ML20290A282

From kanterella
Jump to navigation Jump to search
Finding That Acceptance Criteria in the Combined License Are Met (10 CFR 103g - Finding)
ML20290A282
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/03/2022
From: Andrea Veil
NRC/NRR/VPOB
To:
City of Dalton, GA, Georgia Power Co, MEAG Power, Oglethorpe Power Corp, Southern Nuclear Operating Co
Santos C
Shared Package
ML20290A280 List:
References
Download: ML20290A282 (1)


Text

SOUTHERN NUCLEAR OPERATING COMPANY, INC.

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MEAG POWER SPVM, LLC MEAG POWER SPVJ, LLC MEAG POWER SPVP, LLC CITY OF DALTON, GEORGIA VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 DOCKET NO.52-025 FINDING THAT THE ACCEPTANCE CRITERIA IN THE COMBINED LICENSE ARE MET License No. NPF-91

1. In accordance with Section 185b. of the Atomic Energy Act of 1954, as amended, and Title 10 of the Code of Federal Regulations, Section 52.103(g), the U.S.

Nuclear Regulatory Commission finds that the acceptance criteria in the combined license for Vogtle Electric Generating Plant, Unit 3 are met.

2. This finding is effective as of August 3, 2022.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION:

Digitally signed by Andrea Andrea D. D. Veil Date: 2022.08.03 Veil 07:45:37 -04'00' Andrea D. Veil, Director Office of Nuclear Reactor Regulation