{{#Wiki_filter:________________________________________________________
{{#Wiki_filter:Enclosures 1A, 3A, and 4A Contain Non-Public Information Withhold in Accordance with 10 CFR 2.390 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI PNP 2023-028 10 CFR 50.80 10 CFR 50.90 10 CFR 72.50 December 6, 2023 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20
Enclosures 1A, 3A, and 4A Contain Non-Public Inform ation ___________________________________________
Withhold in Accordance with 10 CFR 2.390


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104
==Subject:==
***** HOLTEC Telephone (856) 797-0900 DEC OMMISSIONING Fax (856) 797-0909 I I'- T r R N,\\ T I O N,\\ L
Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (AEA), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Holtec Decommissioning International, LLC (HDI), on behalf of itself, Holtec Palisades, LLC (Holtec Palisades), and Palisades Energy, LLC (OPCO)
(together, Applicants), submit the enclosed application (Application) requesting that the U.S.
Nuclear Regulatory Commission (NRC) consent to the transfer of operating authority under Renewed Facility Operating License (RFOL) No. DPR-20 for the Palisades Nuclear Plant (PNP) and the general license for the Palisades Independent Spent Fuel Storage Installation (ISFSI) (referred to collectively as the Facility) from HDI to OPCO. Applicants also request NRC approval for conforming administrative amendments to reflect the requested transfer.
Applicants request NRCs consent to the transfer as part of the regulatory approvals to repower PNP. Transitioning operational authority from HDI to OPCO is conditioned on HDIs receipt of NRC approvals necessary to resume full-power operations. As a result of Entergy Nuclear Operations, Inc.s (ENOI) decision to shut down PNP for economic reasons, and following ENOIs submission of the certifications of permanent shutdown and defueling under 10 CFR 50.82(a)(1) and enactment of the standard suite of licensing changes to reflect a permanently defueled reactor, the PNP RFOL does not currently authorize power operations or placement of fuel in the reactor.
As described in HDIs {{letter dated|date=March 13, 2023|text=letter dated March 13, 2023}} (ML23072A404), HDI has identified the regulatory path to reinstate the power operations licensing basis (POLB) to resume power operations. On September 28, 2023, HDI filed a request for exemption from 10 CFR 50.82(a)(2)
HOLTEC DECOMMISSIONING I I'- T r R N,\\ T I O N,\\ L  


HDI PNP 2023-028 10 CFR 50.80 10 CFR 50.90 10 CFR 72.50 December 6, 2023
HDI PNP 2023-028 2
in furtherance of the restart (ML23271A140). HDI intends to submit additional licensing actions over the next several months to reinstate the Facilitys POLB. In this submittal, HDI is requesting NRC approval to transfer operational authority to OPCO and to vest in OPCO exclusive control of operation and maintenance of PNP. OPCO is an indirect, wholly owned subsidiary of Holtec International (Holtec), formed, staffed, and resourced by Holtec specifically for power operations of PNP. As described in the enclosed Application, OPCO will be resourced with in-depth operational experience and the programmatic expertise to conduct power operations licensed activities at PNP to the same level of excellence that HDI has demonstrated in decommissioning and Holtec has upheld for over three decades as the preeminent spent nuclear fuel vendor providing safety-related services and equipment for nearly every nuclear facility in the current domestic operating fleet.
Holtec Palisades will remain the licensed owner, the beneficiary of the PNP decommissioning trust fund, and the party to the Standard Contract for Disposal of Spent Nuclear Fuel. Holtec Palisades has entered into a life-of-plant power purchase agreement with two power co-operatives to sell all Facility energy and capacity under a long-term, fixed price arrangement that will remain in place for the full term of the Facility license (including subsequent license renewal terms).
No changes are being made to the Big Rock Point license, which will remain owned by Holtec Palisades and operated by HDI.
A simplified organization chart reflecting the current PNP licensees and their owners is provided as Figure 1 following this letter. The planned ownership structure following the proposed transfer is depicted in Figure 2. These organization charts are simplified in that they only show the companies in the chain of ownership of the licensee entities before and after the proposed transfer.
As of the date of this letter, PNP is still in decommissioning, and HDI is still adhering to the PNP Post Shutdown Decommissioning Activities Report (PSDAR), dated December 23, 2020 (ML20358A232). Given the long lead time for developing, obtaining, and implementing the necessary NRC approvals, hiring and qualifying operational staff, and completing physical site work needed to resume power operations on an economically-viable schedule, Holtec has made the decision to begin pursuing discrete restart activities at risk, with priority on long lead items that do not impact decommissioning. Holtec is in the process of securing a loan guarantee from the U.S. Department of Energy (DOE) under Title XVII of the Energy Policy Act of 2005. Also, the Michigan Legislature appropriated funds to support the restart, which Holtec expects to be administered via a grant program overseen by the Michigan Department of Labor and Economic Opportunity. Upon obtaining conditional commitment for the DOE loan guaranteewhich is the determinant to Holtecs decision to pursue the restart in earnestHDI expects to docket a notice under 10 CFR 50.82(a)(7) indicating its intention to depart from the current PSDAR schedule to pursue restart activities until such time as PNP either successfully restarts (and exits decommissioning) or Holtec abandons the restart project. HDI anticipates filing this 10 CFR 50.82(a)(7) notice the first quarter of 2024.
Subject to the foregoing, and receipt of the NRC approvals needed to return PNP to power operations, HDI plans to effectuate the transfer to OPCO on the date reinstatement of the POLB occurs. Applicants are currently targeting the transition to power operations in the third quarter of 2025. To support this schedule, Applicants respectfully request that the NRC review the enclosed


U.S. Nuc lear Regu lat ory Co mmissio n At t n: Do cu me nt Co nt ro l Desk Washington, D.C. 20555
HDI PNP 2023-028 3
 
Application on a schedule that will permit issuance of an order consenting to the transfer and approval of conforming license amendments by December 31, 2024. Applicants request that the consent be immediately effective upon issuance and permit the transfer to occur up to one year after issuance or such later date as NRC may permit. Applicants are prepared to work closely with NRC to facilitate the review of the Application. Applicants also request that the license amendments be made effective as of the date the transfer is completed. HDI will notify NRC staff at least five business days prior to transferring operational authority from HDI to OPCO.
Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facilit y Operat ing License No. DPR-20
After obtaining all necessary NRC approvals, HDI intends to submit a notification of transition to power operations to NRC that will docket HDIs and OPCOs satisfaction of the implementation conditions for the license transfer, 10 CFR 50.82(a)(2) exemption, and license amendments. Upon docketing this notification letter, PNP will transition from a facility in decommissioning back to a power operations plant, and HDI will transfer its authority to conduct licensed activities to OPCO.
 
Following the transfer, OPCO will have full authority to conduct licensed activities under the reinstated POLB.
Subject : App licat io n fo r Order Co nsent ing t o Transfer of Cont rol o f License and Approving Co nfo r ming License Amendment s
The proposed transfer of operational authority under the RFOL is desirable and of considerable benefit to the citizens of Michigan. The transfer will facilitate the restart of PNP and the return of 800 MW of carbon-free baseload generation to support state and federal climate, energy security, and reliability goals.
 
Information supporting this request for consent and approval is provided in the enclosed Application. A mark-up showing the proposed conforming license amendments is included in the Application as Attachment A. A clean version of the proposed license amendments is included as Attachment B.
Pursuant to Sect ion 184 o f t he At omic Energy Act of 1954, as amended ( AE A), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Ho lt ec Deco mmissio ning Int ernat io na l, LLC ( HDI), o n beha lf of itself, Ho ltec Palisades, LLC (Ho ltec Palisades), and Palisades Energy, LLC (OPCO)
The Application in Enclosure 1 provides information pertaining to the proposed transfer as required by 10 CFR 50.80. The referenced information demonstrates that: (1) Holtec Palisades and OPCO will have the requisite managerial, technical, and financial qualifications to operate PNP; (2) Holtec Palisades will continue to provide reasonable assurance of funding for decommissioning; (3) the material terms of the NRC license will not be affected; and (4) the transfer will not result in any impermissible foreign ownership, control, or domination. Certain information contained in Enclosure 1, Attachment C constitutes personally identifiable information, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Applicants have redacted such personally identifiable information from Enclosure 1. A non-public version of Enclosure 1, Attachment C is provided in Enclosure 1A. Applicants request that the unredacted enclosure containing personally identifiable information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6).
(toget her, Applicant s), submit t he enclo sed app licat io n ( Applicat ion) request ing t hat t he U.S.
In summary, the proposed transfer will neither have any adverse impact on the public health and safety, nor be inimical to the common defense and security. The proposed transfer will be consistent with the requirements of AEA, NRC regulations, and PNP RFOL. Applicants, therefore, respectfully request that NRC consent to the transfer of operational authority under PNP RFOL in accordance with 10 CFR 50.80 and 10 CFR 72.50 and issue the conforming license amendments requested herein pursuant to 10 CFR 50.90.  
Nuclear Regulatory Co mmissio n (NRC) consent to the transfer of operating authorit y under Renewed Facilit y Operating License (RFOL) No. DPR-20 for the Palisades Nuclear Plant (PNP) and the general license for the Palisades Independent Spent Fuel Storage Installat ion (ISFSI) (referred to collect ively as the Facilit y) fro m HDI to OPCO. Applicants also request NRC approval for co nfor ming ad minist rat ive amendment s to reflect t he request ed t ransfer.
 
Applicants request NRCs consent to the transfer as part of the regulatory approvals to repower PNP. Transit ioning operat ional aut horit y fro m HDI to OPCO is condit io ned on HDIs receipt of NRC approvals necessary to resume full-power operations. As a result of Entergy Nuclear Operations, Inc.s (ENOI) decisio n to shut down PNP for economic reasons, and fo llowing ENOIs submission o f the cert ifications of permanent shutdown and defueling under 10 CFR 50.82(a)(1) and enactment of the standard suite of licensing changes to reflect a permanent ly defueled reactor, the PNP RFOL does not currently authorize power operations or placement of fue l in t he reacto r.
 
As described in HDIs {{letter dated|date=March 13, 2023|text=letter dated March 13, 2023}} (ML23072A404), HDI has ident ified the regulatory path to reinstate the power operations licensing basis (POLB) to resume power operations. On September 28, 2023, HDI filed a request for exempt ion fro m 10 CFR 50.82(a)(2)
HDI PNP 2023-028
 
in furtherance of the restart (ML23271A140). HDI intends to submit addit ional licensing actions over t he next several mo nt hs to reinst ate t he Facilit ys POLB. In t his su bmit t al, HDI is request ing NRC approval to transfer operational authorit y to OPCO and to vest in OPCO exclusive control of operation and maintenance of PNP. OPCO is an indirect, wholly owned subsidiar y o f Holtec International (Holtec), formed, staffed, and resourced by Holtec specifically for power operations of PNP. As described in the enclosed Applicat ion, OPCO will be resourced with in-depth o perat io na l exper ie nce and t he pro gra mmat ic expert ise t o co nduct po wer o perat io ns licensed activit ies at PNP to the same level o f excellence that HDI has demonstrated in deco mmissio ning and Ho lt ec has up held fo r o ver t hree decades as t he preeminent spent nuc lear fue l ve ndo r pro vid ing safety-related services and equipment for nearly every nuclear facility in the current domestic operat ing fleet.
 
Ho lt ec Palisades w ill rema in t he licensed o wner, t he be nefic iar y o f t he PNP deco mmissio ning t rust fund, and the part y to t he Standard Contract for Dispo sal of Spent Nuclear Fuel. Ho lt ec Palisades has ent ered into a life-o f-p lant power purchase agreement wit h t wo po wer co -o perat ives t o sell all Facilit y energy and capacit y under a long-term, fixed price arrangement t hat will remain in place for t he fu ll t er m of t he Facilit y license ( including subsequent license renewal t er ms).
 
No changes are being made to the Big Rock Point license, which will remain owned by Ho ltec Palisades and operat ed by HDI.
 
A simp lified organizat ion chart reflect ing the current PNP licensees and their owners is pro vided as Figure 1 fo llowing this let t er. The planned ownership st ruct ure follo wing the proposed t ransfer is depicted in Figure 2. These organizat ion charts are simplified in that they only show the companies in t he chain o f ownership of t he licensee ent it ies befo re and aft er t he pro po sed t ransfer.
 
As of the date o f t his let t er, PNP is st ill in deco mmissio ning, and HDI is st ill adher ing t o t he PNP Post Shutdown Decommissioning Activities Report (PSDAR), dated December 23, 2020 (ML20358A232). Given the long lead time for developing, obtaining, and implement ing the necessary NRC approvals, hiring and qualifying operational staff, and complet ing physical sit e work needed to resume power operations on an economically-viable schedule, Ho ltec has made the decisio n to begin pursuing discret e rest art activit ies at risk, with pr iorit y on long lead items that do not impact decommissio ning. Holtec is in the process of securing a loan guarantee from t he U.S. Depart ment o f Energ y ( DOE) under T it le XVII o f t he Energ y Policy Act o f 2005. Also,
the Michigan Legislature appropriated funds to support the restart, which Ho ltec expects to be administ ered via a grant program overseen by the Michigan Department of Labor and Economic Opport unit y. Upon obt aining condit io nal co mmit ment for t he DOE loan guarant eewhich is t he determinant to Holtecs decisio n to pursue t he restart in ear nestHDI expects to docket a notice under 10 CFR 50.82(a)(7) indicat ing its intent ion to depart from the current PSDAR schedule to pursue restart activities until such time as PNP either successfully restarts (and exits decommissio ning) or Holtec abandons the restart project. HDI anticipates filing this 10 CFR 50.82(a)(7) not ice the fir st quart er o f 2024.
 
Subject to the foregoing, and receipt of the NRC approvals needed to return PNP to power operations, HDI plans to effectuate the transfer to OPCO on the date reinstatement of the POLB occurs. App licant s are current ly target ing the t ransit io n to power operat ions in t he third quart er o f 2025. To support t his schedule, App licant s respectfu lly request t hat t he NRC review the enclo sed
 
2 HDI PNP 2023-028
 
Application on a schedule that will permit issuance of an order consenting to the transfer and approval of conforming license amendments by December 31, 2024. Applicants request that the consent be immediately effect ive upon issuance and permit the transfer to occur up to one year aft er issuance or such lat er dat e as NRC may per mit. App licant s are prepared to work clo sely wit h NRC to facilitate the review of the Application. Applicants also request that the license amendments be made effective as of the date the transfer is completed. HDI will notify NRC staff at least five business days pr io r to t ransferr ing operatio nal autho r it y fro m HDI to OPCO.
 
Aft er obt aining all necessar y NRC appro vals, HDI int ends to submit a not ificat ion of t ransit io n to power operations to NRC that will docket HDIs and OPCOs sat isfact ion of the implement ation cond it io ns fo r t he license t ransfer, 10 CFR 50.82(a)(2) exempt io n, and license amend ment s. Upon docket ing this notificat ion let ter, PNP will transit io n from a facilit y in deco mmissio ning back to a power o perat io ns plant, and HDI will t ransfer it s autho rit y t o co nduct licensed act ivit ies to OPCO.
Fo llowing the transfer, OPCO will have full authority to conduct licensed act ivit ies under the reinstated POLB.
 
The proposed transfer of operational authorit y under the RFOL is desirable and of considerable benefit to t he cit izens of Michigan. The transfer will facilit at e t he rest art o f PNP and the ret urn of 800 MW of car bo n-free baselo ad generat ion t o suppo rt st at e and federal climat e, energy secur it y, and reliabilit y goals.
 
Information supporting this request for consent and approval is provided in the enclosed App licat io n. A mark-up sho wing t he pro po sed confor ming license amend ment s is included in the App l icat io n as Att achme nt A. A clea n ver s io n of the pr o po sed lice nse ame nd me nt s is inc lud ed as At t achme nt B.
 
The Application in Enclo sure 1 provides informat ion pertaining to the proposed transfer as requ ired by 10 CFR 50.80. The referenc ed info r mat io n demo nst rat es t hat : (1) Ho lt ec Palisades and OPCO will have the requisite managerial, technical, and financial qualifications to operate PNP; (2) Holtec Palisades will continue to provide reasonable assurance of funding for decommissio ning; (3) the material terms of the NRC license will not be affected; and (4) the transfer will not result in any impermissible foreign ownership, control, or domination. Certain information contained in Enclosure 1, Attachment C constitutes personally identifiable infor mat io n, the disclo sure of which would const it ut e a clear ly unwarrant ed invasio n of perso na l pr ivacy. Applicants have redacted such personally ident ifiable infor mat ion fro m Enclo sure 1. A no n-pu blic versio n o f E nclo sure 1, At t achment C is pro vided in E nclo sure 1A. App licant s request that the unredacted enclosure containing personally ident ifiable informat ion be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6).
 
In summary, the proposed transfer will neit her have any adverse impact on the public health and safet y, nor be inimical to the common defense and securit y. The proposed transfer will be co nsist ent w it h t he requ ire ment s o f AE A, NRC regu lat io ns, and PNP RFOL. App lic a nt s, t herefo re, respect fu lly request t hat NRC co nsent to t he t ransfer of o perat ional aut hor it y under PNP RFOL in accordance wit h 10 CFR 50.80 and 10 CFR 72.50 and issue the confor ming license amendments request ed herein pursuant to 10 CFR 50.90.
 
3 HDI PNP 2023-028
 
Enclosures 3A and 4A contain confident ial co mmercial and financial informat ion. Applicants request that this infor mat ion be wit hheld fro m public disclo sure pursuant to 10 CFR 2.390(a)(4),
as described in the affidavit provided in Enclosure 2. Enclosure 3 contains a non-proprietary versio n o f t he inco me st at ement in Enclo sure 3A. Add it io nally, Enclo sures 5 and 6 cont ain a fo r m Operator Services Agreement and fo rm Support Agreement, respectively.


HDI PNP 2023-028 4
Enclosures 3A and 4A contain confidential commercial and financial information. Applicants request that this information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4),
as described in the affidavit provided in Enclosure 2. Enclosure 3 contains a non-proprietary version of the income statement in Enclosure 3A. Additionally, Enclosures 5 and 6 contain a form Operator Services Agreement and form Support Agreement, respectively.
In accordance with 10 CFR 50.91(b)(1), a copy of this submittal has been sent to the State of Michigan.
In accordance with 10 CFR 50.91(b)(1), a copy of this submittal has been sent to the State of Michigan.
This Application contains regulatory commitments as noted in Attachment E to the Application.
Service upon the Applicants of notice, comments, hearing requests, intervention petitions, or other pleadings should be made to:
Jason Day General Counsel Holtec Decommissioning International, LLC 1 Holtec Blvd.
Camden, NJ 08104 Telephone: (856) 797-0900 x 3688 Email: j.day@holtec.com Alan Lovett Balch & Bingham LLP 1901 Sixth Avenue North, Suite 500 Birmingham, AL 35203 Telephone: (205) 226-8769 Email: alovett@balch.com For questions related to this submittal, please contact Michael Schultheis, HDI Manager of Regulatory Assurance, at 269-764-2049 or m.schultheis@holtec.com.
Sincerely, Jean A. Fleming Vice President, Licensing, Regulatory Affairs, and Probabilistic Safety Analysis Holtec International Holtec Decommissioning International, LLC


T his App licat io n co nt a ins regu lat or y co mmit ment s as not ed in Att achment E to t he App licat io n.
==Enclosures:==
 
Figure 1 - Organization Chart (Current)
Service upon t he Applicant s of not ice, comment s, hear ing request s, int ervent io n petit io ns, or ot her pleadings should be made to:
Figure 2 - Organization Chart (Post-Transfer) - Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments NRC Renewed Facility Operating License No. DPR-20 A - Non-public Addenda to Enclosure 1 [Withhold Under 10 CFR 2.390(a)(6)]
 
Digitally signed by Jean A. Fleming DN: cn=Jean A. Fleming, c=US, o=Holtec Decommissioning International, LLC, ou=Regulatory and Environmental Affairs, email=J.Fleming@Holtec.com Date: 2023.12.06 14:11:45 -05'00' Jean A.
Jason Da y Alan Lo vet t General Counsel Ba lch & Bing ham LLP H o lt e c De c o mm is s io n in g Int e r na t ion a l, LL C1901 Sixth Avenue North, Suite 500 1 Holtec Blvd. Bir mingham, AL 35203 Camden, NJ 08104 Telephone: (205) 226-8769 Telephone: (856) 797-0900 x 3688 Email: a lovett@balch.com E ma il: j. da y@ho lt ec. co m
Fleming
 
For quest ions relat ed to t his submit t al, please contact Michael Schu lt heis, HDI Manager of Regulatory Assurance, at 269-764-2049 or m.schult heis@ho lt ec.com.
 
Sincerely,
 
Digitally signed by Jean A. Fleming Jean A. DN: cn=Jean A. Fleming, c=US, o=Holtec Decommissioning International, LLC, ou=Regulatory and Environmental Affairs, Fleming email=J.Fleming@Holtec.com Date: 2023.12.06 14:11:45 -05'00' Jean A. Fleming Vice President, Licensing, Regulatory Affairs, and Probabilist ic Safety Analysis Holt ec Int ernat io nal Holt ec Decommissio ning Int ernational, LLC
 
Enclo su res:
 
Figure 1 - Organizat io n Chart (Current )
 
Figure 2 - Organizat io n Chart (Post-Transfer)
- App licat ion fo r Order Consent ing to Transfer of Cont ro l of License and Appro ving Confor ming License Amendment s NRC Renewed Facilit y Operat ing License No. DPR-20 A - Non-public Addenda to Enclosure 1 [Withhold Under 10 CFR 2.390(a)(6)]
 
4 HDI PNP 2023-028
 
- Affidavit of Jason Day Supporting Holtec Decommissio ning Internat ional, LLCs App licat io n to Wit hho ld Cert ain Document s fro m Public Disclo sure
- Projected Inco me Statement and Opening Balance Sheet of Holtec Palisades, LLC (Non-Proprietary)
 
Enclo sure 3 A - Pro ject ed Inco me St at eme nt and Opening Balance S heet o f Holt ec Palisades, LLC (Proprietary) [ Withhold Under 10 CFR 2.390(a)(4)]
 
Enc lo sure 4A - Holt ec Int ernat io nal Financ ia l I nfo rmat io n (Pro priet ar y) [Withhold Under 10 CFR 2.390(a)(4)]
 
Enc lo sure 5 - Fo rm o f Operat or Service s Agree me nt bet ween Ho lt ec Palisades, LLC and Palisades Energy, LLC
- Form of Support Agreement
 
cc (w/enclo sures, except Enclosures 1A, 3A, and 4A):
 
NRC Regio n III Regional Administrator NRC Deco mmissio ning Inspector - Palisades Nuclear Plant NRC NMSS Project Manager - Palisades Nuclear P lant Designated Michigan State Official
 
5 AFFIRMATION OF KELLY TRICE
 
l, Kelly Trice, do hereby declare under penalty of perjury under the laws of the United States of
 
America that the following is true and correct: (I) lam the President ofHoltec Decommissioning
 
International, LLC and Palisades Energy, LLC, (2) I am duly authorized to execute and file this
 
certification on behalf of Holtec International, Holtec Decommissioning International, LLC,
 
Holtec Palisades, LLC, and Palisades Energy, LLC and (3) the statements set forth in the attached
 
Application, including the financial qualifications for Holtec Palisades, LLC, Palisades Energy,


LLC, and Holtec International, are true and correct to the best of my information, knowledge and
HDI PNP 2023-028 5 - Affidavit of Jason Day Supporting Holtec Decommissioning International, LLCs Application to Withhold Certain Documents from Public Disclosure - Projected Income Statement and Opening Balance Sheet of Holtec Palisades, LLC (Non-Proprietary) A - Projected Income Statement and Opening Balance Sheet of Holtec Palisades, LLC (Proprietary) [Withhold Under 10 CFR 2.390(a)(4)] A - Holtec International Financial Information (Proprietary) [Withhold Under 10 CFR 2.390(a)(4)] - Form of Operator Services Agreement between Holtec Palisades, LLC and Palisades Energy, LLC - Form of Support Agreement cc (w/enclosures, except Enclosures 1A, 3A, and 4A):
 
NRC Region III Regional Administrator NRC Decommissioning Inspector - Palisades Nuclear Plant NRC NMSS Project Manager - Palisades Nuclear Plant Designated Michigan State Official
belief.


AFFIRMATION OF KELLY TRICE l, Kelly Trice, do hereby declare under penalty of perjury under the laws of the United States of America that the following is true and correct: (I) lam the President ofHoltec Decommissioning International, LLC and Palisades Energy, LLC, (2) I am duly authorized to execute and file this certification on behalf of Holtec International, Holtec Decommissioning International, LLC, Holtec Palisades, LLC, and Palisades Energy, LLC and (3) the statements set forth in the attached Application, including the financial qualifications for Holtec Palisades, LLC, Palisades Energy, LLC, and Holtec International, are true and correct to the best of my information, knowledge and belief.
By:
By:
Kellyri(e
Date:
 
Kellyri(e December 6, 2023 Affirmation of Kelly Trice 6  
Date: December 6, 2023
 
Affirmation of Kelly Trice 6
Figure 1 - Organization Chart (Current)
 
Holt ec International
 
Holt ec Po wer, Inc.
 
I Nuclear Asset Holt ec Management Decommissio ning Compa ny, LLC Int ernat io nal, LLC
 
Holtec Palisades, LLC*


Figure 1 Figure 1 - Organization Chart (Current)
Notes:
Notes:
* Holtec Palisades, LLC is the licensed owner of PNP and Big Rock Point and holds the decommissio ning trust fund s and the Standard Cont ract fo r Disposal for Spent Nuclear Fuel.
* Holtec Palisades, LLC is the licensed owner of PNP and Big Rock Point and holds the decommissioning trust funds and the Standard Contract for Disposal for Spent Nuclear Fuel.
 
Holtec Decommissioning International, LLC is the licensed operator of PNP and Big Rock Point and has authorization to conduct licensed activities under the defueled facility licensing bases.
Holt ec Decommissio ning Int ernat io nal, LLC is t he licensed operator o f PNP and Big Ro ck Po int and has authorizat ion to conduct licensed act ivit ies under the defueled facilit y licensing bases.
Holtec International Holtec Power, Inc.
 
Nuclear Asset Management Company, LLC Holtec Palisades, LLC*
Figure 1 Figure 2 - Organization Chart (Post-Transfer)
Holtec Decommissioning International, LLC I
 
Holt ec International
 
Holt ec Po wer, Inc.
 
I I Nuclear Asset Holtec Management Palisades Energy, Decommissioning Compa ny, LLC LLC (OPCO) International, LLC
 
Holtec Palisades, LLC*


Figure 2 Figure 2 - Organization Chart (Post-Transfer)
Notes:
Notes:
* Ho ltec Palisades, LLC will remain the licensed owner of PNP and Big Rock Point and will co nt inue t o ho ld t he decommissio ning t rust fund s and t he Standard Co ntract fo r Dispo sal fo r Spent Nuclear Fuel.
* Holtec Palisades, LLC will remain the licensed owner of PNP and Big Rock Point and will continue to hold the decommissioning trust funds and the Standard Contract for Disposal for Spent Nuclear Fuel.
 
Palisades Energy, LLC will be the licensed operator of PNP, authorized to conduct licensed activities under the reinstated PNP power operations licensing basis.
Palisades Energy, LLC will be the licensed operator of PNP, authorized to conduct licensed activit ies under t he reinst ated PNP power operations licensing basis.
Holtec Decommissioning International, LLC will remain the licensed operator of Big Rock Point and the other Holtec-owned facilities in decommissioning.
 
Holtec International Holtec Power, Inc.
Holt ec Deco mmissio ning I nt ernat io na l, LLC will re ma in t he lic e nsed operato r o f Big Rock Po int and the other Holt ec-o wned facilit ies in decommis sioning.
Nuclear Asset Management Company, LLC Holtec Palisades, LLC*
 
Palisades Energy, LLC (OPCO)
Figure 2 ENCLOSURE 1
Holtec Decommissioning International, LLC I
 
I
Application for O rder Consenting to Transfer of Control of License and Approving Conforming License Amendm ents
 
NRC Renewed Facility Operating License No. DPR-20
 
Encl. 1 TABLE OF CONTENTS
: 1. Introduction................................................................................................................... 1
: 2. Statement of Purpose of the Tran sfer and Nature of the Transaction Making the Transfer Necessa ry or Desi rab le............................................................................. 2 (a) Pu rpose and Description of the Transfer.......................................................... 2 (b) Nature of the Transaction Making the Transfer Desirab le.............................. 4
: 3. General Corporate Information Required by 10 CFR 50.33....................................... 4
: 4. Foreign Ownership, Control, or Domination............................................................... 5
: 5. Technical Qualifications................................................................................................ 6 (a) Senior Leadership.............................................................................................. 9 (b) Site Organization............................................................................................. 11 (c) Home Office Support....................................................................................... 13 (d) Corporate Governance and Oversight............................................................ 13 (e) Conclusion........................................................................................................ 14
: 6. Financial Qualifications............................................................................................... 1 4 (a) Financial Qualifications for Operations.......................................................... 1 5 (b) Decommissioning Funding............................................................................... 16
: 7. Rest ricted Data and Classi fied National Security Information................................. 18
: 8. Other Nuclear Regulatory Issues................................................................................ 19 (a) Price-Ande rson Indemnity and Nuclear Insurance........................................ 19 (b) Standard Contract for Dispo sal of Spent Nuclear Fuel.................................. 19 (c) Exclu sion Area Cont rol.................................................................................... 1 9 (d) Quality Assu rance Progra m............................................................................ 19 (e) No Significant Hazards Consideration............................................................ 20
: 9. Environ mental Review................................................................................................ 20
: 10. Effective Date and Other Required Regulatory Approvals....................................... 20
: 11. Conclusion.................................................................................................................... 2 1


Attachment A - Renewed Facility Operating License No. DPR-20 (Changes)
Encl. 1 ENCLOSURE 1 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments NRC Renewed Facility Operating License No. DPR-20  


Encl. 1 TOC TABLE OF CONTENTS 1.
Introduction................................................................................................................... 1 2.
Statement of Purpose of the Transfer and Nature of the Transaction Making the Transfer Necessary or Desirable............................................................................. 2 (a)
Purpose and Description of the Transfer.......................................................... 2 (b)
Nature of the Transaction Making the Transfer Desirable.............................. 4 3.
General Corporate Information Required by 10 CFR 50.33....................................... 4 4.
Foreign Ownership, Control, or Domination............................................................... 5 5.
Technical Qualifications................................................................................................ 6 (a)
Senior Leadership.............................................................................................. 9 (b)
Site Organization............................................................................................. 11 (c)
Home Office Support....................................................................................... 13 (d)
Corporate Governance and Oversight............................................................ 13 (e)
Conclusion........................................................................................................ 14 6.
Financial Qualifications............................................................................................... 14 (a)
Financial Qualifications for Operations.......................................................... 15 (b)
Decommissioning Funding............................................................................... 16 7.
Restricted Data and Classified National Security Information................................. 18 8.
Other Nuclear Regulatory Issues................................................................................ 19 (a)
Price-Anderson Indemnity and Nuclear Insurance........................................ 19 (b)
Standard Contract for Disposal of Spent Nuclear Fuel.................................. 19 (c)
Exclusion Area Control.................................................................................... 19 (d)
Quality Assurance Program............................................................................ 19 (e)
No Significant Hazards Consideration............................................................ 20 9.
Environmental Review................................................................................................ 20 10.
Effective Date and Other Required Regulatory Approvals....................................... 20 11.
Conclusion.................................................................................................................... 21 Attachment A - Renewed Facility Operating License No. DPR-20 (Changes)
Attachment B - Renewed Facility Operating License No. DPR-20 (Revised Pages)
Attachment B - Renewed Facility Operating License No. DPR-20 (Revised Pages)
Attachment C - Redacted Corporate Information Required by 10 CFR 50.33(d)(3) (Public)


Attachment C - Redacted Corporate Informati on Required by 10 CFR 50.33(d)(3) (Public)
Encl. 1 TOC Attachment D - Palisades Energy, LLC Organization Chart and Resumes of Senior Leadership Attachment E - Regulatory Commitments
 
Encl. 1 TOC Attachment D - Palisades Energy, LLC O rgani zation Chart and Resumes of Senio r Leadership
 
Att achment E - Regulatory Commit ment s
 
Encl. 1 TOC
: 1. Introduction
 
Pursuant to Sect ion 184 of t he At omic Energy Act of 1954, as amended ( AE A), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Holtec Palisades, LLC (Holtec Palisades), Holtec Decommissio ning Internat ional, LLC ( HDI), and Palisades Energy, LLC (OPCO) (together, App licant s) su bmit t his applicat io n ( App licat io n) request ing that t he U.S. Nuclear Regulat o ry Commissio n (NRC) consent to the transfer of HDIs operating authorit y (i.e., authorit y to conduct licensed activit ies) under Renewed Facilit y Operat ing License (RFOL) No. DPR-20 fo r the Palisades Nuclear P lant (PNP) and the gener al license for the PNP Independent Spent Fuel Storage Installat ion (ISFSI) (referred to collect ively as t he Facilit y) to OPCO. Applicants also request t hat NRC appro ve confo r ming admin ist rat ive amend ment s to t he PNP RFOL to reflect t he proposed transfer of operational author it y fro m HDI to OPCO. These administrative changes to the PNP RFOL are shown in Attachment A to this enclo sure. A clean versio n of the proposed license amendment s is included as At t achment B.


Encl. 1 p.1 1.
Introduction Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (AEA), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Holtec Palisades, LLC (Holtec Palisades), Holtec Decommissioning International, LLC (HDI), and Palisades Energy, LLC (OPCO) (together, Applicants) submit this application (Application) requesting that the U.S. Nuclear Regulatory Commission (NRC) consent to the transfer of HDIs operating authority (i.e., authority to conduct licensed activities) under Renewed Facility Operating License (RFOL) No. DPR-20 for the Palisades Nuclear Plant (PNP) and the general license for the PNP Independent Spent Fuel Storage Installation (ISFSI) (referred to collectively as the Facility) to OPCO. Applicants also request that NRC approve conforming administrative amendments to the PNP RFOL to reflect the proposed transfer of operational authority from HDI to OPCO. These administrative changes to the PNP RFOL are shown in Attachment A to this enclosure. A clean version of the proposed license amendments is included as Attachment B.
Applicants request this approval to support the recommencement of power operations at PNP.
Applicants request this approval to support the recommencement of power operations at PNP.
When NRC previously approved the transfer of operational authorit y from Entergy Nuclear Operations, Inc. (ENOI) to HDI, it was based on the understanding that PNP would be per manent ly shut do wn and defueled by ENOI and decommissio ned by HDI. Prio r to t he transfer, ENOI submit ted certificat ions o f per manent shutdown and defueling under 10 CFR 50.82(a)(1), 1 at which point 10 CFR 50.82(a)(2) and the RFOL no longer authorized operations. In approving t he t ransfer fro m ENOI to HDI, NRC evaluat ed HDIs qualificat io ns to perfo rm licensed activit ies at a permanent ly defueled facilit y t hro ugh deco mmissio ning and license t er mination.
When NRC previously approved the transfer of operational authority from Entergy Nuclear Operations, Inc. (ENOI) to HDI, it was based on the understanding that PNP would be permanently shut down and defueled by ENOI and decommissioned by HDI. Prior to the transfer, ENOI submitted certifications of permanent shutdown and defueling under 10 CFR 50.82(a)(1),1 at which point 10 CFR 50.82(a)(2) and the RFOL no longer authorized operations. In approving the transfer from ENOI to HDI, NRC evaluated HDIs qualifications to perform licensed activities at a permanently defueled facility through decommissioning and license termination.
 
In light of the developments since HDI assumed licensee responsibilities in June 2022, including federal and state support for nuclear generation, HDI has engaged with NRC and other government bodies regarding the possibility of restarting PNP. On March 13, 2023, HDI submitted a regulatory path to reinstate power operations at PNP.2 Consistent with that path, on September 28, 2023, HDI submitted an exemption request from 10 CFR 50.82(a)(2).3 In furtherance of this restart plan, HDIs ultimate parent company, Holtec International (Holtec), created a new subsidiary, OPCO, to facilitate power operations at PNP. As described herein, OPCO will possess the financial and technical qualifications necessary to conduct licensed activities at a power operations plant, subject to NRCs approval of the separate licensing actions and exemption requests to reinstate power operations at PNP. In light of the anticipated licensing and restart schedule, Applicants request that NRC approve this Application by December 31, 2024. Subject to receipt of other NRC approvals, Applicants expect the transfer of operational authority from HDI to OPCO to coincide with 1 ENOI Letter No. PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, June 13, 2022 (ML22164A067).
In light of the developments since HDI assumed licensee responsibilit ies in June 2022, including federal and st at e suppo rt fo r nuclear generat io n, HDI has engaged wit h NRC and ot her go vernment bo d ies regarding t he po ssibilit y o f rest art ing PNP. On March 13, 2023, HDI submit t ed a regulat o ry path to reinst at e po wer o perat io ns at PNP.2 Co nsist ent w it h t hat pat h, o n Sept ember 28, 2023, HDI submitted an exempt ion request from 10 CFR 50.82(a)(2).3 In furtherance of this restart plan, HDIs u lt imat e parent co mpa ny, Holt ec Int ernat io nal (Ho lt ec), creat ed a new subsid iar y, OPCO, to facilit ate power operations at PNP. As descr ibed herein, OPCO will possess the financial and t echnic a l qualificat io ns necessar y t o co nduct licensed activit ies at a power o perat io ns p la nt, subject to NRCs approval o f the separate licensing act ions and exempt ion requests to reinstate power o perat io ns at PNP. In lig ht o f t he ant icipat ed licensing and rest art schedu le, App licant s request t hat NRC approve t his App licat io n by December 31, 2024. Subject to receipt of other NRC appro vals, App l ica nt s expect t he t r ans fer of oper at iona l aut ho r ity fro m HDI t o OP CO t o co inc ide with
2 HDI Letter No. PNP 2023-001, Regulatory Path to Reauthorize Power Operations at the Palisades Nuclear Plant, Mar. 13, 2023 (ML23072A404).
 
3 HDI Letter No. PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82, Sept. 28, 2023 (ML23271A140).  
1 E nnrmtaeen Pandrrastepei Ooow Pfna ostsino Cenrtaee Pmfni oaositrtci Cef,22-010 20P.N Potr Ntee LION
.067)22164AL (M 20223,n 1l,uee Jsrsteao Vceh Rterml foue Falm ofveoR 2 H ntl,aral Peuc Nsaiasde Plhnt t aerrstepei Oaowrohoi Pazuteea R Pth torgulyaet,o R-001 2023P.Ntr Pteeo NI LD
).23072A404L (M023,r 2 13aM.
3 H 10 nfquirt oemseen Reeisc Lnfinao ormtirn Taeitrm Cenoio frpttms fo Exequee R,23-025 20P.Ntr Pteeo NI LD
.140)1A2327L3 (M 20228,.pt,e 50. S82RCF
 
Encl. 1 p.1 reinstatement of the facilit ys power operations technical specifications (POTS), which is current ly expected to occur in t he third quart er o f 2025.
 
Holtec Palisades will remain the licensed owner of the PNP and Big Rock Point facilit ies, and Holt ec Palisad es will cont inue to ho ld t he nuclear decommissio ning t rust fu nds fo r bo t h. HDI wil l remain t he licensed operator o f Big Ro ck Po int. The PNP rest art effo rt s and transfer o f operat io nal aut ho rit y fro m HDI to OPCO at PNP will no t affect Big Ro ck Po int act ivit ies o r Ho lt ec Palisadess decommissio ning and spent fuel management funding structure that is current ly in place for Big Rock Po int. 4
 
All act ivit ies performed at PNP will be in compliance wit h the license and NRC regulations, subject to OPCO s direct oversig ht and cont rol as the licensed operator.
 
Cert ain enclo sures acco mpanying this App licat io n cont ain perso nally ident ifiable info r mat io n and confident ial co mmercial and financial infor mation that should be wit hheld from public disclosure pursuant to 10 CFR 2.390.
: 2. Statement of Purpose of the Tran sfer and Nature of the Transaction Making the Transfer Necessa ry or Desi rab le
 
(a) Pu rpose and Description of the Transfer
 
PNP is a 2,565 MW pressur ized water reactor located in Covert, Michigan, on the shore of Lake Michigan, approximately five miles south of South Haven, Michigan. PNP began co mmercia l operations on December 31, 1971. ENOI shut down the facilit y on May 20, 2022. Pursuant to 10 CFR 50.82(a)(1), ENOI submitt ed certificat ions of permanent cessat ion of power operat ions and permanent removal of fuel fro m the reactor vessel on June 13, 2022.5 On June 15, 2022, ENOI implemented the Permanently Defueled Technical Specifications. Accordingly, when ENOI transferred operational authorit y to HDI on June 28, 2022, the permanent ly defueled licensing basis no lo nger autho rized power o perat io ns.
 
NRCs appro val o f ENOIs t ransfer of operat io nal aut ho rit y t o HDI was based on t he expectat io n, at t he t ime, t hat PNP wo uld per manent ly shut do wn. As st at ed in NRCs safet y evaluat io n report :
 
4 mmern coegacial an b electdric W Mr at 75atedractroeartei wlionga baslant war pnuclienock Pt o RThige B nt, alnlpe slqueytesubnd s, a997, 1t 29nnugus o Awh s doutnlnyrtaa peesmwitalycih fTe.rh 1963ancrni Mpeatoio pera acitlnalil oatl ffesiimoentnim osantmilmsoin an deiscogd de0n07,I 2I.SF an ISa trtsnoerruelan wuclfedear fs r 30-acealrxitymeappohthh,n trte oaertyrpela poln,nn plrnta tiied leaoeimsecrvpohin atp ar wneodaccn aurrccd.c Ieo rse 75 acrnxima atppon-imel parnypafctcaoeddicelaltt oled an an aiododr is lhnane tharIiSfe-ostFd we pe IScel o nenantcaeiFSI mn ISnigri ogok Panecotoig R Bi atstiuriven ct arnctelyh od. Taes raelhse ISFSI we tne teoatacdj hn tmemiisoosilcl deI wDl,ue H ffal ovrmoEesnlO.po Due U ffal ovrEmOoD) e (rngy Eefrntm oaetpneng Dpedi (9).2(a) 50.8R CFh 10itr wneodaccn acnianplinaormtin teeeisc lm aitubn sI aSdFIS 5 E nnrmtaeen Pandrrastepei Ooow Pfna ostsino Cenrtaee Pmfni oaositrtci Cef,22-010 20P.N Potr Ntee LION
.067)22164AL (M 20223,n 1l,uee Jsrsteao Vceh Rterml foue Falm ofveoR
 
Encl. 1 p.2 Pursuant to the purchase and sale agreement, the proposed transfer transaction is subject to Palisades also having permanent ly ceased o perat ions. Accordingly, HDI (the proposed licensed operator for decommissio ning) would not be authorized under t he Palisades lic e nse t o o perat e o r lo ad fue l in t he Palisade[ s] reacto r pursuant to 10 CFR 50.82(a)(2) and, therefore, would not conduct the operations co nt emp lat ed by t he financial qualificat io ns pro visio ns o f 10 CFR 50.33(f). Rat her, all o f HDIs licensed activit ies wou ld invo lve t he po ssessio n o f rad io act ive mat er ia l in connection wit h maintaining the safe condit ion of Palisades and the Big Rock Po int and Palisades ISFSIs, radio lo g ical deco mmissioning of Palisades and t he Big Rock Point and Palisades ISFSIs, license termination, and operational responsibilit ies associated with spent fuel management.6
 
As t he licensed operato r fo r all o f t he Holt ec-o wned nuc lear fac ilit ie s t hat are in deco mmissio ning, HDI was created and st affed to o versee deco mmissioning pro jects. The purpose of t his t ransfer is to ensure that the Holtec organizat ion authorized to oversee power operations is appropriately st ructured and st affed for reactor operations. As descr ibed in Sect ion 5, OPCO will be st affed and resourced as a nuclear plant operator, with deep operational experience and the programmat ic competencies necessary for plant operations. PNPs site emplo yees and management are expected to be employed by OPCO, subject to industry-typical staff augmentation and contractor arrangements that OPCO will use to fill certain roles. This Applicat ion also provides NRC wit h the opportunit y to review and confirm OPCOs and Ho ltec Palisadess financial and technica l qualificat ions in connect ion wit h t he ret urn to fu ll-po wer o perat io ns.
 
OPCO, like HDI, is a who lly owned subsidiary of Ho ltec through Holtec Power, Inc. (Holtec Power). Holtec Palisades will cont inue to be the licensed owner and ho ld the PNP nuclear decommissio ning t rust fu nd. As discussed in Sect io n 6, Ho lt ec Palisades is t he part y t o t wo po wer purchase agreements under which all o f PNPs capacit y will be so ld, and Holtec Palisades will reimburse OPCO for its costs under an Operator Services Agreement, a for m of which may be found in Enclosure 5 following this Applicat ion. Holtec will provide supplemental financial support via a Support Agreement with Holtec Palisades, a form of which may be found in to t his App licat io n.
 
A simp lified organizat ion chart reflect ing the current PNP licensees and their owners is pro vided as Figure 1 to the letter accompanying this Applicat ion. The planned organizational structure fo llo wing the proposed transfer is depicted in Figure 2. The ownership and operational structure OPCO is implement ing is based on ENOIs organizatio n st ruct ure prio r to shut down, wit h cert ain fleet and corporate funct ions (previously per for med by Entergy home office personnel) relocated to t he PNP sit e.
 
