Failure                 24-Jan-95 MALF   ED37A 1-5   125VDC Bus (71DC-A) Failure                 20-Jun-95 MALF   ED37B:1-5   125VDC Bus (71DC-B) Failure                 05-Apr-95 MALF   ED38:A-E   125VDC Bus (71BMCC) Failure                 28-Apr-98 MALF   ED39:A-G   125VDC Control Power Failure To 4160V       19-Mar-98 Busses MALF   ED40:A-L   125VDC Control Power Failure To 600V         27-Jun-95 Busses Added   MALF     ED41     Failure To Fast Transfer with A Normal       13-Dec-96 Residual Transfer Added   MALF     ED42     Failure To Fast Transfer With A Loss of     13-Dec-96 RPS Added   MALF     ED43     Loss of Affected 115KV Line                 21-Dec-96 l
NEW YORK POWER AUIllORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST LAST DA33 CEANES NEREBER PERF0EGED MALF ED36E 120VAC Bus (71ACB3) Failure 08-Dec-95 MALF ED36F 120VAC Bus (71ACB4) Failure 24-Jan-95 MALF ED37A 1-5 125VDC Bus (71DC-A) Failure 20-Jun-95 MALF ED37B:1-5 125VDC Bus (71DC-B) Failure 05-Apr-95 MALF ED38:A-E 125VDC Bus (71BMCC) Failure 28-Apr-98 MALF ED39:A-G 125VDC Control Power Failure To 4160V 19-Mar-98 Busses MALF ED40:A-L 125VDC Control Power Failure To 600V 27-Jun-95 Busses Added MALF ED41 Failure To Fast Transfer with A Normal 13-Dec-96 Residual Transfer Added MALF ED42 Failure To Fast Transfer With A Loss of 13-Dec-96 RPS Added MALF ED43 Loss of Affected 115KV Line 21-Dec-96 l
Added   MALF     ED44     Loss of Station Reserve Power               13-Dec-96 MALF     EG01     Main Generator Trip                         20-Dec-96 MALF     EGO?A     Main Generator Field Breaker Fails to       21-Feb-95 l                               Close MALF     EG02B     Main Generator Field Breaker Fails to open 08-Feb-95 l
Added MALF ED44 Loss of Station Reserve Power 13-Dec-96 MALF EG01 Main Generator Trip 20-Dec-96 MALF EGO?A Main Generator Field Breaker Fails to 21-Feb-95 l
l MALF   EG03:A,B   Loss cf Isolated Phase Bus cooling Fitn     08-Feb-95 MALF     EG04     Main Generater Field Brushes Ground         15-Dec-96 MALF     EGOS     Main Generator Stator Temp High             08-Feb-95 I
Close MALF EG02B Main Generator Field Breaker Fails to open 08-Feb-95 l
I MALF     EG06     Generator Hydrogen Cooling System Le.tkage   18-Apr-96 MALF     EG07     Hydrogen Seal Oil System Failure             30-Apr-96 Added   MALF     EG08     Main Generator Auto V/R Fails               07-Mar-96 Replaced MALF     EG08A     Main Generator Auto V/R Fails Increading         N/A (New In EGO 8) l Rev. 1 Tab 2-11
l MALF EG03:A,B Loss cf Isolated Phase Bus cooling Fitn 08-Feb-95 MALF EG04 Main Generater Field Brushes Ground 15-Dec-96 MALF EGOS Main Generator Stator Temp High 08-Feb-95 I
I MALF EG06 Generator Hydrogen Cooling System Le.tkage 18-Apr-96 MALF EG07 Hydrogen Seal Oil System Failure 30-Apr-96 Added MALF EG08 Main Generator Auto V/R Fails 07-Mar-96 Replaced MALF EG08A Main Generator Auto V/R Fails Increading N/A (New In EGO 8) l Rev. 1 Tab 2-11


r NEW YOI1K POWER AUIRORITY JAhES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TRST LIST           TEST                                                 LAST DATE CEANES             NtadBER                                               PERFOSSED Replaced MALF     EG08B   Main Generator Auto V/R Fails Decreasing         N/A (Now In EG08) l MALF     EG09     Main Generator Auto V/R Failure Complete     18-Jun-96 MALF     EG10     Loss of Stator Cooling water Flcw           07-Mar-96 Addad   MALF     EGil     Main H2 Seal Oil Pt'ap Trip                 30-Jan-98 i
r NEW YOI1K POWER AUIRORITY JAhES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TRST LIST TEST LAST DATE CEANES NtadBER PERFOSSED Replaced MALF EG08B Main Generator Auto V/R Fails Decreasing N/A (Now In EG08) l MALF EG09 Main Generator Auto V/R Failure Complete 18-Jun-96 MALF EG10 Loss of Stator Cooling water Flcw 07-Mar-96 Addad MALF EGil Main H2 Seal Oil Pt'ap Trip 30-Jan-98 i
Added   MALF     EG12     Emergency Seal Oil Pump Auto Start Failure 30-Jan-98 MALF   FP01:A-D   EDG Rm Fire                                 08-Sep-97 MALF     FP02     Smoke - Zone 01 through Zone 82             05-Jul-97 MALF   FWO1:A,B   RX Feedwater Pump Trip                       26-Feb-97 MALF   WO2A:A,B RX reedwater Pump Recirc Valve Fails Open 25-Aug-96 MALF   WO2B:AcB RX Feedwater Pump Recirc Valve Fails           25-Aug-96 Closed MALF   FWO3:A,B   RX Feedwater Pump Auto Controller Failure 27-Aug-96 MALF   FWO4:A,B   RX Feedwater Pump Manual Controller         07-Dec-96 Failure MALF   WOS:A,B   RX Feedwater Pu:rp High vibration           30-Jul-96 MALF   FWO6:A,B   RX Teodwater Pump Coupling Failure           22-Dec-96 i
Added MALF EG12 Emergency Seal Oil Pump Auto Start Failure 30-Jan-98 MALF FP01:A-D EDG Rm Fire 08-Sep-97 MALF FP02 Smoke - Zone 01 through Zone 82 05-Jul-97 MALF FWO1:A,B RX Feedwater Pump Trip 26-Feb-97 MALF WO2A:A,B RX reedwater Pump Recirc Valve Fails Open 25-Aug-96 MALF WO2B:AcB RX Feedwater Pump Recirc Valve Fails 25-Aug-96 Closed MALF FWO3:A,B RX Feedwater Pump Auto Controller Failure 27-Aug-96 MALF FWO4:A,B RX Feedwater Pump Manual Controller 07-Dec-96 Failure MALF WOS:A,B RX Feedwater Pu:rp High vibration 30-Jul-96 MALF FWO6:A,B RX Teodwater Pump Coupling Failure 22-Dec-96 i
MALF   WO7 : A, B RX Teedwater Pump Discharge Valve Seat       22-Dec-96 Failure MALF     FWOB     Maste- Feedwater Flow Control Auto Failure 27-Aug-96 MALF     WO9     Master Feedwater Flow Control Manual         27-Aug-96 Fai9e rt MALF     FW10     Master reedwater Flow Control Oscillates     27-Aug-96 Inactivated MALF   FW11:A-D   Loss of Steam Flow Signal To Fdwtr Level       N/A (Ref: JTRG-96-390)
MALF WO7 : A, B RX Teedwater Pump Discharge Valve Seat 22-Dec-96 Failure MALF FWOB Maste-Feedwater Flow Control Auto Failure 27-Aug-96 MALF WO9 Master Feedwater Flow Control Manual 27-Aug-96 Fai9e rt MALF FW10 Master reedwater Flow Control Oscillates 27-Aug-96 Inactivated MALF FW11:A-D Loss of Steam Flow Signal To Fdwtr Level N/A (Ref: JTRG-96-390)
Rev. 1 Tab 2-12
Rev. 1 Tab 2-12


NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                   IAST DATE CRAINES           NtadRER                                                 PERNARED Inactivated MALF   FW12:A,B   Loss of Fe E Flow signal To Fdwtr Level         N/A (Ref: JTRG-95-390)
NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRAINES NtadRER PERNARED Inactivated MALF FW12:A,B Loss of Fe E Flow signal To Fdwtr Level N/A (Ref: JTRG-95-390)
MALF   FW13:A,B   Feedwater System 6th Point Heater Tube       22-Dec-96 Leak MALF   FW14:A,B   Feedwater System Sth Point Heater Tube       13-Jan-99 Leak MALF   W15:A,B     Feedwater System 4th Point Heater Tube       13-Jan-99
MALF FW13:A,B Feedwater System 6th Point Heater Tube 22-Dec-96 Leak MALF FW14:A,B Feedwater System Sth Point Heater Tube 13-Jan-99 Leak MALF W15:A,B Feedwater System 4th Point Heater Tube 13-Jan-99
                              , Leak MALF   N16:A,B     Feedwater System 3rd Point Heater Tube       11-Mar-99 Leak l
, Leak MALF N16:A,B Feedwater System 3rd Point Heater Tube 11-Mar-99 Leak l
l MALF   N17:A,B     Feedwater System 2nd Point Heater Tube       11-Jun-98 Leak MALF   N18:A,B     Feedwater System Drain Cooler Tube Leak     11-Mar-99 {
MALF N17:A,B Feedwater System 2nd Point Heater Tube 11-Jun-98 Leak MALF N18:A,B Feedwater System Drain Cooler Tube Leak 11-Mar-99
MALF   N19: A-E   condensate Pump Trip                         27-Jan-97 Inactivated MALF     N20       Normal Hotwell Level Controller Failure         N/A (Ref: JTRG-96-390)
{
Inactivated MALF   FW21:A-H   Condensat's (DEMIN) Conductivity Increases   26-Mar-98 (Ref: JTRG-98-076)                                     J MALF   FW22:A,B   CST Leak Manway Flange Failure               05-sep-96 MALF   FW23:A-D   Migh Pressure Heater Level Control Failure 17-May-97 MALF   FW24:A,B   RX Feedwater Pump Loss of oil Pressure       05-Mar-97 MALF   FW25:A-C   Condensate Booster Pump Trip                 05-Mar-97 i MALF   FW26:A,B   Condensate Transfer Pump Trip               25-Jul-96 MALF   FW27:A,B   Feedwater Line Break Inside Primary         30-Jun-97 Containment MALF   FW28:A,B   Feedwater Line Break outside Primary         30-Jun-97 Containment MALF   FW29:A,B   Feedwater Line Inboard Containment Check     13-Jul-97 valve Tab 2-13
MALF N19: A-E condensate Pump Trip 27-Jan-97 Inactivated MALF N20 Normal Hotwell Level Controller Failure N/A (Ref: JTRG-96-390)
Inactivated MALF FW21:A-H Condensat's (DEMIN) Conductivity Increases 26-Mar-98 (Ref: JTRG-98-076)
J MALF FW22:A,B CST Leak Manway Flange Failure 05-sep-96 MALF FW23:A-D Migh Pressure Heater Level Control Failure 17-May-97 MALF FW24:A,B RX Feedwater Pump Loss of oil Pressure 05-Mar-97 MALF FW25:A-C Condensate Booster Pump Trip 05-Mar-97 i
MALF FW26:A,B Condensate Transfer Pump Trip 25-Jul-96 MALF FW27:A,B Feedwater Line Break Inside Primary 30-Jun-97 Containment MALF FW28:A,B Feedwater Line Break outside Primary 30-Jun-97 Containment MALF FW29:A,B Feedwater Line Inboard Containment Check 13-Jul-97 valve Tab 2-13


i 4
i
                                                                                        - j NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST   ,        TEST                                                 IAST DATE CMANGES             MUbmER                                                 PERF05GED Inactivated MALF   FW303A-D   Rx Feedwater Pump Discharge Check Valve     21-Feb-95 Fails Open (Ref: JTRG-97-162)
- j 4
Added     MALF       FW31     Condensate Booster Pmp A Auto Start         12-Oct-95 Failure i
NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CMANGES MUbmER PERF05GED Inactivated MALF FW303A-D Rx Feedwater Pump Discharge Check Valve 21-Feb-95 Fails Open (Ref: JTRG-97-162)
Added     MALF       FW32     Feedwater Heater Loop Seal Drain Blockage 21-Dec-96 MALF       HP01     HPCI Failure to Auto Start                 24-Feb-97 MALF       HP02     HPCI Turbine Trip                           23-Apr-96 MALF       HP03     HPCI Discharge Line Break (non-             18-Jun-96 recoverable)                                             l MALF       HPO4   HPCI Flow Controller Auto output Failure     23-Apr-96 l
Added MALF FW31 Condensate Booster Pmp A Auto Start 12-Oct-95 Failure i
MALF       HPOS     HPCI Inadvertent Initiation                 30-Apr-96 j
Added MALF FW32 Feedwater Heater Loop Seal Drain Blockage 21-Dec-96 MALF HP01 HPCI Failure to Auto Start 24-Feb-97 MALF HP02 HPCI Turbine Trip 23-Apr-96 MALF HP03 HPCI Discharge Line Break (non-18-Jun-96 recoverable)
MALF       HP06     L .I Steam Line Break (non-recoverable)     27-Jun-96     i MALF       HP07     HPCI Valve 23MOV-19 Fails to Auto open       23-Apr-96 MALF       HP00     HPCI Turbine Exhaust Piping Failure         25-Jun-96 MALF       HP09     HPCI Torus Suction Pipe Failure (non-       09-Dec-96     j recoverable)
MALF HPO4 HPCI Flow Controller Auto output Failure 23-Apr-96 MALF HPOS HPCI Inadvertent Initiation 30-Apr-96 j
Added     MALF       HP10     HPCI System Auto Isolation Failure           17-Oct-95 Added     MALF       HP11     HPCI 23MOV-15 Auto Isolation Failure         17-Oct-95 Added     MALF       HP12     HPCI High Rx Water Lvl Trip Failure         12-Oct-95 MALF   HV01:A-C   Rx Bldg Supply Fan Trip                     23-Apr-96 MALF   HV02:A,B   Rx Bldg Exhaust Fan Trip                     09-Dec-96 MALP     HV03     Secondary containment Leakage               18-Jul-96 MALF       IA01     Loss of Air Pressure to Scram Air Header     23-Apr-96 MALF       IA02     Loss of Instrument Air                       18-Jul-96 MALF   IA03:A-C   Air Compressor Trip                         30-Apr-96 Added     MALF       IA04     Serv Air Comp A Auto Start on Low Inst Air 17-Oct-95 Hdr Press Fail Rev. 1 Tab 2-14
MALF HP06 L.I Steam Line Break (non-recoverable) 27-Jun-96 MALF HP07 HPCI Valve 23MOV-19 Fails to Auto open 23-Apr-96 MALF HP00 HPCI Turbine Exhaust Piping Failure 25-Jun-96 MALF HP09 HPCI Torus Suction Pipe Failure (non-09-Dec-96 j
recoverable)
Added MALF HP10 HPCI System Auto Isolation Failure 17-Oct-95 Added MALF HP11 HPCI 23MOV-15 Auto Isolation Failure 17-Oct-95 Added MALF HP12 HPCI High Rx Water Lvl Trip Failure 12-Oct-95 MALF HV01:A-C Rx Bldg Supply Fan Trip 23-Apr-96 MALF HV02:A,B Rx Bldg Exhaust Fan Trip 09-Dec-96 MALP HV03 Secondary containment Leakage 18-Jul-96 MALF IA01 Loss of Air Pressure to Scram Air Header 23-Apr-96 MALF IA02 Loss of Instrument Air 18-Jul-96 MALF IA03:A-C Air Compressor Trip 30-Apr-96 Added MALF IA04 Serv Air Comp A Auto Start on Low Inst Air 17-Oct-95 Hdr Press Fail Rev. 1 Tab 2-14


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFC RMANCE TESTING REPORT TEST LIST 9,,9 97,,     MST CRANGES               NUMBER                     TEST TITLE PERFOSGSD MALF       MC01     Main Condenser Air In-Leakage                 18-Jul-96 MALF     MCO2:A-D   Main Condenser Tube Leak                       1-Aug-96 MALF     MCO3:A-D   Main Condenser Water Box Flow Block             -Aug-96 Added     MALF       MC04     SJAE Steam Supply Valve Fails                 12-Sep-96 Replaced     MALF       MC04A     SJAE Steam Supply Valve Fails Open (Now In       N/A MC04)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFC RMANCE TESTING REPORT TEST LIST MST 9,,9 97,,
Replaced   MALF       MC04B     SJAE Steam Supply Valve Fails Closed (Now       N/A In MC04)
TEST TITLE CRANGES NUMBER PERFOSGSD MALF MC01 Main Condenser Air In-Leakage 18-Jul-96 MALF MCO2:A-D Main Condenser Tube Leak 1-Aug-96 MALF MCO3:A-D Main Condenser Water Box Flow Block
MALF     MC05:A-C   Circulating Water Pump Trip                 06-Aug-96 MALF         MC06     Air Ejector Condenser High Level             20 Jan 98 MALF     MC07:A-C   Circ Water Pump Discharge Valve Fails to     18-Jul-96 Close MALF     MC08:A-C   Circ Water Pump Discharge Valve Fails to     25-Jul-96 Open MALF     MC09:A-D   Loss of Condenser Water Box Vacuum Priming 05-Sep-96 MALF         MC10   Water Icing in Intake Structure               05-Sep-96 MALF     M301:A,B   Main Steam Header Press Xmtr Failure         03-Jul-96 MALF     MS02:A-D   Steam Leakage Inside Primary Containment     04-May-97 MALF     MS03:A-D   Main Steam Line Rupture Inside Primary       08-Mar-99 MALF     MSO4:A-D   Main Steam Line Rupture Outside Primary       10-Mar-97 MALF       MS05     Steam Leak Outside Primary Containment       05-Ma,-97 Added     MALF       MS06     Steam Seal Pressure Regulator Fails           03-Sep-96 Replaced   MALF       MS06A   Steam Seal Pressure Regulator Fails Open         N/A (Now In MS06)
-Aug-96 Added MALF MC04 SJAE Steam Supply Valve Fails 12-Sep-96 Replaced MALF MC04A SJAE Steam Supply Valve Fails Open (Now In N/A MC04)
Replaced   MALF       MS06B   Steam Seal Pressure Regulator Fails "losed       N/A (Now In MS06)
Replaced MALF MC04B SJAE Steam Supply Valve Fails Closed (Now N/A In MC04)
MALF MC05:A-C Circulating Water Pump Trip 06-Aug-96 MALF MC06 Air Ejector Condenser High Level 20 Jan 98 MALF MC07:A-C Circ Water Pump Discharge Valve Fails to 18-Jul-96 Close MALF MC08:A-C Circ Water Pump Discharge Valve Fails to 25-Jul-96 Open MALF MC09:A-D Loss of Condenser Water Box Vacuum Priming 05-Sep-96 MALF MC10 Water Icing in Intake Structure 05-Sep-96 MALF M301:A,B Main Steam Header Press Xmtr Failure 03-Jul-96 MALF MS02:A-D Steam Leakage Inside Primary Containment 04-May-97 MALF MS03:A-D Main Steam Line Rupture Inside Primary 08-Mar-99 MALF MSO4:A-D Main Steam Line Rupture Outside Primary 10-Mar-97 MALF MS05 Steam Leak Outside Primary Containment 05-Ma,-97 Added MALF MS06 Steam Seal Pressure Regulator Fails 03-Sep-96 Replaced MALF MS06A Steam Seal Pressure Regulator Fails Open N/A (Now In MS06)
Replaced MALF MS06B Steam Seal Pressure Regulator Fails "losed N/A (Now In MS06)
Rev. 1 Tab 2-15
Rev. 1 Tab 2-15


l NEW YORK POWER AIITHORTTY                                   !
l NEW YORK POWER AIITHORTTY JAMES A. FTTZPATRICK NUCLEAR POWER PLANT I
JAMES A. FTTZPATRICK NUCLEAR POWER PLANT                             I PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                           i CEARNIES          NtRdBER TEST T*.TIA PERN05BdED j MALF   MS07:A-H   MSIV Disc Separates from Stem (non-       05-May-97 recoverable)                                         i i
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT i
MALF   MS08A:A-H MSIV Fails Closed                             03-Sep-96 MALF   M308B:A-H MSIV Fails Open                               02-Sep-96 MALF   MS09:A,B   First Stage Reheat Steam Supply to MSR     27-Jan-98 Fails MALF   MS10:A-H   MSIV Slow Test Closure Time                 02-Sep-96 MALF   MS11:A,B   Second Stage Reheat Steam Supply to MSR     12-Sep-96 Fails 1
TEST LIST TEST TEST T*.TIA CEARNIES NtRdBER PERN05BdED j
MALF   MS12:A-D   Moisture Separato,r Drain Tank Level       06-Jul-97 Control MALF   M513:A-D   First Stage Reheat Drain Tank Level         06-Jul-97 Control MALF   MS14:A-D   Second Stage Reheat Drain Tank Level       06-Jul-97   i control                                                 l MALF   MS15:A-J   Loss of Feedwater Extraction Steam         07-Jul-97 MALF   MS16:A-L   SRV Discharge Line Break Above Torus water 15-Aug-97 Level MALF   NM01:A-D   SRM Channel Failure                         09-Dec-96 MALF   NM02:A,B   SRM Channel Recorder Failure               09-Dec-06 MALF   NM03:A-D   SRM Channel Inoperative                     10-sep-96 MALF   NM04:A-D   SRM Channel Detector Stuck                 10-Sep-96 MALF   NMOS:A-D   SRM Channel Retract Permit Failure         09-Dec-96 MALF   NM06:A-H   IRM Channel Failure                         07-Dec-96 MALF   NM07:A-H   IRM/APRM-RBM Channel Recorder Failure       05-Mar-97 MALF   NM08:A-H   IRM Channel Inoperative                     07-Dec-96 MALF   NM09:A-H   IRM Channel Detector Stuck                 07-Dec-96 MALF   NM10:A-H   IRM Channel Retract Permit Failure         07-Dec-96 Rev. 1 Tab 2-16
MALF MS07:A-H MSIV Disc Separates from Stem (non-05-May-97 recoverable) i i
MALF MS08A:A-H MSIV Fails Closed 03-Sep-96 MALF M308B:A-H MSIV Fails Open 02-Sep-96 MALF MS09:A,B First Stage Reheat Steam Supply to MSR 27-Jan-98 Fails MALF MS10:A-H MSIV Slow Test Closure Time 02-Sep-96 MALF MS11:A,B Second Stage Reheat Steam Supply to MSR 12-Sep-96 Fails 1
MALF MS12:A-D Moisture Separato,r Drain Tank Level 06-Jul-97 Control MALF M513:A-D First Stage Reheat Drain Tank Level 06-Jul-97 Control MALF MS14:A-D Second Stage Reheat Drain Tank Level 06-Jul-97 control MALF MS15:A-J Loss of Feedwater Extraction Steam 07-Jul-97 MALF MS16:A-L SRV Discharge Line Break Above Torus water 15-Aug-97 Level MALF NM01:A-D SRM Channel Failure 09-Dec-96 MALF NM02:A,B SRM Channel Recorder Failure 09-Dec-06 MALF NM03:A-D SRM Channel Inoperative 10-sep-96 MALF NM04:A-D SRM Channel Detector Stuck 10-Sep-96 MALF NMOS:A-D SRM Channel Retract Permit Failure 09-Dec-96 MALF NM06:A-H IRM Channel Failure 07-Dec-96 MALF NM07:A-H IRM/APRM-RBM Channel Recorder Failure 05-Mar-97 MALF NM08:A-H IRM Channel Inoperative 07-Dec-96 MALF NM09:A-H IRM Channel Detector Stuck 07-Dec-96 MALF NM10:A-H IRM Channel Retract Permit Failure 07-Dec-96 Rev. 1 Tab 2-16


Tl l
T l NEW YORK POWER Alm 10RITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRANGES MtEdEER PERFOSSED MALF NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure 12-Sep-96 MALF NM12:A,B RBM Channel Failure 10 Sep-96 s
NEW YORK POWER Alm 10RITY                                       !
MALF NM13:A,B RBM Channel Inoperative 10-Sep-96 MALF NM14:A-F APRM Channel Failure 10-Sep-96 MALF NM15:A-F APRM Channel Inoperative 10-Sep-96 Deleted MALF NM17:XX:YY Leak in LPRM Dry Tube (non-recovetable) 10-Sep-96 (Ref: JTRG-97-086)
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                 I PLANT REFERENCED SIMULATION FACILITY                                   !
MALF OG01 Off Gas Condenser High Level 23-Jun-97 MALF OG02 Off Gas Drain Pot High Level 20-Jan-98 MALF OG03 Explosion in Air Ejector Discharge 23-Jun-97 MALF OG04 Fire in Air Ejector 27-Jan-98 MALF OG05 Recombiner Trip 28-Apr-98 MALF OG06 Stack Isolation Valve Fails closed 21-May-98 Added MALF OG07 Off Gas 01-107AOV-100 Auto Isolation 08-Oct-95 Failure MALF PC01 Containment Vent Purge Fan Trip 07-May-97 MALF PCA2 Loss of Instrument Nitrogen 07-May-97 MALF PCO3:A-H Drywell Cooling Fan Trip 23-Apr-97 MALF PC04:A,B SBGT Fan Trip 10-Mar-97 Added MALF PCOS Containment Pressure Transmitter Failure 14-Jul-97 Replaced MALF PCOSA Containment Pressure Transmitter Failure N/A (Now In PCOS)
FOUR YEAR PERFORMANCE TESTING REPORT                                     l TEST LIST             TEST                                                 IAST DATE CRANGES           MtEdEER                                                 PERFOSSED MALF NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure                         12-Sep-96   I MALF   NM12:A,B   RBM Channel Failure                         10 Sep-96 s
Replaced HALF PC05B Containment Pressure Transmitter Failure N/A (Now In PC05)
MALF   NM13:A,B   RBM Channel Inoperative                     10-Sep-96 MALF   NM14:A-F   APRM Channel Failure                         10-Sep-96 MALF     NM15:A-F   APRM Channel Inoperative                     10-Sep-96 Deleted MALF   NM17:XX:YY Leak in LPRM Dry Tube (non-recovetable)         10-Sep-96 (Ref: JTRG-97-086)
MALF PC06 Torus Drywell Vacuum Breaker 27VB-1 Fails 17-May-97 to Close Rev. 1 Tab 2-17
MALF       OG01     Off Gas Condenser High Level                 23-Jun-97 1
MALF       OG02     Off Gas Drain Pot High Level                 20-Jan-98 MALF       OG03     Explosion in Air Ejector Discharge           23-Jun-97 MALF       OG04     Fire in Air Ejector                           27-Jan-98 MALF       OG05     Recombiner Trip                               28-Apr-98 MALF       OG06     Stack Isolation Valve Fails closed           21-May-98 Added   MALF       OG07     Off Gas 01-107AOV-100 Auto Isolation         08-Oct-95 Failure MALF       PC01     Containment Vent Purge Fan Trip               07-May-97 MALF       PCA2     Loss of Instrument Nitrogen                   07-May-97 MALF   PCO3:A-H   Drywell Cooling Fan Trip                     23-Apr-97 MALF   PC04:A,B   SBGT Fan Trip                                 10-Mar-97 Added   MALF       PCOS     Containment Pressure Transmitter Failure     14-Jul-97 Replaced MALF     PCOSA     Containment Pressure Transmitter Failure         N/A (Now In PCOS)
Replaced HALF     PC05B     Containment Pressure Transmitter Failure         N/A (Now In PC05)
MALF     PC06     Torus Drywell Vacuum Breaker 27VB-1 Fails     17-May-97 to Close Rev. 1 Tab 2-17


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST gg,           TEST CEANES                                           TEST TITLE NUMBER                                                 PERF000ED MALF       PC07     Primary containment Leakage (non-           07-May-97 recoverable)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST gg, TEST TITLE CEANES NUMBER PERF000ED MALF PC07 Primary containment Leakage (non-07-May-97 recoverable)
MALF       PCOS     Primary Containment Hydrogen High             07-May-97 MALF       PC09     Primary Containment Oxygen High               07-May-97 MALF       PC10     Torus Level Decreases (non-recoverable)       10-Mar-97 MALF     RC01:A,B   RCIC Turbine Loss of 011 Pressure             23-Jun-97 MALF       RCO2     RCIC System Fails to Auto Start               30-Jun-97 MALF       RC03     RCIC System Turbine Trip                     15-Jun-97 MALF       RC04     RCIC Turbine Failure to Auto Trip             23-Jun-9'.
MALF PCOS Primary Containment Hydrogen High 07-May-97 MALF PC09 Primary Containment Oxygen High 07-May-97 MALF PC10 Torus Level Decreases (non-recoverable) 10-Mar-97 MALF RC01:A,B RCIC Turbine Loss of 011 Pressure 23-Jun-97 MALF RCO2 RCIC System Fails to Auto Start 30-Jun-97 MALF RC03 RCIC System Turbine Trip 15-Jun-97 MALF RC04 RCIC Turbine Failure to Auto Trip 23-Jun-9'.
l                 MALF       RC05     RCIC System Isolation                         15-Jun-97 MALF       RC06     RCIC Inadvertent In'itiation                 15-Jun-97 MALF     RC07:A,B   RCIC Governor Fails High/ Low (HSS/LSS)       13-Jul-97 Inactivated   MALF     RCOB:A,B   RCIC-RHR Suction Valve (10Mov-36A/B) Fails       N/A Closed (Ref: JTRG-98-059)
l MALF RC05 RCIC System Isolation 15-Jun-97 MALF RC06 RCIC Inadvertent In'itiation 15-Jun-97 MALF RC07:A,B RCIC Governor Fails High/ Low (HSS/LSS) 13-Jul-97 Inactivated MALF RCOB:A,B RCIC-RHR Suction Valve (10Mov-36A/B) Fails N/A Closed (Ref: JTRG-98-059)
MAI'       RC09     RCIC Steam Line Break (non-recoverable)       05-Mar-98 MALF       RC10     RCIC Discharge Line Break (non-               05-Jul-97 1 recoverable)
MAI' RC09 RCIC Steam Line Break (non-recoverable) 05-Mar-98 MALF RC10 RCIC Discharge Line Break (non-05-Jul-97 1
MALF       RC11     RCIC Turbine Exhaust Pipe Fe       (non-     05-Jul-97 recoverable)
recoverable)
MALF       RC12     RCIC Isolation Relay, 13A-K15, Failure       05-Apr-05 Added     MALF       RC13     RCIC High Rx Water Lvl Shutdown Failure       12-Oct-95 MALF     RD01A:A-H SDV Vent or Drain Valve Fails open             01-Apr-98 MALF     RD01B:A-H SDV Vent or Drain Valves rail closed           14-Jul-97 Inactivated     MALF     RD02:A,B   Scram Discharge Instrument Volume High       15-Apr-98 Level (Ref: JTRG-98-107)                                 ;
MALF RC11 RCIC Turbine Exhaust Pipe Fe (non-05-Jul-97 recoverable)
f MALF     RD03:A,B   CRD Flow Control Valve Failure               28-Jul-97 MALF     RD04:A,B   CRD Drive Water Filter Clogging               10-Feb-98 1
MALF RC12 RCIC Isolation Relay, 13A-K15, Failure 05-Apr-05 Added MALF RC13 RCIC High Rx Water Lvl Shutdown Failure 12-Oct-95 MALF RD01A:A-H SDV Vent or Drain Valve Fails open 01-Apr-98 MALF RD01B:A-H SDV Vent or Drain Valves rail closed 14-Jul-97 Inactivated MALF RD02:A,B Scram Discharge Instrument Volume High 15-Apr-98 Level (Ref: JTRG-98-107) f MALF RD03:A,B CRD Flow Control Valve Failure 28-Jul-97 MALF RD04:A,B CRD Drive Water Filter Clogging 10-Feb-98 1
Rev. 1 Tab 2-18
Rev. 1 Tab 2-18


l NEW YORK POWER AUIRORITY                                     I JAMES A. FITZPATRICK NUCLEAR POWER PLANT                             l PLANT REFERENCED SIMULATION FACILITY I
NEW YORK POWER AUIRORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT
FOUR YEAR PERFORMANCE TESTING REPORT                                 {
{
TEST LIST TEST TYPE                               TEST TITLE Cuaness               mamma                                                 psarosemD MALF       RDOS:A,B   CRD Stabilizing Valves Fail Closed           28-Jul-97 i
TEST LIST TEST TYPE TEST TITLE Cuaness mamma psarosemD MALF RDOS:A,B CRD Stabilizing Valves Fail Closed 28-Jul-97 i
MALF       RD06:A,B   CRD Hydraulic Pump Trip                     28-Jul-97 j l
MALF RD06:A,B CRD Hydraulic Pump Trip 28-Jul-97 j
MALF     RD07:**:**   Control Rod (XX-YY) Drift-In                 19-Jul-97 MALF     RDOS:**:**   Control Rod (XX-YY) Drift-Out               19-Jul-97 MALF     RD09:**:**   Control Rod (XX-YY) Accumulator Trouble     19-Jul-97 MALF     RD10:**:**   Control Rod (XX-YY) Blade Stuck             19-Jul-97 MALF     RD11:**:**   Control Rod (XX-YY) Uncoupled               19-Jul-97 MLF     RD12:**:**   Control Rod (XX-YY) Scrammed                 19-Jul-97 MALF     RD13:**:**   Control Rod (XX-YY) Fail to Scram           19-Jul-97 MALF     RD14:**:**   Control Rod (XX-YY) RPIS Failure             10-Feb-98 MALF         RD1b     Rod Drive Control System Timer Fail         16-Mar-98 MALF         RD16     Rod Position Info System Total Failure       02-Dec-97 MALF     RD17:**:**   Control Rod (XX-YY) High Temperature         11-Feb-98 Mt.LF     RD18:A,B   Scram Discharge Volume Rupture (non-         20-Jan-99 recoverable)
l MALF RD07:**:**
MALF       RD19:A,B   CRD Suction Filter Hi Delta-Pressure         19-Jan-99 MALF     RD20:**:**   Line Break CRD HCU (XX-YY) (non-             31-Mar-98 recoverable)
Control Rod (XX-YY) Drift-In 19-Jul-97 MALF RDOS:**:**
MALF     RD21:**:**   Leaking Control Rod Withdraw SOV             30-Apr-98 MALF         RD22     Scram Discharge volume Hydraulic Lock       25-Jul-95 MALF       RH01:A-D   RHR Pump Trip                               08-Jun-97 MALF       RH03:A,B   RHR Heat Exchange Tube Leak (non-           03-Feb-99
Control Rod (XX-YY) Drift-Out 19-Jul-97 MALF RD09:**:**
                                  'ecoverable)
Control Rod (XX-YY) Accumulator Trouble 19-Jul-97 MALF RD10:**:**
MALF     RH04A:A,B LPCI Injection Valve Fails closed             29-Jun-97 MALF     RH04B:A,B LPCI Injection Valve Fails open               29-Jun-97 Tab 2-19
Control Rod (XX-YY) Blade Stuck 19-Jul-97 MALF RD11:**:**
Control Rod (XX-YY) Uncoupled 19-Jul-97 MLF RD12:**:**
Control Rod (XX-YY) Scrammed 19-Jul-97 MALF RD13:**:**
Control Rod (XX-YY) Fail to Scram 19-Jul-97 MALF RD14:**:**
Control Rod (XX-YY) RPIS Failure 10-Feb-98 MALF RD1b Rod Drive Control System Timer Fail 16-Mar-98 MALF RD16 Rod Position Info System Total Failure 02-Dec-97 MALF RD17:**:**
Control Rod (XX-YY) High Temperature 11-Feb-98 Mt.LF RD18:A,B Scram Discharge Volume Rupture (non-20-Jan-99 recoverable)
MALF RD19:A,B CRD Suction Filter Hi Delta-Pressure 19-Jan-99 MALF RD20:**:**
Line Break CRD HCU (XX-YY) (non-31-Mar-98 recoverable)
MALF RD21:**:**
Leaking Control Rod Withdraw SOV 30-Apr-98 MALF RD22 Scram Discharge volume Hydraulic Lock 25-Jul-95 MALF RH01:A-D RHR Pump Trip 08-Jun-97 MALF RH03:A,B RHR Heat Exchange Tube Leak (non-03-Feb-99
'ecoverable)
MALF RH04A:A,B LPCI Injection Valve Fails closed 29-Jun-97 MALF RH04B:A,B LPCI Injection Valve Fails open 29-Jun-97 Tab 2-19


NEW YORK POWER AUIRORITY l
NEW YORK POWER AUIRORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CEAams MtadRER PERropean i
JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT                                   I TEST LIST           TEST                                                   IAST DATE CEAams             MtadRER                                                 PERropean i
MALF RHOS:A-D RHR Pump Discharge Leak (non-recoverable) 29-Jun-97 MALF RHO 6 RHR/SDC Valve 10MOV-18 Is 1s 23-Jun-97
MALF   RHOS:A-D   RHR Pump Discharge Leak (non-recoverable)     29-Jun-97 I I
)
MALF     RHO 6   RHR/SDC Valve 10MOV-18 Is 1s                   23-Jun-97 )
l i
l i
MALF     RH07     RHR/SDC Valve 10MOV-17 Fails                   23-Jun-97 MALF   RH08:A-D   RHR Pump SDC Suction Valve Fails Closed       23-Jun-97 l 1
MALF RH07 RHR/SDC Valve 10MOV-17 Fails 23-Jun-97 MALF RH08:A-D RHR Pump SDC Suction Valve Fails Closed 23-Jun-97 1
I MALF   RH09:A,B   LPCI - Injection Line Failure (non-           29-Jun-97 recoverable)                                            )
I MALF RH09:A,B LPCI - Injection Line Failure (non-29-Jun-97 recoverable)
MALF   RH10:A,B   RHR Loop Suction Line Piping Failure           05-Mar-98 l
MALF RH10:A,B RHR Loop Suction Line Piping Failure 05-Mar-98 Inactivated MALF RH11:A,B RHR Hx Level Controller Auto Mode Failure N/A (Ref: JTRG-98-019)
Inactivated MALF   RH11:A,B   RHR Hx Level Controller Auto Mode Failure         N/A   l (Ref: JTRG-98-019)                                     l Inactivated MALF   RH12:A,B   RHR Hx Steam Supply valve Fails Closed           N/A (Ref: JTRG-98-019)
Inactivated MALF RH12:A,B RHR Hx Steam Supply valve Fails Closed N/A (Ref: JTRG-98-019)
Inactivated MALF   RH13:A,B   RHR Hx Press Reducing Valve Fails closed         N/A (Ref: JTRG-98-019)
Inactivated MALF RH13:A,B RHR Hx Press Reducing Valve Fails closed N/A (Ref: JTRG-98-019)
MALF     RH14     LPCI Failure to Auto Initiate                 29-Jun-97 Added   M74F     RH15     RHR/SDC Valve 10MOV-17(18) Auto Isolation     27-Oct-95 I Failure                                                 :
MALF RH14 LPCI Failure to Auto Initiate 29-Jun-97 Added M74F RH15 RHR/SDC Valve 10MOV-17(18) Auto Isolation 27-Oct-95 Failure Added MALP RH16 RHR P' ump Motor Winding Temperatures High 27-Apr-98 MALF RM01A:15 Process Rad Mon Failure 12-May-97 MALF RM01B: 1-4 Process Rad Mon Failure 08-Jun-97 MALF RM01C 1-7 Process Rad Mon Failure 12-May-97 MALF RM01D:1-8 Process Rad Mon Failure 21-Jul-97 MALF RM01E: 1-7 Process Rad Mon Failure 17-May-97 MALF RM02A:1-10 ARM Failure 21-Apr-97 MALF RM028:11-20 ARM Failure 21-Apr-97 MALF RM02C:21-30 ARM Failure 21-APr-97 MALF RP01A RPS Auto Scram Failure 30-Jun-97 Rev. 1 Tab 2-20
Added   MALP     RH16     RHR P' ump Motor Winding Temperatures High     27-Apr-98 MALF   RM01A:15 Process Rad Mon Failure                           12-May-97 MALF   RM01B: 1-4 Process Rad Mon Failure                       08-Jun-97 MALF   RM01C 1-7   Process Rad Mon Failure                       12-May-97 MALF   RM01D:1-8 Process Rad Mon Failure                         21-Jul-97 MALF   RM01E: 1-7 Process Rad Mon Failure                       17-May-97 MALF RM02A:1-10 ARM Failure                                     21-Apr-97 MALF RM028:11-20 ARM Failure                                     21-Apr-97 MALF RM02C:21-30 ARM Failure                                     21-APr-97 MALF     RP01A     RPS Auto Scram Failure                         30-Jun-97 Rev. 1 Tab 2-20


f.
f.
i NEW YORK POWER AITTHORITY l                   JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT j
i NEW YORK POWER AITTHORITY l
JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT j
PLANT REFERENCED SIMULATION FACILITY t
PLANT REFERENCED SIMULATION FACILITY t
FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST           TEST                                                 IAST DATE CEAHECS           NUbmER                                               PERN0pMED MALF     RP01B     RPS Manual Scram Failure                   12-May-97 MALF       RP02     Inadvertent Reactor Scram                 14-May-97 MALF       RP03     Inadvertent Group I Isolation             24-Feb-97 l MALF       RPO4     Inadvertent Group II Isolation             19-Jul-97 !
FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CEAHECS NUbmER PERN0pMED MALF RP01B RPS Manual Scram Failure 12-May-97 MALF RP02 Inadvertent Reactor Scram 14-May-97 MALF RP03 Inadvertent Group I Isolation 24-Feb-97 MALF RPO4 Inadvertent Group II Isolation 19-Jul-97 i
i MALF     RPOS:A,B   RPS M-G Set Trip                           15-Jun-97 l
MALF RPOS:A,B RPS M-G Set Trip 15-Jun-97 l
1 MALF     RP06:A,B   RPS Electrical Protection Assembly Trip     15-Jun-97 MALF     RP07:A-D   Control Rod Group Fail to scram             30-Jun-97 MALF     RP08:A-D   Control Rod Group (1,2,3,4) Scram           02-Apr-98 l             MALF       RP09     ARI Fails to Actuate                       17-Feb-98 Added   MALF       RP10     PCIS Group III Low Rx Water Lvl Isolation 24-Oct-95 Failure Added   MALF       RPil     PCIS Group II Isolation Failure           Nov-95 Added   MALF       RP12     PCIS Group I Inboard (Outboard) MSIV       24-Oct-95 i Isolation Failure                                     l i
1 MALF RP06:A,B RPS Electrical Protection Assembly Trip 15-Jun-97 MALF RP07:A-D Control Rod Group Fail to scram 30-Jun-97 MALF RP08:A-D Control Rod Group (1,2,3,4) Scram 02-Apr-98 l
Added   MALF       RP13     PCIS Group I Isolation Failure             24-Oct-95 )
MALF RP09 ARI Fails to Actuate 17-Feb-98 Added MALF RP10 PCIS Group III Low Rx Water Lvl Isolation 24-Oct-95 Failure Added MALF RPil PCIS Group II Isolation Failure Nov-95 Added MALF RP12 PCIS Group I Inboard (Outboard) MSIV 24-Oct-95 i
l MALF   RR01:A,B   RWR Pump / Gen Field Breaker Trip           18-Jan-99 MALF   RR02:A,B   RWR Pump Control Signal Failure Scoop Tube 19-Feb-98 Lock MALF   RR03:A,B   RWR Pump Incomplete Start Sequence         03-Feb-99 MALF   PR04:A,B   RWR Pump f1 Seal Failure (non-recoverable) 07-Jul-95 j             MALF   RR05:A,B   RWR Pump 92 Seal Failure (non-recoverable) 07-Jul-95 Deleted   MALF   RR06:A,B   RWR Pump Dual Seal Failure (non-               N/A recoverable) (Ref: DRf 7340)
Isolation Failure i
MALF   RR07:A-H   RWR Loop Flow Transmitter Fails             01-Mar-99 MALF   RR08:A-T   Jet Pump Failure (non-recoverable)         01-Feb-99 Rev. 1 Tab 2-21
Added MALF RP13 PCIS Group I Isolation Failure 24-Oct-95 MALF RR01:A,B RWR Pump / Gen Field Breaker Trip 18-Jan-99 l
MALF RR02:A,B RWR Pump Control Signal Failure Scoop Tube 19-Feb-98 Lock MALF RR03:A,B RWR Pump Incomplete Start Sequence 03-Feb-99 MALF PR04:A,B RWR Pump f1 Seal Failure (non-recoverable) 07-Jul-95 j
MALF RR05:A,B RWR Pump 92 Seal Failure (non-recoverable) 07-Jul-95 Deleted MALF RR06:A,B RWR Pump Dual Seal Failure (non-N/A recoverable) (Ref: DRf 7340)
MALF RR07:A-H RWR Loop Flow Transmitter Fails 01-Mar-99 MALF RR08:A-T Jet Pump Failure (non-recoverable) 01-Feb-99 Rev. 1 Tab 2-21


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST             TEST CEA3pMS             3RRSER                       TEST TITIE PERFOORED Inactivated MALF       RR09     RWR Master Flow Controller Failure (Ref:         N/A JTRG-98-067)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST CEA3pMS 3RRSER TEST TITIE PERFOORED Inactivated MALF RR09 RWR Master Flow Controller Failure (Ref:
MALF   RRIO:A,B     RWR Sfstem MG Flow Controller Failure       30-Apr-98 MALF   RRll:A,B     RWR Pump Shaft Binding                       12-Mar-98 MALF   RR12:A,B     RWR Pump Drive Motor Breaker Trip           03-Mar-97 MALF   RR13:A-C     ATWS System rails to Initiate RWR Pump       29-Apr-98 Trip MALF     RR14:A,B     RWR Loop Rupture (DBA) (non-recoverable)     12-May-98 MALF   RR15:A,B     RWR Coolant Leakage Inside Primat.y         25-Jan-99 Containment                                               .
N/A JTRG-98-067)
f MALF   RR16:A,B     Reactor Vessel Wide Range Level             07-Jul-95   ,
MALF RRIO:A,B RWR Sfstem MG Flow Controller Failure 30-Apr-98 MALF RRll:A,B RWR Pump Shaft Binding 12-Mar-98 MALF RR12:A,B RWR Pump Drive Motor Breaker Trip 03-Mar-97 MALF RR13:A-C ATWS System rails to Initiate RWR Pump 29-Apr-98 Trip MALF RR14:A,B RWR Loop Rupture (DBA) (non-recoverable) 12-May-98 MALF RR15:A,B RWR Coolant Leakage Inside Primat.y 25-Jan-99 Containment f
Transmitter Fails Replaced   MALF RR16:C,D, E, F (UNDER DEVELOPMENT) ( Now in RR16: A,B)         N/A     A MALF   RR17:A,B     Reactor Vessel Fuel Zone Level Failure     30-Apr-98     j l
MALF RR16:A,B Reactor Vessel Wide Range Level 07-Jul-95 Transmitter Fails Replaced MALF RR16:C,D, E, F (UNDER DEVELOPMENT) ( Now in RR16: A,B)
MALF       RR18     Refuel Water Level Indicator Fails           17-Feb-98     I M74F   RR19:A-D     Rx Vessel Lvl Transmitter To FW Lvl         22-Jan-99 Control 1
N/A A
MALF   RR20:A,B     Loss Pressure Compensation to Feedwater     17-Feb-98     I control MALF   RR21:A-D     Loss of Pressure Compensation to Feedwater 21-Jan-99 Added     MALF       RR22     Reactor Vessel Scram Level Transmitter       29-Apr-98 Failure Replaced   MALF     RR22A     Reactor Vessel Scram Level Transmitter           N/A Failure (Now In RR22)
MALF RR17:A,B Reactor Vessel Fuel Zone Level Failure 30-Apr-98 j
Replaced   MALF     RR22B     Reactor Vessel Scram Level Switch (A-D)         N/A Fail Downscale (Now In RR22)
MALF RR18 Refuel Water Level Indicator Fails 17-Feb-98 M74F RR19:A-D Rx Vessel Lvl Transmitter To FW Lvl 22-Jan-99 Control MALF RR20:A,B Loss Pressure Compensation to Feedwater 17-Feb-98 control MALF RR21:A-D Loss of Pressure Compensation to Feedwater 21-Jan-99 Added MALF RR22 Reactor Vessel Scram Level Transmitter 29-Apr-98 Failure Replaced MALF RR22A Reactor Vessel Scram Level Transmitter N/A Failure (Now In RR22)
Replaced   MALF     RR22C     Reactor Vessel Scram Level Switch (A-D)         N/A Fail As Is (Now In RR22)
Replaced MALF RR22B Reactor Vessel Scram Level Switch (A-D)
MALF   RR23:A-D     RWR Flow Unit Failure                       20-Jan-99 Rev. 1 Tab 2-22
N/A Fail Downscale (Now In RR22)
Replaced MALF RR22C Reactor Vessel Scram Level Switch (A-D)
N/A Fail As Is (Now In RR22)
MALF RR23:A-D RWR Flow Unit Failure 20-Jan-99 Rev. 1 Tab 2-22


r i
r i
i NEW YORK POWER AUn{ORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST gg,         TEST CEANGES             NIEdaER TEST TITLE PEMOBBIED MALF   RR24:A-D   Jet Pump Summer Failure                     27-Apr-98 MALF     RR25:A,B   Core Spray Pipe Break Inside Downcomer     29-Dec-98 l
i NEW YORK POWER AUn{ORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST gg, TEST TITLE CEANGES NIEdaER PEMOBBIED MALF RR24:A-D Jet Pump Summer Failure 27-Apr-98 MALF RR25:A,B Core Spray Pipe Break Inside Downcomer 29-Dec-98 MALF RR26 Unexplained Reactivity Change (non-23-Aug-98 recoverable)
MALF       RR26     Unexplained Reactivity Change (non-         23-Aug-98 recoverable)
MALF RR27:A,B Rx Level Narrow Range Reference Leg De-30-Apr-98 Gassing MALF RR28 Rx Level Narrow Range Reference Legs 21-Jan-99 Severe MALF Rn29 Reactor Vessel NR Lvl Transmitter Fails 17-Oct-95 Added MALF RR30 RWR MG Set Drive Motor Breaker Trip 05-Sep-95 1
MALF     RR27:A,B   Rx Level Narrow Range Reference Leg De-     30-Apr-98 Gassing MALF       RR28     Rx Level Narrow Range Reference Legs       21-Jan-99 Severe                                                 ;
Failure l
MALF       Rn29     Reactor Vessel NR Lvl Transmitter Fails     17-Oct-95 Added     MALF       RR30     RWR MG Set Drive Motor Breaker Trip         05-Sep-95 1 Failure                                                 !
l Added MALF RR31 Reactor Vessel Wide Range Level 07-Jul-95 Transmitter rails i
l l
MALF RW01 Rod Worth Minimizer Failure 14-Jan-99 MALF RX01 Fuel Cladding Failure 12-Jan-95 MALF RXO2:XX:YY Increased Rod Worth (XX-YY) 03-Feb-99 MALF RXO3 Core Thermal Hydraulic Instability 29-Apr-98 MALF sLol:A,B Standby Liquid Control Pump Breaker Trip 27-Apr-98 MALF SLO 2:A,B Standby Liquid Control Squib Valve rails 30-Mar-98 to open MALF SLO 3:A,B SLC Pump Relief Valve Lifts 30-Mar-98 Added MALF SLO 4 Standby Liquid control Squib Valve loss of 17-Mar-98 Continuity MALF SWOl:A,B Loss of RBCLC Flow to RWR 13-Jan-99 MALF SWO2:A-C TBCLC Hx Cooling Water Blockage 20-Jan-99 MALF SWO3:A-C RBCLC Hx Cooling Water Blockage 06-Jan-99 MALF SWO4:A-D RHR Service Water Pump Trip 28-Jun-98 Rev. 1 Tab 2-23
Added     MALF       RR31     Reactor Vessel Wide Range Level             07-Jul-95 Transmitter rails
                                                                                            )
i MALF       RW01     Rod Worth Minimizer Failure                 14-Jan-99 MALF       RX01     Fuel Cladding Failure                       12-Jan-95 MALF   RXO2:XX:YY Increased Rod Worth (XX-YY)                   03-Feb-99 MALF       RXO3     Core Thermal Hydraulic Instability           29-Apr-98 MALF   sLol:A,B   Standby Liquid Control Pump Breaker Trip     27-Apr-98
  ,            MALF   SLO 2:A,B   Standby Liquid Control Squib Valve rails     30-Mar-98 to open MALF   SLO 3:A,B   SLC Pump Relief Valve Lifts                 30-Mar-98 Added     MALF     SLO 4     Standby Liquid control Squib Valve loss of 17-Mar-98 Continuity MALF   SWOl:A,B   Loss of RBCLC Flow to RWR                   13-Jan-99 MALF   SWO2:A-C   TBCLC Hx Cooling Water Blockage             20-Jan-99 MALF   SWO3:A-C   RBCLC Hx Cooling Water Blockage             06-Jan-99 MALF   SWO4:A-D   RHR Service Water Pump Trip                 28-Jun-98 Rev. 1 Tab 2-23


c NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST             TEST                                                 IAST DAIR CEANGES           NtBSER                                                 PERFOSIED MALF   SWO5:A-C   Service Water Pump Trip                     15-Jun-97 MALF   SWO6:A,B   RHR Hx Cooling Water Blockage               28-Jun-98 MALF   SWO7:A-C   TBCLC Pump Trip                             27-Apr-98 MALF   SWO8:A-C *TBCLC Hx Tube Leak (non-recoverable)           12-Jan-99 MALF     SWO9:A-C   RBCLC Pump Trip                             28-Feb-99 MALF     SW10:A-C 'RBCLC Hx Tube Leak (non-recoverable)           04-Mar-99 MALF       SWil     RBCLC Leakage in Drywell (non-recoverable) 18-Jan-99 MALF   SW12:A,B   Loss of Drywell cooling Assemblies           22-Dec-98 MALP       SW13     Loss of Cooling to RWCU NRHX                 08-Mar-99 MALF   SW14:A,B   Emergency Service Water Pump Trip           30-Apr-98 Added   MALF       SW15     Service Water Pump A Auto Start Failure     25-Jul-95 Added   MALF       SW16     TBCLC Pmp A Auto Start Failure               12-Oct-95 Added   MALF       SW17     RBCLC Pmp A Auto Start Failure               12-Oct-95 Added   MALF       SW1B     ESW Pmp A(B) Auto Start Failure             Y7-Oct-95 MALF       TC01     Main Turbine Acceler.ation                   02-Feb-99 MALF   TCO2:A,B   EHC Pump Trip                               28-Jun-98 Added   MALF       TCO3     EHC Pump Press Reg Fails                     29-Dec-98 Replaced MALF   TCO3A:A,B EHC Pump Press Reg Fails High (Now In               N/A TCO3)
c NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DAIR CEANGES NtBSER PERFOSIED MALF SWO5:A-C Service Water Pump Trip 15-Jun-97 MALF SWO6:A,B RHR Hx Cooling Water Blockage 28-Jun-98 MALF SWO7:A-C TBCLC Pump Trip 27-Apr-98 MALF SWO8:A-C *TBCLC Hx Tube Leak (non-recoverable) 12-Jan-99 MALF SWO9:A-C RBCLC Pump Trip 28-Feb-99 MALF SW10:A-C 'RBCLC Hx Tube Leak (non-recoverable) 04-Mar-99 MALF SWil RBCLC Leakage in Drywell (non-recoverable) 18-Jan-99 MALF SW12:A,B Loss of Drywell cooling Assemblies 22-Dec-98 MALP SW13 Loss of Cooling to RWCU NRHX 08-Mar-99 MALF SW14:A,B Emergency Service Water Pump Trip 30-Apr-98 Added MALF SW15 Service Water Pump A Auto Start Failure 25-Jul-95 Added MALF SW16 TBCLC Pmp A Auto Start Failure 12-Oct-95 Added MALF SW17 RBCLC Pmp A Auto Start Failure 12-Oct-95 Added MALF SW1B ESW Pmp A(B) Auto Start Failure Y7-Oct-95 MALF TC01 Main Turbine Acceler.ation 02-Feb-99 MALF TCO2:A,B EHC Pump Trip 28-Jun-98 Added MALF TCO3 EHC Pump Press Reg Fails 29-Dec-98 Replaced MALF TCO3A:A,B EHC Pump Press Reg Fails High (Now In N/A TCO3)
Replaced MALF   TCO3B:A,B EHC ? ump Press Reg Fails Low (Now In TCO3)         N/A Added   MALF       TC04     Bypass Valve Failure                         03-Feb-99 Replaced MALF     1 04A     Bypass Valve Failure (Now In TC04)               N/A Replaced MALF     TC04B     Bypass Valve Fails Closed (Now In TC04)         N/A Rev. 1 Tab 2-24 m
Replaced MALF TCO3B:A,B EHC ? ump Press Reg Fails Low (Now In TCO3)
N/A Added MALF TC04 Bypass Valve Failure 03-Feb-99 Replaced MALF 1 04A Bypass Valve Failure (Now In TC04)
N/A Replaced MALF TC04B Bypass Valve Fails Closed (Now In TC04)
N/A Rev. 1 Tab 2-24 m


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST             TEST               -
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TEST TITLE CEANGES NERSER PERFOSSED Added MALF TC05 Main Turbine Load Select Failure 03-Feb-99 Replaced MALF TCOSA Main Turbine Load Select Fails High (Wow N/A i
CEANGES           NERSER TEST TITLE PERFOSSED Added   MALF       TC05     Main Turbine Load Select Failure             03-Feb-99 Replaced   MALF     TCOSA     Main Turbine Load Select Fails High (Wow         N/A   i In TC05)
In TC05)
Replaced   MALF     TC05B     Main Turbine Load select Fails Low (Now In     N/A TC05)
Replaced MALF TC05B Main Turbine Load select Fails Low (Now In N/A TC05)
Replaced   MALF   TC06A:A,8 EHC System Regulator Fails High                   N/A (Redundant, Now In MS01) DR87759 Replaced   MALF   TC06B:A,B EHC System Regulator Fails Low (Redundant,         N/A Now In MS01) DRf7759 MALF     TC07:A,B   EHC System Regulator oscillation           28-Jan-99 Added   MALF       TC08     Turbine control valve Failure               26-Jan-99 Replaced MALF   TC08A:A-D T*trbine Control Valve Fails Open (Now In         N/A TC08)
Replaced MALF TC06A:A,8 EHC System Regulator Fails High N/A (Redundant, Now In MS01) DR87759 Replaced MALF TC06B:A,B EHC System Regulator Fails Low (Redundant, N/A Now In MS01) DRf7759 MALF TC07:A,B EHC System Regulator oscillation 28-Jan-99 Added MALF TC08 Turbine control valve Failure 26-Jan-99 Replaced MALF TC08A:A-D T*trbine Control Valve Fails Open (Now In N/A TC08)
Replaced MALF   TCOBB:A-D Turbine Control Valve Fails Close (Now In         N/A TC08)
Replaced MALF TCOBB:A-D Turbine Control Valve Fails Close (Now In N/A TC08)
Added   MALF       TC09     Turbine Stop Valve Failure                   02-Feb-99 Replaced MALF   TC09A:A-D Turbine Stop Valve Fails Open (Now In             N/A TC09)
Added MALF TC09 Turbine Stop Valve Failure 02-Feb-99 Replaced MALF TC09A:A-D Turbine Stop Valve Fails Open (Now In N/A TC09)
Replaced   MALF   TC09B:A-D Turbine Stop Valve Fails Closed (Now In           N/A TC09)
Replaced MALF TC09B:A-D Turbine Stop Valve Fails Closed (Now In N/A TC09)
MALF       TC10     Turbine Load Reject                         03-Feb-99 Added   MALF       TCll     Main Turbine Auto Trip Failure               04-Aug-95 MALF       TUOl     Inadvertent Turbine Trip                     05-Mar-97 MALF   TUO2:A-J   Main Turbine Bearing High Temp               28-Jun-98 MALF       TUO3     Main Turbine Bearing 011 Pressure Low       15-Jan-99 MALF. TUO4:A-J   Main Turbine Bearing High vibration         28-Jun-98 MALF     TU0S     Main Turbine Shaft Driven Oil Pump Failure 29-Dec-98 MALF     TUO6     Turbine Motor Suction Pump Trip               14-Jan-99 Rev. 1 Tab 2-25
MALF TC10 Turbine Load Reject 03-Feb-99 Added MALF TCll Main Turbine Auto Trip Failure 04-Aug-95 MALF TUOl Inadvertent Turbine Trip 05-Mar-97 MALF TUO2:A-J Main Turbine Bearing High Temp 28-Jun-98 MALF TUO3 Main Turbine Bearing 011 Pressure Low 15-Jan-99 MALF.
TUO4:A-J Main Turbine Bearing High vibration 28-Jun-98 MALF TU0S Main Turbine Shaft Driven Oil Pump Failure 29-Dec-98 MALF TUO6 Turbine Motor Suction Pump Trip 14-Jan-99 Rev. 1 Tab 2-25


I                                                                                             y l i
I y l NEW YORK POWER AUTHORITY i
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTU(G REPORT                                     l TEST LIST                 TEST                                                 IAST DATE 9
JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTU(G REPORT TEST LIST TEST IAST DATE 9
CIIANES               BRRIBER                                                 PERNCERED MALF       TUO7     Turbine Emergency Bearing 011 Pump Trip     14-Jan-99 i
CIIANES BRRIBER PERNCERED MALF TUO7 Turbine Emergency Bearing 011 Pump Trip 14-Jan-99 i
Added       MALF       TUO8     Exhaust Hood Spray valve Failure             14-Jan-99 Replaced     MALF       TUO8A     Exhaust Hood Spray Valve Fails Open (Now         N/A In TUO8) l Replaced     MALF     TUO88     Exhaust Hood Spray Valve Fails Closed (Now       N/A In TUO8) 1 MALF-     YC01     EPIC Fails.                                   19-Mar-98     '
Added MALF TUO8 Exhaust Hood Spray valve Failure 14-Jan-99 Replaced MALF TUO8A Exhaust Hood Spray Valve Fails Open (Now N/A In TUO8) l Replaced MALF TUO88 Exhaust Hood Spray Valve Fails Closed (Now N/A In TUO8)
l              STEADY     SS-01     25% Rated Thermal Power                       01-Mar-99 STATE STEADY     35-02     75% Rated Thermal Power                     01-Mar-99 STATE STEADY     55-03     100% Rated Thermal Power Stability Test     01-Mar-99 STATE
MALF-YC01 EPIC Fails.
,            TRANSIENT     TT01     Manual RX Scram                             01-Mar-99 l               TEST TRANSIENT     TT02     Trip All Feedwater Pumps                     01-Mar-99 TEST TRANSIENT     TT03     Closure of All MSIVs                         01-Mar-99 TEST TRANSIENT     TT04     Trip of Both Recirc Pumps                   01-Mar-99 TEST TRANSIENT     TTOS     Single Recirc Pump Trip                     01-Mar-99 TEST l
19-Mar-98 l
l TRANSIENT     TT06     Main Turbine Trip (No Scram)                 01-Mar-99 TEST TRANSIENT     TT07     Max Rate Power Ramp                           01-Mar-99 TEST                                                                           l TRANSIENT     TT08     DBA LOCA With Loss of off-site Power         01-Mar-99 TES!
STEADY SS-01 25% Rated Thermal Power 01-Mar-99 STATE STEADY 35-02 75% Rated Thermal Power 01-Mar-99 STATE STEADY 55-03 100% Rated Thermal Power Stability Test 01-Mar-99 STATE TRANSIENT TT01 Manual RX Scram 01-Mar-99 l
TRANSIENT     TT09     Main Steam Line Rupture                       01-Mar-99     )
TEST TRANSIENT TT02 Trip All Feedwater Pumps 01-Mar-99 TEST TRANSIENT TT03 Closure of All MSIVs 01-Mar-99 TEST TRANSIENT TT04 Trip of Both Recirc Pumps 01-Mar-99 TEST TRANSIENT TTOS Single Recirc Pump Trip 01-Mar-99 TEST TRANSIENT TT06 Main Turbine Trip (No Scram) 01-Mar-99 TEST TRANSIENT TT07 Max Rate Power Ramp 01-Mar-99 TEST l
TRANSIENT TT08 DBA LOCA With Loss of off-site Power 01-Mar-99 TES!
TRANSIENT TT09 Main Steam Line Rupture 01-Mar-99
)
TEST I
TEST I
l l Rev. 1 Tab 2-26 t
l l
Rev. 1 t
Tab 2-26


NI!W YORK POWER ALTTHORrrY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST               TEST CRANGES TEST M                                   TEST TITLE NUtaER                                                   PERF00GdED TRANSIENT     TT10     Closure of All MSIVs With Stuck open         01-Mar-99 TEST                   Relief Valve MOD         7091     MOD 88-173: TO MAIN GENERATOR EXCITER         15-reb-95 VOLTAGE ADJUSTER DRIVE MOTOR ASSEMBLY.
NI!W YORK POWER ALTTHORrrY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TEST M TEST TITLE CRANGES NUtaER PERF00GdED TRANSIENT TT10 Closure of All MSIVs With Stuck open 01-Mar-99 TEST Relief Valve MOD 7091 MOD 88-173: TO MAIN GENERATOR EXCITER 15-reb-95 VOLTAGE ADJUSTER DRIVE MOTOR ASSEMBLY.
MOD         7257     MOD 88-238 INSTALLS AN EDW/TP SYSTEM CROSS 14-Sep-95 CONNECT MOD         7426     PLANT CHANGE REQUIRES IMPLEMENTATION ON       25-Nov-96 THE SIMULATOR - MOD D1-89-055. RWCU TEMP SWITCH REMOVAL.
MOD 7257 MOD 88-238 INSTALLS AN EDW/TP SYSTEM CROSS 14-Sep-95 CONNECT MOD 7426 PLANT CHANGE REQUIRES IMPLEMENTATION ON 25-Nov-96 THE SIMULATOR - MOD D1-89-055.
MOD         7089     MOD 89-158: POWER MONITORING s ANALYZING       24-Apr-95 PANEL (27 MAP) FROM STATION BATTERIES.
RWCU TEMP SWITCH REMOVAL.
MOD         7425     PLANT CHANGE REQUIRES IMPLEMENTATION ON     10/23/1995 :
MOD 7089 MOD 89-158: POWER MONITORING s ANALYZING 24-Apr-95 PANEL (27 MAP) FROM STATION BATTERIES.
THE SIMULATOR - MOD F1-90-202. 12P-1A REPLACEMENT.
MOD 7425 PLANT CHANGE REQUIRES IMPLEMENTATION ON 10/23/1995 THE SIMULATOR - MOD F1-90-202.
MOD         7424     PLANT CHANGE REQUIRES IMPLEMENTATION ON       12/13/1995 THE SIMULATOR - MOD M1-90-206. EDG VENT SYSTEM ALARM.
12P-1A REPLACEMENT.
MOD         7494     IMPLEMENT MOD 90-220     -
MOD 7424 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-90-206.
METER SCALE     04/02/1996 DIVISIONS ON 33LI-101A IN PLANT HAS CHANGED AND SIMULATOR METER DOES NOT MATCH l
EDG VENT SYSTEM ALARM.
MOD         7417     PLANT CHANGE REQUIRES IMPLEMENTATION ON       12/13/1995 THE SIMULATOR - MOD M1-91-093. INST. AIR SYSTEM IMPROVEMENTS.
MOD 7494 IMPLEMENT MOD 90-220 METER SCALE 04/02/1996 DIVISIONS ON 33LI-101A IN PLANT HAS CHANGED AND SIMULATOR METER DOES NOT MATCH MOD 7417 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-91-093.
MOD         7259     MOD 91-102 DISABLES 29-MOV-102               06/12/1995 MOD         7255     MOD 91-337 REPLACES SOME RAD MONITOR BULBS 05/22/1995 MOD         7423     PLANT CHANGE REQUIRES IMPLEMENTATION ON     12/04/1995 THE SIMULATOR - MOD D1-92-003. REPLACE 25" MONITORS ON 09-5 W/ 33" MONITORS.
INST. AIR SYSTEM IMPROVEMENTS.
MOD         7097     MOD 92-338: RPV WIR LVL COND. CHAMBERS       02/27/1995 TEMP MONITORS, MOD         7427     PLANT CHANGE REQUIRES IMPLEMENTATION ON     04/30/1997 THE SIMULATOR - MOD 92-377. MOD TO RELAY ROOM CO2 SYSTEM.
MOD 7259 MOD 91-102 DISABLES 29-MOV-102 06/12/1995 MOD 7255 MOD 91-337 REPLACES SOME RAD MONITOR BULBS 05/22/1995 MOD 7423 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/04/1995 THE SIMULATOR - MOD D1-92-003.
REPLACE 25" MONITORS ON 09-5 W/ 33" MONITORS.
MOD 7097 MOD 92-338: RPV WIR LVL COND. CHAMBERS 02/27/1995 TEMP MONITORS, MOD 7427 PLANT CHANGE REQUIRES IMPLEMENTATION ON 04/30/1997 THE SIMULATOR - MOD 92-377.
MOD TO RELAY ROOM CO2 SYSTEM.
Rev. 1 Tab 2-27 L_
Rev. 1 Tab 2-27 L_


1 NEW YORK POWER AITTHORITY                                     ;
1 NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST LAST DATE TEST TYPE TEST TITLE MOD 7258 MOD 93-086 REMOVES MSL ISOL VLV CLOSURE 04/11/1995 FUNCTION AND SCRAM FUNCTION FROM MAIN STM
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                               !
)
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST               TEST                                                   LAST DATE
        ,  TEST TYPE                               TEST TITLE MOD         7258     MOD 93-086 REMOVES MSL ISOL VLV CLOSURE     04/11/1995 l FUNCTION AND SCRAM FUNCTION FROM MAIN STM               )
RAD MON.
RAD MON.
I MOD       7094       MOD 94-001: RELOCATION OF EPIC POINTS TO 10/23/1995 THE SEQ OF EVENTS LOG.
MOD 7094 MOD 94-001: RELOCATION OF EPIC POINTS TO 10/23/1995 THE SEQ OF EVENTS LOG.
                                                                                            )
)
l MOD       7260     MOD 94-057 IMPLEMENTS ELEC. SEPARATION OF 08/18/1995 CONTROL ROOM VENT INTAKE AIR ISOL VLV 70MOV-108 AND DAMPER 70 MOD-105.                       I MOD       7422       PLANT CHANGE REQUIRES IMPLEMENTATION ON     12/05/1995 THE SIMULATOR - MOD M1-94-083. REMOVAL OF MAIN TURBINE TURNING GEAR MOTOR FAST SPEED.
l MOD 7260 MOD 94-057 IMPLEMENTS ELEC. SEPARATION OF 08/18/1995 CONTROL ROOM VENT INTAKE AIR ISOL VLV 70MOV-108 AND DAMPER 70 MOD-105.
MOD       7421     PLANT CHANGE REQUIRES IMPLEMENTATION ON     12/13/1995 THE SIMULATOR - MOD M1-94-116.
I MOD 7422 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/05/1995 THE SIMULATOR - MOD M1-94-083.
REMOVAL OF MAIN TURBINE TURNING GEAR MOTOR FAST SPEED.
MOD 7421 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-94-116.
RESTORATION OF AUTO-START FUNCTION FOR 70FN-6A&B l
RESTORATION OF AUTO-START FUNCTION FOR 70FN-6A&B l
MOD       7420     PLANT CHANGE REQUIRES IMPLEMENTATION ON     12/04/1995 )
MOD 7420 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/04/1995 THE SIMULATOR - MOD D1-94-131.
THE SIMULATOR - MOD D1-94-131. ADD RED LINE O 53 AMPS ON 71AM14A.
ADD RED LINE O 53 AMPS ON 71AM14A.
MOD         7256     MOD 94-133 REMOVES EPIC TREND RECORDER AND 04/12/1995 RELATED HARDWARE.
MOD 7256 MOD 94-133 REMOVES EPIC TREND RECORDER AND 04/12/1995 RELATED HARDWARE.
MOD         7419     PLANT CHANGE REQUIRES IMPLEMENTATION ON     12/19/1995 THE SIMULATOA - MOD M1-94-171. MODIFY MAIN TURB GEN VIB TRIP SYS.
MOD 7419 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/19/1995 THE SIMULATOA - MOD M1-94-171.
MOD         7418     PLANT CHANGE REQUIRES IMPLEMENTATION ON     07/25/1996 1 THE SIMULATOR - MOD D1-94-174.
MODIFY MAIN TURB GEN VIB TRIP SYS.
MOD 7418 PLANT CHANGE REQUIRES IMPLEMENTATION ON 07/25/1996 1
THE SIMULATOR - MOD D1-94-174.
INSTALLATION OF DC LED LAMPS ON 09-4 PANEL.
INSTALLATION OF DC LED LAMPS ON 09-4 PANEL.
MOD         7472     PLANT MODIFICATION 94-195 IS INSTALLED IN 05/28/1996 THE PLANT CONTROL ROOM EMERGENCY VENTILATION DAMPER MODIFICATION.
MOD 7472 PLANT MODIFICATION 94-195 IS INSTALLED IN 05/28/1996 THE PLANT CONTROL ROOM EMERGENCY VENTILATION DAMPER MODIFICATION.
MOD         7491     MODIFICATION 95-090 VALVE POSITION           01/29/1996 INDICATION LIGHTS FOR 31MOV-RSSV-1 MOD         7638     PLANT MODIFICATION 93-038 -- 71XVR-349       04/04/1996 TRANSDUCER REPLACEMENT MOD         7640     PLANT MODIFICATION 94-061 -- D/W FLOOR       06/27/1996 SUMP FLOW INTEGRATOR SUBSTITUTION Rev. 1 Tab 2-28
MOD 7491 MODIFICATION 95-090 VALVE POSITION 01/29/1996 INDICATION LIGHTS FOR 31MOV-RSSV-1 MOD 7638 PLANT MODIFICATION 93-038 -- 71XVR-349 04/04/1996 TRANSDUCER REPLACEMENT MOD 7640 PLANT MODIFICATION 94-061 -- D/W FLOOR 06/27/1996 SUMP FLOW INTEGRATOR SUBSTITUTION Rev. 1 Tab 2-28


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE                                 TEST TITLE CEANGES               NUniBER                                                 PERF0BelED MOD         7641     PLANT MODIFICATION 94-112 -- HPCI BOOSTER 05/20/1996 PUMP IMPELLER SUBSTITUTION MOD         7972     MODIFICATION 94-211 HAS BEEN COMPLETED IN 06/30/1997 THE PLANT l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITLE CEANGES NUniBER PERF0BelED MOD 7641 PLANT MODIFICATION 94-112 -- HPCI BOOSTER 05/20/1996 PUMP IMPELLER SUBSTITUTION MOD 7972 MODIFICATION 94-211 HAS BEEN COMPLETED IN 06/30/1997 THE PLANT l
MOD         7643     PLANT MODIFICATION 95-013 -- SUBSTITUTION 04/12/1996 0F 02-3TE-69J2 FOR RECORDER I:4PUT IN PLACE OF 02-3TE-69J1 MOD         7644     PLANT MODIFICATION 95-034 -- CONTROL ROOM 06/25/1997 CEILING EGGCRATE SUPPORT ENHANCEMENT MOD         7645     PLANT MODIFICATION 95-058 -- MAIN STEAM     04/04/1996 RAD MONITOR NOISE SUPPRESSION MOD         8127     MODIFICATION D1-95-088 TO REPLACE GREEN     09/08/1997 PCIS LA.4PS HAS BEEN COMPLETED IN THE PLANT MOD         7974     MODIFICATION 95-131 HAS BEEN COMPLETED IN 05/13/1997 THE PLANT MOD         8256     MOD 97-056 REFLACES METER SCALES 12-         01/06/1998 4FI141A & B 0-120 SCALES WITH 0-130 SCALES.
MOD 7643 PLANT MODIFICATION 95-013 -- SUBSTITUTION 04/12/1996 0F 02-3TE-69J2 FOR RECORDER I:4PUT IN PLACE OF 02-3TE-69J1 MOD 7644 PLANT MODIFICATION 95-034 -- CONTROL ROOM 06/25/1997 CEILING EGGCRATE SUPPORT ENHANCEMENT MOD 7645 PLANT MODIFICATION 95-058 -- MAIN STEAM 04/04/1996 RAD MONITOR NOISE SUPPRESSION MOD 8127 MODIFICATION D1-95-088 TO REPLACE GREEN 09/08/1997 PCIS LA.4PS HAS BEEN COMPLETED IN THE PLANT MOD 7974 MODIFICATION 95-131 HAS BEEN COMPLETED IN 05/13/1997 THE PLANT MOD 8256 MOD 97-056 REFLACES METER SCALES 12-01/06/1998 4FI141A & B 0-120 SCALES WITH 0-130 SCALES.
MOD         7971     MODIFICATION 94-031 HAS BEEN COMPLETED IN 12/02/1997 THE PLANT MOD         7807     POWER UPRATE MOD 96-045 PACKAGE             10/06/1997 IMPLEMENTATION.
MOD 7971 MODIFICATION 94-031 HAS BEEN COMPLETED IN 12/02/1997 THE PLANT MOD 7807 POWER UPRATE MOD 96-045 PACKAGE 10/06/1997 IMPLEMENTATION.
l MOD         7970     MOD 92-088 HAS BEEN COMPLETED IN PLANT       04/16/1997 MOD         7637     PLANT MODIFICATION 93-018 -- RWCU PUMP       07/16/1996
MOD 7970 MOD 92-088 HAS BEEN COMPLETED IN PLANT 04/16/1997 MOD 7637 PLANT MODIFICATION 93-018 -- RWCU PUMP 07/16/1996
                                    'B' SEAL COOLER REMOVAL MOD         7642     PLANT MODIFICATION 94-157 -- 94TR-200       04/12/1996 REPLACEMENT     +
'B' SEAL COOLER REMOVAL MOD 7642 PLANT MODIFICATION 94-157 -- 94TR-200 04/12/1996 REPLACEMENT
MOD         7483     IMPLEMENT THE EPIC /LEFM MODIFICATION 95-   06/29/1998 056.
+
MOD         7973     MODIFICATION 95-077 HAS BEEN COMPLETED IN 01/26/1998 THE PLANT Rev. 1 Tao 2-29
MOD 7483 IMPLEMENT THE EPIC /LEFM MODIFICATION 95-06/29/1998 056.
MOD 7973 MODIFICATION 95-077 HAS BEEN COMPLETED IN 01/26/1998 THE PLANT Rev. 1 Tao 2-29


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING '1Pon?
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING '1Pon?
TEST LIST           TEST     !                      ,                      LAST DATE CEAmass           museum   l                                               PERSCEGEED MOD     7734       IMPLF. MENT MODIFICATION M1-95-123 w.C .%NEL 10/06/1996 MODIFICATION FOR TEST MONITORING SYSTEM AND POWER UPRATE PROJECT MOD     7913       UPDATE THE 3D-MONICORE REPORTS PERIODIC       06/23/1997 '
TEST LIST TEST LAST DATE CEAmass museum l
LOG,   CONTROL ROD POSITIONS, AND CORE POWER AND FLOW LOG, AND LPRM READINGS AS SHOWN ON THE ATTACHMENTS. MOD 95-123 MOD       7912       UPDATE THE 3D-MONICORE MAIN MENU DISPLAYS 06/16/1997 IN ACCORDANCE WITH THEIR NEW FORMAT. MOD 95-130 J
PERSCEGEED MOD 7734 IMPLF. MENT MODIFICATION M1-95-123 w.C.%NEL 10/06/1996 MODIFICATION FOR TEST MONITORING SYSTEM AND POWER UPRATE PROJECT MOD 7913 UPDATE THE 3D-MONICORE REPORTS PERIODIC 06/23/1997
MOD       7843     THERMAL STABILTIY/3D MONICORE UPGRADE MOD 02/19/1998 95-130 MOD       7751       IMPLEMEN* NECESSARY CHANGES FOR M1-96-005 09/12/1996 RE"T GD SCALES FOR METER AND RECORDER CHANGES FOR POWER UPRATE.                                 I MOD       7975     MODIFICATION 96-018 HAS BEEN COMPLETED IN 06/02/1997 THE PLANT MOD       7976. MODIFICATION 96-078 HAS BEEN COMPLETED IN 05/05/1997 THE PLANT MOD       7639     PLANT MODIFICATICN 93-093 -- 20LS-355A RX 07/16/1996 BLDG LEVEL SWITCH SUBSTITUTION MOD     7447     COMPUTER PLATFORM UPGRADE - MASTER             21-May-96 CONTROLLER I/O INTERFACE 1
: LOG, CONTROL ROD POSITIONS, AND CORE POWER AND FLOW LOG, AND LPRM READINGS AS SHOWN ON THE ATTACHMENTS. MOD 95-123 MOD 7912 UPDATE THE 3D-MONICORE MAIN MENU DISPLAYS 06/16/1997 IN ACCORDANCE WITH THEIR NEW FORMAT. MOD 95-130 J
MOD     7448     COMPUTER PLATFORM UPGRADE - INSTRUCTOR         10-Feb-98 STAION H/W & S/W INTERFACES MOD     7449     COMPUTER PLATFORM UPGRADE - EPIC SYSTEM         10-Feb-98 SOFTWARE AND HARDWARE MOD     7450     COMPUTER PLATFORM UPGRADE - SIMULATION         10-Feb-98 LOAD MODULES SCR     7575     SET POINT CHANGE TO 02-3 MTU-272A-D           03/26/1996 SCR     7619     CST LEVEL ALARM SETPOINTS HAVE CHANGED IN 03/27/1996 PLANT SCR     7261     MOD CHANGES CST TEMP ALARM SETPOINT TO 40 04/28/1995 DEG F. PER SCR-JAF-94-0022 Rev. 1 Tab 2-30
MOD 7843 THERMAL STABILTIY/3D MONICORE UPGRADE MOD 02/19/1998 95-130 MOD 7751 IMPLEMEN* NECESSARY CHANGES FOR M1-96-005 09/12/1996 RE"T GD SCALES FOR METER AND RECORDER CHANGES FOR POWER UPRATE.
I MOD 7975 MODIFICATION 96-018 HAS BEEN COMPLETED IN 06/02/1997 THE PLANT MOD 7976.
MODIFICATION 96-078 HAS BEEN COMPLETED IN 05/05/1997 THE PLANT MOD 7639 PLANT MODIFICATICN 93-093 -- 20LS-355A RX 07/16/1996 BLDG LEVEL SWITCH SUBSTITUTION MOD 7447 COMPUTER PLATFORM UPGRADE - MASTER 21-May-96 CONTROLLER I/O INTERFACE 1
MOD 7448 COMPUTER PLATFORM UPGRADE - INSTRUCTOR 10-Feb-98 STAION H/W & S/W INTERFACES MOD 7449 COMPUTER PLATFORM UPGRADE - EPIC SYSTEM 10-Feb-98 SOFTWARE AND HARDWARE MOD 7450 COMPUTER PLATFORM UPGRADE - SIMULATION 10-Feb-98 LOAD MODULES SCR 7575 SET POINT CHANGE TO 02-3 MTU-272A-D 03/26/1996 SCR 7619 CST LEVEL ALARM SETPOINTS HAVE CHANGED IN 03/27/1996 PLANT SCR 7261 MOD CHANGES CST TEMP ALARM SETPOINT TO 40 04/28/1995 DEG F.
PER SCR-JAF-94-0022 Rev. 1 Tab 2-30


NEW YORK POWER AUn{ORITY lutes A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT
NEW YORK POWER AUn{ORITY lutes A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT
' TEST LIST             TEST                                                 IAST DATE
' TEST LIST TEST IAST DATE
  ' CHANES           NURSER                                                 PEPJCOBED SCR       7262     CHANGES 02RV-71A THROUGH 02RV-71L           03/17/1995 SETPOINTS.
' CHANES NURSER PEPJCOBED SCR 7262 CHANGES 02RV-71A THROUGH 02RV-71L 03/17/1995 SETPOINTS.
SCR       7630     PLANT SETPOINT FOR 33DPS-111 HAS CHANGED   06/07/1996 SCR       7629     PLANT SETPOINTS FOR 94PNS-101, 102, 103,   04/04/1996 AND 104 HAVE CHANGED SCR       7618     SETPOINT FOR 23PT-68A,B,C,&D HAS CHANGED   03/26/1996 IN PLANT SCR       7612     SETPOINT FOR 34PS-137 MAS CHANGED IN THE     06/18/1996 PLANT SCR       7607     SETPOINT FOR 17RM-150 A & B HAS BEEN         03/21/1996 CHANGED IN THE PLANT SCR       7576     SET POINT CHANGE TO 76CO2-PNL-1 TIMER       05/21/1996 SCR       7574     SET POINT CHANGE TO 02-3 MTU-202A-D         03/26/1996 SCR       "J573   SET POINT CHANGES TO 17RM-150A & B           03/21/1996 SCR       7572     SETPOINT CHANGES TO 17RM-251A-D             03/21/1996 SCR       7263     MOD IS SETPOINT CHANGE TO 39TS-113A,B,C     04/28/1995 PER SCR-JAF-94-0027 SCR       7264     MOD IS SETPOINT CHANGES FOR RPS EPAJ ' NDER 04/28/1995
SCR 7630 PLANT SETPOINT FOR 33DPS-111 HAS CHANGED 06/07/1996 SCR 7629 PLANT SETPOINTS FOR 94PNS-101, 102, 103, 04/04/1996 AND 104 HAVE CHANGED SCR 7618 SETPOINT FOR 23PT-68A,B,C,&D HAS CHANGED 03/26/1996 IN PLANT SCR 7612 SETPOINT FOR 34PS-137 MAS CHANGED IN THE 06/18/1996 PLANT SCR 7607 SETPOINT FOR 17RM-150 A & B HAS BEEN 03/21/1996 CHANGED IN THE PLANT SCR 7576 SET POINT CHANGE TO 76CO2-PNL-1 TIMER 05/21/1996 SCR 7574 SET POINT CHANGE TO 02-3 MTU-202A-D 03/26/1996 SCR "J573 SET POINT CHANGES TO 17RM-150A & B 03/21/1996 SCR 7572 SETPOINT CHANGES TO 17RM-251A-D 03/21/1996 SCR 7263 MOD IS SETPOINT CHANGE TO 39TS-113A,B,C 04/28/1995 PER SCR-JAF-94-0027 SCR 7264 MOD IS SETPOINT CHANGES FOR RPS EPA ' NDER 04/28/1995 J
                                & OVER VOLTAGE, AND UNDER FREQUENCY. --
& OVER VOLTAGE, AND UNDER FREQUENCY. --
NORMAL TEED, PER SCR-JAF-94-0036.
NORMAL TEED, PER SCR-JAF-94-0036.
SCR       7265     MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 ALTERNATE FEED PER SCR-JAF-94-0037 SCR       7266     MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 NORMAL FEED PER SCR-JAF-94-0038 SCR       7267     MOD IS SETPOINT CHANGE FOR RPS EPA UNDER & 04/28/1995 OVER VOLTAGE, AND UNDER FREQUENCY. --
SCR 7265 MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 ALTERNATE FEED PER SCR-JAF-94-0037 SCR 7266 MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 NORMAL FEED PER SCR-JAF-94-0038 SCR 7267 MOD IS SETPOINT CHANGE FOR RPS EPA UNDER & 04/28/1995 OVER VOLTAGE, AND UNDER FREQUENCY. --
ALTERNATE FEED PER SCR-JAF-94-0039 SCR       7577     SET POINT CHANGE TO 03DPIS-246             03/21/1996 SCR       7827     CHANGE 70FN-4A TIME DELAY START LOGI:       05/05/1997 SCR       7810     RPS EPA UV RELAY SETPOINT CHANGES.         12/16/1996 Rev. 1 Tab 2-31
ALTERNATE FEED PER SCR-JAF-94-0039 SCR 7577 SET POINT CHANGE TO 03DPIS-246 03/21/1996 SCR 7827 CHANGE 70FN-4A TIME DELAY START LOGI:
05/05/1997 SCR 7810 RPS EPA UV RELAY SETPOINT CHANGES.
12/16/1996 Rev. 1 Tab 2-31


i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                               I PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIET             TEST                                                   IAST DATE CEANGES           NtadBER                                                 PERf0ERED SCR       7811     02-3MTU-255A-D SETPOINT CHANGES.             12/16/1996 SCR       7812     02MTU-216 THRU 219A-219D.                   12/16/1996 SCR     7813     RX HIGH PRESSURE ALARM SETPOINT CHANGE.     12/16/1996 SCR     7817     29PNS-80A2,B2,C2,D2 AND 29PNS-               03/17/1997 86A2,B2,C2,D2 SETPOINTS HAVE CHANGED FROM 88 TO 78.
i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT I
SCR       7822     CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3312 SCR       7823     CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3390 SCR       7824     CHANGE 1:PCI TURBINE MECHANICAL OVERSPEED   12/23/1996 SETPOIN'i' FOR POWER UPRATE SCR     7731     SETPOINTS FOR 02-MTU-234A-D HAVE BEEN       10/07/1996 CHANGED IN THE PLANT SCR     7826     CHANGE SRV SETPOINTS FOR UPRATE             12/23/1996 SCR     7805     72TS-129 THROUGH 132 SEPOINT REVISIONS       03/24/1997 SCR       7878     SCR-JAF-96-0082 HAS BEEN IMPLEMENTED IN       10/06/1997 THE PLANT REVISING 71UPS-3UVR SETPOINT SCR       8000     ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVA02 .
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIET TEST IAST DATE CEANGES NtadBER PERf0ERED SCR 7811 02-3MTU-255A-D SETPOINT CHANGES.
SCR       8001     ADD STARTING TIME DELAY SEr SINT FOR 70-62 06/23/1997 1CRVB02 .
12/16/1996 SCR 7812 02MTU-216 THRU 219A-219D.
SCR       8002     ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVB04   .
12/16/1996 SCR 7813 RX HIGH PRESSURE ALARM SETPOINT CHANGE.
SCR     8003     MODIFY LOW OFFGAS FLOW SETPOINT ON           06/23/1997 INSTRUMENT 01-107FS-108L.
12/16/1996 SCR 7817 29PNS-80A2,B2,C2,D2 AND 29PNS-03/17/1997 86A2,B2,C2,D2 SETPOINTS HAVE CHANGED FROM 88 TO 78.
SCR     8213     CHANGE SETPOINT OF 29PS-107 FROM 190 PSIG 08/26/1997 TO 155 PSIG.
SCR 7822 CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3312 SCR 7823 CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3390 SCR 7824 CHANGE 1:PCI TURBINE MECHANICAL OVERSPEED 12/23/1996 SETPOIN'i' FOR POWER UPRATE SCR 7731 SETPOINTS FOR 02-MTU-234A-D HAVE BEEN 10/07/1996 CHANGED IN THE PLANT SCR 7826 CHANGE SRV SETPOINTS FOR UPRATE 12/23/1996 SCR 7805 72TS-129 THROUGH 132 SEPOINT REVISIONS 03/24/1997 SCR 7878 SCR-JAF-96-0082 HAS BEEN IMPLEMENTED IN 10/06/1997 THE PLANT REVISING 71UPS-3UVR SETPOINT SCR 8000 ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVA02.
SCR     8310     SETPOINT CHANGE TO RPS EPA'S                 03/13/1998 Rev. 1 i
SCR 8001 ADD STARTING TIME DELAY SEr SINT FOR 70-62 06/23/1997 1CRVB02.
SCR 8002 ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVB04 SCR 8003 MODIFY LOW OFFGAS FLOW SETPOINT ON 06/23/1997 INSTRUMENT 01-107FS-108L.
SCR 8213 CHANGE SETPOINT OF 29PS-107 FROM 190 PSIG 08/26/1997 TO 155 PSIG.
SCR 8310 SETPOINT CHANGE TO RPS EPA'S 03/13/1998 Rev. 1 i
Tab 2-32 l
Tab 2-32 l


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE                               TEST TITIE CBANGES               NtRdBER                                                 PERPO50mp SCR         8313     ADD NEW EPIC ALARM SETPOINTS FOR FW         03/30/1998 HEATERS.
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITIE CBANGES NtRdBER PERPO50mp SCR 8313 ADD NEW EPIC ALARM SETPOINTS FOR FW 03/30/1998 HEATERS.
SCR       8348     TIME DELAY SETPOINT FOR CO2 DISCHARGE INTO 06/18/1998 RELAY ROOM HAS BEEN CHANGED.
SCR 8348 TIME DELAY SETPOINT FOR CO2 DISCHARGE INTO 06/18/1998 RELAY ROOM HAS BEEN CHANGED.
SCR       7825     CHANGE RCIC TURBINE MECHANICAL OVERSPEED   12/23/1996 SETPOINT FOR POWER UPRATE SCR         7777     SETPOINT CHANGES FOR 70TS-103.               03/24/1997 SCR         7730     SETPOINTS FOR 02-3MTU-201A-D HAVE BEEN       10/06/1996 CHANGED IN THE PLANT SCR         7732     SETPOINTS FOR 33MTU-235A-D, 33PT-135A-D     12/16/1996 HAVE BEEN CHANGED IN THE PLANT SCR         8396     IMPLEMENT SCR-JAT-97-0014, OFFGAS           08/10/1998 RECOMBINER LOW FLOW ALARM SETPOINT FROM 12.5 TO 7.5 SCFM.
SCR 7825 CHANGE RCIC TURBINE MECHANICAL OVERSPEED 12/23/1996 SETPOINT FOR POWER UPRATE SCR 7777 SETPOINT CHANGES FOR 70TS-103.
SCR       7745     SETPOINTS FOR 02-3STU-274 A & B HAVE BEEN 10/07/1996 CHANGED IN THE PLANT SCR       7746     SETPOINTS FOR 02-3MTU-283 A & B HAVE       10/07/1996 CHANGED IN THE PLANT SCR         7747     PLANT SETPOINTS FOR 02-3MTU-283 C & D HAVE 10/07/1996 CHANGED IN THE PLANT SCR         7748     PLANT SETPOINTS FOR 02-3MTU-273 s 279 HAVE 10/07/1996 CHANGED IN THE PLANT SCR         7749     PLANT SETPOINTS FOR 23MTU-276, 23MTU-277, 10/07/1996 23STU-278,23STU-279, 23DPT-76 AND 23DPT-77 HAVE CHANGED IN THE PLANT SCR       7750       SETPOINTS FOR 13MTU-284, 13STU-286, 13DPT 10/07/1996 84, 13DPT-83, 13MTU-283 AND 13STU-285 HAVE CHANGED IN PLANT SCR       7809     4 KV DEGRADED VOLTAGE TIME DELAY RELAY       03/17/1997 SETPOINT CHANGE.
03/24/1997 SCR 7730 SETPOINTS FOR 02-3MTU-201A-D HAVE BEEN 10/06/1996 CHANGED IN THE PLANT SCR 7732 SETPOINTS FOR 33MTU-235A-D, 33PT-135A-D 12/16/1996 HAVE BEEN CHANGED IN THE PLANT SCR 8396 IMPLEMENT SCR-JAT-97-0014, OFFGAS 08/10/1998 RECOMBINER LOW FLOW ALARM SETPOINT FROM 12.5 TO 7.5 SCFM.
SCR       7758     IMPLEMENT REQUIRED CHANGES IAW SCR--96-00311/25/1996 Rev.
SCR 7745 SETPOINTS FOR 02-3STU-274 A & B HAVE BEEN 10/07/1996 CHANGED IN THE PLANT SCR 7746 SETPOINTS FOR 02-3MTU-283 A & B HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7747 PLANT SETPOINTS FOR 02-3MTU-283 C & D HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7748 PLANT SETPOINTS FOR 02-3MTU-273 s 279 HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7749 PLANT SETPOINTS FOR 23MTU-276, 23MTU-277, 10/07/1996 23STU-278,23STU-279, 23DPT-76 AND 23DPT-77 HAVE CHANGED IN THE PLANT SCR 7750 SETPOINTS FOR 13MTU-284, 13STU-286, 13DPT 10/07/1996 84, 13DPT-83, 13MTU-283 AND 13STU-285 HAVE CHANGED IN PLANT SCR 7809 4 KV DEGRADED VOLTAGE TIME DELAY RELAY 03/17/1997 SETPOINT CHANGE.
SCR 7758 IMPLEMENT REQUIRED CHANGES IAW SCR--96-00311/25/1996 Rev.
Tab 2-33
Tab 2-33


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST I.IST         TEST                                                 LAST DATE 9
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST I.IST TEST LAST DATE 9
CEANGES           NUMBER                                               PERNOORAD SCR     7806     ADD A REMOTE FUNCTION FOR INSTRUCTOR TO     12/16/1996 CHANGE THE REACTOR HI PR ATWS TRIP FROM THE NORMAL 1139 PSIG TO 1104 PSIG IN THE CASE WHERE TWO OR MORE SRV'S ARE INOPERABLE.
CEANGES NUMBER PERNOORAD SCR 7806 ADD A REMOTE FUNCTION FOR INSTRUCTOR TO 12/16/1996 CHANGE THE REACTOR HI PR ATWS TRIP FROM THE NORMAL 1139 PSIG TO 1104 PSIG IN THE CASE WHERE TWO OR MORE SRV'S ARE INOPERABLE.
SCR     7778     SETPOINT CHANGES FOR 23MTU-277, 23STU-279, 09/25/1997 13MTU-284 AND 13ST'J-286.
SCR 7778 SETPOINT CHANGES FOR 23MTU-277, 23STU-279, 09/25/1997 13MTU-284 AND 13ST'J-286.
SCR     7779     CRESCENT AREA UNIT COOLER LOW TEMP ALARM   03/19/1997 SETPOINT REVISIONS.
SCR 7779 CRESCENT AREA UNIT COOLER LOW TEMP ALARM 03/19/1997 SETPOINT REVISIONS.
SCR     7780     37 TICS-101SETPOINT CHANGE.               03/24/1997 SCR     7800     70TS-103 SETPOINT REVISION                 03/19/1997 i
SCR 7780 37 TICS-101SETPOINT CHANGE.
SCR     7801     CRESCENT AREA UNIT COOLER LOW TEMPERATURE 03/19/1997 ALARM SETPOINT REVISION SCR     7802     37 TICS-101 SETPOINT REVISION             03/19/1997 i
03/24/1997 SCR 7800 70TS-103 SETPOINT REVISION 03/19/1997 i
SCR     7803     07SRM-40A-D SETPOINT REVISION             06/02/1997 SCR     7804     72TS-122A/B SETPOINT REVISION             03/24/1997
SCR 7801 CRESCENT AREA UNIT COOLER LOW TEMPERATURE 03/19/1997 ALARM SETPOINT REVISION SCR 7802 37 TICS-101 SETPOINT REVISION 03/19/1997 i
                                                                                      #1 SCR     7729     SETPOINTS FOR 27RM-104A&B HAVE BEEN       03/19/1997 CHANGED IN THE PLANT I
SCR 7803 07SRM-40A-D SETPOINT REVISION 06/02/1997 SCR 7804 72TS-122A/B SETPOINT REVISION 03/24/1997
SCR     7753     SETPOINTS FOR 66TS-107A, B, C, D, G, H, J, 03/31/1997   l
#1 SCR 7729 SETPOINTS FOR 27RM-104A&B HAVE BEEN 03/19/1997 CHANGED IN THE PLANT I
                                & K HAVE CHANGED IN THE PLANT                           l l
SCR 7753 SETPOINTS FOR 66TS-107A, B,
I l
C, D,
i I
G, H,
Rev. 1 Tab 2-34
J, 03/31/1997 l
& K HAVE CHANGED IN THE PLANT l
l I
l i
I Rev. 1 Tab 2-34


NEW YORK POWER AUTHOEUTY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                       !
NEW YORK POWER AUTHOEUTY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TES'I1NG PLAN 1999-2002 TEST TF5B TEST TITLE SCIEDULE STEADY STATE SS-01 25% Rated Thermal Power ANNUALLY STEADY STATE SS-02 75% Rated Thermal Power ANNUALLY l
PLANT REFERENCED SIMULATION FACILITY                         l l
STEADY STATE SS-03 100% Rated Thermal Power Stability Test ANNUALLY TRANSIENT TT01 Manual RX Scram ANNUALLY TEST TRANSIENT TT02 Trip All Feedwater Pumps ANNUALLY j
FOUR YEAR PERFORMANCE TES'I1NG PLAN 1999-2002                     l TEST TF5B                               TEST TITLE               SCIEDULE STEADY STATE SS-01     25% Rated Thermal Power                     ANNUALLY STEADY STATE SS-02     75% Rated Thermal Power                     ANNUALLY l
TEST TRANSIENT TT03 Closure of All MSIVs ANNUALLY TEST TRANSIENT TT04 Trip of Both Recirc Pumps ANNUALLY TEST l
STEADY STATE SS-03     100% Rated Thermal Power Stability Test     ANNUALLY TRANSIENT   TT01     Manual RX Scram                             ANNUALLY TEST TRANSIENT   TT02     Trip All Feedwater Pumps                   ANNUALLY   j TEST TRANSIENT   TT03     Closure of All MSIVs                       ANNUALLY TEST TRANSIENT   TT04     Trip of Both Recirc Pumps                   ANNUALLY TEST                                                                       l l
TRANSIENT TT05 Single Recirc Pump Trip ANNUALLY l
TRANSIENT   TT05     Single Recirc Pump Trip                     ANNUALLY   l TEST l
TEST TRANSIENT TT06 Main Turbine Trip (No Scram)
TRANSIENT   TT06     Main Turbine Trip (No Scram)               ANNUALLY TEST l
ANNUALLY TEST l
TRANSIENT   TT07     Max Rate Power Ramp                         ANNUALLY   l TEST TRANSIENT   TT08     DBA LOCA With Loss of Off-site Power       ANNUALLY TEST TRANSIENT   TT09     Main Steam Line Rupture                     ANNUALLY TEST TRANSIENT   TT10     Closure of All MSIVs With Stuck Open Relief ANNUALLY TEST               Valve MALFUNCTION   AD01   ADS Timer Fails to Start                     Year 1 TEST MALFUNCTION   AD02     ADS Inadvertent Timer and Logic Start       Year 4 TEST MALFUNCTION AD03:A-H ADS Valve (s) Fail to Initiate Automatically Year 4 TEST MALFUNCTION AD04:A-K   RX Press Relief Valve Solenoid Failure       Year 4 TEST Rev. 1 Tab 3-1
TRANSIENT TT07 Max Rate Power Ramp ANNUALLY TEST TRANSIENT TT08 DBA LOCA With Loss of Off-site Power ANNUALLY TEST TRANSIENT TT09 Main Steam Line Rupture ANNUALLY TEST TRANSIENT TT10 Closure of All MSIVs With Stuck Open Relief ANNUALLY TEST Valve MALFUNCTION AD01 ADS Timer Fails to Start Year 1 TEST MALFUNCTION AD02 ADS Inadvertent Timer and Logic Start Year 4 TEST MALFUNCTION AD03:A-H ADS Valve (s) Fail to Initiate Automatically Year 4 TEST MALFUNCTION AD04:A-K RX Press Relief Valve Solenoid Failure Year 4 TEST Rev. 1 Tab 3-1


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTFE                               TEST TITLE                 SCEEDULE MALFUNCTION AD05:A-K   RX Press Relief Valve Laak                     Year 4 TEST MALFUNCTION AD06:A-K   RX Press Relief Valve Inadvertently Opens     Year 4 TEST MALFUNCTION AD07:A-K   RX Press Relief Valve Fails to Open           Year 4 TEST MALFUNCTION ADOS:A-K   RX Press Relief Valve Stuck Open               Year 1 TEST
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTFE TEST TITLE SCEEDULE MALFUNCTION AD05:A-K RX Press Relief Valve Laak Year 4 TEST MALFUNCTION AD06:A-K RX Press Relief Valve Inadvertently Opens Year 4 TEST MALFUNCTION AD07:A-K RX Press Relief Valve Fails to Open Year 4 TEST MALFUNCTION ADOS:A-K RX Press Relief Valve Stuck Open Year 1 TEST
                                                                                      )
)
l MALFUNCTION AD09:A-K   RX SRV Vacuum Breaker Stuck Open               Year 4     )
MALFUNCTION AD09:A-K RX SRV Vacuum Breaker Stuck Open Year 4
TEST MALFUNCTION AN01:A,B   Control Room Annunciator Power Failure         Year 3 TEST MALFUNCTION CS01:A,B   Core Spray Pump Trip                           Year 4 TEST MALFUNCTION CS02:A,B   Core Spray Injection Valve Fails to Auto Open Year 4 TEST MALFUNCTION CS03:A,B   Core Spray Torus Suction Fails Closed         Year 4     ,
)
TEST                                                                         I MALFUNCTION CSO4:A,B   Core Spray Injection Line Break (nor.-         Year 4 TEST               recoverable)
TEST MALFUNCTION AN01:A,B Control Room Annunciator Power Failure Year 3 TEST MALFUNCTION CS01:A,B Core Spray Pump Trip Year 4 TEST MALFUNCTION CS02:A,B Core Spray Injection Valve Fails to Auto Open Year 4 TEST MALFUNCTION CS03:A,B Core Spray Torus Suction Fails Closed Year 4 TEST MALFUNCTION CSO4:A,B Core Spray Injection Line Break (nor.-
MALFUNCTION CS05:A,B   Core Spray Torus Suction Line Pipe Failure     Year 1 TEST MALFUNCTION   CUO1     RWCU Flow Control Failure                     Year 1 TEST MALFUNCTION CUO2:A,B   RWCU Pump Trip                                 Year 1 TEST MALFUNCTION CUO3:A,B   Tube Leak in RWCU HX (non-recoverable)         Year 1 TEST MALFUNCTION CUO4:A,B   RWCU Resin Intrusion                           Year 1 TEST MALFUNCTION   CUO6     RWCU Inadvertent Isolation                     Year 1 TEST MALFUNCTION   CUO7     RWCU Pipe Break Between 12MOV-15 and 12MOV-18 Year 1 TEST Rev. 1 Tab 3-2
Year 4 TEST recoverable)
MALFUNCTION CS05:A,B Core Spray Torus Suction Line Pipe Failure Year 1 TEST MALFUNCTION CUO1 RWCU Flow Control Failure Year 1 TEST MALFUNCTION CUO2:A,B RWCU Pump Trip Year 1 TEST MALFUNCTION CUO3:A,B Tube Leak in RWCU HX (non-recoverable)
Year 1 TEST MALFUNCTION CUO4:A,B RWCU Resin Intrusion Year 1 TEST MALFUNCTION CUO6 RWCU Inadvertent Isolation Year 1 TEST MALFUNCTION CUO7 RWCU Pipe Break Between 12MOV-15 and 12MOV-18 Year 1 TEST Rev. 1 Tab 3-2


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE                                 TEST TITIA                 SCEEDULE MALFUNCTION   CUO8     RWCU Return Temperature Transmitter Failure     Year 1 TEST MALFUNCTION   CUO9     RWCU Inlet Pipe Failure (non-recoverable)       Year 1 TEST MALFUNCTION   CU10     RWCU Valve 12MOV-18 Fails To Auto Isolate       Year 1 TEST MALFUNCTION DG01:A-D   EDG Fails to Start                             Year 1 TEST MALFUNCTION DG02:A-D   EDG Fails to Trip                               Year 1 TEST MALFUNCTION DG03:A-D   EDG Output Breaker Fails to Auto Close         Year 1 TEST l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITIA SCEEDULE MALFUNCTION CUO8 RWCU Return Temperature Transmitter Failure Year 1 TEST MALFUNCTION CUO9 RWCU Inlet Pipe Failure (non-recoverable)
l MALFUNCTION DG04:A-D EDG Trip                                         Year 1 TEST MALTUllCTION DG05:A-D EDG Voltage Regulator Oscillations               Year 1 TE3T MALFUNCTION DG06:A-D EDG Slow to Start                               Year 1 TEST                                                                           l i
Year 1 TEST MALFUNCTION CU10 RWCU Valve 12MOV-18 Fails To Auto Isolate Year 1 TEST MALFUNCTION DG01:A-D EDG Fails to Start Year 1 TEST MALFUNCTION DG02:A-D EDG Fails to Trip Year 1 TEST MALFUNCTION DG03:A-D EDG Output Breaker Fails to Auto Close Year 1 TEST l
l MALFUNCTION DG07:A-D EDG Governor Tails High                         Year 1    1 TEST MALFUNCTION DG08:A-D EDG Governor Fails Low                           Year 1     l TEST MALFUNCTION ED01:A,B 345/24hT Transformer (T1A, T1B) Failure         Year 1 TEST MALFUNCTION ED02:A,B   115/4KV Transformer (T2, T3) Failure           Year 1 TEST MALFUNCTION ED03:A-D   4KV/600V Transformer (T13, T14, TIS, T16)       Year 1 TEST                 Failure l
MALFUNCTION DG04:A-D EDG Trip Year 1 TEST MALTUllCTION DG05:A-D EDG Voltage Regulator Oscillations Year 1 TE3T MALFUNCTION DG06:A-D EDG Slow to Start Year 1 TEST i
l     MALFUNCTION ED04:A,B   Inverter (71INV-3A/B) Failure                   Year 1 l
MALFUNCTION DG07:A-D EDG Governor Tails High Year 1 TEST MALFUNCTION DG08:A-D EDG Governor Fails Low Year 1 TEST MALFUNCTION ED01:A,B 345/24hT Transformer (T1A, T1B) Failure Year 1 TEST MALFUNCTION ED02:A,B 115/4KV Transformer (T2, T3) Failure Year 1 TEST MALFUNCTION ED03:A-D 4KV/600V Transformer (T13, T14, TIS, T16)
TEST MALFUNCTION ED05:A-H   4KV/600V Transformer (TS, T6, T7, T8, T9, T10, Year 1 TEST j Rev. 1 Tab 3-3 t
Year 1 TEST Failure l
l MALFUNCTION ED04:A,B Inverter (71INV-3A/B) Failure Year 1 l
TEST MALFUNCTION ED05:A-H 4KV/600V Transformer (TS, T6, T7, T8, T9, T10, Year 1 TEST Rev. 1 j
Tab 3-3 t


NEW YORK POWER AUTHORITY                       l JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE                               TEST TITLE     SCEEDUI2 MALFUNCTION ED06A     120VAC Bus (RBACA5) Failure       Year 1 TEST MALFUNCTION ED06B     120VAC Bus (TBACA6) Failure       Year 1 TEST                                                             I l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITLE SCEEDUI2 MALFUNCTION ED06A 120VAC Bus (RBACA5) Failure Year 1 TEST MALFUNCTION ED06B 120VAC Bus (TBACA6) Failure Year 1 TEST MALFUNCTION ED06C 120VAC Bus (SWACA7) Failure Year 1 TEST MALFUNCTION ED06D 120VAC Bus (RBACBS) Failure Year 1 TEST MALFUNCTION ED06E 120VAC Bus (TBACB6) Failure Yea: 1 TEST MALFUNCTION ED06F 120 SAC Bus (RWACB7) Failure Year 1 TEST MALFUNCTION ED07A 120VAC Bus (RRACAB) Failure Year 1 TEST MALFUNCTION ED07B 120VAC Bus (RRACB8) Failure Year 1 TEST MALFUNCTION ED07C 120VAC Bus (RBACCS) Failure Year 1 TEST MALFUNCTION ED07D 120VAC Bus (TBACC6) Failure Year 1 TEST MALFUNCTION ED07E 120VAC Bus (SWACC7) Failure Year 1 TEST MALFUNCTION ED07F 120VAC Bus (RBACDS) Failure Year 1 TEST MALFUNCTION ED07G 120VAC Bus (TBACD6) Failure Year 1 TEST MALFUNCTION ED07I 120VAC Bus (RBACE5) Failure Year 1 j
MALFUNCTION ED06C     120VAC Bus (SWACA7) Failure       Year 1 TEST MALFUNCTION ED06D     120VAC Bus (RBACBS) Failure       Year 1 TEST MALFUNCTION ED06E     120VAC Bus (TBACB6) Failure       Yea: 1     l TEST                                                             l MALFUNCTION ED06F     120 SAC Bus (RWACB7) Failure       Year 1 TEST MALFUNCTION ED07A     120VAC Bus (RRACAB) Failure       Year 1 TEST MALFUNCTION ED07B     120VAC Bus (RRACB8) Failure       Year 1 TEST MALFUNCTION ED07C     120VAC Bus (RBACCS) Failure       Year 1 TEST MALFUNCTION ED07D     120VAC Bus (TBACC6) Failure       Year 1 TEST MALFUNCTION ED07E     120VAC Bus (SWACC7) Failure       Year 1 TEST MALFUNCTION ED07F     120VAC Bus (RBACDS) Failure       Year 1 TEST MALFUNCTION ED07G     120VAC Bus (TBACD6) Failure       Year 1 TEST MALFUNCTION ED07I     120VAC Bus (RBACE5) Failure       Year 1     j TEST MALFUNCTION ED07J     120VAC Bus (71ABAC1) Failure       Year 1 TEST HALFUNCTION ED07K     120VAC Bus (71ACNMS) Failure       Year 1     ,
TEST MALFUNCTION ED07J 120VAC Bus (71ABAC1) Failure Year 1 TEST HALFUNCTION ED07K 120VAC Bus (71ACNMS) Failure Year 1 TEST MALFbNCTION ED07L 120VAC Bus (71ACNMS-A) Failure Year 1 TEST Rev. 1 Tab 3-4
I TEST MALFbNCTION ED07L     120VAC Bus (71ACNMS-A) Failure     Year 1 TEST l
Rev. 1 Tab 3-4


NEW YORK POWER AUIRORITY JAMES A. FITZPA*IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tsa? TT75                                 TEST TITLE                 SCEEDUIA MALFUNCTION   ED07M     120VAC Bus (71ACNMS-B) Failure                 Year 1 TEST MALFUNCTION   ED08     120V/240VAC Bus (71AC9/71AC10) Failure         Year 1 TEST l
NEW YORK POWER AUIRORITY JAMES A. FITZPA*IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tsa? TT75 TEST TITLE SCEEDUIA MALFUNCTION ED07M 120VAC Bus (71ACNMS-B) Failure Year 1 TEST MALFUNCTION ED08 120V/240VAC Bus (71AC9/71AC10) Failure Year 1 TEST MALFUNCTION ED09:A,B UPS MG Drive Failure (AC/DC)
l MALFUNCTION ED09:A,B   UPS MG Drive Failure (AC/DC)                   Year 1 TEST MALFUNCTION   ED10     120VAC UPS Bus (71ACUPS) Failure               Year 2 TEST MALFUNCTION   ED11A     125VDC Bus A (71BCB-2A) Failure                 Year 1     <
Year 1 TEST MALFUNCTION ED10 120VAC UPS Bus (71ACUPS) Failure Year 2 TEST MALFUNCTION ED11A 125VDC Bus A (71BCB-2A) Failure Year 1 TEST MALFUNCTION ED11B 125VDC Bus B (71BCB-2B) Failure Year 1 TEST MALFUNCTION ED12:A,B 125VDC Bus Battery Charger Failure Year 1 TEST J
TEST MALFUNCTION   ED11B     125VDC Bus B (71BCB-2B) Failure                 Year 1 TEST MALFUNCTION ED12:A,B   125VDC Bus Battery Charger Failure             Year 1 TEST                                                                           J MALFUNCTION   ED13     24VDC Bus A(B) System Failure                   Year 1 TEST                                                                           j l
MALFUNCTION ED13 24VDC Bus A(B) System Failure Year 1 TEST j
l MALFUNCTION ED14:A,B   24VDC Battery Charger Failure                   Year 1 TEST                                                                           i MALFUNCTION   ED15     24KV/4KV Transformer T4 Failure                 Year 1     !
l MALFUNCTION ED14:A,B 24VDC Battery Charger Failure Year 1 TEST i
TEST MALFUNCTION   ED16     Power Grid Transient With Load                 Year 2 TEST               Increasing / Decreasing MALFUNCTION   ED17     Station Blackout                               Year 2 TEST MALFUNCTION ED18:A,B   4.16KV Emergency Bus (10500, 10600) Failure     Year 2 TEST MALFUNCTION ED19:A-E   4.16KV Normal Bus (10100, 10200, 10300, 10400, Year 2 TEST MALFUNCTION ED20:A-H   600VAC Bus (11300, 11400, 12300, 12400, 13300, Year 2     1 TEST MALFUNCTION ED21:A-D   600VAC Emergency Bus (11500, 12500, 11600,     Year 2 TEST               12600) l l
MALFUNCTION ED15 24KV/4KV Transformer T4 Failure Year 1 TEST MALFUNCTION ED16 Power Grid Transient With Load Year 2 TEST Increasing / Decreasing MALFUNCTION ED17 Station Blackout Year 2 TEST MALFUNCTION ED18:A,B 4.16KV Emergency Bus (10500, 10600) Failure Year 2 TEST MALFUNCTION ED19:A-E 4.16KV Normal Bus (10100, 10200, 10300, 10400, Year 2 TEST MALFUNCTION ED20:A-H 600VAC Bus (11300, 11400, 12300, 12400, 13300, Year 2 TEST MALFUNCTION ED21:A-D 600VAC Emergency Bus (11500, 12500, 11600, Year 2 TEST 12600) i Rev. 1 Tab 3-5
i i
Rev. 1 Tab 3-5


1
1
                                                                                        )
)
NEW YORK MWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                           I PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TT7E                                 TEST TITIA                 SCIEDUI2 MALFUNCTION ED22:A-C   600VAC Normal Bus (113100, 113200, 113300)     Year 1 TEST               Failure MALFUNCTION ED23:A-C   600VAC Normal Bus g'14100, 114200, 114300)     Year 1 TEST               Failure                                                   i MALFUNCTION ED24A-D     600VAC Emergency Bus (115100, 115200, 115300, Year 1 TEST               115600)
NEW YORK MWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TT7E TEST TITIA SCIEDUI2 MALFUNCTION ED22:A-C 600VAC Normal Bus (113100, 113200, 113300)
I MALFUNCTION ED25:A-F   600VAC Bus (116100, 116200, 116300, 116400,   Year 2 TEST               116500, 1
Year 1 TEST Failure MALFUNCTION ED23:A-C 600VAC Normal Bus g'14100, 114200, 114300)
MALFUNCTION ED26:A,B   600VAC Bus (123100, 123200) Failure           Year 1 TEST f
Year 1 TEST Failure i
j MALFUNCTION ED27:A,B   600VAC Bus (124100, 124200) Fa lure           Year 1 TEST MALFUNCTION ED28:A-D   600VAC Bits (125100, 125200, 12530J, 125400)   Year 2 TEST               Failure MALFUNCTION ED29:A-D   600VAC Emergency Bus (126100, 126200, 126300, Year 2 TEST               126400)
MALFUNCTION ED24A-D 600VAC Emergency Bus (115100, 115200, 115300, Year 1 TEST 115600)
MALFUNCTION ED30:A-D   600VAC Bus (133100, 133200, 133300, 133400)   Year 1 TEST               Failure                                                   j i
MALFUNCTION ED25:A-F 600VAC Bus (116100, 116200, 116300, 116400, Year 2 TEST
MALFUNCTION ED31:A-D   600VAC Bus (134100, 134200, 134300, 134400)   Year 1     I TEST               Failure l
: 116500, f
MALFUNCTION ED32:A-E   600VAC Bus (143100, 143200, 143300, 143400,   Year 2 TEST               143500)
MALFUNCTION ED26:A,B 600VAC Bus (123100, 123200) Failure Year 1 TEST j
MALFUNCTION   13:A-E   600VAC Bus (144100, 144200, 144300, 144400,   Year 2 TEST               144500)
MALFUNCTION ED27:A,B 600VAC Bus (124100, 124200) Fa lure Year 1 TEST MALFUNCTION ED28:A-D 600VAC Bits (125100, 125200, 12530J, 125400)
MALFUNCTION   ED34A     120VAC Bus RPS-A Failure                       Year 1 TEST MALFUNCTION   ED34B     120VAC Bus RPS-B Failure                       Year 1 TEST MALFUNCTION   ED35A     120VAC Bus (71 ESSA 1) Failure                 Year 1 TEST MALFUNCTION   ED35B     120VAC Bus (71ESSB1) Failure                   Year 1 TEST MALFUNCTION   ED36'     120VAC Bus (71ACA2) Failure                   Year 1 TEST
Year 2 TEST Failure MALFUNCTION ED29:A-D 600VAC Emergency Bus (126100, 126200, 126300, Year 2 TEST 126400)
MALFUNCTION ED30:A-D 600VAC Bus (133100, 133200, 133300, 133400)
Year 1 TEST Failure j
i MALFUNCTION ED31:A-D 600VAC Bus (134100, 134200, 134300, 134400)
Year 1 TEST Failure MALFUNCTION ED32:A-E 600VAC Bus (143100, 143200, 143300, 143400, Year 2 TEST 143500)
MALFUNCTION 13:A-E 600VAC Bus (144100, 144200, 144300, 144400, Year 2 TEST 144500)
MALFUNCTION ED34A 120VAC Bus RPS-A Failure Year 1 TEST MALFUNCTION ED34B 120VAC Bus RPS-B Failure Year 1 TEST MALFUNCTION ED35A 120VAC Bus (71 ESSA 1) Failure Year 1 TEST MALFUNCTION ED35B 120VAC Bus (71ESSB1) Failure Year 1 TEST MALFUNCTION ED36' 120VAC Bus (71ACA2) Failure Year 1 TEST
}
}
Rev. 1 Tab 3-6
Rev. 1 Tab 3-6


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICI . NUCLEAR POWER PLANT PLANT REFERENCET , SIMULATION FACILITY FOUR YEAR PEK < OW! ACE TESTING PLAN 1999-2002 TEST Tf75                                     TE87 TITIE               SCEEDUI2 l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICI. NUCLEAR POWER PLANT PLANT REFERENCET, SIMULATION FACILITY FOUR YEAR PEK < OW! ACE TESTING PLAN 1999-2002 TEST Tf75 TE87 TITIE SCEEDUI2 MALTUNCTION ED36B 120VAC Bus (71ACA3) Failure Year 1 TEST
MALTUNCTION     ED36B     120VAC Bus (71ACA3) Failure                   Year 1     l TEST
{
{
MALFUNCTION     ED36C     120VAC Bus (71ACA4) Failure                   Year 1 TEST J
MALFUNCTION ED36C 120VAC Bus (71ACA4) Failure Year 1 TEST J
MALFUNCTION     ED36D     120VAC Bus (71ACL2) Failure                   Year 1 TEST
MALFUNCTION ED36D 120VAC Bus (71ACL2) Failure Year 1 TEST
{
{
MALFUNCTION     ED36E     120VAC Bus (71ACB3 ) Failure                 Year 1     l' TEST MALFUNCTION     ED36F     120VAC Bus -(71ACB4) Failure                 Year 1     i TEST MALFUNCTION   ED37A:1-5   125VDC Bus (71DC-A) Failure                   Year 1 TEST MEFUNCTION     ED37B:1-5   125VDC Bus (71DC-B) Failure                   Year 1 TEST MALFUNCTION   ED38:A-E   225VDC Bus (71BMCC) Failure                   Year 4 TEST
MALFUNCTION ED36E 120VAC Bus (71ACB3 ) Failure Year 1 TEST MALFUNCTION ED36F 120VAC Bus -(71ACB4) Failure Year 1 i
                                                                                              )
TEST MALFUNCTION ED37A:1-5 125VDC Bus (71DC-A) Failure Year 1 TEST MEFUNCTION ED37B:1-5 125VDC Bus (71DC-B) Failure Year 1 TEST MALFUNCTION ED38:A-E 225VDC Bus (71BMCC) Failure Year 4 TEST
1 MALTUNCTIDN   ED39:A-G   125VDC Control Power Failure To 4160V Busses Year 4 TEST l
)
MALFUNCTION   ED40 A-L   125VDC Control Power Failure To 600V Busses   Year 1 TEST                                                                               I MALFUNCTION     ED41     Failure To Fast Transfer With A Normal       Year 2 TEST                   Residual Transfer MALFUNCTION     ED42     Failure To Fast Transfer With A Loss of RPS   Year 2 TEST MALFUNCTION     ED43     Loss of Affected 115KV Line                   Year 2 TEST MALFUNCTION     ED44     Loss of Station Reserve Power                 Year 2 TEST MALFUNCTION     EG01     Main Generator Trip                           Year 2 TEST MALFUNCTION     EG02A   Main Generator Field Breaker Fails to Close   Year 1 TEST Rev. 1 Tab 3-7
MALTUNCTIDN ED39:A-G 125VDC Control Power Failure To 4160V Busses Year 4 TEST MALFUNCTION ED40 A-L 125VDC Control Power Failure To 600V Busses Year 1 TEST MALFUNCTION ED41 Failure To Fast Transfer With A Normal Year 2 TEST Residual Transfer MALFUNCTION ED42 Failure To Fast Transfer With A Loss of RPS Year 2 TEST MALFUNCTION ED43 Loss of Affected 115KV Line Year 2 TEST MALFUNCTION ED44 Loss of Station Reserve Power Year 2 TEST MALFUNCTION EG01 Main Generator Trip Year 2 TEST MALFUNCTION EG02A Main Generator Field Breaker Fails to Close Year 1 TEST Rev. 1 Tab 3-7


NE W YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT M FERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST THE                                 TEST TITLE               SCEEDUI2 MALFUNCTION   EG02B   Main Generator Field Breaker Fails to open   Year 1 TEST MALFUNCTION EG03:A,B   Loss of Isolated Phase Bus Cooling Fan       Year 1 TEST MALFUNCTION   EG04     Main Generator Field Brushes Ground           Year 2     i TEST                                                                         l MALFUNCTION   EGOS     Main Generator Stator Temp High               Year 1 TEST MALFUNCTION   EG06     Generator Hydrogen Cooling System Leakage     Year 2 TEST MALFUNCTION   EG07     Hydrogen Seal Oil System Failure             Year 2 TEST MALFUNCTION   EGOS     Main Generator Auto V/R Fails                 Year 2 TEST MALFUNCTION   EG09     Main Generator Auto V/R Failure Complete     Year 2 TEST MALFUNCTION   EG10     Loss of Stator Cooling Water Flow           Year 2 TEST MALFUNCTION   EGil     Main H2 Seal Oil Pump Trip                   Year 4 TEST MALFUNCTION   EGl2     Emergency Seal Oil Pump Auto Start Failure   Year 4 TEST MALFUNCTION FP01:A-D   EDG Rm Fire                                 Year 3     I TEST MALFUNCTTON     FPG2     Smoke - Zone 0) through Zone 82             Year 3 TEST MALFUNCTION FWOl:A,B   RX Feedwater Pump Trip                       Year 2 TEST MALFUNCTION IWO2A:A,B   RX Feedwater Pump Recirc Valve Fails Open   Year 2 TEST MALFUNCTION FN02B:A,B   RX Feedwater Pump Recirc Valve Fails Closed Year 2 TEST MALFUNCTION FWO3:A,B   RX Feedwater Pump Auto Controller Failure   Year 2 TEST Rev, 1 Tab 3-8
NE W YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT M FERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST THE TEST TITLE SCEEDUI2 MALFUNCTION EG02B Main Generator Field Breaker Fails to open Year 1 TEST MALFUNCTION EG03:A,B Loss of Isolated Phase Bus Cooling Fan Year 1 TEST MALFUNCTION EG04 Main Generator Field Brushes Ground Year 2 i
TEST l
MALFUNCTION EGOS Main Generator Stator Temp High Year 1 TEST MALFUNCTION EG06 Generator Hydrogen Cooling System Leakage Year 2 TEST MALFUNCTION EG07 Hydrogen Seal Oil System Failure Year 2 TEST MALFUNCTION EGOS Main Generator Auto V/R Fails Year 2 TEST MALFUNCTION EG09 Main Generator Auto V/R Failure Complete Year 2 TEST MALFUNCTION EG10 Loss of Stator Cooling Water Flow Year 2 TEST MALFUNCTION EGil Main H2 Seal Oil Pump Trip Year 4 TEST MALFUNCTION EGl2 Emergency Seal Oil Pump Auto Start Failure Year 4 TEST MALFUNCTION FP01:A-D EDG Rm Fire Year 3 TEST MALFUNCTTON FPG2 Smoke - Zone 0) through Zone 82 Year 3 TEST MALFUNCTION FWOl:A,B RX Feedwater Pump Trip Year 2 TEST MALFUNCTION IWO2A:A,B RX Feedwater Pump Recirc Valve Fails Open Year 2 TEST MALFUNCTION FN02B:A,B RX Feedwater Pump Recirc Valve Fails Closed Year 2 TEST MALFUNCTION FWO3:A,B RX Feedwater Pump Auto Controller Failure Year 2 TEST Rev, 1 Tab 3-8


NEW YORK POWER AUTHORITY                                   j JAMES A. FITZPATRICK NUCLEAR POWER PLANT
NEW YORK POWER AUTHORITY j
(
JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY r
PLANT REFERENCED SIMULATION FACILITY r
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002                         )
)
i TEST TTFE                               TEST TITLE                 SCEEDULE MALFUNCTION FWO4:A,B     RX Feedwater Pump Manual Controller Failure   Year 2 TEST MALFUNCTION FWO5:A,B   RX Teedwater Pump High Vibration               Year 2 TEST MALFUNCTION FWO6:A,B   RX Feedwater Pump Coupling Failure             Year 2 TEST MALFUNCTION FWO7:A,B   RX Feedwater Pump Discharge Valve Seat Failure Year 2 TEST MALFUNCTION   FWO8     Master Feedwater Flow Control Auto Failure     Year 2 TEST MALFUNCTION   FWO9     Master Feedwater Flow Control Manual Failure   Year 2 TEST MALFUNCTION   N10       Master Feedwater Flow Control Oscillates       Year 2 TEST MALFUNCTION N13 : A, B Feedwater System 6th Point Heater Tube Leak     Year 2     1 TEST                                                                           l MALFUNCTION FW14:A,B   Feedwater System Sth Point Heater Tube Leak     Year 3 TEST MALFUNCTION FW15:A,B   Feedwater System 4th Point Heater Tube Leak     Year 3 TEST l
i TEST TTFE TEST TITLE SCEEDULE MALFUNCTION FWO4:A,B RX Feedwater Pump Manual Controller Failure Year 2 TEST MALFUNCTION FWO5:A,B RX Teedwater Pump High Vibration Year 2 TEST MALFUNCTION FWO6:A,B RX Feedwater Pump Coupling Failure Year 2 TEST MALFUNCTION FWO7:A,B RX Feedwater Pump Discharge Valve Seat Failure Year 2 TEST MALFUNCTION FWO8 Master Feedwater Flow Control Auto Failure Year 2 TEST MALFUNCTION FWO9 Master Feedwater Flow Control Manual Failure Year 2 TEST MALFUNCTION N10 Master Feedwater Flow Control Oscillates Year 2 TEST MALFUNCTION N13 : A, B Feedwater System 6th Point Heater Tube Leak Year 2 TEST MALFUNCTION FW14:A,B Feedwater System Sth Point Heater Tube Leak Year 3 TEST MALFUNCTION FW15:A,B Feedwater System 4th Point Heater Tube Leak Year 3 TEST MALFUNCTION FW16:A,B Feedwater System 3rd Point Heater Tube Leak Year 3 TEST MALFUNCTION FW17:A,B Feedwater System 2nd Point Heater Tube Leak Year 3 TEST MALFUNCTION N18:A,B Feedwater System Drain Coole:: Tube Leak Year 3 TEST MALFUNCTION FW19:A-E Condensate Pump Trip Yoar 3 TEST l
MALFUNCTION FW16:A,B   Feedwater System 3rd Point Heater Tube Leak     Year 3 TEST MALFUNCTION FW17:A,B   Feedwater System 2nd Point Heater Tube Leak     Year 3 l
l MALFUNCTION FW22:A,B CST Leak Manway Flange Failure Year 2 l
TEST MALFUNCTION N18:A,B     Feedwater System Drain Coole:: Tube Leak       Year 3 TEST MALFUNCTION FW19:A-E   Condensate Pump Trip                           Yoar 3 TEST l
TEST MALFUNCTION FW23:A-D High Pressure Heater Level Control Failure Year 3 TEST Rev. 1 Tab 3-9 l
l     MALFUNCTION FW22:A,B   CST Leak Manway Flange Failure                 Year 2 TEST l
L
MALFUNCTION FW23:A-D   High Pressure Heater Level Control Failure     Year 3 TEST Rev. 1 l
Tab 3-9 L


l l
l l
l t
t NEW YORK POWER AIRHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 i
NEW YORK POWER AIRHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 i
TEST TTWE TEST TITLE SCEEDUIE MALFUNCTION FW24:A,B RX Feedwater Pump Loss of oil Pressure Year 3 TEST MALFUNCTION IW25:A-C Condensate Booster Pump Trip Year 3 TEST
TEST TTWE                               TEST TITLE                 SCEEDUIE MALFUNCTION FW24:A,B   RX Feedwater Pump Loss of oil Pressure         Year 3 TEST MALFUNCTION IW25:A-C   Condensate Booster Pump Trip                   Year 3 TEST
{
{
MALFUNCTICH FW26 A,B   Condensate Transfer Pump Trip                   Year 2 TEST MALFUNCTION FW27:A,B   Feedwater Line Break Inside Primary             Year 3 TEST               Containment MALFUNCTION FW28:A,B   Feedwater Line Break Outside Primary           Year 3 TEST               Containment MALFUNCTION IW29:A,B   Feedwater Line Inboard Containment Check Valve Year 3 TEST MALFUNCTION   FW31     Condensate Booster Pmp A Auto Start Failure     Year 1 TEST MALFUNCTION   FW32     Feedwater Heater Loop Seal Drair Blockage       Year 3 TEST MALFUNCTION   HP01     HPCI Failure to Auto Start                       Year 2 TEST MALFUNCTION   HP02     HPCI Turbine Trip                               Year 2 TEST MALFUNCTION   HP03     HPCI Discharge Line Break (non-recoverable)     Year 2 TEST MALFUNCTION   HPO4     HPCI Flow Controller Auto Output Failure         Year 2 TEST MALFUNCTION   HPOS     HPCI Inadvertent Initiation                     Year 2 TEST                                                                           )
MALFUNCTICH FW26 A,B Condensate Transfer Pump Trip Year 2 TEST MALFUNCTION FW27:A,B Feedwater Line Break Inside Primary Year 3 TEST Containment MALFUNCTION FW28:A,B Feedwater Line Break Outside Primary Year 3 TEST Containment MALFUNCTION IW29:A,B Feedwater Line Inboard Containment Check Valve Year 3 TEST MALFUNCTION FW31 Condensate Booster Pmp A Auto Start Failure Year 1 TEST MALFUNCTION FW32 Feedwater Heater Loop Seal Drair Blockage Year 3 TEST MALFUNCTION HP01 HPCI Failure to Auto Start Year 2 TEST MALFUNCTION HP02 HPCI Turbine Trip Year 2 TEST MALFUNCTION HP03 HPCI Discharge Line Break (non-recoverable)
i MALFUNCTION   HP06     HPCI Steam Line Break (non-recoverable)         Year 2     l TEST 1
Year 2 TEST MALFUNCTION HPO4 HPCI Flow Controller Auto Output Failure Year 2 TEST MALFUNCTION HPOS HPCI Inadvertent Initiation Year 2 TEST
MALFUNCTION   HP07     HPCI Valve 23MOV-19 Fails to Auto Open           Year 2     !
)
TEST MALFUNCTION   HP08     HPCI Turbine Exhaust Piping Failure             Year 2     .
i MALFUNCTION HP06 HPCI Steam Line Break (non-recoverable)
TEST MALFUNCTION   HP09     HPCI Torus Suction Pipe Failure (non-           Year 2 TEST               recoverable)                                               :
Year 2 l
TEST MALFUNCTION HP07 HPCI Valve 23MOV-19 Fails to Auto Open Year 2 TEST MALFUNCTION HP08 HPCI Turbine Exhaust Piping Failure Year 2 TEST MALFUNCTION HP09 HPCI Torus Suction Pipe Failure (non-Year 2 TEST recoverable)
Rev. 1 Tab 3-10 i
Rev. 1 Tab 3-10 i


i                                                                                         )
i
NEW YORK POWER AUTHORITY                                     l JAMES A. FITZPATRICK NUCLEAR POWER PLANT                           l PLANT REFERENCED SIMULATION FACILITY l
)
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002                           !
NEW YORK POWER AUTHORITY l
I TEST TENE                                 TEST TITLE                 SCIEDUI2 MALFUNCTION   HP10     HPCI System Auto Isolation Failure             Year 1 TEST l     MALFUNCTION   HP11     HPCI 23MOV-15 Auto Isolation Failure           Year 1     i TEST MALFUNCTION   HP12     HPCI High Rx Water Lvl Trip Failure             Year 1 TEST MALFUNCTION HV01:A-C   Rx Bldg Supply Fan Trip                         Year 2       i TEST                                                                           I i
JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 I
MALFUNCTION HV02:A,B   Rx Bldg Exhaust Fan Trip                       Year 2 TEST                                                                             {
TEST TENE TEST TITLE SCIEDUI2 MALFUNCTION HP10 HPCI System Auto Isolation Failure Year 1 TEST l
l i
MALFUNCTION HP11 HPCI 23MOV-15 Auto Isolation Failure Year 1 i
MALFUNCTION   HV03     Secondary Containment Leakage                   Year 2     l TEST                                                                           l h
TEST MALFUNCTION HP12 HPCI High Rx Water Lvl Trip Failure Year 1 TEST MALFUNCTION HV01:A-C Rx Bldg Supply Fan Trip Year 2 TEST I
MALFUNCTION   IA01     Loss of Air Pressure to Scram Air Header       Year 2     j TEST                                                                             j I
i MALFUNCTION HV02:A,B Rx Bldg Exhaust Fan Trip Year 2 TEST
MALFUNCTION   IA02     Loss of Instrument Air                         Year 2     l TEST                                                                             I MALFUNCTION IA03:A-C   Air Compressor Trip                             Year 2 TEST MALFUNCTION   IA04     Serv Air Comp A Auto Start on Low Inst Air Hdr Year 1 TEST                 Press Fail MALFUNCTION   HC01     Main Condenser Air In-Leakage                   Year 2       ,
{
TEST                                                                             I MALFUNCTION MCO2:A-D   Main Condenser Tube Leak                         Year 2 TEST MALFUNCTION MC03:A-D  Main Co. t u. s Water Box Flow Block           Year 2       l TEST l
i MALFUNCTION HV03 Secondary Containment Leakage Year 2 TEST l
l     MALFUNCTION   MC04     SJAE Steam :. , a   Valve Fails                 Year 2 TEST MALFUNCTION MC05:A-C   Circulating Water Pump Trip                     Year 2 TEST MALFUNCTION   MC06     Air Ejector Condenser High Level                 Year 3 TEST Rev. 1 Tab 3-11
h MALFUNCTION IA01 Loss of Air Pressure to Scram Air Header Year 2 j
TEST j
MALFUNCTION IA02 Loss of Instrument Air Year 2 TEST I
MALFUNCTION IA03:A-C Air Compressor Trip Year 2 TEST MALFUNCTION IA04 Serv Air Comp A Auto Start on Low Inst Air Hdr Year 1 TEST Press Fail MALFUNCTION HC01 Main Condenser Air In-Leakage Year 2 TEST MALFUNCTION MCO2:A-D Main Condenser Tube Leak Year 2 TEST t u. s Water Box Flow Block Year 2 MALFUNCTION MC03:A-D Main Co.
TEST l
l MALFUNCTION MC04 SJAE Steam :., a Valve Fails Year 2 TEST MALFUNCTION MC05:A-C Circulating Water Pump Trip Year 2 TEST MALFUNCTION MC06 Air Ejector Condenser High Level Year 3 TEST Rev. 1 Tab 3-11


1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY j
1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY j
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTEE                               TEST TITIA                 SCREDUI2 MALFUNCTION MC07:A-C   Circ Water Pump Discharge Valve Fails to Close Year 2     l TEST                                                                           I MALFUNCTION MC08:A-C   Cire Water Pump Discharge Valve rails to Open   Year 2     j TEST J
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTEE TEST TITIA SCREDUI2 MALFUNCTION MC07:A-C Circ Water Pump Discharge Valve Fails to Close Year 2 TEST I
MALFUNCTaON MC09:A-D   Loss of Condenser Water Box Vacuum Priming     Year 2 TEST 1
MALFUNCTION MC08:A-C Cire Water Pump Discharge Valve rails to Open Year 2 j
MALFUNCTION   MC10     Water Icing in Intake Structure                 Year 2     I TEST MALFUNCTION MS01:A,8   Main Steam Header Press Xmtr Failure           Year 2     l TEST                                                                           I l
TEST J
MALFUNCTION MS02:A-D   Steam Leakage Inside Primary Containment       Year 3     l TEST                                                                           l I
MALFUNCTaON MC09:A-D Loss of Condenser Water Box Vacuum Priming Year 2 TEST 1
MALFUNCTION MS03:A-D   Main Steam Line Rupture Inside Primary         Year 3 TEST                                                                           )
I MALFUNCTION MC10 Water Icing in Intake Structure Year 2 TEST MALFUNCTION MS01:A,8 Main Steam Header Press Xmtr Failure Year 2 l
MALFUNCTION MSO4:A-D   Main Steam Line Rupture Outside Primary         Year 3 TEST MALFUNCTION   MS05     Steam Leak Outside Primary Containment         Year 3 TEST MALFUNCTION   MS06     Steam Seal Pressure Regulator Tails             Year 2     ;
TEST I
TEST MALFUNCTION MS07:A-H   MSIV Disc Separates from Stem (non-             Year 2 TEST               recoverable)                                               l MALFUNCTION M508A:A-H MSIV Fails Closed                               Year 2 TEST MALFUNCTION MS08B:A-H MSIV Fails Open                                 Year 2 TEST MALFUNCTION MSO9:A,B   First Stage Reheat Steam Supply to MSR Fails   Year 2 TEST MALFUNCTION MS10:A-H   MSIV Slow Test closure Time                     Year 2 TEST MALFUNCTION MSil:A,B   Second Stage Reheat Steam Supply to MSR Fails   Year 2 TEST MALTdNCTION MS12:A-D   Moisture Separator Drain Tank Level control     Year 3 TEST Rev. 1 Tab 3-12
MALFUNCTION MS02:A-D Steam Leakage Inside Primary Containment Year 3 TEST l
MALFUNCTION MS03:A-D Main Steam Line Rupture Inside Primary Year 3 TEST
)
MALFUNCTION MSO4:A-D Main Steam Line Rupture Outside Primary Year 3 TEST MALFUNCTION MS05 Steam Leak Outside Primary Containment Year 3 TEST MALFUNCTION MS06 Steam Seal Pressure Regulator Tails Year 2 TEST MALFUNCTION MS07:A-H MSIV Disc Separates from Stem (non-Year 2 TEST recoverable)
MALFUNCTION M508A:A-H MSIV Fails Closed Year 2 TEST MALFUNCTION MS08B:A-H MSIV Fails Open Year 2 TEST MALFUNCTION MSO9:A,B First Stage Reheat Steam Supply to MSR Fails Year 2 TEST MALFUNCTION MS10:A-H MSIV Slow Test closure Time Year 2 TEST MALFUNCTION MSil:A,B Second Stage Reheat Steam Supply to MSR Fails Year 2 TEST MALTdNCTION MS12:A-D Moisture Separator Drain Tank Level control Year 3 TEST Rev. 1 Tab 3-12


NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE                                 TEST TITLE               SCHEDUI2 l
NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE TEST TITLE SCHEDUI2 MALFUNCTION MS13:A-D First Stage Reheat Drain Tank Level Control Year 3 J
MALFUNCTION MS13:A-D   First Stage Reheat Drain Tank Level Control   Year 3     J TEST j
TEST j
MALFUNCTION MS14:A-D   Second Stage Reheat Drain Tank Level Control Year 3     l TEST MALFUNCTION MS15:A-J   Loss of Feedwater Extraction Steam           Year 3 TEST MALFUNCTION MS16:A-L   SRV Discharge Line Dreak Above Torus Water   Year 2     j TEST               Level                                                   f MALFUNCTION NM01:A-D   SRM Channel Failure                           Year 2 TEST l
MALFUNCTION MS14:A-D Second Stage Reheat Drain Tank Level Control Year 3 TEST MALFUNCTION MS15:A-J Loss of Feedwater Extraction Steam Year 3 TEST MALFUNCTION MS16:A-L SRV Discharge Line Dreak Above Torus Water Year 2 j
MALFUNCTION NM02:A,B   SF;4 Channel Recorder Failure                 Year 2 TEST I'
TEST Level f
MALFUNCTION NM03:A-D   SRM Channel Inoperative                       Year 2 TEST I
MALFUNCTION NM01:A-D SRM Channel Failure Year 2 TEST MALFUNCTION NM02:A,B SF;4 Channel Recorder Failure Year 2 TEST MALFUNCTION NM03:A-D SRM Channel Inoperative Year 2 TEST I
NM04 A-D   SRM Channel Detector Stuck MALFUNCTION                                                          Year 2 TEST l
MALFUNCTION NM04 A-D SRM Channel Detector Stuck Year 2 TEST l
MALFUNCTION NMOS:A-D   SRM Channel Retract Permit Failure           Year 2       l TEST MALFUNCTION NM06:A-H   1RM Channel Failure                           Year 2 TEST MALFUNCTION NM07:A-H   IRM/APRM-RBM Channel Recorder Failure         Year 3 TEST MALFUNCTION NM08:A-H   IRM Channel Inoperative                       Year 2 TEST MALFUNCTION NM09:A-H   IRM Channel Detector Stuck                   Year 2       l TEST MALFUNCTION NM10:A-H   IRM Channel Retract Permit Failure           Year 2 7EST MALFUNCTION NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure                       Year 2 TEST MALFUNCTION NM12:A,B   RBM Channel Failure                           Year 2 TEST Rev. 1 Tab 3-13
MALFUNCTION NMOS:A-D SRM Channel Retract Permit Failure Year 2 TEST MALFUNCTION NM06:A-H 1RM Channel Failure Year 2 TEST MALFUNCTION NM07:A-H IRM/APRM-RBM Channel Recorder Failure Year 3 TEST MALFUNCTION NM08:A-H IRM Channel Inoperative Year 2 TEST MALFUNCTION NM09:A-H IRM Channel Detector Stuck Year 2 TEST MALFUNCTION NM10:A-H IRM Channel Retract Permit Failure Year 2 7EST MALFUNCTION NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure Year 2 TEST MALFUNCTION NM12:A,B RBM Channel Failure Year 2 TEST Rev. 1 Tab 3-13


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                         j PLANT REFERENCED SIMULATION FACILITY l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT j
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002                         l TEST TTWB                               TEST TITLE                 SCEEDUIE MALFUNCTION NM13:A, O RBM Channel Inoperative                       Year 2 TESl' l
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWB TEST TITLE SCEEDUIE MALFUNCTION NM13:A, O RBM Channel Inoperative Year 2 TESl' MALFUNCTION NM14:A-F APRM Channel Failure Year 2 TEST MALFUNCTION NM15:A-F APRM Channel Inoperative Year 2 TEST i
l MALFUNCTION NM14:A-F   APRM Channel Failure                           Year 2 TEST I
MALFUNCTION OG01 Off Gas Condenser High Level Year 3 TEST MALFUNCTION OG02 Off Gas Drain Pot High Level Year 3 TEST MALFUNCTION OG03 Explosion in Air Ejector Discharge Year 3 TEST MALFUNCTION OG04 Fire in Air Ejector Year 3 TEST MALFUNCTION OG05 Recombiner Trip Year 4 TEST MALFUNCTION OG06 Stack Isolation Valve Fails Closed Year 4 TEST MALFUNCTION OG07 Off Gas 01-107AOV-100 Auto Isolation Fai}ure Year 1 TEST MALFUNCTION PC01 Containment Vent Purge Fan Trip Year 3 TEST MALFUNCTION PCO2 Loss of Instrument Nitrogen Year 3 TEST MALFUNCTION PCO3:A-H Drywell Cooling Fan Trip Year 3 TEST MALFUNCTION PC04:A,B SBGT Fan Trip Year 3 TEST MALFUNCTION PCOS Containment Pressure Transmitter Failure Year 3 TEST MALFUNCTION PC06 Torus Drywell Vacuum Breaker 27VB-1 Fails to Year 3 TEST Close MALFUNCTION PC07 Primary Containment Leakage (non-recoverable)
MALFUNCTION NM15:A-F APRM Channel Inoperative                       Year 2     !
Year 3 TEST Tab 3-14
TEST                                                                         i MALFUNCTION   OG01     Off Gas Condenser High Level                   Year 3 TEST MALFUNCTION   OG02     Off Gas Drain Pot High Level                   Year 3 TEST MALFUNCTION   OG03     Explosion in Air Ejector Discharge             Year 3 TEST MALFUNCTION   OG04     Fire in Air Ejector                           Year 3 TEST                         '
MALFUNCTION   OG05     Recombiner Trip                               Year 4 TEST MALFUNCTION   OG06     Stack Isolation Valve Fails Closed             Year 4 TEST MALFUNCTION   OG07     Off Gas 01-107AOV-100 Auto Isolation Fai}ure   Year 1 TEST MALFUNCTION   PC01     Containment Vent Purge Fan Trip               Year 3 TEST MALFUNCTION   PCO2     Loss of Instrument Nitrogen                   Year 3 TEST MALFUNCTION PCO3:A-H   Drywell Cooling Fan Trip                       Year 3 TEST MALFUNCTION PC04:A,B   SBGT Fan Trip                                 Year 3 TEST MALFUNCTION   PCOS     Containment Pressure Transmitter Failure       Year 3 TEST MALFUNCTION   PC06     Torus Drywell Vacuum Breaker 27VB-1 Fails to   Year 3 TEST               Close MALFUNCTION   PC07     Primary Containment Leakage (non-recoverable) Year 3 TEST Tab 3-14


1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBET TT35                               '1EST TITLE             SCHEDULE     j
1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBET TT35
'1EST TITLE SCHEDULE j
(
(
l                                                                                     '
l MALFUNCTION PCO8 Primary Containment Hydrogen High Year 3 l
MALFUNCTION   PCO8     Primary Containment Hydrogen High           Year 3 l         TEST MALFUNCTION   PC09     Primary Containment Oxygen High             Year 3 TEST                                                                         l j
TEST MALFUNCTION PC09 Primary Containment Oxygen High Year 3 TEST j
1 MALFUNCTION   PC10     Torus Level Decreases (non-recoverable)     Year 3 TEST l
1 MALFUNCTION PC10 Torus Level Decreases (non-recoverable)
;    MALFUNCTION RC01:A,B   RCIC Turbine Loss of oil Pressure           Year 3
Year 3 TEST l
!        TEST
MALFUNCTION RC01:A,B RCIC Turbine Loss of oil Pressure Year 3 TEST
                                                                                    \
\\
MALFUNCTION   RCO2     RCIC System Fails to Auto Start             Year 3 TEST MALFUNCTION   RCO3     RCIC System Turbine Trip                   Year 3 TEST MALFUNCTION   RC04     RCIC Turbine Failure to Auto Trip           Year 3 TEST I
MALFUNCTION RCO2 RCIC System Fails to Auto Start Year 3 TEST MALFUNCTION RCO3 RCIC System Turbine Trip Year 3 TEST MALFUNCTION RC04 RCIC Turbine Failure to Auto Trip Year 3 TEST I
MALFUNCTION   RC05     RCIC System Isolation                       Year 3
MALFUNCTION RC05 RCIC System Isolation Year 3 TEST i
!        TEST i
MALFUNCTION RC06 RCIC Inadvertent Initiation Year 3 TEST VALFUNCTION RC07:A,B RCIC Governor Fails High/ Low (HSS/LSS)
MALFUNCTION   RC06     RCIC Inadvertent Initiation                 Year 3 TEST VALFUNCTION RC07:A,B   RCIC Governor Fails High/ Low (HSS/LSS)     Year 3 TEST MALFUNCTION   RC09     RCIC Steam Line Break (non-recoverable)     Year 4 TEST MALFUNCTION   RC10     RCIC Discharge Line Break (non-recoverable) Year 3 TEST                                                             t MALFUNCTION                                                                     1 RC11     RCIC Turbfnr.::xhaust Pipe Failure (non-     Y f3       i j         TEST               recoverable)
Year 3 TEST MALFUNCTION RC09 RCIC Steam Line Break (non-recoverable)
                                                                                    }
Year 4 TEST MALFUNCTION RC10 RCIC Discharge Line Break (non-recoverable)
MALFUNCTION   RC12     RCIC Isolation Relay, 13A-K15, Failure       Year 1 TEST f
Year 3 TEST t
i MALFUNCTION   RC13     RCIC High Rx Water Lvl Shutdown Failure     Year 1     j TEST                                                                       {
1 MALFUNCTION RC11 RCIC Turbfnr.::xhaust Pipe Failure (non-Y f3 i
l MALFUNCTION RD01A:A-H SDV Vent or Drain Valve Fails Open           Year 4 TEST t
j TEST recoverable)
}
f MALFUNCTION RC12 RCIC Isolation Relay, 13A-K15, Failure Year 1 TEST i
MALFUNCTION RC13 RCIC High Rx Water Lvl Shutdown Failure Year 1 j
TEST
{
l MALFUNCTION RD01A:A-H SDV Vent or Drain Valve Fails Open Year 4 TEST t
1 I
1 I
l Rev. 1 Tab 3-15
l Rev. 1 Tab 3-15


l l
NEW YORK POWER AUlliORITY
NEW YORK POWER AUlliORITY                             {
{
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                         I PLANT REFERENCED SIMULATION FACILITY l
JAMES A. FITZPATRICK NUCLEAR POWER PLANT I
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE                                     TEST TITIE         SCEEDUI2 MALTUNCTION   RD018:A-H     SDV Vent or Drain Valves Fail Closed     Year 3 TEST MALFUNCTION   RD03:A,B     CRD Flow Control Valve Failure           Year 3 TEST
PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE TEST TITIE SCEEDUI2 MALTUNCTION RD018:A-H SDV Vent or Drain Valves Fail Closed Year 3 TEST MALFUNCTION RD03:A,B CRD Flow Control Valve Failure Year 3 TEST MALFUNCTION RD04:A,B CRD Drive Water Filter Clogging Year 3 TEST MALFUNCTION RDOS:A,B CRD Stabilizing Valves Fail Closed Year 3 TEST MALFUNCTION RD06:A,B CRD Fydraulic Pump Trip Year 3 TEST MALFUNCTION RD07:**:**
* MALFUNCTION   RD04:A,B     CRD Drive Water Filter Clogging         Year 3 TEST MALFUNCTION   RDOS:A,B     CRD Stabilizing Valves Fail Closed       Year 3 TEST MALFUNCTION   RD06:A,B     CRD Fydraulic Pump Trip                 Year 3     '
Control Rod' (XX-YY) Drift-In Year 3 TEST MALFUNCTION RDO8:**:**
TEST MALFUNCTION RD07:**:**     Control Rod' (XX-YY) Drift-In           Year 3 TEST MALFUNCTION RDO8:**:**     Control Rod (XX-YY) Drift-out           Year 3 TEST MALFUNCTION RD09:**:**     Control Rod (XX-YY) Accumulator Trouble Year 4 TEST                                                                           l i
Control Rod (XX-YY) Drift-out Year 3 TEST MALFUNCTION RD09:**:**
MALFUNCTION RD10:**:**     Control Rod (XX-YY) Blade Stuck         Year 3
Control Rod (XX-YY) Accumulator Trouble Year 4 TEST i
                                                                                        ]
]
TEST                                                                           '
MALFUNCTION RD10:**:**
MALFUNCTION RD11:**:**     Control Rod (XX-YY) Uncoupled           Year 3 TEST MALFUNCTION RD12:**:**     Control Rod (XX-YY) Scrammed             Year 3 TEST MALFUNCTION RD13:**:**     Control Rod (XX-YY) Fail to scram       Year 3         ,
Control Rod (XX-YY) Blade Stuck Year 3 TEST MALFUNCTION RD11:**:**
TEST                                                                           '
Control Rod (XX-YY) Uncoupled Year 3 TEST MALFUNCTION RD12:**:**
MALTUNCTION RD14:**:**     Control Rod (XX-YY) RPIS Failure         Year 3 TEST
Control Rod (XX-YY) Scrammed Year 3 TEST MALFUNCTION RD13:**:**
                                                                                        )
Control Rod (XX-YY) Fail to scram Year 3 TEST MALTUNCTION RD14:**:**
MALFUNCTION     RD15       Rod Drive Control System Timer Fail     Year 4       i TEST                                                                           j l
Control Rod (XX-YY) RPIS Failure Year 3 TEST MALFUNCTION RD15 Rod Drive Control System Timer Fail Year 4 i
MALFUNCTION     RD16       Rod Position Info System Total Failure   Year 3 l
TEST j
TEST                                                                           '
MALFUNCTION RD16 Rod Position Info System Total Failure Year 3 l
l                                                                                       '
TEST l
l MALFUNCTION RD17 : * * : ' Control Rod (XX-YY) High Temperature     Year 3 TEST MALFUNCTION   RD18:A,B     Scram Discharge Volume Rupture (non-     Year 4 TEST                   recoverable) l Rev. 1 Tab 3-16
l MALFUNCTION RD17 : * * : '
Control Rod (XX-YY) High Temperature Year 3 TEST MALFUNCTION RD18:A,B Scram Discharge Volume Rupture (non-Year 4 TEST recoverable) l Rev. 1 Tab 3-16


