ATTACHMENT TO LICENSE AMENDMENT NO. 180 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE INSERT 7
7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-175 C-175
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 180, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 180
C-175 Amendment No. 180 Table 2.2.5-2 Line Name Line Number ASME Code Section III Functional Capability Required MCR Relief Line VES-PL-022A Yes Yes MCR Relief Line VES-PL-022B Yes Yes Table 2.2.5-3 Equipment Tag No.
Display Air Storage Tank Pressure VES-001A Yes Air Storage Tank Pressure VES-001B Yes Table 2.2.5-4 Room Name Room Numbers Heat Load 0 to 24 Hours (Btu/s)
Heat Load 24 to 72 Hours (Btu/s)
MCR Envelope 12401 23.5 (hour 0 to 0.5) 14.5 (hour 0.5 to 3.5) 4.75 (hour 3.5 through 24) 3.95 I&C Rooms 12301 3.50 1.10 12302 3.20 2.50 12304 4.30 3.20 12305 4.20 1.50 dc Equipment Rooms 12201 2.00 2.00 12203 3.30 3.30 12205 2.40 2.40 12207 3.45 3.45 Table 2.2.5-5 Inspections, Tests, Analyses, and Acceptance Criteria No.
ITAAC No.
Design Commitment Inspections, Tests, Analyses Acceptance Criteria 252 2.2.05.01
- 1. The functional arrangement of the VES is as described in the Design Description of this Section 2.2.5.
Inspection of the as-built system will be performed.
The as-built VES conforms with the functional arrangement described in the Design Description of this Section 2.2.5.