6 Seden-6,per Rew OaR FciPatl. Din Liifcentoylge N osnro CotfTrrer oanofsts fquee Rnel taot Raedtli Euaovetafy ucl Neapnr O-2r0,n, peraers O atrrmRganyid th.era EntPciFtoae Dlnoye tl fotin LicenoIe Ghise NSesfsFg Lise ISce atC,Ln L,rnatliaontenmng Imiciosiose Dlcteond H anatlilrnaot Inteeoc HtoC L,sa Ldeliaaslr Peuc Nrnten EgyadIn.c
.148)92A2121 (ML 20213,.c9,e D
 
Encl. 1 p.3 (b) Nature of the Transaction Making the Transfer Desirab le
 
In parallel to this Applicat ion, HDI is submitting an exempt ion request and license amendment request s to aut ho rize t he ret urn to fu ll power o peratio ns. The purpose of t he t ransfer is t o facilit at e the prompt restart and return to the full-power operation of PNP, which is in furtherance of state and federal climate and electric reliabilit y goals. As stated by the Michigan Governors Office,
[k]eeping Palisades open will keep energy cost s low, shore up domest ic energy production, and incr ea se Mic higa n s co mpet it ive ne ss fo r fut ur e eco no mic de ve lop me nt. 7 On July 31, 2023, Governor Whit mer signed the 2024 Michigan state budget, in which the Michigan Legis lature appropriated $150 millio n for targeted energy investment, aimed at the PNP restart project.8 Likewise, with the passage of federal legislat ion, including the Bipart isan Infrastruct ure Law and t he Inflation Reduct ion Act, Congress has provided financial support for t he U.S. nuclear fleet as part of federal efforts to maintain carbon-free domestic baseload generat ion. The transfer is desirable and o f considerable benefit to the citizens o f Michigan and supports federal and state climate, energy securit y, and electric reliabilit y policies. As discussed in Section 5 below, the license transfer will place PNP in a well-supported organizat ion with deep expertise in reactor operations.
 
This Applicat ion provides informat ion regarding the financial qualificat ions o f OPCO and the required financial assurance for decommissio ning of the site and ISFSI. In addit ion, it provides information pertaining to the proposed transfer of authority to conduct licensed activities, including the informat ion required under 10 CFR 50.80. As that informat ion demo nstrates: (1)
OPCO will have t he requisit e manager ial, t echnical, and financial qualificat io ns t o be t he licensed operator of PNP; (2) the material terms of the RFOL will not be affected; and (3) the license t ransfer will not result in any imper missible fo reign ownership, contro l, or do minat ion.
 
In summary, the proposed transfer will not be inimical to the commo n defense and securit y or result in any undue risk to public health and safety, and the transfer will be consistent with the requ irement s o f AEA and NRC regulat ions.
: 3. General Corporate Information Required by 10 CFR 50.33
 
OPCO is a direct, wholly owned subsidiary o f Holtec Power. Holtec Power is a direct, wholly o wned su bsid iar y o f Ho lt ec. Holt ec is a Delaw are corporat io n and the ult imat e parent company o f all the relevant entit ies who will own or operate PNP. Figures 1 and 2 illustrate the corporate o wnership st ruct ure prio r to and fo llo w ing the license t ransfer. Upon co mp let io n o f t he t ransact io n
 
7 W available at 22,, 20. 9ptnet, Slapns Poealisade P Re toltecoith Hn wlas Pnnuneocr Ahietm https://www.michigan.gov/whitmer/news/press-r eleases/2022/09/09/whitmer -announces-plan -with-h oltec-to-reopen-palisades-plant.
8 2023 Mich. Pub. Acts 379-380 a vailable at https://www.legislature.mi.gov/documents/2023-2024/publicact/pdf/2023-PA-0119.pdf; Governor Whitmer Signs Make it in Michigan Budget, July 31, 2023, available at h ttps://www.mich igan.gov/whitmer/news/pr ess-releases/2023/07/31/whitmer -signs-make-it-in-mich igan-budget.
 
Encl. 1 p.4 and license t ransfer, sit e-based PNP emp lo yees will be emp lo yed by OPCO, supp lement ed by st aff augment at io n and/or cont ractors who report to and are subject to OPCO s direct ion and cont ro l.
 
The general corporate informat ion required by 10 CFR 50.33(d)(3) regarding Holtec, Holtec Power, Nuclear Asset Management Company, LLC, Holtec Palisades, and OPCO, including identification of their principal officers and directors, is provided in Attachment C to this App licat io n. Att achme nt C co ntains perso na lly ident if iable info r mat io n, the disc lo sure of which would const itute a clearly unwarranted invasio n of personal pr ivacy. Applicants request that this personally identifiable information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6). All such info r mat ion has been redacted fro m the versio n of At t achment C att ached to t his Enclosure 1. An unredacted versio n o f At t achment C is pro vided in the no n-public Enclo sur e 1A addenda, which App licant s request be wit hheld under 10 CFR 2.390(a)(6).
 
Because OPCO is a newly-for med ent it y, t he infor mat ion cont emplated by 10 CFR 50.33(f)(4) is included herein. OPCO is a Delaware limited liabilit y co mpany whose sole member is Holtec Po wer. As of the dat e o f this App licat io n, OPCO has no liabilit ies. Pursua nt to t he t erms o f it s LLC operat ing agree ment and the Operato r Services Agreement wit h Holt ec Palisades (Enclo sure 5), OPCO wi ll be authorized to undertake all reasonably necessary corporate actions to operate PNP for itself and as agent for Holtec Palisades, including entering into contracts, emplo ying personnel, acquiring equipment and other property, borrowing and remitting funds, and taking other actions as reasonably necessary to carry out its business. As OPCOs so le member, Holtec Power holds 100% of t he membership interest s in OPCO. OPCO i s governed by its So le Member wit h delegated authorit y to o fficers, all o f who m are list ed in Att achment C. These ind ividuals are ult imately account able to t he Holt ec Executive Commit t ee member s also list ed in At t achment C.
OPCO is authorized to make distribut ions, if any, to Holtec Power at times and in amounts determined by the OPCO management committee, subject to applicable project finance rest rict io ns. Ho wever, OPCO is a ser vice co mpa ny that is not expect ed to generat e revenue or make dist r ibut ions to it s parent companies. As descr ibed in Sect ion 6 belo w, revenue fro m PNPs power generation will flow through Holtec Palisades. Holtec Palisades will reimburse OPCO, at cost, for OPCO s expenses incurred at PNP pursuant to the Operator Services Agreement (Enclosure 5). Holtec will enter into a Support Agreement (Enclosure 6) pursuant to which it wil l pro vide Holt ec Palisades (and t hus, ind irect ly, OPCO) wit h fu nds to support facilit y operations, if necessary, in accordance with the terms thereof. OPCOs and Holtec Palisadess financial qualificat ions are discussed in Sect ion 6 belo w.
 
Holtec is the ult imate parent company o f all the ent it ies descr ibed in Attachment C. Holtec is a pr ivat ely held corporat io n. It is o wned by it s shareho lders as fo llo ws: (1) The Great Banyan Trust, 36.33% o wnership int erest ; and (2) Mu lt i-Decades Trust, 63.67% ownership int erest. These t rust s are contro lled by Dr. Kr ishna Singh, who is a U.S. cit izen.
: 4. Foreign Ownership, Control, or Domination
 
As noted immediately above, Holtec is a privately held corporation owned by do mest ic trust companies t hat are in t urn cont ro lled by a U.S. cit izen. Holt ec is led by it s Chief E xecut ive Officer Dr. Kr ishna Singh, and management of the company is vested in t he Ho lt ec execut ive leadership team, including the Executive Committee members listed in Attachment C. Holtecs CEO,
 
Encl. 1 p.5 principal officers, and Execut ive Committee are all U.S. cit izens. Holtecs Board of Directors serves in an advisor y capacit y to Holtecs executive leadership team. The Board of Directors is not compr ised ent irely o f U.S. cit izens, as indicated in the unredacted version of Attachment C included in Enclosure 1A. No Director represents the interests of a foreign company or go vernment al aut ho rit y. Holt ecs Bo ard is compr ised o f ind iv iduals who advise Holt ecs execut ive leader ship based on t heir ext ensive nuclear indust ry exper ience and leader ship ro les in pro minent nuclear utilit ies and nuclear governing bodies, including internat ional ut ilit ies and governing bodies. The Board of Directors is an advisor y board. It does not have the individual or collective autho rit y t o direct or co nt ro l t he conduct o f NRC-regu lat ed activit ies by Ho lt ec or it s subsid iar ies, including OPCO and Ho lt ec Palisades, no r do t hey have aut hor it y to appoint o r remo ve any of t he officers responsible for the conduct of NRC-regulated activit ies. Dr. Kr ishna Singh serves as the Chair man of the Board of Directors and has a deciding vote on matters before the Board. Holt ec is pr ivat e ly he ld, and as suc h t he Direct o rs are appoint ed, and ma y be rep laced, by Ho lt ecs o wners, which are trust companies organized in t he Stat e of Flo r id a and the Stat e o f Nevada, respect ively, and cont ro lled by a U.S. cit izen. Holt ec has been pr ivately owned by a U.S. cit izen or corporat io n since it s incept io n in 1986 wit hout any non-U.S. cont rol or do minat ion.
 
Thro ugh it s Executive Co mmit t ee, Ho lt ec will exercise corporat e parent appro val and oversig ht o f Holtec Palisades and OPCO, including budgetary approvals, financial performance, hiring decisio ns fo r senio r manag ement, and appro val of majo r capit al expendit ures. All of t he members o f t he Holt ec Execut ive Co mmit t ee are U.S. cit izens. All o f t he manager s and pr incipal o fficers o f t he int er mediat e Holt ec subsid iar ies, Holt ec Po wer and Nuclear Asset Management Co mp any, are U.S. cit izens. All o f the principal o fficers of Holtec Palisades and OPCO who will have direct respo nsib ilit y fo r NRC-regulat ed act ivit ies are U.S. cit izens. As such, OPCO and Ho lt ec Palisades will no t be o wned, contro lled, or dominated by any foreign person.


As t he licensed ent it y wit h possessio n of and respo nsibilit y fo r direct o versight and cont ro l of the site, OPCO will act for itself and on behalf of Holtec Palisades as its agent. OPCO and Holtec Palisades are no t acting as t he agent or represent at ive of any other ent it y in t he pro po sed transfer.
Encl. 1 p.2 reinstatement of the facilitys power operations technical specifications (POTS), which is currently expected to occur in the third quarter of 2025.
: 5. Technical Qualifications
Holtec Palisades will remain the licensed owner of the PNP and Big Rock Point facilities, and Holtec Palisades will continue to hold the nuclear decommissioning trust funds for both. HDI will remain the licensed operator of Big Rock Point. The PNP restart efforts and transfer of operational authority from HDI to OPCO at PNP will not affect Big Rock Point activities or Holtec Palisadess decommissioning and spent fuel management funding structure that is currently in place for Big Rock Point.4 All activities performed at PNP will be in compliance with the license and NRC regulations, subject to OPCOs direct oversight and control as the licensed operator.
Certain enclosures accompanying this Application contain personally identifiable information and confidential commercial and financial information that should be withheld from public disclosure pursuant to 10 CFR 2.390.
2.
Statement of Purpose of the Transfer and Nature of the Transaction Making the Transfer Necessary or Desirable (a)
Purpose and Description of the Transfer PNP is a 2,565 MW pressurized water reactor located in Covert, Michigan, on the shore of Lake Michigan, approximately five miles south of South Haven, Michigan. PNP began commercial operations on December 31, 1971. ENOI shut down the facility on May 20, 2022. Pursuant to 10 CFR 50.82(a)(1), ENOI submitted certifications of permanent cessation of power operations and permanent removal of fuel from the reactor vessel on June 13, 2022.5 On June 15, 2022, ENOI implemented the Permanently Defueled Technical Specifications. Accordingly, when ENOI transferred operational authority to HDI on June 28, 2022, the permanently defueled licensing basis no longer authorized power operations.
NRCs approval of ENOIs transfer of operational authority to HDI was based on the expectation, at the time, that PNP would permanently shut down. As stated in NRCs safety evaluation report:
4 The Big Rock Point nuclear plant was a boiling water reactor rated at 75 MW electric and began commercial operation in March 1963. The facility was permanently shut down on August 29, 1997, and subsequently, all spent nuclear fuel was transferred to an ISFSI. In 2007, decommissioning and dismantlement of all operational facilities occurred. In accordance with an approved license termination plan, all property, other than the approximately 30-acre on-site parcel of land where the ISFSI is located and an additional non-impacted parcel of approximately 75 acres adjacent to the ISFSI was released. The only current activities at Big Rock Point are ongoing ISFSI maintenance pending Department of Energy (DOE) removal of fuel. Upon DOEs removal of fuel, HDI will decommission the ISFSI and submit a license termination plan in accordance with 10 CFR 50.82(a)(9).
5 ENOI Letter No. PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, June 13, 2022 (ML22164A067).  


OPCO will be fu lly st affed and reso urced as a plant o perato r wit h an o rganizat io nal st ruct ure based on ENOIs previous operating organizat ion, with certain funct ions that were previously fulfilled by ENOI home office personnel relocated to either the plant site or Holtecs corporate headquart ers. OPCO will be managed and st affed by perso nnel who have decades o f nuclear p lant operating exper ience at PNP and other U.S. nuclear plant s. As an operator wit h responsibilit y for a single facilit y, OPCOs organizat ion will consist primarily o f on-site personnel at PNP, a substantial portion of which previously served in ENOIs operating organization prior to shutdown. OPCOs senior leadership will be made up of exist ing Holtec-affiliated officers and senio r leadership, includ ing the incu mbent PNP Sit e Vice Presid ent who served in t hat ro le dur ing PNPs per manent ly defueled operations and who will report to a Chief Nuclear Officer with over four decades of nuclear operating exper ience and senior management roles. While OPCO will be exclu sively respo nsible fo r t he conduct o f licensed activit ies at PNP, OPCO s organizat io n will be augmented by various Holtec corporate and administrative support, and OPCOs leadership will
Encl. 1 p.3 Pursuant to the purchase and sale agreement, the proposed transfer transaction is subject to Palisades also having permanently ceased operations. Accordingly, HDI (the proposed licensed operator for decommissioning) would not be authorized under the Palisades license to operate or load fuel in the Palisade[s] reactor pursuant to 10 CFR 50.82(a)(2) and, therefore, would not conduct the operations contemplated by the financial qualifications provisions of 10 CFR 50.33(f). Rather, all of HDIs licensed activities would involve the possession of radioactive material in connection with maintaining the safe condition of Palisades and the Big Rock Point and Palisades ISFSIs, radiological decommissioning of Palisades and the Big Rock Point and Palisades ISFSIs, license termination, and operational responsibilities associated with spent fuel management.6 As the licensed operator for all of the Holtec-owned nuclear facilities that are in decommissioning, HDI was created and staffed to oversee decommissioning projects. The purpose of this transfer is to ensure that the Holtec organization authorized to oversee power operations is appropriately structured and staffed for reactor operations. As described in Section 5, OPCO will be staffed and resourced as a nuclear plant operator, with deep operational experience and the programmatic competencies necessary for plant operations. PNPs site employees and management are expected to be employed by OPCO, subject to industry-typical staff augmentation and contractor arrangements that OPCO will use to fill certain roles. This Application also provides NRC with the opportunity to review and confirm OPCOs and Holtec Palisadess financial and technical qualifications in connection with the return to full-power operations.
OPCO, like HDI, is a wholly owned subsidiary of Holtec through Holtec Power, Inc. (Holtec Power). Holtec Palisades will continue to be the licensed owner and hold the PNP nuclear decommissioning trust fund. As discussed in Section 6, Holtec Palisades is the party to two power purchase agreements under which all of PNPs capacity will be sold, and Holtec Palisades will reimburse OPCO for its costs under an Operator Services Agreement, a form of which may be found in Enclosure 5 following this Application. Holtec will provide supplemental financial support via a Support Agreement with Holtec Palisades, a form of which may be found in to this Application.
A simplified organization chart reflecting the current PNP licensees and their owners is provided as Figure 1 to the letter accompanying this Application. The planned organizational structure following the proposed transfer is depicted in Figure 2. The ownership and operational structure OPCO is implementing is based on ENOIs organization structure prior to shutdown, with certain fleet and corporate functions (previously performed by Entergy home office personnel) relocated to the PNP site.
6 Safety Evaluation Related to Request for Transfer of Control of Facility Operating License No. DPR-6, Renewed Facility Operating License No. DPR-20, and the General Licenses for the ISFSIs from Entergy Nuclear Operations, Inc. and Entergy Nuclear Palisades, LLC to Holtec International and Holtec Decommissioning International, LLC, at 9, Dec. 13, 2021 (ML21292A148).


Encl. 1 p.6 draw on the decades of experience of Ho ltecs senior leaders who will oversee and provide bus ine ss dir ect io n to OP CO.
Encl. 1 p.4 (b)
Nature of the Transaction Making the Transfer Desirable In parallel to this Application, HDI is submitting an exemption request and license amendment requests to authorize the return to full power operations. The purpose of the transfer is to facilitate the prompt restart and return to the full-power operation of PNP, which is in furtherance of state and federal climate and electric reliability goals. As stated by the Michigan Governors Office,
[k]eeping Palisades open will keep energy costs low, shore up domestic energy production, and increase Michigans competitiveness for future economic development.7 On July 31, 2023, Governor Whitmer signed the 2024 Michigan state budget, in which the Michigan Legislature appropriated $150 million for targeted energy investment, aimed at the PNP restart project.8 Likewise, with the passage of federal legislation, including the Bipartisan Infrastructure Law and the Inflation Reduction Act, Congress has provided financial support for the U.S. nuclear fleet as part of federal efforts to maintain carbon-free domestic baseload generation. The transfer is desirable and of considerable benefit to the citizens of Michigan and supports federal and state climate, energy security, and electric reliability policies. As discussed in Section 5 below, the license transfer will place PNP in a well-supported organization with deep expertise in reactor operations.
This Application provides information regarding the financial qualifications of OPCO and the required financial assurance for decommissioning of the site and ISFSI. In addition, it provides information pertaining to the proposed transfer of authority to conduct licensed activities, including the information required under 10 CFR 50.80. As that information demonstrates: (1)
OPCO will have the requisite managerial, technical, and financial qualifications to be the licensed operator of PNP; (2) the material terms of the RFOL will not be affected; and (3) the license transfer will not result in any impermissible foreign ownership, control, or domination.
In summary, the proposed transfer will not be inimical to the common defense and security or result in any undue risk to public health and safety, and the transfer will be consistent with the requirements of AEA and NRC regulations.
3.
General Corporate Information Required by 10 CFR 50.33 OPCO is a direct, wholly owned subsidiary of Holtec Power. Holtec Power is a direct, wholly owned subsidiary of Holtec. Holtec is a Delaware corporation and the ultimate parent company of all the relevant entities who will own or operate PNP. Figures 1 and 2 illustrate the corporate ownership structure prior to and following the license transfer. Upon completion of the transaction 7 Whitmer Announces Plan with Holtec to Reopen Palisades Plant, Sept. 9, 2022, available at https://www.michigan.gov/whitmer/news/press-releases/2022/09/09/whitmer-announces-plan-with-holtec-to-reopen-palisades-plant.
8 2023 Mich.
Pub.
Acts 379-380 available at https://www.legislature.mi.gov/documents/2023-2024/publicact/pdf/2023-PA-0119.pdf; Governor Whitmer Signs Make it in Michigan Budget, July 31, 2023, available at https://www.michigan.gov/whitmer/news/press-releases/2023/07/31/whitmer-signs-make-it-in-michigan-budget.  


Figure A-1 below provides an overview of the operating organization, OPCOs senior management, and the oversight and lines of reporting to Holtec. Attachment D includes o rganizat io n chart s sho wing the ent ire sit e organizat io n of appro ximat ely 550 fu ll-t ime emp lo yees and their reporting relat ionships up to the Site Vice President. As shown in Figure A-1, OPCOs sit e organizat ion, led by the S it e Vice President, will report to OPCOs senior leadership, who in t urn will ult imately answer to t he Holt ec Executive Commit t ee compo sed of the members sho wn in Att achment C. While OPCO lead ership will be acco unt able to t he Holt ec Executive Co mmit t ee, and, through the Executive Co mmittee, Holtec will exercise the typical approval and oversight r ight s of a corporate parent (e.g., budgetary approval and financial oversight, hir ing decisio ns for senior management, approval of major capital expendit ures, and ensur ing a strong nuclear safet y culture fro m the top down), OPCOs officers will be ult imately responsible for and have control over all licensed activit ies at PNP. This responsibilit y and control includes daily operations, compliance wit h the Facilit y licensing basis, hiring, training, and supervising site emplo yees, licensing reviews and submittals to NRC, engineering, maintenance, and outage work, and manag ing operat ing cost s.
Encl. 1 p.5 and license transfer, site-based PNP employees will be employed by OPCO, supplemented by staff augmentation and/or contractors who report to and are subject to OPCOs direction and control.
The general corporate information required by 10 CFR 50.33(d)(3) regarding Holtec, Holtec Power, Nuclear Asset Management Company, LLC, Holtec Palisades, and OPCO, including identification of their principal officers and directors, is provided in Attachment C to this Application. Attachment C contains personally identifiable information, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Applicants request that this personally identifiable information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6). All such information has been redacted from the version of Attachment C attached to this Enclosure 1. An unredacted version of Attachment C is provided in the non-public Enclosure 1A addenda, which Applicants request be withheld under 10 CFR 2.390(a)(6).
Because OPCO is a newly-formed entity, the information contemplated by 10 CFR 50.33(f)(4) is included herein. OPCO is a Delaware limited liability company whose sole member is Holtec Power. As of the date of this Application, OPCO has no liabilities. Pursuant to the terms of its LLC operating agreement and the Operator Services Agreement with Holtec Palisades (Enclosure 5), OPCO will be authorized to undertake all reasonably necessary corporate actions to operate PNP for itself and as agent for Holtec Palisades, including entering into contracts, employing personnel, acquiring equipment and other property, borrowing and remitting funds, and taking other actions as reasonably necessary to carry out its business. As OPCOs sole member, Holtec Power holds 100% of the membership interests in OPCO. OPCO is governed by its Sole Member with delegated authority to officers, all of whom are listed in Attachment C. These individuals are ultimately accountable to the Holtec Executive Committee members also listed in Attachment C.
OPCO is authorized to make distributions, if any, to Holtec Power at times and in amounts determined by the OPCO management committee, subject to applicable project finance restrictions. However, OPCO is a service company that is not expected to generate revenue or make distributions to its parent companies. As described in Section 6 below, revenue from PNPs power generation will flow through Holtec Palisades. Holtec Palisades will reimburse OPCO, at cost, for OPCOs expenses incurred at PNP pursuant to the Operator Services Agreement (Enclosure 5). Holtec will enter into a Support Agreement (Enclosure 6) pursuant to which it will provide Holtec Palisades (and thus, indirectly, OPCO) with funds to support facility operations, if necessary, in accordance with the terms thereof. OPCOs and Holtec Palisadess financial qualifications are discussed in Section 6 below.
Holtec is the ultimate parent company of all the entities described in Attachment C. Holtec is a privately held corporation. It is owned by its shareholders as follows: (1) The Great Banyan Trust, 36.33% ownership interest; and (2) Multi-Decades Trust, 63.67% ownership interest. These trusts are controlled by Dr. Krishna Singh, who is a U.S. citizen.
4.
Foreign Ownership, Control, or Domination As noted immediately above, Holtec is a privately held corporation owned by domestic trust companies that are in turn controlled by a U.S. citizen. Holtec is led by its Chief Executive Officer Dr. Krishna Singh, and management of the company is vested in the Holtec executive leadership team, including the Executive Committee members listed in Attachment C. Holtecs CEO,


Encl. 1 p.7
Encl. 1 p.6 principal officers, and Executive Committee are all U.S. citizens. Holtecs Board of Directors serves in an advisory capacity to Holtecs executive leadership team. The Board of Directors is not comprised entirely of U.S. citizens, as indicated in the unredacted version of Attachment C included in Enclosure 1A. No Director represents the interests of a foreign company or governmental authority. Holtecs Board is comprised of individuals who advise Holtecs executive leadership based on their extensive nuclear industry experience and leadership roles in prominent nuclear utilities and nuclear governing bodies, including international utilities and governing bodies. The Board of Directors is an advisory board. It does not have the individual or collective authority to direct or control the conduct of NRC-regulated activities by Holtec or its subsidiaries, including OPCO and Holtec Palisades, nor do they have authority to appoint or remove any of the officers responsible for the conduct of NRC-regulated activities. Dr. Krishna Singh serves as the Chairman of the Board of Directors and has a deciding vote on matters before the Board. Holtec is privately held, and as such the Directors are appointed, and may be replaced, by Holtecs owners, which are trust companies organized in the State of Florida and the State of Nevada, respectively, and controlled by a U.S. citizen. Holtec has been privately owned by a U.S. citizen or corporation since its inception in 1986 without any non-U.S. control or domination.
Through its Executive Committee, Holtec will exercise corporate parent approval and oversight of Holtec Palisades and OPCO, including budgetary approvals, financial performance, hiring decisions for senior management, and approval of major capital expenditures. All of the members of the Holtec Executive Committee are U.S. citizens. All of the managers and principal officers of the intermediate Holtec subsidiaries, Holtec Power and Nuclear Asset Management Company, are U.S. citizens. All of the principal officers of Holtec Palisades and OPCO who will have direct responsibility for NRC-regulated activities are U.S. citizens. As such, OPCO and Holtec Palisades will not be owned, controlled, or dominated by any foreign person.
As the licensed entity with possession of and responsibility for direct oversight and control of the site, OPCO will act for itself and on behalf of Holtec Palisades as its agent. OPCO and Holtec Palisades are not acting as the agent or representative of any other entity in the proposed transfer.
5.
Technical Qualifications OPCO will be fully staffed and resourced as a plant operator with an organizational structure based on ENOIs previous operating organization, with certain functions that were previously fulfilled by ENOI home office personnel relocated to either the plant site or Holtecs corporate headquarters. OPCO will be managed and staffed by personnel who have decades of nuclear plant operating experience at PNP and other U.S. nuclear plants. As an operator with responsibility for a single facility, OPCOs organization will consist primarily of on-site personnel at PNP, a substantial portion of which previously served in ENOIs operating organization prior to shutdown. OPCOs senior leadership will be made up of existing Holtec-affiliated officers and senior leadership, including the incumbent PNP Site Vice President who served in that role during PNPs permanently defueled operations and who will report to a Chief Nuclear Officer with over four decades of nuclear operating experience and senior management roles. While OPCO will be exclusively responsible for the conduct of licensed activities at PNP, OPCOs organization will be augmented by various Holtec corporate and administrative support, and OPCOs leadership will


~--
Encl. 1 p.7 draw on the decades of experience of Holtecs senior leaders who will oversee and provide business direction to OPCO.
Figure A-1 below provides an overview of the operating organization, OPCOs senior management, and the oversight and lines of reporting to Holtec. Attachment D includes organization charts showing the entire site organization of approximately 550 full-time employees and their reporting relationships up to the Site Vice President. As shown in Figure A-1, OPCOs site organization, led by the Site Vice President, will report to OPCOs senior leadership, who in turn will ultimately answer to the Holtec Executive Committee composed of the members shown in Attachment C. While OPCO leadership will be accountable to the Holtec Executive Committee, and, through the Executive Committee, Holtec will exercise the typical approval and oversight rights of a corporate parent (e.g., budgetary approval and financial oversight, hiring decisions for senior management, approval of major capital expenditures, and ensuring a strong nuclear safety culture from the top down), OPCOs officers will be ultimately responsible for and have control over all licensed activities at PNP. This responsibility and control includes daily operations, compliance with the Facility licensing basis, hiring, training, and supervising site employees, licensing reviews and submittals to NRC, engineering, maintenance, and outage work, and managing operating costs.


Encl. 1 p.8 Figure A Palisades Energy, LLC Senior Management Organization Chart
* Expected to be filled by incumbent personnel who worked at PNP in significant management role during operations.
Security Manager also reports to Holtec Security Internationals Director of Fleet Security Operations.
President Kelly Trice Holtec International Executive Committee Chief Nuclear Officer Richard Burroni Site Vice President Michael Mlynarek VP, Licensing and Regulatory Affairs Jean Fleming Manager, Quality Assurance*
General Manager, Plant Operations*
: Director, Engineering*
Director, Site Services*
Employee Concerns Chief Financial Officer Troy Geauthreaux Manager, Security
~--
I I
I I
I I
I I
Line 294: Line 189:
I I
I I
I I
I I
I
I  
 
(a) Senior Leadership
 
The OPCO executive leadership team will oversee safe operation of PNP and will be ultimately responsible for the conduct of licensed act ivit ies in accordance with the plant power operations licensing basis (POLB). The execut ive leadership t eam consist s of the President, Chief Nuclear O fficer, Chief Financial O fficer, Vice Presid ent o f Licensing, Regu lat ory Affa ir s, and Pro babilist ic Safet y Analys is, and Sit e Vice President.
 
OPCOs senior leadership has over a century o f collect ive nuclear operational experience, wit h most holding Senior Reactor Operator licenses during their careers and bringing in-depth management experience from their prior roles in nuclear operating organizat ions. The OPCO execut ives wit h key nuclear oversig ht ro les are discussed in t his sect io n, wit h all senio r leader ship ro les and responsib ilit ies pro vided in Table A-1.
 
OPCO will be led by Kelly Tr ice, as President. Mr. Trice current ly ser ves as HDI s President and will cont inue in that role in addit ion to his responsibilit ies for OPCO. Mr. Trice brings over 30 years of execut ive management exper ience of complex business ent erprises and nuclear industr y leader ship. Mr. Trice previo u sly served as t he president o f bo t h t he po wer divisio n and t he fac ilit ie s and plant services divis ion of Chicago Bridge and Iron (CB&I). In this capacit y, he managed approximately 70 offices worldwide with operations spanning four continents. At its peak, this enterprise had approximately 200 plants under contract, which included about 40% of the U.S.
nuclear operat ing fleet and anot her 150 petrochemical plant s, 17,000 emplo yees and a backlog o f ro ughly $10B wit h annual revenues o f $3.5B. Mr. Trice also served as execut ive vice president of Bruce Power, a major utilit y in Canada, which operates eight nuclear reactors and generates appro ximat ely 6.4 GW of power. In t his capacit y, he had t he overall respo nsibilit y fo r all of Bruce Po wers capit al pro grams, as well as t he refur bishment o f six reactors. The planned budget fo r t his cap it al pro gram was appro ximat ely $14B CAD. Mr. Trice is a graduat e o f t he U.S. Navys Nuclear Pro pulsio n Pro gram. He served in t he U.S. Navy fo r six years as an o fficer o n a nuclear submar ine and held several t o p-secret and Depart ment of Energy (DOE) Q clearances. Mr. Trices resume is included in At t achment D.
 
All PNP perso nnel respo nsible fo r licensed act ivit ies will repo rt to OPCOs Chief Nuclear Officer, Richard Burroni. Mr. Burroni has worked in the nuclear industry for over four decades, most recent ly as HDIs Site Vice President of Indian Point Energy Center. Mr. Burroni has served in various nuclear industry roles of increasing responsibilit y since jo ining the New York Power Author ity at Indian Point Unit 3 Nuclear Power Plant in 1980. His posit ions included Technica l Services Engineer, Engineering Supervisor for Performance, Assistant Operations Manager for Support, Supervisor Instrument and Control Engineering, and Superintendent/Manager of the Instrument and Control Department. Following his role in Instrument and Control, Mr. Burroni served in mult iple engineering management positions at Indian Point before beco ming Chie f Engineer for Entergys northern reactor fleet. He then returned to Indian Po int as Engineering Director and has served as S it e Vice President for 3 years under Ho lt ecs ownership. Pr ior to the transfer of operational authority to OPCO, Mr. Burroni will transition out of his role as Indian
 
Encl. 1 p.9 Point Sit e Vice President. Mr. Burroni received his Senior Reactor Operator license in 1986. His resume is included in Att achment D.
 
PNPs Qualit y Assurance funct ions will report to Ms. Jean Fleming as OPCOs Vice President of Licensing, Regu lat ory Affairs, and Probabilist ic Safet y Analysis. Ms. Fleming will report direct ly to t he OPCO President. Ms. Fleming current ly oversees the licensing, permit t ing, and compliance fu nct io ns o f HDIs deco mmissio ning pro ject s, Ho lt ecs dr y st o rage business, and t he Ho lt ec SMR-160 small modular reactor design. Ms. Fleming previously served as director of site regulatory co mp lia nce and licensing at PSEG Nuclear, LLC, where she oversaw t he licensing and comp lia nce organizat ion wit h responsibilit ies for the Salem and Hope Creek operations and support for licensing act ivit ies at Peach Bottom. Ms. Fleming held a Senior Reactor Operator license for the Salem Nuclear P lant fro m 2010 to 2017. Prio r to joining the privat e co mmercial nuclear indust ry, Ms. Fleming ser ved in the U.S. Navy as Nuclear Surface Warfare Officer onboard t he USS Harry S. Truman. Ms. Flemings resume is included in Attachment D.
 
PNPs sit e o rganizat io n will cont inue t o repo rt to t he S it e Vice President, Mr. Mike Mlynarek. Mr.
Mlynarek has wo rked at PNP since 1988 and has served as t he Sit e Vice Preside nt since June 2022.
He has over 37 years of exp er ience in nuclear power in Michigan, beg inn ing at t he Big Ro ck Po int Nuclear Power Plant in 1985. Mr. Mlynarek has served in many leadership posit ions at PNP over the years, including the plant reactor engineer, nuclear operations shift manager, chemistr y manager, nuclear independent oversight manager, and decommissio ning manager. As a former evaluator at the Inst itute of Nuclear Po wer Operations (INPO), Mr. Mlynarek served nuclear indust r y leadership on evaluat ion and assist ance t eams at 14 st at ions t hroughout t he U.S. and at 6 stations throughout Japan, Finland, France, Bulgaria, the United Arab Emirates, and England.
Mlynarek has held a Senior Reactor Operator License for 17 years. His resume is included in At t achme nt D.
 
Table A-1 belo w summar izes the roles and respo nsibilit ies of OPCOs senior management.
 
Table A-1 Responsibilities of Pali sades Energy, LLC, Senior Management President Ult imately responsible for the safe and reliable operations o f PNP; responsible for overall corporate policy and provides executive direction and guidance for PNP as well as promulgates corporate policy through the senior management st aff; est ablishes effect ive management controls to maintain nuclear safety and organizational effectiveness; provides strategic direction and guidance for the company; establishes expectations for high levels o f qualit y, safet y, and efficienc y throughout the company; routinely reports to Holtec International Executive Committee; assures sufficient resources and support functions to achieve nuclear safety object ives.
 
Encl. 1 p.10 Chief Nuclear Officer Reports directly to the President; highest level nuclear (CNO) executive officer ; responsible for providing top-level direct ion for the safe and reliable operation of PNP; responsible for execution of the Quality Assurance Program; ensures engineering services and operational support are provided to maint ain nuclear safet y; exercises oversig ht and gover nance o f corporate or home office functions that support plant operations, including procurement, information technology, and human resources; ho lds no ancillary responsibilit ies that ma y d ist ract fro m t he offic ers respo nsibilit y fo r nu c lear sa fet y.
Chief Financial Officer Reports direct ly to the President; responsible for development (CFO) and management of all financial matters, including financia l statement reporting, budgeting, analysis, accounting, billing, and maintaining adequate internal financial controls; and report ing t o ensure regulat ory compliance.
Vice President of Licensing, Reports directly to the President; responsible for verifying Regulatory Affairs, and effective execution of the Quality Assurance Program, Probabilist ic Safet y Analysis including maint aining independence t hrough t he audit fu nct io n and ver ifying t he adequacy of the Qualit y Assurance Program, including act ivit ies related to vendor qualit y; responsible for ensuring that programmat ic elements are in place to support plant personnel in co mplying with and carrying out Qualit y Assurance Program requirements.
S it e Vice President Report s direct ly t o t he CNO; responsib le for managing day-t o -
day nuclear operations and operations support; directly responsible for management of the site line organization; responsible for implement ing Qualit y Assurance Program in al l site activit ies; responsible for establishing policies, goals, and o bject ive s necessar y t o ma int a in nu c lear safet y; respo nsible fo r overall safe plant operation and exercising oversight and co ntro l over o n-s it e act ivit ies nece ssar y fo r t he safe oper at io n and mainte nance o f t he p la nt.
 
(b) Site Organization
 
Fo llowing shutdown in May 2022 and transfer from ENOI to Holtec in June 2022, HDI has maintained a meaning fu l number of incu mbent sit e management that were emp lo yed at PNP during operations. As of the Application date, the current site organization consists of approximately 220 personnel, pr imar ily made up of incumbent ENOI personnel, many o f who m held management and senior operator posit ions during operations. As a result, HDI has retained key t alent and inst it ut io nal knowledge from t he pr io r operat ions per iod. HDI will st aff PNP to t he qualificat ions and levels required by the reinstated POTS and Updated Final Safet y Analysis
 
Encl. 1 p.11 Report (UFSAR) 9 to ensure compliance with the reinstated POLB and NRC regulations applicable to an o perat ing reacto r, prio r to t ransfer of operat io nal autho rit y t o OPCO. Att achment D includes o rganizat io na l chart s sho w ing t he p lanned 550-perso n PNP o rganizat io n t hat will repo rt up to OPCOs senior leadership fo llowing the t ransfer. At t achment D includes all on-sit e and off-sit e po sit io ns fo r activit ies affect ing plant safet y. The organizat io n chart s are based on t he previo us operat ing organizat ion in place pr ior to shut do wn and define the lines of authorit y, respo nsibilit y, and co mmunicat ion fro m senior management levels through inter mediate levels to and including all operating organizat ion posit ions. As part of its staffing plan, HDI is developing funct ional descriptions of departmental responsibilities and relationships, and job descriptions for key posit ions. The reinstated power operations UFSAR will also document the requirements for the jo b t it les referred to in the reinstated POTS. Prior to co nsummat ing the transfer, HDI and OPCO will provide NRC wit h evidence demonst rating that t he PNP operat ing organization has returned to operational levels and qualificat ions and meets the applicable requirements of the reinstated POLB.
 
HDI is current ly imp le me nt ing a hir ing, training, and recert ificat io n p la n to ensure t hat all po sit io ns in the operational organizat ion are filled prior to transfer to OPCO with individuals qualified to meet t he POLB requ irement s. As o f t he Applicat io n date, HDI is in t he pro cess of reinst at ing a 10 CFR Part 55 training program for licensed reactor operators to support operational staffing needs and training lead t imes. The operational organization will meet the requirements of the POTS, Chapter 12 of the reinstated UFSAR, and the power operations Qualit y Assurance Program Manual (QAPM). 10 HDI will reinstate training programs consistent with Chapter 12 of the power o perat io ns UFSAR that are eit her accredit ed by the Natio nal Nuclear Accredit ing Board o r meet the standards set forth in Sect ion 5 o f ANSI/ANS 3.1-1978 to ensure that the technica l support organizat ion has the combined educat ion, experience, and skills sufficient to ensure safe and efficient operation of t he plant.
 
In addit io n t o direct emp lo yees, OPCO will leverage st andard nu clear indust ry st aff augment at io n arrangements and contracted labor for certain specialt y scope. Holtec Securit y Internat ional, LLC
 
9 I Dtntnsrsrnm r rtmi,olnng eenesqueaainitsh Hattdirdd ci r tubee tmedstgsng soglwe mteeieseduisecusApubdics fnnctri oenoitsL le Cotrl sdmsatOinsn AiFicenu rsvoth and (2) thde coriits andT RsootOeinSaie Pte pevote (1)s n See NRC, Issuance of Amendment Regarding Administrative Controls for Permanently.atiosicifcpel ShnacicTe Defueled Condition, June 4, 2018 (ML18114A410); NRC, Issuance of Amendment No. 272 Re: Permanently Defueled Technical Specifications, May 13, 2022 (ML22039A198). Coincident w ith implementation of the two Techn ical Specification s license amen dmen ts, HDI expects to reinstate, via the 10 CFR 50.59 pr ocess, th e power operations UFSAR based on UFSAR Rev. 35 (the version in effect immediately prior to shutdown) with a ppropriate con for ming amen dments. See Palisades Nuclear Plant, Revision 35 to UFSAR, Chapter 12, Conduct of Operations, Apr. 14, 2021 (ML21125A337). HDI expe cts that any changes to UFSAR Revision 35, Chapter 12 will reflect the fact that OPCO will have a more site-centric organization due to the fact that ENOI had a large corpo rate/home office or ganization to pr ovide fleet-wide ser vices to all En ter gy-ow n ed plan ts, wh er eas OPCO will locate all pr incipa l sa fet y fun ction s at th e Palisades plan t site with a mor e limited set of typical cor porate suppor t ser vices pr ovided by th e Holtec home office (e.g., pr ocur ement, human r esour ces, tax an d accoun tin g).
10 Palisades is currently governed by HDIs fleet-wide Decommissioning Quality Assurance Program. See HDI Letter, Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Rev. 2, Aug. 3, 2022 (ML22215A147). HDI expects to reinstate a power operations Quality Assurance Program via 10 CFR 50.54(a) coincident with implementation of the POTS.
 
Encl. 1 p.12 (HSI), a who lly o w ned su bsid iar y o f Ho lt ec Po wer, will co nt inue t o pro vide sit e secur it y ser vice s and emplo y site securit y personnel via a contractual arrangement with OPCO. HSI currently pro vides secur it y services and emp lo ys secur it y p erso nnel u nd er a cont ract wit h, and su bject to t he supervis io n and cont ro l o f, HDI. All secur it y perso nnel will be direct ly respo nsible to and subject to t he direct io n and cont ro l of OPCO and the Sit e Vice President.
 
As part o f t he reinst at ement o f t he POLB, HDI will revise PNP po licies, pro grams, and pro cedures to support the return to operations in accordance with the reinstated POTS, UFSAR, and NRC regulatory requirements applicable to operating reactors.11 HDI has ma inta ined the access and fit ness-fo r-dut y pro grams dur ing deco mmissio ning in a manner t hat ensures current sit e perso nne l will be able to transit io n back to equivalent roles in OPCOs operational organizat ion. Upon t ransfer o f o perat io nal aut ho rit y, OPCO will wo rk in accordance wit h t he revised power o perat io ns program documents. The PNP programs and procedures at the time of the license transfer, including, as applicable, the reinst at ed emergency plan, operat io nal secur it y plans, fire protectio n program, radio logical protection, and Qualit y Assurance Program, will be implemented post-license transfer by OPCO. Any subsequent changes to these procedures will be determined by OPCO and made in accordance with the applicable change requirements set forth in NRC regulat ions.
 
(c) Home Offic e Support
 
OPCO w ill have dedicated ho me office support for certain ser vice funct ions located in Holtecs corporate headquarters in Camden, New Jersey. Among other things, OPCO will leverage efficiencies of conso lidated accounting, finance, procurement, tax, human resources, and infor mat io n techno log y. OPCO will remain ult imat ely respo nsible fo r all licensed act ivit ies, including nuclear safet y mat t ers.
 
Who lly owned Holtec affiliate HSI currently provides sit e securit y ser vices and emplo ys secur it y personnel pursuant to a contract between HSI and HDI, subject to HDIs ult imate direct ion and control. Post-t ransfer, HSI will cont inue providing secur it y ser vices to PNP pursuant to a contract wit h OPCO, subject to OPCOs ult imat e direct ion and cont ro l.
 
(d) Corporate Governance and Oversight
 
Holtec Palisades and OPCO are who lly owned subsidiar ies of Ho ltec. Holtec Palisadess senior leadership will report to the Holtec Execut ive Committee made up of the individuals listed in Attachment C. While Holtec will exercise general corporate oversight and decisio n-making authority over financial, personnel, and other business matters of OPCO, OPCOs senior leadership will ult imately be responsible for the conduct of licensed act ivit ies and day-to-day operations.
 
11 Hlan and Pn Emynergecerperasti oowra poeintatse tsortsnnequet dm ameleimceniteubs steleparay s tnoindsteID rnrpeiaoset owra potrpienappo atrnouirnltumleect wsodrmi prga steofr omndearih.les Tveneteico L AnrcyEgeme
..54 50R CFn 10 ad.59 50R0 CFn 1nt imserrquiheehtietr wneodaccnacai issb
 
Encl. 1 p.13 Ho lt ec is an integrat ed t echno lo g ies enterprise pro vid ing innovat ive so lut io ns, equ ip me nt, and services t o t he glo bal nuclear, so lar, geother mal, and fo ssil power generat io n sect ors o f t he energ y industry. Holtec has extensive experience in providing safety-related services to operating commercial power plants, as well as in designing, manufacturing, and installing safet y-related equip ment, and possesses in-ho use capabilit ies t o desig n, eng ineer, analyze, const ruct, and deplo y t he t echno lo g ies to manage used nuc lear fuel d ischarged fro m nuclear react ors. Ho lt ec has decades of exper ience implement ing a qualit y assurance pr ogram and NRC licensing organization for its dr y storage systems. Holtec, which is led by Dr. Kr ishna Singh, is an industry leader in nuclear fuel management systems. In this undertaking, Holtec br ings a diverse corporate resume of prior accomplishments in nuclear projects in the U.S. and abroad, a substantial list of ongoing and sat isfactorily comp let ed nuclear pro jects (including many t urnkey pro jects), and a lo ng safet y and qualit y record t hat demo nst rat es it s commit ment to nuclear safet y and excellence.
 
(e) Conclusion
 
The pro po sed license transfer w ill pro vide PNP wit h a ma nagement t eam and sit e o rganizat io n t hat is experienced and qualified to oversee and implement PNPs operations in accordance with the reinstated POLB and all applicable NRC requirements. The necessary management processes and co nt ro ls w ill be applied, w it h clear lines o f autho rit y and co mmu nicat io n. Fo r t hese rea so ns, OPCO will have the necessar y technical qualifications to safely perfor m the authorized activit ies under t he RFOL in accordance wit h AE A and NRC regulat io ns.
: 6. Financial Qualifications
 
Pursuant to 10 CFR 50.33(f)(2) and NRCs guidance in the Standard Review Plan on Power Reactor Licensee Financial Qualificat ions and Decommissio ning Funding Assurance (NUREG-1577, Rev. 1), a no n-electric ut ilit y must demo nst rat e t hat it has reaso nable assurance of o bt ainin g the funds necessary to cover the plants est imated operating costs. Holtec Palisades and OPCO will be financially qualified to own and operate PNP as demonstrated by the projected income stat ement s enclo sed wit h this App licat io n. Holt ec Palisades has ent ered int o a Power Purchase Agreement (PPA) wit h Wo lver ine Power Supply Coo perat ive, Inc. (Wo lver ine), and Hoo sier Energy Rural E lectric Coop erative, Inc. (Hoosier), to collectively sell al l of t he Facilit ys energ y and capacit y under a lo ng-t erm, fixed pr ice arrangement t hat will remain in effect fo r t he fu ll t er m of the Facility license, including any license renewal terms. While not required by NRC regulat ions, further assurance will be provided via a Support Agreement provided by Ho ltec and the expected requirements of the DOE project financing agreements descr ibed in E nclosure 3A.
OPCO will be financially qualified pursuant to the Operator Services Agreement under which Holtec Palisades will reimburse OPCO for all o f it s operat ing costs.
 
While no t part o f t he 10 CFR 50.33(f)(2) financial assurance demo nst rat io n, Holt ec Palisades is in t he process of secur ing a DOE lo an guarant ee und er Tit le XVII of t he E nergy Po licy Act of 2005 and a grant fro m t he Stat e of Michigan to support the capit al expend it ure necessar y to ret urn PNP to fu ll-po wer o perat io ns. Fu nd s received und er t he DOE lo an pro gram and Michig an grant are not int ended to fu nd Facilit y operat ing cost s aft er t he ret urn to service. Expected DOE debt servicing cost s are addressed in the pro fo rma inco me st at ement s in Enclo sure 3A.
 
Encl. 1 p.14 The transfer of operational authorit y fro m HDI to OPCO will not affect the form of Ho ltec Palisadess deco mmissio ning funding, which will co nt inue to be sat isfied by prepaid fu nds held in t he PNP decommissioning trust fund. Following t he return to operat ions, Holt ec Palisades will be subject to the decommissio ning funding requirements applicable to an operating facilit y, as descr ibed below.
 
(a) Financial Qualifications for Operations
 
As the facilit y owner, Holtec Palisades has the right to all output from PNP. Holtec Palisades has entered into a life-o f-plant PPA with Wolver ine and Hoosier for all Facilit y energy and capacit y during the license term and any subsequent renewal terms. The pricing terms o f the PPA are reflected in the proprietary E nclosure 3A. Wo lverine and Hoosier are electr ic cooperatives that serve as their own rate-setting author ity. They wi ll recover amounts paid to Holtec Palisades under the PPA through tariff rates charged to their members, which members in tu rn collect a ll such costs fro m t he ir re t a il ra t e p a ye r s ; i.e., even tho ugh Holt ec Palisades is not an electric ut ilit y under NRC regulat ions, the two Facilit y o fftakers are. The proprietary pro forma inco me statement provided in Enclosure 3A demo nst rat es t hat PNP will have sufficient operat io nal revenue to fu nd operat ion and maintenance costs for PNP. Enclosure 3A includes sensit ivit y analyses demo nstrating the impact o f a reduct io n in Facilit y capacit y o r generatio n revenue in bo t h cases, demo nst rat ing t hat PNP will cont inue to generat e po sit ive net inco me.
 
In addit io n t o po wer generat io n revenue, Holt ec Int ernat io nal will ent er into a Support Agreement under which Ho ltec International will provide up to $75 millio n to Holtec Palisadesan amount sufficient to cover fixed operating and maintenance costs during an extended outage, as contemplated by NUREG-1577. While not required by NRC regulat ions, the Support Agreement bo lsters Holtec Palisadess financial wherewit hal by providing addit ional financial assurance in the for m of a formalized parent company co mmit ment. A for m of this agreement is provided in Enclosure 6. The Support Agreement is substantially similar to the support agreement Holtec current ly has in connect io n wit h t he Big Ro ck Point spent fuel manageme nt o perat ing fu nd, 12 with appropriate modifications to reflect the differences in the underlying regulatory costs and o bligat io ns bet ween Big Ro ck Po int and PNP. Info r mat io n regard ing Ho lt ecs financial capabilit y to sat isfy t his support co mmit ment is included in propriet ar y Enclo sure 4A.
 
OPCO will be financially qualified pursuant to the Operator Services Agreement it will enter int o with Ho ltec Palisades. The Operator Services Agr eement requires Ho ltec Palisades to reimburse OPCO, at cost, for all operating expenses incurred to operate and maintain PNP. A form of this agreement is provided in Enclosure 5. The form agreement is substantially similar to the current
 
12 Hhr tefoeer rnd bquiiedee eecvrnumaey doctrtaoyacI) stDifsC (HLn Lli,rnaoantnmn Itmieisoiosge DclcteI,oD H nlE.cntl,ain Pok Ptcoig Rn Badnatlr Paleuc Nsade Plaisfn oinotraasc ta slend ahaesrh puc tef ote daisnglo cnnpldae
.077)78A221L22 (M 20 24,n4,ue J
 
Encl. 1 p.15 Decommissio ning Operator Agreement between HDI and Holtec Palisades,13 with appropriate mo d ificat io ns to reflect OPCOs ro le at an o perat ing react or.
 
HDI requests t hat Enclosures 3A and 4A be withheld fro m public disclosure pursuant to 10 CFR 2.390(a)(4), as set fort h in the affidavit provided in Enclosure 2. A no n-pro priet ar y versio n of t he pro forma financial infor mation is provided as Enclosure 3.
 
(b) Decommissioning Funding
 
Holtec Palisades will cont inue to meet decommissio ning funding requir ements via prepaid funds deposit ed in t he PNP Nuclear Decommissio ning Trust (NDT). Ho lt ec Palisades will manage the NDT bet ween no w and the transit ion date in a manner that ensures Ho lt ec Palisades will co mp ly with the operational deco mmissio ning funding requirements (i.e., 10 CFR 50.75) that will apply to PNP once it returns to power operations. On the transition date, PNP will exit the decommissio ning oversight process and enter the reactor oversight process coincident with the effect iveness of the POTS.
 
As o f t he date o f t his App licat io n, PNP is st ill in deco mmissio ning st at us, and HDI is st ill ad her ing to the PNP Post Shutdown Decommissioning Activities Report (PSDAR). HDI has not commenced any major decommissio ning activit ies at PNP, as defined by 10 CFR 50.2. Upon a final decisio n by Ho ltec to suspend deco mmissio ning and pursue restart in earnest, HDI expects to do cket a not ice under 10 CFR 50.82(a)(7) (Rest art Not ice) ind icat ing it s int ent to depart fro m the current P SDAR schedule to f ocus on restart efforts until such t ime as PNP either successfully resumes operations (and thus exits decommissioning) or abandons the restart project. HDI ant icipates filing this formal Restart Notice the first quarter of 2024. Certain deco mmissio ning compliance activities will continue following the Restart Notice, and PNP will remain in decommissio ning st at us and governed by it s per manent ly defueled licensing basis unt il such t ime as the POLB is reinst ated. However, fo llowing the Rest art Not ice, Holt ec Palisades will manage withdrawals fro m the NDT with the object ive of maintaining NDT funds at a level sufficient to sat isfy Ho lt ec Palisadess deco mmissio ning fu nd in g o bligat io ns upo n a ret urn to po wer o perat io ns.
Prio r to o r in para lle l w it h re inst at eme nt o f t he POLB, HDI will su bmit ano t her 10 CFR 50.82(a)(7) not ice for mally rescinding the PSDAR.
 
The transfer of operating authority fro m HDI to OPCO i s condit ioned on NRC approval of suppo rt ive license ame nd me nt request s and gra nt ing o f t he 10 CFR 50.82(a)(2) exe mpt io n t o allo w PNP to return to power operations. Accordingly, when the transfer occurs, Holtec Palisades and OPCO will no longer be subject to the decommissio ning funding requirements applicable to shutdown plants (i.e., 10 CFR 50.82) and will revert back to the decommissio ning funding requirements applicable to operating plants (10 CFR 50.75). Likewise, HDIs current exempt ion fro m 10 CFR 50.82(a)(8)(i)( A) autho rizing use of NDT funds for spent fuel management and sit e
 
13 Hhr tefoeer rnd bquiiedee eecvrnumaey doctrtaoyacI) stDifsC (HLn Lli,rnaoantnmn Itmieisoiosge DclcteI,oD H nlE.cntl,ain Pok Ptcoig Rn Badnatlr Paleuc Nsade Plaisfn oinotraasc ta slend ahaesrh puc tef ote daisnglo cnnpldae
.077)78A221L22 (M 20 24,n3,ue J
 
Encl. 1 p.16 restoration activities will cease to apply upon the return to operations.14 Consistent with lo ngst anding NRC po licy, Ho lt ec Palisades will fund spent fuel management cost s incurred aft er the restart out of the plants operational revenues. The costs of maintaining the PNP ISFSI and spent fuel pool are included in the plant operating costs set forth in the pro forma income st at ements. As demo nstrated in Enclosure 3A, revenue from the plant will be sufficient to cover p lant o perat io ns, including spent fuel management.
 
Consist ent wit h the 10 CFR 50.75 operat ing plant paradig m, fo llo wing wit hdrawal o f the PSDAR and transfer of authority to OPCO, OPCO and Holtec Palisades will provide deco mmissioning funding assurance based on the requirements of 10 CFR 50.75(c). As provided in HDIs mo st-recent 10 CFR 50.82(a)(8)(v) report, the formula amount for PNP is $539,595,280 in 2022 dollars. 15 This 10 CFR 50.75(c) formula amount is conservative for PNP because it exceeds the est imat ed cost s o f rad io lo g ica l deco mmissio ning fr o m t he previo usly-su bmit t ed HDI Sit e-Specific Deco mmiss io ning Co st Est ima t e. 16
 
The value of the PNP NDT fund assets as of November 24, 2023, is approximately $560 millio n.
As noted in HDIs most recent decommissio ning funding status report, Holtec Palisades has voluntarily deferred reimbursement of certain decommissioning costs that are otherwise reimbursable fro m t he NDT. 17 As o f t he date o f t his App licat io n, Holt ec Palisades is st ill carr ying an accrual o f deco mmissioning costs that have been incurred but not reimbursed fro m the NDT.
Holtec Palisades intends to manage NDT withdrawals in a manner that safeguards Holtec Palisadess abilit y t o meet t he requirement s of 10 CFR 50.75 upon returning to operat ional st atus.
Prior to the transfer, HDI will cont inue to submit annual deco mmissio ning funding reports that will provide updated NDT balances and updated 10 CFR 50.75(c) formula calculat ions for PNP.


Pursuant to 10 CFR 72.30(b)(3), Applicants must also identify a method for funding ISFSI decommissio ning. HDI updated the most recent PNP ISFSI decommissioning cost estimate in March 2023. 18 The escalated ISFSI decommissio ning amount was $10.1 millio n (2022 dollars).
Encl. 1 p.9 (a)
Given the amount of prepaid funds available in the PNP NDT relat ive to the 10 CFR 50.75(c)
Senior Leadership The OPCO executive leadership team will oversee safe operation of PNP and will be ultimately responsible for the conduct of licensed activities in accordance with the plant power operations licensing basis (POLB). The executive leadership team consists of the President, Chief Nuclear Officer, Chief Financial Officer, Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis, and Site Vice President.
OPCOs senior leadership has over a century of collective nuclear operational experience, with most holding Senior Reactor Operator licenses during their careers and bringing in-depth management experience from their prior roles in nuclear operating organizations. The OPCO executives with key nuclear oversight roles are discussed in this section, with all senior leadership roles and responsibilities provided in Table A-1.
OPCO will be led by Kelly Trice, as President. Mr. Trice currently serves as HDIs President and will continue in that role in addition to his responsibilities for OPCO. Mr. Trice brings over 30 years of executive management experience of complex business enterprises and nuclear industry leadership. Mr. Trice previously served as the president of both the power division and the facilities and plant services division of Chicago Bridge and Iron (CB&I). In this capacity, he managed approximately 70 offices worldwide with operations spanning four continents. At its peak, this enterprise had approximately 200 plants under contract, which included about 40% of the U.S.
nuclear operating fleet and another 150 petrochemical plants, 17,000 employees and a backlog of roughly $10B with annual revenues of $3.5B. Mr. Trice also served as executive vice president of Bruce Power, a major utility in Canada, which operates eight nuclear reactors and generates approximately 6.4 GW of power. In this capacity, he had the overall responsibility for all of Bruce Powers capital programs, as well as the refurbishment of six reactors. The planned budget for this capital program was approximately $14B CAD. Mr. Trice is a graduate of the U.S. Navys Nuclear Propulsion Program. He served in the U.S. Navy for six years as an officer on a nuclear submarine and held several top-secret and Department of Energy (DOE) Q clearances. Mr. Trices resume is included in Attachment D.
All PNP personnel responsible for licensed activities will report to OPCOs Chief Nuclear Officer, Richard Burroni. Mr. Burroni has worked in the nuclear industry for over four decades, most recently as HDIs Site Vice President of Indian Point Energy Center. Mr. Burroni has served in various nuclear industry roles of increasing responsibility since joining the New York Power Authority at Indian Point Unit 3 Nuclear Power Plant in 1980. His positions included Technical Services Engineer, Engineering Supervisor for Performance, Assistant Operations Manager for Support, Supervisor Instrument and Control Engineering, and Superintendent/Manager of the Instrument and Control Department. Following his role in Instrument and Control, Mr. Burroni served in multiple engineering management positions at Indian Point before becoming Chief Engineer for Entergys northern reactor fleet. He then returned to Indian Point as Engineering Director and has served as Site Vice President for 3 years under Holtecs ownership. Prior to the transfer of operational authority to OPCO, Mr. Burroni will transition out of his role as Indian


14 Tntmnaegealn muert fpeo sTD] f Nsadelihasrm [P te foun th fdsfrean o pot ioe usI tDo Hrszehianutiomoptxeh ee ad te dt],sittme esao cicifcpe sit [send aRADS PIsDh Hitr wneodaccacn i]siaasdel [Patitsiivetn acratrtisooein stead lcteoro H) fh(iv5()(1) 50.7RCFn 10 ad)(i))(A82(a 50.)(8RCF 10 rmn foimoEptxeC,R N20.r 20e 23,mcbeeD ID Heicntao)(7) 50.82(RCFncod 10 he snte. I21286A506)L (M,. 2021 31cC,e DL,na Llirnaonttenmng ImicisoioseD rncketnied corace th dolpovdeedgeesat thnw aeI ickoDnt teno, H thdsinrLBt alOatineslfe Pide themfogseents oe
Encl. 1 p.10 Point Site Vice President. Mr. Burroni received his Senior Reactor Operator license in 1986. His resume is included in Attachment D.
. RADhS P tefal ohrawitndo w upleabicapplnrgen loisond ainndrcesdeee bhnasmptioxee 15 H20231, r. 3a Ml. 6,n, EIsSFcrnISto aasd creo Rn fndingniumg Fmiocsisoe Dfantus oprt Seot oI,D R
PNPs Quality Assurance functions will report to Ms. Jean Fleming as OPCOs Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis. Ms. Fleming will report directly to the OPCO President. Ms. Fleming currently oversees the licensing, permitting, and compliance functions of HDIs decommissioning projects, Holtecs dry storage business, and the Holtec SMR-160 small modular reactor design. Ms. Fleming previously served as director of site regulatory compliance and licensing at PSEG Nuclear, LLC, where she oversaw the licensing and compliance organization with responsibilities for the Salem and Hope Creek operations and support for licensing activities at Peach Bottom. Ms. Fleming held a Senior Reactor Operator license for the Salem Nuclear Plant from 2010 to 2017. Prior to joining the private commercial nuclear industry, Ms. Fleming served in the U.S. Navy as Nuclear Surface Warfare Officer onboard the USS Harry S. Truman. Ms. Flemings resume is included in Attachment D.
.140)23090AL(M 16 HtmetEasitsnmng Comi Dcoisiiosceifcpe-Steing Srludinpot ieci Rtsiiventnicmg Amincsioose Dwths SdoutI,oD P 2).2320358AL (M2020,. 23ce Dntl,raal Peuc Nsderlaiasfo P 17 H, 2023 31r.a M,n.1,lTe 1abEn,cl. 4, IsSFan ISrdreactoso Rnin fdugnin Fmmicoisgose Df otatn Susrpot oe RI,D
PNPs site organization will continue to report to the Site Vice President, Mr. Mike Mlynarek. Mr.
.140)23090AL(M 18 H 2023)1,r. 3a (M. 4nlEc, IsSFrn ISto aasdcreno Rnig fnudmn Fmioissioge Dcf otausntpr SeoI,t oD R
Mlynarek has worked at PNP since 1988 and has served as the Site Vice President since June 2022.
.140)23090AL(M
He has over 37 years of experience in nuclear power in Michigan, beginning at the Big Rock Point Nuclear Power Plant in 1985. Mr. Mlynarek has served in many leadership positions at PNP over the years, including the plant reactor engineer, nuclear operations shift manager, chemistry manager, nuclear independent oversight manager, and decommissioning manager. As a former evaluator at the Institute of Nuclear Power Operations (INPO), Mr. Mlynarek served nuclear industry leadership on evaluation and assistance teams at 14 stations throughout the U.S. and at 6 stations throughout Japan, Finland, France, Bulgaria, the United Arab Emirates, and England.
Mlynarek has held a Senior Reactor Operator License for 17 years. His resume is included in Attachment D.
Table A-1 below summarizes the roles and responsibilities of OPCOs senior management.
Table A-1 Responsibilities of Palisades Energy, LLC, Senior Management President Ultimately responsible for the safe and reliable operations of PNP; responsible for overall corporate policy and provides executive direction and guidance for PNP as well as promulgates corporate policy through the senior management staff; establishes effective management controls to maintain nuclear safety and organizational effectiveness; provides strategic direction and guidance for the company; establishes expectations for high levels of quality, safety, and efficiency throughout the company; routinely reports to Holtec International Executive Committee; assures sufficient resources and support functions to achieve nuclear safety objectives.  


Encl. 1 p.17 for mula amount and HDIs abilit y to manage wit hdrawals fro m the NDT, HDI expects that t here w ill be suffic ie nt fu nd s in t he NDT to address t he rad io lo g ica l deco mmissio ning cost s o f t he ISFSI, accounting for the 2% real rate of return allowed by NRC regulations and the ant icipated ISFSI decommissio ning date (following DOEs removal o f spent fuel fro m the PNP site). As noted above, this funding demo nstration is conservat ive because HDIs previously-submitted Site-Specific Decommissioning Cost Estimate projected the total cost of Facility radiological decommissio ning, includ ing the ISFSI, at an amo unt t hat is less t han t he 10 CFR 50.75(c) fo r mu la amount.
Encl. 1 p.11 Chief Nuclear Officer (CNO)
Reports directly to the President; highest level nuclear executive officer; responsible for providing top-level direction for the safe and reliable operation of PNP; responsible for execution of the Quality Assurance Program; ensures engineering services and operational support are provided to maintain nuclear safety; exercises oversight and governance of corporate or home office functions that support plant operations, including procurement, information technology, and human resources; holds no ancillary responsibilities that may distract from the officers responsibility for nuclear safety.
Chief Financial Officer (CFO)
Reports directly to the President; responsible for development and management of all financial matters, including financial statement reporting, budgeting, analysis, accounting, billing, and maintaining adequate internal financial controls; and reporting to ensure regulatory compliance.
Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis Reports directly to the President; responsible for verifying effective execution of the Quality Assurance Program, including maintaining independence through the audit function and verifying the adequacy of the Quality Assurance Program, including activities related to vendor quality; responsible for ensuring that programmatic elements are in place to support plant personnel in complying with and carrying out Quality Assurance Program requirements.
Site Vice President Reports directly to the CNO; responsible for managing day-to-day nuclear operations and operations support; directly responsible for management of the site line organization; responsible for implementing Quality Assurance Program in all site activities; responsible for establishing policies, goals, and objectives necessary to maintain nuclear safety; responsible for overall safe plant operation and exercising oversight and control over on-site activities necessary for the safe operation and maintenance of the plant.
(b)
Site Organization Following shutdown in May 2022 and transfer from ENOI to Holtec in June 2022, HDI has maintained a meaningful number of incumbent site management that were employed at PNP during operations. As of the Application date, the current site organization consists of approximately 220 personnel, primarily made up of incumbent ENOI personnel, many of whom held management and senior operator positions during operations. As a result, HDI has retained key talent and institutional knowledge from the prior operations period. HDI will staff PNP to the qualifications and levels required by the reinstated POTS and Updated Final Safety Analysis


The current value of funds held in the NDT is sufficient to satisfy the deco mmissio ning funding obligations for an operational plant under 10 CFR 50.75(c) and 10 CFR 72.30. Prior to implement ing t he license t ransfer, HDI will provide evidence demonstrating t hat Holtec Palisades possesses sufficient financial assurance to satisfy the operating reactor requirements in 10 CFR 50.75 and t he ISFSI decommissio ning funding requirement s in 10 CFR 72.30.
Encl. 1 p.12 Report (UFSAR)9 to ensure compliance with the reinstated POLB and NRC regulations applicable to an operating reactor, prior to transfer of operational authority to OPCO. Attachment D includes organizational charts showing the planned 550-person PNP organization that will report up to OPCOs senior leadership following the transfer. Attachment D includes all on-site and off-site positions for activities affecting plant safety. The organization charts are based on the previous operating organization in place prior to shutdown and define the lines of authority, responsibility, and communication from senior management levels through intermediate levels to and including all operating organization positions. As part of its staffing plan, HDI is developing functional descriptions of departmental responsibilities and relationships, and job descriptions for key positions. The reinstated power operations UFSAR will also document the requirements for the job titles referred to in the reinstated POTS. Prior to consummating the transfer, HDI and OPCO will provide NRC with evidence demonstrating that the PNP operating organization has returned to operational levels and qualifications and meets the applicable requirements of the reinstated POLB.
HDI is currently implementing a hiring, training, and recertification plan to ensure that all positions in the operational organization are filled prior to transfer to OPCO with individuals qualified to meet the POLB requirements. As of the Application date, HDI is in the process of reinstating a 10 CFR Part 55 training program for licensed reactor operators to support operational staffing needs and training lead times. The operational organization will meet the requirements of the POTS, Chapter 12 of the reinstated UFSAR, and the power operations Quality Assurance Program Manual (QAPM).10 HDI will reinstate training programs consistent with Chapter 12 of the power operations UFSAR that are either accredited by the National Nuclear Accrediting Board or meet the standards set forth in Section 5 of ANSI/ANS 3.1-1978 to ensure that the technical support organization has the combined education, experience, and skills sufficient to ensure safe and efficient operation of the plant.
In addition to direct employees, OPCO will leverage standard nuclear industry staff augmentation arrangements and contracted labor for certain specialty scope. Holtec Security International, LLC 9 As discussed during public meetings regarding the restart, HDI intends to submit two license amendment requests to reinstate (1) the POTS and RFOL license conditions and (2) the previous Administrative Controls sections of Technical Specifications. See NRC, Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition, June 4, 2018 (ML18114A410); NRC, Issuance of Amendment No. 272 Re: Permanently Defueled Technical Specifications, May 13, 2022 (ML22039A198). Coincident with implementation of the two Technical Specifications license amendments, HDI expects to reinstate, via the 10 CFR 50.59 process, the power operations UFSAR based on UFSAR Rev. 35 (the version in effect immediately prior to shutdown) with appropriate conforming amendments. See Palisades Nuclear Plant, Revision 35 to UFSAR, Chapter 12, Conduct of Operations, Apr. 14, 2021 (ML21125A337). HDI expects that any changes to UFSAR Revision 35, Chapter 12 will reflect the fact that OPCO will have a more site-centric organization due to the fact that ENOI had a large corporate/home office organization to provide fleet-wide services to all Entergy-owned plants, whereas OPCO will locate all principal safety functions at the Palisades plant site with a more limited set of typical corporate support services provided by the Holtec home office (e.g., procurement, human resources, tax and accounting).
10 Palisades is currently governed by HDIs fleet-wide Decommissioning Quality Assurance Program. See HDI Letter, Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Rev. 2, Aug. 3, 2022 (ML22215A147). HDI expects to reinstate a power operations Quality Assurance Program via 10 CFR 50.54(a) coincident with implementation of the POTS.  


Consist ent with the 10 CFR 50.75( f)(3) and 10 CFR 50.54(bb), OPCO will submit a preliminar y decommissioning cost estimate and spent fuel management funding plan five years before expiration of the current license term; i.e., on or before March 24, 2026. The preliminar y decommissio ning cost est imat e is expect ed to be ba sed on t he sa me cost-est imat io n met ho do lo g ie s used in the December 2020 Site-Specific Decommissioning Cost Estimate HDI previously submitted for PNP. Accordingly, Applicants expect that those submittals will not change Applicants ability to provide reasonable assurance that funds will be available for the decommissio ning pro cess. OPCO also int end s to submit a subsequent license renewal applicat ion at that same time to satisfy the timely renewal requirements of 10 CFR 2.109(b). If granted, a subsequent renewal ter m would afford more time for prepaid funds in the NDT to accrue int erest befo re the plant event ually re-ent ers decommissio ning.
Encl. 1 p.13 (HSI), a wholly owned subsidiary of Holtec Power, will continue to provide site security services and employ site security personnel via a contractual arrangement with OPCO. HSI currently provides security services and employs security personnel under a contract with, and subject to the supervision and control of, HDI. All security personnel will be directly responsible to and subject to the direction and control of OPCO and the Site Vice President.
As part of the reinstatement of the POLB, HDI will revise PNP policies, programs, and procedures to support the return to operations in accordance with the reinstated POTS, UFSAR, and NRC regulatory requirements applicable to operating reactors.11 HDI has maintained the access and fitness-for-duty programs during decommissioning in a manner that ensures current site personnel will be able to transition back to equivalent roles in OPCOs operational organization. Upon transfer of operational authority, OPCO will work in accordance with the revised power operations program documents. The PNP programs and procedures at the time of the license transfer, including, as applicable, the reinstated emergency plan, operational security plans, fire protection program, radiological protection, and Quality Assurance Program, will be implemented post-license transfer by OPCO. Any subsequent changes to these procedures will be determined by OPCO and made in accordance with the applicable change requirements set forth in NRC regulations.
(c)
Home Office Support OPCO will have dedicated home office support for certain service functions located in Holtecs corporate headquarters in Camden, New Jersey. Among other things, OPCO will leverage efficiencies of consolidated accounting, finance, procurement, tax, human resources, and information technology. OPCO will remain ultimately responsible for all licensed activities, including nuclear safety matters.
Wholly owned Holtec affiliate HSI currently provides site security services and employs security personnel pursuant to a contract between HSI and HDI, subject to HDIs ultimate direction and control. Post-transfer, HSI will continue providing security services to PNP pursuant to a contract with OPCO, subject to OPCOs ultimate direction and control.
(d)
Corporate Governance and Oversight Holtec Palisades and OPCO are wholly owned subsidiaries of Holtec. Holtec Palisadess senior leadership will report to the Holtec Executive Committee made up of the individuals listed in Attachment C. While Holtec will exercise general corporate oversight and decision-making authority over financial, personnel, and other business matters of OPCO, OPCOs senior leadership will ultimately be responsible for the conduct of licensed activities and day-to-day operations.
11 HDI intends to separately submit license amendment requests to reinstate a power operations Emergency Plan and Emergency Action Levels. The remainder of site program documents will return to an appropriate power operations basis in accordance with the requirements in 10 CFR 50.59 and 10 CFR 50.54.  


For the foregoing reasons, Applicants have provided reasonable assurance o f obtaining the funds necessary to cover estimated operating and decommissioning costs and are thus financially qualified.
Encl. 1 p.14 Holtec is an integrated technologies enterprise providing innovative solutions, equipment, and services to the global nuclear, solar, geothermal, and fossil power generation sectors of the energy industry. Holtec has extensive experience in providing safety-related services to operating commercial power plants, as well as in designing, manufacturing, and installing safety-related equipment, and possesses in-house capabilities to design, engineer, analyze, construct, and deploy the technologies to manage used nuclear fuel discharged from nuclear reactors. Holtec has decades of experience implementing a quality assurance program and NRC licensing organization for its dry storage systems. Holtec, which is led by Dr. Krishna Singh, is an industry leader in nuclear fuel management systems. In this undertaking, Holtec brings a diverse corporate resume of prior accomplishments in nuclear projects in the U.S. and abroad, a substantial list of ongoing and satisfactorily completed nuclear projects (including many turnkey projects), and a long safety and quality record that demonstrates its commitment to nuclear safety and excellence.
: 7. Rest ricted Data and Classi fied National Security Information
(e)
Conclusion The proposed license transfer will provide PNP with a management team and site organization that is experienced and qualified to oversee and implement PNPs operations in accordance with the reinstated POLB and all applicable NRC requirements. The necessary management processes and controls will be applied, with clear lines of authority and communication. For these reasons, OPCO will have the necessary technical qualifications to safely perform the authorized activities under the RFOL in accordance with AEA and NRC regulations.
6.
Financial Qualifications Pursuant to 10 CFR 50.33(f)(2) and NRCs guidance in the Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance (NUREG-1577, Rev. 1), a non-electric utility must demonstrate that it has reasonable assurance of obtaining the funds necessary to cover the plants estimated operating costs. Holtec Palisades and OPCO will be financially qualified to own and operate PNP as demonstrated by the projected income statements enclosed with this Application. Holtec Palisades has entered into a Power Purchase Agreement (PPA) with Wolverine Power Supply Cooperative, Inc. (Wolverine), and Hoosier Energy Rural Electric Cooperative, Inc. (Hoosier), to collectively sell all of the Facilitys energy and capacity under a long-term, fixed price arrangement that will remain in effect for the full term of the Facility license, including any license renewal terms. While not required by NRC regulations, further assurance will be provided via a Support Agreement provided by Holtec and the expected requirements of the DOE project financing agreements described in Enclosure 3A.
OPCO will be financially qualified pursuant to the Operator Services Agreement under which Holtec Palisades will reimburse OPCO for all of its operating costs.
While not part of the 10 CFR 50.33(f)(2) financial assurance demonstration, Holtec Palisades is in the process of securing a DOE loan guarantee under Title XVII of the Energy Policy Act of 2005 and a grant from the State of Michigan to support the capital expenditure necessary to return PNP to full-power operations. Funds received under the DOE loan program and Michigan grant are not intended to fund Facility operating costs after the return to service. Expected DOE debt servicing costs are addressed in the pro forma income statements in Enclosure 3A.


The proposed t ransfer of ownership and operat ing authorit y does not invo lve any Rest ricted Data or possessio n o f other Classified National Security Informat ion, and it is not expected that possessio n of any such informat ion will beco me invo lved in the licensed activit ies of OPCO.
Encl. 1 p.15 The transfer of operational authority from HDI to OPCO will not affect the form of Holtec Palisadess decommissioning funding, which will continue to be satisfied by prepaid funds held in the PNP decommissioning trust fund. Following the return to operations, Holtec Palisades will be subject to the decommissioning funding requirements applicable to an operating facility, as described below.
However, in the event that such infor mat ion does beco me invo lved, and in accordance wit h 10 CFR 50.37, Agreement Limit ing Access to Classified Informat ion, OPCO agrees that it will appro priat ely safeguard such infor mat io n and will not permit any indiv idual to have access under 10 CFR Part 25, Access Aut horizat io n and/or 10 CFR Part 95, Facilit y Securit y Clearance and Safeguarding of National Securit y I nfor mat io n and Rest rict Data.
(a)
Financial Qualifications for Operations As the facility owner, Holtec Palisades has the right to all output from PNP. Holtec Palisades has entered into a life-of-plant PPA with Wolverine and Hoosier for all Facility energy and capacity during the license term and any subsequent renewal terms. The pricing terms of the PPA are reflected in the proprietary Enclosure 3A. Wolverine and Hoosier are electric cooperatives that serve as their own rate-setting authority. They will recover amounts paid to Holtec Palisades under the PPA through tariff rates charged to their members, which members in turn collect all such costs from their retail ratepayers; i.e., even though Holtec Palisades is not an electric utility under NRC regulations, the two Facility offtakers are. The proprietary pro forma income statement provided in Enclosure 3A demonstrates that PNP will have sufficient operational revenue to fund operation and maintenance costs for PNP. Enclosure 3A includes sensitivity analyses demonstrating the impact of a reduction in Facility capacity or generation revenuein both cases, demonstrating that PNP will continue to generate positive net income.
In addition to power generation revenue, Holtec International will enter into a Support Agreement under which Holtec International will provide up to $75 million to Holtec Palisadesan amount sufficient to cover fixed operating and maintenance costs during an extended outage, as contemplated by NUREG-1577. While not required by NRC regulations, the Support Agreement bolsters Holtec Palisadess financial wherewithal by providing additional financial assurance in the form of a formalized parent company commitment. A form of this agreement is provided in. The Support Agreement is substantially similar to the support agreement Holtec currently has in connection with the Big Rock Point spent fuel management operating fund,12 with appropriate modifications to reflect the differences in the underlying regulatory costs and obligations between Big Rock Point and PNP. Information regarding Holtecs financial capability to satisfy this support commitment is included in proprietary Enclosure 4A.
OPCO will be financially qualified pursuant to the Operator Services Agreement it will enter into with Holtec Palisades. The Operator Services Agreement requires Holtec Palisades to reimburse OPCO, at cost, for all operating expenses incurred to operate and maintain PNP. A form of this agreement is provided in Enclosure 5. The form agreement is substantially similar to the current 12 HDI, Holtec Decommissioning International, LLC (HDI) satisfactory documentary evidence required before the planned closing date of the purchase and sale transaction of Palisades Nuclear Plant and Big Rock Point Plant, Encl.
4, June 24, 2022 (ML22178A077).  


Encl. 1 p.18
Encl. 1 p.16 Decommissioning Operator Agreement between HDI and Holtec Palisades,13 with appropriate modifications to reflect OPCOs role at an operating reactor.
: 8. Other Nuclear Regulatory Issues
HDI requests that Enclosures 3A and 4A be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4), as set forth in the affidavit provided in Enclosure 2. A non-proprietary version of the pro forma financial information is provided as Enclosure 3.
(b)
Decommissioning Funding Holtec Palisades will continue to meet decommissioning funding requirements via prepaid funds deposited in the PNP Nuclear Decommissioning Trust (NDT). Holtec Palisades will manage the NDT between now and the transition date in a manner that ensures Holtec Palisades will comply with the operational decommissioning funding requirements (i.e., 10 CFR 50.75) that will apply to PNP once it returns to power operations. On the transition date, PNP will exit the decommissioning oversight process and enter the reactor oversight process coincident with the effectiveness of the POTS.
As of the date of this Application, PNP is still in decommissioning status, and HDI is still adhering to the PNP Post Shutdown Decommissioning Activities Report (PSDAR). HDI has not commenced any major decommissioning activities at PNP, as defined by 10 CFR 50.2. Upon a final decision by Holtec to suspend decommissioning and pursue restart in earnest, HDI expects to docket a notice under 10 CFR 50.82(a)(7) (Restart Notice) indicating its intent to depart from the current PSDAR schedule to focus on restart efforts until such time as PNP either successfully resumes operations (and thus exits decommissioning) or abandons the restart project. HDI anticipates filing this formal Restart Notice the first quarter of 2024. Certain decommissioning compliance activities will continue following the Restart Notice, and PNP will remain in decommissioning status and governed by its permanently defueled licensing basis until such time as the POLB is reinstated. However, following the Restart Notice, Holtec Palisades will manage withdrawals from the NDT with the objective of maintaining NDT funds at a level sufficient to satisfy Holtec Palisadess decommissioning funding obligations upon a return to power operations.
Prior to or in parallel with reinstatement of the POLB, HDI will submit another 10 CFR 50.82(a)(7) notice formally rescinding the PSDAR.
The transfer of operating authority from HDI to OPCO is conditioned on NRC approval of supportive license amendment requests and granting of the 10 CFR 50.82(a)(2) exemption to allow PNP to return to power operations. Accordingly, when the transfer occurs, Holtec Palisades and OPCO will no longer be subject to the decommissioning funding requirements applicable to shutdown plants (i.e., 10 CFR 50.82) and will revert back to the decommissioning funding requirements applicable to operating plants (10 CFR 50.75). Likewise, HDIs current exemption from 10 CFR 50.82(a)(8)(i)(A) authorizing use of NDT funds for spent fuel management and site 13 HDI, Holtec Decommissioning International, LLC (HDI) satisfactory documentary evidence required before the planned closing date of the purchase and sale transaction of Palisades Nuclear Plant and Big Rock Point Plant, Encl.
3, June 24, 2022 (ML22178A077).  


(a) Price-Anderson Indemnity and Nuclear Insu rance
Encl. 1 p.17 restoration activities will cease to apply upon the return to operations.14 Consistent with longstanding NRC policy, Holtec Palisades will fund spent fuel management costs incurred after the restart out of the plants operational revenues. The costs of maintaining the PNP ISFSI and spent fuel pool are included in the plant operating costs set forth in the pro forma income statements. As demonstrated in Enclosure 3A, revenue from the plant will be sufficient to cover plant operations, including spent fuel management.
Consistent with the 10 CFR 50.75 operating plant paradigm, following withdrawal of the PSDAR and transfer of authority to OPCO, OPCO and Holtec Palisades will provide decommissioning funding assurance based on the requirements of 10 CFR 50.75(c). As provided in HDIs most-recent 10 CFR 50.82(a)(8)(v) report, the formula amount for PNP is $539,595,280 in 2022 dollars.15 This 10 CFR 50.75(c) formula amount is conservative for PNP because it exceeds the estimated costs of radiological decommissioning from the previously-submitted HDI Site-Specific Decommissioning Cost Estimate.16 The value of the PNP NDT fund assets as of November 24, 2023, is approximately $560 million.
As noted in HDIs most recent decommissioning funding status report, Holtec Palisades has voluntarily deferred reimbursement of certain decommissioning costs that are otherwise reimbursable from the NDT.17 As of the date of this Application, Holtec Palisades is still carrying an accrual of decommissioning costs that have been incurred but not reimbursed from the NDT.
Holtec Palisades intends to manage NDT withdrawals in a manner that safeguards Holtec Palisadess ability to meet the requirements of 10 CFR 50.75 upon returning to operational status.
Prior to the transfer, HDI will continue to submit annual decommissioning funding reports that will provide updated NDT balances and updated 10 CFR 50.75(c) formula calculations for PNP.
Pursuant to 10 CFR 72.30(b)(3), Applicants must also identify a method for funding ISFSI decommissioning. HDI updated the most recent PNP ISFSI decommissioning cost estimate in March 2023.18 The escalated ISFSI decommissioning amount was $10.1 million (2022 dollars).
Given the amount of prepaid funds available in the PNP NDT relative to the 10 CFR 50.75(c) 14 The exemption authorizes HDI to use a portion of the funds from the [Palisades NDT] for spent fuel management and site restoration activities at [Palisades] in accordance with HDIs PSDAR and [site specific cost estimate], dated December 23, 2020. NRC, Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) for Holtec Decommissioning International, LLC, Dec. 31, 2021 (ML21286A506). In the second 10 CFR 50.82(a)(7) notice HDI files alongside the reinstatement of the POLB, HDI intends to acknowledge via docketed correspondence that the exemption has been rescinded and is no longer applicable upon withdrawal of the PSDAR.
15 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 6, Mar. 31, 2023 (ML23090A140).
16 HDI, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, Dec. 23, 2020 (ML20358A232).
17 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 4, Table 1, n.1, Mar. 31, 2023 (ML23090A140).
18 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 4 (Mar. 31, 2023)
(ML23090A140).


OPCO request s that NRC amend the Price-Anderson indemnit y agreement for PNP to add OPCO as a licensee for t he facilit y and name OPCO as an indemnified ent it y upon the consummat ion of the proposed transfer of licensee authorit y.
Encl. 1 p.18 formula amount and HDIs ability to manage withdrawals from the NDT, HDI expects that there will be sufficient funds in the NDT to address the radiological decommissioning costs of the ISFSI, accounting for the 2% real rate of return allowed by NRC regulations and the anticipated ISFSI decommissioning date (following DOEs removal of spent fuel from the PNP site). As noted above, this funding demonstration is conservative because HDIs previously-submitted Site-Specific Decommissioning Cost Estimate projected the total cost of Facility radiological decommissioning, including the ISFSI, at an amount that is less than the 10 CFR 50.75(c) formula amount.
The current value of funds held in the NDT is sufficient to satisfy the decommissioning funding obligations for an operational plant under 10 CFR 50.75(c) and 10 CFR 72.30. Prior to implementing the license transfer, HDI will provide evidence demonstrating that Holtec Palisades possesses sufficient financial assurance to satisfy the operating reactor requirements in 10 CFR 50.75 and the ISFSI decommissioning funding requirements in 10 CFR 72.30.
Consistent with the 10 CFR 50.75(f)(3) and 10 CFR 50.54(bb), OPCO will submit a preliminary decommissioning cost estimate and spent fuel management funding plan five years before expiration of the current license term; i.e., on or before March 24, 2026. The preliminary decommissioning cost estimate is expected to be based on the same cost-estimation methodologies used in the December 2020 Site-Specific Decommissioning Cost Estimate HDI previously submitted for PNP. Accordingly, Applicants expect that those submittals will not change Applicants ability to provide reasonable assurance that funds will be available for the decommissioning process. OPCO also intends to submit a subsequent license renewal application at that same time to satisfy the timely renewal requirements of 10 CFR 2.109(b). If granted, a subsequent renewal term would afford more time for prepaid funds in the NDT to accrue interest before the plant eventually re-enters decommissioning.
For the foregoing reasons, Applicants have provided reasonable assurance of obtaining the funds necessary to cover estimated operating and decommissioning costs and are thus financially qualified.
7.
Restricted Data and Classified National Security Information The proposed transfer of ownership and operating authority does not involve any Restricted Data or possession of other Classified National Security Information, and it is not expected that possession of any such information will become involved in the licensed activities of OPCO.
However, in the event that such information does become involved, and in accordance with 10 CFR 50.37, Agreement Limiting Access to Classified Information, OPCO agrees that it will appropriately safeguard such information and will not permit any individual to have access under 10 CFR Part 25, Access Authorization and/or 10 CFR Part 95, Facility Security Clearance and Safeguarding of National Security Information and Restrict Data.  


OPCO will maintain on-site property damage insurance coverage and off-site nuclear liabilit y coverage as required by NRC, and pr io r to t he license transfer, OPCO will provide pro of that t his coverage will be in place on the effect ive date of the transfer. HDI has submitted the norma l insurance exempt io ns for plant s in deco mmissio ning, request ing to st ep do wn on-sit e and off-sit e coverages required by 10 CFR 50.54(w)(1) and 10 CFR 140.11(a)(4) once fuel in the spent fue l pool has cooled sufficient ly to reasonably eliminate the risk of the zirconium cladding catching fire in a loss of coolant accident scenario. 19 As of the date of th is Applicat ion, NRC has not issued these exemptions. Subject to HDIs docketing of its formal notice of suspension of decommissio ning activit ies, HDI intends to maintain operational on-site and o ff-site insurance coverages even if NRC appro ves the request ed exempt io ns.
Encl. 1 p.19 8.
Other Nuclear Regulatory Issues (a)
Price-Anderson Indemnity and Nuclear Insurance OPCO requests that NRC amend the Price-Anderson indemnity agreement for PNP to add OPCO as a licensee for the facility and name OPCO as an indemnified entity upon the consummation of the proposed transfer of licensee authority.
OPCO will maintain on-site property damage insurance coverage and off-site nuclear liability coverage as required by NRC, and prior to the license transfer, OPCO will provide proof that this coverage will be in place on the effective date of the transfer. HDI has submitted the normal insurance exemptions for plants in decommissioning, requesting to step down on-site and off-site coverages required by 10 CFR 50.54(w)(1) and 10 CFR 140.11(a)(4) once fuel in the spent fuel pool has cooled sufficiently to reasonably eliminate the risk of the zirconium cladding catching fire in a loss of coolant accident scenario.19 As of the date of this Application, NRC has not issued these exemptions. Subject to HDIs docketing of its formal notice of suspension of decommissioning activities, HDI intends to maintain operational on-site and off-site insurance coverages even if NRC approves the requested exemptions.
(b)
Standard Contract for Disposal of Spent Nuclear Fuel Holtec Palisades will continue to hold title to the spent nuclear fuel at PNP and will maintain the DOE Standard Contract, including all rights and obligations under that contract. Standard Contract, No. DE-CR01-83NE44373, dated as of June 3, 1983, was entered into by the previous owners and the United States of America, represented by the DOE, to govern the disposal of the spent nuclear fuel generated at PNP. Holtec Palisades expects to recover from DOE through litigation or settlement of its claims for the spent fuel management costs it will incur as a result of the DOEs breach of its obligations to dispose of the spent nuclear fuel.
(c)
Exclusion Area Control Upon approval of the transfer, OPCO will have control over the PNP exclusion area and will have authority to determine all activities within the exclusion area to the extent required by 10 CFR Part 100.
(d)
Quality Assurance Program PNP is currently operating under its Fleet Decommissioning Quality Assurance Program.20 Coincident with the transfer of operational authority, HDI will reinstate a power operations QAPM pursuant to 10 CFR 50.54(a). Upon transfer, OPCO will retain authority and responsibility for the 19 HDI Letter PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance, Oct. 26, 2022 (ML22299A059); HDI Letter PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance, Oct. 26, 2022 (ML22299A062).
20 HDI Letter, Update Report For Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Rev. 2, Aug. 3, 2022 (ML22215A147).  


(b) Standard Contract for Dispo sal of Spent Nuclear Fuel
Encl. 1 p.20 functions necessary to fulfill the quality assurance requirements required by the POTS and as specified in the power operations QAPM.
HDI has maintained IT infrastructure and records required to comply with NRC recordkeeping requirements that will apply upon reinstatement of the POLB. OPCO will have full access to all such assets and records following transfer of operational authority.
(e)
No Significant Hazards Consideration The changes proposed for the RFOL are shown in Attachment A to this Application. The changes conform the RFOL to reflect the proposed transfer of authority and responsibility for licensed activities under the RFOL to OPCO. Consistent with the generic determination in 10 CFR 2.1315(a), the proposed conforming license amendments involve no significant hazards consideration, because they do no more than conform the RFOL to reflect the proposed transfer.
The proposed license amendments do not involve any change in the design or licensing basis, plant configuration, status of PNP, or the requirements of the RFOL. Therefore, the proposed action does not: (1) involve an increase in the probability or consequences of an accident previously analyzed; (2) create the possibility of a new or different kind of accident from the accidents previously analyzed; or (3) involve a significant reduction in a margin of safety.
9.
Environmental Review The requested consent to transfer of licensed operator authority for PNP is exempt from environmental review because it falls within the categorical exclusion contained in 10 CFR 51.22(c)(21) for which neither an Environmental Assessment nor an Environmental Impact Statement is required. The proposed transfer does not involve an increase in the amounts, nor a change in the types, of non-radiological effluents that may be released off-site. Further, there is no increase in the individual or cumulative occupational radiation exposure, and the proposed transfer has no environmental impact. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
10.
Effective Date and Other Required Regulatory Approvals Applicants are targeting a transfer of operational authority to occur at the same time as reinstatement of the POLB. Subject to NRC approval of the supporting regulatory actions, HDI is proposing to submit a notification of transition to power operations letter to NRC that will docket HDIs and OPCOs satisfaction of the implementation conditions for the license transfer, as well as the other NRC approvals necessary for reinstatement of the POLB. Upon docketing this transition notification letter, PNP intends to transition from a facility in decommissioning back to a power operations plant, and HDI will transfer its authority to conduct licensed activities to OPCO.
To support the expected regulatory schedule, Applicants request that NRC review this Application on a schedule that will permit issuance of an order consenting to the transfer and approving conforming license amendments by December 31, 2024. Applicants request that the consent be


Ho lt ec Pa lisade s will co nt inue to hold tit le to t he spent nuc lear fue l at PNP and will mainta in the DOE St andard Co nt ract, inc lud ing all r ig ht s and o bligat io ns u nder t hat cont ract. St andard Co ntract,
Encl. 1 p.21 immediately effective upon issuance and authorize the transfer to occur up to one year after issuance or such later date as NRC may authorize. HDI will notify NRC staff at least five business days prior to the expected transfer date.
No. DE-CR01-83NE44373, dat ed as o f June 3, 1983, was ent ered int o by t he previo us o wners and t he Unit ed St at es o f Amer ica, represent ed by t he DOE, to go vern t he dispo sal o f t he spent nuclear fuel generated at PNP. Holtec Palisades expects to recover fro m DOE through lit igat ion or sett le me nt o f it s cla ims fo r t he spe nt fue l ma nag e me nt co st s it will incur as a result of t he DOEs breach of its obligations to dispose of the spent nuclear fuel.
Applicants do not anticipate the need for other agency approvals in order to transfer licensed authority to OPCO. Applicants will continue to coordinate with NRC on the status of the other NRC approvals needed to support the Facility restart, the timing of which could impact the anticipated transfer date.
 
11.
(c) Exclu sion Area Cont rol
Conclusion The proposed transfer of authority to conduct licensed activities under the RFOL will be consistent with the requirements of AEA, NRC regulations, and regulatory guidance. The transfer will not be inimical to the common defense and security and will not involve foreign ownership, control, or domination. Therefore, Applicants respectfully request NRC to issue an order (1) consenting to the proposed license transfer related to Renewed Facility Operating License No. DPR-20 and the PNP ISFSI general license, and (2) approving the conforming license amendments.  
 
Upon appro val of t he t ransfer, OPCO w ill have cont ro l o ver t he PNP exclu sio n area and will have aut ho rit y t o det ermine all act ivit ies w it hin t he exc lu sio n area t o t he ext ent required by 10 CFR Part 100.
 
(d) Quality Assu rance Program
 
PNP is currently operating under its Fleet Decommissioning Quality Assurance Program. 20 Co inc id e nt wit h t he t r ans fer o f o p erat io n a l au t ho r it y, HD I will re in st at e a pow e r o p er at io ns QAP M pursuant to 10 CFR 50.54(a). Upo n t ransfer, OPCO will ret ain authorit y and respo nsibilit y for t he
 
19 Hnrdoa aycnred Sarynmirning Peca)(4) Co 140.11(RCFnrm 10 froptitsm foo Exequee, R2-024tr 202I LtPDeeN P R CF 10 rmn frotimoo Epxets fquee, R026 2022-PNtr PteeI LD H59);22299A0L (M 2022,. 26t,cn Oera InciuilsaiLbty 62).022299AL (M 2022,t.c 26Or,nneuaIsca Dmagertyrpenoi Pstn OerningeCoc)(1) 50.54(w 20 Htyliua Qnmngmisioioscte DeleI) FD (HnalirnaoInttennimgmicisoose Dlcteorr Hpoto Fe Rpdate Utr,teeI LD 147).5A2221 (ML 20223,.ug A. 2,ev R)PmA (DQrgraour PsnseAac
 
Encl. 1 p.19 funct ions necessary to fulfill the qualit y assurance requirements required by the POTS and as specified in t he power o perat ions QAP M.
 
HDI has maintained IT infrastructure and records required to comply wit h NRC recordkeeping requirements that will apply upon reinstatement of the POLB. OPCO will have full access to all such assets and records fo llo w ing transfer of operatio nal autho rit y.
 
(e) No Significant Hazards Consideration
 
The changes pro po sed fo r t he RFOL are sho wn in At t achment A to t his App licat io n. The changes conform the RFOL to reflect the proposed transfer of authorit y and responsibilit y for licensed activit ies under the RFOL to OPCO. Consistent with the generic determinat ion in 10 CFR 2.1315(a), the proposed conforming license amendments involve no significant hazards considerat io n, because they do no mo re t han confo r m t he RFOL to reflect t he pro po sed transfer.
 
The pro po sed license amend ment s do not invo lve any change in t he desig n o r licensing basis, p lant configuration, status of PNP, or the requirements of the RFOL. Therefore, the proposed action does not: (1) invo lve an increase in the probability or consequences of an accident previously analyzed; (2) create the possibility of a new or different kind of accident from the accidents previo usly analyzed; or (3) invo lve a sig nificant reduction in a margin of safet y.
: 9. Environ mental Review
 
The requested consent to transfer of licensed operator authority for PNP is exempt from environmental review because it falls within the categorical exclusio n contained in 10 CFR 51.22(c)(21) for which neither an Environmental Assessment nor an Environmental Impact Statement is required. The proposed transfer does not invo lve an increase in the amounts, nor a chang e in t he types, o f no n-radio lo g ical effluent s that may be released off-sit e. Furt her, t here is no increase in t he ind ividu a l o r cumu lat ive o ccupatio na l rad iat io n expo sure, and t he pro po sed t ransfer has no environmental impact. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact st at ement or enviro nment al assessment need be prepared in connect io n wit h t he pro po sed change.
: 10. Effective Date and Other Required Regulatory Approvals
 
Applicants are targeting a transfer of operational authority to occur at the same time as reinst atement of t he POLB. Subject to NRC approval o f the support ing regulat ory act ions, HDI is pro po sing to submit a not ificat ion of t ransit io n to po wer operat io ns let t er to NRC t hat will docket HDIs and OPCOs satisfaction of the implementation conditions for the license transfer, as well as the other NRC approvals necessary for reinstatement of the POLB. Upon docketing this t r ans it io n not if icat io n let t er, PNP intends to tr ansit io n fr o m a fac ilit y in d eco mmiss io ning back t o a power operations plant, and HDI will transfer its authorit y to conduct licensed activit ies to OPCO.
 
To support t he expect ed regulat o ry schedule, App licant s request t hat NRC review t his App licat io n on a schedule that will permit issuance o f an order consent ing to the transfer and approving conforming license amendments by December 31, 2024. Applicants request that the consent be
 
Encl. 1 p.20 immediately effect ive upon issuance and authorize the transfer to occur up to one year after issuance or such lat er dat e as NRC may autho r ize. HDI will no t ify NRC st aff at least five bu siness days pr ior to t he expected transfer date.
 
Applicants do not anticipate the need for other agency approvals in order to transfer licensed authority to OPCO. Applicants will cont inue to coordinate with NRC on the status of the other NRC approvals needed to support the Facilit y restart, the timing o f which could impact the ant icipated transfer date.
: 11. Conclusion
 
The pro po sed transfer o f aut horit y to co nduct licensed activit ies und er t he RFO L will be co nsist ent wit h t he requirement s o f AE A, NRC regulat io ns, and regu lat ory guid ance. The t ransfer will no t be inimical to the common defense and secur it y and will not involve foreign ownership, control, or dominat ion. Therefore, Applicants respectfully request NRC to issue an order (1) consenting to t he proposed license transfer related to Renewed Facilit y Operat ing License No. DPR-20 and the PNP ISFSI general license, and (2) appro ving the confo rming license amend ment s.
 
Encl. 1 p.21 Enclosure 1 Attachment A
 
Proposed Changes (mark-up) to Palisades Plant (PNP)
 
Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255
 
(8 PAGES INCLUDING THIS COVER PAGE)


Attachment A Proposed Changes (mark-up) to Palisades Plant (PNP)
Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255 (8 PAGES INCLUDING THIS COVER PAGE)
The proposed changes to the PNP RFOL are identified by a dditions in bold-italics RED and deletions in strike-out.
The proposed changes to the PNP RFOL are identified by a dditions in bold-italics RED and deletions in strike-out.
To coordinate the license transfer application (LTA) conforming amendments with the power operations technical specification (POTS) license amendment request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed changes are shown in bracketed italics.
The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditioned by and coincident with the effectiveness of the POTS amendments.


To coordinate the license transfer application (LTA) conforming amendments with th e power operations technical specification (POTS) license amendme nt request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 ( ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed changes are shown in bracketed italics.
Amendment No. 272, 273 HOLTEC PALISADES, LLC HOLTEC DECOMMISSIONING INTERNATIONAL, LLC PALISADES ENERGY, LLC DOCKET NO. 50-255 PALISADES NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-20
 
: 1.
The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditio ned by and coincident with the effectiveness of the POTS amendments.
The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:
HOLTEC PALISADES, LLC
A.
 
The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
HOLTEC DECOMMISS IONING INTERNATI ONAL, LLC PALISADES ENERGY, LLC
and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
 
[deleted];
DOCKET NO. 50-255
 
PALISADES NUCLEAR PLANT
 
RENEWED FACILITY OPERATING LICENSE
 
Renewed License No. DPR-20
: 1. The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:
 
A. The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made;
 
B. [deleted];
 
C. Actions have been identified and have been or will be taken with respect to:
C. Actions have been identified and have been or will be taken with respect to:
(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the perio d of extended operation, and (2) time-limited aging analyses th at have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 1 0 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance wit h the Act and the Commissions regulations;
(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations;  
 
Amendment No. 272, 273 2
 
D. and of the Act, se provision thwill operate in conformity with the application,y The facilit ns of the Commission; the regulatio
 
E. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I;
 
F. Holtec Palisades, LLC (Holtec Palisades) is fina ncially qualified and Holtec Decommissioning International, LLC (HDI) Palisades Energy, LLC (Palisades Energy) is financially and technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commissions re gulations set forth in 10 CFR Chapter I;
 
G. Holtec Palisades and HDI Palisades Energy have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commissions regulations;
 
H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public;


I. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and cons idering available alternatives, the issuance of this renewed Facility Operating License No. DPR-20, subject to the conditions for protection of the environment set forth herein, is in accorda nce with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commissions r egulations and all applicable requirements have be en satisfied; and
Renewed License No. DPR-20 Amendment No. 272, 273
2
D. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; E.
There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; F.
Holtec Palisades, LLC (Holtec Palisades) is financially qualified and Holtec Decommissioning International, LLC (HDI) Palisades Energy, LLC (Palisades Energy) is financially and technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; G. Holtec Palisades and HDI Palisades Energy have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commissions regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this renewed Facility Operating License No. DPR-20, subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commissions regulations and all applicable requirements have been satisfied; and J.
The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with 10 CFR Parts 30, 40, and 70.
: 2.
Renewed Facility Operating License No. DPR-20 is hereby issued to Holtec Palisades and HDI Palisades Energy as follows:
A.
This renewed license applies to the Palisades Plant, a pressurized light water moderated and cooled reactor and electrical generating equipment (the facility). The facility is located in Van Buren County, Michigan, and is described in the Palisades Plant Updated Final Safety Analysis Report, as supplemented and amended, and in the Palisades Plant Environmental Report, as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, Licensing of Production and Utilization Facilities, (a) Holtec Palisades to possess and use, and (b) HDI Palisades Energy to possess[, and use and operate], the facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license;


J. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with 10 CFR Parts 30, 40, and 70.
Renewed License No. DPR-20 Amendment No. 272, 273  
: 2. Renewed Facility Operating License No. DPR-20 is hereby issued to Holtec Palisades and HDI Palisades Energy as follows:
3
 
(2)
A. This renewed license applies to the Palisades Plant, a pressurized light water moderated and cooled reactor and electrical generating equipment (the facilit y). The facility is located in Van Buren County, Michigan, and is described in the Palisades Plant Updated Final Safety Analysis Report, as supplemented and amended, and in the Palisades Plant Environmental Report, as su pplemented and amended.
HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 40 and 70, to
 
B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
 
(1) Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, Licensing of Production and Utilization Facilities, (a) Holtec Palisades to possess and use, and (b) HDI Palisades Energy to possess[, and use and operate], the facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license; DPR-20Renewed License No.
Amendment No. 272, 273 3
 
(2) HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 40 and 70, to
[receive,]possess [, and use ]source, and special nuclear material [that was used]
[receive,]possess [, and use ]source, and special nuclear material [that was used]
as reactor fuel, in accordance with the limitations for storage [and amounts required for reactor operation], as described in the Updated Final Safety Analysis Report, as supplemented and amended;
as reactor fuel, in accordance with the limitations for storage [and amounts required for reactor operation], as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
 
HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources [that were used] for reactor startup, [sealed sources that were used for]reactor instrumentation[, and are used in the calibration of ]radiation monitoring equipment [calibration], and [that were used as] fission detectors in amounts as required; (4)
(3) HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources [that were used] for reactor startup, [sealed sources that were used for]reactor instrumentation[, and are used in the calibration of ]radiation monitoring equipment [calibration], and [that were used as] fission dete ctors in amounts as required;
HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5)
 
HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials [that were as may be] produced by the operations of the facility.
(4) HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or in strument calibration, or associated with radioactive apparatus or components; and
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
 
(1)
(5) HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials [that were as may be] produced by the operations of the facility.
[deleted]Palisades Energy [is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.]
 
(2)
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is sub ject to the additional conditions specified or incorporated below:
The Technical Specifications contained in Appendix A, as revised through Amendment No. 273XXX, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. HDI Palisades Energy shall
 
(1) [deleted]Palisades Energy [is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565. 4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. ]
 
(2) The Technical Specifications contained in Appendix A, as revised through Amendment No. 273XXX, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. HDI Palisades Energy shall
[maintain operate] the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
[maintain operate] the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
[deleted]
(4)
[deleted]
(5)
Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.
Insert 1


(3) [deleted] Insert 1
Renewed License No. DPR-20 Amendment No. 272, 273  
 
5
(4) [deleted]
 
(5) Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.
 
DPR-20Renewed License No.
Amendment No. 272, 273 5
 
D. [deleted]
D. [deleted]
E.
HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.
HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and 264.
F.
[deleted]
G. Holtec Palisades and HDI Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.


E. HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to p rovisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the aut hority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.
HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CS P was approved by License Amendment No. 243 as supplemented by chang es approved by License Amendment Nos. 248, 253, 259, and 264.
F. [deleted]
G. Holtec Palisades and HDI Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall req uire in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Renewed License No. DPR-20 Amendment No. 272, 273




Insert 1

 
Insert 1 (3)
(3) [deleted] [Fire Protection]
[deleted] [Fire Protection]
 
Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013, October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and January 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013, October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and Janu ary 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
(a)
 
Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
(a) Risk-Informed Changes that May Be Made Without Prior NRC Approva l
: 1.
 
Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.
A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, meth ods that have been approved by NRC through a plant-specific license ame ndment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
: 2.
: 1. Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.
Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10-8/yr for LERF. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.  
: 2. Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10-8/yr for LERF. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be imple mented following completion of the plant change evaluation.








(b) Other Changes that May Be Made Without Prior NRC Appr oval
(b)
: 1. Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program
Other Changes that May Be Made Without Prior NRC Approval
 
: 1.
Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is functionally equivalent or adequate for the hazard.
Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is functionally equivalent or adequate for the hazard.
 
The licensee may use an engineering evaluation to demonstrate that a change to an NFPA 805, Chapter 3, element is functionally equivalent to the corresponding technical requirement. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard.
The licensee may use an engineering evaluation to demonstrate that a change to an NFPA 805, Chapter 3, element is functionally equivalent to the corresponding technical requirement. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard.
 
The licensee may use an engineering evaluation to demonstrate that changes to certain NFPA 805, Chapter 3, elements are acceptable because the alternative is adequate for the hazard. Prior NRC review and approval would not be required for alternatives to four specific sections of NFPA 805, Chapter 3, for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is adequate for the hazard. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard. The four specific sections of NFPA 805, Chapter 3, are as follows:
The licensee may use an engineering evaluation to demonstrate that changes to certain NFPA 805, Chapter 3, elements are acceptable because t he alternative is adequate for the hazard. Prior NRC review and approval would not be required for alternatives to four specific sections of NFPA 805, Chapter 3, for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is adequate for the hazard. A qualified fire protection engineer shall perform the engineer ing evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard. The four specific sections of NFPA 805, Chapter 3, are as follows:
x Fire Alarm and Detection Systems (Section 3.8);
 
x Fire Alarm and Detection Systems (Section 3. 8);
x Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);
x Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);
x Gaseous Fire Suppression Systems (Section 3.10); and x Passive Fire Protection Features (Section 3.11).
x Gaseous Fire Suppression Systems (Section 3.10); and x
 
Passive Fire Protection Features (Section 3.11).
This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.  








: 2. Fire Protection Program Changes that Have No More than Minimal Risk Impact
: 2.
 
Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
(c)
(c) Transition License Conditions
Transition License Conditions
: 1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to th e licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
: 1.
: 2. The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) lette r PNP 2019-028 dated May 28, 2019, to complete the transition to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
: 3. The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]
: 2.
 
The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) letter PNP 2019-028 dated May 28, 2019, to complete the transition to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.

: 3.
Enclosure 1 Attachment B Proposed Changes to Palisades Plant (PNP)
The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]  


Proposed Changes to Palisades Plant (PNP)
Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255
Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255
( PAGES INCLUDING THIS COVER PAGE)
The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditioned by and coincident with the effectiveness of the POTS amendments.
To coordinate the license transfer application (LTA) conforming amendments with the power operations technical specification (POTS) license amendment request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed name changes are shown in brackets.
Attachment B


( PAGES INCLUDING THIS COVER PAGE)
Amendment No. 273, XXX HOLTEC PALISADES, LLC PALISADES ENERGY, LLC DOCKET NO. 50-255 PALISADES NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-20
 
: 1.
To coordinate the license transfer application (LTA) conforming amendments with the power operations technical specification (POTS) license amendment request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 ( ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed name changes are shown in brackets.
The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:
 
A.
The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditio ned by and coincident with the effectiveness of the POTS amendments.
The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
HOLTEC PALISADES, LLC
and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
 
[deleted];
PALISADES ENERGY, LLC
 
DOCKET NO. 50-255
 
PALISADES NUCLEAR PLANT
 
RENEWED FACILITY OPERATING LICENSE
 
Renewed License No. DPR-20
: 1. The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:
 
A. The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made;
 
B. [deleted];
 
C. Actions have been identified and have been or will be taken with respect to:
C. Actions have been identified and have been or will be taken with respect to:
(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the perio d of extended operation, and (2) time-limited aging analyses th at have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 1 0 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance wit h the Act and the Commissions regulations;
(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations;  
 
Amendment No. 273, XXX 2
 
D. and of the Act, se provision thwill operate in conformity with the application,y The facilit ns of the Commission; the regulatio
 
E. enewed ized by this rhat the activities authorsonable assurance: (i) tThere is rea safety of the health and without endangering the conducted operating license can be e ed in compliance with thies will be conductactivitch ii) that supublic, and (
10 CFR Chs set forth inapter I; s regulationCommission
 
F. gy, ied and Palisades Enerncially qualifHoltec Palisades, LLC (Holtec Palisades) is fina in the d to engage lifiecially and technically qua is finanLLC (Palisades Energy) h the ccordance withis renewed operating license in ahorized by ties autactivit 10 CFR Chs set forth inapter I; s regulationCommission
 
G. Holtec Palisades and Palisades Ens of rovisionpapplicable ergy have satisfied the 10 CFR Partcial Protection Requirements and Indemnity Agreements" of 140, "Finan lations;the Commissions regu
 
H. common imical to thewill not be inse ewed operating licence of this renThe issuan f the public;and safety oo the health security or tdefense and
 
I. After weighing the envir other benefits of the facility andchnical, onmental, economic, te ives, the idering available alternatagainst environmental and other costs and cons ct to the nse No. DPR-20, subjey Operating Liced Facilitthis renewe of issuance nce with onment set forth herein, is in accorda of the enviror protectionconditions f nd egulations a10 CFR PartD to Part 50), of the Commissions r 51 (formerly Appendix and ied;en satisfall applicable requirements have be
 
J. The receipt, r material as ecial nucleaduct, and spand use of source, bypropossession, 0 CFR Parts ance with 1be in accord license will ed operatingy this renewauthorized b
: 70. 30, 40, and
: 2. s and No. DPR-2issued to Holtec Palisadese0 is hereby y Operating LicenRenewed Facilit nergy as follows: Palisades E
 
A. water Palisades Plant, a pressurized lightplies to the apThis renewed license y). Theerating equipment (the facilitl genlectricaeactor and emoderated and cooled r Palisades, and is described in theBuren County, Michiganlocated in Van y is facilit ety Analysis Report, as supplemented and amended, and inPlant Updated Final Saf pplemented and amended. s Plant Environmental Report, as suthe Palisade
 
B. ments incorporated herein, the Commission s and requiree conditionSubject to th ses:hereby licen
 
(1) as amended, and 10 CFR Part 50, Licensing b of the Act,Pursuant to Section 104 and use, to possess s s, (a) Holtec Palisadetion Facilitien and Utilizaof Productio he y at te facilit operate], thss[, use andgy to posseand (b) Palisades Ener the rdance with an Buren County, Michigan, in accodesignated location in V this license;n set forth inand limitatioprocedures
 
DPR-20Renewed License No.
Amendment No. 273, XXX 3
 
(2) receive,] ant to the Act and 10 CFR Parts 40 and 70, to [nergy, pursuPalisades E in material[ ]as reactor fuel,cial nuclear ce, and spend use] sourpossess[, a ctor orage [and amounts required for reawith the limitations for staccordance ety Analysis Report, as in the Updated Final Safd s describeoperation], a supplemented and amended;
 
(3) to ant to the Act and 10 CFR Parts 30, 40, and 70,nergy, pursuPalisades E clear material as d special nuse byproduct, source, anssess, and ureceive, po rumentation[,] radiation ]reactor instctor startup,[ces[ ]for reasealed sour amounts as detectors in nd[ ]fission monitoring equipment [calibration], a required;
 
(4) to ant to the Act and 10 CFR Parts 30, 40, and 70,nergy, pursuPalisades E
, or duct, sourced any byprose in amounts as requiressess, and ureceive, po strument calibration, or clear material for sample analysis or inspecial nu us or components; andwith radioactive apparated associat
 
(5) to ant to the Act and 10 CFR Parts 30, 40, and 70,nergy, pursuPalisades E ar materials[ as may oduct and special nuclee, such byprt not separatpossess, bu y.e facilitrations of thd by the opebe] produce


C. o the d is subject tbe deemed to contain anThis renewed operating license shall ect jFR Chapter I and is subions in 10 Che Commissions regulat tconditions specified in
Renewed License No. DPR-20 Amendment No. 273, XXX
; to the rules, regulations, and orders of the ns of the Actble provisioto all applica nditions dditional coject to the a now or hereafter in effect; and is subCommission below: incorporated or specified
2
D. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; E.
There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; F.
Holtec Palisades, LLC (Holtec Palisades) is financially qualified and Palisades Energy, LLC (Palisades Energy) is financially and technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; G. Holtec Palisades and Palisades Energy have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commissions regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this renewed Facility Operating License No. DPR-20, subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commissions regulations and all applicable requirements have been satisfied; and J.
The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with 10 CFR Parts 30, 40, and 70.
: 2.
Renewed Facility Operating License No. DPR-20 is hereby issued to Holtec Palisades and Palisades Energy as follows:
A.
This renewed license applies to the Palisades Plant, a pressurized light water moderated and cooled reactor and electrical generating equipment (the facility). The facility is located in Van Buren County, Michigan, and is described in the Palisades Plant Updated Final Safety Analysis Report, as supplemented and amended, and in the Palisades Plant Environmental Report, as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, Licensing of Production and Utilization Facilities, (a) Holtec Palisades to possess and use, and (b) Palisades Energy to possess[, use and operate], the facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license;


(1) actor core ady-state rey at steacilitperate the fhorized to onergy [is autPalisades E ted Megawatts thermal (100 percent rass of 2565.4power levels not in exce d herein.]cifieions spepower) in accordance with the condit
Renewed License No. DPR-20 Amendment No. 273, XXX
 
3
(2) ed in Appendix A, as revised throughinions contaThe Technical Specificat Amendin ment No. XXX, aonmental Protection Plan contained nd the Envir all s Energy sh in the license. PalisadeAppendix B are hereby incorporated d the with the Technical Specifications anccordance y in ae facilit[operate] th n Plan. Environmental Protectio
(2)
 
Palisades Energy, pursuant to the Act and 10 CFR Parts 40 and 70, to [receive,]
Protection (3) Fire
possess[, and use] source, and special nuclear material[ ]as reactor fuel, in accordance with the limitations for storage [and amounts required for reactor operation], as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)
 
Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources[ ]for reactor startup,[ ]reactor instrumentation[,] radiation monitoring equipment [calibration], and[ ]fission detectors in amounts as required; (4)
Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013,
Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5)
 
Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials[ as may be] produced by the operations of the facility.
DPR-20Renewed License No.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Amendment No. 273, XXX 4
(1)
Palisades Energy [is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.]
(2)
The Technical Specifications contained in Appendix A, as revised through Amendment No. XXX, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Palisades Energy shall
[operate] the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
Fire Protection Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013,  


Renewed License No. DPR-20 Amendment No. 269, 272, XXX
4
October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and January 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and January 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
(a)
Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
: 1.
Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.
: 2.
Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10-8/yr for LERF. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.
(b)
Other Changes that May Be Made Without Prior NRC Approval
: 1.
Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering


(a) Risk-Informed Changes that May Be Made Without Prior NRC Approva l
Renewed License No. DPR-20 Amendment No. 265, 272, XXX
 
5
A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; an d reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approv al of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.
evaluation demonstrates that the alternative to the Chapter 3 element is functionally equivalent or adequate for the hazard.
: 1. Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant ch ange evaluation.
The licensee may use an engineering evaluation to demonstrate that a change to an NFPA 805, Chapter 3, element is functionally equivalent to the corresponding technical requirement. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard.
: 2. Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10 -8/yr for LERF. The proposed chang e must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant ch ange evaluation.
The licensee may use an engineering evaluation to demonstrate that changes to certain NFPA 805, Chapter 3, elements are acceptable because the alternative is adequate for the hazard. Prior NRC review and approval would not be required for alternatives to four specific sections of NFPA 805, Chapter 3, for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is adequate for the hazard. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard. The four specific sections of NFPA 805, Chapter 3, are as follows:
 
(b) Other Changes that May Be Made Without Prior NRC Appr oval
: 1. Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program
 
Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering
 
DPR-20Renewed License No.
Amendment No. 269, 272, XXX 5
 
e Chapter 3 rnative to themonstrates that the altedevaluation
. r the hazardadequate foquivalent or unctionally eelement is f to ng evaluatioe may use an engineerinseThe licen ge to an NFPA 805, Chdemonstrate that a chanapter 3, nding the correspoquivalent tounctionally eelement is f all engineer shquirement. A qualified fire protectionl retechnica that the end concludaevaluation perform the engineering component, ality of the the functionnot affected change has nt ngement, using a releval arrahysicacedure, or psystem, pro quirement or standard.l retechnica to g evaluatione may use an engineerinThe license NFPA 805, s to certain Chapter 3, demonstrate that change he alternative is elements are acceptable because t
: d. Prior NRC review and approval adequate for the hazar ecific or alternatives to four spwould not be required f NFPA 805, engineering sections of Chapter 3, for which an e rnative to themonstrates that the alteevaluation d A qualified he hazard. Chapter 3 element is adequate for t ing n engineer shall perform the engineerfire protectio affected nge has not that the chand concludeevaluation a component, system, procedure, or ality of the the function l vant technicaangement, using a relel arrphysica sections of. The four specific requirement or standard NFPA 805, Chapter 3, are as follows:
 
x Fire Alarm and Detection Systems (Section 3.8);
x Fire Alarm and Detection Systems (Section 3.8);
x Automatic and Manual Water-Based Fire
x Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);
; Systems (Section 3.9)Suppression x Gaseous Fire Suppression Systems (Section 3.10); and x Passive Fire Protection Features (Section 3.11).
x Gaseous Fire Suppression Systems (Section 3.10); and x
 
Passive Fire Protection Features (Section 3.11).
This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.
: 2. Fire Protection Program Changes that Have No More than Minimal Risk Impact
: 2.
 
Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall  
Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall
 
DPR-20Renewed License No.
Amendment No. 265, 272, XXX ----
6
 
-depth and safety n defense-inire protectioensure that f margins are maintained when changes are made to the fire ogram.protection pr
 
(c) Transition License Conditions
: 1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to th e licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
: 2. The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) lette r PNP 2019-028 dated May 28, 2019, to complete the transit ion to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
: 3. The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]
 
(4) [deleted]


(5) Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.
Renewed License No. DPR-20 Amendment No. 269, 272, XXX
 
6
DPR-20Renewed License No.
ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.
Amendment No. 269, 272, XXX 8
(c)
Transition License Conditions
: 1.
Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
: 2.
The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) letter PNP 2019-028 dated May 28, 2019, to complete the transition to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
: 3.
The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]
(4)
[deleted]
(5)
Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.  


Renewed License No. DPR-20 Amendment No. 273, XXX
8
D. [deleted]
D. [deleted]
E.
Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.
Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and 264.
F.
[deleted]
G. Holtec Palisades and Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.


E. Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to p rovisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the aut hority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.
Encl. 1 Att. C p.1 Attachment C Redacted Corporate Information Required by 10 CFR 50.33(d)(3) (Public)
NAME:
Holtec International STATE OF INCORPORATION:
Delaware BUSINESS ADDRESS:
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 DIRECTORS:
Dr. Krishna P. Singh Stuart Crooks José A. Gago Dr. Eduardo D. Glandt James H. Miller Dominique Miniere George E. Norcross III Michael J. Pacilio Jim Saxton Martha J. Singh S. Amy Singh EXECUTIVE COMMITTEE:
Dr. Krishna P. Singh, President & Chief Executive Officer Pankaj Chaudhary, Senior V.P. of Operations Frederick J. Roegge, Senior V.P. and Chief Strategy Officer Kelly D. Trice, President of Nuclear Generation and Decommissioning J. Scott Thomson, Senior V.P. and Governance Officer Joy Russell, Senior V.P., Chief Commercial Officer Dr. Richard Springman, Senior V.P. of International Projects William F. Gill, V.P. and General Counsel
[
]


Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CS P was approved by License Amendment No. 243 as supplemented by chang es approved by License Amendment Nos. 248, 253, 259, and 264.
Encl. 1 Att. C p.2 NAME:
Holtec Power, Inc.
STATE OF INCORPORATION:
Delaware BUSINESS ADDRESS:
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 DIRECTORS:
Pankaj Chaudhary Dr. Stefan Anton EXECUTIVE COMMITTEE:
Dr. Krishna P. Singh, President & Chief Executive Officer Pankaj Chaudhary, Senior V.P. of Operations Frederick J. Roegge, Senior V.P. and Chief Strategy Officer Kelly D. Trice, President of Nuclear Generation and Decommissioning J. Scott Thomson, Senior V.P. and Governance Officer Joy Russell, Senior V.P., Chief Commercial Officer Dr. Richard Springman, Senior V.P. of International Projects William F. Gill, V.P. and General Counsel All of the directors, principal officers, and executive committee members of Holtec Power, Inc.
are U.S. citizens, with the same corporate address as Holtec Power, Inc.  


F. [deleted]
Encl. 1 Att. C p.3 NAME:
Nuclear Asset Management Company, LLC STATE OF FORMATION:
Delaware BUSINESS ADDRESS:
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:
Holtec Power, Inc.
PRINCIPAL OFFICERS:
Kelly D. Trice, President Michelle Tate, Treasurer and Vice President Martin Babos, Secretary All of the principal officers of Nuclear Asset Management Company, LLC are U.S. citizens, with the same corporate address as Nuclear Asset Management Company, LLC.


G. Holtec Palisades and Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall req uire in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liab ility claims.
Encl. 1 Att. C p.4 NAME:
Holtec Palisades, LLC STATE OF INCORPORATION:
Delaware BUSINESS ADDRESS:
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:
Nuclear Asset Management Company, LLC PRINCIPAL OFFICERS:
Kelly D. Trice, President Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Troy Geauthreaux, Chief Financial Officer All of the principal officers of Holtec Palisades, LLC are U.S. citizens, with the same corporate address as Holtec Palisades, LLC.


Renewed License No. DPR-20 Amendment No. 273, XXX Attachment C
Encl. 1 Att. C p.5 NAME:
Palisades Energy, LLC STATE OF FORMATION:
Delaware BUSINESS ADDRESS:
Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:
Holtec Power, Inc.
PRINCIPAL OFFICERS:
Kelly D. Trice, President Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Troy Geauthreaux, Chief Financial Officer All of the principal officers of Palisades Energy, LLC are U.S. citizens, with the same corporate address as Palisades Energy, LLC.


Redacted Corporate Information Required by 10 CFR 50.33(d)(3) (Public)
Encl. 1 Att. D p.1 Attachment D Palisades Energy, LLC Organization Chart and Resumes of Senior Leadership


NAME: Holt ec Int ernat io nal STATE OF Delaware INCORPORATION:
1 Palisades License Restarted Organization Chart 111023 Holtec Executive Committee Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Holtec Palisades C-Suite CHIEF NUCLEAR OFFICER Richard Burroni SITE VICE PRESIDENT PALISADES Michael Mlynarek VP, LICENSING Jean Fleming PRESIDENT NUCLEAR RESOURCES Kelly Trice HOLTEC PALISADES Site Organization HOLTEC PALISADES Quality Assurance
BUSINESS ADDRESS: Kr ishna P. Singh Tec hno lo g y Ca mpu s 1 Holt ec Bo ulevard Camden, NJ 08104 DIRECTORS: Dr. Krishna P. Singh St uart Crooks Jo sé A. Gago Dr. Eduardo D. Glandt James H. Miller Domin ique Min iere Geo rge E. No rcross III Michael J. Pacilio Jim Saxton Mart ha J. Sing h S. Amy S ingh EXECUT IVE Dr. Krishna P. Sing h, President & Chief E xecut ive Officer COMMITTEE: Pankaj Chaudhar y, Senior V.P. of Operat io ns Freder ick J. Roegge, Senior V.P. and Chief Strat egy Officer Kelly D. Trice, President of Nuclear Generat io n and Decommissio ning J. Scott Tho mson, Senior V.P. and Governance Officer Joy Russell, Senio r V.P., Chie f Co mmerc ia l Officer Dr. Richard Spr ingman, Senior V.P. of Internat ional Projects William F. Gill, V.P. and General Counsel


[
VP, SITE Michael Mlynarek (550) 2 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OVERVIEW GM, PLANT OPS SUPERINTENDENT PROJECTS MGR, REG ASSUR ADMIN, SR MGR, TRAINING
 
: MANAGER, EP SR MGR, PROJECTS SR MANAGER, MAINTENANCE
]
: MANAGER, CHEMISTRY MANAGER, RP ADMIN, SR
 
: MANAGER, SYSTEMS ENG
Encl. 1 Att. C p.1 NAME: Holt ec Po wer, Inc.
: MANAGER, DESIGN ENG/PROJ ENG
STATE OF Delaware INCORPORATION:
: MANAGER, SUPPLY CHAIN COORDINATOR, PROJECT CONTROLS
BUSINESS ADDRESS: Kr ishna P. Singh Tec hno lo g y Ca mpu s 1 Holt ec Bo ulevard Camden, NJ 08104 DIRECTORS: Pankaj Chaudhar y Dr. St efan Ant o n
: MANAGER, OUTAGE PROJECT MGR (2)
 
PROJECT MGR, RX SERVICES PROJECT MGR, TURBINE PROJECT MGR, STEAM GENERATOR ADMIN, SR ASSISTANT, EXEC SR MANAGER, OPERATIONS DIR, ENGINEERING DIR, SITE SERVICES I
EXECUT IVE Dr. Krishna P. Sing h, President & Chief E xecut ive Officer COMMITTEE: Pankaj Chaudhar y, Senior V.P. of Operat io ns Freder ick J. Roegge, Senior V.P. and Chief Strat egy Officer Kelly D. Trice, President of Nuclear Generat io n and Decommissio ning J. Scott Tho mson, Senior V.P. and Governance Officer Joy Russell, Senio r V.P., Chie f Co mmerc ia l Officer Dr. Richard Spr ingman, Senior V.P. of Internat ional Projects William F. Gill, V.P. and General Counsel
I I
 
I  
All of the direct o rs, principa l officer s, and execut ive co mmit t ee members of Ho lt ec Power, Inc.
are U.S. cit izens, wit h the same corporat e address as Holt ec Power, Inc.
 
Encl. 1 Att. C p.2 NAME: Nuclear Asset Management Company, LLC STATE OF Delaware FORMATION:
BUSINESS ADDRESS: Kr ishna P. Singh Tec hno lo g y Ca mpu s 1 Holt ec Bo ulevard Camden, NJ 08104 MANAGING Holt ec Po wer, Inc.
MEMBER:
PRINC IPAL Kelly D. Trice, President OFFICERS: Michelle Tat e, Treasurer and Vice President Mart in Babo s, Secret ary
 
All o f t he pr incipal o fficers of Nuclear Asset Management Company, LLC are U.S. cit izens, wit h t he same corporat e address as Nuclear Asset Management Co mpany, LLC.
 
Encl. 1 Att. C p.3 NAME: Holt ec Palisades, LLC STATE OF Delaware INCORPORATION:
BUSINESS ADDRESS: Kr ishna P. Singh Tec hno lo g y Ca mpu s 1 Holt ec Bo ulevard Camden, NJ 08104 MANAGING Nuclear Asset Management Company, LLC MEMBER:
PRINC IPAL Kelly D. Trice, President OFFICERS: Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Troy Geauthreaux, Chief Financial Officer
 
All o f the principal o fficers of Holtec Palisades, LLC are U.S. citizens, with the same corporate address as Ho lt ec Palisades, LLC.
 
Encl. 1 Att. C p.4 NAME: Palisades Energy, LLC STATE OF Delaware FORMATION:
BUSINESS ADDRESS: Kr ishna P. Singh Tec hno lo g y Ca mpu s 1 Holt ec Bo ulevard Camden, NJ 08104 MANAGING Holt ec Po wer, Inc.
MEMBER:
PRINC IPAL Kelly D. Trice, President OFFICERS: Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Tro y Geauthreaux, Chief Financial Officer
 
All o f the principal o fficers of Palisades Energy, LLC are U.S. cit izens, with the same corporate address as Palisades Energy, LLC.
 
Encl. 1 Att. C p.5 Attachment D
 
Palisades Energy, LLC O rganization Chart and Resumes of Senior Leadership
 
Encl. 1 At t. D p.1
 
I I I I
 
~------


VP, SITE Staff: (9) 3 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART ASST VP, SITE MANAGER, FINANCE Reports to HDI CFO SR MANAGER, GOVT AFFAIRS/
COMMUNICATIONS Reports to Director, Govt Affairs/
Communications MANAGER, HR Reports to Associate Director, HR Generalist, HR (2)
MANAGER, SECURITY Reports to Director, Fleet Sec Operations MANAGER, QA Reports to VP, Reg Assurance Recruiter (1)
Mgr, IT Reports to Dir, IT INPO LOANEE Site VP Coordinator Mgr, ECP 1--
~------
I I
I I
I I
I I
I I
I I
I I
I I
*------------+------------+--------------,
I,_____---,
I I
I I
I I I I I I
I  
*------------+------------+--------------,
~--_,_I __  
~--_,_I __ I __, --L----,.--I I I I,_____---,
--L----,
I I  


1--
DIR, ENGINEERING (Staff: 94) 4 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART ENGINEERING Mgr, Systems & Programs Supv, BOP Systems Supv, NSSS Systems Supv, Components Mgr, Design & Analysis Admin, Sr Supv, Programs Supv, Elec/I&C Design Supv, Mech/Civil Design Supervisor, Analysis Supervisor, EFIN PDM Eng (2)
Elec NSSS Eng (3)
PM Eng (1)
Mech BOP Eng (3)
Elec BOP Eng (3)
Mech NSSS Eng (3)
MR/MSPI/NEIL Eng (2)
NDE Level III (2)
Program Engineer (6)
NDE Level II (1)
Component Eng (7)
Fire Protection Eng (2)
Designer (2)
Procurement Eng (1)
Designer (1)
Civil Des Eng (3)
Digital/I&C Des Eng (3)
Procurement Eng (1)
Elec Des Eng (3)
Mech Des Eng (4)
Rx/Nuc Fuels Eng (4)
EEQ Engineer (1)
PRA/Safety Anls Eng (3)
Elec Analysis Eng (1)
Civil/Mech Anls Eng (1)
Mechanical Eng (4)
Elec/I&C Eng (4)
Civil Engineer (2)
Mgr, Supply Chain Buyers 2
Supv, Materials (1)
Stockkeeper (5)
Supv, Procurement 1


I
SR MANAGER, OPERATIONS (Staff: 76) 5 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OPERATIONS OPS MGR - SHIFT (1)
Managers, Shift (5)
NPO (30)
Specialist, Ops (2)
Supv, WCC (SRO)
(4)
OPS MGR - SUPPORT (1)
Work Support (NPO)
(1)
Fire/Flex Marshal (1)
Supv, Control Room (5)
SE/STA (5)
NCO (15)
Field Supv. (SRO)
(5)


- I
SR MANAGER, MAINTENANCE Staff: (91) 6 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MAINTENANCE/PRODUCTION Manager, Work Control (4)
Coordinators, Work (4)
Schedulers (2)
Supervisors, Mtnce (12)
Planners (9)
Coord, Unit/PM (1)
Leads, Mtnce (9)
Supt, Work Planning (1)
Craft/Techs Mtnce (40)
Coordinators, Dept (2)
Specialists, Mtnce (4)
Specialist, Safety (1)
I I
: MANAGER, OUTAGE (Staff: 6) 7 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OUTAGE Lead Outage Scheduler (1)
OUTAGE SRO (1)
Outage Staff Operator (Rotate)
Outage Scheduler (2)


I
MANAGER.
CHEMISTRY
( Staff: 18) 8 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART CHEMISTRY Radio Chemist (9)
Chemical Specialist (6)
SUPERVISOR, CHEMISTRY (1)
SUPERVISOR, CHEMISTRY (1)


- I I
MGR, RAD PRO (Staff: 37) 9 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Radiation Protection Supt, Rad Operations (1)
Health Physicist (9)
Specialist, HP (6)
Supv, Rad Support (1)
Radwaste Handler (3)
Supv, Rad Operations (1)
Supv, Rad Operations (1)
Health Physicist (2)
Health Physicist (8)
Supt, Rad Technical (1)
Health Physicist (2)
Specialist, HP (1)
I I
T I
I  


- - T I I
MANAGER, EP (STAFF: 4) 10 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART EMERGENCY PLANNING Specialists, EP (3)


KELLY D. TRICE
MGR, REG ASSUR Staff: (11) 11 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Regulatory Assurance Supervisor, CAP/
Records (1)
Engineer, Licensing (2)
Specialist, Compliance (2)
Admins (3)
Lead Records Coordinator (1)
CAP Coordinator (1)


EXPERIENCE
MANAGER, TRAINING Staff: (27) 12 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART TRAINING Supt, Ops Training Instructors, Lead (2)
Instructor, Electrical Instructors, Ops (6)
Instructor, Mechanical Instructor, I&C Spec, Simulator Support (2)
Supt, Mtnce/Tech Trng Coordinators, Training (2)
Exam Writers (2)
Instructor, Chemistry Instructor, RP Instructor, Eng Sup Instructor, GET Instructor, EP Asst Mgr, Training


==SUMMARY==
13 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART DOTTED LINE TO SVP MANAGER, FINANCE Reports to HDI CFO Staff (5)
Thirty-five years of executive management experience as the chief executive, president, or COO of several large companies with full sales, operational and P&L responsibility, serving on multiple boards for independent or affiliated companies. These companies focus on diverse clients which are international and domestic. The services provided range from environmental cleanup/consultation to maintenance and operation of a variety of plants, and large-scale multibillio n-dollar Engineering, Procurement and Construction (EPC) programs. The clients include utilities, nuclear power plants, refineries, LNG plants, chemical plants, coal-fired power plants, and co mbined cycle power plants. Other experience includes deal/contract negotiation, financial management, restructuring and turnaround, and M&A.
Analyst, Outage (1)
Analyst, O&M (1)
Analyst, Capital (1)
Analyst, Payroll (1)


President, Holtec International, Nuclear Generati on and Deco mmissioning (3/19 to p resent) - Served as the chief executive and president of CDI LLC (3/19-8/21), then chief executive and president of HDI LLC (8/21-8/2 3) before being promoted to the current role. This role includes the P&L responsibility for Holtec International and its subsidiaries, the ambitious restart of the Palisades Energy Center after a year of shutdown, the small modular reactor (S MR) program for design completion, licensing, and ultimate construction/fabrication, as well as the decommissioning of the Oyster Creek Nuclear Station, Pilgrim Nuclear Station, and the Indian Point Energy Center. In total there are five large-scale power reactors in decommissioning plus the restart of Palisades from a decommissioning status, and deployment of SMRs throughout the world. Ke y duties include executive committee member, DOE loan program negotiation/approval, Michigan grant legislation/approval, and associated political interfaces, as well as SMR deployment throughout the world (including Ukraine during the Russian aggression.)
14 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART QA Organization & ECP Inspector, QC (2)
MANAGER, QA (Staff: 12)
Supervisor, QA (1)
Auditor (3)
Auditor (2)
Supervisor, QA Supplier (1)
Inspector, Receipt (2)
VP, LICENSING Jean Fleming MANAGER, ECP


Executive Vice President, B ruce Power (7/17 to 3/19) - Senior executive responsible for the EPC projects associated with Bruce Power generating station located in Ontario Canada. Bruce Power operates eight nuclear reactors, generating a total of 6.8GW. Primary responsibilities included the setup and refurbishment of six units as well as the ongoing operation of t he on-line units. Capital project budgets totaled approximately $14B CAD, and annual revenue of the plant was approximately $3.5B CAD.
MANAGER IT
( Staff: 11) 15 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART IT CONSULTANTS, IT (5)
SPECIALISTS, IT (5)
: MANAGER, SECURITY (139) 16 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Security SR SUPERVISOR, SECURITY (3)
SR SUPERVISOR, TRAINING (1)
Trainers (4)
Supervisor, Access Authorization (1)
Superintendent (1)
Access Personnel (3)
SOS B Team (1)
SOS D Team (1)
SOS A Team (1)
SOS E Team (1)
SOS C Team (1)
SSS (4)
Officers (23)
Officers (23)
SSS (4)
Officers (9)
SSS (2)
Officers (23)
SSS (4)
Officers (23)
SSS (4)
Asst, Admin (1)


President of CB&I Facilities, Plant Services, Environment, and Infrastructure (1/16 to 7/17) - Chief executive of the CB&I plant maintenance and facilities services business. The focus of this unit was to perform maintenance and services on approximately 45 of the 99 operating nuclear po wer plants in the US, 70 fossil po wer plants, and approximately 140 chemical, refinery, and LNG processing plants. The business operated out of 70 offices and spanned over four continents. Peak employment of this business was approximately 17,000 peo ple with an annual revenue of approx imately $2.5B.
KELLY D. TRICE EXPERIENCE


==SUMMARY==
Thirty-five years of executive management experience as the chief executive, president, or COO of several large companies with full sales, operational and P&L responsibility, serving on multiple boards for independent or affiliated companies. These companies focus on diverse clients which are international and domestic. The services provided range from environmental cleanup/consultation to maintenance and operation of a variety of plants, and large-scale multibillion-dollar Engineering, Procurement and Construction (EPC) programs. The clients include utilities, nuclear power plants, refineries, LNG plants, chemical plants, coal-fired power plants, and combined cycle power plants. Other experience includes deal/contract negotiation, financial management, restructuring and turnaround, and M&A.
President, Holtec International, Nuclear Generation and Decommissioning (3/19 to present) - Served as the chief executive and president of CDI LLC (3/19-8/21), then chief executive and president of HDI LLC (8/21-8/23) before being promoted to the current role. This role includes the P&L responsibility for Holtec International and its subsidiaries, the ambitious restart of the Palisades Energy Center after a year of shutdown, the small modular reactor (SMR) program for design completion, licensing, and ultimate construction/fabrication, as well as the decommissioning of the Oyster Creek Nuclear Station, Pilgrim Nuclear Station, and the Indian Point Energy Center. In total there are five large-scale power reactors in decommissioning plus the restart of Palisades from a decommissioning status, and deployment of SMRs throughout the world. Key duties include executive committee member, DOE loan program negotiation/approval, Michigan grant legislation/approval, and associated political interfaces, as well as SMR deployment throughout the world (including Ukraine during the Russian aggression.)
Executive Vice President, Bruce Power (7/17 to 3/19) - Senior executive responsible for the EPC projects associated with Bruce Power generating station located in Ontario Canada. Bruce Power operates eight nuclear reactors, generating a total of 6.8GW. Primary responsibilities included the setup and refurbishment of six units as well as the ongoing operation of the on-line units. Capital project budgets totaled approximately $14B CAD, and annual revenue of the plant was approximately $3.5B CAD.
President of CB&I Facilities, Plant Services, Environment, and Infrastructure (1/16 to 7/17) - Chief executive of the CB&I plant maintenance and facilities services business. The focus of this unit was to perform maintenance and services on approximately 45 of the 99 operating nuclear power plants in the US, 70 fossil power plants, and approximately 140 chemical, refinery, and LNG processing plants. The business operated out of 70 offices and spanned over four continents. Peak employment of this business was approximately 17,000 people with an annual revenue of approximately $2.5B.
President of CB&I Power (11/14 to 1/16) - Chief executive for the power business unit of CB&I. This business unit posted annual revenue of approximately $3.5B with a backlog of approximately $10B and employed 12,000 people working in the US, Europe, and China. Projects included an assortment of engineering design efforts, construction of combined-cycle power plants, and nine nuclear plants. Led a complex divestiture of the nuclear power unit and consolidated the fossil power business with CB&Is oil and gas unit.
President of CB&I Power (11/14 to 1/16) - Chief executive for the power business unit of CB&I. This business unit posted annual revenue of approximately $3.5B with a backlog of approximately $10B and employed 12,000 people working in the US, Europe, and China. Projects included an assortment of engineering design efforts, construction of combined-cycle power plants, and nine nuclear plants. Led a complex divestiture of the nuclear power unit and consolidated the fossil power business with CB&Is oil and gas unit.
 
President and CEO of CB&I Project Services Group LLC (2/12 to 7/15) - Chief executive responsible for the nuclear business line, including mega-projects in China, Vogtle, and VC Summer (8 new nuclear plants under construction simultaneously) as well as a 9th nuclear plant under construction called the Mixed Oxide Fuel Fabrication Facility. The total value of the nuclear plants under construction was approximately $25B. The CPSG LLC was established as a proxy entity to satisfy government regulations associated with the foreign ownership and control when dealing with special nuclear materials.  
President and CEO of CB&I Project Services Group LLC (2/12 to 7/15) - Chief executive responsible for the nuclear business line, including mega-projects in China, Vogtle, and VC Summer (8 new nuclear plants under construction simultaneously) as well as a 9th nuclear plant under construction called the Mixed Oxide Fuel Fabrication Facility. The total value of the nuclear plants under construction was approximately $25B. The CPSG LLC was established as a proxy entity to satisfy government regulations associated with the foreign ownership and control when dealing with special nuclear materials.


President and CEO of CB&I AREVA MOX Services LLC (4/09 to 11/14)- Responsible for all aspects of the CB&I AREVA MOX Services LLC operation including construction, design, startup, and operation of the mixed oxide fuel fabrication facility and its supporting buildings and infrastructure. This project was an $8.5B effort with follow-on operations totaling approximately $12B. Its purpose was to implement a treaty that the US signed with the Russian Federation to eliminate 68 metric tons of plutonium (17,000 weapons) from the world inventory and process this material into nuclear reactor fuel for commercial sales and usage.
President and CEO of CB&I AREVA MOX Services LLC (4/09 to 11/14)- Responsible for all aspects of the CB&I AREVA MOX Services LLC operation including construction, design, startup, and operation of the mixed oxide fuel fabrication facility and its supporting buildings and infrastructure. This project was an $8.5B effort with follow-on operations totaling approximately $12B. Its purpose was to implement a treaty that the US signed with the Russian Federation to eliminate 68 metric tons of plutonium (17,000 weapons) from the world inventory and process this material into nuclear reactor fuel for commercial sales and usage.
Vice President/Deputy General Manager of East Tennessee Technology Park (4/04 to 4/09) - Large EPC contract for the operation, construction, decommissioning, and reindustrialization of the East Tennessee Technology Park. The project was a $4.0B effort.
Vice President/Deputy General Manager of East Tennessee Technology Park (4/04 to 4/09) - Large EPC contract for the operation, construction, decommissioning, and reindustrialization of the East Tennessee Technology Park. The project was a $4.0B effort.
 
Vice President Kaiser-Hill LLC (1997-4/04) - Large EPC contract for the ultimate closure of the Rocky Flats Technology Site located in Golden, Colorado. The total project was a $7.0B effort and involved over 6,300 people at peak operation. Key responsibilities included infrastructure management, construction of all support facilities, demolition of over 700 structures, and management of all nuclear operations as well as the decommissioning of the main plutonium process buildings (771, 371, 779, 776 and 707). The project was completed one year ahead of schedule and approximately $1.0B under budget.
Vice President Kaiser-Hill LLC (1997-4/04) - Large EPC contract for the ultimate closure of the Rocky Flats Technology Site located in Golden, Colorado. The total project was a $7.0B effort and involved over 6,300 people at peak operation. Key responsibilities included infrastructure management, construction of all support facilities, demolition of over 700 structures, and management of all nuclear operation s as well as the decommissioning of the main plutonium process buildings (771, 37 1, 779, 776 and 707). The project was completed one year ahead of schedule and approximately $1.0B under budget.
 
Project Director/Senior Project Manager of various Projects throughout the United States (1990-1997) - Directly managed many EPC projects. The largest of these projects was a $1.5B effort, supervising approximately 700 personnel at the Hanford reservation in Richland, Washington. Directly responsible for the decommissioning of several nuclear reactors and buildings, landfill operations, and numerous environmental cleanup sites. On other projects, key responsibilities included construction of various buildings, engineering and construction of waste processing plants, construction of utilities and infrastructure, excavation of buried wastes, and termination of several NRC licenses.
Project Director/Senior Project Manager of various Projects throughout the United States (1990-1997) - Directly managed many EPC projects. The largest of these projects was a $1.5B effort, supervising approximately 700 personnel at the Hanford reservation in Richland, Washington. Directly responsible for the decommissioning of several nuclear reactors and buildings, landfill operations, and numerous environmental cleanup sites. On other projects, key responsibilities included construction of various buildings, engineering and construction of waste processing plants, construction of utilities and infrastructure, excavation of buried wastes, and termination of several NRC licenses.
Lieutenant, U.S. Navy, Submarines (Nuclear), Charleston, SC (1985-1990) - Served as head of six divisions. Responsible for the operation, maintenance, and testing of all submarine sonar equipment, weapons systems, and nuclear propulsion systems.
Lieutenant, U.S. Navy, Submarines (Nuclear), Charleston, SC (1985-1990) - Served as head of six divisions. Responsible for the operation, maintenance, and testing of all submarine sonar equipment, weapons systems, and nuclear propulsion systems.
 
EDUCATION 1997 MBA University of New Mexico 1987 Nuclear Prototype, Nuclear Power School, Idaho Falls, ID 1986 Nuclear Engineering, Nuclear Power School, Orlando, FL 1985 BS Chemical Engineering (Honors), University of Oklahoma SECURITY CLEARANCE DOE, Q Clearance, Inactive DOD, TS, SIOP, ESI, NATO, Inactive (Served as Lieutenant U.S. Navy, Submarines)
EDUCATION 1997 MBA University of New Mexico 1987 Nuclear Prototype, Nuclear Power School, Idaho Falls, ID 1986 Nuclear Engineering, Nuclear Power School, Orlando, FL 1985 BS Chemical Engineering (Honors), University of Oklahoma
 
SECURITY CLEARANCE DOE, Q Clearance, Inactive DOD, TS, SIOP, ESI, NATO, Inactive (Served as Lieutenant U.S. Navy, Submarines)
 
EMPLOYMENT HISTORY March 2019-Present President Holtec Nuclear Generation and Decommissioning 2017-March 2019 Executive Vice President, Bruce Power 2009-2017 President and CEO, CB&I (Several Business Units) 2004-2009 Vice President/Deputy General Manager, Bechtel National Inc.
EMPLOYMENT HISTORY March 2019-Present President Holtec Nuclear Generation and Decommissioning 2017-March 2019 Executive Vice President, Bruce Power 2009-2017 President and CEO, CB&I (Several Business Units) 2004-2009 Vice President/Deputy General Manager, Bechtel National Inc.
1997-2004 Vice President, CH2M Hill (Kaiser Hill LLC)
1997-2004 Vice President, CH2M Hill (Kaiser Hill LLC)  
RICHARD J. BURRONI
 
traiiteHigled ovphn leader h exerears ory 4ief Ew0ce ineeri ynnnitegn, Mainagnce, Opnder, an Decoatiosinms.ismiongn


Holtec International 8/14/2023 - Present Chief Nuclear Officer x Lead the organizational, regulatory, and programmatic efforts required to restart the Palisades Nuclear Plant by ensuring regulatory, operational, organ izational, and environmental compliance with federal, state, and local requirements in accordance with industry norms and standards. This position will serve as Holtecs principal interface with the NRC, Institute of Nuclear Power Operations (INPO), Nuclear Energy Institute (NEI), and other stakeholders on emerging nuclear issues and challenges.
RICHARD J. BURRONI Highly trained leader with over 40 years of experience in Engineering, Maintenance, Operations, and Decommissioning.
Holtec Decommissioning International 6/1/2020 - 8/14/2023 Cndian Point Enernter geIy Site Vice President x Responsible for implementing the prompt decomm philosophy to decommission the IPEC facility in a safe, prompt, and thorough manner. This role provides direction and oversite in daily and critical path activities.
Holtec International 8/14/2023 - Present Chief Nuclear Officer x
Lead the organizational, regulatory, and programmatic efforts required to restart the Palisades Nuclear Plant by ensuring regulatory, operational, organizational, and environmental compliance with federal, state, and local requirements in accordance with industry norms and standards. This position will serve as Holtecs principal interface with the NRC, Institute of Nuclear Power Operations (INPO), Nuclear Energy Institute (NEI), and other stakeholders on emerging nuclear issues and challenges.
Holtec Decommissioning International 6/1/2020 - 8/14/2023 Indian Point Energy Center Site Vice President x
Responsible for implementing the prompt decomm philosophy to decommission the IPEC facility in a safe, prompt, and thorough manner. This role provides direction and oversite in daily and critical path activities.
x Budget management of the IPEC decommissioning trust fund allotments to ensure regulatory compliance and fiscally responsible project controls.
x Budget management of the IPEC decommissioning trust fund allotments to ensure regulatory compliance and fiscally responsible project controls.
x Direct outreach and communication with internal and external stakeholders, state officials, and local politicians in addition to regulators to ensure issues and concerns are well understood and resolved.
x Direct outreach and communication with internal and external stakeholders, state officials, and local politicians in addition to regulators to ensure issues and concerns are well understood and resolved.
Entergy Nuclear Northaste 1/2017 - 6/1/2020 Indian Point Energy Center Director of Special Projects x Lee IPed License Re thECan towl teap colete te renmheqiremts tomuit t pertie coronit 2huned Un thm Mug op ofherationay Mahgyrouh 3 ti2021.tnd U2020 an x Led a cross-funct ional tea m from IPEC, Entergys Corporate Office, and Holtec employees to prepare the IPEC site for the transition to decommissioning by ensuring all operational, regulatory, programmatic, environmental, and personnel requirements for the successful transfer of the operating license from Entergy to Holtec was accomplished in a professional and timely manner.
Entergy Nuclear Northeast 1/2017 - 6/1/2020 Indian Point Energy Center Director of Special Projects x
Engineering Director 1/2014 - 1/2017 x Responsible for the delivery of safe, reliable, and timely engineering support at the IPEC. Responsible for maintaining the plant design bases, equipment reliability through preventive maintenance, and optimization and plant system health through aggressive predictive programs and system monitoring.
Led the IPEC License Renewal team to complete the requirements to permit the continued operation of Unit 2 through May 2020 and Unit 3 through May 2021.
Entergy Nuclear Northaste 10/2012 - 1/2014 White Plains Corporate Office Chief Engineer / Corporate Functional Area Manager x Pelidr enoviedygeerin a timngdcal sn techipnuptort toe En the rgy Fleet ( total). 1tai0 sites ineMaindnnce o cogizanfeky tseseccritical isat auhfted plant operation and supported the Entergy sites as necessary. Worked with Engineering Managers f across the fleet to establish goals and responsibilities to achieve the highest level of performance within the industry.
x Led a cross-functional team from IPEC, Entergys Corporate Office, and Holtec employees to prepare the IPEC site for the transition to decommissioning by ensuring all operational, regulatory, programmatic, environmental, and personnel requirements for the successful transfer of the operating license from Entergy to Holtec was accomplished in a professional and timely manner.
Engineering Director 1/2014 - 1/2017 x
Responsible for the delivery of safe, reliable, and timely engineering support at the IPEC. Responsible for maintaining the plant design bases, equipment reliability through preventive maintenance, and optimization and plant system health through aggressive predictive programs and system monitoring.
Entergy Nuclear Northeast 10/2012 - 1/2014 White Plains Corporate Office Chief Engineer / Corporate Functional Area Manager x
Provided timely engineering and technical support to the Entergy Fleet (10 sites in total). Maintained cognizance of key critical issues that affected plant operation and supported the Entergy sites as necessary. Worked with Engineering Managers across the fleet to establish goals and responsibilities to achieve the highest level of performance within the industry.
Performed periodic assessments of engineering activities and performance; developed reports and submitted to senior management as required.
Performed periodic assessments of engineering activities and performance; developed reports and submitted to senior management as required.
Entergy Nuclear Northeast 10/2006 - 10/2012 Indian Point Energy Center Engineering Manager - S ystems, Programs & Components x Manager to ofsepawrate engieernin fucgtionns driecting a dedca ted team of over 70 engineers in total, focusing on system i and plant component health. Engaged daily with various site departments in the resolution of plant issues to ensure station reliability. Active in initiatives relative to the improvement of system and component health across the fleet. Engaged routinely with industry regulators to address station and system concerns.
Entergy Nuclear Northeast 10/2006 - 10/2012 Indian Point Energy Center Engineering Manager - Systems, Programs & Components x
Assistant Operations Manager - Support 01/2005 - 10/2006 x Responsibilities and duties include the management of those Operations Department personnel responsible for procedure development and maintenance in addition to ensuring accuracy in response to issues noted in the site corrective action program.
Manager of two separate engineering functions directing a dedicated team of over 70 engineers in total, focusing on system and plant component health. Engaged daily with various site departments in the resolution of plant issues to ensure station reliability. Active in initiatives relative to the improvement of system and component health across the fleet. Engaged routinely with industry regulators to address station and system concerns.
Assistant Operations Manager - Support 01/2005 - 10/2006 x
Responsibilities and duties include the management of those Operations Department personnel responsible for procedure development and maintenance in addition to ensuring accuracy in response to issues noted in the site corrective action program.  


Entergy Nuclear Northeast / New York Power 09/1991 - 12/2004 Authority Indian Point Energy Center (Transition Period)
Entergy Nuclear Northeast / New York Power Authority 09/1991 - 12/2004 Indian Point Energy Center (Transition Period)
Instrument & Control Department Management x Star thtedis d ineepat as artn Enimneger Snpingisoeurv cr inep 8 co ooeargfhnt enimneegn darrose pris tiehuymesrwe tow otor iitresnmntatuanealormo hice.d perftnn anmh x Transitioed toager t Mann ofC Depheare I&t, tirst at Unimfn 3t, then Unit 2, and finally at both Units following the merger directed by Entergy. The merger resulted in a staff of approximately 80 plant personnel. Focus was on integrating I&C personnel from both units to increase the efficiency/flexibili ty of the department. Success was noted in the integrated procedure group, training program, increased instrumentation reliability and performance, and outage work force.
Instrument & Control Department Management x
Started in this department as an Engineering Supervisor in charge of 8 component engineers whose primary duties were to monitor instrumentation health and performance.
x Transitioned to Manager of the I&C Department, first at Unit 3, then Unit 2, and finally at both Units following the merger directed by Entergy. The merger resulted in a staff of approximately 80 plant personnel. Focus was on integrating I&C personnel from both units to increase the efficiency/flexibility of the department. Success was noted in the integrated procedure group, training program, increased instrumentation reliability and performance, and outage work force.
New York Power Authority 09/ 1990 - 09/1991 Indian Point 3 NPP Engineering Supervisor: Performance Dept.
New York Power Authority 09/ 1990 - 09/1991 Indian Point 3 NPP Engineering Supervisor: Performance Dept.
x Responsibilities included the supervision of 8 Performance Dept. Engineers. Duties included the revision and development of plant surveillance test procedures, in addition to the development of post-work test requirements following plant maintenance and modification activities.
x Responsibilities included the supervision of 8 Performance Dept. Engineers. Duties included the revision and development of plant surveillance test procedures, in addition to the development of post-work test requirements following plant maintenance and modification activities.
Engineer: Technical Services Dept. 06/1980 - 09/1991 x During this +10-year period, p rog ressed from an Assistant Plant Electrical Engineer to Senior Plant Engineer II. Duties included the preparation of engineering modifications and procedures, as well as providing responses to technical concerns raised by regulatory agencies and station audits.
Engineer: Technical Services Dept.
06/1980 - 09/1991 x
During this +10-year period, progressed from an Assistant Plant Electrical Engineer to Senior Plant Engineer II. Duties included the preparation of engineering modifications and procedures, as well as providing responses to technical concerns raised by regulatory agencies and station audits.
x Was afforded the opportunity to attend Senior Reactor Operator (SRO) training during this time period and received an SRO license in April 1986.
x Was afforded the opportunity to attend Senior Reactor Operator (SRO) training during this time period and received an SRO license in April 1986.
EDUCATION / LICENSES:
EDUCATION / LICENSES:
New York Inst. of Technology - Old Westbury, NY (B.S. Electrical En gineering) 1976 - 1980 Pace University - Pleasantville, NY (M.S. Ma nagement Science) 1992 - 1994 Nuclear Regulatory Commission - Senior Reactor Operator License (SOP -10482) 1986 - 1988
New York Inst. of Technology - Old Westbury, NY (B.S. Electrical Engineering) 1976 - 1980 Pace University - Pleasantville, NY (M.S. Management Science) 1992 - 1994 Nuclear Regulatory Commission - Senior Reactor Operator License (SOP-10482) 1986 - 1988 INDUSTRY / SITE INVOLVEMENT:
 
x Involved in numerous INPO Assessment visits as both an Industry and Host Peer.
ENT:VOLVEM / SITE INSUTRYIND x In INPserouoO numlvesed insi IAsv asent vsts animdu asr bothtsnd Ho Pntsyeer.
x INPO Senior Nuclear Plant Mangers course in the spring 2010.
x INP SenioOclear Pr Nulant Merangrs coe spse iur th 20ingn10.
x Member of the Pressurized Water Reactor Owners Group (PWROG) - member of the System Engineering and Equipment Subcommittee as well as the Management Committee.
x Mee Pb ther oressfrizedum Water Reactorer Grp Onsou (PwWbOG) -eerR t oe Smfsthm Enyipe andgeerinin Equgemmt n bSucottee aimell as tsme whManageemt Conittee.mm x Heldtap Ouedp Sueg Eort ancern Pgm alylannin roles ingl ofe p thositios nonted abe ov
x Held Outage Support and Emergency Planning roles in all of the positions noted above
 
JEAN A. FLEMING


FlemingJean@hotmail.com PROFESSIONAL  
JEAN A. FLEMING FlemingJean@hotmail.com PROFESSIONAL  


==SUMMARY==
==SUMMARY==
Highly trained leader with over 18 year s of experience in nuclear regulatory assu rance and licensing, decommissioning licensing and compliance, nuclear power plant operations, work management, and emergency preparedness.
Highly trained leader with over 18 years of experience in nuclear regulatory assurance and licensing, decommissioning licensing and compliance, nuclear power plant operations, work management, and emergency preparedness.
EXPERIENCE HIGHLIGHTS Holtec International - Camden, New Jersey Vice President of Licensing, Regulatory and Probabilistic Safety Analysis (PSA) (2021 - Present) x Responsible for federal, state, and local licensing, environmental and regulatory compliance for five Holtec Decommissioning International, LLC (HDI) nuclear sites, nuclear dry storage and transport cask licensing, small modular reactor (SMR-160) pre-application engagemen t and licensing activities, and PSA activities.
EXPERIENCE HIGHLIGHTS Holtec International - Camden, New Jersey Vice President of Licensing, Regulatory and Probabilistic Safety Analysis (PSA) (2021 - Present) x Responsible for federal, state, and local licensing, environmental and regulatory compliance for five Holtec Decommissioning International, LLC (HDI) nuclear sites, nuclear dry storage and transport cask licensing, small modular reactor (SMR-160) pre-application engagement and licensing activities, and PSA activities.
x Executive member of Palisades restart project, leading the nuclear regulatory engagement and execution plan to support the regulatory path for restart efforts.
x Executive member of Palisades restart project, leading the nuclear regulatory engagement and execution plan to support the regulatory path for restart efforts.
PSEG - Salem and Hope Creek Nuclear Generating Station - Salem, New Jersey Director of Site Regulat ory Com pliance and Licensing (2017 - 2021) - REGULATORY AFFAIRS
PSEG - Salem and Hope Creek Nuclear Generating Station - Salem, New Jersey Director of Site Regulatory Compliance and Licensing (2017 - 2021) - REGULATORY AFFAIRS
* Responsible for the management of the fleet nuclear regulatory compliance including the strategic management of regulatory relationships and comprehensive assessment of regul atory margin to ensure leadership engag ement with issue response.
* Responsible for the management of the fleet nuclear regulatory compliance including the strategic management of regulatory relationships and comprehensive assessment of regulatory margin to ensure leadership engagement with issue response.
* Direct the preparation, submittal, issuance, and implementation of fleet license amendments and relief requests to the Nuclear Regulatory Commission to enhance the operational flexibility while preserving nuclear safety.
* Direct the preparation, submittal, issuance, and implementation of fleet license amendments and relief requests to the Nuclear Regulatory Commission to enhance the operational flexibility while preserving nuclear safety.
x Engage w ith industry through the nuclear policy organization to address issues that impact the nuclear industry and develop strategies for the timely and efficient resolution of nuclear regulatory issues.
x Engage with industry through the nuclear policy organization to address issues that impact the nuclear industry and develop strategies for the timely and efficient resolution of nuclear regulatory issues.
x Direct the emergenc y preparedness operational a nd communications response teams in response to drill an d actual emergency events.
x Direct the emergency preparedness operational and communications response teams in response to drill and actual emergency events.
x Organized, facilitated, and moderated multiple womens leadership forums to develop and promote diversity, equity and inclusion within PSEG and the nuclear industry.
x Organized, facilitated, and moderated multiple womens leadership forums to develop and promote diversity, equity and inclusion within PSEG and the nuclear industry.
Salem Online Work Management - Operations Work Week Senior Reactor Operator (2013-2017) - OPERATIONS
Salem Online Work Management - Operations Work Week Senior Reactor Operator (2013-2017) - OPERATIONS
* Coordinate the preparation and approval of clearance orders to support scheduled and emergent wor k activities to ensure compliance with regulatory requirements, improve plant safety and equipment reliability, identify risk -significant work, provide operational focus, and ensure production risk analysis is performed for all scheduled work activities.
* Coordinate the preparation and approval of clearance orders to support scheduled and emergent work activities to ensure compliance with regulatory requirements, improve plant safety and equipment reliability, identify risk-significant work, provide operational focus, and ensure production risk analysis is performed for all scheduled work activities.
Salem Control Room Supervisor - Senior Reactor Operator & Shift Technical Advisor (2008-2017) - OPERATIONS
Salem Control Room Supervisor - Senior Reactor Operator & Shift Technical Advisor (2008-2017) - OPERATIONS
* Direct safe and efficient operations by supervising, controlling, and coordinating activities and plant evolutions with emphasis on safety and adherence to established regulations and standards of performance.
* Direct safe and efficient operations by supervising, controlling, and coordinating activities and plant evolutions with emphasis on safety and adherence to established regulations and standards of performance.
* Authorize testing, surveillance and mainte nance on all equipment and systems affecting plant safety or that place the plant in a degraded mode and ensure equipment is properly restored following completion of these activities.
* Authorize testing, surveillance and maintenance on all equipment and systems affecting plant safety or that place the plant in a degraded mode and ensure equipment is properly restored following completion of these activities.
UNITED STATES NAVY - Surface Warfare Officer - Nuclear Operations Officer (Lieutenant, O-3)
UNITED STATES NAVY - Surface Warfare Officer - Nuclear Operations Officer (Lieutenant, O-3)
USS HARRY S. TRUMAN (CVN 75) - Norfolk, Virginia Propulsion Plant Watch Officer & Reactor Laboratories Manager (200 6-2008)
USS HARRY S. TRUMAN (CVN 75) - Norfolk, Virginia Propulsion Plant Watch Officer & Reactor Laboratories Manager (2006-2008)
* Led, trained, and supervised 32+ sailors in nuclear propulsion plant operations and the reactor laboratory divisions.
* Led, trained, and supervised 32+ sailors in nuclear propulsion plant operations and the reactor laboratory divisions.
USS VALLEY FO RGE (C G 50) - San Diego, California Operations Intelligence Division Manager & Public Affairs Officer ( 2003-2004)
USS VALLEY FORGE (CG 50) - San Diego, California Operations Intelligence Division Manager & Public Affairs Officer (2003-2004)
* Led 35 enlisted Operations Specialists onboard a g uided missile cruiser in handling air/surface/subsurface monitoring and intelligence gat hering duties in support of inter-deployment training cycles and a Counter-Drug Smuggling deployment.
* Led 35 enlisted Operations Specialists onboard a guided missile cruiser in handling air/surface/subsurface monitoring and intelligence gathering duties in support of inter-deployment training cycles and a Counter-Drug Smuggling deployment.
 
LICENSES, EDUCATION & TRAINING EXECUTIVE TRAINING PROGRAMS Women in Nuclear - Nuclear Executives of Tomorrow (NEXT) Leadership Program, INPO (2021)
LICENSES, EDUCATION & TRAINING EXECUTIVE TRAINING PROGRAMS Women in Nuclear - Nuclear Executives of Tomorrow (NEXT) Leadership Program, INPO (2021)
Senior Nuclear Plant Management Course, INPO (2019)
Senior Nuclear Plant Management Course, INPO (2019)
Nuclear Regulatory Co mmission Licensed Senior Reactor Operator - Salem Unit 1 and 2 (2010)
Nuclear Regulatory Commission Licensed Senior Reactor Operator - Salem Unit 1 and 2 (2010)
UNITED STATES NAVY S CHOOLS & FORMAL TR AINING PROGRAMS
UNITED STATES NAVY SCHOOLS & FORMAL TRAINING PROGRAMS
* Nuclear Power School and Training Unit, Charleston, South Carolina (2005-2006)
* Nuclear Power School and Training Unit, Charleston, South Carolina (2005-2006)
* Navy Qualified Nuclear Propulsion Plant Watch Officer on A4W and S5W Reactors DREXEL UNIVERSITY - Philadelphia, Pennsylvania Bachelor of Science Degree in Biomedical Engineering (2003) Summa Cum Laude Michael G. Mlynarek Holtec Palisades Site Vice President
* Navy Qualified Nuclear Propulsion Plant Watch Officer on A4W and S5W Reactors DREXEL UNIVERSITY - Philadelphia, Pennsylvania Bachelor of Science Degree in Biomedical Engineering (2003) Summa Cum Laude  
 
Michael G. Mlynarek  


==SUMMARY==
==SUMMARY==
(June 2022 - Present) x Holtec Palisades Site Vice President responsible for strategic planning, resource accountability, organizational effectiveness, and knowledge transfer. Experience and background enable safe, error free, and predictable performance.
(June 2022 - Present)
Holtec Palisades Site Vice President x Holtec Palisades Site Vice President responsible for strategic planning, resource accountability, organizational effectiveness, and knowledge transfer. Experience and background enable safe, error free, and predictable performance.
x Drives competitive positioning through mitigation of internal and external risks and knowledge sharing. Believe mutual performance and accountability amongst a diverse workforce is achieved through effective communication and valuing traditions.
x Drives competitive positioning through mitigation of internal and external risks and knowledge sharing. Believe mutual performance and accountability amongst a diverse workforce is achieved through effective communication and valuing traditions.
x Accomplishments reflect producing empowered, motivated and disciplined teams. Demonstrated success includes establishing team cultures that achieve sustainable results and enable continuous learning and performance improvement. Focus and team development include values and behaviors that leverage high degrees of self-awareness and engagement that drive goal achievement through integrated risk recognition and mitigation including high standards and low thresholds for action and correction. Methods include vertical alignment and horizontal integration of roles and responsibilities.
x Accomplishments reflect producing empowered, motivated and disciplined teams. Demonstrated success includes establishing team cultures that achieve sustainable results and enable continuous learning and performance improvement. Focus and team development include values and behaviors that leverage high degrees of self-awareness and engagement that drive goal achievement through integrated risk recognition and mitigation including high standards and low thresholds for action and correction. Methods include vertical alignment and horizontal integration of roles and responsibilities.
 
LEADERSHIP EXPERIENCE Manager, Decommissioning Planning Organization (DPO) (June 2020 - May 2022) x Responsible for leading the Palisades team through transaction (sale preparation) and transition (operational to post defuel organization). Included managing interface and alignments between Palisades and corporate transaction and transition planning teams and associated functional area change management plans.
LEADERSHIP EXPERIENCE Manager, Decommissioning Planning Organization (DPO) (June 2020 - May 2022) Palisades, MI x Responsible for leading the Palisades team through transaction (sale preparation) and transition (operational to post defuel organization). Included managing interface and alignments between Palisades and corporate transaction and transition planning teams and associated functional area change management plans.
Palisades, MI Manager, Nuclear Independent Oversight (NIOS) (June 2017 - May 2020) x Responsible for corporate independent oversight of Palisades performance including regulatory auditing, quality control, and cross-functional assessment to identify station performance shortfalls and effectively communicate for sustained safe and error free performance.
Manager, Nuclear Independent Oversight (NIOS) (June 2017 - May 2020) Palisades, MI x Responsible for corporate independent oversight of Palisades performance including regulatory auditing, quality control, and cross-functional assessment to identify station performance shortfalls and effectively communicate for sustained safe and error free performance.
x Team Manager for Susquehanna NIEP (Jun18) x Consumers Energy Grid Management Assessment (Mar18)
x Team Manager for Susquehanna NIEP (Jun18) x Consumers Energy Grid Management Assessment (Mar18)
INPO Operations Senior Evaluator & Assistance (June 2015 - June 2017) Atlanta, GA x In addition to primary role evaluating Operations performance, focus was on leadership team organizational effectiveness and driving proficiency principles of worker and team risk recognition and mitigation through self and situational awareness.
Palisades, MI INPO Operations Senior Evaluator & Assistance (June 2015 - June 2017)
Atlanta, GA x In addition to primary role evaluating Operations performance, focus was on leadership team organizational effectiveness and driving proficiency principles of worker and team risk recognition and mitigation through self and situational awareness.
x Cumulative career supporting Nuclear station teams: International (6 stations) - 12 weeks; Domestic (17 stations) - 33 weeks Organizations evaluated & supported:
x Cumulative career supporting Nuclear station teams: International (6 stations) - 12 weeks; Domestic (17 stations) - 33 weeks Organizations evaluated & supported:
x Wolf Creek / Vogel 1&2 / Turkey Point / Byron / Harris / Kozloduy, Bulgaria / Oconee / Millstone / Fessenheim, France / Davis Besse / Barakah, UAE / Olkiluoto, Finland / Three Mile Island / Sequoyah x Higashidori, Japan (WANO/JANSI - first Japanese Peer Review; 2013) Braidwood (WANO Mid-Cycle; 2010) /
x Wolf Creek / Vogel 1&2 / Turkey Point / Byron / Harris / Kozloduy, Bulgaria / Oconee / Millstone / Fessenheim, France / Davis Besse / Barakah, UAE / Olkiluoto, Finland / Three Mile Island / Sequoyah x Higashidori, Japan (WANO/JANSI - first Japanese Peer Review; 2013) Braidwood (WANO Mid-Cycle; 2010) /
British Energy Hartlepool Station (WANO Config Cntl; 2009) / River Bend Station (OPS; 2008) / Arkansas Nuclear One (Conduct of Operations; 2008) / Calvert Cliffs (INPO Site Eval; 2006) / Diablo Canyon (INPO Training Accreditation Eval; 2003) / Millstone (INPO Site Eval; 1996) / DC Cook (Conduct of Operations; 1995)
British Energy Hartlepool Station (WANO Config Cntl; 2009) / River Bend Station (OPS; 2008) / Arkansas Nuclear One (Conduct of Operations; 2008) / Calvert Cliffs (INPO Site Eval; 2006) / Diablo Canyon (INPO Training Accreditation Eval; 2003) / Millstone (INPO Site Eval; 1996) / DC Cook (Conduct of Operations; 1995)
Supervisor, Reactor Engineering (November 2013 - May 2015; 1988 - 1992) Palisades, MI x Leadership focus addressed individual and team gaps in behaviors resulting in safe and error free performance.
Supervisor, Reactor Engineering (November 2013 - May 2015; 1988 - 1992) x Managed station alignments with NRC region and Entergy corporate fuels group for self-identified Spent Fuel Pool criticality non-conformances.
x Managed station alignments with NRC region and Entergy corporate fuels group for self-identified Spent Fuel Pool criticality non-conformances.
Palisades, MI x Leadership focus addressed individual and team gaps in behaviors resulting in safe and error free performance.
Manager, Chemistry (July 2011 - October 2013) Palisades, MI x Leadership focus corrected staff and technician individual and team significant gaps in behaviors. This resulted in safe and error free performance.
Manager, Chemistry (July 2011 - October 2013) x Leadership focus corrected staff and technician individual and team significant gaps in behaviors. This resulted in safe and error free performance.
x Results recognized by INPO Chemistry Manager in 2017 as industry leading and sustained performance.
x Results recognized by INPO Chemistry Manager in 2017 as industry leading and sustained performance.
x Gained proficiency in radiological and non-radiological environmental programs.
x Gained proficiency in radiological and non-radiological environmental programs.
Shift Manager, Operations (January 2000 - June 2011) Palisades, MI x Focus on individual and crew team performance including reputation for correcting people-problem issues.
Palisades, MI
 
Shift Manager, Operations (January 2000 - June 2011)
Palisades, MI x Reestablished Operations Training Accreditation after station-imposed probation, 2000-2002.
x Focus on individual and crew team performance including reputation for correcting people-problem issues.
x Station achieved INPO 1 performance, 2010.
x Station achieved INPO 1 performance, 2010.
x Day shift Operations Manager, R021: Station achieved best in Entergy fleet refueling outage performance for safety and duration, 2010.
x Day shift Operations Manager, R021: Station achieved best in Entergy fleet refueling outage performance for safety and duration, 2010.
x Reestablished Operations Training Accreditation after station-imposed probation, 2000-2002.
Control Room Supervisor, Operations (1995 - 1999) x First Engineer to assume position. Established crew role clarification and performance optimization for all modes of plant operation including Simulator training and evaluation.
Control Room Supervisor, Operations (1995 - 1999) Palisades, MI x First Engineer to assume position. Established crew role clarification and performance optimization for all modes of plant operation including Simulator training and evaluation.
x Developed and implemented SE/STA Training program focusing on oversight roles, responsibilities (1996).
x Developed and implemented SE/STA Training program focusing on oversight roles, responsibilities (1996).
 
Palisades, MI PROJECT MANAGEMENT EXPERIENCE Project Management Professional (PMP) Training (2006)
PROJECT MANAGEMENT EXPERIENCE Project Management Professional (PMP) Training (20 06) Grand Rapids, MI x Six-week course encompassing fundamentals of effective project management controls.
Grand Rapids, MI x Six-week course encompassing fundamentals of effective project management controls.
Work Control Center (WCC) Supervisor (2005) Palisades, MI x First Operations single point responsible for WCC implementation including work week protocol and execution. Palisades, MI Safety Committee Chair (2005) x Established station system for safety work order prioritization and execution.
Work Control Center (WCC) Supervisor (2005) x First Operations single point responsible for WCC implementation including work week protocol and execution.
Manager, Operations Training Excellence Program (2000 - 2002) Palisades, MI x Led team responsible for re-validation of the six Operations Accredited Training Programs. Included establishment of standards and ownership culture between line and training personnel.
Safety Committee Chair (2005) x Established station system for safety work order prioritization and execution.
Reactor Engineer (1985 - 1988) Big Rock Point, MI x Procured and implemented industry first design for hafnium tipped control blades.
Manager, Operations Training Excellence Program (2000 - 2002) x Led team responsible for re-validation of the six Operations Accredited Training Programs. Included establishment of standards and ownership culture between line and training personnel.
Reactor Engineer (1985 - 1988) x Procured and implemented industry first design for hafnium tipped control blades.
x Managed logistics associated with industry-first demonstration of mixed-oxide fuel.
x Managed logistics associated with industry-first demonstration of mixed-oxide fuel.
 
EDUCATION Big Rock Point, MI Palisades, MI Palisades, MI Palisades, MI Aquinas College Grand Rapids, MI x Masters in Management (1999)
EDUCATION Aquinas College Grand Rapids, MI x Masters in Management (1999)
University of Michigan - School of Engineering Ann Arbor, MI x Bachelor of Science in Nuclear Engineering (1985)
University of Michigan - School of Engineering Ann Arbor, MI x Bachelor of Science in Nuclear Engineering (1985)
 
LICENSE AND CERTIFICATIONS State of Michigan Professional Engineering License (1992 - Present)  
LICENSE AND CERTIFICATIONS State of Michigan Professional Engineering License (1992 - Present)
#102198891 NRC Senior Reactor Operator License (1994-2011)
#102198891 NRC Senior Reactor Operator License (1994-2011)
 
ADDITIONAL Evans Scholarship recipient: Four years tuition / housing at University of Michigan Professional  
ADDITIONAL Evans Scholarship recipient: Four years tuition / housing at University of Michigan Professional  


==References:==
==References:==
Available upon request Attachment E
Available upon request  
 
Regulatory Commitments
 
This table ident ifies actions discussed in this Applicat ion for which, upon approval, Holtec Decommissio ning Internat ional, LLC (HDI), Holtec Palisades, LLC (Ho ltec Palisades), or Palisades Energy, LLC (OPCO) commits to perform. Any other actions discussed in this submitt al are descr ibed for t he U.S. Nuclear Regulatory Commissio ns (NRC) infor mat ion and are not commit me nt s.
 
TYPE SCHEDULED (Check One) COMPLETION COMMITMENT DATE ONE-TIME CONTINUING (If Required)
ACTION COMPLIANCE
 
HDI will pr ovide n otice of th e plann ed X cl osi n g dat e for proposed tr an sa ct i on At least five business days an d tr an sfer of oper a t in g auth or i t y so before the planned that NRC can issue the license tr an sfer date.
amendment.
 
OPCO will provide to NRC proof that X on-site property damage insurance coverage an d off-site n uclear liability At least five business days coverage, as required by NRC, has before the planned been obtained and that coverage will be tr an sfer date.
in place on the effective date of th e tr an sfer.
 
HDI will pr ovide evidence that the X Holtec Palisades has provided sufficient financial assurance for At least five business days decommissioning to satisfy th e before the planned r equir em ents appli cable to an oper ating tr an sfer date.
reactor pursuant to 10 CFR 50.75 and 72.30.
 
HDI will pr ovide evidence that the X PNP or ganization meets th e staffin g At least five business days an d qualification r equir emen ts set for th before the planned in the power opera ti on s Technical tr an sfer date.
Specifications, Physical Security Plan, Emergency Plan, QAPM, and UFSAR.


Encl. 1 At t. E p.1 ENCLOSURE 2
Encl. 1 Att. E p.1 Attachment E Regulatory Commitments This table identifies actions discussed in this Application for which, upon approval, Holtec Decommissioning International, LLC (HDI), Holtec Palisades, LLC (Holtec Palisades), or Palisades Energy, LLC (OPCO) commits to perform. Any other actions discussed in this submittal are described for the U.S. Nuclear Regulatory Commissions (NRC) information and are not commitments.
COMMITMENT TYPE (Check One)
SCHEDULED COMPLETION DATE (If Required)
ONE-TIME ACTION CONTINUING COMPLIANCE HDI will provide notice of the planned closing date for proposed transaction and transfer of operating authority so that NRC can issue the license amendment.
X At least five business days before the planned transfer date.
OPCO will provide to NRC proof that on-site property damage insurance coverage and off-site nuclear liability coverage, as required by NRC, has been obtained and that coverage will be in place on the effective date of the transfer.
X At least five business days before the planned transfer date.
HDI will provide evidence that the Holtec Palisades has provided sufficient financial assurance for decommissioning to satisfy the requirements applicable to an operating reactor pursuant to 10 CFR 50.75 and 72.30.
X At least five business days before the planned transfer date.
HDI will provide evidence that the PNP organization meets the staffing and qualification requirements set forth in the power operations Technical Specifications, Physical Security Plan, Emergency Plan, QAPM, and UFSAR.
X At least five business days before the planned transfer date.


AFFIDAVIT OF JASON DAY SUPPORTING HOLTEC DECOMMISSIONING INTERNATIONAL, LLCS APPLICATION TO WITHHOLD CERTAIN DOCUMENTS FROM PUBLIC DISCLOSURE
Encl. 2 p.1 ENCLOSURE 2 AFFIDAVIT OF JASON DAY SUPPORTING HOLTEC DECOMMISSIONING INTERNATIONAL, LLCS APPLICATION TO WITHHOLD CERTAIN DOCUMENTS FROM PUBLIC DISCLOSURE I, Jason Day, General Counsel for Holtec Decommissioning International, LLC (HDI), declare the following under penalty of perjury:
 
: 1. I am authorized to execute this declaration on behalf of HDI, for itself and Holtec International, Holtec Palisades, LLC, and Palisades Energy, LLC (collectively Holtec).
I, Jason Day, General Counsel fo r Holt ec Decommissio ning I nt ernational, LLC ( HDI), declare t he fo llowing under penalt y o f per jur y:
: 2. Holtec is providing information to the U.S. Nuclear Regulatory Commission (NRC) in support of their Application for Order Consenting to Transfer of License. The proprietary version of Enclosures 3A and 4A of this submittal contains financial information, including pro forma income statements, related to anticipated revenues from sales of electricity and capacity from the Palisades Nuclear Plant, as well as plant operating and maintenance costs and internal financial information related to the ultimate parent company. These documents constitute proprietary commercial and financial information that should be held in confidence by NRC pursuant to the policy reflected in 10 CFR 2.390(a)(4) because:
: 1. I am authorized to execute this declarat ion on behalf of HDI, for itself and Holtec Int ernat ional, Holt ec Palisades, LLC, and Palisades Energy, LLC (co llect ively Ho lt ec).
a.
: 2. Holtec is providing infor mat ion to the U.S. Nuclear Regulatory Co mmissio n ( NRC) in support o f t heir App licat io n for Order Co nsent ing to Transfer of License. The pro priet ar y versio n o f Enc lo sures 3 A and 4 A o f t his su bmit t al co nt ains financ ia l in fo r mat io n, inc lud in g pro forma inco me st atement s, relat ed to ant icipated revenues fro m sales of electr icit y and capacit y fro m t he Palisades Nuclear P la nt, as well as p lant o perat ing and maint ena nce cost s and internal financial information related to the ultimate parent company. These do cume nt s const it ut e pro priet ary co mmerc ia l a nd financ ia l info r mat io n t hat sho uld be he ld in confidence by NRC pursuant to t he policy reflect ed in 10 CFR 2.390(a)(4) because:
They contain information that is held in confidence by Holtec and their affiliates.
: a. They cont ain info r mat io n t hat is held in confid ence by Ho lt ec and their affiliates.
: b. This information is of a type that is customarily held in confidence by Holtec and their affiliates and the information contains sensitive financial competitive information concerning Holtecs anticipated revenues and operating expenses.
: b. T his info r mat io n is of a type that is cust o mar ily he ld in co nfide nce by Ho lt ec and their affiliates and the information contains sensitive financial competitive infor mat io n concer ning Holt ecs ant icipated revenues and operating expenses.
c.
: c. This infor mation is being t ransmit t ed to NRC in confidence.
This information is being transmitted to NRC in confidence.
: d. This info r mat io n is no t available in pu blic so urces and co u ld no t be gat hered readil y fro m public ly available infor mat ion.
: d. This information is not available in public sources and could not be gathered readily from publicly available information.
: e. Public disclo sure of t his infor mat io n would create subst ant ial financial har m t o t he compet it ive position of Holtec and their affiliates by disclosing their internal financial and co mmercial info r mat io n to other parties whose commercial int erest s may be adver se to t ho se o f Ho lt ec.
e.
Public disclosure of this information would create substantial financial harm to the competitive position of Holtec and their affiliates by disclosing their internal financial and commercial information to other parties whose commercial interests may be adverse to those of Holtec.
: 3. Accordingly, Holtec requests that Enclosures 3A and 4A be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4).
: 3. Accordingly, Holtec requests that Enclosures 3A and 4A be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4).
: 4. Ho lt ec also request s t hat t he cit iz e nship info r mat io n co nt a ined in E nc lo sure 1A be w it hhe ld fro m public disclo sure to protect t he personal informat io n of the individuals list ed therein.
: 4. Holtec also requests that the citizenship information contained in Enclosure 1A be withheld from public disclosure to protect the personal information of the individuals listed therein.
The disclo sure of this information would const itute a clearly unwarranted invasion o f personal privacy, and as such Ho ltec requests that the infor mat ion be wit hheld under 10 CFR 2.390(a)(6).
The disclosure of this information would constitute a clearly unwarranted invasion of personal privacy, and as such Holtec requests that the information be withheld under 10 CFR 2.390(a)(6).  
 
Encl. 2 p.1 I declare that the foregoing is true and correct.


I declare that the foregoing is true and correct.
{
{
Executed on December iO, 2023.
Executed on December iO, 2023.
Jason Day General Counsel Encl. 2 p.2


Jason Day General Counsel
Encl. 3 p.1 ENCLOSURE 3 PROJECTED INCOME STATEMENT AND OPENING BALANCE SHEET OF HOLTEC PALISADES, LLC (NON-PROPRIETARY)


Encl. 2 p.2 ENCLOSURE 3
Encl. 3 p.2 Holtec Palisades, LLC Pro Forma Income Statement Base Case Projected Financial Data - Unaudited, Non-GAAP
 
[
PROJECTED INCOME STATEMENT AND OPENING BALANCE SHEET OF HOLTEC PALISADES, LLC (NON-PROPRIETARY)
]
 
Revenue Generation (TW)
Encl. 3 p.1 Holtec Palisades, LLC Pro Forma Income Statement
[  
 
]
Base Case Projected Financial Data - Unaudited, Non-GAAP
Capacity revenue
[]
[  
Revenue Generation (TW) [ ]
]
Capacity revenue [ ]
Energy revenue
Energy revenue [ ]
[
Ancillar y r even ue [ ]
]
Total Revenue [ ]
Ancillary revenue
Expenses Fuel expense [ ]
[
Labor costs [ ]
]
Non-l a bor opera tin g cost s [ ]
Total Revenue
Outage costs [ ]
[  
Property tax [ ]
]
Total Opex [ ]
Expenses Fuel expense
Net Income EBITDA (excl. amortized fuel [ ]
[  
and outage)
]
Depreciation & Amortization [ ]
Labor costs
Operating Income (incl. [ ]
[  
]
Non-labor operating costs [  
]
Outage costs
[  
]
Property tax
[  
]
Total Opex [  
]
Net Income EBITDA (excl. amortized fuel and outage)
[
]
Depreciation & Amortization
[  
]
Operating Income (incl.
amortized fuel and outage)
amortized fuel and outage)
Interest [ ]
[
Income tax [ ]
]
Production tax credits [ ]
Interest [  
Net Income [ ]
]
$ Millions, rounded
Income tax
 
[  
Notes:
]
: 1. [
Production tax credits
]
[  
: 2. Generation volumes reflect historical PNP capacity fact or and 18-month refue ling cycles.
]
: 3. Energy revenue based on energy prices set for th in the Pow er Purch ase Agreemen ts (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperati ve, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.
Net Income
: 4. [
[  
]  
$ Millions, rounded Notes:
1.
[
]
2.
Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles.
3.
Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.
4.
[
]
5.
[  
]
6.
Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.


Encl. 3 p.3 Sensitivity Case - 10% Reduction in Capacity Projected Financial Data - Unaudited, Non-GAAP
[
]
Revenue Generation (TW)
[
]
Capacity revenue
[
]
Energy revenue
[
]
Ancillary revenue
[
  ]
  ]
: 5. [
Total Revenue
]
[  
: 6. Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.
]
 
Expenses Fuel expense
Encl. 3 p.2 Sensitivity Case - 10% Reduction in Capacity Projected Financial Data - Unaudited, Non-GAAP
[  
[ ]
]
Revenue Generation (TW) [ ]
Labor costs
Capacity revenue [ ]
[  
Energy revenue [ ]
]
Ancillar y r even ue [ ]
Non-labor operating costs [  
Total Revenue [ ]
]
Expenses Fuel expense [ ]
Outage costs
Labor costs [ ]
[  
Non-l a bor opera tin g cost s [ ]
]
Outage costs [ ]
Property tax
Property tax [ ]
[  
Total Opex [ ]
]
Net Income EBITDA (excl. amortized fuel [ ]
Total Opex [  
and outage)
]
Depreciation & Amortization [ ]
Net Income EBITDA (excl. amortized fuel and outage)
Operating Income (incl. [ ]
[
]
Depreciation & Amortization
[  
]
Operating Income (incl.
amortized fuel and outage)
amortized fuel and outage)
Interest [ ]
[
Income tax [ ]
]
Production tax credits [ ]
Interest [  
Net Income [ ]
]
$ Millions, rounded
Income tax
 
[  
Notes:
]
: 1. [
Production tax credits
]
[  
: 2. Generation volumes reflect historical PNP capacity fact or and 18-month refueling cycles. Reduced by 10%
]
Net Income
[  
]  
$ Millions, rounded Notes:
1.
[  
]
2.
Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles. Reduced by 10%
to reflect the sensitivity analysis.
to reflect the sensitivity analysis.
: 3. Energy revenue based on energy prices set for th in the Pow er Purch ase Agreemen ts (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperati ve, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.
3.
: 4. [
Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.
4.
[
]
5.
[  
]
6.
Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts. Costs conservatively assumed not to be reduced for this sensitivity study.


Encl. 3 p.4 Sensitivity Case - 10% Reduction in Energy Revenue Projected Financial Data - Unaudited, Non-GAAP
[
]
Revenue Generation (TW)
[
]
Capacity revenue
[
]
Energy revenue
[
]
Ancillary revenue
[
  ]
  ]
: 5. [
Total Revenue
]
[  
: 6. Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts. Costs conservativel y assumed not to be reduced for this sensitivity study.
]
 
Expenses Fuel expense
Encl. 3 p.3 Sensitivity Case - 10% Reduction in Energy Revenue Projected Financial Data - Unaudited, Non-GAAP
[  
[ ]
]
Revenue Generation (TW) [ ]
Labor costs
Capacity revenue [ ]
[  
Energy revenue [ ]
]
Ancillar y r even ue [ ]
Non-labor operating costs [  
Total Revenue [ ]
]
Expenses Fuel expense [ ]
Outage costs
Labor costs [ ]
[  
Non-l a bor opera tin g cost s [ ]
]
Outage costs [ ]
Property tax
Property tax [ ]
[  
Total Opex [ ]
]
Net Income EBITDA (excl. amortized fuel [ ]
Total Opex [  
and outage)
]
Depreciation & Amortization [ ]
Net Income EBITDA (excl. amortized fuel and outage)
Operating Income (incl. [ ]
[
]
Depreciation & Amortization
[  
]
Operating Income (incl.
amortized fuel and outage)
amortized fuel and outage)
Interest [ ]
[
Income tax [ ]
]
Production tax credits [ ]
Interest [  
Net Income [ ]
]
$ Millions, rounded
Income tax
 
[  
Notes:
]
: 1. [
Production tax credits
]
[  
: 2. Generation volumes reflect historical PNP capacity fact or and 18-month refueling cycles. Reduced by 10%
]
Net Income
[  
]  
$ Millions, rounded Notes:
1.
[
]
2.
Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles. Reduced by 10%
to reflect the sensitivity analysis.
to reflect the sensitivity analysis.
: 3. Energy revenue based on energy prices set for th in the Pow er Purch ase Agreemen ts (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperati ve, Inc. and Hoosier Energy Rural Electric Cooperative, Inc., reduced by 10% to illustrate this sensitivity analysis (despite the fact that the PPA pricing is fixed).
3.
: 4. [
Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc., reduced by 10% to illustrate this sensitivity analysis (despite the fact that the PPA pricing is fixed).
 
4.
]
[
: 5. [
]
]
5.
: 6. Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.
[  
 
]
Encl. 3 p.4 Holtec Palisades, LLC Opening Balance Sheet Projected Financial Data - Unaudited, Non-GAAP
6.
 
Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.  
Assets
[ ]
Cash [ ]
Loan Reser ve s / Escro ws []
Acco unt s Rece iva ble [ ]
Tax Receivable [ ]
Plant [ ]
Deferred Outage [ ]
Nuclear Fuel [ ]
Less: Accumulat ed Depreciat ion and [ ]
Amortization
 
Total Assets [ ]


Encl. 3 p.5 Holtec Palisades, LLC Opening Balance Sheet Projected Financial Data - Unaudited, Non-GAAP Assets
[
]
Cash
[
]
Loan Reserves / Escrows
[
]
Accounts Receivable
[
]
Tax Receivable
[
]
Plant
[
]
Deferred Outage
[
]
Nuclear Fuel
[
]
Less: Accumulated Depreciation and Amortization
[
]
Total Assets
[
]
Liabilities and Equity
Liabilities and Equity
[ ]
[  
Liabilities
]
 
Liabilities Accounts Payable
Accounts Payable [ ]
[  
Tax Payable [ ]
]
LPO Debt [ ]
Tax Payable
 
[  
Total liabi lities [ ]
]
Equity
LPO Debt
 
[  
Michigan State Grant [ ]
]
Owner Paid [ ]
Total liabilities
Retained Earning s [ ]
[  
Total Equity [ ]
]
 
Equity Michigan State Grant
Total Liabilities and Equity [ ]
[  
$ Millions, rounded Notes:
]
Owner Paid
[  
]
Retained Earnings
[  
]
Total Equity
[  
]
Total Liabilities and Equity
[  
]  
$ Millions, rounded Notes:
[
[
]


]
Encl. 5 p.1 ENCLOSURE 5 FORM OF OPERATOR SERVICES AGREEMENT BETWEEN HOLTEC PALISADES, LLC AND PALISADES ENERGY, LLC THIS OPERATOR SERVICES AGREEMENT (the Agreement) is effective as of the ___ day of ____,
 
20__, between HOLTEC PALISADES, LLC (Owner), and PALISADES ENERGY, LLC, a Delaware limited liability company (Operator), each a Party and together, Parties to this Agreement.
Encl. 3 p.5 ENCLOSURE 5
R E C I T A L S:
 
a.
FORM OF OPERATOR SERVICES AGREEMENT BETWEEN HOLTEC PALISADES, LLC AND PALISADES ENERGY, LLC
Owner owns the Palisades Nuclear Generation Station (the Palisades Station) and its associated Independent Spent Fuel Storage Installation (the Palisades ISFSI), both located near Covert, Michigan, which are licensed by the U.S. Nuclear Regulatory Commission (NRC) pursuant to Renewed Facility Operating License No. DPR-20.
 
b.
THIS OPERATOR SERVICES AGREEMENT (the Agr eement) is effective as of the ___ da y of ____,
The Palisades Station and Palisades ISFSI will be collectively referred to herein as the Facility, and the NRC license will be referred to as the NRC Operating License.
20__, between HOLTEC PALISADES, LLC (Owner ), and PALISADES ENERGY, LLC, a Dela ware limited liability company (Operator), each a Party and together, Parties to this Agr eement.
c.
 
Owner and Operator are indirect wholly owned subsidiaries of Holtec International.
R E C I T A L S :
d.
: a. Owner owns the Palisades Nuclear Generation Station (the Palisades Station) and its associated Indep endent Spent Fuel Storage Installation (the Palisades ISFSI), both locat ed near Covert, Michiga n, which are licens ed by the U.S. Nuclear Regulatory Commission (NRC) pursuant to Renewed Facility Operating License No. DPR-20.
Owner and Operator desire that Operator possess, use, operate, and maintain (Operate) the Facility for Owner under the terms of this Agreement.
: b. The Palisades Station and Palisades ISFSI will be collectively referr ed to her ein as the Facility, and the NRC license will be referr ed to as the NRC Operating License.
: c. Owner and Op erator are indirect wholly owned subsidiaries of Holt ec Int er national.
: d. Owner and Operator desir e that Operator possess, use, operate, and maintain (Operate) the Facility for Owner under the ter ms of this Agreement.
 
A G R E E M E N T:
A G R E E M E N T:
NOW, THEREFORE, for the mutual covenants and consideration referenced in this Agreement, Owner and Operator agree as follows:
1.
Agency. Operator is hereby appointed as the agent of Owner to act on its behalf for the purposes set forth in this Agreement. Owner shall have the sole right to control and directly supervise the method, manner and detail of Operators duties and responsibilities hereunder, provided, however, that Operator shall have sole discretion with respect to its obligations to comply with the requirements of the NRC Operating License, and all applicable NRC or other applicable requirements of law with respect to Operation of the Facility.
2.
Duties of Operator. Operator shall do and perform all such things as shall be reasonably necessary to Operate and maintain the Facility on behalf of Owner. Operator shall conduct all operations of the Facility in compliance with the NRC Operating License and all applicable NRC requirements, in a good and workmanlike manner, and in accordance with generally accepted industry standards. Operators responsibilities will include, without limitation, the following activities:
2.1.
engage and supervise, as employees of Operator or as personnel assigned to provide services to Operator under a service agreement, all personnel reasonably required to Operate the Facility;


NOW, THEREFORE, for the mutual covenants and consideration referenced in this Agreement, Owner and Op erator agree as follows :
Encl. 5 p.2 2.2.
: 1. Agency. Operator is her eby appointed as the a gent of Owner to act on its behalf for the purposes set forth in this Agr eement. Owner shall have the sole right to control and dir ect ly supervise the method, ma nner and detail of Operators duties and responsibilities her eunder, provided, however, that Operator shall have sole discr etion with r espect to its obligations to comply with the r equirements of the NRC Operating License, and all applicable NRC or other applicable requir ements of law with respect to Operation of the Facilit y.
negotiate, enter into, supervise and administer, in Operators name, or in Operators name and as agent for Owner, all contracts reasonably necessary for possession, use, operation, and maintenance of the Facility (Operations), including, without limitation, equipment purchase orders and agreements, and agreements with contractors and service providers; 2.3.
: 2. Duties of Operator. Operator shall do and perfor m all such things as shall be reasonably necessary to Operate and ma intain the Facility on beha lf of Owner. Operator shall conduct all operations of the Facility in compliance with the NRC Operating License and all applicable NRC requirements, in a good and workma nlike ma nner, and in accor dance wit h generally accept ed industry standards. Operators responsibilities will include, without limitation, the following activities:
procure and furnish all materials, equipment, services, supplies and labor determined by Operator to be reasonably necessary or desirable to Operate the Facility and to otherwise carry out Operators responsibilities hereunder; 2.4.
 
use its best efforts to abide by and conform with all valid applicable laws, orders, rules and regulations that affect the Facility or Operators duties under this Agreement; 2.5.
2.1. engage and supervise, as employees of Operator or as personnel assigned to provide services to Operator under a service agreement, all personnel reasonably required to Operate the Facility;
file (and keep current) all reports, and filings required by law with respect to the Facility, and pay any fees in connection therewith; 2.6.
 
obtain and use its best efforts to comply and to conduct all Operations at the Facility in accordance with all licenses, permits and authorizations required by law already obtained or to be obtained by Owner, Operator or the Facility; 2.7.
Encl. 5 p.1 2.2. negotiate, enter into, supervise and administer, in Operators name, or in Operators name and as agent for Owner, all contracts reasonably necessary for possession, use, operation, and maintena nce of the Facility (Operations), including, without limitation, equipment purchase orders and agreements, and agreements with contractors and service providers;
keep an accurate record of all significant operations of the Facility and furnish, from time to time, upon reasonable request of Owner, such reports and other information (or access thereto);
 
and 2.8.
2.3. procure and furnish all materials, equipment, services, supplies and labor deter mined by Operator to be reasonably necessary or desirable to Operate the Facility and to other wise carry out Operators responsibilities her eunder;
do such other and further acts and deeds as may be necessary to accomplish fully and to perform its duties under this Agreement, subject to the limitations herein provided.
 
3.
2.4. use its best efforts to abide by and confor m with all valid applicable la ws, orders, rules and regulations that affect the Facilit y or Operators duties under this Agr eement;
Right to Audit. Either party may audit any and all records of the other party relating to the Facility or the services provided hereunder on such dates and at such times as a party may reasonably request.
4.
Term. The term of this Agreement shall commence as of the date noted above, which is the same day as the NRC Operating License is being transferred to Operator, and the term shall continue until terminated pursuant to Section 5 of this Agreement.
5.
Termination. This Agreement may be terminated upon notice by either Party and upon the expiration of the Transition Period contemplated by Section 6, or upon termination of the NRC Operating License.
6.
Transition Period. A period of not less than six (6) months during which Operator will cooperate with another operator selected by Owner in order to prepare for the transfer of operating responsibility pursuant to the NRC Operating License to a new operator, including obtaining the required approval of NRC and any other required regulatory approvals. The Transition Period shall end upon the transfer of operating responsibility, which shall occur no later ten (10) business days after receiving all required regulatory approvals. Operator agrees to cooperate and execute such documents as may be necessary to affect the transfer.


2.5. file (and keep current) all reports, and filings required by la w with respect to the Facilit y, and pay any f ees in connection ther ewit h;
Encl. 5 p.3 7.
Survival. The indemnification, release, and limitation of liability provisions contained in this Agreement shall survive termination to the extent they pertain to events giving rise to such indemnification, release and liability that occurred during the term of this Agreement. Further, it is agreed that in no event shall this Agreement terminate unless all payments required under this Agreement to have been made by the Owner to Operator shall have been made and all necessary regulatory approvals for termination of the NRC Operating License or transfer of responsibility for the Facility shall have been obtained.
8.
Responsibilities of Owner. Owner shall cooperate with and assist Operator and provide Operator with correct and reliable information and access to the Facility, as reasonably necessary for Operator to carry out and perform its duties under this Agreement.
9.
Price for Services. The price for the services provided by Operator to Owner pursuant to this Agreement shall be the sum of all of Operators costs arising out of, or associated with, the performance of this Agreement by Operator and its agents or contractors, including but not limited to, direct labor costs, supervisory and clerical costs, employee benefits costs, utility costs, materials and supplies costs, contractor costs, liability, property and other insurance costs, federal, state and local taxes, administrative and general overhead costs allocable to the performance of this Agreement, depreciation and amortization costs, interest expense, and expenses incurred to lease or rent equipment for performance under this Agreement.
10.
Monthly Reports. Upon request by Owner, Operator shall furnish Owner with a closing statement for each month, which statement shall report the significant operations of the Facility for the month in question.
11.
Insurance. Unless otherwise directed by Owner, Operator shall procure and maintain for Owner insurance coverage of the types and in the amounts as required by applicable NRC regulations and as generally maintained by the industry.
12.
Release of Operator. In no event shall Operator be liable to Owner for any direct, indirect, incidental or consequential damages, including, without limitation, liabilities for loss of profits or loss of use or cost of replacement power or any claim or demand against Owner by any person or entity, arising out of Operators performance or failure to perform this Agreement (including, without limitation, Operators, or any of its officers, directors or employees, own negligence or other basis, whether arising in or based upon tort, fraud, contract, strict liability, negligence, breach of fiduciary duty or any other theory of legal liability), even if Operator has been advised of the possibility of such liabilities, and Owner hereby release Operator for any liabilities arising out of Operators performance or failure to perform this Agreement. Operator does not assume liability or responsibility to Owner for liabilities that may be suffered by Owner as a result of any action or inaction of Operator; provided, however, that nothing herein shall relieve any party or person, other than Operator, from any responsibility to Operator or to Owner, whether assumed by contract or by operation of law.
13.
Indemnity. Owner shall protect, indemnify and hold Operator (including its officers, directors and employees) free and harmless from and against any and all liabilities (including, without limitation, all costs in connection with liabilities and in connection with the defense of causes of action, suits or other proceedings, including attorneys fees) of every kind and character, arising from or connected with the operation the Facility thereof or for any damage thereto, whether arising in or based upon tort, fraud, contract, strict liability, negligence, breach of fiduciary duty or any other theory of legal liability or as a result of fines or other penalties imposed by NRC or other governmental authority.


2.6. obtain and use its best efforts to comply and to conduct all Operations at the F a cilit y in a cc or da nc e wit h a ll lic ens es, p er mits a nd a uthor iza tions r equir ed by la w a lr ea dy obta ined or to be obtained by Owner, Operator or the Facility;
Encl. 5 p.4 14.
Scope of Indemnity and Release. OWNER ACKNOWLEDGES TO OPERATOR THAT THE PROVISIONS OF THIS AGREEMENT WHICH RELEASE OPERATOR OR PROVIDE FOR THE INDEMNIFICATION BY OWNER OF OPERATOR ARE INTENDED BY OWNER, TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW FROM TIME TO TIME, TO RELEASE AND SAVE AND HOLD HARMLESS AND INDEMNIFY OPERATOR FROM THE CONSEQUENCES OF OPERATORS OWN NEGLIGENCE (WHETHER ORDINARY OR GROSS, SOLE, JOINT OR CONCURRENT, OR ACTIVE OR PASSIVE) AND RECKLESS OR INTENTIONAL CONDUCT OR STRICT LIABILITY OF OPERATOR.
15.
Capacity, Liability and Release. Operator is entering into this Agreement as agent for and on behalf of Owner, and all obligations of Operator under this Agreement are being incurred solely on behalf of, and shall be enforceable solely against, Owner. Rights being granted in favor of or retained by Operator herein shall be held and enforceable by Operator, in its individual or corporate capacity. In no event shall Operator be liable to Owner for any damages of any kind, direct, incidental or consequential, and Owner hereby releases Operator from liability for damages arising out of Operators performance, nonperformance or breach of this Agreement.
16.
Material Consideration. The Parties agree that the limitations on liability and indemnity provisions set forth in this Agreement are supported by the Parties respective contractual undertakings and other good and valuable consideration and acknowledge that the Parties would not have entered into this Agreement in the absence of the indemnification obligations and the limitations on liability undertaken by either or both Parties.
17.
Confidentiality. Any information belonging to a party hereto which such party designates as confidential or proprietary shall not be disclosed to any other person or entity by the party receiving such information, except to the extent disclosure is required by law or as otherwise permitted with the consent of the non-disclosing party.
18.
Power of Attorney. Owner hereby irrevocably appoints Operator, and any officer or agent thereof, with full power of substitution, as its true and lawful attorney-in-fact with full and irrevocable power and authority in the place and stead of Owner and in the name of Owner for the purpose of carrying out the terms of this Agreement, to take any and all appropriate action and to execute any and all reports, contracts, documents and instruments which may be necessary or desirable to accomplish the purposes of this Agreement.
19.
Force Majeure. Operators performance of its obligations hereunder shall be excused to the extent that performance is prevented by an event beyond the reasonable control of Operator. Operator will use its reasonable efforts to remedy any such event as soon as possible, and performance shall be resumed as soon as reasonably practicable after the cause has been removed.
20.
Notices. Notices, requests, consents, elections, reports, payments, or other communications required or permitted to be given or made hereunder shall be in writing and shall be deemed to be delivered upon delivery to the Operator or Owner at their principal place of business during regular business hours on a business day. Notices delivered after hours or on a weekend or legal holiday will be effective on the next business day. Addresses shown below shall be considered the principal place of business of each unless and until the other is notified in writing.


2.7. keep an accurate record of all significant operations of the Facility and furnish, from time t o time, up on r easonable r equ est of Owner, such r ep orts and ot her infor mation (or access ther eto);
Encl. 5 p.5 Owner:
and
Holtec Palisades, LLC Holtec Technology Campus 1 Holtec Blvd Camden, NJ 08104 Attention: William Gill Operator:
 
Palisades Energy, LLC Holtec Technology Campus 1 Holtec Blvd Camden, NJ 08104 Attention: Kelly Trice 21.
2.8. do such other and further acts and deeds as may be necessary to accomplish fully and to perfor m its duties under this Agr eement, subject to the limitations her ein provided.
Successors in Interest; Assignment. Each and all of the covenants, agreements, terms, and provisions of this Agreement shall be binding on and inure to the benefit of the parties hereto and, to the extent permitted by this Agreement, their respective heirs, executors, administrators, personal representatives, successors and assigns. Neither party may assign this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld; provided, that either party may assign this Agreement to a wholly-owned affiliate of Holtec International upon written notice to the other party and receipt of any required regulatory approvals.
: 3. Right to Audit. Either party may audit any and all recor ds of the other party relating to the Facility or the services provided her eunder on such dates and at such times as a party may reasonably request.
22.
: 4. T er m. T he ter m of this Agr eement sha ll commenc e a s of the da t e not ed a bove, whic h is the same day as the NRC Operating License is being transferred to Operator, and the term shall continue until ter minated pursuant to Section 5 of this Agr eement.
Severability. Any provision of this Agreement which is invalid, illegal, or unenforceable in any respect in any jurisdiction shall be, as to such jurisdiction, ineffective to the extent of such invalidity, illegality or unenforceability without in any way affecting the validity, legality or enforceability of the remaining provisions hereof, and any such invalidity, illegality or unenforceability in any jurisdiction shall not invalidate or in any way affect the validity, legality or enforceability of such provision in any other jurisdiction.
: 5. Termination. This Agreement may be ter minat ed upon notice by eit her Party and upon the expiration of the Transition Period cont emplated by S ection 6, or upon ter mination of the NRC Operating Licens e.
23.
: 6. Transition Period. A period of not less than six (6) months during which Operator will cooperate wit h anot her operator select ed by Owner in order to prepare for the transfer of operating responsibility pursuant to the NRC Operating License to a new operator, including obtaining the required approval of NRC and any other required regulatory approvals. The Transition Period shall end upon the transfer of operating responsibility, which shall occur no later ten (10) business days after receiving all required regulatory approvals. Operator agrees to cooperate and execute such documents as may be necessary to affect the transfer.
Waivers. The failure or delay of any party to seek redress for violation of or to insist upon the strict performance of any obligation in this Agreement shall not be a waiver of that violation or obligation or a waiver of a subsequent act.
 
24.
Encl. 5 p.2
Third-Party Rights. Nothing in this Agreement, expressed or implied, is intended, nor shall same be construed or interpreted, to confer any rights or remedies upon any person or entity not a party hereto, other than the permitted successors or assigns of a party hereto.
: 7. Survival. The indemnification, release, and limitation of liability provisions contained in this Agreement shall survive termination to the extent they pertain to events giving rise to such indemnification, release and liability that occurred during the term of this Agreement. Further, it is agreed that in no event shall this Agr eement ter minate unless all payments requir ed under this Agr eement to have been ma de by the Owner to Operator shall have been made and all necessary regulatory approvals for ter mination of the NRC Operating License or transfer of responsibility for the Facility shall have been ob t a i n ed.
25.
: 8. Resp ons ib ilit ies of Owner. Owner sha ll coop er a te wit h a nd a ssist Oper ator a nd pr ovide Operator with correct and reliable information and access to the Facility, as reasonably necessary for Operator to carry out and perfor m its dut ies under this Agr eement.
Entire Agreement; Amendments. This Agreement contains the entire agreement and understanding between Owner and Operator concerning the operation of the Facility, and supersedes and replaces any and all prior agreements, both verbal and written. This Agreement may only be amended in writing, signed by both parties.
: 9. Price for Services. The price for the services provided by Operator to Owner pursuant to t his Agr eemen t s ha l l b e t he s u m of a ll of Op er a t or s cos t s ar is ing out of, or a s s ocia t ed wit h, t he per f or ma nc e of t his Agr eement by Operator and its agents or contractors, including but not limit ed to, dir ect labor costs, supervis ory and cler ical costs, employee b enefits costs, utility costs, materials and supplies costs, contractor costs, liabilit y, property and other insurance costs, federal, state and local taxes, administrative and genera l overhea d costs allocable to the p erfor ma nce of this Agr eement, depreciation and amortization costs, int erest expense, and expenses incurred to lease or rent equipment for perfor mance under this Agreement.
26.
: 10. Monthly Reports. Upon request by Owner, Operator shall furnish Owner with a closing statement for each month, which statement shall report the significant operations of the Facility for the month in qu es t i on.
No Partnership or Joint Venture. Nothing in this Agreement shall be deemed or construed to create a partnership, joint venture or any similar relationship or create any fiduciary duties between Operator and Owner.
: 11. Insurance. Unless otherwise dir ected by Owner, Operator shall procure and maintain for Owner insurance coverage of the types and in t he a mounts as required by applicable NRC regulations and as generally maintained by t he industry.
: 12. R el ea s e of Op er a t or. In no event s ha l l Oper a t or be lia bl e t o O wner for a ny dir ect, indir ect,
incidental or consequential da mages, including, without limitation, liabilities for loss of profits or loss of use or cost of replacement power or any claim or demand against Owner by any person or entity, arising out of Operators performance or failure to perform this Agreement (including, without limitation, Operators, or any of its officers, dir ect ors or employees, own negligence or other basis, whet her arising i n or based upon t or t, fra ud, cont r a ct, str ict lia bi lit y, negl i genc e, br ea ch of fi duc ia r y duty or a ny ot her theor y of legal liability), even if Operator has been advis ed of the p ossibilit y of such liabilit ies, and Owner her eb y release Operator for any liabilit ies arising out of Operators perfor mance or failure to perfor m this Agr eement. Operator does not assume liability or responsibility to Owner for liabilities that may be suffer ed by Owner as a result of any action or inaction of Operator; provided, however, that nothing her ein shall relieve any party or person, other than Operator, from any responsibilit y to Operator or to Owner, whet her a ssumed by c ont r a ct or by op er a t ion of la w.
: 13. Indemnity. Owner shall protect, indemnify and hold Operator (including its officers, directors and employees) free and harmless from and against any and all liabilities (including, without limitation, all costs in connection with liabilities and in connection with the defense of causes of action, suits or other proceedings, including attorneys fees) of ever y kind and character, arising from or connect ed with the operation the Facility ther eof or for any da mage thereto, whether arising in or based upon tort, fraud, contract, strict liability, negligence, breach of fiduciary duty or any ot her theory of lega l liability or as a result of fines or other penalt ies imposed by NRC or other governmental authorit y.
 
Encl. 5 p.3
: 14. S cop e of I nd emn it y a nd R el ea s e. OWNER AC KNOW LEDGES T O OP ER AT OR T HAT T HE PROVISIONS OF T HIS AGREEMENT WHICH RELEASE OPERAT OR OR PROVIDE FOR T HE INDEMNIFICATION BY OWNER OF OPERATOR ARE INTENDED BY OWNER, TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW FROM TIME TO TIME, TO RELEASE AND SAVE AND HOLD HARMLESS AND INDEMNIFY OPERATOR FROM THE CONSEQUENCES OF OPERATORS OWN NEGLIGENCE (WHETHER ORDINARY OR GROSS, S O L E, J O IN T O R C O NC UR R E N T, OR ACT IVE OR P AS S IVE ) AN D R E C KL E SS OR INT E NT IO NAL C ONDUC T OR STR ICT L IAB IL IT Y OF OP ER AT OR.
: 15. Capacity, Liability and Release. Operator is entering into this Agreement as agent for and on behalf of Owner, and all obligations of Operator under this Agr eement are being incurred solely on behalf of, and shall be enforceable solely against, Owner. Rights being granted in favor of or retained by Operator her ein shall be held and enforceable by Operator, in its individual or corporate capacity. In no event shall Operator be liable to Owner for any da mages of any kind, dir ect, incidental or consequential, and Owner her eby releases Operator from liability for damages arising out of Operators performa nce, nonperfor ma nce or breach of this Agr eement.
: 16. Material Consideration. The Parties agree that the limitations on liability and indemnity provisions set forth in this Agreement are supported by the Parties respective contractual undertakings and other good and valuable consideration and acknowledge that the Parties would not have enter ed into this Agr eement in t he absence of the indemnification obliga tions and t he limitations on liabilit y undertaken by eit her or both Par ties.
: 17. Confident iality. Any infor mation belonging to a party her eto which such party designates as confident ial or proprietary shall not be disclos ed to any other person or entit y by the party receiving such infor mation, except to the extent disclosure is requir ed by law or as otherwise permitted with the consent of t he non-disc l osi ng pa r t y.
: 18. Power of Attorney. Owner hereby irrevocably appoints Operator, and any officer or agent ther eof, with full power of substitution, as its true and la wful attorney-in-fact with full and irrevocable power and authorit y in the place and stead of Owner and in the na me of Owner for the purpose of carrying out the terms of this Agreement, to take any and all appropriate action and to execute any and all reports, contracts, documents and instruments which ma y be necessary or desirable to accomplish the purposes of this Agreement.
: 19. Force Majeur e. Operators perfor mance of its obligations hereu nder shall b e excus ed t o the ext ent that perfor mance is prevent ed by an event beyond the r easonable control of Operator. Operator will use its reasonable efforts to remedy any such event as soon as possible, and perfor ma nce shall be resumed as soon as reasonably practicable after the cause has been removed.
: 20. Notices. Not ices, requ ests, cons ents, elect ions, reports, payments, or ot her commu nications requir ed or per mitt ed to be given or ma de her eunder shall be in writ ing and shall be deemed to be deliver ed upon delivery to the Operator or Owner at their principal place of business during regular business hours on a business day. Notices deliver ed after hours or on a weekend or legal holida y will be effective on the next business day. Address es shown below shall b e cons ider ed the principal place of business of each unless and unt il the ot her is notified in writ ing.
 
Encl. 5 p.4 Owner:
 
Holt ec Palisades, LLC Holt ec Technology Campus 1 Holt ec Blvd Camden, NJ 08104 Att ention: Willia m Gill
 
Operator:
 
Palisades Energy, LLC Holt ec Technology Campus 1 Holt ec Blvd Camden, NJ 08104 Att ention: Kelly Trice
: 21. Success or s in I nt er est; Ass ignment. Each and all of the covena nts, agr eements, ter ms, and provisions of this Agreement shall be binding on and inure to the benefit of the parties her eto and, to the extent permitted by this Agreement, their respective heirs, executors, administrators, personal representatives, successors and assigns. Neit her party ma y assign this Agr eement wit hout the prior writt en consent of the other party, which consent shall not be unreasonably withheld; provided, that either party may assign this Agreement to a wholly-owned affiliate of Holtec International upon written notice to the other party and receipt of any required regulatory approvals.
: 22. Severability. Any provision of this Agr eement which is invalid, illega l, or unenforceable in any respect in any jurisdiction shall be, as to such jurisdiction, ineffective to the extent of such invalidity, illegality or unenforceability without in any way affecting the validity, legality or enforceability of the remaining provis ions her eof, and any such invalidit y, illegality or unenforceabilit y in any jurisdiction shall not inva lidate or in any way affect the validity, lega lity or enforceability of such provision in any other jurisdict ion.
: 23. Waivers. The failur e or delay of any party to seek redr ess for violation of or to insist upon the strict performance of any obligation in this Agreement shall not be a waiver of that violation or ob li ga t i on or a wa iver of a s ubs equ ent a ct.
: 24. Third-Party Rights. Nothing in this Agr eement, expressed or implied, is intended, nor shall same be construed or interpreted, to confer any rights or remedies upon any person or entity not a party her eto, ot her than the per mitt ed successors or assigns of a party her et o.
: 25. Entire Agreement; Amendments. This Agreement contains the entire agreement and understanding between Owner and Operator concerning the operation of the Facility, and supersedes and replaces any and all prior agreements, both verbal and written. This Agr eement may only be a mended in writ ing, signed by both parties.
: 26. No Partnership or Joint Venture. Not hing in t his Agr eement shall be deemed or construed to create a partnership, joint venture or any similar relationship or create any fiduciary duties between Operator and Owner.
 
Encl. 5 p.5 IN WITNESS WHEREOF, the parties her eto have ex ecuted and deliver ed t his Agr eement as of the day and year first above written.


Encl. 5 p.6 IN WITNESS WHEREOF, the parties hereto have executed and delivered this Agreement as of the day and year first above written.
OWNER:
OWNER:
 
HOLTEC PALISADES, LLC By:
HOLTEC PALISADES, LLC
 
By: __________________________________
Name:
Name:


==Title:==
==Title:==
OPERAT OR:
OPERATOR:
 
PALISADES ENERGY, LLC By:
PAL I S ADE S E NE RG Y, L L C
 
By: __________________________________
Name:
Name:


==Title:==
==Title:==
Encl. 5 p.6 ENCLOSURE 6
Encl. 6 p.1 ENCLOSURE 6 FORM OF SUPPORT AGREEMENT THIS SUPPORT AGREEMENT (as amended, supplemented or otherwise modified from time to time, this Agreement), dated as of _______, 20__, between Holtec International, a Delaware limited liability company (the Parent), and Holtec Palisades, LLC, a Delaware limited liability company (the Owner).
WHEREAS, the Parent indirectly owns and controls the limited liability company interests of the Owner; WHEREAS, the Owner is the NRC-licensed owner of the Palisades Nuclear Plant (Palisades) and its associated Independent Spent Fuel Storage Installation (ISFSI) (collectively, the Facility);
WHEREAS, Parents subsidiary Palisades Energy, LLC (Operator) is the licensed operator of the Facility and Owners agent pursuant to an Operator Services Agreement between Owner and Operator dated even herewith; and WHEREAS, in connection with the return to full power operations and the transfer of control of the Facilitys NRC license, Parent and Owner desire to take certain actions to enhance and maintain the financial condition of the Owner as hereinafter set forth in order to ensure its ability to pay the costs and expenses relating to the operations and maintenance of the Facility; NOW THEREFORE, in consideration of the mutual promises herein contained, the parties hereto agree as follows:
1.
Subsidiary Payments. At all times while this Agreement is in effect and subject to the limitations set forth in paragraphs 3 and 4, the Parent agrees that it will make, or cause one of its subsidiaries to make, to the extent necessary, a Support Payment (as defined in paragraph 2) to the Owner in order to ensure that the Owner has sufficient liquidity in order to pay the costs and expenses relating to the operations and maintenance of the Facility. Any Support Payments required by this Agreement shall be made not later than the end of the next fiscal quarter.
2.
Commitment to Provide Capital. If during the term of this Agreement, the Parent is required to make a Support Payment to the Owner, such payment may be provided by the Parent, or any subsidiary of the Parent, at the Parents option, either as an equity investment or capital contribution or as a loan, in each case in cash or other liquid assets (any of the foregoing, a Support Payment). If such payment is advanced to the Owner as a loan, the loan shall be on such terms and conditions, including maturity and rate of interest, as the Parent and the Owner shall agree.
3.
Limitation of the Parents Support Obligations. Each of the Parent and the Owner agrees that the Parent shall not be required to make, or cause its subsidiaries or affiliates to make, Support Payments to the Subsidiary Owner in excess of $75 million in the aggregate.
4.
Not a Guaranty. This Agreement, its provisions and any actions pursuant hereto by the Parent shall not constitute or be deemed to constitute a direct or indirect guaranty by the Parent of any indebtedness for borrowed money or other obligation or liability of any kind or character whatsoever of the Owner.


FORM OF SUPPORT AGREEMENT
Encl. 6 p.2 5.
Rights of Participants and Creditors. The obligations of the Parent pursuant to this Agreement are to the Owner only and do not run to and are not enforceable directly by any creditor of the Owner or other entity or person, nor shall this Agreement cause the Parent to be responsible for payment of any obligation of the Owner to any creditor or other entity or person or give rise to any recourse by any creditor or other entity or person to or against the Parent or any of its assets or properties.
6.
Waivers. Any failure by any party hereto, at any time or times hereafter, to require strict performance by the other party of any provision of this Agreement shall not waive, affect or diminish any right of any party thereafter to demand strict compliance and performance therewith. None of the agreements contained in this Agreement shall be deemed to have been suspended or waived by any party hereto unless such suspension or waiver is in writing.
7.
Amendments and Termination. Subject to paragraph 10, this Agreement may be amended, modified or terminated at any time by the parties hereto only by a written instrument signed by both the Parent and the Owner. This Agreement shall terminate at such time as Parent is no longer the direct or indirect owner of any of the ownership interests in Owner. This Agreement shall also terminate whenever the Facility permanently ceases commercial operations and certification is made as to the permanent removal of fuel from the reactor vessel.
8.
Successors. This Agreement shall be binding upon, and shall inure to the benefit of, the parties hereto and their respective successors and assigns, provided that the Owner may not assign, transfer or pledge its rights hereunder without the prior written consent of the Parent. This Agreement is not intended for the benefit of any entity or person other than the parties hereto, and shall not confer or be deemed to confer upon any other such entity or person any benefits, rights or remedies hereunder.
9.
Governing Law; Severability. This Agreement and all rights and obligations hereunder shall be governed by and construed and enforced in accordance with the laws of the State of _____. Whenever possible, each provision of this Agreement shall be interpreted in such a manner as to be effective and valid under applicable law, but if any provision of this Agreement shall be prohibited by or invalid under applicable law, such provision shall be ineffective only to the extent of such prohibition or invalidity, without it invalidating the remainder of such provisions or the remaining provisions of this Agreement.
: 10. Notice to NRC. Owner shall take no action to cause Parent, or its successors and assigns, to void, cancel, or modify the commitment to provide financial support to Owner as set forth in this Agreement or cause Parent to fail to perform or impair its performance under the commitment, or remove or interfere with Owners ability to draw upon the commitment, without the prior written consent of the Director of the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission (NRC). Also, Owner shall inform NRC in writing any time that it draws upon the commitment to provide capital by obtaining a Support Payment.
[Signatures on Following Page]


THIS SUPPORT AGREEMENT (as amended, supplement ed or other wise modified from time t o time, this Agreement), dated as of _______, 20__, between Holtec Inter national, a Delaware limited liabilit y compa ny (the Parent), and Holt ec Palisades, LLC, a Delaware limit ed liabilit y compa ny (the Owner).
Encl. 6 p.3 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers thereunto duly authorized as of the day and year first above written.
 