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE                                 TEST TITLE                 SCIEDUKE MALFUNCTION   RD19 A,B CRD Suction Filter Hi Delta-Pressure           Year 4 TEST HALTUNCTION RD20:**:**   Line Break CRD HCU (XX-YY) (non-recoverable) Year 4 TEST MALFUNCTION RD21:**:** Leaking Control Rod withdraw SOV               Year 4 TEST MALFUNCTION   -RD22   Scram Discharge Volume Hydraulic Lock         Yeler 1 TEST MALFUNCTION   RH01 A-D   RHR Pump Trip                                 Year 3 TEST MALFUNCTION   RH03:A,B RHR Heat Exchange Tube Leak (non-recoverable) Year 4 TEST MALFUNCTION   RH04A:A,B LPCI Injection Valve Fails closed             Year 3 TEST MALFUNCTION   RH04B:A,B LPCI Injection Valve Fails open               Year 3 TEST MALFUNCTION   RHOS:A-D   RHR Pump Discharge Leak (non-recoverable)     Year 3 TEST MALFUNCTION     RH06   RHR/SDC Valve 10MOV-18 Fails                   Year 3 TEST MALFUNCTION     RH07   RHR/SDC Valve 10MOV-17 Fails                   Year 3 TEST MALFUNCTION   RH08:A-D   RHR Pump SDC Suction Valve Fails Closed       Year 3 TEST MALFUNCTION   RH09:A,B   LPCI - Injection Line Failure (non-           Year 3 TEST                 recoverable)
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITLE SCIEDUKE MALFUNCTION RD19 A,B CRD Suction Filter Hi Delta-Pressure Year 4 TEST HALTUNCTION RD20:**:**
MALFUNCTION   RH10:A,B   RHR Loop Suction Line Piping Failure           Year 4 TEST MALFUNCTION     RH14   LPCI Failure to Auto Initiate                 Year 3 TEST MALFUNCTION     RH15   RHR/SDC Valve 10MOV-17(18) Auto Isolation     Year 1 TEST                 Failure
Line Break CRD HCU (XX-YY) (non-recoverable)
                                                =
Year 4 TEST MALFUNCTION RD21:**:**
Leaking Control Rod withdraw SOV Year 4 TEST MALFUNCTION
-RD22 Scram Discharge Volume Hydraulic Lock Yeler 1 TEST MALFUNCTION RH01 A-D RHR Pump Trip Year 3 TEST MALFUNCTION RH03:A,B RHR Heat Exchange Tube Leak (non-recoverable)
Year 4 TEST MALFUNCTION RH04A:A,B LPCI Injection Valve Fails closed Year 3 TEST MALFUNCTION RH04B:A,B LPCI Injection Valve Fails open Year 3 TEST MALFUNCTION RHOS:A-D RHR Pump Discharge Leak (non-recoverable)
Year 3 TEST MALFUNCTION RH06 RHR/SDC Valve 10MOV-18 Fails Year 3 TEST MALFUNCTION RH07 RHR/SDC Valve 10MOV-17 Fails Year 3 TEST MALFUNCTION RH08:A-D RHR Pump SDC Suction Valve Fails Closed Year 3 TEST MALFUNCTION RH09:A,B LPCI - Injection Line Failure (non-Year 3 TEST recoverable)
MALFUNCTION RH10:A,B RHR Loop Suction Line Piping Failure Year 4 TEST MALFUNCTION RH14 LPCI Failure to Auto Initiate Year 3 TEST MALFUNCTION RH15 RHR/SDC Valve 10MOV-17(18) Auto Isolation Year 1 TEST Failure
=
l
l
  "*I Tab 3-17
"*I Tab 3-17


b NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST Tf35                                 TEST TITLE             3CMEDUIE MALFUNCTION     RH16     RHR Pump Motor Winding Temperatures High Year 3 TEST MALFUNCTION   RM01A:1-5   Process Rad Mon Failure                   Year 3 TEST ltALFUNCTION RM018:1-4   Process Rad Mon Failure                   Year 3 TEST MALFUNCTION   RM01C1-7   Process Rad Fon Failure                   Year 3 TEST MALFUNCTION   RM01D 1-8   Process Rad Mon Failure                   Year 3 TEST MALFUNCTION   RM01E:1-7   Process Rad Mon Failure                   Year 3 TEST MALFUNCTION RM02A:1-10 ARM Failure                               Year 3 TEST j
b NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST Tf35 TEST TITLE 3CMEDUIE MALFUNCTION RH16 RHR Pump Motor Winding Temperatures High Year 3 TEST MALFUNCTION RM01A:1-5 Process Rad Mon Failure Year 3 TEST ltALFUNCTION RM018:1-4 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM01C1-7 Process Rad Fon Failure Year 3 TEST MALFUNCTION RM01D 1-8 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM01E:1-7 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM02A:1-10 ARM Failure Year 3 TEST j
MALFUNCTION RM02B:11-20 ARM Failure                                 Year 3     l TEST                                                                     l MALFUNCTION RM02C:21-30 ARM Failure                                 Year 3 TEST MALFUNCTION     RP01A     RPS Auto Scram Failure                   Year 3 TEST MALFUNCTION     RP01B     RPS Manual Scram Failure                 Year 3 TEST MALFUNCTION     RP02     Inadvertent Reactor Scram                 Year 3 TEST MALFUNCTION     RP03     Inadvertent Group I Isolation             Year 3 TEST MALFUNCTION     RPO4     Inadvertent Group II Isolation           Year 3 TEST MALFUNCTION   RPOS:A,B   RPS M-G Set Trip                         Year 3 TEST MALFUNCTICN   RP06:A,B   RPS Electrical Protection Assembly Trip   Year 3 TEST MALFUNCTION   RP07:A-D   Control Rod Group Fail to Scram           Year 3 TEST Rev. 1 Tab 3-18
MALFUNCTION RM02B:11-20 ARM Failure Year 3 TEST l
MALFUNCTION RM02C:21-30 ARM Failure Year 3 TEST MALFUNCTION RP01A RPS Auto Scram Failure Year 3 TEST MALFUNCTION RP01B RPS Manual Scram Failure Year 3 TEST MALFUNCTION RP02 Inadvertent Reactor Scram Year 3 TEST MALFUNCTION RP03 Inadvertent Group I Isolation Year 3 TEST MALFUNCTION RPO4 Inadvertent Group II Isolation Year 3 TEST MALFUNCTION RPOS:A,B RPS M-G Set Trip Year 3 TEST MALFUNCTICN RP06:A,B RPS Electrical Protection Assembly Trip Year 3 TEST MALFUNCTION RP07:A-D Control Rod Group Fail to Scram Year 3 TEST Rev. 1 Tab 3-18


NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY l
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 l
FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTFE                               TEST TITLE                 SCEEDU12 MALFUNCTION RP08:A-D   Control Rod Group (1,2,3,4) Scram               Year 4 TEST MALFUNCTION   RP09   ARI rails to Actuate                             Year 4 TEST MALFUNCTION   RP10     PCIS Group III Low Rx Water Lvl Isolation       Year 1 TEST               Failure MALFUNCTION   RP11     PCIS Group II Isolation Failure                 Year 1 TEST MALFUNCTION   RP12     PCIS Group I Inboard (Outboard) MSIV Isolation Year 1 TEST               Failure                                                   !
TEST TTFE TEST TITLE SCEEDU12 MALFUNCTION RP08:A-D Control Rod Group (1,2,3,4) Scram Year 4 TEST MALFUNCTION RP09 ARI rails to Actuate Year 4 TEST MALFUNCTION RP10 PCIS Group III Low Rx Water Lvl Isolation Year 1 TEST Failure MALFUNCTION RP11 PCIS Group II Isolation Failure Year 1 TEST MALFUNCTION RP12 PCIS Group I Inboard (Outboard) MSIV Isolation Year 1 TEST Failure MALFUNCTION RP13 PCIS Group I Isolation Failure Year 1 TEST MM. FUNCTION RR01:A,B RWR Pump / Gen Field Breaker Trip Year 4 TEST MALFUNCTION RR02:A,B RWR Pump Control Signal Failure Scoop Tube Year 4 TEST Lock MALFUNCTION RR03:A,B RWR Pump Incomplete Start Sequence Year 4
MALFUNCTION   RP13     PCIS Group I Isolation Failure                 Year 1 TEST MM. FUNCTION RR01:A,B   RWR Pump / Gen Field Breaker Trip               Year 4 TEST MALFUNCTION RR02:A,B   RWR Pump Control Signal Failure Scoop Tube     Year 4 TEST               Lock MALFUNCTION RR03:A,B RWR Pump Incomplete Start Sequence               Year 4     )
)
TEST MALFUNCTION RR04:A,B   RWR Pump fl Seal Failure (non-recoverable)     Year 4 TEST                                                                           ,
TEST MALFUNCTION RR04:A,B RWR Pump fl Seal Failure (non-recoverable)
g MALFUNCTION   RR05:A,B RWR Pump #2 Seal Failure (non-recoverable)       Year 1     )
Year 4 TEST g
TEST MALTUNCTION   RR07:A-H RWR Loop Flow Transmitter rails                 Year 4     )
MALFUNCTION RR05:A,B RWR Pump #2 Seal Failure (non-recoverable)
TEST                                                                           1 MALFUNCTION   RR08:A-T Jet Pump Failure (non-recoverable)               Year 4 TEST MALFUNCTION RR10:A,B   RWR System MG Flow Controller Failure           Year 4     l TEST                                                                           l I
Year 1
    .                                                                                  l MALFUNCTION   RRll:A,B RWR Pump Shaft Binding                           Year 4     j TEST                                                                           I MALFUNCTION   RR12:A,B RWR Pump Drive Motor Breaker Trip               Year 4 TEST                                                                           l l
)
Rev. 1 Tab 3-19
TEST MALTUNCTION RR07:A-H RWR Loop Flow Transmitter rails Year 4
                                                                                      ]
)
TEST 1
MALFUNCTION RR08:A-T Jet Pump Failure (non-recoverable)
Year 4 TEST MALFUNCTION RR10:A,B RWR System MG Flow Controller Failure Year 4 l
TEST l
I l
MALFUNCTION RRll:A,B RWR Pump Shaft Binding Year 4 j
TEST I
MALFUNCTION RR12:A,B RWR Pump Drive Motor Breaker Trip Year 4 TEST l
l Rev. 1 Tab 3-19
]


NEW YORK POWER AITriiORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE                               TEST TITIE                 SCIEDUI2 MALFUNCTION RR13;A-C   ATWS System Fails to Initiate RWR Pump Trip     Year 4 TEST MALFUNCTION RR14:A,B   RWR Loop Rupture (DBA) (non-recoverable)       Year 4 TEST MALFUNCTION RR15:A,B   RWR Coolant Leakage Inside Primary Containment Year 4 TEST MALFUNCTION RR16:A,B   Reactor Vessel Wide Range Level Transmitter     Year 4 TEST               Fails                                                     1 MALFUNCTION RR17:A,B   Reactor Vessel Fuel Zone Level Failure         Year 4 TEST MALFUNCTION   RR18     Refuel Water Level Indicator Fails             Year 4 TEST MALFUNCTION RR19:A-D   Rx Vessel Lvl Transmitter To FW Lvl Control     Year 4 TEST l
NEW YORK POWER AITriiORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITIE SCIEDUI2 MALFUNCTION RR13;A-C ATWS System Fails to Initiate RWR Pump Trip Year 4 TEST MALFUNCTION RR14:A,B RWR Loop Rupture (DBA) (non-recoverable)
MALFUNCTION RR20:A,B   Loss Pressure Compensation to Feedwater         Year 4     l TEST               Control MALFUNCTION RR21:A-D   Loss of Pressure Compensation to Feedwater     Year 4 TEST MALFUNCTION   RR22     Reactor Vessel Scram Level Transmitter Failure Year 4 TEST I
Year 4 TEST MALFUNCTION RR15:A,B RWR Coolant Leakage Inside Primary Containment Year 4 TEST MALFUNCTION RR16:A,B Reactor Vessel Wide Range Level Transmitter Year 4 TEST Fails 1
MALFUNCTION RR23:A-D   RFA Flow Unit Failure                           Year 4     j TEST                                                                           1 MALFUNCTION RR24:A-D   Jet Pum), Summer Failure                       Year 4     j TEST l
MALFUNCTION RR17:A,B Reactor Vessel Fuel Zone Level Failure Year 4 TEST MALFUNCTION RR18 Refuel Water Level Indicator Fails Year 4 TEST MALFUNCTION RR19:A-D Rx Vessel Lvl Transmitter To FW Lvl Control Year 4 TEST l
MALFUNCTION RR25:A,B   Core Sp;ay Pipe Break Inside Downcomer         Year 4 TEST                                                                           l l
MALFUNCTION RR20:A,B Loss Pressure Compensation to Feedwater Year 4 l
MALFUNCTION   RR26     Unexplained Reactivity Change (non-             Year 4     I TEST               recoverable)
TEST Control MALFUNCTION RR21:A-D Loss of Pressure Compensation to Feedwater Year 4 TEST MALFUNCTION RR22 Reactor Vessel Scram Level Transmitter Failure Year 4 TEST I
MALFUNCTION RR27:A,B   Rx Level Narrow Range Reference Leg De-Gassing Year 4     j TEST                                                                           {
MALFUNCTION RR23:A-D RFA Flow Unit Failure Year 4 j
MALFUNCTION   RR28     Rx Level Narrow Range Reference Legs Severe     Year 4 TEST MALFUNCTION   RR29     Reactor Vessel NR Lvl Transmitter Fails         Year 1     i TEST Rev. 1 Tab 3-20
TEST 1
MALFUNCTION RR24:A-D Jet Pum), Summer Failure Year 4 j
TEST l
MALFUNCTION RR25:A,B Core Sp;ay Pipe Break Inside Downcomer Year 4 TEST l
l MALFUNCTION RR26 Unexplained Reactivity Change (non-Year 4 I
TEST recoverable)
MALFUNCTION RR27:A,B Rx Level Narrow Range Reference Leg De-Gassing Year 4 j
TEST
{
MALFUNCTION RR28 Rx Level Narrow Range Reference Legs Severe Year 4 TEST MALFUNCTION RR29 Reactor Vessel NR Lvl Transmitter Fails Year 1 i
TEST Rev. 1 Tab 3-20


n NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2M2 TEST TTBE                                 TEST TITIE               SCIEDUIE MALFUNCTION   RR30     RWR MG Set Drive Motor Breaker Trip Failure Year 1 TEST MALFUNCTION   RR31     Reactor Vessel Wide Range Level Transmitter Year 1 TEST                 Fails MALFUNCTION   RWOl     Rod Worth Minimizer Failure                 Year 4       j TEST                                                                           '
n NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2M2 TEST TTBE TEST TITIE SCIEDUIE MALFUNCTION RR30 RWR MG Set Drive Motor Breaker Trip Failure Year 1 TEST MALFUNCTION RR31 Reactor Vessel Wide Range Level Transmitter Year 1 TEST Fails MALFUNCTION RWOl Rod Worth Minimizer Failure Year 4 j
MALFUNCTION   RX01     Fuel Cladding Failure                       Year 1 TEST MALFUNCTION RXO2:XX:YY   Increased Rod Worth (XX-YY)                 Year 4 TEST MALFUNCTION   RXO3     Core Thermal Hydraulic Instability           Year 4       )
TEST MALFUNCTION RX01 Fuel Cladding Failure Year 1 TEST MALFUNCTION RXO2:XX:YY Increased Rod Worth (XX-YY)
Year 4 TEST MALFUNCTION RXO3 Core Thermal Hydraulic Instability Year 4
)
TEST
TEST
                                                                                        )
)
i MALFUNCTION SLOl:A,B   Standby Liquid Control Pump Breaker Trip     Year 4 l
i MALFUNCTION SLOl:A,B Standby Liquid Control Pump Breaker Trip Year 4 TEST MALFUNCTION SLO 2:A,B Standby Liquid Control Squib Valve Fails to Year 4 TEST Open MALFUNCTION SLO 3:A,B SLC Pump Relief Valve Lifts Year 4 TEST MALFUNCTION SLO 4 Standby Liquid Control Squib Valve Loss of Year 4 TEST Continuity MALFUNCTION SWOl:A,B Loss of RBCLC Flow to RWR Year 4 TEST MALFUNCTION SWO2A-C TBCLC Hx Cooling Water Blockage Year 4 TEST MALFUNCTION SWO3:A-C RBCLC Hx Cooling Water Blockage Year 4 TEST MALFUNCTION SWO4:A-D RHR Service Water Pump Trip Year 4 TEST MALFUNCTION SWO5:A-C Service Water Pump Trip Year 4 TEST i
TEST MALFUNCTION SLO 2:A,B   Standby Liquid Control Squib Valve Fails to Year 4 TEST                 Open MALFUNCTION SLO 3:A,B   SLC Pump Relief Valve Lifts                 Year 4 TEST MALFUNCTION   SLO 4     Standby Liquid Control Squib Valve Loss of   Year 4 TEST                 Continuity MALFUNCTION SWOl:A,B   Loss of RBCLC Flow to RWR                   Year 4 TEST MALFUNCTION SWO2A-C     TBCLC Hx Cooling Water Blockage             Year 4 TEST MALFUNCTION SWO3:A-C   RBCLC Hx Cooling Water Blockage             Year 4 TEST MALFUNCTION SWO4:A-D   RHR Service Water Pump Trip                 Year 4 TEST MALFUNCTION SWO5:A-C   Service Water Pump Trip                     Year 4 TEST i   MALFUNCTION SWO6:A,B   RHR Hx Cooling Water Blockage               Year 4 TEST Rev. 1 Tab 3-21
MALFUNCTION SWO6:A,B RHR Hx Cooling Water Blockage Year 4 TEST Rev. 1 Tab 3-21


m NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TrWE                                 TEST TITLE           SCEEDULE
m NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TrWE TEST TITLE SCEEDULE MALFUNCTION SWO7:A-C TBCLC Pump Trip Year
                                                                                    ~
~
MALFUNCTION SWO7:A-C   TBCLC Pump Trip                             Year TEST MALFUNCTION SWO8:A-C   TBCLC Hx Tube Leak (non-recoverable)       Year 4 TEST MALFUNCTION SWO9:A-C   RBCLC Pump Trip                             Year 4 TEST MALFUNCTION SW10:A-C   RBCLC Hx Tube Leak (non-recoverable)       Year 4 TEST MALFUNCTION   SWil     RBCLC Leakage in Drywell (non-recoverable) Year 4 TEST MALFUNCTION SW12:A,B   Loss of Drywell Cooling Assemblies         Year 4 TEST l
TEST MALFUNCTION SWO8:A-C TBCLC Hx Tube Leak (non-recoverable)
l MALFUNCTION   SW13     Loss of Cooling to RWCU NRHX               Year 4 TEST l
Year 4 TEST MALFUNCTION SWO9:A-C RBCLC Pump Trip Year 4 TEST MALFUNCTION SW10:A-C RBCLC Hx Tube Leak (non-recoverable)
MALFUNCTION SW14:A,B   Emergency Service Water Pump Trip           Year 4 TEST l
Year 4 TEST MALFUNCTION SWil RBCLC Leakage in Drywell (non-recoverable)
MALFUNCTION   SW15     Service Water Pump A Auto Start Failure     Year 1     ;
Year 4 TEST MALFUNCTION SW12:A,B Loss of Drywell Cooling Assemblies Year 4 TEST MALFUNCTION SW13 Loss of Cooling to RWCU NRHX Year 4 TEST l
TEST MALFUNCTION   SW16   TBCLC Pmp A Auto Start Failure               Year 1 TEST MALFUNCTION   SW17     RBCLC Pmp A Auco Start Failure             Year 1 TEST MALFUNCTION   SW18     ESW Pmp A(B) Auto Start Failure             Year 1 TEST MALFUNCTION   TC01   Main Turbine Acceleration                   Year 4 TEST MALFUNCTION TCO2:A,B   EHC Pump Trip                               Year 4 TF.ST MALFUNCTION   TCO3     EHC Pump Press Reg Fails                   Year 4 TEST l
MALFUNCTION SW14:A,B Emergency Service Water Pump Trip Year 4 TEST MALFUNCTION SW15 Service Water Pump A Auto Start Failure Year 1 TEST MALFUNCTION SW16 TBCLC Pmp A Auto Start Failure Year 1 TEST MALFUNCTION SW17 RBCLC Pmp A Auco Start Failure Year 1 TEST MALFUNCTION SW18 ESW Pmp A(B) Auto Start Failure Year 1 TEST MALFUNCTION TC01 Main Turbine Acceleration Year 4 TEST MALFUNCTION TCO2:A,B EHC Pump Trip Year 4 TF.ST MALFUNCTION TCO3 EHC Pump Press Reg Fails Year 4 TEST l
MALFUNCTION   TC04     Bypass Valve Failure                       Year 4 TEST MALFUNCTION   TC05   Main Turbine Load Select Failure             Year 4 TEST l
MALFUNCTION TC04 Bypass Valve Failure Year 4 TEST MALFUNCTION TC05 Main Turbine Load Select Failure Year 4 TEST l
Rev. 1 Tab 3-22 C__
Rev. 1 Tab 3-22 C


NEW YORK POWER AUTHORITY JAMES A. FTTZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TY35                                 TEST TITLE             SCHEDULE MALFUNCTION TC07:A,B   EHC System Regulator Oscillation             Year 4 TEST MALFUNCTION   TC08     Turbine Control Valve Failure               Year 4 TEST MALFUNCTION   TC09     Turbine Stop Valve Failure                   Year 4 TEST MALFUNCTION   TC10     Turbine Load Reject                         Year 4     ]
NEW YORK POWER AUTHORITY JAMES A. FTTZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TY35 TEST TITLE SCHEDULE MALFUNCTION TC07:A,B EHC System Regulator Oscillation Year 4 TEST MALFUNCTION TC08 Turbine Control Valve Failure Year 4 TEST MALFUNCTION TC09 Turbine Stop Valve Failure Year 4 TEST MALFUNCTION TC10 Turbine Load Reject Year 4
TEST                                                                         l MALFUNCTION   TCll     Main Turbine Auto Trip Failure               Year 1 TEST MALFUNCTION   TUOl     Inadvertent Turbine Trip                     Year 4     '
]
TEST MALFUNCTION TUO2:A-J   Main Turbine Bearing High Temp               Year 4 TEST                                                                         l l
TEST MALFUNCTION TCll Main Turbine Auto Trip Failure Year 1 TEST MALFUNCTION TUOl Inadvertent Turbine Trip Year 4 TEST MALFUNCTION TUO2:A-J Main Turbine Bearing High Temp Year 4 TEST l
MALFUNCTION   TUO3     Main Turbine Bearing 011 Pressure Low         Year 4     l TEST MALFUNCTION TUO4:A-J   Main Turbine Bearing High Vibration           Year 4 TEST MALFUNCTION   TUO5     Main Turbine Shaft Driven Oil Pump Failure   Year 4     j TEST l
l MALFUNCTION TUO3 Main Turbine Bearing 011 Pressure Low Year 4 l
MALFUNCTION   TUO6     Turbine Motor Suction Pump Trip               Year 4     l TEST MALFUNCTION   TUO7     Turbine Emergency Bearing Oil Pump Trip     Year 4     j TEST                                                                       i MALFUNCTION   TUO8     Exhaust Hood Spray Valve Failure             Year 4     ,
TEST MALFUNCTION TUO4:A-J Main Turbine Bearing High Vibration Year 4 TEST MALFUNCTION TUO5 Main Turbine Shaft Driven Oil Pump Failure Year 4 j
TEST                                                                       I MALFUNCTION   YC01     EPIC Fails                                   Year 4 TEST NOP     OP-65     Plant Startup (including applicable PAP's) Year 4*
TEST l
l NOP     OP-65     Plant Shutdown (including applicable RAP's) Year 4*
MALFUNCTION TUO6 Turbine Motor Suction Pump Trip Year 4 l
NOP     ST-OlB   MSIV Fast Closure and Main Steam Line Drain Year 4*     ;
TEST MALFUNCTION TUO7 Turbine Emergency Bearing Oil Pump Trip Year 4 j
Isolation Valve Test (IST)                             l l
TEST i
MALFUNCTION TUO8 Exhaust Hood Spray Valve Failure Year 4 TEST I
MALFUNCTION YC01 EPIC Fails Year 4 TEST NOP OP-65 Plant Startup (including applicable PAP's)
Year 4*
l NOP OP-65 Plant Shutdown (including applicable RAP's)
Year 4*
NOP ST-OlB MSIV Fast Closure and Main Steam Line Drain Year 4*
Isolation Valve Test (IST) l l
Rev. 1 Tab 3-23
Rev. 1 Tab 3-23


NEW YORK FOWER AUlilORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tast Tryn                                 Tust TITLs               scunncIm NOP     ST-Olt     Main Turbine stop Valves Limit Switch         Year 4-Instrument Functional Test NOP     ST-OlG   Main Steam Radiation Monitor (17RM-251A, B, C Year 4*
NEW YORK FOWER AUlilORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tast Tryn Tust TITLs scunncIm NOP ST-Olt Main Turbine stop Valves Limit Switch Year 4-Instrument Functional Test NOP ST-OlG Main Steam Radiation Monitor (17RM-251A, B,
and D) Functional Test NOP     ST-OlI   Kain Steam Isolation Valves Limit Switch       Year 4*
C Year 4*
Instrument Functional Test NOP     ST-OlK   Main Steam Line Isolation Valves, Main Steam   Year 4*
and D) Functional Test NOP ST-OlI Kain Steam Isolation Valves Limit Switch Year 4*
Crain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP     ST-OlL   Main Turbine Control Valve Instrument Channel   Year 4*
Instrument Functional Test NOP ST-OlK Main Steam Line Isolation Valves, Main Steam Year 4*
and Valve Operability Check                               l NOP     ST-Ols     Shutdown Cooling Containment Isolation Valve   Year 4*
Crain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP ST-OlL Main Turbine Control Valve Instrument Channel Year 4*
Testing (IST)                                               ;
and Valve Operability Check l
i NOP   ST-02AN     RHR Loop A Pump and MOV Operability and LPCI   Year 4*
NOP ST-Ols Shutdown Cooling Containment Isolation Valve Year 4*
Keep-Full Level Switch Functional Test NOP   ST-02A0     RHR Loop B Pump and MOV Operability and LPCI   Year 4*
Testing (IST) i NOP ST-02AN RHR Loop A Pump and MOV Operability and LPCI Year 4*
Keep-Full Level Switch Functional Test NOP     ST-02J   One RHR Service Water Pump or One Containment   Year 4*
Keep-Full Level Switch Functional Test NOP ST-02A0 RHR Loop B Pump and MOV Operability and LPCI Year 4*
Cooling Subsystea Inoperable Test                           ,
Keep-Full Level Switch Functional Test NOP ST-02J One RHR Service Water Pump or One Containment Year 4*
l NOP     ST-02N     LPCI Mode Inoperable Test                     Year 4*
Cooling Subsystea Inoperable Test NOP ST-02N LPCI Mode Inoperable Test Year 4*
NOP   ST-02RA     RHR SW Loop A Monthly Operability Test       Year 4*     !
NOP ST-02RA RHR SW Loop A Monthly Operability Test Year 4*
l NOP   ST-02RB     RHR SW Loop B Monthly operability Test       Year 4*
NOP ST-02RB RHR SW Loop B Monthly operability Test Year 4*
NOP     ST-02T     LPCI Cross Connect Position Functional Test   Year 4*
NOP ST-02T LPCI Cross Connect Position Functional Test Year 4*
NOP     ST-02Y     RHR Heat Exchanger Performance Test           Year 4*
NOP ST-02Y RHR Heat Exchanger Performance Test Year 4*
NOP   ST-03PA   Core Spray Loop A Quarterly Operability Test   Year 4*
NOP ST-03PA Core Spray Loop A Quarterly Operability Test Year 4*
NOP   ST-03PB   Core Spray Loop B Quarterly Operability Test   Year 4*
NOP ST-03PB Core Spray Loop B Quarterly Operability Test Year 4*
NOP     ST-04B   HPCI Pump and MOV Operability Test             Year 4*
NOP ST-04B HPCI Pump and MOV Operability Test Year 4*
NOP   ST-04K     HPCI Turb Slow Roll & Overspeed Test           Year 4*
NOP ST-04K HPCI Turb Slow Roll & Overspeed Test Year 4*
NOP     ST-04L   HPCI Class 2 Piping Functional Test (ISI)       Year 4*
NOP ST-04L HPCI Class 2 Piping Functional Test (ISI)
NOP     ST-04M   HPCI Torus Suction Operability Test (IST)       Year 4*
Year 4*
NOP ST-04M HPCI Torus Suction Operability Test (IST)
Year 4*
Rev. 1 Tab 3-24
Rev. 1 Tab 3-24


NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 199's-2002 TEST TTWE                               TEST TITLE                 SCMEDUIA NOP     ST-04N     HPCI Flow Rate and Inservice Test (IST)       Year 4*
NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 199's-2002 TEST TTWE TEST TITLE SCMEDUIA NOP ST-04N HPCI Flow Rate and Inservice Test (IST)
NOP     ST-05B   APRM Instrument Functional Test (Run Mode)     Year 4*
Year 4*
NOP     ST-05C     IRM-APRM Instrument Range Overlap Check       Year 4*
NOP ST-05B APRM Instrument Functional Test (Run Mode)
NOP     ST-05D   APRM Calibration
Year 4*
NOP ST-05C IRM-APRM Instrument Range Overlap Check Year 4*
NOP ST-05D APRM Calibration
* Year 4*
* Year 4*
NOP     ST-05E   Core Performance Daily Surveillance           Year 4*
NOP ST-05E Core Performance Daily Surveillance Year 4*
NOP     ST-05N   APRM Instrument Functional Test (Refuel,       Year 4*
NOP ST-05N APRM Instrument Functional Test (Refuel, Year 4*
Startup, or Shutdown Mode)
Startup, or Shutdown Mode)
NOP     ST-050   SRM Functional Test                           Year 4*
NOP ST-050 SRM Functional Test Year 4*
NOP     ST-OSP   Source Range Channel checks                   Year 4*
NOP ST-OSP Source Range Channel checks Year 4*
NOP     ST-05Q   APRM Flow Bias Functional Test (Run Mode)     Year 4*
NOP ST-05Q APRM Flow Bias Functional Test (Run Mode)
NOP     ST-05R   RBM Upscale and Downscale Instrument           Year 4*
Year 4*
Functional Test NOP     ST-08C   ESW Motor Operated valves Operability Test     Year 4*
NOP ST-05R RBM Upscale and Downscale Instrument Year 4*
l NOP     ST-08N   F.SW Pump Inservice Test (IST)                 Year 4*
Functional Test NOP ST-08C ESW Motor Operated valves Operability Test Year 4*
NOP   ST-09BA   EDG A & C Full Load Test & ESW Pump           Year 4*     i operability Test NOP   ST-09BB   EDG B & D Full Load Test & ESW Pump           Year 4*
NOP ST-08N F.SW Pump Inservice Test (IST)
Operability Test NOP   ST-09C     Emergency AC Power Load Sequencing Test and 4 Year 4*
Year 4*
KV Emergency Power System Voltage Relays Instrument Functional Test                               j l
NOP ST-09BA EDG A & C Full Load Test & ESW Pump Year 4*
1 NOP   ST-09D     EDG, ll5KV Reserve Power, Station Battery, or Year 4*
i operability Test NOP ST-09BB EDG B & D Full Load Test & ESW Pump Year 4*
ESW Pump Inoperable Test NOP   ST-10A     Off-Gas Line Isolation Logic Sys Functional   Year 4*     i Test NOP   ST-10B     Off-Gas System Automatic Isolation and Closure Year 4*     l Test NOP     ST-ll     off-Gas Process Rad Monitor Instrument         Year 4*
Operability Test NOP ST-09C Emergency AC Power Load Sequencing Test and 4 Year 4*
Functional Test NOP   ST-12I     Liq Radwaste Eff Mon Instr & Iso Logic Sys     Year 4*
KV Emergency Power System Voltage Relays Instrument Functional Test j
1 NOP ST-09D EDG, ll5KV Reserve Power, Station Battery, or Year 4*
ESW Pump Inoperable Test NOP ST-10A Off-Gas Line Isolation Logic Sys Functional Year 4*
i Test NOP ST-10B Off-Gas System Automatic Isolation and Closure Year 4*
Test NOP ST-ll off-Gas Process Rad Monitor Instrument Year 4*
Functional Test NOP ST-12I Liq Radwaste Eff Mon Instr & Iso Logic Sys Year 4*
Functional Test Rev. 1 Tab 3-25
Functional Test Rev. 1 Tab 3-25


NEW YORK POWER AUTHORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TTWB                               TEST TITIE                 SCEMMER NOP     ST-12K   Main CR ventilation Rad Monitor Instruseent     Year 4*
NEW YORK POWER AUTHORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TTWB TEST TITIE SCEMMER NOP ST-12K Main CR ventilation Rad Monitor Instruseent Year 4*
channel Functional Test                                     '
channel Functional Test NOP ST-13A Stack Gas Rad Mon It Channel Functional Year 4*
NOP     ST-13A   Stack Gas Rad Mon It     Channel Functional     Year 4*     -
Test i
Test i
NOP     ST-18   Mn Cntrl Rm Emergency ran and Damper           Year 4*
NOP ST-18 Mn Cntrl Rm Emergency ran and Damper Year 4*
Operability Test NOP     ST-20A   Rod Worth Minimizer Functional Test           Year 4*
Operability Test NOP ST-20A Rod Worth Minimizer Functional Test Year 4*
NOP     ST-20C   Control Rod operability and HCU Cooling Water   Year 4*       L Supply Check "alve Reverse Flow Check (IST)
NOP ST-20C Control Rod operability and HCU Cooling Water Year 4*
NOP     ST-20K   Pre-Control Rod Withdrawal Checklist           Year 4*
L Supply Check "alve Reverse Flow Check (IST)
NOP     ST-20M   Scram Discharge Volume Vent and Drain valves   Year 4*
NOP ST-20K Pre-Control Rod Withdrawal Checklist Year 4*
NOP ST-20M Scram Discharge Volume Vent and Drain valves Year 4*
Full Stroke and Timing Test (IST)
Full Stroke and Timing Test (IST)
NOP     ST-20N   Control Rod Exercise / Timing / Stall Flow Test Year 4*
NOP ST-20N Control Rod Exercise / Timing / Stall Flow Test Year 4*
NOP     ST-21A   Main Turbine Overspeed Trip Test (Actual       Year 4*
NOP ST-21A Main Turbine Overspeed Trip Test (Actual Year 4*
Overspeed Trip Test - Valves Remain open)
Overspeed Trip Test - Valves Remain open)
NOP     ST-21C   Main Turbine combined Intermediate Va3"a Test   Year 4*       ;
NOP ST-21C Main Turbine combined Intermediate Va3"a Test Year 4*
NOP     ST-21E   Main Turbine Backup Overspeed Trip System Test Year 4*
NOP ST-21E Main Turbine Backup Overspeed Trip System Test Year 4*
(Actual Overspeed)
(Actual Overspeed)
NOP     ST-21F   Main Turbine Overspeed Trip Device and         Year 4*
NOP ST-21F Main Turbine Overspeed Trip Device and Year 4*
Mechanical Trip valve Test NOP     ST-21I   Main Turbine Thrust Bearing Wear Detector       Year 4*
Mechanical Trip valve Test NOP ST-21I Main Turbine Thrust Bearing Wear Detector Year 4*
Test
Test
* NOP     ST-21K   Main Turbine Overspeed Trip System Test         Year 4*
* NOP ST-21K Main Turbine Overspeed Trip System Test Year 4*
(Actual Overspeed)
(Actual Overspeed)
NOP     ST-21L   Main Turbine Mech Trip Valve & Master Trip     Year 4*
NOP ST-21L Main Turbine Mech Trip Valve & Master Trip Year 4*
Solenoid A & B N0P     ST-22B   Manual Safecy Relief Vlv Operation & Vlv       Year 4*
Solenoid A & B N0P ST-22B Manual Safecy Relief Vlv Operation & Vlv Year 4*
Monitoring Sys NOP     ST-23B   Control Rod Coupling Integrity Test             Year 4*
Monitoring Sys NOP ST-23B Control Rod Coupling Integrity Test Year 4*
NOP     ST-23C   Jet Pump Operability Test for Two Loop         Year 4*
NOP ST-23C Jet Pump Operability Test for Two Loop Year 4*
Operation (EPIC Available)
Operation (EPIC Available)
Rev. 1 Teb 3-26
Rev. 1 Teb 3-26


I NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TENE                               TEST TITLE               SCEEDUI2 NOP     ST-23D     Jet Pump Operability Test for Single Loop   Year 4*
I NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TENE TEST TITLE SCEEDUI2 NOP ST-23D Jet Pump Operability Test for Single Loop Year 4*
Operation NOP     ST-23E     Jet Pump Operability Test for Two Loop       Year 4*
Operation NOP ST-23E Jet Pump Operability Test for Two Loop Year 4*
Operation (EPIC Not Available)
Operation (EPIC Not Available)
NOP     ST-24A   RCIC Pump and MOV Operability Test           Year 4*
NOP ST-24A RCIC Pump and MOV Operability Test Year 4*
NOP     ST-24F   RCIC System Inoperable Test                   Year 4*
NOP ST-24F RCIC System Inoperable Test Year 4*
NOP     ST-24J   RCIC Flow Rate and Inservice Test (IST)       Year 4*
NOP ST-24J RCIC Flow Rate and Inservice Test (IST)
NOP     ST-24K   RCIC Torus Suction Operability Test           Year 4*
Year 4*
NOP     ST-24Q   RCIC Turb Slow Roll & Overspeed Test         Year 4*
NOP ST-24K RCIC Torus Suction Operability Test Year 4*
NOP     ST-26J   Heatup and Cooldown Temperature Checks       Year 4*
NOP ST-24Q RCIC Turb Slow Roll & Overspeed Test Year 4*
NOP     ST-26K   Recirculation Pump Start-up Differential     Year 4*
NOP ST-26J Heatup and Cooldown Temperature Checks Year 4*
Temperature Check NOP     ST-26L   Reactor Vessel Head Bolting Studs Temperature Year 4*
NOP ST-26K Recirculation Pump Start-up Differential Year 4*
Monitoring NOP     ST-27A   Recirc Loop Valve Operability Test (IST)     Year 4*
Temperature Check NOP ST-26L Reactor Vessel Head Bolting Studs Temperature Year 4*
NOP     ST-29A   Manual Scram Functional Test                 Year 4*
Monitoring NOP ST-27A Recirc Loop Valve Operability Test (IST)
NOP     ST-29B   Mode switch in Shutdown Functional Test       Year 4*
Year 4*
NOP     ST-29C   RPS Channel Test Switch Functional Test       Year 4*
NOP ST-29A Manual Scram Functional Test Year 4*
NOP     ST-40C   Computer Cut of Service Surveillance         Year 4*
NOP ST-29B Mode switch in Shutdown Functional Test Year 4*
NOP     ST-40D   Daily Sur.eillance and Instrument check       Year 4*
NOP ST-29C RPS Channel Test Switch Functional Test Year 4*
NOP     ST-40K   Periodic Pump, Valve, and Component Test     Year 4*
NOP ST-40C Computer Cut of Service Surveillance Year 4*
NOP     ST-40X   Daily Shutdown Surveillance and Instrument   Year 4*
NOP ST-40D Daily Sur.eillance and Instrument check Year 4*
Check NOP     ST-50     SRM Functional Test                           Year 4*
NOP ST-40K Periodic Pump, Valve, and Component Test Year 4*
Year 4*   NOP Tests not run during scheduled training will be performed in Year 4 Rev. 1 Tab 3-27}}
NOP ST-40X Daily Shutdown Surveillance and Instrument Year 4*
Check NOP ST-50 SRM Functional Test Year 4*
Year 4*
NOP Tests not run during scheduled training will be performed in Year 4 Rev. 1 Tab 3-27}}

Latest revision as of 20:07, 7 December 2024

Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years
ML20204F717
Person / Time
Site: FitzPatrick 
Issue date: 03/17/1999
From: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
JAFP-99-0097, JAFP-99-97, NUDOCS 9903250345
Download: ML20204F717 (67)


Text

  1. m:s & [ht2atric::

Nuclear Power Pfarit 268 Lak) Road

/

P O Box 41 -

Lycoming. New York 13093 315 342 3840

  1. > NewWrkPbwer M80%

ite exNutiv$iIeI March 17,1999 JAFP-99-OO97 United States Nuclear Regulatory Commission Director, Office of Nuclear Reactor Regulation Washington, D.C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Four Year Performance Testing Report

Dear Sir:

The New York Power Authority submits Attachment 1, James A. FitzPatrick Plant Referenced Simulation Facility Four Year Performance Testing Report, pursuant to 10 CFR 55.45(b)ii, certifying that there are no uncorrected simulator performance test failures.

The reports includes a description of the performance testing completed during the past four years and a description of the testing scheduled to be performed during the next four years.

Should you or your staff have any questions regarding this report, please contact Mr.

I James Klinger, Simulator and Training Support Supervisor, at (315) 349-6446.

Very truly yours, N

s MICHAEL J. COLOMB

{

MJC:JK:las

Attachment:

Four Year Performance Testing Report Cc:

next page l

n40151 k

9903250345 990317 PDR ADOCK 05000333 R

PDP.

a

r A'

I Cc:

D cum 2nt Contrcl Disk Unit:d Statas Nucirtr R:gul: tory Commission Mail Station P1-137 Washington, D.C. 20555 Regional Administrator United States Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector United States Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Joseph Williams, Project Manager Project Directorate 1-1 Division of Licensing Project Management United States Nuclear Regulatory Commission Mail Stop 14B2 Washington, D.C. 20555 1

i 1

l

REPORT

SUMMARY

l PERFORMANCE TESTING COMPLETED 2 PERFORMANCE TESTING PLAN 3 l

NEW. YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMUL.ATION FACILITY REPORT

SUMMARY

EasiutI:

James A. FitzPatrick Nuclear Power Plant - Docket Number 50-333 Lissangg:

New York Power Authority Location:

New York Power Authority James A. FitzPatrick Nuclear Power Plant P.O. Box 41 Lycoming, New York 13093 Performance Testina Comoleted The testing program described in the "Four Year Performance Testing Report" submitted to the commission on March 17,1995 has been completed. Performance testing has been conducted in accordance with the requirements of ANSI /ANS 3.51985. Pursuant to 10CFR55.45(bX5Xii), all test performance failures during this repon period have been corrected.

Pursuant to 10CFR55.45(bX5Xvi), a report is attached (Tab 2), describing the testing completed during this report period. The report lists each test that has been performed, grouped by test type, and includes the test number and test title. Changes to the testing program due to plant modifications, plant and simulator procedure changes, and training value assessments are annotated on the report as follows:

1) " deleted" - indicates the function and test are no longer applicable to the simulator.

The test has been permanently removed from the testing program.

2)_ " replaced"-indicates testing of the function or feature has been moved to a different test as a result of test or procedure revisions.

3) " inactivated"-indicates the function is no longer used in simulator training. The test has been flagged as inactive in the testing database and on the Instructor Station. The test will no longer be performed. The function may be reactivated in the future, after successful re-performance of the test.

NEW YORK POWER AUTHORITY j

JAMES A. FITZPATRICK NUCLEAR POWER PLANT

{

PLANT REFERENCED SIMULATION FACILITY l

REPORT SUMMAav

4) "added"-indicates additional testing performed not required by the testing plan submitted in 1995 (includes newly developed tests added to the testing program).

The simulator hardware and software platforms were upgraded during this report period. The changes involved replacing the Encore /MPX based computer platform with a Pentium/W' dows m

NT platform and porting the simulation software from the original Singer-Link executive to OpenSim NT. The upgrade acceptance testing appears in the report with other modification testing.

Discrepancies identified during performance testing have been documented and controlled in accordance with the Simulator Configuration Management Control Procedure (STP-1). Testing related discrepancy reports and all performance test results are on file and available for review in the Simulator.

Performance Testine Plan 1999-2002:

Simulator performance testing for the next four years will continue to be conducted in accordance with the requirements of ANSI /ANS 3.51985. The program to implement the testing for the next four years is the same as that used for the last four years and is described in the procedure entitled

" Simulator Test Program" (STP-3). The specific listing of tests to be perfonned is now maintained in a testing database and has been revised to reflect simulator changes implemented during the past four year period (as described in this report).

Pursuant to 10CFR55.45(b)(5)vi, a description of the tests to be performed and a testing schedule for the next four year period is attached (Tab 3).

NEW YORK POWER AUIRORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITLE CHANGES NUMBER PERFORMED NOP ST-01B MSIV Fast Closure and Main Steam Line 11-Mar-98 Drain Isolation Valve Test (IST)

NOP ST-01E Main Turbine Stop Valves Limit Switch 05-May-97 Instrument Functional Test NOP ST-01G Main Steam Radiation Monitor (17RM-251A, 03-Mar-99 B, C and D) Functional Test NOP ST-01I Main Steam Isolation valves Limit Switch 11-Mar-99 Instrument Functional Test NOP ST-01K Main Steam Line Isolation Valves, Main 10-Mar-99 Steam Drain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP ST-01L Main Turbine control Valve Instrument 01-Dec-97 j

Channel and Valve Operability Check NOP ST-Ols shutdown Cooling Containment Isolation 10-Mar-99 Valve Testing (IST)

Deleted NOP ST-01Y MSIV Partial Closure Exercise Test N/A Added NOP ST-02AL RHR Loop A Quarterly Operability Test 05-Mar-99 (IST)

I Added NOP ST-02AM RHR Loop B Quarterly Operability Test 07-Mar-99 (IST)

NOP ST-02AN RHR Loop A Pump an'd MOV Operability and 05-Mar-99 t

LPCI Keep-Full Level Switch Functional j

Test j

NOP ST-02AO RHR Loop B Pump and MOV Operability and 07-Mar-99

~

LPCI Keep-Full Level Switch Functional Test NOP ST-02J One RHR Service Water Pump or One 10-Mar-99 Containment Cooling subsystem inoperable Test 1

NOP ST-02N LPCI Mode Inoperable Test 10-Mar-99 f

I Replaced NOP ST-02R RHR Service Water Pump and MOV Operability N/A j

Test (Now in 02RA & 02RB) l Rev. 1 Tab 2-1 I

1 I

i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CNANGES NtadRER PERSCOGED Added NOP ST-02RA RHR Service Water Loop A Monthly 10-Mar-99 operability Test Added NOP ST-02RB RHR Service Water Loop B Monthly 10-Mar-99 operability Test NOP ST-02T LPCI Cross Connect Position Functional 10-Mar-99 Test NOP ST-02Y RHR Heat Exchanger Performance Test 07-Mar-99 Replaced NOP ST-03A Core Spray Pump and Valve operability N/A Test (Now in ST-3PA & PB)

Added NOP ST-3PA Core Spray Loop A Quarterly Operability 11-Mar-99 (IST)

Added NOP ST-3PB Core Spray Loop B Quarterly Operability 11-Mar-99 (IST)

Deleted NOP ST-03M Core Spray Testable Check Valve Testing N/A (IST)

NOP ST-04B HPCI Pump and MOV operability Test 21-May-96 Added NOP ST-04K HPCI Turb Slow Roll & Overspeed Test 02-Feb-97 NOP ST-04L HPCI Class 2 Piping Functional Test (ISI) 28-Sep-97 NOP ST-04M HPCI Torus Suction Operability Test (IST) 03-Mar-99 NOP ST-04N HPCI Flow Rate and Inservice Test (IST) 16-Dec-97 Added NOP ST-04P HPCI Annual Transient Monitoring Test 21-Apr-97 NOP ST-05B APRM Instrument Functional Test (Run Mode) 11-Mar-99 NOP ST-05C IRM-APRM Instrument Range Overlap Check 01-May-97 Added NOP ST-05D APRM Calibration

  • 01-Jun-97 Added NOP ST-OSE Core Performance Daily Surveillance 27-Jan-97 Added NOP ST-05F Turb First Stage Press Secam Byp setpt 24-Mar-97 Determination I

1 Rev. 1 Tab 2-2

7 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE 37 CEANGES NUMBER PE32000SD NOP ST-05N APRM Instrument Functional Test (Refuel, 24-Sep-97 Startup, or Shutdown Mode) f NOP ST-050 SRM Functional Test 28-Sep-97 NOP ST-OSP Source Range Channel checks 08-Mar-99 NOP ST-05Q APRM Flow Bias Functional Test (Run Mode) 31-May-97 NOP ST-05R RBM Upscale and Downscale Instrument 02-Mar-99 Functional Test Deleted NOP ST-OST RPS Channel A APRM Downscale Functional N/A Test (Run Mode)

Deleted NOP ST-05U RPS Channel B APRM Downscule Functional N/A Test (Run Mode)

NOP ST-08C ESW Motor Operated Valves Operability Test 02-Mar-99 Replaced NOP ST-09B EDG Gull Load Test and ESW Pump N/A Operability Test (Now in ST-09BA & Sr-09BB)

Added NOP ST-09BA EDG A & C Full Load Test & ESW Pump 03-Mar-99 operability Test I

Added NOP ST-09BB EDG B & D Full Load Test & ESW Pump 03-Mar-99 I

operability Test NOP ST-09C Emergency AC Power Load Sequencing Test 10-Mar-99 and 4 KV Emergency Power System Voltage Relays Instrument Functional Test NOP ST-09D EDG, ll5KV Reserve Power, Station Battery, ll-Jun-98 or ESW Pump Inoperable Test i

NOP ST-10B Off-Gas System Automatic Isolation and 09-Mar-99 j

Closure Test j

NOP ST-ll Off-Gas Process Rad Monitor Instrument 25-Apr-97 Functional Test i

Deleted NOP ST-12B Reactor Building Exhaust RAD Monitor N/A j

Instrument Response Test Deleted NOP ST-12F Main CR ventilation Rad Monitor Instrument N/A l

Response Test l

Rev. 1 Tab 2-3

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT l

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRAINES NUMBER PERFOURED NOP ST-12K Main CR ventilation Rad Monitor Instrument 10-Feb-98 channel Functional Test Deleted NOP ST-13 Main btack Rad Monitor Response Test N/A Added NOP ST-13A Stack Gas Rad Mon Instr Channel Functional 10-Mar-99 Test Deleted NOP ST-14A Normal Service Water Radiation Monitor N/A Functional Test NOP ST-20A Rod Worth Minimizer Functional Test 23-Apr-97 NOP ST-20C Control Rod Operability and HCU Cooling 10-Mar-99 Water Supply Check Valve Reverse Flow Check (IST)

Deleted NOP ST-20J Verification of Scram Discharge Volume N/A Vents and Drains NOP ST-20K Pre-Control Rod Withdrawal checklist 07-Mar-99 NOP ST-20M Scram Discharge Volume Vent and Drain 10-Mar-99 Valves Full Stroke and Timing Test (IST)

NOP ST-20N Control Rod Exercise / Timing / Stall Flow 07-Mar-99 Test NOP ST-21A Main Turbine Overspeed Trip Test (Actual 02-Mar-99 overspeed Trip Test - Valves Remain Open)

NOP ST-21C Main Tura ne Combined Intermediate Valve 02-Mar-99 Test NOP ST-21E Main Turbine Backup overspeed Trip System 02-Mer-99 Test (Actual Overspeed)

NOP ST-21F Main Turbine overspeed Trip Device and 02-Mar-99 Mechanical Trip Valve Test NOP ST-21I Main Turbine Thrust Bearing Wear Detector 02-Mar-99 Test

Added NOP ST-22B Manual Safety Relief Vlv operation & Vlv 29-Jun-97 Monitoring Sys Rev. 1 Tab 2-4 I

r NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE caamans NUbdRER PERF05BdED NOP ST-23B Control Rod Coupling Integrity Test 02-Mar-99 NOP ST-23C Jet Pump Operability Test for Two Loop 24-Feb-98 Operation (EPIC Available)

NOP ST-23D Jet Pump Operability Test for Single Loop 12-Mar-99 Operation NOP ST-23E Jet Pump Operability Test for Two Loop 02-Mar-99 Operation (EPIC Not Available)

NOP ST-24A RCIC Pump and MOV Operability Test 10-Mar-99 NOP ST-24F RCIC System Inoperable Test 10-Mar-99 NOP ST-24J RCIC Flow Rate and Inservice Test (IST) 08-Mar-99 Added NOP ST-240 RCIC Turb Slow Roll & Overspeed Test 21-Apr-97 NOP ST-26J Meatup and Cooldown Temperature Checks 08-Mar-99 NOP ST-26K Recirculation Pump Start-un Differential 07-Mar-99 Temperature Check NOP ST-26L Main Turbine Mechanical Trip valve and 07-Mar-99 Master Trip Solenoid A and B Test NOP ST-27A Recire Loop Valve Operability Test (IST) 10-Mar-99 NOP ST-29A Manual Scram Functional Test 19-Aug-97 NOP ST-29B Mode Switch in Shutdown Functional Test 07-Mar-99 NOP ST-29C RPS Channel Test Switch Functional Test 10-Mar-99 NOP ST-40C Computer out of Service Surveillance 07-Mar-99 NOP ST-40D Daily Surveillance and Instrument Check ll-Mar-99 NOP ST-40K Periodic Pump, Valve, and Component Test ll-Mar-99 NOP ST-40X Daily shutdown Surveillance and Instrument 10-Mar-99 l

Check l

Deleted NOP ST-41B Valve Testing - Reactor Building Closed Loop Cooling Water (IST)

Rev. 1 tab 2-5

NEW YORK POWER AUTHORI/Y JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT Tas? LIST Tus?

IAsTzmTs CEAams MtaEsa PEIWCORED Added NOP ST-50 SRM Functional Test 14-May-97 NOP OP-65 Plant Startup (including applicable OP's) 10-Mar-99 NOP OP-65 Plant Shutdown (including applicable OP's) 12-Mar-99 Added NOP RAP-7.3.2.9 Determination of Rated Recirc Flow 11-M*Y-97 Added NOP RAP-7.3.7 Core Flow Evaluation and Indication Calcul ll-May-97 MALF AD01 ADS Timer Fails to Start 24-Feb-97 MALF AD02 ADS Inadvertent Timer and Logic Start 28-Dec-98 MALF AD03:A-H ADS Valve (s) Fail to Initiate 15-Jan-99 Automatically MALF AD04:A-K RX Press Relief Valve Solenoid Failure 28-Jun-98 MALF.

ADOS:A-K RX Press Relief Valve Leak 23-Aug-98 MALF AD06:A-K RX Press Relief Valve Inadvertently Opens 23-Aug-98 MALF AD07:A-K RX Press Relief Valve Fails to open 28-Jun-98 i

MALF AD08:A-K RX Press Relief Valve Stuck open 24-Feb-97 MALF AD09:A-K RX SRV Vacuum Breaker Stuck Open 23-Aug-98 MALF AN01:A,B Control Room Annunciator Power Failure 12-Jan-97 MALF CS01:A,B Core Spray Pump Trip 28-Dec-98 MALF CS02:A,B Core Spray Injection Valve rails to Auto 29-Dec-98 Open MALF C503:A,B core Spray Torus Suction Fails Closed 29-Dec-98 MALF CSO4:A,B Core Spray Injection Line Break (non-26-Jan-99 recoverable)

MALF CS05:A,B Core Spray Torus Suction Line Pipe Failure 02-Mar-95 MALF CUOl RWCU Flow Control Failure 02-Mar-95 MALT' CUO2:A,B RWCU Pump Trip 02-Mar-95 Rev. 1 Tab 2-6

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT i

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR IERFORMANCE TESTING REPORT usT LIST usT me

,,,T TITza Camens manaR PERF0ERED l

MALF CUO3:A,B Tube Leak in RWCU HX (non-recoverable) 09-Mar-95 MALF CUO4:A,B KWCU Resin Intrusion 09-Mar-95 Inactivated MALF COOS:A,B RWCU 'esin Depletion in Filt/Demin (Ref:

09-Mar-95 JTRG-98-076)

MALF CUO6 RWCU Inadvertent Isolation 09-Mar-95 MALF CUO7 RWCU Pipe Break Between 12Mov-15 and 12Mov 13-Mar-95 18 MALF CUO8 RWCU Return Temperature Transmitter 02-Feb-95 Failure HALF CUO9 RWCU Inlet Pipe Failure (non-recoverable) 13-Mar-95 Added MALF CU10 RWCU Valve 12MOV-18 Fails To Auto Isolate 14-Jul-95 MALF DG01:A-D EDG Fails to Start 02-Feb-95 MALF DG02:A-D EDG Fails to Trip 20-Mar-95 MALF DG03:A-D EDG Output Breaker Fails to Auto close 02-Feb-95 MALF DG04:A-D EDG Trip 06-Apr-95 MALF DG05:A-D EDG Voltage Regulator Oscillations 21-Mar-95 MALF DG06:A-D EDG Slow to Start 20-Mar-95 MA4F DG07:A-D EDG Governor Fails High 06-Apr-95 MALF DG08:A-D EDG Governor Fails Low 02-Feb-95 MALF ED01:A,B 345/24KV Transformer (T1A, T1B) Failure 22-Mar-95 MALF ED02:A,B 115/4KV Transformer (T2, T3) Failure 24-Feb-97 MALF ED03:A-D 4KV/600V Transformer (T13, Tli, T15, T16) 17-Jan-95 Failure MALF ED04:A,B Inverter (71INV-3A/B) Failure 16-Jan-95 MALF EDOS:A-H 4KV/600V Transformer (TS, T6, T7, T8, T9, 17-Apr-95

T10, Rev. 1 Tab 2-7

NEW YORK POWER AUTHORITY JAMES A. FTrZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY

)

J FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE WT M CEAWERS NtadBER PERFCORED MALF ED06A 120VAC Bus (RBACAS) Failure 30-Mar-95 I

MALF ED06B 120VAC Bus (TBACA6) Failure 10-Apr-95 MALF ED06C 120VAC Bus (SWACA7) Failure 10-Apr-95 MALF ED06D 120VAC Bus (RBACBS) Failure 10-Apr-95 MALF ED06E 120VAC Bus (TBACB6) Failure 10-Apr-95 MALF ED06F 120VAC Bus (RWACB7) Failure 10-Apr-95 MALF ED07A 120VAC Bus (RRACA8) Failure 10-Apr-95 MALF ED07B 120VAC Bus (RRACBS) Failure 13-Apr-95 MALF ED07C 120VAC Bus (RBACCS) Failure 03-May-95 MALF ED07D 120VAC Bus (TBACC6) Failure 16-Jan-95 MALF ED07E 120VAC Bus (SWACC7) Failure 10-Apr-95 MALF ED07F 120VAC Bus (RBACDS) Failure 16-Jan-95 MALF ED07G 120VAC Bus (TBACD6) Failure 06-Apr-95 Deleted MALF ED07H 120VAC Bus (RWACD7) Failure (Ref: JTRG 16-Jan-95 125)

MALF ED07I 120VAC Bus (RBACE5) Failure 06-Apr-95 MALF ED07J 120VAC Bus (71ABAC1) Failure 16-Jan-95 MALF ED07K 120VAC Bus (71ACNMS) Failure 16-Jan-95 l

MALF ED07L 120VAC Bus (71ACNMS-A) Failure 16-Jan-95 HALF ED07M 120VAC Bus (71ACNMS-B) Failure 16-Jan-95 Deleted MALF ED07N 120VAC Bus (71EBAC1) Failure (Ref: JTRG-97 16-Jan-95 125)

Added MALF ED08 120V/240VAC Bu' (71AC9/71AC10) Failure 04-May-95 Replaced MALF ED08A 120V/240VAC Bus (71AC9) Failure (Now In N/A ED08)

Tab 2-8

NEW YORK POWER AUTHORITY j

JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT i

TEST LIST TEST IAST DATE g

cmAmass wuman PEarosemD j

Replaced MALF ED08B 120V/240VAC Bus (71AC10) Failure (Now In N/A J

i.D08)

MALF ED09:A,B UPS MG Drive Failure (AC/DC) 03-May-95 MALF ED10 120VAC UPS Bus (71ACUPS) Failure 01-Feb-96 MALF ED11A 125VDC Eas A (71BCB-2A) Failure 19-Dec-95 I

I "Ir ED11B 125VDC Bus B (71BCB-2B) Failure 19-Dec-95 MALF ED. *8 :A,B 125VDC Bus Battery Charger Failure 14-Sep-95 Added MALF ED13 24VDC Bus A(B) System Failure 03-Oct-95 Replaced MALF ED13A 24VDC Bus A RR24DCA Failure (Now In ED13)

N/A Replaced MALF ED13B 24VDC Bus B RR24DCB Failure (Now In ED13)

N/A MALF ED14:A,B 24VDC Battery Charger Failure 08-Feb-95 MALF ED15 24KV/4KV Transfortner T4 Failure 08-Feb-95 Added MALF ED16 Power Grid Transient With Load 03-Mar-96 Increasing / Decreasing Replaced MALF ED16A Power Grid Transient With Load Increasing 2/A (Now In ED16)

Replaced MALF ED16B Power Grid Transient With Load Decreasing N/A (Now In ED16)

MALF ED17 Station Blacko'it 20-Dec-96 MALF ED18:A,B 4.16KV Emergency Bus (10500, 10600) 31-Mar-96 Failure MALF ED19:A-E 4.16KV Normal Bus (10100, 10200, 10300, 31-Mar-96 1

MALF ED20:A-H 600VAC Bus (11300, 11400, 12300, 12400, 31-Mar-96 i

13300,

{

MALF ED21:A-D 600VAC Emergency Bus (11500, 12500, 11600, 12-Mar-96 12600)

MALF ED22:A-C 600VAC Normal Bus (113100, 113200, 113300) 28-Nov-95 Failure Rev. 1 Tab 2-9 i

f i

NEW YORK POWER AUTHORITY I

JAMES A. FITZPA'IluCK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DME CEANGEs NIBdBER PEMOBBSD MALF ED23:A-C 600VAC Normal Bus (114100, 114200, 114300) 07-Dec-95 Failure MALF ED24:A-D 600VAC Emergency Bus (115100, 115200, 14-Dec-95 115300, 115600)

MALF ED25:A-F 600VAC Bus (116100, 116200, 116300, 12-Mar-96 116400, 116500, MALF ED26:A,B 600VAC Bus (123100, 123200) Failure 07-Dec-95 MALF ED27:A,B 600VAC Bus (124100, 124200) Failure 07-Dec-95 MALF ED28:A-D ff10VAC Bus (125100, 125200, 125300, 13-Feb-96 125400) Failure MALF ED29:A-D 600VAC Emergency Bus (126100, 126200, 08-Feb-96 126300, 126400)

MALF ED30:A-D 600VAC Bus (133100, 133200, 133300, 28-Nov-95 133400) Failure MALF ED31:A-D 600VAC Bus (134100, 134200, 134300, 07-Du-95 134400) Failure MALF ED32:A-E 600VAC Bus (113100, 143200, 143300, 19-Mar-96 143400, 143500)

MALF ED33:A-E 600VAC Bus (le 100, 144200, 144300, 07-Mar-96 144400, 144500)

MALF ED34A 120VAC Bus RPS-A Failure 17-Dec-95 MALF ED34B 120VAC Bus RPS-B Failure 17-Dec-95 MALF ED35A 120VAC Bus (71 ESSA 1) Failure 13-Dec-95 MALF ED35B 120VAC Bus (71ESSB1) Failure 14-Dec-95 MALF ED36A 120VAC Bus (71ACA2) Failure 08-Dec-95 MALF ED36B 120VAC Bus (71ACA3) Failure 24-Jan-95 MALF ED36C 120VAC Bus (71ACA4) Failure 24-Jan-95 MALF FD36D 120VAC Bus (71ACB2) Failure 13-Dec-95 Rev. 1 Tab 2-10

NEW YORK POWER AUIllORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST LAST DA33 CEANES NEREBER PERF0EGED MALF ED36E 120VAC Bus (71ACB3) Failure 08-Dec-95 MALF ED36F 120VAC Bus (71ACB4) Failure 24-Jan-95 MALF ED37A 1-5 125VDC Bus (71DC-A) Failure 20-Jun-95 MALF ED37B:1-5 125VDC Bus (71DC-B) Failure 05-Apr-95 MALF ED38:A-E 125VDC Bus (71BMCC) Failure 28-Apr-98 MALF ED39:A-G 125VDC Control Power Failure To 4160V 19-Mar-98 Busses MALF ED40:A-L 125VDC Control Power Failure To 600V 27-Jun-95 Busses Added MALF ED41 Failure To Fast Transfer with A Normal 13-Dec-96 Residual Transfer Added MALF ED42 Failure To Fast Transfer With A Loss of 13-Dec-96 RPS Added MALF ED43 Loss of Affected 115KV Line 21-Dec-96 l

Added MALF ED44 Loss of Station Reserve Power 13-Dec-96 MALF EG01 Main Generator Trip 20-Dec-96 MALF EGO?A Main Generator Field Breaker Fails to 21-Feb-95 l

Close MALF EG02B Main Generator Field Breaker Fails to open 08-Feb-95 l

l MALF EG03:A,B Loss cf Isolated Phase Bus cooling Fitn 08-Feb-95 MALF EG04 Main Generater Field Brushes Ground 15-Dec-96 MALF EGOS Main Generator Stator Temp High 08-Feb-95 I

I MALF EG06 Generator Hydrogen Cooling System Le.tkage 18-Apr-96 MALF EG07 Hydrogen Seal Oil System Failure 30-Apr-96 Added MALF EG08 Main Generator Auto V/R Fails 07-Mar-96 Replaced MALF EG08A Main Generator Auto V/R Fails Increading N/A (New In EGO 8) l Rev. 1 Tab 2-11

r NEW YOI1K POWER AUIRORITY JAhES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TRST LIST TEST LAST DATE CEANES NtadBER PERFOSSED Replaced MALF EG08B Main Generator Auto V/R Fails Decreasing N/A (Now In EG08) l MALF EG09 Main Generator Auto V/R Failure Complete 18-Jun-96 MALF EG10 Loss of Stator Cooling water Flcw 07-Mar-96 Addad MALF EGil Main H2 Seal Oil Pt'ap Trip 30-Jan-98 i

Added MALF EG12 Emergency Seal Oil Pump Auto Start Failure 30-Jan-98 MALF FP01:A-D EDG Rm Fire 08-Sep-97 MALF FP02 Smoke - Zone 01 through Zone 82 05-Jul-97 MALF FWO1:A,B RX Feedwater Pump Trip 26-Feb-97 MALF WO2A:A,B RX reedwater Pump Recirc Valve Fails Open 25-Aug-96 MALF WO2B:AcB RX Feedwater Pump Recirc Valve Fails 25-Aug-96 Closed MALF FWO3:A,B RX Feedwater Pump Auto Controller Failure 27-Aug-96 MALF FWO4:A,B RX Feedwater Pump Manual Controller 07-Dec-96 Failure MALF WOS:A,B RX Feedwater Pu:rp High vibration 30-Jul-96 MALF FWO6:A,B RX Teodwater Pump Coupling Failure 22-Dec-96 i

MALF WO7 : A, B RX Teedwater Pump Discharge Valve Seat 22-Dec-96 Failure MALF FWOB Maste-Feedwater Flow Control Auto Failure 27-Aug-96 MALF WO9 Master Feedwater Flow Control Manual 27-Aug-96 Fai9e rt MALF FW10 Master reedwater Flow Control Oscillates 27-Aug-96 Inactivated MALF FW11:A-D Loss of Steam Flow Signal To Fdwtr Level N/A (Ref: JTRG-96-390)

Rev. 1 Tab 2-12

NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRAINES NtadRER PERNARED Inactivated MALF FW12:A,B Loss of Fe E Flow signal To Fdwtr Level N/A (Ref: JTRG-95-390)

MALF FW13:A,B Feedwater System 6th Point Heater Tube 22-Dec-96 Leak MALF FW14:A,B Feedwater System Sth Point Heater Tube 13-Jan-99 Leak MALF W15:A,B Feedwater System 4th Point Heater Tube 13-Jan-99

, Leak MALF N16:A,B Feedwater System 3rd Point Heater Tube 11-Mar-99 Leak l

MALF N17:A,B Feedwater System 2nd Point Heater Tube 11-Jun-98 Leak MALF N18:A,B Feedwater System Drain Cooler Tube Leak 11-Mar-99

{

MALF N19: A-E condensate Pump Trip 27-Jan-97 Inactivated MALF N20 Normal Hotwell Level Controller Failure N/A (Ref: JTRG-96-390)

Inactivated MALF FW21:A-H Condensat's (DEMIN) Conductivity Increases 26-Mar-98 (Ref: JTRG-98-076)

J MALF FW22:A,B CST Leak Manway Flange Failure 05-sep-96 MALF FW23:A-D Migh Pressure Heater Level Control Failure 17-May-97 MALF FW24:A,B RX Feedwater Pump Loss of oil Pressure 05-Mar-97 MALF FW25:A-C Condensate Booster Pump Trip 05-Mar-97 i

MALF FW26:A,B Condensate Transfer Pump Trip 25-Jul-96 MALF FW27:A,B Feedwater Line Break Inside Primary 30-Jun-97 Containment MALF FW28:A,B Feedwater Line Break outside Primary 30-Jun-97 Containment MALF FW29:A,B Feedwater Line Inboard Containment Check 13-Jul-97 valve Tab 2-13

i

- j 4

NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CMANGES MUbmER PERF05GED Inactivated MALF FW303A-D Rx Feedwater Pump Discharge Check Valve 21-Feb-95 Fails Open (Ref: JTRG-97-162)

Added MALF FW31 Condensate Booster Pmp A Auto Start 12-Oct-95 Failure i

Added MALF FW32 Feedwater Heater Loop Seal Drain Blockage 21-Dec-96 MALF HP01 HPCI Failure to Auto Start 24-Feb-97 MALF HP02 HPCI Turbine Trip 23-Apr-96 MALF HP03 HPCI Discharge Line Break (non-18-Jun-96 recoverable)

MALF HPO4 HPCI Flow Controller Auto output Failure 23-Apr-96 MALF HPOS HPCI Inadvertent Initiation 30-Apr-96 j

MALF HP06 L.I Steam Line Break (non-recoverable) 27-Jun-96 MALF HP07 HPCI Valve 23MOV-19 Fails to Auto open 23-Apr-96 MALF HP00 HPCI Turbine Exhaust Piping Failure 25-Jun-96 MALF HP09 HPCI Torus Suction Pipe Failure (non-09-Dec-96 j

recoverable)

Added MALF HP10 HPCI System Auto Isolation Failure 17-Oct-95 Added MALF HP11 HPCI 23MOV-15 Auto Isolation Failure 17-Oct-95 Added MALF HP12 HPCI High Rx Water Lvl Trip Failure 12-Oct-95 MALF HV01:A-C Rx Bldg Supply Fan Trip 23-Apr-96 MALF HV02:A,B Rx Bldg Exhaust Fan Trip 09-Dec-96 MALP HV03 Secondary containment Leakage 18-Jul-96 MALF IA01 Loss of Air Pressure to Scram Air Header 23-Apr-96 MALF IA02 Loss of Instrument Air 18-Jul-96 MALF IA03:A-C Air Compressor Trip 30-Apr-96 Added MALF IA04 Serv Air Comp A Auto Start on Low Inst Air 17-Oct-95 Hdr Press Fail Rev. 1 Tab 2-14

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFC RMANCE TESTING REPORT TEST LIST MST 9,,9 97,,

TEST TITLE CRANGES NUMBER PERFOSGSD MALF MC01 Main Condenser Air In-Leakage 18-Jul-96 MALF MCO2:A-D Main Condenser Tube Leak 1-Aug-96 MALF MCO3:A-D Main Condenser Water Box Flow Block

-Aug-96 Added MALF MC04 SJAE Steam Supply Valve Fails 12-Sep-96 Replaced MALF MC04A SJAE Steam Supply Valve Fails Open (Now In N/A MC04)

Replaced MALF MC04B SJAE Steam Supply Valve Fails Closed (Now N/A In MC04)

MALF MC05:A-C Circulating Water Pump Trip 06-Aug-96 MALF MC06 Air Ejector Condenser High Level 20 Jan 98 MALF MC07:A-C Circ Water Pump Discharge Valve Fails to 18-Jul-96 Close MALF MC08:A-C Circ Water Pump Discharge Valve Fails to 25-Jul-96 Open MALF MC09:A-D Loss of Condenser Water Box Vacuum Priming 05-Sep-96 MALF MC10 Water Icing in Intake Structure 05-Sep-96 MALF M301:A,B Main Steam Header Press Xmtr Failure 03-Jul-96 MALF MS02:A-D Steam Leakage Inside Primary Containment 04-May-97 MALF MS03:A-D Main Steam Line Rupture Inside Primary 08-Mar-99 MALF MSO4:A-D Main Steam Line Rupture Outside Primary 10-Mar-97 MALF MS05 Steam Leak Outside Primary Containment 05-Ma,-97 Added MALF MS06 Steam Seal Pressure Regulator Fails 03-Sep-96 Replaced MALF MS06A Steam Seal Pressure Regulator Fails Open N/A (Now In MS06)

Replaced MALF MS06B Steam Seal Pressure Regulator Fails "losed N/A (Now In MS06)

Rev. 1 Tab 2-15

l NEW YORK POWER AIITHORTTY JAMES A. FTTZPATRICK NUCLEAR POWER PLANT I

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT i

TEST LIST TEST TEST T*.TIA CEARNIES NtRdBER PERN05BdED j

MALF MS07:A-H MSIV Disc Separates from Stem (non-05-May-97 recoverable) i i

MALF MS08A:A-H MSIV Fails Closed 03-Sep-96 MALF M308B:A-H MSIV Fails Open 02-Sep-96 MALF MS09:A,B First Stage Reheat Steam Supply to MSR 27-Jan-98 Fails MALF MS10:A-H MSIV Slow Test Closure Time 02-Sep-96 MALF MS11:A,B Second Stage Reheat Steam Supply to MSR 12-Sep-96 Fails 1

MALF MS12:A-D Moisture Separato,r Drain Tank Level 06-Jul-97 Control MALF M513:A-D First Stage Reheat Drain Tank Level 06-Jul-97 Control MALF MS14:A-D Second Stage Reheat Drain Tank Level 06-Jul-97 control MALF MS15:A-J Loss of Feedwater Extraction Steam 07-Jul-97 MALF MS16:A-L SRV Discharge Line Break Above Torus water 15-Aug-97 Level MALF NM01:A-D SRM Channel Failure 09-Dec-96 MALF NM02:A,B SRM Channel Recorder Failure 09-Dec-06 MALF NM03:A-D SRM Channel Inoperative 10-sep-96 MALF NM04:A-D SRM Channel Detector Stuck 10-Sep-96 MALF NMOS:A-D SRM Channel Retract Permit Failure 09-Dec-96 MALF NM06:A-H IRM Channel Failure 07-Dec-96 MALF NM07:A-H IRM/APRM-RBM Channel Recorder Failure 05-Mar-97 MALF NM08:A-H IRM Channel Inoperative 07-Dec-96 MALF NM09:A-H IRM Channel Detector Stuck 07-Dec-96 MALF NM10:A-H IRM Channel Retract Permit Failure 07-Dec-96 Rev. 1 Tab 2-16

T l NEW YORK POWER Alm 10RITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CRANGES MtEdEER PERFOSSED MALF NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure 12-Sep-96 MALF NM12:A,B RBM Channel Failure 10 Sep-96 s

MALF NM13:A,B RBM Channel Inoperative 10-Sep-96 MALF NM14:A-F APRM Channel Failure 10-Sep-96 MALF NM15:A-F APRM Channel Inoperative 10-Sep-96 Deleted MALF NM17:XX:YY Leak in LPRM Dry Tube (non-recovetable) 10-Sep-96 (Ref: JTRG-97-086)

MALF OG01 Off Gas Condenser High Level 23-Jun-97 MALF OG02 Off Gas Drain Pot High Level 20-Jan-98 MALF OG03 Explosion in Air Ejector Discharge 23-Jun-97 MALF OG04 Fire in Air Ejector 27-Jan-98 MALF OG05 Recombiner Trip 28-Apr-98 MALF OG06 Stack Isolation Valve Fails closed 21-May-98 Added MALF OG07 Off Gas 01-107AOV-100 Auto Isolation 08-Oct-95 Failure MALF PC01 Containment Vent Purge Fan Trip 07-May-97 MALF PCA2 Loss of Instrument Nitrogen 07-May-97 MALF PCO3:A-H Drywell Cooling Fan Trip 23-Apr-97 MALF PC04:A,B SBGT Fan Trip 10-Mar-97 Added MALF PCOS Containment Pressure Transmitter Failure 14-Jul-97 Replaced MALF PCOSA Containment Pressure Transmitter Failure N/A (Now In PCOS)

Replaced HALF PC05B Containment Pressure Transmitter Failure N/A (Now In PC05)

MALF PC06 Torus Drywell Vacuum Breaker 27VB-1 Fails 17-May-97 to Close Rev. 1 Tab 2-17

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST gg, TEST TITLE CEANES NUMBER PERF000ED MALF PC07 Primary containment Leakage (non-07-May-97 recoverable)

MALF PCOS Primary Containment Hydrogen High 07-May-97 MALF PC09 Primary Containment Oxygen High 07-May-97 MALF PC10 Torus Level Decreases (non-recoverable) 10-Mar-97 MALF RC01:A,B RCIC Turbine Loss of 011 Pressure 23-Jun-97 MALF RCO2 RCIC System Fails to Auto Start 30-Jun-97 MALF RC03 RCIC System Turbine Trip 15-Jun-97 MALF RC04 RCIC Turbine Failure to Auto Trip 23-Jun-9'.

l MALF RC05 RCIC System Isolation 15-Jun-97 MALF RC06 RCIC Inadvertent In'itiation 15-Jun-97 MALF RC07:A,B RCIC Governor Fails High/ Low (HSS/LSS) 13-Jul-97 Inactivated MALF RCOB:A,B RCIC-RHR Suction Valve (10Mov-36A/B) Fails N/A Closed (Ref: JTRG-98-059)

MAI' RC09 RCIC Steam Line Break (non-recoverable) 05-Mar-98 MALF RC10 RCIC Discharge Line Break (non-05-Jul-97 1

recoverable)

MALF RC11 RCIC Turbine Exhaust Pipe Fe (non-05-Jul-97 recoverable)

MALF RC12 RCIC Isolation Relay, 13A-K15, Failure 05-Apr-05 Added MALF RC13 RCIC High Rx Water Lvl Shutdown Failure 12-Oct-95 MALF RD01A:A-H SDV Vent or Drain Valve Fails open 01-Apr-98 MALF RD01B:A-H SDV Vent or Drain Valves rail closed 14-Jul-97 Inactivated MALF RD02:A,B Scram Discharge Instrument Volume High 15-Apr-98 Level (Ref: JTRG-98-107) f MALF RD03:A,B CRD Flow Control Valve Failure 28-Jul-97 MALF RD04:A,B CRD Drive Water Filter Clogging 10-Feb-98 1

Rev. 1 Tab 2-18

NEW YORK POWER AUIRORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT

{

TEST LIST TEST TYPE TEST TITLE Cuaness mamma psarosemD MALF RDOS:A,B CRD Stabilizing Valves Fail Closed 28-Jul-97 i

MALF RD06:A,B CRD Hydraulic Pump Trip 28-Jul-97 j

l MALF RD07:**:**

Control Rod (XX-YY) Drift-In 19-Jul-97 MALF RDOS:**:**

Control Rod (XX-YY) Drift-Out 19-Jul-97 MALF RD09:**:**

Control Rod (XX-YY) Accumulator Trouble 19-Jul-97 MALF RD10:**:**

Control Rod (XX-YY) Blade Stuck 19-Jul-97 MALF RD11:**:**

Control Rod (XX-YY) Uncoupled 19-Jul-97 MLF RD12:**:**

Control Rod (XX-YY) Scrammed 19-Jul-97 MALF RD13:**:**

Control Rod (XX-YY) Fail to Scram 19-Jul-97 MALF RD14:**:**

Control Rod (XX-YY) RPIS Failure 10-Feb-98 MALF RD1b Rod Drive Control System Timer Fail 16-Mar-98 MALF RD16 Rod Position Info System Total Failure 02-Dec-97 MALF RD17:**:**

