ML23101A124

From kanterella
Jump to navigation Jump to search

COL Docs - FW Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (LAR-23-001)
ML23101A124
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/11/2023
From:
NRC
To:
References
Download: ML23101A124 (3)


Text

From: Cayetano Santos Sent: Tuesday, April 11, 2023 2:10 PM To: Vogtle PEmails

Subject:

FW: ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS LICENSE AMENDMENT REQUEST TO REMOVE COMBINED LICENSE APPENDIX C (LAR-23-001) (EPID NO. L-2023-LLA-0050)

From: Cayetano Santos Sent: Tuesday, April 11, 2023 2:09 PM To: rkbrown@southernco.com; Chamberlain, Amy Christine <acchambe@southernco.com>; Dorsey, Keith A. <kadorsey@southernco.com>; Will Garrett (wgarrett@southernco.com)

<wgarrett@southernco.com>; Leighty, Steven <sleighty@southernco.com>; Grant, Eddie

<X2EDGRAN@SOUTHERNCO.COM>

Cc: Billy Gleaves <Bill.Gleaves@nrc.gov>; Lauren Nist (She) <lauren.nist@nrc.gov>; Christopher Welch

<Christopher.Welch@nrc.gov>

Subject:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS LICENSE AMENDMENT REQUEST TO REMOVE COMBINED LICENSE APPENDIX C (LAR-23-001) (EPID NO. L-2023-LLA-0050)

Keith R. Brown, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway, Bin N-274-EC Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS LICENSE AMENDMENT REQUEST TO REMOVE COMBINED LICENSE APPENDIX C (LAR-23-001) (EPID NO. L-2023-LLA-0050)

Dear Mr. Brown:

By letter dated April 4, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23094A268), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Number NPF-91 for the Vogtle Electric Generating Plant Unit 3. The requested amendment proposes to remove COL Appendix C, Inspections, Tests, Analyses, and Acceptance Criteria, and make appropriate revisions to the COL that reference this appendix.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with 10 CFR 50.90, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required. This section stipulates

that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. SNC will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

SNC has requested staff approval of this LAR no later than 12 months from acceptance. The staff will try to complete its review by 4/11/24 unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 124 hours0.00144 days <br />0.0344 hours <br />2.050265e-4 weeks <br />4.7182e-5 months <br /> to complete this licensing action.

If you have any questions, please contact me at (301) 415-7270 or Cayetano.Santos@nrc.gov.

Sincerely, Cayetano Santos Jr., Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket No.: 52-025

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 659 Mail Envelope Properties (MW4PR09MB90102780BD35204256B1E656E59A9)

Subject:

FW ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS LICENSE AMENDMENT REQUEST TO REMOVE COMBINED LICENSE APPENDIX C (LAR-23-001) (EPID NO. L-2023-LLA-0050)

Sent Date: 4/11/2023 2:09:36 PM Received Date: 4/11/2023 2:09:39 PM From: Cayetano Santos Created By: Cayetano.Santos@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None Post Office: MW4PR09MB9010.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3954 4/11/2023 2:09:39 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: