ML23158A248

From kanterella
Jump to navigation Jump to search

Issuance of Amendment to Remove Combined License Appendix C (LAR 23-001)
ML23158A248
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/31/2023
From: Cayetano Santos
NRC/NRR/VPOB
To: Brown R
Southern Nuclear Operating Co
References
LAR-23-001, EPID L-2023-LLA-0050
Download: ML23158A248 (1)


Text

July 31, 2023 Mr. R. Keith Brown, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway, Bin N-274-EC Birmingham, AL 35243

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 ISSUANCE OF AMENDMENT TO REMOVE COMBINED LICENSE APPENDIX C (EPID NO. L-2023-LLA-0050)

Dear Mr. Brown:

In response to your application dated April 4, 2023, the U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 192 to Combined License (COL) No. NPF-91 for Vogtle Electric Generating Plant (VEGP) Unit 3. The amendment removes Appendix C, Inspections, Tests, Analyses, and Acceptance Criteria, in its entirety from the COL along with specific references to Appendix C within the COL.

A copy of the related Safety Evaluation, which includes the staffs evaluation of the amendment, is enclosed. The notice of issuance of the amendment documents included in this letter will be published in the Federal Register.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Cayetano Santos Jr., Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket Nos.: 52-025

Enclosures:

1. Amendment No. 192 to VEGP Unit 3 COL
2. Safety Evaluation cc: Listserv

Package: ML23158A243 Letter: ML23158A248 Amendment: ML23159A097 Safety Evaluation: ML23159A102 NRO-002 OFFICE NRR/VPO/PM NRR/VPO/LA NRR/VPO/D NRR/VPO/PM NAME CSantos RButler LNist CSantos DATE 6/8/2023 6/16/2023 7/31/2023 7/31/2023