Control Rod (XX-YY) High Temperature 11-Feb-98 Mt.LF RD18:A,B Scram Discharge Volume Rupture (non-20-Jan-99 recoverable)

MALF RD19:A,B CRD Suction Filter Hi Delta-Pressure 19-Jan-99 MALF RD20:**:**

Line Break CRD HCU (XX-YY) (non-31-Mar-98 recoverable)

MALF RD21:**:**

Leaking Control Rod Withdraw SOV 30-Apr-98 MALF RD22 Scram Discharge volume Hydraulic Lock 25-Jul-95 MALF RH01:A-D RHR Pump Trip 08-Jun-97 MALF RH03:A,B RHR Heat Exchange Tube Leak (non-03-Feb-99

'ecoverable)

MALF RH04A:A,B LPCI Injection Valve Fails closed 29-Jun-97 MALF RH04B:A,B LPCI Injection Valve Fails open 29-Jun-97 Tab 2-19

NEW YORK POWER AUIRORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CEAams MtadRER PERropean i

MALF RHOS:A-D RHR Pump Discharge Leak (non-recoverable) 29-Jun-97 MALF RHO 6 RHR/SDC Valve 10MOV-18 Is 1s 23-Jun-97

)

l i

MALF RH07 RHR/SDC Valve 10MOV-17 Fails 23-Jun-97 MALF RH08:A-D RHR Pump SDC Suction Valve Fails Closed 23-Jun-97 1

I MALF RH09:A,B LPCI - Injection Line Failure (non-29-Jun-97 recoverable)

MALF RH10:A,B RHR Loop Suction Line Piping Failure 05-Mar-98 Inactivated MALF RH11:A,B RHR Hx Level Controller Auto Mode Failure N/A (Ref: JTRG-98-019)

Inactivated MALF RH12:A,B RHR Hx Steam Supply valve Fails Closed N/A (Ref: JTRG-98-019)

Inactivated MALF RH13:A,B RHR Hx Press Reducing Valve Fails closed N/A (Ref: JTRG-98-019)

MALF RH14 LPCI Failure to Auto Initiate 29-Jun-97 Added M74F RH15 RHR/SDC Valve 10MOV-17(18) Auto Isolation 27-Oct-95 Failure Added MALP RH16 RHR P' ump Motor Winding Temperatures High 27-Apr-98 MALF RM01A:15 Process Rad Mon Failure 12-May-97 MALF RM01B: 1-4 Process Rad Mon Failure 08-Jun-97 MALF RM01C 1-7 Process Rad Mon Failure 12-May-97 MALF RM01D:1-8 Process Rad Mon Failure 21-Jul-97 MALF RM01E: 1-7 Process Rad Mon Failure 17-May-97 MALF RM02A:1-10 ARM Failure 21-Apr-97 MALF RM028:11-20 ARM Failure 21-Apr-97 MALF RM02C:21-30 ARM Failure 21-APr-97 MALF RP01A RPS Auto Scram Failure 30-Jun-97 Rev. 1 Tab 2-20

f.

i NEW YORK POWER AITTHORITY l

JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT j

PLANT REFERENCED SIMULATION FACILITY t

FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DATE CEAHECS NUbmER PERN0pMED MALF RP01B RPS Manual Scram Failure 12-May-97 MALF RP02 Inadvertent Reactor Scram 14-May-97 MALF RP03 Inadvertent Group I Isolation 24-Feb-97 MALF RPO4 Inadvertent Group II Isolation 19-Jul-97 i

MALF RPOS:A,B RPS M-G Set Trip 15-Jun-97 l

1 MALF RP06:A,B RPS Electrical Protection Assembly Trip 15-Jun-97 MALF RP07:A-D Control Rod Group Fail to scram 30-Jun-97 MALF RP08:A-D Control Rod Group (1,2,3,4) Scram 02-Apr-98 l

MALF RP09 ARI Fails to Actuate 17-Feb-98 Added MALF RP10 PCIS Group III Low Rx Water Lvl Isolation 24-Oct-95 Failure Added MALF RPil PCIS Group II Isolation Failure Nov-95 Added MALF RP12 PCIS Group I Inboard (Outboard) MSIV 24-Oct-95 i

Isolation Failure i

Added MALF RP13 PCIS Group I Isolation Failure 24-Oct-95 MALF RR01:A,B RWR Pump / Gen Field Breaker Trip 18-Jan-99 l

MALF RR02:A,B RWR Pump Control Signal Failure Scoop Tube 19-Feb-98 Lock MALF RR03:A,B RWR Pump Incomplete Start Sequence 03-Feb-99 MALF PR04:A,B RWR Pump f1 Seal Failure (non-recoverable) 07-Jul-95 j

MALF RR05:A,B RWR Pump 92 Seal Failure (non-recoverable) 07-Jul-95 Deleted MALF RR06:A,B RWR Pump Dual Seal Failure (non-N/A recoverable) (Ref: DRf 7340)

MALF RR07:A-H RWR Loop Flow Transmitter Fails 01-Mar-99 MALF RR08:A-T Jet Pump Failure (non-recoverable) 01-Feb-99 Rev. 1 Tab 2-21

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST CEA3pMS 3RRSER TEST TITIE PERFOORED Inactivated MALF RR09 RWR Master Flow Controller Failure (Ref:

N/A JTRG-98-067)

MALF RRIO:A,B RWR Sfstem MG Flow Controller Failure 30-Apr-98 MALF RRll:A,B RWR Pump Shaft Binding 12-Mar-98 MALF RR12:A,B RWR Pump Drive Motor Breaker Trip 03-Mar-97 MALF RR13:A-C ATWS System rails to Initiate RWR Pump 29-Apr-98 Trip MALF RR14:A,B RWR Loop Rupture (DBA) (non-recoverable) 12-May-98 MALF RR15:A,B RWR Coolant Leakage Inside Primat.y 25-Jan-99 Containment f

MALF RR16:A,B Reactor Vessel Wide Range Level 07-Jul-95 Transmitter Fails Replaced MALF RR16:C,D, E, F (UNDER DEVELOPMENT) ( Now in RR16: A,B)

N/A A

MALF RR17:A,B Reactor Vessel Fuel Zone Level Failure 30-Apr-98 j

MALF RR18 Refuel Water Level Indicator Fails 17-Feb-98 M74F RR19:A-D Rx Vessel Lvl Transmitter To FW Lvl 22-Jan-99 Control MALF RR20:A,B Loss Pressure Compensation to Feedwater 17-Feb-98 control MALF RR21:A-D Loss of Pressure Compensation to Feedwater 21-Jan-99 Added MALF RR22 Reactor Vessel Scram Level Transmitter 29-Apr-98 Failure Replaced MALF RR22A Reactor Vessel Scram Level Transmitter N/A Failure (Now In RR22)

Replaced MALF RR22B Reactor Vessel Scram Level Switch (A-D)

N/A Fail Downscale (Now In RR22)

Replaced MALF RR22C Reactor Vessel Scram Level Switch (A-D)

N/A Fail As Is (Now In RR22)

MALF RR23:A-D RWR Flow Unit Failure 20-Jan-99 Rev. 1 Tab 2-22

r i

i NEW YORK POWER AUn{ORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST gg, TEST TITLE CEANGES NIEdaER PEMOBBIED MALF RR24:A-D Jet Pump Summer Failure 27-Apr-98 MALF RR25:A,B Core Spray Pipe Break Inside Downcomer 29-Dec-98 MALF RR26 Unexplained Reactivity Change (non-23-Aug-98 recoverable)

MALF RR27:A,B Rx Level Narrow Range Reference Leg De-30-Apr-98 Gassing MALF RR28 Rx Level Narrow Range Reference Legs 21-Jan-99 Severe MALF Rn29 Reactor Vessel NR Lvl Transmitter Fails 17-Oct-95 Added MALF RR30 RWR MG Set Drive Motor Breaker Trip 05-Sep-95 1

Failure l

l Added MALF RR31 Reactor Vessel Wide Range Level 07-Jul-95 Transmitter rails i

MALF RW01 Rod Worth Minimizer Failure 14-Jan-99 MALF RX01 Fuel Cladding Failure 12-Jan-95 MALF RXO2:XX:YY Increased Rod Worth (XX-YY) 03-Feb-99 MALF RXO3 Core Thermal Hydraulic Instability 29-Apr-98 MALF sLol:A,B Standby Liquid Control Pump Breaker Trip 27-Apr-98 MALF SLO 2:A,B Standby Liquid Control Squib Valve rails 30-Mar-98 to open MALF SLO 3:A,B SLC Pump Relief Valve Lifts 30-Mar-98 Added MALF SLO 4 Standby Liquid control Squib Valve loss of 17-Mar-98 Continuity MALF SWOl:A,B Loss of RBCLC Flow to RWR 13-Jan-99 MALF SWO2:A-C TBCLC Hx Cooling Water Blockage 20-Jan-99 MALF SWO3:A-C RBCLC Hx Cooling Water Blockage 06-Jan-99 MALF SWO4:A-D RHR Service Water Pump Trip 28-Jun-98 Rev. 1 Tab 2-23

c NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST IAST DAIR CEANGES NtBSER PERFOSIED MALF SWO5:A-C Service Water Pump Trip 15-Jun-97 MALF SWO6:A,B RHR Hx Cooling Water Blockage 28-Jun-98 MALF SWO7:A-C TBCLC Pump Trip 27-Apr-98 MALF SWO8:A-C *TBCLC Hx Tube Leak (non-recoverable) 12-Jan-99 MALF SWO9:A-C RBCLC Pump Trip 28-Feb-99 MALF SW10:A-C 'RBCLC Hx Tube Leak (non-recoverable) 04-Mar-99 MALF SWil RBCLC Leakage in Drywell (non-recoverable) 18-Jan-99 MALF SW12:A,B Loss of Drywell cooling Assemblies 22-Dec-98 MALP SW13 Loss of Cooling to RWCU NRHX 08-Mar-99 MALF SW14:A,B Emergency Service Water Pump Trip 30-Apr-98 Added MALF SW15 Service Water Pump A Auto Start Failure 25-Jul-95 Added MALF SW16 TBCLC Pmp A Auto Start Failure 12-Oct-95 Added MALF SW17 RBCLC Pmp A Auto Start Failure 12-Oct-95 Added MALF SW1B ESW Pmp A(B) Auto Start Failure Y7-Oct-95 MALF TC01 Main Turbine Acceler.ation 02-Feb-99 MALF TCO2:A,B EHC Pump Trip 28-Jun-98 Added MALF TCO3 EHC Pump Press Reg Fails 29-Dec-98 Replaced MALF TCO3A:A,B EHC Pump Press Reg Fails High (Now In N/A TCO3)

Replaced MALF TCO3B:A,B EHC ? ump Press Reg Fails Low (Now In TCO3)

N/A Added MALF TC04 Bypass Valve Failure 03-Feb-99 Replaced MALF 1 04A Bypass Valve Failure (Now In TC04)

N/A Replaced MALF TC04B Bypass Valve Fails Closed (Now In TC04)

N/A Rev. 1 Tab 2-24 m

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TEST TITLE CEANGES NERSER PERFOSSED Added MALF TC05 Main Turbine Load Select Failure 03-Feb-99 Replaced MALF TCOSA Main Turbine Load Select Fails High (Wow N/A i

In TC05)

Replaced MALF TC05B Main Turbine Load select Fails Low (Now In N/A TC05)

Replaced MALF TC06A:A,8 EHC System Regulator Fails High N/A (Redundant, Now In MS01) DR87759 Replaced MALF TC06B:A,B EHC System Regulator Fails Low (Redundant, N/A Now In MS01) DRf7759 MALF TC07:A,B EHC System Regulator oscillation 28-Jan-99 Added MALF TC08 Turbine control valve Failure 26-Jan-99 Replaced MALF TC08A:A-D T*trbine Control Valve Fails Open (Now In N/A TC08)

Replaced MALF TCOBB:A-D Turbine Control Valve Fails Close (Now In N/A TC08)

Added MALF TC09 Turbine Stop Valve Failure 02-Feb-99 Replaced MALF TC09A:A-D Turbine Stop Valve Fails Open (Now In N/A TC09)

Replaced MALF TC09B:A-D Turbine Stop Valve Fails Closed (Now In N/A TC09)

MALF TC10 Turbine Load Reject 03-Feb-99 Added MALF TCll Main Turbine Auto Trip Failure 04-Aug-95 MALF TUOl Inadvertent Turbine Trip 05-Mar-97 MALF TUO2:A-J Main Turbine Bearing High Temp 28-Jun-98 MALF TUO3 Main Turbine Bearing 011 Pressure Low 15-Jan-99 MALF.

TUO4:A-J Main Turbine Bearing High vibration 28-Jun-98 MALF TU0S Main Turbine Shaft Driven Oil Pump Failure 29-Dec-98 MALF TUO6 Turbine Motor Suction Pump Trip 14-Jan-99 Rev. 1 Tab 2-25

I y l NEW YORK POWER AUTHORITY i

JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTU(G REPORT TEST LIST TEST IAST DATE 9

CIIANES BRRIBER PERNCERED MALF TUO7 Turbine Emergency Bearing 011 Pump Trip 14-Jan-99 i

Added MALF TUO8 Exhaust Hood Spray valve Failure 14-Jan-99 Replaced MALF TUO8A Exhaust Hood Spray Valve Fails Open (Now N/A In TUO8) l Replaced MALF TUO88 Exhaust Hood Spray Valve Fails Closed (Now N/A In TUO8)

MALF-YC01 EPIC Fails.

19-Mar-98 l

STEADY SS-01 25% Rated Thermal Power 01-Mar-99 STATE STEADY 35-02 75% Rated Thermal Power 01-Mar-99 STATE STEADY 55-03 100% Rated Thermal Power Stability Test 01-Mar-99 STATE TRANSIENT TT01 Manual RX Scram 01-Mar-99 l

TEST TRANSIENT TT02 Trip All Feedwater Pumps 01-Mar-99 TEST TRANSIENT TT03 Closure of All MSIVs 01-Mar-99 TEST TRANSIENT TT04 Trip of Both Recirc Pumps 01-Mar-99 TEST TRANSIENT TTOS Single Recirc Pump Trip 01-Mar-99 TEST TRANSIENT TT06 Main Turbine Trip (No Scram) 01-Mar-99 TEST TRANSIENT TT07 Max Rate Power Ramp 01-Mar-99 TEST l

TRANSIENT TT08 DBA LOCA With Loss of off-site Power 01-Mar-99 TES!

TRANSIENT TT09 Main Steam Line Rupture 01-Mar-99

)

TEST I

l l

Rev. 1 t

Tab 2-26

NI!W YORK POWER ALTTHORrrY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TEST M TEST TITLE CRANGES NUtaER PERF00GdED TRANSIENT TT10 Closure of All MSIVs With Stuck open 01-Mar-99 TEST Relief Valve MOD 7091 MOD 88-173: TO MAIN GENERATOR EXCITER 15-reb-95 VOLTAGE ADJUSTER DRIVE MOTOR ASSEMBLY.

MOD 7257 MOD 88-238 INSTALLS AN EDW/TP SYSTEM CROSS 14-Sep-95 CONNECT MOD 7426 PLANT CHANGE REQUIRES IMPLEMENTATION ON 25-Nov-96 THE SIMULATOR - MOD D1-89-055.

RWCU TEMP SWITCH REMOVAL.

MOD 7089 MOD 89-158: POWER MONITORING s ANALYZING 24-Apr-95 PANEL (27 MAP) FROM STATION BATTERIES.

MOD 7425 PLANT CHANGE REQUIRES IMPLEMENTATION ON 10/23/1995 THE SIMULATOR - MOD F1-90-202.

12P-1A REPLACEMENT.

MOD 7424 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-90-206.

EDG VENT SYSTEM ALARM.

MOD 7494 IMPLEMENT MOD 90-220 METER SCALE 04/02/1996 DIVISIONS ON 33LI-101A IN PLANT HAS CHANGED AND SIMULATOR METER DOES NOT MATCH MOD 7417 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-91-093.

INST. AIR SYSTEM IMPROVEMENTS.

MOD 7259 MOD 91-102 DISABLES 29-MOV-102 06/12/1995 MOD 7255 MOD 91-337 REPLACES SOME RAD MONITOR BULBS 05/22/1995 MOD 7423 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/04/1995 THE SIMULATOR - MOD D1-92-003.

REPLACE 25" MONITORS ON 09-5 W/ 33" MONITORS.

MOD 7097 MOD 92-338: RPV WIR LVL COND. CHAMBERS 02/27/1995 TEMP MONITORS, MOD 7427 PLANT CHANGE REQUIRES IMPLEMENTATION ON 04/30/1997 THE SIMULATOR - MOD 92-377.

MOD TO RELAY ROOM CO2 SYSTEM.

Rev. 1 Tab 2-27 L_

1 NEW YORK POWER AITTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST LAST DATE TEST TYPE TEST TITLE MOD 7258 MOD 93-086 REMOVES MSL ISOL VLV CLOSURE 04/11/1995 FUNCTION AND SCRAM FUNCTION FROM MAIN STM

)

RAD MON.

MOD 7094 MOD 94-001: RELOCATION OF EPIC POINTS TO 10/23/1995 THE SEQ OF EVENTS LOG.

)

l MOD 7260 MOD 94-057 IMPLEMENTS ELEC. SEPARATION OF 08/18/1995 CONTROL ROOM VENT INTAKE AIR ISOL VLV 70MOV-108 AND DAMPER 70 MOD-105.

I MOD 7422 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/05/1995 THE SIMULATOR - MOD M1-94-083.

REMOVAL OF MAIN TURBINE TURNING GEAR MOTOR FAST SPEED.

MOD 7421 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/13/1995 THE SIMULATOR - MOD M1-94-116.

RESTORATION OF AUTO-START FUNCTION FOR 70FN-6A&B l

MOD 7420 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/04/1995 THE SIMULATOR - MOD D1-94-131.

ADD RED LINE O 53 AMPS ON 71AM14A.

MOD 7256 MOD 94-133 REMOVES EPIC TREND RECORDER AND 04/12/1995 RELATED HARDWARE.

MOD 7419 PLANT CHANGE REQUIRES IMPLEMENTATION ON 12/19/1995 THE SIMULATOA - MOD M1-94-171.

MODIFY MAIN TURB GEN VIB TRIP SYS.

MOD 7418 PLANT CHANGE REQUIRES IMPLEMENTATION ON 07/25/1996 1

THE SIMULATOR - MOD D1-94-174.

INSTALLATION OF DC LED LAMPS ON 09-4 PANEL.

MOD 7472 PLANT MODIFICATION 94-195 IS INSTALLED IN 05/28/1996 THE PLANT CONTROL ROOM EMERGENCY VENTILATION DAMPER MODIFICATION.

MOD 7491 MODIFICATION 95-090 VALVE POSITION 01/29/1996 INDICATION LIGHTS FOR 31MOV-RSSV-1 MOD 7638 PLANT MODIFICATION 93-038 -- 71XVR-349 04/04/1996 TRANSDUCER REPLACEMENT MOD 7640 PLANT MODIFICATION 94-061 -- D/W FLOOR 06/27/1996 SUMP FLOW INTEGRATOR SUBSTITUTION Rev. 1 Tab 2-28

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITLE CEANGES NUniBER PERF0BelED MOD 7641 PLANT MODIFICATION 94-112 -- HPCI BOOSTER 05/20/1996 PUMP IMPELLER SUBSTITUTION MOD 7972 MODIFICATION 94-211 HAS BEEN COMPLETED IN 06/30/1997 THE PLANT l

MOD 7643 PLANT MODIFICATION 95-013 -- SUBSTITUTION 04/12/1996 0F 02-3TE-69J2 FOR RECORDER I:4PUT IN PLACE OF 02-3TE-69J1 MOD 7644 PLANT MODIFICATION 95-034 -- CONTROL ROOM 06/25/1997 CEILING EGGCRATE SUPPORT ENHANCEMENT MOD 7645 PLANT MODIFICATION 95-058 -- MAIN STEAM 04/04/1996 RAD MONITOR NOISE SUPPRESSION MOD 8127 MODIFICATION D1-95-088 TO REPLACE GREEN 09/08/1997 PCIS LA.4PS HAS BEEN COMPLETED IN THE PLANT MOD 7974 MODIFICATION 95-131 HAS BEEN COMPLETED IN 05/13/1997 THE PLANT MOD 8256 MOD 97-056 REFLACES METER SCALES 12-01/06/1998 4FI141A & B 0-120 SCALES WITH 0-130 SCALES.

MOD 7971 MODIFICATION 94-031 HAS BEEN COMPLETED IN 12/02/1997 THE PLANT MOD 7807 POWER UPRATE MOD 96-045 PACKAGE 10/06/1997 IMPLEMENTATION.

MOD 7970 MOD 92-088 HAS BEEN COMPLETED IN PLANT 04/16/1997 MOD 7637 PLANT MODIFICATION 93-018 -- RWCU PUMP 07/16/1996

'B' SEAL COOLER REMOVAL MOD 7642 PLANT MODIFICATION 94-157 -- 94TR-200 04/12/1996 REPLACEMENT

+

MOD 7483 IMPLEMENT THE EPIC /LEFM MODIFICATION 95-06/29/1998 056.

MOD 7973 MODIFICATION 95-077 HAS BEEN COMPLETED IN 01/26/1998 THE PLANT Rev. 1 Tao 2-29

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING '1Pon?

TEST LIST TEST LAST DATE CEAmass museum l

PERSCEGEED MOD 7734 IMPLF. MENT MODIFICATION M1-95-123 w.C.%NEL 10/06/1996 MODIFICATION FOR TEST MONITORING SYSTEM AND POWER UPRATE PROJECT MOD 7913 UPDATE THE 3D-MONICORE REPORTS PERIODIC 06/23/1997

LOG, CONTROL ROD POSITIONS, AND CORE POWER AND FLOW LOG, AND LPRM READINGS AS SHOWN ON THE ATTACHMENTS. MOD 95-123 MOD 7912 UPDATE THE 3D-MONICORE MAIN MENU DISPLAYS 06/16/1997 IN ACCORDANCE WITH THEIR NEW FORMAT. MOD 95-130 J

MOD 7843 THERMAL STABILTIY/3D MONICORE UPGRADE MOD 02/19/1998 95-130 MOD 7751 IMPLEMEN* NECESSARY CHANGES FOR M1-96-005 09/12/1996 RE"T GD SCALES FOR METER AND RECORDER CHANGES FOR POWER UPRATE.

I MOD 7975 MODIFICATION 96-018 HAS BEEN COMPLETED IN 06/02/1997 THE PLANT MOD 7976.

MODIFICATION 96-078 HAS BEEN COMPLETED IN 05/05/1997 THE PLANT MOD 7639 PLANT MODIFICATICN 93-093 -- 20LS-355A RX 07/16/1996 BLDG LEVEL SWITCH SUBSTITUTION MOD 7447 COMPUTER PLATFORM UPGRADE - MASTER 21-May-96 CONTROLLER I/O INTERFACE 1

MOD 7448 COMPUTER PLATFORM UPGRADE - INSTRUCTOR 10-Feb-98 STAION H/W & S/W INTERFACES MOD 7449 COMPUTER PLATFORM UPGRADE - EPIC SYSTEM 10-Feb-98 SOFTWARE AND HARDWARE MOD 7450 COMPUTER PLATFORM UPGRADE - SIMULATION 10-Feb-98 LOAD MODULES SCR 7575 SET POINT CHANGE TO 02-3 MTU-272A-D 03/26/1996 SCR 7619 CST LEVEL ALARM SETPOINTS HAVE CHANGED IN 03/27/1996 PLANT SCR 7261 MOD CHANGES CST TEMP ALARM SETPOINT TO 40 04/28/1995 DEG F.

PER SCR-JAF-94-0022 Rev. 1 Tab 2-30

NEW YORK POWER AUn{ORITY lutes A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT

' TEST LIST TEST IAST DATE

' CHANES NURSER PEPJCOBED SCR 7262 CHANGES 02RV-71A THROUGH 02RV-71L 03/17/1995 SETPOINTS.

SCR 7630 PLANT SETPOINT FOR 33DPS-111 HAS CHANGED 06/07/1996 SCR 7629 PLANT SETPOINTS FOR 94PNS-101, 102, 103, 04/04/1996 AND 104 HAVE CHANGED SCR 7618 SETPOINT FOR 23PT-68A,B,C,&D HAS CHANGED 03/26/1996 IN PLANT SCR 7612 SETPOINT FOR 34PS-137 MAS CHANGED IN THE 06/18/1996 PLANT SCR 7607 SETPOINT FOR 17RM-150 A & B HAS BEEN 03/21/1996 CHANGED IN THE PLANT SCR 7576 SET POINT CHANGE TO 76CO2-PNL-1 TIMER 05/21/1996 SCR 7574 SET POINT CHANGE TO 02-3 MTU-202A-D 03/26/1996 SCR "J573 SET POINT CHANGES TO 17RM-150A & B 03/21/1996 SCR 7572 SETPOINT CHANGES TO 17RM-251A-D 03/21/1996 SCR 7263 MOD IS SETPOINT CHANGE TO 39TS-113A,B,C 04/28/1995 PER SCR-JAF-94-0027 SCR 7264 MOD IS SETPOINT CHANGES FOR RPS EPA ' NDER 04/28/1995 J

& OVER VOLTAGE, AND UNDER FREQUENCY. --

NORMAL TEED, PER SCR-JAF-94-0036.

SCR 7265 MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 ALTERNATE FEED PER SCR-JAF-94-0037 SCR 7266 MOD IS SETPOINT CHANGE RPS EPA TIME DELAYS 04/28/1995 NORMAL FEED PER SCR-JAF-94-0038 SCR 7267 MOD IS SETPOINT CHANGE FOR RPS EPA UNDER & 04/28/1995 OVER VOLTAGE, AND UNDER FREQUENCY. --

ALTERNATE FEED PER SCR-JAF-94-0039 SCR 7577 SET POINT CHANGE TO 03DPIS-246 03/21/1996 SCR 7827 CHANGE 70FN-4A TIME DELAY START LOGI:

05/05/1997 SCR 7810 RPS EPA UV RELAY SETPOINT CHANGES.

12/16/1996 Rev. 1 Tab 2-31

i NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT I

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIET TEST IAST DATE CEANGES NtadBER PERf0ERED SCR 7811 02-3MTU-255A-D SETPOINT CHANGES.

12/16/1996 SCR 7812 02MTU-216 THRU 219A-219D.

12/16/1996 SCR 7813 RX HIGH PRESSURE ALARM SETPOINT CHANGE.

12/16/1996 SCR 7817 29PNS-80A2,B2,C2,D2 AND 29PNS-03/17/1997 86A2,B2,C2,D2 SETPOINTS HAVE CHANGED FROM 88 TO 78.

SCR 7822 CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3312 SCR 7823 CHANGE VALUES FOR ALERT AND CAUTION ALARMS 12/23/1996 FOR MAXIMUM RX POWER FOR EPIC POINT 3390 SCR 7824 CHANGE 1:PCI TURBINE MECHANICAL OVERSPEED 12/23/1996 SETPOIN'i' FOR POWER UPRATE SCR 7731 SETPOINTS FOR 02-MTU-234A-D HAVE BEEN 10/07/1996 CHANGED IN THE PLANT SCR 7826 CHANGE SRV SETPOINTS FOR UPRATE 12/23/1996 SCR 7805 72TS-129 THROUGH 132 SEPOINT REVISIONS 03/24/1997 SCR 7878 SCR-JAF-96-0082 HAS BEEN IMPLEMENTED IN 10/06/1997 THE PLANT REVISING 71UPS-3UVR SETPOINT SCR 8000 ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVA02.

SCR 8001 ADD STARTING TIME DELAY SEr SINT FOR 70-62 06/23/1997 1CRVB02.

SCR 8002 ADD STARTING TIME DELAY SETPOINT FOR 70-62 06/23/1997 1CRVB04 SCR 8003 MODIFY LOW OFFGAS FLOW SETPOINT ON 06/23/1997 INSTRUMENT 01-107FS-108L.

SCR 8213 CHANGE SETPOINT OF 29PS-107 FROM 190 PSIG 08/26/1997 TO 155 PSIG.

SCR 8310 SETPOINT CHANGE TO RPS EPA'S 03/13/1998 Rev. 1 i

Tab 2-32 l

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST LIST TEST TYPE TEST TITIE CBANGES NtRdBER PERPO50mp SCR 8313 ADD NEW EPIC ALARM SETPOINTS FOR FW 03/30/1998 HEATERS.

SCR 8348 TIME DELAY SETPOINT FOR CO2 DISCHARGE INTO 06/18/1998 RELAY ROOM HAS BEEN CHANGED.

SCR 7825 CHANGE RCIC TURBINE MECHANICAL OVERSPEED 12/23/1996 SETPOINT FOR POWER UPRATE SCR 7777 SETPOINT CHANGES FOR 70TS-103.

03/24/1997 SCR 7730 SETPOINTS FOR 02-3MTU-201A-D HAVE BEEN 10/06/1996 CHANGED IN THE PLANT SCR 7732 SETPOINTS FOR 33MTU-235A-D, 33PT-135A-D 12/16/1996 HAVE BEEN CHANGED IN THE PLANT SCR 8396 IMPLEMENT SCR-JAT-97-0014, OFFGAS 08/10/1998 RECOMBINER LOW FLOW ALARM SETPOINT FROM 12.5 TO 7.5 SCFM.

SCR 7745 SETPOINTS FOR 02-3STU-274 A & B HAVE BEEN 10/07/1996 CHANGED IN THE PLANT SCR 7746 SETPOINTS FOR 02-3MTU-283 A & B HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7747 PLANT SETPOINTS FOR 02-3MTU-283 C & D HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7748 PLANT SETPOINTS FOR 02-3MTU-273 s 279 HAVE 10/07/1996 CHANGED IN THE PLANT SCR 7749 PLANT SETPOINTS FOR 23MTU-276, 23MTU-277, 10/07/1996 23STU-278,23STU-279, 23DPT-76 AND 23DPT-77 HAVE CHANGED IN THE PLANT SCR 7750 SETPOINTS FOR 13MTU-284, 13STU-286, 13DPT 10/07/1996 84, 13DPT-83, 13MTU-283 AND 13STU-285 HAVE CHANGED IN PLANT SCR 7809 4 KV DEGRADED VOLTAGE TIME DELAY RELAY 03/17/1997 SETPOINT CHANGE.

SCR 7758 IMPLEMENT REQUIRED CHANGES IAW SCR--96-00311/25/1996 Rev.

Tab 2-33

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING REPORT TEST I.IST TEST LAST DATE 9

CEANGES NUMBER PERNOORAD SCR 7806 ADD A REMOTE FUNCTION FOR INSTRUCTOR TO 12/16/1996 CHANGE THE REACTOR HI PR ATWS TRIP FROM THE NORMAL 1139 PSIG TO 1104 PSIG IN THE CASE WHERE TWO OR MORE SRV'S ARE INOPERABLE.

SCR 7778 SETPOINT CHANGES FOR 23MTU-277, 23STU-279, 09/25/1997 13MTU-284 AND 13ST'J-286.

SCR 7779 CRESCENT AREA UNIT COOLER LOW TEMP ALARM 03/19/1997 SETPOINT REVISIONS.

SCR 7780 37 TICS-101SETPOINT CHANGE.

03/24/1997 SCR 7800 70TS-103 SETPOINT REVISION 03/19/1997 i

SCR 7801 CRESCENT AREA UNIT COOLER LOW TEMPERATURE 03/19/1997 ALARM SETPOINT REVISION SCR 7802 37 TICS-101 SETPOINT REVISION 03/19/1997 i

SCR 7803 07SRM-40A-D SETPOINT REVISION 06/02/1997 SCR 7804 72TS-122A/B SETPOINT REVISION 03/24/1997

  1. 1 SCR 7729 SETPOINTS FOR 27RM-104A&B HAVE BEEN 03/19/1997 CHANGED IN THE PLANT I

SCR 7753 SETPOINTS FOR 66TS-107A, B,

C, D,

G, H,

J, 03/31/1997 l

& K HAVE CHANGED IN THE PLANT l

l I

l i

I Rev. 1 Tab 2-34

NEW YORK POWER AUTHOEUTY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TES'I1NG PLAN 1999-2002 TEST TF5B TEST TITLE SCIEDULE STEADY STATE SS-01 25% Rated Thermal Power ANNUALLY STEADY STATE SS-02 75% Rated Thermal Power ANNUALLY l

STEADY STATE SS-03 100% Rated Thermal Power Stability Test ANNUALLY TRANSIENT TT01 Manual RX Scram ANNUALLY TEST TRANSIENT TT02 Trip All Feedwater Pumps ANNUALLY j

TEST TRANSIENT TT03 Closure of All MSIVs ANNUALLY TEST TRANSIENT TT04 Trip of Both Recirc Pumps ANNUALLY TEST l

TRANSIENT TT05 Single Recirc Pump Trip ANNUALLY l

TEST TRANSIENT TT06 Main Turbine Trip (No Scram)

ANNUALLY TEST l

TRANSIENT TT07 Max Rate Power Ramp ANNUALLY TEST TRANSIENT TT08 DBA LOCA With Loss of Off-site Power ANNUALLY TEST TRANSIENT TT09 Main Steam Line Rupture ANNUALLY TEST TRANSIENT TT10 Closure of All MSIVs With Stuck Open Relief ANNUALLY TEST Valve MALFUNCTION AD01 ADS Timer Fails to Start Year 1 TEST MALFUNCTION AD02 ADS Inadvertent Timer and Logic Start Year 4 TEST MALFUNCTION AD03:A-H ADS Valve (s) Fail to Initiate Automatically Year 4 TEST MALFUNCTION AD04:A-K RX Press Relief Valve Solenoid Failure Year 4 TEST Rev. 1 Tab 3-1

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTFE TEST TITLE SCEEDULE MALFUNCTION AD05:A-K RX Press Relief Valve Laak Year 4 TEST MALFUNCTION AD06:A-K RX Press Relief Valve Inadvertently Opens Year 4 TEST MALFUNCTION AD07:A-K RX Press Relief Valve Fails to Open Year 4 TEST MALFUNCTION ADOS:A-K RX Press Relief Valve Stuck Open Year 1 TEST

)

MALFUNCTION AD09:A-K RX SRV Vacuum Breaker Stuck Open Year 4

)

TEST MALFUNCTION AN01:A,B Control Room Annunciator Power Failure Year 3 TEST MALFUNCTION CS01:A,B Core Spray Pump Trip Year 4 TEST MALFUNCTION CS02:A,B Core Spray Injection Valve Fails to Auto Open Year 4 TEST MALFUNCTION CS03:A,B Core Spray Torus Suction Fails Closed Year 4 TEST MALFUNCTION CSO4:A,B Core Spray Injection Line Break (nor.-

Year 4 TEST recoverable)

MALFUNCTION CS05:A,B Core Spray Torus Suction Line Pipe Failure Year 1 TEST MALFUNCTION CUO1 RWCU Flow Control Failure Year 1 TEST MALFUNCTION CUO2:A,B RWCU Pump Trip Year 1 TEST MALFUNCTION CUO3:A,B Tube Leak in RWCU HX (non-recoverable)

Year 1 TEST MALFUNCTION CUO4:A,B RWCU Resin Intrusion Year 1 TEST MALFUNCTION CUO6 RWCU Inadvertent Isolation Year 1 TEST MALFUNCTION CUO7 RWCU Pipe Break Between 12MOV-15 and 12MOV-18 Year 1 TEST Rev. 1 Tab 3-2

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITIA SCEEDULE MALFUNCTION CUO8 RWCU Return Temperature Transmitter Failure Year 1 TEST MALFUNCTION CUO9 RWCU Inlet Pipe Failure (non-recoverable)

Year 1 TEST MALFUNCTION CU10 RWCU Valve 12MOV-18 Fails To Auto Isolate Year 1 TEST MALFUNCTION DG01:A-D EDG Fails to Start Year 1 TEST MALFUNCTION DG02:A-D EDG Fails to Trip Year 1 TEST MALFUNCTION DG03:A-D EDG Output Breaker Fails to Auto Close Year 1 TEST l

MALFUNCTION DG04:A-D EDG Trip Year 1 TEST MALTUllCTION DG05:A-D EDG Voltage Regulator Oscillations Year 1 TE3T MALFUNCTION DG06:A-D EDG Slow to Start Year 1 TEST i

MALFUNCTION DG07:A-D EDG Governor Tails High Year 1 TEST MALFUNCTION DG08:A-D EDG Governor Fails Low Year 1 TEST MALFUNCTION ED01:A,B 345/24hT Transformer (T1A, T1B) Failure Year 1 TEST MALFUNCTION ED02:A,B 115/4KV Transformer (T2, T3) Failure Year 1 TEST MALFUNCTION ED03:A-D 4KV/600V Transformer (T13, T14, TIS, T16)

Year 1 TEST Failure l

l MALFUNCTION ED04:A,B Inverter (71INV-3A/B) Failure Year 1 l

TEST MALFUNCTION ED05:A-H 4KV/600V Transformer (TS, T6, T7, T8, T9, T10, Year 1 TEST Rev. 1 j

Tab 3-3 t

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITLE SCEEDUI2 MALFUNCTION ED06A 120VAC Bus (RBACA5) Failure Year 1 TEST MALFUNCTION ED06B 120VAC Bus (TBACA6) Failure Year 1 TEST MALFUNCTION ED06C 120VAC Bus (SWACA7) Failure Year 1 TEST MALFUNCTION ED06D 120VAC Bus (RBACBS) Failure Year 1 TEST MALFUNCTION ED06E 120VAC Bus (TBACB6) Failure Yea: 1 TEST MALFUNCTION ED06F 120 SAC Bus (RWACB7) Failure Year 1 TEST MALFUNCTION ED07A 120VAC Bus (RRACAB) Failure Year 1 TEST MALFUNCTION ED07B 120VAC Bus (RRACB8) Failure Year 1 TEST MALFUNCTION ED07C 120VAC Bus (RBACCS) Failure Year 1 TEST MALFUNCTION ED07D 120VAC Bus (TBACC6) Failure Year 1 TEST MALFUNCTION ED07E 120VAC Bus (SWACC7) Failure Year 1 TEST MALFUNCTION ED07F 120VAC Bus (RBACDS) Failure Year 1 TEST MALFUNCTION ED07G 120VAC Bus (TBACD6) Failure Year 1 TEST MALFUNCTION ED07I 120VAC Bus (RBACE5) Failure Year 1 j

TEST MALFUNCTION ED07J 120VAC Bus (71ABAC1) Failure Year 1 TEST HALFUNCTION ED07K 120VAC Bus (71ACNMS) Failure Year 1 TEST MALFbNCTION ED07L 120VAC Bus (71ACNMS-A) Failure Year 1 TEST Rev. 1 Tab 3-4

NEW YORK POWER AUIRORITY JAMES A. FITZPA*IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tsa? TT75 TEST TITLE SCEEDUIA MALFUNCTION ED07M 120VAC Bus (71ACNMS-B) Failure Year 1 TEST MALFUNCTION ED08 120V/240VAC Bus (71AC9/71AC10) Failure Year 1 TEST MALFUNCTION ED09:A,B UPS MG Drive Failure (AC/DC)

Year 1 TEST MALFUNCTION ED10 120VAC UPS Bus (71ACUPS) Failure Year 2 TEST MALFUNCTION ED11A 125VDC Bus A (71BCB-2A) Failure Year 1 TEST MALFUNCTION ED11B 125VDC Bus B (71BCB-2B) Failure Year 1 TEST MALFUNCTION ED12:A,B 125VDC Bus Battery Charger Failure Year 1 TEST J