HOLTEC INTERNATIONAL Name:
WHEREAS, the Parent indir ectly owns and controls the limited liability compa ny inter ests of th e Owner;
 
WHEREAS, the Owner is the NRC-licensed owner of the Palisades Nuclear Plant (Palisades) a nd it s assoc ia t ed I ndep endent Spent Fuel Stora ge Inst a llat i on ( IS F S I) (collect ivel y, the F a cilit y);
 
WHEREAS, Parents subsidiary Palisades Ener gy, LLC (Operator) is the licensed operator of the Facilit y and Owners agent pursuant to an Operator Services Agr eement bet ween Owner and Op erator dat ed even her ewith; a nd
 
WHEREAS, in connection with the return to full power operations and the transfer of control of the Facilitys NRC license, Parent and Owner desire to take certain actions to enhance and maintain the financial condition of the Owner as her eina ft er set for th in order to ensur e its ability to pa y the costs and exp ens es rela t i n g to th e op era t io ns and ma int ena nc e of th e Fa cil it y;
 
NOW THEREFORE, in consideration of the mutual promises herein contained, the parties her et o agree as f ollows:
: 1. Subsidiary Payments. At all times while this Agreement is in effect and subject to the limitations set forth in paragraphs 3 and 4, the Parent agrees th at it will make, or cause one of its subsidiaries to make, to the ext ent necessary, a Support Payment (as defined in paragraph 2) to the Owner in order to ensur e that the Owner has suffic ient liquidity in order to pa y the costs and exp enses relating to the oper a tions and ma int enance of t he Facilit y. Any Support Payments r equired b y this A gr eement shall b e made not lat er than the end of the next fiscal quarter.
: 2. Commitment to Provide Capital. If during the ter m of this Agr eement, the Parent is required to ma ke a Support Payment to the Owner, such payment ma y be provided by the Parent, or any subsidiary of the Parent, at the Parents option, eit her as an equit y invest ment or capital contribution or as a loan, in each case in cash or other liquid assets (any of the for egoing, a Support Payment ). If such payment is advanced to the Owner as a loan, the loan shall be on such terms and conditions, including maturity and rate of int erest, as the Parent and the Owner shall agree.
: 3. Limitation of the Parents S upport Obligations. Each of the Parent and the Owner agrees th at the Parent shall not be required to ma ke, or cause its subsidiaries or affiliat es to make, Support Payments to the Subsidiary Owner in excess of $75 million in the aggr egate.
: 4. Not a Guaranty. This Agreement, its provision s a nd any actions pursu ant her et o by the Parent sha ll not constitut e or be deemed t o constitut e a direct or indirect guaranty by the Parent of any indebt edness for borrowed money or other obligation or liabilit y of any kind or character whatsoever of the Owner.
 
Encl. 6 p.1
: 5. Rights of Participants and Creditors. The obligations of the Parent pursuant to this Agr eement are to the Owner only and do not run to and are not enforceable directly by any cr edit or of the Owner or other ent ity or person, nor shall this Ag reement caus e the Parent to be responsible for payment of any obligation of the Owner to any creditor or other entit y or person or give rise to any recourse by any credit or or other entity or person to or against the Parent or any of its assets or properties.
: 6. Waivers. Any failure by any party hereto, at any time or times hereafter, to require strict perfor mance by the ot her party of any provision of this A gr eement shall not waive, affect or diminish any right of any party thereafter to demand strict compliance and performance therewith. None of the agreements contained in this Agreement shall be deemed to have been suspended or waived by any party her eto unless such suspension or waiver is in writing.
: 7. Amend ments a nd T er mination. Subject to paragraph 10, this Agreement ma y b e amended, modified or ter minated at any time by the parties her eto only by a written instrument signed by both t he Parent and the Owner. This Agr eement shall t er minat e at such time as Parent is no longer the dir ect or indir ect owner of any of the ownership inter ests in Owner. This Agr eement shall also ter minate whenever the Facility permanently ceases commercial operations and certification is made as to the permanent removal of fuel from the r eactor vess el.
: 8. Successors. This Agr eement sha ll be binding upon, and shall inur e to the benefit of, the parties her eto and their respective successors a nd assi gns, provided that the Owner ma y not assign, transfer or pledge its rights her eunder without the prior writt en consent of the Parent. This Agr eement is not int ended for the benefit of any entity or person other than t he parties her eto, and shall not confer or be deemed t o confer upon any ot her such entit y or person any benefit s, rights or remedies her eunder.
: 9. Governing Law; Severability. This Agreement and all rights and obligations her eunder shall be governed by and construed and enforced in accordance with the laws of the State of _____. Whenever possible, each provision of this Agreement shall be int erpret ed in such a manner as to be effect ive and vali d under applicable law, but if any provision of this Agreement shall be prohibited by or invalid under applicable law, such provision shall be ineffective only to the extent of such prohibition or invalidity, without it invalidating the r ema inder of such provisions or the rema ining provisions of this Agr eement.
: 10. Notice to NRC. Owner shall take no action to cause Parent, or its successors and assigns, to void, ca ncel, or modify the commit ment to pr ovide financia l support to Owner as set for th in this Agr eement or cause Parent to fail to p erfor m or impair its perfor mance under the commit ment, or remove or int erfer e wit h Owner s ability to draw upon t he commit ment, wit ho ut the pr ior writt en consent of the Dir ector of th e Office of Nuclear Reactor Regulation of the Nuclear R egulatory Commission (NRC). Also, Owner shall inform NRC in writing any time that it draws upon the commitment to provide capital by obtaining a Support Payment.
 
[Signatures on Following Page]
 
Encl. 6 p.2 IN WITNESS WHEREOF, the parties her eto have caused this Agreement to be executed and deliver ed by their respective officers ther eunto duly authorized as of the da y and year first above writt en.
 
HOLTEC INTERNATIONAL
 
Name:


==Title:==
==Title:==
HOLTEC PALISADES, LLC
HOLTEC PALISADES, LLC Name:
 
Name:


==Title:==
==Title:==
Encl. 6 p.3}}
}}

Revision as of 07:35, 25 November 2024

Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments
ML23340A161
Person / Time
Site: Palisades  
Issue date: 12/06/2023
From: Fleming J
Holtec Decommissioning International
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23340A160 List:
References
HDI PNP 2023-028
Download: ML23340A161 (1)


Text

Enclosures 1A, 3A, and 4A Contain Non-Public Information Withhold in Accordance with 10 CFR 2.390 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI PNP 2023-028 10 CFR 50.80 10 CFR 50.90 10 CFR 72.50 December 6, 2023 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20

Subject:

Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (AEA), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Holtec Decommissioning International, LLC (HDI), on behalf of itself, Holtec Palisades, LLC (Holtec Palisades), and Palisades Energy, LLC (OPCO)

(together, Applicants), submit the enclosed application (Application) requesting that the U.S.

Nuclear Regulatory Commission (NRC) consent to the transfer of operating authority under Renewed Facility Operating License (RFOL) No. DPR-20 for the Palisades Nuclear Plant (PNP) and the general license for the Palisades Independent Spent Fuel Storage Installation (ISFSI) (referred to collectively as the Facility) from HDI to OPCO. Applicants also request NRC approval for conforming administrative amendments to reflect the requested transfer.

Applicants request NRCs consent to the transfer as part of the regulatory approvals to repower PNP. Transitioning operational authority from HDI to OPCO is conditioned on HDIs receipt of NRC approvals necessary to resume full-power operations. As a result of Entergy Nuclear Operations, Inc.s (ENOI) decision to shut down PNP for economic reasons, and following ENOIs submission of the certifications of permanent shutdown and defueling under 10 CFR 50.82(a)(1) and enactment of the standard suite of licensing changes to reflect a permanently defueled reactor, the PNP RFOL does not currently authorize power operations or placement of fuel in the reactor.

As described in HDIs letter dated March 13, 2023 (ML23072A404), HDI has identified the regulatory path to reinstate the power operations licensing basis (POLB) to resume power operations. On September 28, 2023, HDI filed a request for exemption from 10 CFR 50.82(a)(2)

HOLTEC DECOMMISSIONING I I'- T r R N,\\ T I O N,\\ L

HDI PNP 2023-028 2

in furtherance of the restart (ML23271A140). HDI intends to submit additional licensing actions over the next several months to reinstate the Facilitys POLB. In this submittal, HDI is requesting NRC approval to transfer operational authority to OPCO and to vest in OPCO exclusive control of operation and maintenance of PNP. OPCO is an indirect, wholly owned subsidiary of Holtec International (Holtec), formed, staffed, and resourced by Holtec specifically for power operations of PNP. As described in the enclosed Application, OPCO will be resourced with in-depth operational experience and the programmatic expertise to conduct power operations licensed activities at PNP to the same level of excellence that HDI has demonstrated in decommissioning and Holtec has upheld for over three decades as the preeminent spent nuclear fuel vendor providing safety-related services and equipment for nearly every nuclear facility in the current domestic operating fleet.

Holtec Palisades will remain the licensed owner, the beneficiary of the PNP decommissioning trust fund, and the party to the Standard Contract for Disposal of Spent Nuclear Fuel. Holtec Palisades has entered into a life-of-plant power purchase agreement with two power co-operatives to sell all Facility energy and capacity under a long-term, fixed price arrangement that will remain in place for the full term of the Facility license (including subsequent license renewal terms).

No changes are being made to the Big Rock Point license, which will remain owned by Holtec Palisades and operated by HDI.

A simplified organization chart reflecting the current PNP licensees and their owners is provided as Figure 1 following this letter. The planned ownership structure following the proposed transfer is depicted in Figure 2. These organization charts are simplified in that they only show the companies in the chain of ownership of the licensee entities before and after the proposed transfer.

As of the date of this letter, PNP is still in decommissioning, and HDI is still adhering to the PNP Post Shutdown Decommissioning Activities Report (PSDAR), dated December 23, 2020 (ML20358A232). Given the long lead time for developing, obtaining, and implementing the necessary NRC approvals, hiring and qualifying operational staff, and completing physical site work needed to resume power operations on an economically-viable schedule, Holtec has made the decision to begin pursuing discrete restart activities at risk, with priority on long lead items that do not impact decommissioning. Holtec is in the process of securing a loan guarantee from the U.S. Department of Energy (DOE) under Title XVII of the Energy Policy Act of 2005. Also, the Michigan Legislature appropriated funds to support the restart, which Holtec expects to be administered via a grant program overseen by the Michigan Department of Labor and Economic Opportunity. Upon obtaining conditional commitment for the DOE loan guaranteewhich is the determinant to Holtecs decision to pursue the restart in earnestHDI expects to docket a notice under 10 CFR 50.82(a)(7) indicating its intention to depart from the current PSDAR schedule to pursue restart activities until such time as PNP either successfully restarts (and exits decommissioning) or Holtec abandons the restart project. HDI anticipates filing this 10 CFR 50.82(a)(7) notice the first quarter of 2024.

Subject to the foregoing, and receipt of the NRC approvals needed to return PNP to power operations, HDI plans to effectuate the transfer to OPCO on the date reinstatement of the POLB occurs. Applicants are currently targeting the transition to power operations in the third quarter of 2025. To support this schedule, Applicants respectfully request that the NRC review the enclosed

HDI PNP 2023-028 3

Application on a schedule that will permit issuance of an order consenting to the transfer and approval of conforming license amendments by December 31, 2024. Applicants request that the consent be immediately effective upon issuance and permit the transfer to occur up to one year after issuance or such later date as NRC may permit. Applicants are prepared to work closely with NRC to facilitate the review of the Application. Applicants also request that the license amendments be made effective as of the date the transfer is completed. HDI will notify NRC staff at least five business days prior to transferring operational authority from HDI to OPCO.

After obtaining all necessary NRC approvals, HDI intends to submit a notification of transition to power operations to NRC that will docket HDIs and OPCOs satisfaction of the implementation conditions for the license transfer, 10 CFR 50.82(a)(2) exemption, and license amendments. Upon docketing this notification letter, PNP will transition from a facility in decommissioning back to a power operations plant, and HDI will transfer its authority to conduct licensed activities to OPCO.

Following the transfer, OPCO will have full authority to conduct licensed activities under the reinstated POLB.

The proposed transfer of operational authority under the RFOL is desirable and of considerable benefit to the citizens of Michigan. The transfer will facilitate the restart of PNP and the return of 800 MW of carbon-free baseload generation to support state and federal climate, energy security, and reliability goals.

Information supporting this request for consent and approval is provided in the enclosed Application. A mark-up showing the proposed conforming license amendments is included in the Application as Attachment A. A clean version of the proposed license amendments is included as Attachment B.

The Application in Enclosure 1 provides information pertaining to the proposed transfer as required by 10 CFR 50.80. The referenced information demonstrates that: (1) Holtec Palisades and OPCO will have the requisite managerial, technical, and financial qualifications to operate PNP; (2) Holtec Palisades will continue to provide reasonable assurance of funding for decommissioning; (3) the material terms of the NRC license will not be affected; and (4) the transfer will not result in any impermissible foreign ownership, control, or domination. Certain information contained in Enclosure 1, Attachment C constitutes personally identifiable information, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Applicants have redacted such personally identifiable information from Enclosure 1. A non-public version of Enclosure 1, Attachment C is provided in Enclosure 1A. Applicants request that the unredacted enclosure containing personally identifiable information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6).

In summary, the proposed transfer will neither have any adverse impact on the public health and safety, nor be inimical to the common defense and security. The proposed transfer will be consistent with the requirements of AEA, NRC regulations, and PNP RFOL. Applicants, therefore, respectfully request that NRC consent to the transfer of operational authority under PNP RFOL in accordance with 10 CFR 50.80 and 10 CFR 72.50 and issue the conforming license amendments requested herein pursuant to 10 CFR 50.90.

HDI PNP 2023-028 4

Enclosures 3A and 4A contain confidential commercial and financial information. Applicants request that this information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4),

as described in the affidavit provided in Enclosure 2. Enclosure 3 contains a non-proprietary version of the income statement in Enclosure 3A. Additionally, Enclosures 5 and 6 contain a form Operator Services Agreement and form Support Agreement, respectively.

In accordance with 10 CFR 50.91(b)(1), a copy of this submittal has been sent to the State of Michigan.

This Application contains regulatory commitments as noted in Attachment E to the Application.

Service upon the Applicants of notice, comments, hearing requests, intervention petitions, or other pleadings should be made to:

Jason Day General Counsel Holtec Decommissioning International, LLC 1 Holtec Blvd.

Camden, NJ 08104 Telephone: (856) 797-0900 x 3688 Email: j.day@holtec.com Alan Lovett Balch & Bingham LLP 1901 Sixth Avenue North, Suite 500 Birmingham, AL 35203 Telephone: (205) 226-8769 Email: alovett@balch.com For questions related to this submittal, please contact Michael Schultheis, HDI Manager of Regulatory Assurance, at 269-764-2049 or m.schultheis@holtec.com.

Sincerely, Jean A. Fleming Vice President, Licensing, Regulatory Affairs, and Probabilistic Safety Analysis Holtec International Holtec Decommissioning International, LLC

Enclosures:

Figure 1 - Organization Chart (Current)

Figure 2 - Organization Chart (Post-Transfer) - Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments NRC Renewed Facility Operating License No. DPR-20 A - Non-public Addenda to Enclosure 1 [Withhold Under 10 CFR 2.390(a)(6)]

Digitally signed by Jean A. Fleming DN: cn=Jean A. Fleming, c=US, o=Holtec Decommissioning International, LLC, ou=Regulatory and Environmental Affairs, email=J.Fleming@Holtec.com Date: 2023.12.06 14:11:45 -05'00' Jean A.

Fleming

HDI PNP 2023-028 5 - Affidavit of Jason Day Supporting Holtec Decommissioning International, LLCs Application to Withhold Certain Documents from Public Disclosure - Projected Income Statement and Opening Balance Sheet of Holtec Palisades, LLC (Non-Proprietary) A - Projected Income Statement and Opening Balance Sheet of Holtec Palisades, LLC (Proprietary) [Withhold Under 10 CFR 2.390(a)(4)] A - Holtec International Financial Information (Proprietary) [Withhold Under 10 CFR 2.390(a)(4)] - Form of Operator Services Agreement between Holtec Palisades, LLC and Palisades Energy, LLC - Form of Support Agreement cc (w/enclosures, except Enclosures 1A, 3A, and 4A):

NRC Region III Regional Administrator NRC Decommissioning Inspector - Palisades Nuclear Plant NRC NMSS Project Manager - Palisades Nuclear Plant Designated Michigan State Official

AFFIRMATION OF KELLY TRICE l, Kelly Trice, do hereby declare under penalty of perjury under the laws of the United States of America that the following is true and correct: (I) lam the President ofHoltec Decommissioning International, LLC and Palisades Energy, LLC, (2) I am duly authorized to execute and file this certification on behalf of Holtec International, Holtec Decommissioning International, LLC, Holtec Palisades, LLC, and Palisades Energy, LLC and (3) the statements set forth in the attached Application, including the financial qualifications for Holtec Palisades, LLC, Palisades Energy, LLC, and Holtec International, are true and correct to the best of my information, knowledge and belief.

By:

Date:

Kellyri(e December 6, 2023 Affirmation of Kelly Trice 6

Figure 1 Figure 1 - Organization Chart (Current)

Notes:

  • Holtec Palisades, LLC is the licensed owner of PNP and Big Rock Point and holds the decommissioning trust funds and the Standard Contract for Disposal for Spent Nuclear Fuel.

Holtec Decommissioning International, LLC is the licensed operator of PNP and Big Rock Point and has authorization to conduct licensed activities under the defueled facility licensing bases.

Holtec International Holtec Power, Inc.

Nuclear Asset Management Company, LLC Holtec Palisades, LLC*

Holtec Decommissioning International, LLC I

Figure 2 Figure 2 - Organization Chart (Post-Transfer)

Notes:

  • Holtec Palisades, LLC will remain the licensed owner of PNP and Big Rock Point and will continue to hold the decommissioning trust funds and the Standard Contract for Disposal for Spent Nuclear Fuel.

Palisades Energy, LLC will be the licensed operator of PNP, authorized to conduct licensed activities under the reinstated PNP power operations licensing basis.

Holtec Decommissioning International, LLC will remain the licensed operator of Big Rock Point and the other Holtec-owned facilities in decommissioning.

Holtec International Holtec Power, Inc.

Nuclear Asset Management Company, LLC Holtec Palisades, LLC*

Palisades Energy, LLC (OPCO)

Holtec Decommissioning International, LLC I

I

Encl. 1 ENCLOSURE 1 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments NRC Renewed Facility Operating License No. DPR-20

Encl. 1 TOC TABLE OF CONTENTS 1.

Introduction................................................................................................................... 1 2.

Statement of Purpose of the Transfer and Nature of the Transaction Making the Transfer Necessary or Desirable............................................................................. 2 (a)

Purpose and Description of the Transfer.......................................................... 2 (b)

Nature of the Transaction Making the Transfer Desirable.............................. 4 3.

General Corporate Information Required by 10 CFR 50.33....................................... 4 4.

Foreign Ownership, Control, or Domination............................................................... 5 5.

Technical Qualifications................................................................................................ 6 (a)

Senior Leadership.............................................................................................. 9 (b)

Site Organization............................................................................................. 11 (c)

Home Office Support....................................................................................... 13 (d)

Corporate Governance and Oversight............................................................ 13 (e)

Conclusion........................................................................................................ 14 6.

Financial Qualifications............................................................................................... 14 (a)

Financial Qualifications for Operations.......................................................... 15 (b)

Decommissioning Funding............................................................................... 16 7.

Restricted Data and Classified National Security Information................................. 18 8.

Other Nuclear Regulatory Issues................................................................................ 19 (a)

Price-Anderson Indemnity and Nuclear Insurance........................................ 19 (b)

Standard Contract for Disposal of Spent Nuclear Fuel.................................. 19 (c)

Exclusion Area Control.................................................................................... 19 (d)

Quality Assurance Program............................................................................ 19 (e)

No Significant Hazards Consideration............................................................ 20 9.

Environmental Review................................................................................................ 20 10.

Effective Date and Other Required Regulatory Approvals....................................... 20 11.

Conclusion.................................................................................................................... 21 Attachment A - Renewed Facility Operating License No. DPR-20 (Changes)

Attachment B - Renewed Facility Operating License No. DPR-20 (Revised Pages)

Attachment C - Redacted Corporate Information Required by 10 CFR 50.33(d)(3) (Public)

Encl. 1 TOC Attachment D - Palisades Energy, LLC Organization Chart and Resumes of Senior Leadership Attachment E - Regulatory Commitments

Encl. 1 p.1 1.

Introduction Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (AEA), 10 CFR 50.80, 10 CFR 50.90, and 10 CFR 72.50, Holtec Palisades, LLC (Holtec Palisades), Holtec Decommissioning International, LLC (HDI), and Palisades Energy, LLC (OPCO) (together, Applicants) submit this application (Application) requesting that the U.S. Nuclear Regulatory Commission (NRC) consent to the transfer of HDIs operating authority (i.e., authority to conduct licensed activities) under Renewed Facility Operating License (RFOL) No. DPR-20 for the Palisades Nuclear Plant (PNP) and the general license for the PNP Independent Spent Fuel Storage Installation (ISFSI) (referred to collectively as the Facility) to OPCO. Applicants also request that NRC approve conforming administrative amendments to the PNP RFOL to reflect the proposed transfer of operational authority from HDI to OPCO. These administrative changes to the PNP RFOL are shown in Attachment A to this enclosure. A clean version of the proposed license amendments is included as Attachment B.

Applicants request this approval to support the recommencement of power operations at PNP.

When NRC previously approved the transfer of operational authority from Entergy Nuclear Operations, Inc. (ENOI) to HDI, it was based on the understanding that PNP would be permanently shut down and defueled by ENOI and decommissioned by HDI. Prior to the transfer, ENOI submitted certifications of permanent shutdown and defueling under 10 CFR 50.82(a)(1),1 at which point 10 CFR 50.82(a)(2) and the RFOL no longer authorized operations. In approving the transfer from ENOI to HDI, NRC evaluated HDIs qualifications to perform licensed activities at a permanently defueled facility through decommissioning and license termination.

In light of the developments since HDI assumed licensee responsibilities in June 2022, including federal and state support for nuclear generation, HDI has engaged with NRC and other government bodies regarding the possibility of restarting PNP. On March 13, 2023, HDI submitted a regulatory path to reinstate power operations at PNP.2 Consistent with that path, on September 28, 2023, HDI submitted an exemption request from 10 CFR 50.82(a)(2).3 In furtherance of this restart plan, HDIs ultimate parent company, Holtec International (Holtec), created a new subsidiary, OPCO, to facilitate power operations at PNP. As described herein, OPCO will possess the financial and technical qualifications necessary to conduct licensed activities at a power operations plant, subject to NRCs approval of the separate licensing actions and exemption requests to reinstate power operations at PNP. In light of the anticipated licensing and restart schedule, Applicants request that NRC approve this Application by December 31, 2024. Subject to receipt of other NRC approvals, Applicants expect the transfer of operational authority from HDI to OPCO to coincide with 1 ENOI Letter No. PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, June 13, 2022 (ML22164A067).

2 HDI Letter No. PNP 2023-001, Regulatory Path to Reauthorize Power Operations at the Palisades Nuclear Plant, Mar. 13, 2023 (ML23072A404).

3 HDI Letter No. PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82, Sept. 28, 2023 (ML23271A140).

Encl. 1 p.2 reinstatement of the facilitys power operations technical specifications (POTS), which is currently expected to occur in the third quarter of 2025.

Holtec Palisades will remain the licensed owner of the PNP and Big Rock Point facilities, and Holtec Palisades will continue to hold the nuclear decommissioning trust funds for both. HDI will remain the licensed operator of Big Rock Point. The PNP restart efforts and transfer of operational authority from HDI to OPCO at PNP will not affect Big Rock Point activities or Holtec Palisadess decommissioning and spent fuel management funding structure that is currently in place for Big Rock Point.4 All activities performed at PNP will be in compliance with the license and NRC regulations, subject to OPCOs direct oversight and control as the licensed operator.

Certain enclosures accompanying this Application contain personally identifiable information and confidential commercial and financial information that should be withheld from public disclosure pursuant to 10 CFR 2.390.

2.

Statement of Purpose of the Transfer and Nature of the Transaction Making the Transfer Necessary or Desirable (a)

Purpose and Description of the Transfer PNP is a 2,565 MW pressurized water reactor located in Covert, Michigan, on the shore of Lake Michigan, approximately five miles south of South Haven, Michigan. PNP began commercial operations on December 31, 1971. ENOI shut down the facility on May 20, 2022. Pursuant to 10 CFR 50.82(a)(1), ENOI submitted certifications of permanent cessation of power operations and permanent removal of fuel from the reactor vessel on June 13, 2022.5 On June 15, 2022, ENOI implemented the Permanently Defueled Technical Specifications. Accordingly, when ENOI transferred operational authority to HDI on June 28, 2022, the permanently defueled licensing basis no longer authorized power operations.

NRCs approval of ENOIs transfer of operational authority to HDI was based on the expectation, at the time, that PNP would permanently shut down. As stated in NRCs safety evaluation report:

4 The Big Rock Point nuclear plant was a boiling water reactor rated at 75 MW electric and began commercial operation in March 1963. The facility was permanently shut down on August 29, 1997, and subsequently, all spent nuclear fuel was transferred to an ISFSI. In 2007, decommissioning and dismantlement of all operational facilities occurred. In accordance with an approved license termination plan, all property, other than the approximately 30-acre on-site parcel of land where the ISFSI is located and an additional non-impacted parcel of approximately 75 acres adjacent to the ISFSI was released. The only current activities at Big Rock Point are ongoing ISFSI maintenance pending Department of Energy (DOE) removal of fuel. Upon DOEs removal of fuel, HDI will decommission the ISFSI and submit a license termination plan in accordance with 10 CFR 50.82(a)(9).

5 ENOI Letter No. PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel, June 13, 2022 (ML22164A067).

Encl. 1 p.3 Pursuant to the purchase and sale agreement, the proposed transfer transaction is subject to Palisades also having permanently ceased operations. Accordingly, HDI (the proposed licensed operator for decommissioning) would not be authorized under the Palisades license to operate or load fuel in the Palisade[s] reactor pursuant to 10 CFR 50.82(a)(2) and, therefore, would not conduct the operations contemplated by the financial qualifications provisions of 10 CFR 50.33(f). Rather, all of HDIs licensed activities would involve the possession of radioactive material in connection with maintaining the safe condition of Palisades and the Big Rock Point and Palisades ISFSIs, radiological decommissioning of Palisades and the Big Rock Point and Palisades ISFSIs, license termination, and operational responsibilities associated with spent fuel management.6 As the licensed operator for all of the Holtec-owned nuclear facilities that are in decommissioning, HDI was created and staffed to oversee decommissioning projects. The purpose of this transfer is to ensure that the Holtec organization authorized to oversee power operations is appropriately structured and staffed for reactor operations. As described in Section 5, OPCO will be staffed and resourced as a nuclear plant operator, with deep operational experience and the programmatic competencies necessary for plant operations. PNPs site employees and management are expected to be employed by OPCO, subject to industry-typical staff augmentation and contractor arrangements that OPCO will use to fill certain roles. This Application also provides NRC with the opportunity to review and confirm OPCOs and Holtec Palisadess financial and technical qualifications in connection with the return to full-power operations.

OPCO, like HDI, is a wholly owned subsidiary of Holtec through Holtec Power, Inc. (Holtec Power). Holtec Palisades will continue to be the licensed owner and hold the PNP nuclear decommissioning trust fund. As discussed in Section 6, Holtec Palisades is the party to two power purchase agreements under which all of PNPs capacity will be sold, and Holtec Palisades will reimburse OPCO for its costs under an Operator Services Agreement, a form of which may be found in Enclosure 5 following this Application. Holtec will provide supplemental financial support via a Support Agreement with Holtec Palisades, a form of which may be found in to this Application.

A simplified organization chart reflecting the current PNP licensees and their owners is provided as Figure 1 to the letter accompanying this Application. The planned organizational structure following the proposed transfer is depicted in Figure 2. The ownership and operational structure OPCO is implementing is based on ENOIs organization structure prior to shutdown, with certain fleet and corporate functions (previously performed by Entergy home office personnel) relocated to the PNP site.

6 Safety Evaluation Related to Request for Transfer of Control of Facility Operating License No. DPR-6, Renewed Facility Operating License No. DPR-20, and the General Licenses for the ISFSIs from Entergy Nuclear Operations, Inc. and Entergy Nuclear Palisades, LLC to Holtec International and Holtec Decommissioning International, LLC, at 9, Dec. 13, 2021 (ML21292A148).

Encl. 1 p.4 (b)

Nature of the Transaction Making the Transfer Desirable In parallel to this Application, HDI is submitting an exemption request and license amendment requests to authorize the return to full power operations. The purpose of the transfer is to facilitate the prompt restart and return to the full-power operation of PNP, which is in furtherance of state and federal climate and electric reliability goals. As stated by the Michigan Governors Office,

[k]eeping Palisades open will keep energy costs low, shore up domestic energy production, and increase Michigans competitiveness for future economic development.7 On July 31, 2023, Governor Whitmer signed the 2024 Michigan state budget, in which the Michigan Legislature appropriated $150 million for targeted energy investment, aimed at the PNP restart project.8 Likewise, with the passage of federal legislation, including the Bipartisan Infrastructure Law and the Inflation Reduction Act, Congress has provided financial support for the U.S. nuclear fleet as part of federal efforts to maintain carbon-free domestic baseload generation. The transfer is desirable and of considerable benefit to the citizens of Michigan and supports federal and state climate, energy security, and electric reliability policies. As discussed in Section 5 below, the license transfer will place PNP in a well-supported organization with deep expertise in reactor operations.

This Application provides information regarding the financial qualifications of OPCO and the required financial assurance for decommissioning of the site and ISFSI. In addition, it provides information pertaining to the proposed transfer of authority to conduct licensed activities, including the information required under 10 CFR 50.80. As that information demonstrates: (1)

OPCO will have the requisite managerial, technical, and financial qualifications to be the licensed operator of PNP; (2) the material terms of the RFOL will not be affected; and (3) the license transfer will not result in any impermissible foreign ownership, control, or domination.

In summary, the proposed transfer will not be inimical to the common defense and security or result in any undue risk to public health and safety, and the transfer will be consistent with the requirements of AEA and NRC regulations.

3.

General Corporate Information Required by 10 CFR 50.33 OPCO is a direct, wholly owned subsidiary of Holtec Power. Holtec Power is a direct, wholly owned subsidiary of Holtec. Holtec is a Delaware corporation and the ultimate parent company of all the relevant entities who will own or operate PNP. Figures 1 and 2 illustrate the corporate ownership structure prior to and following the license transfer. Upon completion of the transaction 7 Whitmer Announces Plan with Holtec to Reopen Palisades Plant, Sept. 9, 2022, available at https://www.michigan.gov/whitmer/news/press-releases/2022/09/09/whitmer-announces-plan-with-holtec-to-reopen-palisades-plant.

8 2023 Mich.

Pub.

Acts 379-380 available at https://www.legislature.mi.gov/documents/2023-2024/publicact/pdf/2023-PA-0119.pdf; Governor Whitmer Signs Make it in Michigan Budget, July 31, 2023, available at https://www.michigan.gov/whitmer/news/press-releases/2023/07/31/whitmer-signs-make-it-in-michigan-budget.

Encl. 1 p.5 and license transfer, site-based PNP employees will be employed by OPCO, supplemented by staff augmentation and/or contractors who report to and are subject to OPCOs direction and control.

The general corporate information required by 10 CFR 50.33(d)(3) regarding Holtec, Holtec Power, Nuclear Asset Management Company, LLC, Holtec Palisades, and OPCO, including identification of their principal officers and directors, is provided in Attachment C to this Application. Attachment C contains personally identifiable information, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Applicants request that this personally identifiable information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(6). All such information has been redacted from the version of Attachment C attached to this Enclosure 1. An unredacted version of Attachment C is provided in the non-public Enclosure 1A addenda, which Applicants request be withheld under 10 CFR 2.390(a)(6).

Because OPCO is a newly-formed entity, the information contemplated by 10 CFR 50.33(f)(4) is included herein. OPCO is a Delaware limited liability company whose sole member is Holtec Power. As of the date of this Application, OPCO has no liabilities. Pursuant to the terms of its LLC operating agreement and the Operator Services Agreement with Holtec Palisades (Enclosure 5), OPCO will be authorized to undertake all reasonably necessary corporate actions to operate PNP for itself and as agent for Holtec Palisades, including entering into contracts, employing personnel, acquiring equipment and other property, borrowing and remitting funds, and taking other actions as reasonably necessary to carry out its business. As OPCOs sole member, Holtec Power holds 100% of the membership interests in OPCO. OPCO is governed by its Sole Member with delegated authority to officers, all of whom are listed in Attachment C. These individuals are ultimately accountable to the Holtec Executive Committee members also listed in Attachment C.

OPCO is authorized to make distributions, if any, to Holtec Power at times and in amounts determined by the OPCO management committee, subject to applicable project finance restrictions. However, OPCO is a service company that is not expected to generate revenue or make distributions to its parent companies. As described in Section 6 below, revenue from PNPs power generation will flow through Holtec Palisades. Holtec Palisades will reimburse OPCO, at cost, for OPCOs expenses incurred at PNP pursuant to the Operator Services Agreement (Enclosure 5). Holtec will enter into a Support Agreement (Enclosure 6) pursuant to which it will provide Holtec Palisades (and thus, indirectly, OPCO) with funds to support facility operations, if necessary, in accordance with the terms thereof. OPCOs and Holtec Palisadess financial qualifications are discussed in Section 6 below.

Holtec is the ultimate parent company of all the entities described in Attachment C. Holtec is a privately held corporation. It is owned by its shareholders as follows: (1) The Great Banyan Trust, 36.33% ownership interest; and (2) Multi-Decades Trust, 63.67% ownership interest. These trusts are controlled by Dr. Krishna Singh, who is a U.S. citizen.

4.

Foreign Ownership, Control, or Domination As noted immediately above, Holtec is a privately held corporation owned by domestic trust companies that are in turn controlled by a U.S. citizen. Holtec is led by its Chief Executive Officer Dr. Krishna Singh, and management of the company is vested in the Holtec executive leadership team, including the Executive Committee members listed in Attachment C. Holtecs CEO,

Encl. 1 p.6 principal officers, and Executive Committee are all U.S. citizens. Holtecs Board of Directors serves in an advisory capacity to Holtecs executive leadership team. The Board of Directors is not comprised entirely of U.S. citizens, as indicated in the unredacted version of Attachment C included in Enclosure 1A. No Director represents the interests of a foreign company or governmental authority. Holtecs Board is comprised of individuals who advise Holtecs executive leadership based on their extensive nuclear industry experience and leadership roles in prominent nuclear utilities and nuclear governing bodies, including international utilities and governing bodies. The Board of Directors is an advisory board. It does not have the individual or collective authority to direct or control the conduct of NRC-regulated activities by Holtec or its subsidiaries, including OPCO and Holtec Palisades, nor do they have authority to appoint or remove any of the officers responsible for the conduct of NRC-regulated activities. Dr. Krishna Singh serves as the Chairman of the Board of Directors and has a deciding vote on matters before the Board. Holtec is privately held, and as such the Directors are appointed, and may be replaced, by Holtecs owners, which are trust companies organized in the State of Florida and the State of Nevada, respectively, and controlled by a U.S. citizen. Holtec has been privately owned by a U.S. citizen or corporation since its inception in 1986 without any non-U.S. control or domination.

Through its Executive Committee, Holtec will exercise corporate parent approval and oversight of Holtec Palisades and OPCO, including budgetary approvals, financial performance, hiring decisions for senior management, and approval of major capital expenditures. All of the members of the Holtec Executive Committee are U.S. citizens. All of the managers and principal officers of the intermediate Holtec subsidiaries, Holtec Power and Nuclear Asset Management Company, are U.S. citizens. All of the principal officers of Holtec Palisades and OPCO who will have direct responsibility for NRC-regulated activities are U.S. citizens. As such, OPCO and Holtec Palisades will not be owned, controlled, or dominated by any foreign person.

As the licensed entity with possession of and responsibility for direct oversight and control of the site, OPCO will act for itself and on behalf of Holtec Palisades as its agent. OPCO and Holtec Palisades are not acting as the agent or representative of any other entity in the proposed transfer.

5.

Technical Qualifications OPCO will be fully staffed and resourced as a plant operator with an organizational structure based on ENOIs previous operating organization, with certain functions that were previously fulfilled by ENOI home office personnel relocated to either the plant site or Holtecs corporate headquarters. OPCO will be managed and staffed by personnel who have decades of nuclear plant operating experience at PNP and other U.S. nuclear plants. As an operator with responsibility for a single facility, OPCOs organization will consist primarily of on-site personnel at PNP, a substantial portion of which previously served in ENOIs operating organization prior to shutdown. OPCOs senior leadership will be made up of existing Holtec-affiliated officers and senior leadership, including the incumbent PNP Site Vice President who served in that role during PNPs permanently defueled operations and who will report to a Chief Nuclear Officer with over four decades of nuclear operating experience and senior management roles. While OPCO will be exclusively responsible for the conduct of licensed activities at PNP, OPCOs organization will be augmented by various Holtec corporate and administrative support, and OPCOs leadership will

Encl. 1 p.7 draw on the decades of experience of Holtecs senior leaders who will oversee and provide business direction to OPCO.

Figure A-1 below provides an overview of the operating organization, OPCOs senior management, and the oversight and lines of reporting to Holtec. Attachment D includes organization charts showing the entire site organization of approximately 550 full-time employees and their reporting relationships up to the Site Vice President. As shown in Figure A-1, OPCOs site organization, led by the Site Vice President, will report to OPCOs senior leadership, who in turn will ultimately answer to the Holtec Executive Committee composed of the members shown in Attachment C. While OPCO leadership will be accountable to the Holtec Executive Committee, and, through the Executive Committee, Holtec will exercise the typical approval and oversight rights of a corporate parent (e.g., budgetary approval and financial oversight, hiring decisions for senior management, approval of major capital expenditures, and ensuring a strong nuclear safety culture from the top down), OPCOs officers will be ultimately responsible for and have control over all licensed activities at PNP. This responsibility and control includes daily operations, compliance with the Facility licensing basis, hiring, training, and supervising site employees, licensing reviews and submittals to NRC, engineering, maintenance, and outage work, and managing operating costs.

Encl. 1 p.8 Figure A Palisades Energy, LLC Senior Management Organization Chart

  • Expected to be filled by incumbent personnel who worked at PNP in significant management role during operations.

Security Manager also reports to Holtec Security Internationals Director of Fleet Security Operations.

President Kelly Trice Holtec International Executive Committee Chief Nuclear Officer Richard Burroni Site Vice President Michael Mlynarek VP, Licensing and Regulatory Affairs Jean Fleming Manager, Quality Assurance*

General Manager, Plant Operations*

Director, Engineering*

Director, Site Services*

Employee Concerns Chief Financial Officer Troy Geauthreaux Manager, Security

~--

I I

I I

I I

I I

I I

I I

I

Encl. 1 p.9 (a)

Senior Leadership The OPCO executive leadership team will oversee safe operation of PNP and will be ultimately responsible for the conduct of licensed activities in accordance with the plant power operations licensing basis (POLB). The executive leadership team consists of the President, Chief Nuclear Officer, Chief Financial Officer, Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis, and Site Vice President.

OPCOs senior leadership has over a century of collective nuclear operational experience, with most holding Senior Reactor Operator licenses during their careers and bringing in-depth management experience from their prior roles in nuclear operating organizations. The OPCO executives with key nuclear oversight roles are discussed in this section, with all senior leadership roles and responsibilities provided in Table A-1.

OPCO will be led by Kelly Trice, as President. Mr. Trice currently serves as HDIs President and will continue in that role in addition to his responsibilities for OPCO. Mr. Trice brings over 30 years of executive management experience of complex business enterprises and nuclear industry leadership. Mr. Trice previously served as the president of both the power division and the facilities and plant services division of Chicago Bridge and Iron (CB&I). In this capacity, he managed approximately 70 offices worldwide with operations spanning four continents. At its peak, this enterprise had approximately 200 plants under contract, which included about 40% of the U.S.

nuclear operating fleet and another 150 petrochemical plants, 17,000 employees and a backlog of roughly $10B with annual revenues of $3.5B. Mr. Trice also served as executive vice president of Bruce Power, a major utility in Canada, which operates eight nuclear reactors and generates approximately 6.4 GW of power. In this capacity, he had the overall responsibility for all of Bruce Powers capital programs, as well as the refurbishment of six reactors. The planned budget for this capital program was approximately $14B CAD. Mr. Trice is a graduate of the U.S. Navys Nuclear Propulsion Program. He served in the U.S. Navy for six years as an officer on a nuclear submarine and held several top-secret and Department of Energy (DOE) Q clearances. Mr. Trices resume is included in Attachment D.

All PNP personnel responsible for licensed activities will report to OPCOs Chief Nuclear Officer, Richard Burroni. Mr. Burroni has worked in the nuclear industry for over four decades, most recently as HDIs Site Vice President of Indian Point Energy Center. Mr. Burroni has served in various nuclear industry roles of increasing responsibility since joining the New York Power Authority at Indian Point Unit 3 Nuclear Power Plant in 1980. His positions included Technical Services Engineer, Engineering Supervisor for Performance, Assistant Operations Manager for Support, Supervisor Instrument and Control Engineering, and Superintendent/Manager of the Instrument and Control Department. Following his role in Instrument and Control, Mr. Burroni served in multiple engineering management positions at Indian Point before becoming Chief Engineer for Entergys northern reactor fleet. He then returned to Indian Point as Engineering Director and has served as Site Vice President for 3 years under Holtecs ownership. Prior to the transfer of operational authority to OPCO, Mr. Burroni will transition out of his role as Indian

Encl. 1 p.10 Point Site Vice President. Mr. Burroni received his Senior Reactor Operator license in 1986. His resume is included in Attachment D.

PNPs Quality Assurance functions will report to Ms. Jean Fleming as OPCOs Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis. Ms. Fleming will report directly to the OPCO President. Ms. Fleming currently oversees the licensing, permitting, and compliance functions of HDIs decommissioning projects, Holtecs dry storage business, and the Holtec SMR-160 small modular reactor design. Ms. Fleming previously served as director of site regulatory compliance and licensing at PSEG Nuclear, LLC, where she oversaw the licensing and compliance organization with responsibilities for the Salem and Hope Creek operations and support for licensing activities at Peach Bottom. Ms. Fleming held a Senior Reactor Operator license for the Salem Nuclear Plant from 2010 to 2017. Prior to joining the private commercial nuclear industry, Ms. Fleming served in the U.S. Navy as Nuclear Surface Warfare Officer onboard the USS Harry S. Truman. Ms. Flemings resume is included in Attachment D.

PNPs site organization will continue to report to the Site Vice President, Mr. Mike Mlynarek. Mr.

Mlynarek has worked at PNP since 1988 and has served as the Site Vice President since June 2022.

He has over 37 years of experience in nuclear power in Michigan, beginning at the Big Rock Point Nuclear Power Plant in 1985. Mr. Mlynarek has served in many leadership positions at PNP over the years, including the plant reactor engineer, nuclear operations shift manager, chemistry manager, nuclear independent oversight manager, and decommissioning manager. As a former evaluator at the Institute of Nuclear Power Operations (INPO), Mr. Mlynarek served nuclear industry leadership on evaluation and assistance teams at 14 stations throughout the U.S. and at 6 stations throughout Japan, Finland, France, Bulgaria, the United Arab Emirates, and England.

Mlynarek has held a Senior Reactor Operator License for 17 years. His resume is included in Attachment D.

Table A-1 below summarizes the roles and responsibilities of OPCOs senior management.

Table A-1 Responsibilities of Palisades Energy, LLC, Senior Management President Ultimately responsible for the safe and reliable operations of PNP; responsible for overall corporate policy and provides executive direction and guidance for PNP as well as promulgates corporate policy through the senior management staff; establishes effective management controls to maintain nuclear safety and organizational effectiveness; provides strategic direction and guidance for the company; establishes expectations for high levels of quality, safety, and efficiency throughout the company; routinely reports to Holtec International Executive Committee; assures sufficient resources and support functions to achieve nuclear safety objectives.

Encl. 1 p.11 Chief Nuclear Officer (CNO)

Reports directly to the President; highest level nuclear executive officer; responsible for providing top-level direction for the safe and reliable operation of PNP; responsible for execution of the Quality Assurance Program; ensures engineering services and operational support are provided to maintain nuclear safety; exercises oversight and governance of corporate or home office functions that support plant operations, including procurement, information technology, and human resources; holds no ancillary responsibilities that may distract from the officers responsibility for nuclear safety.

Chief Financial Officer (CFO)

Reports directly to the President; responsible for development and management of all financial matters, including financial statement reporting, budgeting, analysis, accounting, billing, and maintaining adequate internal financial controls; and reporting to ensure regulatory compliance.

Vice President of Licensing, Regulatory Affairs, and Probabilistic Safety Analysis Reports directly to the President; responsible for verifying effective execution of the Quality Assurance Program, including maintaining independence through the audit function and verifying the adequacy of the Quality Assurance Program, including activities related to vendor quality; responsible for ensuring that programmatic elements are in place to support plant personnel in complying with and carrying out Quality Assurance Program requirements.

