ML23159A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 20: Line 20:
{{#Wiki_filter:.
{{#Wiki_filter:.
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
 
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO. 52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 192 License No. NPF-91
GEORGIA POWER COMPANY
: 1.
 
The Nuclear Regulatory Commission (the Commission) has found that:
OGLETHORPE POWER CORPORATION
A.
 
The application for amendment by Southern Nuclear Operating Company (SNC),
MEAG POWER SPVM, LLC
dated April 4, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.
 
The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
MEAG POWER SPVJ, LLC
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.
 
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
MEAG POWER SPVP, LLC
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations, and all applicable requirements have been satisfied.
 
: 2.
CITY OF DALTON, GEORGIA
Accordingly, the license is amended by removing the content of Appendix C, Inspections, Tests, Analyses, and Acceptance Criteria, License Condition 2.D.(2)(d) and License Condition 2.D.(3)(b) from the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-91 is hereby amended to read as follows:
 
(8) Incorporation The Technical Specifications and Environmental Protection Plan in Appendices A and B, respectively, of this license, as revised through Amendment No. 192, are hereby incorporated into this license.
VOGTLE ELECTRIC GENERATING PLANT, UNIT 3
: 3.
 
This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.
DOCKET NO. 52-025
 
AMENDMENT TO FACILITY COMBINED LICENSE
 
Amendment No. 192 License No. NPF-91
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
 
A. The application for amendment by Southern Nuclear Operating Company (SNC),
dated April 4, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I;
 
B. The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
 
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
 
D. The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and
 
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations, and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by removing the content of Appendix C, Inspections, Tests, Analyses, and Acceptance Criteria, License Condition 2.D.(2)(d) and License Condition 2.D.(3)(b) from the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-91 is hereby amended to read as follows:
 
(8) Incorporation
 
The Technical Specifications and Environmental Protection Plan in Appendices A and B, respectively, of this license, as revised through Amendment No. 192, are hereby incorporated into this license.
: 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.
 
FOR THE NUCLEAR REGULATORY COMMISSION:
FOR THE NUCLEAR REGULATORY COMMISSION:
 
Lauren Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation Date of Issuance: July 31, 2023  
Lauren Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation
 
Date of Issuance: July 31, 2023


==Attachment:==
==Attachment:==
Page 7 of the facility Combined License and affected pages of Appendix C of the facility Combined License}}
Page 7 of the facility Combined License and affected pages of Appendix C of the facility Combined License Lauren A.
Nist Digitally signed by Lauren A. Nist Date: 2023.07.31 13:32:46 -04'00'}}

Latest revision as of 03:28, 27 November 2024

Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 23-001)
ML23159A097
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/31/2023
From: Lauren Nist
NRC/NRR/VPOB
To:
City of Dalton, GA, Georgia Power Co, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co
References
LAR-23-001, EPID L-2023-LLA-0050
Download: ML23159A097 (1)


Text

.

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO.52-025 AMENDMENT TO FACILITY COMBINED LICENSE Amendment No. 192 License No. NPF-91

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern Nuclear Operating Company (SNC),

dated April 4, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations set forth in 10 CFR Chapter I; B.

The facility will be constructed and will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations, and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by removing the content of Appendix C, Inspections, Tests, Analyses, and Acceptance Criteria, License Condition 2.D.(2)(d) and License Condition 2.D.(3)(b) from the facility Combined License as indicated in the attachment to this license amendment. Paragraph 2.D(8) of facility Combined License No. NPF-91 is hereby amended to read as follows:

(8) Incorporation The Technical Specifications and Environmental Protection Plan in Appendices A and B, respectively, of this license, as revised through Amendment No. 192, are hereby incorporated into this license.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION:

Lauren Nist, Director Vogtle Project Office Office of Nuclear Reactor Regulation Date of Issuance: July 31, 2023

Attachment:

Page 7 of the facility Combined License and affected pages of Appendix C of the facility Combined License Lauren A.

Nist Digitally signed by Lauren A. Nist Date: 2023.07.31 13:32:46 -04'00'