MALFUNCTION ED13 24VDC Bus A(B) System Failure Year 1 TEST j

l MALFUNCTION ED14:A,B 24VDC Battery Charger Failure Year 1 TEST i

MALFUNCTION ED15 24KV/4KV Transformer T4 Failure Year 1 TEST MALFUNCTION ED16 Power Grid Transient With Load Year 2 TEST Increasing / Decreasing MALFUNCTION ED17 Station Blackout Year 2 TEST MALFUNCTION ED18:A,B 4.16KV Emergency Bus (10500, 10600) Failure Year 2 TEST MALFUNCTION ED19:A-E 4.16KV Normal Bus (10100, 10200, 10300, 10400, Year 2 TEST MALFUNCTION ED20:A-H 600VAC Bus (11300, 11400, 12300, 12400, 13300, Year 2 TEST MALFUNCTION ED21:A-D 600VAC Emergency Bus (11500, 12500, 11600, Year 2 TEST 12600) i Rev. 1 Tab 3-5

1

)

NEW YORK MWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TT7E TEST TITIA SCIEDUI2 MALFUNCTION ED22:A-C 600VAC Normal Bus (113100, 113200, 113300)

Year 1 TEST Failure MALFUNCTION ED23:A-C 600VAC Normal Bus g'14100, 114200, 114300)

Year 1 TEST Failure i

MALFUNCTION ED24A-D 600VAC Emergency Bus (115100, 115200, 115300, Year 1 TEST 115600)

MALFUNCTION ED25:A-F 600VAC Bus (116100, 116200, 116300, 116400, Year 2 TEST

116500, f

MALFUNCTION ED26:A,B 600VAC Bus (123100, 123200) Failure Year 1 TEST j

MALFUNCTION ED27:A,B 600VAC Bus (124100, 124200) Fa lure Year 1 TEST MALFUNCTION ED28:A-D 600VAC Bits (125100, 125200, 12530J, 125400)

Year 2 TEST Failure MALFUNCTION ED29:A-D 600VAC Emergency Bus (126100, 126200, 126300, Year 2 TEST 126400)

MALFUNCTION ED30:A-D 600VAC Bus (133100, 133200, 133300, 133400)

Year 1 TEST Failure j

i MALFUNCTION ED31:A-D 600VAC Bus (134100, 134200, 134300, 134400)

Year 1 TEST Failure MALFUNCTION ED32:A-E 600VAC Bus (143100, 143200, 143300, 143400, Year 2 TEST 143500)

MALFUNCTION 13:A-E 600VAC Bus (144100, 144200, 144300, 144400, Year 2 TEST 144500)

MALFUNCTION ED34A 120VAC Bus RPS-A Failure Year 1 TEST MALFUNCTION ED34B 120VAC Bus RPS-B Failure Year 1 TEST MALFUNCTION ED35A 120VAC Bus (71 ESSA 1) Failure Year 1 TEST MALFUNCTION ED35B 120VAC Bus (71ESSB1) Failure Year 1 TEST MALFUNCTION ED36' 120VAC Bus (71ACA2) Failure Year 1 TEST

}

Rev. 1 Tab 3-6

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICI. NUCLEAR POWER PLANT PLANT REFERENCET, SIMULATION FACILITY FOUR YEAR PEK < OW! ACE TESTING PLAN 1999-2002 TEST Tf75 TE87 TITIE SCEEDUI2 MALTUNCTION ED36B 120VAC Bus (71ACA3) Failure Year 1 TEST

{

MALFUNCTION ED36C 120VAC Bus (71ACA4) Failure Year 1 TEST J

MALFUNCTION ED36D 120VAC Bus (71ACL2) Failure Year 1 TEST

{

MALFUNCTION ED36E 120VAC Bus (71ACB3 ) Failure Year 1 TEST MALFUNCTION ED36F 120VAC Bus -(71ACB4) Failure Year 1 i

TEST MALFUNCTION ED37A:1-5 125VDC Bus (71DC-A) Failure Year 1 TEST MEFUNCTION ED37B:1-5 125VDC Bus (71DC-B) Failure Year 1 TEST MALFUNCTION ED38:A-E 225VDC Bus (71BMCC) Failure Year 4 TEST

)

MALTUNCTIDN ED39:A-G 125VDC Control Power Failure To 4160V Busses Year 4 TEST MALFUNCTION ED40 A-L 125VDC Control Power Failure To 600V Busses Year 1 TEST MALFUNCTION ED41 Failure To Fast Transfer With A Normal Year 2 TEST Residual Transfer MALFUNCTION ED42 Failure To Fast Transfer With A Loss of RPS Year 2 TEST MALFUNCTION ED43 Loss of Affected 115KV Line Year 2 TEST MALFUNCTION ED44 Loss of Station Reserve Power Year 2 TEST MALFUNCTION EG01 Main Generator Trip Year 2 TEST MALFUNCTION EG02A Main Generator Field Breaker Fails to Close Year 1 TEST Rev. 1 Tab 3-7

NE W YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT M FERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST THE TEST TITLE SCEEDUI2 MALFUNCTION EG02B Main Generator Field Breaker Fails to open Year 1 TEST MALFUNCTION EG03:A,B Loss of Isolated Phase Bus Cooling Fan Year 1 TEST MALFUNCTION EG04 Main Generator Field Brushes Ground Year 2 i

TEST l

MALFUNCTION EGOS Main Generator Stator Temp High Year 1 TEST MALFUNCTION EG06 Generator Hydrogen Cooling System Leakage Year 2 TEST MALFUNCTION EG07 Hydrogen Seal Oil System Failure Year 2 TEST MALFUNCTION EGOS Main Generator Auto V/R Fails Year 2 TEST MALFUNCTION EG09 Main Generator Auto V/R Failure Complete Year 2 TEST MALFUNCTION EG10 Loss of Stator Cooling Water Flow Year 2 TEST MALFUNCTION EGil Main H2 Seal Oil Pump Trip Year 4 TEST MALFUNCTION EGl2 Emergency Seal Oil Pump Auto Start Failure Year 4 TEST MALFUNCTION FP01:A-D EDG Rm Fire Year 3 TEST MALFUNCTTON FPG2 Smoke - Zone 0) through Zone 82 Year 3 TEST MALFUNCTION FWOl:A,B RX Feedwater Pump Trip Year 2 TEST MALFUNCTION IWO2A:A,B RX Feedwater Pump Recirc Valve Fails Open Year 2 TEST MALFUNCTION FN02B:A,B RX Feedwater Pump Recirc Valve Fails Closed Year 2 TEST MALFUNCTION FWO3:A,B RX Feedwater Pump Auto Controller Failure Year 2 TEST Rev, 1 Tab 3-8

NEW YORK POWER AUTHORITY j

JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY r

FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002

)

i TEST TTFE TEST TITLE SCEEDULE MALFUNCTION FWO4:A,B RX Feedwater Pump Manual Controller Failure Year 2 TEST MALFUNCTION FWO5:A,B RX Teedwater Pump High Vibration Year 2 TEST MALFUNCTION FWO6:A,B RX Feedwater Pump Coupling Failure Year 2 TEST MALFUNCTION FWO7:A,B RX Feedwater Pump Discharge Valve Seat Failure Year 2 TEST MALFUNCTION FWO8 Master Feedwater Flow Control Auto Failure Year 2 TEST MALFUNCTION FWO9 Master Feedwater Flow Control Manual Failure Year 2 TEST MALFUNCTION N10 Master Feedwater Flow Control Oscillates Year 2 TEST MALFUNCTION N13 : A, B Feedwater System 6th Point Heater Tube Leak Year 2 TEST MALFUNCTION FW14:A,B Feedwater System Sth Point Heater Tube Leak Year 3 TEST MALFUNCTION FW15:A,B Feedwater System 4th Point Heater Tube Leak Year 3 TEST MALFUNCTION FW16:A,B Feedwater System 3rd Point Heater Tube Leak Year 3 TEST MALFUNCTION FW17:A,B Feedwater System 2nd Point Heater Tube Leak Year 3 TEST MALFUNCTION N18:A,B Feedwater System Drain Coole:: Tube Leak Year 3 TEST MALFUNCTION FW19:A-E Condensate Pump Trip Yoar 3 TEST l

l MALFUNCTION FW22:A,B CST Leak Manway Flange Failure Year 2 l

TEST MALFUNCTION FW23:A-D High Pressure Heater Level Control Failure Year 3 TEST Rev. 1 Tab 3-9 l

L

l l

t NEW YORK POWER AIRHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 i

TEST TTWE TEST TITLE SCEEDUIE MALFUNCTION FW24:A,B RX Feedwater Pump Loss of oil Pressure Year 3 TEST MALFUNCTION IW25:A-C Condensate Booster Pump Trip Year 3 TEST

{

MALFUNCTICH FW26 A,B Condensate Transfer Pump Trip Year 2 TEST MALFUNCTION FW27:A,B Feedwater Line Break Inside Primary Year 3 TEST Containment MALFUNCTION FW28:A,B Feedwater Line Break Outside Primary Year 3 TEST Containment MALFUNCTION IW29:A,B Feedwater Line Inboard Containment Check Valve Year 3 TEST MALFUNCTION FW31 Condensate Booster Pmp A Auto Start Failure Year 1 TEST MALFUNCTION FW32 Feedwater Heater Loop Seal Drair Blockage Year 3 TEST MALFUNCTION HP01 HPCI Failure to Auto Start Year 2 TEST MALFUNCTION HP02 HPCI Turbine Trip Year 2 TEST MALFUNCTION HP03 HPCI Discharge Line Break (non-recoverable)

Year 2 TEST MALFUNCTION HPO4 HPCI Flow Controller Auto Output Failure Year 2 TEST MALFUNCTION HPOS HPCI Inadvertent Initiation Year 2 TEST

)

i MALFUNCTION HP06 HPCI Steam Line Break (non-recoverable)

Year 2 l

TEST MALFUNCTION HP07 HPCI Valve 23MOV-19 Fails to Auto Open Year 2 TEST MALFUNCTION HP08 HPCI Turbine Exhaust Piping Failure Year 2 TEST MALFUNCTION HP09 HPCI Torus Suction Pipe Failure (non-Year 2 TEST recoverable)

Rev. 1 Tab 3-10 i

i

)

NEW YORK POWER AUTHORITY l

JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 I

TEST TENE TEST TITLE SCIEDUI2 MALFUNCTION HP10 HPCI System Auto Isolation Failure Year 1 TEST l

MALFUNCTION HP11 HPCI 23MOV-15 Auto Isolation Failure Year 1 i

TEST MALFUNCTION HP12 HPCI High Rx Water Lvl Trip Failure Year 1 TEST MALFUNCTION HV01:A-C Rx Bldg Supply Fan Trip Year 2 TEST I

i MALFUNCTION HV02:A,B Rx Bldg Exhaust Fan Trip Year 2 TEST

{

i MALFUNCTION HV03 Secondary Containment Leakage Year 2 TEST l

h MALFUNCTION IA01 Loss of Air Pressure to Scram Air Header Year 2 j

TEST j

MALFUNCTION IA02 Loss of Instrument Air Year 2 TEST I

MALFUNCTION IA03:A-C Air Compressor Trip Year 2 TEST MALFUNCTION IA04 Serv Air Comp A Auto Start on Low Inst Air Hdr Year 1 TEST Press Fail MALFUNCTION HC01 Main Condenser Air In-Leakage Year 2 TEST MALFUNCTION MCO2:A-D Main Condenser Tube Leak Year 2 TEST t u. s Water Box Flow Block Year 2 MALFUNCTION MC03:A-D Main Co.

TEST l

l MALFUNCTION MC04 SJAE Steam :., a Valve Fails Year 2 TEST MALFUNCTION MC05:A-C Circulating Water Pump Trip Year 2 TEST MALFUNCTION MC06 Air Ejector Condenser High Level Year 3 TEST Rev. 1 Tab 3-11

1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY j

FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTEE TEST TITIA SCREDUI2 MALFUNCTION MC07:A-C Circ Water Pump Discharge Valve Fails to Close Year 2 TEST I

MALFUNCTION MC08:A-C Cire Water Pump Discharge Valve rails to Open Year 2 j

TEST J

MALFUNCTaON MC09:A-D Loss of Condenser Water Box Vacuum Priming Year 2 TEST 1

I MALFUNCTION MC10 Water Icing in Intake Structure Year 2 TEST MALFUNCTION MS01:A,8 Main Steam Header Press Xmtr Failure Year 2 l

TEST I

MALFUNCTION MS02:A-D Steam Leakage Inside Primary Containment Year 3 TEST l

MALFUNCTION MS03:A-D Main Steam Line Rupture Inside Primary Year 3 TEST

)

MALFUNCTION MSO4:A-D Main Steam Line Rupture Outside Primary Year 3 TEST MALFUNCTION MS05 Steam Leak Outside Primary Containment Year 3 TEST MALFUNCTION MS06 Steam Seal Pressure Regulator Tails Year 2 TEST MALFUNCTION MS07:A-H MSIV Disc Separates from Stem (non-Year 2 TEST recoverable)

MALFUNCTION M508A:A-H MSIV Fails Closed Year 2 TEST MALFUNCTION MS08B:A-H MSIV Fails Open Year 2 TEST MALFUNCTION MSO9:A,B First Stage Reheat Steam Supply to MSR Fails Year 2 TEST MALFUNCTION MS10:A-H MSIV Slow Test closure Time Year 2 TEST MALFUNCTION MSil:A,B Second Stage Reheat Steam Supply to MSR Fails Year 2 TEST MALTdNCTION MS12:A-D Moisture Separator Drain Tank Level control Year 3 TEST Rev. 1 Tab 3-12

NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE TEST TITLE SCHEDUI2 MALFUNCTION MS13:A-D First Stage Reheat Drain Tank Level Control Year 3 J

TEST j

MALFUNCTION MS14:A-D Second Stage Reheat Drain Tank Level Control Year 3 TEST MALFUNCTION MS15:A-J Loss of Feedwater Extraction Steam Year 3 TEST MALFUNCTION MS16:A-L SRV Discharge Line Dreak Above Torus Water Year 2 j

TEST Level f

MALFUNCTION NM01:A-D SRM Channel Failure Year 2 TEST MALFUNCTION NM02:A,B SF;4 Channel Recorder Failure Year 2 TEST MALFUNCTION NM03:A-D SRM Channel Inoperative Year 2 TEST I

MALFUNCTION NM04 A-D SRM Channel Detector Stuck Year 2 TEST l

MALFUNCTION NMOS:A-D SRM Channel Retract Permit Failure Year 2 TEST MALFUNCTION NM06:A-H 1RM Channel Failure Year 2 TEST MALFUNCTION NM07:A-H IRM/APRM-RBM Channel Recorder Failure Year 3 TEST MALFUNCTION NM08:A-H IRM Channel Inoperative Year 2 TEST MALFUNCTION NM09:A-H IRM Channel Detector Stuck Year 2 TEST MALFUNCTION NM10:A-H IRM Channel Retract Permit Failure Year 2 7EST MALFUNCTION NM11:XXYYZZ LPRM (XX-YY-ZZ) Failure Year 2 TEST MALFUNCTION NM12:A,B RBM Channel Failure Year 2 TEST Rev. 1 Tab 3-13

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT j

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWB TEST TITLE SCEEDUIE MALFUNCTION NM13:A, O RBM Channel Inoperative Year 2 TESl' MALFUNCTION NM14:A-F APRM Channel Failure Year 2 TEST MALFUNCTION NM15:A-F APRM Channel Inoperative Year 2 TEST i

MALFUNCTION OG01 Off Gas Condenser High Level Year 3 TEST MALFUNCTION OG02 Off Gas Drain Pot High Level Year 3 TEST MALFUNCTION OG03 Explosion in Air Ejector Discharge Year 3 TEST MALFUNCTION OG04 Fire in Air Ejector Year 3 TEST MALFUNCTION OG05 Recombiner Trip Year 4 TEST MALFUNCTION OG06 Stack Isolation Valve Fails Closed Year 4 TEST MALFUNCTION OG07 Off Gas 01-107AOV-100 Auto Isolation Fai}ure Year 1 TEST MALFUNCTION PC01 Containment Vent Purge Fan Trip Year 3 TEST MALFUNCTION PCO2 Loss of Instrument Nitrogen Year 3 TEST MALFUNCTION PCO3:A-H Drywell Cooling Fan Trip Year 3 TEST MALFUNCTION PC04:A,B SBGT Fan Trip Year 3 TEST MALFUNCTION PCOS Containment Pressure Transmitter Failure Year 3 TEST MALFUNCTION PC06 Torus Drywell Vacuum Breaker 27VB-1 Fails to Year 3 TEST Close MALFUNCTION PC07 Primary Containment Leakage (non-recoverable)

Year 3 TEST Tab 3-14

1 NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBET TT35

'1EST TITLE SCHEDULE j

(

l MALFUNCTION PCO8 Primary Containment Hydrogen High Year 3 l

TEST MALFUNCTION PC09 Primary Containment Oxygen High Year 3 TEST j

1 MALFUNCTION PC10 Torus Level Decreases (non-recoverable)

Year 3 TEST l

MALFUNCTION RC01:A,B RCIC Turbine Loss of oil Pressure Year 3 TEST

\\

MALFUNCTION RCO2 RCIC System Fails to Auto Start Year 3 TEST MALFUNCTION RCO3 RCIC System Turbine Trip Year 3 TEST MALFUNCTION RC04 RCIC Turbine Failure to Auto Trip Year 3 TEST I

MALFUNCTION RC05 RCIC System Isolation Year 3 TEST i

MALFUNCTION RC06 RCIC Inadvertent Initiation Year 3 TEST VALFUNCTION RC07:A,B RCIC Governor Fails High/ Low (HSS/LSS)

Year 3 TEST MALFUNCTION RC09 RCIC Steam Line Break (non-recoverable)

Year 4 TEST MALFUNCTION RC10 RCIC Discharge Line Break (non-recoverable)

Year 3 TEST t

1 MALFUNCTION RC11 RCIC Turbfnr.::xhaust Pipe Failure (non-Y f3 i

j TEST recoverable)

}

f MALFUNCTION RC12 RCIC Isolation Relay, 13A-K15, Failure Year 1 TEST i

MALFUNCTION RC13 RCIC High Rx Water Lvl Shutdown Failure Year 1 j

TEST

{

l MALFUNCTION RD01A:A-H SDV Vent or Drain Valve Fails Open Year 4 TEST t

1 I

l Rev. 1 Tab 3-15

NEW YORK POWER AUlliORITY

{

JAMES A. FITZPATRICK NUCLEAR POWER PLANT I

PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TYPE TEST TITIE SCEEDUI2 MALTUNCTION RD018:A-H SDV Vent or Drain Valves Fail Closed Year 3 TEST MALFUNCTION RD03:A,B CRD Flow Control Valve Failure Year 3 TEST MALFUNCTION RD04:A,B CRD Drive Water Filter Clogging Year 3 TEST MALFUNCTION RDOS:A,B CRD Stabilizing Valves Fail Closed Year 3 TEST MALFUNCTION RD06:A,B CRD Fydraulic Pump Trip Year 3 TEST MALFUNCTION RD07:**:**

Control Rod' (XX-YY) Drift-In Year 3 TEST MALFUNCTION RDO8:**:**

Control Rod (XX-YY) Drift-out Year 3 TEST MALFUNCTION RD09:**:**

Control Rod (XX-YY) Accumulator Trouble Year 4 TEST i

]

MALFUNCTION RD10:**:**

Control Rod (XX-YY) Blade Stuck Year 3 TEST MALFUNCTION RD11:**:**

Control Rod (XX-YY) Uncoupled Year 3 TEST MALFUNCTION RD12:**:**

Control Rod (XX-YY) Scrammed Year 3 TEST MALFUNCTION RD13:**:**

Control Rod (XX-YY) Fail to scram Year 3 TEST MALTUNCTION RD14:**:**

Control Rod (XX-YY) RPIS Failure Year 3 TEST MALFUNCTION RD15 Rod Drive Control System Timer Fail Year 4 i

TEST j

MALFUNCTION RD16 Rod Position Info System Total Failure Year 3 l

TEST l

l MALFUNCTION RD17 : * * : '

Control Rod (XX-YY) High Temperature Year 3 TEST MALFUNCTION RD18:A,B Scram Discharge Volume Rupture (non-Year 4 TEST recoverable) l Rev. 1 Tab 3-16

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITLE SCIEDUKE MALFUNCTION RD19 A,B CRD Suction Filter Hi Delta-Pressure Year 4 TEST HALTUNCTION RD20:**:**

Line Break CRD HCU (XX-YY) (non-recoverable)

Year 4 TEST MALFUNCTION RD21:**:**

Leaking Control Rod withdraw SOV Year 4 TEST MALFUNCTION

-RD22 Scram Discharge Volume Hydraulic Lock Yeler 1 TEST MALFUNCTION RH01 A-D RHR Pump Trip Year 3 TEST MALFUNCTION RH03:A,B RHR Heat Exchange Tube Leak (non-recoverable)

Year 4 TEST MALFUNCTION RH04A:A,B LPCI Injection Valve Fails closed Year 3 TEST MALFUNCTION RH04B:A,B LPCI Injection Valve Fails open Year 3 TEST MALFUNCTION RHOS:A-D RHR Pump Discharge Leak (non-recoverable)

Year 3 TEST MALFUNCTION RH06 RHR/SDC Valve 10MOV-18 Fails Year 3 TEST MALFUNCTION RH07 RHR/SDC Valve 10MOV-17 Fails Year 3 TEST MALFUNCTION RH08:A-D RHR Pump SDC Suction Valve Fails Closed Year 3 TEST MALFUNCTION RH09:A,B LPCI - Injection Line Failure (non-Year 3 TEST recoverable)

MALFUNCTION RH10:A,B RHR Loop Suction Line Piping Failure Year 4 TEST MALFUNCTION RH14 LPCI Failure to Auto Initiate Year 3 TEST MALFUNCTION RH15 RHR/SDC Valve 10MOV-17(18) Auto Isolation Year 1 TEST Failure

=

l

"*I Tab 3-17

b NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST Tf35 TEST TITLE 3CMEDUIE MALFUNCTION RH16 RHR Pump Motor Winding Temperatures High Year 3 TEST MALFUNCTION RM01A:1-5 Process Rad Mon Failure Year 3 TEST ltALFUNCTION RM018:1-4 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM01C1-7 Process Rad Fon Failure Year 3 TEST MALFUNCTION RM01D 1-8 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM01E:1-7 Process Rad Mon Failure Year 3 TEST MALFUNCTION RM02A:1-10 ARM Failure Year 3 TEST j

MALFUNCTION RM02B:11-20 ARM Failure Year 3 TEST l

MALFUNCTION RM02C:21-30 ARM Failure Year 3 TEST MALFUNCTION RP01A RPS Auto Scram Failure Year 3 TEST MALFUNCTION RP01B RPS Manual Scram Failure Year 3 TEST MALFUNCTION RP02 Inadvertent Reactor Scram Year 3 TEST MALFUNCTION RP03 Inadvertent Group I Isolation Year 3 TEST MALFUNCTION RPO4 Inadvertent Group II Isolation Year 3 TEST MALFUNCTION RPOS:A,B RPS M-G Set Trip Year 3 TEST MALFUNCTICN RP06:A,B RPS Electrical Protection Assembly Trip Year 3 TEST MALFUNCTION RP07:A-D Control Rod Group Fail to Scram Year 3 TEST Rev. 1 Tab 3-18

NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 l

TEST TTFE TEST TITLE SCEEDU12 MALFUNCTION RP08:A-D Control Rod Group (1,2,3,4) Scram Year 4 TEST MALFUNCTION RP09 ARI rails to Actuate Year 4 TEST MALFUNCTION RP10 PCIS Group III Low Rx Water Lvl Isolation Year 1 TEST Failure MALFUNCTION RP11 PCIS Group II Isolation Failure Year 1 TEST MALFUNCTION RP12 PCIS Group I Inboard (Outboard) MSIV Isolation Year 1 TEST Failure MALFUNCTION RP13 PCIS Group I Isolation Failure Year 1 TEST MM. FUNCTION RR01:A,B RWR Pump / Gen Field Breaker Trip Year 4 TEST MALFUNCTION RR02:A,B RWR Pump Control Signal Failure Scoop Tube Year 4 TEST Lock MALFUNCTION RR03:A,B RWR Pump Incomplete Start Sequence Year 4

)

TEST MALFUNCTION RR04:A,B RWR Pump fl Seal Failure (non-recoverable)

Year 4 TEST g

MALFUNCTION RR05:A,B RWR Pump #2 Seal Failure (non-recoverable)

Year 1

)

TEST MALTUNCTION RR07:A-H RWR Loop Flow Transmitter rails Year 4

)

TEST 1

MALFUNCTION RR08:A-T Jet Pump Failure (non-recoverable)

Year 4 TEST MALFUNCTION RR10:A,B RWR System MG Flow Controller Failure Year 4 l

TEST l

I l

MALFUNCTION RRll:A,B RWR Pump Shaft Binding Year 4 j

TEST I

MALFUNCTION RR12:A,B RWR Pump Drive Motor Breaker Trip Year 4 TEST l

l Rev. 1 Tab 3-19

]

NEW YORK POWER AITriiORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TTWE TEST TITIE SCIEDUI2 MALFUNCTION RR13;A-C ATWS System Fails to Initiate RWR Pump Trip Year 4 TEST MALFUNCTION RR14:A,B RWR Loop Rupture (DBA) (non-recoverable)

Year 4 TEST MALFUNCTION RR15:A,B RWR Coolant Leakage Inside Primary Containment Year 4 TEST MALFUNCTION RR16:A,B Reactor Vessel Wide Range Level Transmitter Year 4 TEST Fails 1

MALFUNCTION RR17:A,B Reactor Vessel Fuel Zone Level Failure Year 4 TEST MALFUNCTION RR18 Refuel Water Level Indicator Fails Year 4 TEST MALFUNCTION RR19:A-D Rx Vessel Lvl Transmitter To FW Lvl Control Year 4 TEST l

MALFUNCTION RR20:A,B Loss Pressure Compensation to Feedwater Year 4 l

TEST Control MALFUNCTION RR21:A-D Loss of Pressure Compensation to Feedwater Year 4 TEST MALFUNCTION RR22 Reactor Vessel Scram Level Transmitter Failure Year 4 TEST I

MALFUNCTION RR23:A-D RFA Flow Unit Failure Year 4 j

TEST 1

MALFUNCTION RR24:A-D Jet Pum), Summer Failure Year 4 j

TEST l

MALFUNCTION RR25:A,B Core Sp;ay Pipe Break Inside Downcomer Year 4 TEST l

l MALFUNCTION RR26 Unexplained Reactivity Change (non-Year 4 I

TEST recoverable)

MALFUNCTION RR27:A,B Rx Level Narrow Range Reference Leg De-Gassing Year 4 j

TEST

{

MALFUNCTION RR28 Rx Level Narrow Range Reference Legs Severe Year 4 TEST MALFUNCTION RR29 Reactor Vessel NR Lvl Transmitter Fails Year 1 i

TEST Rev. 1 Tab 3-20

n NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2M2 TEST TTBE TEST TITIE SCIEDUIE MALFUNCTION RR30 RWR MG Set Drive Motor Breaker Trip Failure Year 1 TEST MALFUNCTION RR31 Reactor Vessel Wide Range Level Transmitter Year 1 TEST Fails MALFUNCTION RWOl Rod Worth Minimizer Failure Year 4 j

TEST MALFUNCTION RX01 Fuel Cladding Failure Year 1 TEST MALFUNCTION RXO2:XX:YY Increased Rod Worth (XX-YY)

Year 4 TEST MALFUNCTION RXO3 Core Thermal Hydraulic Instability Year 4

)

TEST

)

i MALFUNCTION SLOl:A,B Standby Liquid Control Pump Breaker Trip Year 4 TEST MALFUNCTION SLO 2:A,B Standby Liquid Control Squib Valve Fails to Year 4 TEST Open MALFUNCTION SLO 3:A,B SLC Pump Relief Valve Lifts Year 4 TEST MALFUNCTION SLO 4 Standby Liquid Control Squib Valve Loss of Year 4 TEST Continuity MALFUNCTION SWOl:A,B Loss of RBCLC Flow to RWR Year 4 TEST MALFUNCTION SWO2A-C TBCLC Hx Cooling Water Blockage Year 4 TEST MALFUNCTION SWO3:A-C RBCLC Hx Cooling Water Blockage Year 4 TEST MALFUNCTION SWO4:A-D RHR Service Water Pump Trip Year 4 TEST MALFUNCTION SWO5:A-C Service Water Pump Trip Year 4 TEST i

MALFUNCTION SWO6:A,B RHR Hx Cooling Water Blockage Year 4 TEST Rev. 1 Tab 3-21

m NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TrWE TEST TITLE SCEEDULE MALFUNCTION SWO7:A-C TBCLC Pump Trip Year

~

TEST MALFUNCTION SWO8:A-C TBCLC Hx Tube Leak (non-recoverable)

Year 4 TEST MALFUNCTION SWO9:A-C RBCLC Pump Trip Year 4 TEST MALFUNCTION SW10:A-C RBCLC Hx Tube Leak (non-recoverable)

Year 4 TEST MALFUNCTION SWil RBCLC Leakage in Drywell (non-recoverable)

Year 4 TEST MALFUNCTION SW12:A,B Loss of Drywell Cooling Assemblies Year 4 TEST MALFUNCTION SW13 Loss of Cooling to RWCU NRHX Year 4 TEST l

MALFUNCTION SW14:A,B Emergency Service Water Pump Trip Year 4 TEST MALFUNCTION SW15 Service Water Pump A Auto Start Failure Year 1 TEST MALFUNCTION SW16 TBCLC Pmp A Auto Start Failure Year 1 TEST MALFUNCTION SW17 RBCLC Pmp A Auco Start Failure Year 1 TEST MALFUNCTION SW18 ESW Pmp A(B) Auto Start Failure Year 1 TEST MALFUNCTION TC01 Main Turbine Acceleration Year 4 TEST MALFUNCTION TCO2:A,B EHC Pump Trip Year 4 TF.ST MALFUNCTION TCO3 EHC Pump Press Reg Fails Year 4 TEST l

MALFUNCTION TC04 Bypass Valve Failure Year 4 TEST MALFUNCTION TC05 Main Turbine Load Select Failure Year 4 TEST l

Rev. 1 Tab 3-22 C

NEW YORK POWER AUTHORITY JAMES A. FTTZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TY35 TEST TITLE SCHEDULE MALFUNCTION TC07:A,B EHC System Regulator Oscillation Year 4 TEST MALFUNCTION TC08 Turbine Control Valve Failure Year 4 TEST MALFUNCTION TC09 Turbine Stop Valve Failure Year 4 TEST MALFUNCTION TC10 Turbine Load Reject Year 4

]

TEST MALFUNCTION TCll Main Turbine Auto Trip Failure Year 1 TEST MALFUNCTION TUOl Inadvertent Turbine Trip Year 4 TEST MALFUNCTION TUO2:A-J Main Turbine Bearing High Temp Year 4 TEST l

l MALFUNCTION TUO3 Main Turbine Bearing 011 Pressure Low Year 4 l

TEST MALFUNCTION TUO4:A-J Main Turbine Bearing High Vibration Year 4 TEST MALFUNCTION TUO5 Main Turbine Shaft Driven Oil Pump Failure Year 4 j

TEST l

MALFUNCTION TUO6 Turbine Motor Suction Pump Trip Year 4 l

TEST MALFUNCTION TUO7 Turbine Emergency Bearing Oil Pump Trip Year 4 j

TEST i

MALFUNCTION TUO8 Exhaust Hood Spray Valve Failure Year 4 TEST I

MALFUNCTION YC01 EPIC Fails Year 4 TEST NOP OP-65 Plant Startup (including applicable PAP's)

Year 4*

l NOP OP-65 Plant Shutdown (including applicable RAP's)

Year 4*

NOP ST-OlB MSIV Fast Closure and Main Steam Line Drain Year 4*

Isolation Valve Test (IST) l l

Rev. 1 Tab 3-23

NEW YORK FOWER AUlilORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 Tast Tryn Tust TITLs scunncIm NOP ST-Olt Main Turbine stop Valves Limit Switch Year 4-Instrument Functional Test NOP ST-OlG Main Steam Radiation Monitor (17RM-251A, B,

C Year 4*

and D) Functional Test NOP ST-OlI Kain Steam Isolation Valves Limit Switch Year 4*

Instrument Functional Test NOP ST-OlK Main Steam Line Isolation Valves, Main Steam Year 4*

Crain Valves and Reactor Water Sample Valves Simulated Automatic Isolation Test NOP ST-OlL Main Turbine Control Valve Instrument Channel Year 4*

and Valve Operability Check l

NOP ST-Ols Shutdown Cooling Containment Isolation Valve Year 4*

Testing (IST) i NOP ST-02AN RHR Loop A Pump and MOV Operability and LPCI Year 4*

Keep-Full Level Switch Functional Test NOP ST-02A0 RHR Loop B Pump and MOV Operability and LPCI Year 4*

Keep-Full Level Switch Functional Test NOP ST-02J One RHR Service Water Pump or One Containment Year 4*

Cooling Subsystea Inoperable Test NOP ST-02N LPCI Mode Inoperable Test Year 4*

NOP ST-02RA RHR SW Loop A Monthly Operability Test Year 4*

NOP ST-02RB RHR SW Loop B Monthly operability Test Year 4*

NOP ST-02T LPCI Cross Connect Position Functional Test Year 4*

NOP ST-02Y RHR Heat Exchanger Performance Test Year 4*

NOP ST-03PA Core Spray Loop A Quarterly Operability Test Year 4*

NOP ST-03PB Core Spray Loop B Quarterly Operability Test Year 4*

NOP ST-04B HPCI Pump and MOV Operability Test Year 4*

NOP ST-04K HPCI Turb Slow Roll & Overspeed Test Year 4*

NOP ST-04L HPCI Class 2 Piping Functional Test (ISI)

Year 4*

NOP ST-04M HPCI Torus Suction Operability Test (IST)

Year 4*

Rev. 1 Tab 3-24

NEW YORK POWER ALTTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 199's-2002 TEST TTWE TEST TITLE SCMEDUIA NOP ST-04N HPCI Flow Rate and Inservice Test (IST)

Year 4*

NOP ST-05B APRM Instrument Functional Test (Run Mode)

Year 4*

NOP ST-05C IRM-APRM Instrument Range Overlap Check Year 4*

NOP ST-05D APRM Calibration

  • Year 4*

NOP ST-05E Core Performance Daily Surveillance Year 4*

NOP ST-05N APRM Instrument Functional Test (Refuel, Year 4*

Startup, or Shutdown Mode)

NOP ST-050 SRM Functional Test Year 4*

NOP ST-OSP Source Range Channel checks Year 4*

NOP ST-05Q APRM Flow Bias Functional Test (Run Mode)

Year 4*

NOP ST-05R RBM Upscale and Downscale Instrument Year 4*

Functional Test NOP ST-08C ESW Motor Operated valves Operability Test Year 4*

NOP ST-08N F.SW Pump Inservice Test (IST)

Year 4*

NOP ST-09BA EDG A & C Full Load Test & ESW Pump Year 4*

i operability Test NOP ST-09BB EDG B & D Full Load Test & ESW Pump Year 4*

Operability Test NOP ST-09C Emergency AC Power Load Sequencing Test and 4 Year 4*

KV Emergency Power System Voltage Relays Instrument Functional Test j

1 NOP ST-09D EDG, ll5KV Reserve Power, Station Battery, or Year 4*

ESW Pump Inoperable Test NOP ST-10A Off-Gas Line Isolation Logic Sys Functional Year 4*

i Test NOP ST-10B Off-Gas System Automatic Isolation and Closure Year 4*

Test NOP ST-ll off-Gas Process Rad Monitor Instrument Year 4*

Functional Test NOP ST-12I Liq Radwaste Eff Mon Instr & Iso Logic Sys Year 4*

Functional Test Rev. 1 Tab 3-25

NEW YORK POWER AUTHORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TBsT TTWB TEST TITIE SCEMMER NOP ST-12K Main CR ventilation Rad Monitor Instruseent Year 4*

channel Functional Test NOP ST-13A Stack Gas Rad Mon It Channel Functional Year 4*

Test i

NOP ST-18 Mn Cntrl Rm Emergency ran and Damper Year 4*

Operability Test NOP ST-20A Rod Worth Minimizer Functional Test Year 4*

NOP ST-20C Control Rod operability and HCU Cooling Water Year 4*

L Supply Check "alve Reverse Flow Check (IST)

NOP ST-20K Pre-Control Rod Withdrawal Checklist Year 4*

NOP ST-20M Scram Discharge Volume Vent and Drain valves Year 4*

Full Stroke and Timing Test (IST)

NOP ST-20N Control Rod Exercise / Timing / Stall Flow Test Year 4*

NOP ST-21A Main Turbine Overspeed Trip Test (Actual Year 4*

Overspeed Trip Test - Valves Remain open)

NOP ST-21C Main Turbine combined Intermediate Va3"a Test Year 4*

NOP ST-21E Main Turbine Backup Overspeed Trip System Test Year 4*

(Actual Overspeed)

NOP ST-21F Main Turbine Overspeed Trip Device and Year 4*

Mechanical Trip valve Test NOP ST-21I Main Turbine Thrust Bearing Wear Detector Year 4*

Test

(Actual Overspeed)

NOP ST-21L Main Turbine Mech Trip Valve & Master Trip Year 4*

Solenoid A & B N0P ST-22B Manual Safecy Relief Vlv Operation & Vlv Year 4*

Monitoring Sys NOP ST-23B Control Rod Coupling Integrity Test Year 4*

NOP ST-23C Jet Pump Operability Test for Two Loop Year 4*

Operation (EPIC Available)

Rev. 1 Teb 3-26

I NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT PLANT REFERENCED SIMULATION FACILITY FOUR YEAR PERFORMANCE TESTING PLAN 1999-2002 TEST TENE TEST TITLE SCEEDUI2 NOP ST-23D Jet Pump Operability Test for Single Loop Year 4*

Operation NOP ST-23E Jet Pump Operability Test for Two Loop Year 4*

Operation (EPIC Not Available)

NOP ST-24A RCIC Pump and MOV Operability Test Year 4*

NOP ST-24F RCIC System Inoperable Test Year 4*

NOP ST-24J RCIC Flow Rate and Inservice Test (IST)

Year 4*

NOP ST-24K RCIC Torus Suction Operability Test Year 4*

NOP ST-24Q RCIC Turb Slow Roll & Overspeed Test Year 4*

NOP ST-26J Heatup and Cooldown Temperature Checks Year 4*

NOP ST-26K Recirculation Pump Start-up Differential Year 4*

Temperature Check NOP ST-26L Reactor Vessel Head Bolting Studs Temperature Year 4*

Monitoring NOP ST-27A Recirc Loop Valve Operability Test (IST)

Year 4*

NOP ST-29A Manual Scram Functional Test Year 4*

NOP ST-29B Mode switch in Shutdown Functional Test Year 4*

NOP ST-29C RPS Channel Test Switch Functional Test Year 4*

NOP ST-40C Computer Cut of Service Surveillance Year 4*

NOP ST-40D Daily Sur.eillance and Instrument check Year 4*

NOP ST-40K Periodic Pump, Valve, and Component Test Year 4*

NOP ST-40X Daily Shutdown Surveillance and Instrument Year 4*

Check NOP ST-50 SRM Functional Test Year 4*

Year 4*

NOP Tests not run during scheduled training will be performed in Year 4 Rev. 1 Tab 3-27