Site Vice President Reports directly to the CNO; responsible for managing day-to-day nuclear operations and operations support; directly responsible for management of the site line organization; responsible for implementing Quality Assurance Program in all site activities; responsible for establishing policies, goals, and objectives necessary to maintain nuclear safety; responsible for overall safe plant operation and exercising oversight and control over on-site activities necessary for the safe operation and maintenance of the plant.

(b)

Site Organization Following shutdown in May 2022 and transfer from ENOI to Holtec in June 2022, HDI has maintained a meaningful number of incumbent site management that were employed at PNP during operations. As of the Application date, the current site organization consists of approximately 220 personnel, primarily made up of incumbent ENOI personnel, many of whom held management and senior operator positions during operations. As a result, HDI has retained key talent and institutional knowledge from the prior operations period. HDI will staff PNP to the qualifications and levels required by the reinstated POTS and Updated Final Safety Analysis

Encl. 1 p.12 Report (UFSAR)9 to ensure compliance with the reinstated POLB and NRC regulations applicable to an operating reactor, prior to transfer of operational authority to OPCO. Attachment D includes organizational charts showing the planned 550-person PNP organization that will report up to OPCOs senior leadership following the transfer. Attachment D includes all on-site and off-site positions for activities affecting plant safety. The organization charts are based on the previous operating organization in place prior to shutdown and define the lines of authority, responsibility, and communication from senior management levels through intermediate levels to and including all operating organization positions. As part of its staffing plan, HDI is developing functional descriptions of departmental responsibilities and relationships, and job descriptions for key positions. The reinstated power operations UFSAR will also document the requirements for the job titles referred to in the reinstated POTS. Prior to consummating the transfer, HDI and OPCO will provide NRC with evidence demonstrating that the PNP operating organization has returned to operational levels and qualifications and meets the applicable requirements of the reinstated POLB.

HDI is currently implementing a hiring, training, and recertification plan to ensure that all positions in the operational organization are filled prior to transfer to OPCO with individuals qualified to meet the POLB requirements. As of the Application date, HDI is in the process of reinstating a 10 CFR Part 55 training program for licensed reactor operators to support operational staffing needs and training lead times. The operational organization will meet the requirements of the POTS, Chapter 12 of the reinstated UFSAR, and the power operations Quality Assurance Program Manual (QAPM).10 HDI will reinstate training programs consistent with Chapter 12 of the power operations UFSAR that are either accredited by the National Nuclear Accrediting Board or meet the standards set forth in Section 5 of ANSI/ANS 3.1-1978 to ensure that the technical support organization has the combined education, experience, and skills sufficient to ensure safe and efficient operation of the plant.

In addition to direct employees, OPCO will leverage standard nuclear industry staff augmentation arrangements and contracted labor for certain specialty scope. Holtec Security International, LLC 9 As discussed during public meetings regarding the restart, HDI intends to submit two license amendment requests to reinstate (1) the POTS and RFOL license conditions and (2) the previous Administrative Controls sections of Technical Specifications. See NRC, Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition, June 4, 2018 (ML18114A410); NRC, Issuance of Amendment No. 272 Re: Permanently Defueled Technical Specifications, May 13, 2022 (ML22039A198). Coincident with implementation of the two Technical Specifications license amendments, HDI expects to reinstate, via the 10 CFR 50.59 process, the power operations UFSAR based on UFSAR Rev. 35 (the version in effect immediately prior to shutdown) with appropriate conforming amendments. See Palisades Nuclear Plant, Revision 35 to UFSAR, Chapter 12, Conduct of Operations, Apr. 14, 2021 (ML21125A337). HDI expects that any changes to UFSAR Revision 35, Chapter 12 will reflect the fact that OPCO will have a more site-centric organization due to the fact that ENOI had a large corporate/home office organization to provide fleet-wide services to all Entergy-owned plants, whereas OPCO will locate all principal safety functions at the Palisades plant site with a more limited set of typical corporate support services provided by the Holtec home office (e.g., procurement, human resources, tax and accounting).

10 Palisades is currently governed by HDIs fleet-wide Decommissioning Quality Assurance Program. See HDI Letter, Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Rev. 2, Aug. 3, 2022 (ML22215A147). HDI expects to reinstate a power operations Quality Assurance Program via 10 CFR 50.54(a) coincident with implementation of the POTS.

Encl. 1 p.13 (HSI), a wholly owned subsidiary of Holtec Power, will continue to provide site security services and employ site security personnel via a contractual arrangement with OPCO. HSI currently provides security services and employs security personnel under a contract with, and subject to the supervision and control of, HDI. All security personnel will be directly responsible to and subject to the direction and control of OPCO and the Site Vice President.

As part of the reinstatement of the POLB, HDI will revise PNP policies, programs, and procedures to support the return to operations in accordance with the reinstated POTS, UFSAR, and NRC regulatory requirements applicable to operating reactors.11 HDI has maintained the access and fitness-for-duty programs during decommissioning in a manner that ensures current site personnel will be able to transition back to equivalent roles in OPCOs operational organization. Upon transfer of operational authority, OPCO will work in accordance with the revised power operations program documents. The PNP programs and procedures at the time of the license transfer, including, as applicable, the reinstated emergency plan, operational security plans, fire protection program, radiological protection, and Quality Assurance Program, will be implemented post-license transfer by OPCO. Any subsequent changes to these procedures will be determined by OPCO and made in accordance with the applicable change requirements set forth in NRC regulations.

(c)

Home Office Support OPCO will have dedicated home office support for certain service functions located in Holtecs corporate headquarters in Camden, New Jersey. Among other things, OPCO will leverage efficiencies of consolidated accounting, finance, procurement, tax, human resources, and information technology. OPCO will remain ultimately responsible for all licensed activities, including nuclear safety matters.

Wholly owned Holtec affiliate HSI currently provides site security services and employs security personnel pursuant to a contract between HSI and HDI, subject to HDIs ultimate direction and control. Post-transfer, HSI will continue providing security services to PNP pursuant to a contract with OPCO, subject to OPCOs ultimate direction and control.

(d)

Corporate Governance and Oversight Holtec Palisades and OPCO are wholly owned subsidiaries of Holtec. Holtec Palisadess senior leadership will report to the Holtec Executive Committee made up of the individuals listed in Attachment C. While Holtec will exercise general corporate oversight and decision-making authority over financial, personnel, and other business matters of OPCO, OPCOs senior leadership will ultimately be responsible for the conduct of licensed activities and day-to-day operations.

11 HDI intends to separately submit license amendment requests to reinstate a power operations Emergency Plan and Emergency Action Levels. The remainder of site program documents will return to an appropriate power operations basis in accordance with the requirements in 10 CFR 50.59 and 10 CFR 50.54.

Encl. 1 p.14 Holtec is an integrated technologies enterprise providing innovative solutions, equipment, and services to the global nuclear, solar, geothermal, and fossil power generation sectors of the energy industry. Holtec has extensive experience in providing safety-related services to operating commercial power plants, as well as in designing, manufacturing, and installing safety-related equipment, and possesses in-house capabilities to design, engineer, analyze, construct, and deploy the technologies to manage used nuclear fuel discharged from nuclear reactors. Holtec has decades of experience implementing a quality assurance program and NRC licensing organization for its dry storage systems. Holtec, which is led by Dr. Krishna Singh, is an industry leader in nuclear fuel management systems. In this undertaking, Holtec brings a diverse corporate resume of prior accomplishments in nuclear projects in the U.S. and abroad, a substantial list of ongoing and satisfactorily completed nuclear projects (including many turnkey projects), and a long safety and quality record that demonstrates its commitment to nuclear safety and excellence.

(e)

Conclusion The proposed license transfer will provide PNP with a management team and site organization that is experienced and qualified to oversee and implement PNPs operations in accordance with the reinstated POLB and all applicable NRC requirements. The necessary management processes and controls will be applied, with clear lines of authority and communication. For these reasons, OPCO will have the necessary technical qualifications to safely perform the authorized activities under the RFOL in accordance with AEA and NRC regulations.

6.

Financial Qualifications Pursuant to 10 CFR 50.33(f)(2) and NRCs guidance in the Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance (NUREG-1577, Rev. 1), a non-electric utility must demonstrate that it has reasonable assurance of obtaining the funds necessary to cover the plants estimated operating costs. Holtec Palisades and OPCO will be financially qualified to own and operate PNP as demonstrated by the projected income statements enclosed with this Application. Holtec Palisades has entered into a Power Purchase Agreement (PPA) with Wolverine Power Supply Cooperative, Inc. (Wolverine), and Hoosier Energy Rural Electric Cooperative, Inc. (Hoosier), to collectively sell all of the Facilitys energy and capacity under a long-term, fixed price arrangement that will remain in effect for the full term of the Facility license, including any license renewal terms. While not required by NRC regulations, further assurance will be provided via a Support Agreement provided by Holtec and the expected requirements of the DOE project financing agreements described in Enclosure 3A.

OPCO will be financially qualified pursuant to the Operator Services Agreement under which Holtec Palisades will reimburse OPCO for all of its operating costs.

While not part of the 10 CFR 50.33(f)(2) financial assurance demonstration, Holtec Palisades is in the process of securing a DOE loan guarantee under Title XVII of the Energy Policy Act of 2005 and a grant from the State of Michigan to support the capital expenditure necessary to return PNP to full-power operations. Funds received under the DOE loan program and Michigan grant are not intended to fund Facility operating costs after the return to service. Expected DOE debt servicing costs are addressed in the pro forma income statements in Enclosure 3A.

Encl. 1 p.15 The transfer of operational authority from HDI to OPCO will not affect the form of Holtec Palisadess decommissioning funding, which will continue to be satisfied by prepaid funds held in the PNP decommissioning trust fund. Following the return to operations, Holtec Palisades will be subject to the decommissioning funding requirements applicable to an operating facility, as described below.

(a)

Financial Qualifications for Operations As the facility owner, Holtec Palisades has the right to all output from PNP. Holtec Palisades has entered into a life-of-plant PPA with Wolverine and Hoosier for all Facility energy and capacity during the license term and any subsequent renewal terms. The pricing terms of the PPA are reflected in the proprietary Enclosure 3A. Wolverine and Hoosier are electric cooperatives that serve as their own rate-setting authority. They will recover amounts paid to Holtec Palisades under the PPA through tariff rates charged to their members, which members in turn collect all such costs from their retail ratepayers; i.e., even though Holtec Palisades is not an electric utility under NRC regulations, the two Facility offtakers are. The proprietary pro forma income statement provided in Enclosure 3A demonstrates that PNP will have sufficient operational revenue to fund operation and maintenance costs for PNP. Enclosure 3A includes sensitivity analyses demonstrating the impact of a reduction in Facility capacity or generation revenuein both cases, demonstrating that PNP will continue to generate positive net income.

In addition to power generation revenue, Holtec International will enter into a Support Agreement under which Holtec International will provide up to $75 million to Holtec Palisadesan amount sufficient to cover fixed operating and maintenance costs during an extended outage, as contemplated by NUREG-1577. While not required by NRC regulations, the Support Agreement bolsters Holtec Palisadess financial wherewithal by providing additional financial assurance in the form of a formalized parent company commitment. A form of this agreement is provided in. The Support Agreement is substantially similar to the support agreement Holtec currently has in connection with the Big Rock Point spent fuel management operating fund,12 with appropriate modifications to reflect the differences in the underlying regulatory costs and obligations between Big Rock Point and PNP. Information regarding Holtecs financial capability to satisfy this support commitment is included in proprietary Enclosure 4A.

OPCO will be financially qualified pursuant to the Operator Services Agreement it will enter into with Holtec Palisades. The Operator Services Agreement requires Holtec Palisades to reimburse OPCO, at cost, for all operating expenses incurred to operate and maintain PNP. A form of this agreement is provided in Enclosure 5. The form agreement is substantially similar to the current 12 HDI, Holtec Decommissioning International, LLC (HDI) satisfactory documentary evidence required before the planned closing date of the purchase and sale transaction of Palisades Nuclear Plant and Big Rock Point Plant, Encl.

4, June 24, 2022 (ML22178A077).

Encl. 1 p.16 Decommissioning Operator Agreement between HDI and Holtec Palisades,13 with appropriate modifications to reflect OPCOs role at an operating reactor.

HDI requests that Enclosures 3A and 4A be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4), as set forth in the affidavit provided in Enclosure 2. A non-proprietary version of the pro forma financial information is provided as Enclosure 3.

(b)

Decommissioning Funding Holtec Palisades will continue to meet decommissioning funding requirements via prepaid funds deposited in the PNP Nuclear Decommissioning Trust (NDT). Holtec Palisades will manage the NDT between now and the transition date in a manner that ensures Holtec Palisades will comply with the operational decommissioning funding requirements (i.e., 10 CFR 50.75) that will apply to PNP once it returns to power operations. On the transition date, PNP will exit the decommissioning oversight process and enter the reactor oversight process coincident with the effectiveness of the POTS.

As of the date of this Application, PNP is still in decommissioning status, and HDI is still adhering to the PNP Post Shutdown Decommissioning Activities Report (PSDAR). HDI has not commenced any major decommissioning activities at PNP, as defined by 10 CFR 50.2. Upon a final decision by Holtec to suspend decommissioning and pursue restart in earnest, HDI expects to docket a notice under 10 CFR 50.82(a)(7) (Restart Notice) indicating its intent to depart from the current PSDAR schedule to focus on restart efforts until such time as PNP either successfully resumes operations (and thus exits decommissioning) or abandons the restart project. HDI anticipates filing this formal Restart Notice the first quarter of 2024. Certain decommissioning compliance activities will continue following the Restart Notice, and PNP will remain in decommissioning status and governed by its permanently defueled licensing basis until such time as the POLB is reinstated. However, following the Restart Notice, Holtec Palisades will manage withdrawals from the NDT with the objective of maintaining NDT funds at a level sufficient to satisfy Holtec Palisadess decommissioning funding obligations upon a return to power operations.

Prior to or in parallel with reinstatement of the POLB, HDI will submit another 10 CFR 50.82(a)(7) notice formally rescinding the PSDAR.

The transfer of operating authority from HDI to OPCO is conditioned on NRC approval of supportive license amendment requests and granting of the 10 CFR 50.82(a)(2) exemption to allow PNP to return to power operations. Accordingly, when the transfer occurs, Holtec Palisades and OPCO will no longer be subject to the decommissioning funding requirements applicable to shutdown plants (i.e., 10 CFR 50.82) and will revert back to the decommissioning funding requirements applicable to operating plants (10 CFR 50.75). Likewise, HDIs current exemption from 10 CFR 50.82(a)(8)(i)(A) authorizing use of NDT funds for spent fuel management and site 13 HDI, Holtec Decommissioning International, LLC (HDI) satisfactory documentary evidence required before the planned closing date of the purchase and sale transaction of Palisades Nuclear Plant and Big Rock Point Plant, Encl.

3, June 24, 2022 (ML22178A077).

Encl. 1 p.17 restoration activities will cease to apply upon the return to operations.14 Consistent with longstanding NRC policy, Holtec Palisades will fund spent fuel management costs incurred after the restart out of the plants operational revenues. The costs of maintaining the PNP ISFSI and spent fuel pool are included in the plant operating costs set forth in the pro forma income statements. As demonstrated in Enclosure 3A, revenue from the plant will be sufficient to cover plant operations, including spent fuel management.

Consistent with the 10 CFR 50.75 operating plant paradigm, following withdrawal of the PSDAR and transfer of authority to OPCO, OPCO and Holtec Palisades will provide decommissioning funding assurance based on the requirements of 10 CFR 50.75(c). As provided in HDIs most-recent 10 CFR 50.82(a)(8)(v) report, the formula amount for PNP is $539,595,280 in 2022 dollars.15 This 10 CFR 50.75(c) formula amount is conservative for PNP because it exceeds the estimated costs of radiological decommissioning from the previously-submitted HDI Site-Specific Decommissioning Cost Estimate.16 The value of the PNP NDT fund assets as of November 24, 2023, is approximately $560 million.

As noted in HDIs most recent decommissioning funding status report, Holtec Palisades has voluntarily deferred reimbursement of certain decommissioning costs that are otherwise reimbursable from the NDT.17 As of the date of this Application, Holtec Palisades is still carrying an accrual of decommissioning costs that have been incurred but not reimbursed from the NDT.

Holtec Palisades intends to manage NDT withdrawals in a manner that safeguards Holtec Palisadess ability to meet the requirements of 10 CFR 50.75 upon returning to operational status.

Prior to the transfer, HDI will continue to submit annual decommissioning funding reports that will provide updated NDT balances and updated 10 CFR 50.75(c) formula calculations for PNP.

Pursuant to 10 CFR 72.30(b)(3), Applicants must also identify a method for funding ISFSI decommissioning. HDI updated the most recent PNP ISFSI decommissioning cost estimate in March 2023.18 The escalated ISFSI decommissioning amount was $10.1 million (2022 dollars).

Given the amount of prepaid funds available in the PNP NDT relative to the 10 CFR 50.75(c) 14 The exemption authorizes HDI to use a portion of the funds from the [Palisades NDT] for spent fuel management and site restoration activities at [Palisades] in accordance with HDIs PSDAR and [site specific cost estimate], dated December 23, 2020. NRC, Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) for Holtec Decommissioning International, LLC, Dec. 31, 2021 (ML21286A506). In the second 10 CFR 50.82(a)(7) notice HDI files alongside the reinstatement of the POLB, HDI intends to acknowledge via docketed correspondence that the exemption has been rescinded and is no longer applicable upon withdrawal of the PSDAR.

15 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 6, Mar. 31, 2023 (ML23090A140).

16 HDI, Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, Dec. 23, 2020 (ML20358A232).

17 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 4, Table 1, n.1, Mar. 31, 2023 (ML23090A140).

18 HDI, Report on Status of Decommissioning Funding for Reactors and ISFSIs, Encl. 4 (Mar. 31, 2023)

(ML23090A140).

Encl. 1 p.18 formula amount and HDIs ability to manage withdrawals from the NDT, HDI expects that there will be sufficient funds in the NDT to address the radiological decommissioning costs of the ISFSI, accounting for the 2% real rate of return allowed by NRC regulations and the anticipated ISFSI decommissioning date (following DOEs removal of spent fuel from the PNP site). As noted above, this funding demonstration is conservative because HDIs previously-submitted Site-Specific Decommissioning Cost Estimate projected the total cost of Facility radiological decommissioning, including the ISFSI, at an amount that is less than the 10 CFR 50.75(c) formula amount.

The current value of funds held in the NDT is sufficient to satisfy the decommissioning funding obligations for an operational plant under 10 CFR 50.75(c) and 10 CFR 72.30. Prior to implementing the license transfer, HDI will provide evidence demonstrating that Holtec Palisades possesses sufficient financial assurance to satisfy the operating reactor requirements in 10 CFR 50.75 and the ISFSI decommissioning funding requirements in 10 CFR 72.30.

Consistent with the 10 CFR 50.75(f)(3) and 10 CFR 50.54(bb), OPCO will submit a preliminary decommissioning cost estimate and spent fuel management funding plan five years before expiration of the current license term; i.e., on or before March 24, 2026. The preliminary decommissioning cost estimate is expected to be based on the same cost-estimation methodologies used in the December 2020 Site-Specific Decommissioning Cost Estimate HDI previously submitted for PNP. Accordingly, Applicants expect that those submittals will not change Applicants ability to provide reasonable assurance that funds will be available for the decommissioning process. OPCO also intends to submit a subsequent license renewal application at that same time to satisfy the timely renewal requirements of 10 CFR 2.109(b). If granted, a subsequent renewal term would afford more time for prepaid funds in the NDT to accrue interest before the plant eventually re-enters decommissioning.

For the foregoing reasons, Applicants have provided reasonable assurance of obtaining the funds necessary to cover estimated operating and decommissioning costs and are thus financially qualified.

7.

Restricted Data and Classified National Security Information The proposed transfer of ownership and operating authority does not involve any Restricted Data or possession of other Classified National Security Information, and it is not expected that possession of any such information will become involved in the licensed activities of OPCO.

However, in the event that such information does become involved, and in accordance with 10 CFR 50.37, Agreement Limiting Access to Classified Information, OPCO agrees that it will appropriately safeguard such information and will not permit any individual to have access under 10 CFR Part 25, Access Authorization and/or 10 CFR Part 95, Facility Security Clearance and Safeguarding of National Security Information and Restrict Data.

Encl. 1 p.19 8.

Other Nuclear Regulatory Issues (a)

Price-Anderson Indemnity and Nuclear Insurance OPCO requests that NRC amend the Price-Anderson indemnity agreement for PNP to add OPCO as a licensee for the facility and name OPCO as an indemnified entity upon the consummation of the proposed transfer of licensee authority.

OPCO will maintain on-site property damage insurance coverage and off-site nuclear liability coverage as required by NRC, and prior to the license transfer, OPCO will provide proof that this coverage will be in place on the effective date of the transfer. HDI has submitted the normal insurance exemptions for plants in decommissioning, requesting to step down on-site and off-site coverages required by 10 CFR 50.54(w)(1) and 10 CFR 140.11(a)(4) once fuel in the spent fuel pool has cooled sufficiently to reasonably eliminate the risk of the zirconium cladding catching fire in a loss of coolant accident scenario.19 As of the date of this Application, NRC has not issued these exemptions. Subject to HDIs docketing of its formal notice of suspension of decommissioning activities, HDI intends to maintain operational on-site and off-site insurance coverages even if NRC approves the requested exemptions.

(b)

Standard Contract for Disposal of Spent Nuclear Fuel Holtec Palisades will continue to hold title to the spent nuclear fuel at PNP and will maintain the DOE Standard Contract, including all rights and obligations under that contract. Standard Contract, No. DE-CR01-83NE44373, dated as of June 3, 1983, was entered into by the previous owners and the United States of America, represented by the DOE, to govern the disposal of the spent nuclear fuel generated at PNP. Holtec Palisades expects to recover from DOE through litigation or settlement of its claims for the spent fuel management costs it will incur as a result of the DOEs breach of its obligations to dispose of the spent nuclear fuel.

(c)

Exclusion Area Control Upon approval of the transfer, OPCO will have control over the PNP exclusion area and will have authority to determine all activities within the exclusion area to the extent required by 10 CFR Part 100.

(d)

Quality Assurance Program PNP is currently operating under its Fleet Decommissioning Quality Assurance Program.20 Coincident with the transfer of operational authority, HDI will reinstate a power operations QAPM pursuant to 10 CFR 50.54(a). Upon transfer, OPCO will retain authority and responsibility for the 19 HDI Letter PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance, Oct. 26, 2022 (ML22299A059); HDI Letter PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance, Oct. 26, 2022 (ML22299A062).

20 HDI Letter, Update Report For Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Rev. 2, Aug. 3, 2022 (ML22215A147).

Encl. 1 p.20 functions necessary to fulfill the quality assurance requirements required by the POTS and as specified in the power operations QAPM.

HDI has maintained IT infrastructure and records required to comply with NRC recordkeeping requirements that will apply upon reinstatement of the POLB. OPCO will have full access to all such assets and records following transfer of operational authority.

(e)

No Significant Hazards Consideration The changes proposed for the RFOL are shown in Attachment A to this Application. The changes conform the RFOL to reflect the proposed transfer of authority and responsibility for licensed activities under the RFOL to OPCO. Consistent with the generic determination in 10 CFR 2.1315(a), the proposed conforming license amendments involve no significant hazards consideration, because they do no more than conform the RFOL to reflect the proposed transfer.

The proposed license amendments do not involve any change in the design or licensing basis, plant configuration, status of PNP, or the requirements of the RFOL. Therefore, the proposed action does not: (1) involve an increase in the probability or consequences of an accident previously analyzed; (2) create the possibility of a new or different kind of accident from the accidents previously analyzed; or (3) involve a significant reduction in a margin of safety.

9.

Environmental Review The requested consent to transfer of licensed operator authority for PNP is exempt from environmental review because it falls within the categorical exclusion contained in 10 CFR 51.22(c)(21) for which neither an Environmental Assessment nor an Environmental Impact Statement is required. The proposed transfer does not involve an increase in the amounts, nor a change in the types, of non-radiological effluents that may be released off-site. Further, there is no increase in the individual or cumulative occupational radiation exposure, and the proposed transfer has no environmental impact. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.

10.

Effective Date and Other Required Regulatory Approvals Applicants are targeting a transfer of operational authority to occur at the same time as reinstatement of the POLB. Subject to NRC approval of the supporting regulatory actions, HDI is proposing to submit a notification of transition to power operations letter to NRC that will docket HDIs and OPCOs satisfaction of the implementation conditions for the license transfer, as well as the other NRC approvals necessary for reinstatement of the POLB. Upon docketing this transition notification letter, PNP intends to transition from a facility in decommissioning back to a power operations plant, and HDI will transfer its authority to conduct licensed activities to OPCO.

To support the expected regulatory schedule, Applicants request that NRC review this Application on a schedule that will permit issuance of an order consenting to the transfer and approving conforming license amendments by December 31, 2024. Applicants request that the consent be

Encl. 1 p.21 immediately effective upon issuance and authorize the transfer to occur up to one year after issuance or such later date as NRC may authorize. HDI will notify NRC staff at least five business days prior to the expected transfer date.

Applicants do not anticipate the need for other agency approvals in order to transfer licensed authority to OPCO. Applicants will continue to coordinate with NRC on the status of the other NRC approvals needed to support the Facility restart, the timing of which could impact the anticipated transfer date.

11.

Conclusion The proposed transfer of authority to conduct licensed activities under the RFOL will be consistent with the requirements of AEA, NRC regulations, and regulatory guidance. The transfer will not be inimical to the common defense and security and will not involve foreign ownership, control, or domination. Therefore, Applicants respectfully request NRC to issue an order (1) consenting to the proposed license transfer related to Renewed Facility Operating License No. DPR-20 and the PNP ISFSI general license, and (2) approving the conforming license amendments.

Attachment A Proposed Changes (mark-up) to Palisades Plant (PNP)

Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255 (8 PAGES INCLUDING THIS COVER PAGE)

The proposed changes to the PNP RFOL are identified by a dditions in bold-italics RED and deletions in strike-out.

To coordinate the license transfer application (LTA) conforming amendments with the power operations technical specification (POTS) license amendment request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed changes are shown in bracketed italics.

The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditioned by and coincident with the effectiveness of the POTS amendments.

Amendment No. 272, 273 HOLTEC PALISADES, LLC HOLTEC DECOMMISSIONING INTERNATIONAL, LLC PALISADES ENERGY, LLC DOCKET NO. 50-255 PALISADES NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-20

1.

The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:

A.

The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.

[deleted];

C. Actions have been identified and have been or will be taken with respect to:

(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations;

Renewed License No. DPR-20 Amendment No. 272, 273

2

D. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; E.

There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; F.

Holtec Palisades, LLC (Holtec Palisades) is financially qualified and Holtec Decommissioning International, LLC (HDI) Palisades Energy, LLC (Palisades Energy) is financially and technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; G. Holtec Palisades and HDI Palisades Energy have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commissions regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this renewed Facility Operating License No. DPR-20, subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commissions regulations and all applicable requirements have been satisfied; and J.

The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with 10 CFR Parts 30, 40, and 70.

2.

Renewed Facility Operating License No. DPR-20 is hereby issued to Holtec Palisades and HDI Palisades Energy as follows:

A.

This renewed license applies to the Palisades Plant, a pressurized light water moderated and cooled reactor and electrical generating equipment (the facility). The facility is located in Van Buren County, Michigan, and is described in the Palisades Plant Updated Final Safety Analysis Report, as supplemented and amended, and in the Palisades Plant Environmental Report, as supplemented and amended.

B.

Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1)

Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, Licensing of Production and Utilization Facilities, (a) Holtec Palisades to possess and use, and (b) HDI Palisades Energy to possess[, and use and operate], the facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license;

Renewed License No. DPR-20 Amendment No. 272, 273

3

(2)

HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 40 and 70, to

[receive,]possess [, and use ]source, and special nuclear material [that was used]

as reactor fuel, in accordance with the limitations for storage [and amounts required for reactor operation], as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources [that were used] for reactor startup, [sealed sources that were used for]reactor instrumentation[, and are used in the calibration of ]radiation monitoring equipment [calibration], and [that were used as] fission detectors in amounts as required; (4)

HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5)

HDI Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials [that were as may be] produced by the operations of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

[deleted]Palisades Energy [is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.]

(2)

The Technical Specifications contained in Appendix A, as revised through Amendment No. 273XXX, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. HDI Palisades Energy shall

[maintain operate] the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

[deleted]

(4)

[deleted]

(5)

Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.

Insert 1

Renewed License No. DPR-20 Amendment No. 272, 273

5

D. [deleted]

E.

HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.

HDI Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and 264.

F.

[deleted]

G. Holtec Palisades and HDI Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.







Insert 1 (3)

[deleted] [Fire Protection]

Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013, October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and January 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.

(a)

Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.

1.

Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.

2.

Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10-8/yr for LERF. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.







(b)

Other Changes that May Be Made Without Prior NRC Approval

1.

Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is functionally equivalent or adequate for the hazard.

The licensee may use an engineering evaluation to demonstrate that a change to an NFPA 805, Chapter 3, element is functionally equivalent to the corresponding technical requirement. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard.

The licensee may use an engineering evaluation to demonstrate that changes to certain NFPA 805, Chapter 3, elements are acceptable because the alternative is adequate for the hazard. Prior NRC review and approval would not be required for alternatives to four specific sections of NFPA 805, Chapter 3, for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is adequate for the hazard. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard. The four specific sections of NFPA 805, Chapter 3, are as follows:

x Fire Alarm and Detection Systems (Section 3.8);

x Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);

x Gaseous Fire Suppression Systems (Section 3.10); and x

Passive Fire Protection Features (Section 3.11).

This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.







2.

Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.

(c)

Transition License Conditions

1.

Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.

2.

The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) letter PNP 2019-028 dated May 28, 2019, to complete the transition to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.

3.

The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]

Proposed Changes to Palisades Plant (PNP)

Renewed Facility Operating License (RFOL) NO. DPR-20 DOCKET NO. 50-255

( PAGES INCLUDING THIS COVER PAGE)

The conforming amendments are proposed to become effective on the date that PNP transitions from a facility in decommissioning to a power operations plant conditioned by and coincident with the effectiveness of the POTS amendments.

To coordinate the license transfer application (LTA) conforming amendments with the power operations technical specification (POTS) license amendment request (LAR) as discussed in the Holtec Decommissioning exemption request, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (ML23271A140), the changes expected in the POTS LAR that overlap the LTA proposed name changes are shown in brackets.

Attachment B

Amendment No. 273, XXX HOLTEC PALISADES, LLC PALISADES ENERGY, LLC DOCKET NO. 50-255 PALISADES NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE Renewed License No. DPR-20

1.

The Nuclear Regulatory Commission (NRC or the Commission) having previously made the findings set forth in Operating License No. DPR-20, dated February 21, 1991, has now found that:

A.

The application for Renewed Operating License No. DPR-20 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commissions rules and regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.

[deleted];

C. Actions have been identified and have been or will be taken with respect to:

(1) managing the effects of aging on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1) during the period of extended operation, and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by this renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3 for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations;

Renewed License No. DPR-20 Amendment No. 273, XXX

2

D. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; E.

There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; F.

Holtec Palisades, LLC (Holtec Palisades) is financially qualified and Palisades Energy, LLC (Palisades Energy) is financially and technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; G. Holtec Palisades and Palisades Energy have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements" of the Commissions regulations; H. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public; I.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this renewed Facility Operating License No. DPR-20, subject to the conditions for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 (formerly Appendix D to Part 50), of the Commissions regulations and all applicable requirements have been satisfied; and J.

The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this renewed operating license will be in accordance with 10 CFR Parts 30, 40, and 70.

2.

Renewed Facility Operating License No. DPR-20 is hereby issued to Holtec Palisades and Palisades Energy as follows:

A.

This renewed license applies to the Palisades Plant, a pressurized light water moderated and cooled reactor and electrical generating equipment (the facility). The facility is located in Van Buren County, Michigan, and is described in the Palisades Plant Updated Final Safety Analysis Report, as supplemented and amended, and in the Palisades Plant Environmental Report, as supplemented and amended.

B.

Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1)

Pursuant to Section 104b of the Act, as amended, and 10 CFR Part 50, Licensing of Production and Utilization Facilities, (a) Holtec Palisades to possess and use, and (b) Palisades Energy to possess[, use and operate], the facility at the designated location in Van Buren County, Michigan, in accordance with the procedures and limitation set forth in this license;

Renewed License No. DPR-20 Amendment No. 273, XXX

3

(2)

Palisades Energy, pursuant to the Act and 10 CFR Parts 40 and 70, to [receive,]

possess[, and use] source, and special nuclear material[ ]as reactor fuel, in accordance with the limitations for storage [and amounts required for reactor operation], as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use byproduct, source, and special nuclear material as sealed sources[ ]for reactor startup,[ ]reactor instrumentation[,] radiation monitoring equipment [calibration], and[ ]fission detectors in amounts as required; (4)

Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material for sample analysis or instrument calibration, or associated with radioactive apparatus or components; and (5)

Palisades Energy, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials[ as may be] produced by the operations of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act; to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Palisades Energy [is authorized to operate the facility at steady-state reactor core power levels not in excess of 2565.4 Megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.]

(2)

The Technical Specifications contained in Appendix A, as revised through Amendment No. XXX, and the Environmental Protection Plan contained in Appendix B are hereby incorporated in the license. Palisades Energy shall

[operate] the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Fire Protection Palisades Energy [shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment requests dated December 12, 2012, November 1, 2017, November 1, 2018, and March 8, 2019, as supplemented by letters dated February 21, 2013, September 30, 2013,

Renewed License No. DPR-20 Amendment No. 269, 272, XXX

4

October 24, 2013, December 2, 2013, April 2, 2014, May 7, 2014, June 17, 2014, August 14, 2014, November 4, 2014, December 18, 2014, and January 24, 2018, and May 28, 2019, as approved in the safety evaluations dated February 27, 2015, February 27, 2018, and August 20, 2019. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.

(a)

Risk-Informed Changes that May Be Made Without Prior NRC Approval A risk assessment of the change must demonstrate that the acceptance criteria below are met. The risk assessment approach, methods, and data shall be acceptable to the NRC and shall be appropriate for the nature and scope of the change being evaluated; be based on the as-built, as operated, and maintained plant; and reflect the operating experience at the plant. Acceptable methods to assess the risk of the change may include methods that have been used in the peer-reviewed fire PRA model, methods that have been approved by NRC through a plant-specific license amendment or NRC approval of generic methods specifically for use in NFPA 805 risk assessments, or methods that have been demonstrated to bound the risk impact.

1.

Prior NRC review and approval is not required for changes that clearly result in a decrease in risk. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.

2.

Prior NRC review and approval is not required for individual changes that result in a risk increase less than 1x10-7/year (yr) for CDF and less than 1x10-8/yr for LERF. The proposed change must also be consistent with the defense-in-depth philosophy and must maintain sufficient safety margins. The change may be implemented following completion of the plant change evaluation.

(b)

Other Changes that May Be Made Without Prior NRC Approval

1.

Changes to NFPA 805, Chapter 3, Fundamental Fire Protection Program Prior NRC review and approval are not required for changes to the NFPA 805, Chapter 3, fundamental fire protection program elements and design requirements for which an engineering

Renewed License No. DPR-20 Amendment No. 265, 272, XXX

5

evaluation demonstrates that the alternative to the Chapter 3 element is functionally equivalent or adequate for the hazard.

The licensee may use an engineering evaluation to demonstrate that a change to an NFPA 805, Chapter 3, element is functionally equivalent to the corresponding technical requirement. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard.

The licensee may use an engineering evaluation to demonstrate that changes to certain NFPA 805, Chapter 3, elements are acceptable because the alternative is adequate for the hazard. Prior NRC review and approval would not be required for alternatives to four specific sections of NFPA 805, Chapter 3, for which an engineering evaluation demonstrates that the alternative to the Chapter 3 element is adequate for the hazard. A qualified fire protection engineer shall perform the engineering evaluation and conclude that the change has not affected the functionality of the component, system, procedure, or physical arrangement, using a relevant technical requirement or standard. The four specific sections of NFPA 805, Chapter 3, are as follows:

x Fire Alarm and Detection Systems (Section 3.8);

x Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);

x Gaseous Fire Suppression Systems (Section 3.10); and x

Passive Fire Protection Features (Section 3.11).

This License Condition does not apply to any demonstration of equivalency under Section 1.7 of NFPA 805.

2.

Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation dated February 27, 2015, to determine that certain fire protection program changes meet the minimal criterion. The licensee shall

Renewed License No. DPR-20 Amendment No. 269, 272, XXX

6

ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.

(c)

Transition License Conditions

1.

Before achieving full compliance with 10 CFR 50.48(c), as specified by 2, below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.

2.

The licensee shall implement the modifications to its facility, as described in Table S-2, Plant Modifications Committed, of Entergy Nuclear Operations, Inc. (ENO) letter PNP 2019-028 dated May 28, 2019, to complete the transition to full compliance with 10 CFR 50.48(c) before the end of the refueling outage following the fourth full operating cycle after NRC approval. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.

3.

The licensee shall implement the items listed in Table S-3, Implementation Items, of ENO letter PNP 2014-097 dated November 4, 2014, within six months after NRC approval, or six months after a refueling outage if in progress at the time of approval with the exception of Implementation Items 3 and 8 which will be completed once the related modifications are installed and validated in the PRA model.]

(4)

[deleted]

(5)

Movement of a fuel cask in or over the spent fuel pool is prohibited when irradiated fuel assemblies decayed less than 90 days are in the spent fuel pool.

Renewed License No. DPR-20 Amendment No. 273, XXX

8

D. [deleted]

E.

Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palisades Nuclear Plant Physical Security Plan.

Palisades Energy shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and 264.

F.

[deleted]

G. Holtec Palisades and Palisades Energy shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

Encl. 1 Att. C p.1 Attachment C Redacted Corporate Information Required by 10 CFR 50.33(d)(3) (Public)

NAME:

Holtec International STATE OF INCORPORATION:

Delaware BUSINESS ADDRESS:

Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 DIRECTORS:

Dr. Krishna P. Singh Stuart Crooks José A. Gago Dr. Eduardo D. Glandt James H. Miller Dominique Miniere George E. Norcross III Michael J. Pacilio Jim Saxton Martha J. Singh S. Amy Singh EXECUTIVE COMMITTEE:

Dr. Krishna P. Singh, President & Chief Executive Officer Pankaj Chaudhary, Senior V.P. of Operations Frederick J. Roegge, Senior V.P. and Chief Strategy Officer Kelly D. Trice, President of Nuclear Generation and Decommissioning J. Scott Thomson, Senior V.P. and Governance Officer Joy Russell, Senior V.P., Chief Commercial Officer Dr. Richard Springman, Senior V.P. of International Projects William F. Gill, V.P. and General Counsel

[

]

Encl. 1 Att. C p.2 NAME:

Holtec Power, Inc.

STATE OF INCORPORATION:

Delaware BUSINESS ADDRESS:

Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 DIRECTORS:

Pankaj Chaudhary Dr. Stefan Anton EXECUTIVE COMMITTEE:

Dr. Krishna P. Singh, President & Chief Executive Officer Pankaj Chaudhary, Senior V.P. of Operations Frederick J. Roegge, Senior V.P. and Chief Strategy Officer Kelly D. Trice, President of Nuclear Generation and Decommissioning J. Scott Thomson, Senior V.P. and Governance Officer Joy Russell, Senior V.P., Chief Commercial Officer Dr. Richard Springman, Senior V.P. of International Projects William F. Gill, V.P. and General Counsel All of the directors, principal officers, and executive committee members of Holtec Power, Inc.

are U.S. citizens, with the same corporate address as Holtec Power, Inc.

Encl. 1 Att. C p.3 NAME:

Nuclear Asset Management Company, LLC STATE OF FORMATION:

Delaware BUSINESS ADDRESS:

Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:

Holtec Power, Inc.

PRINCIPAL OFFICERS:

Kelly D. Trice, President Michelle Tate, Treasurer and Vice President Martin Babos, Secretary All of the principal officers of Nuclear Asset Management Company, LLC are U.S. citizens, with the same corporate address as Nuclear Asset Management Company, LLC.

Encl. 1 Att. C p.4 NAME:

Holtec Palisades, LLC STATE OF INCORPORATION:

Delaware BUSINESS ADDRESS:

Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:

Nuclear Asset Management Company, LLC PRINCIPAL OFFICERS:

Kelly D. Trice, President Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Troy Geauthreaux, Chief Financial Officer All of the principal officers of Holtec Palisades, LLC are U.S. citizens, with the same corporate address as Holtec Palisades, LLC.

Encl. 1 Att. C p.5 NAME:

Palisades Energy, LLC STATE OF FORMATION:

Delaware BUSINESS ADDRESS:

Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104 MANAGING MEMBER:

Holtec Power, Inc.

PRINCIPAL OFFICERS:

Kelly D. Trice, President Richard Burroni, Chief Nuclear Officer Jean Fleming, Vice President of Licensing, Regulatory and Probabilistic Safety Analysis Troy Geauthreaux, Chief Financial Officer All of the principal officers of Palisades Energy, LLC are U.S. citizens, with the same corporate address as Palisades Energy, LLC.

Encl. 1 Att. D p.1 Attachment D Palisades Energy, LLC Organization Chart and Resumes of Senior Leadership

1 Palisades License Restarted Organization Chart 111023 Holtec Executive Committee Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Holtec Palisades C-Suite CHIEF NUCLEAR OFFICER Richard Burroni SITE VICE PRESIDENT PALISADES Michael Mlynarek VP, LICENSING Jean Fleming PRESIDENT NUCLEAR RESOURCES Kelly Trice HOLTEC PALISADES Site Organization HOLTEC PALISADES Quality Assurance

VP, SITE Michael Mlynarek (550) 2 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OVERVIEW GM, PLANT OPS SUPERINTENDENT PROJECTS MGR, REG ASSUR ADMIN, SR MGR, TRAINING

MANAGER, EP SR MGR, PROJECTS SR MANAGER, MAINTENANCE
MANAGER, CHEMISTRY MANAGER, RP ADMIN, SR
MANAGER, SYSTEMS ENG
MANAGER, DESIGN ENG/PROJ ENG
MANAGER, SUPPLY CHAIN COORDINATOR, PROJECT CONTROLS
MANAGER, OUTAGE PROJECT MGR (2)

PROJECT MGR, RX SERVICES PROJECT MGR, TURBINE PROJECT MGR, STEAM GENERATOR ADMIN, SR ASSISTANT, EXEC SR MANAGER, OPERATIONS DIR, ENGINEERING DIR, SITE SERVICES I

I I

I

VP, SITE Staff: (9) 3 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART ASST VP, SITE MANAGER, FINANCE Reports to HDI CFO SR MANAGER, GOVT AFFAIRS/

COMMUNICATIONS Reports to Director, Govt Affairs/

Communications MANAGER, HR Reports to Associate Director, HR Generalist, HR (2)

MANAGER, SECURITY Reports to Director, Fleet Sec Operations MANAGER, QA Reports to VP, Reg Assurance Recruiter (1)

Mgr, IT Reports to Dir, IT INPO LOANEE Site VP Coordinator Mgr, ECP 1--

~------

I I

I I

I I

I I

I I

I I

  • ------------+------------+--------------,

I,_____---,

I I

I

~--_,_I __

--L----,

I I

DIR, ENGINEERING (Staff: 94) 4 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART ENGINEERING Mgr, Systems & Programs Supv, BOP Systems Supv, NSSS Systems Supv, Components Mgr, Design & Analysis Admin, Sr Supv, Programs Supv, Elec/I&C Design Supv, Mech/Civil Design Supervisor, Analysis Supervisor, EFIN PDM Eng (2)

Elec NSSS Eng (3)

PM Eng (1)

Mech BOP Eng (3)

Elec BOP Eng (3)

Mech NSSS Eng (3)

MR/MSPI/NEIL Eng (2)

NDE Level III (2)

Program Engineer (6)

NDE Level II (1)

Component Eng (7)

Fire Protection Eng (2)

Designer (2)

Procurement Eng (1)

Designer (1)

Civil Des Eng (3)

Digital/I&C Des Eng (3)

Procurement Eng (1)

Elec Des Eng (3)

Mech Des Eng (4)

Rx/Nuc Fuels Eng (4)

EEQ Engineer (1)

PRA/Safety Anls Eng (3)

Elec Analysis Eng (1)

Civil/Mech Anls Eng (1)

Mechanical Eng (4)

Elec/I&C Eng (4)

Civil Engineer (2)

Mgr, Supply Chain Buyers 2

Supv, Materials (1)

Stockkeeper (5)

Supv, Procurement 1

SR MANAGER, OPERATIONS (Staff: 76) 5 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OPERATIONS OPS MGR - SHIFT (1)

Managers, Shift (5)

NPO (30)

Specialist, Ops (2)

Supv, WCC (SRO)

(4)

OPS MGR - SUPPORT (1)

Work Support (NPO)

(1)

Fire/Flex Marshal (1)

Supv, Control Room (5)

SE/STA (5)

NCO (15)

Field Supv. (SRO)

(5)

SR MANAGER, MAINTENANCE Staff: (91) 6 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART MAINTENANCE/PRODUCTION Manager, Work Control (4)

Coordinators, Work (4)

Schedulers (2)

Supervisors, Mtnce (12)

Planners (9)

Coord, Unit/PM (1)

Leads, Mtnce (9)

Supt, Work Planning (1)

Craft/Techs Mtnce (40)

Coordinators, Dept (2)

Specialists, Mtnce (4)

Specialist, Safety (1)

I I

MANAGER, OUTAGE (Staff: 6) 7 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART OUTAGE Lead Outage Scheduler (1)

OUTAGE SRO (1)

Outage Staff Operator (Rotate)

Outage Scheduler (2)

MANAGER.

CHEMISTRY

( Staff: 18) 8 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART CHEMISTRY Radio Chemist (9)

Chemical Specialist (6)

SUPERVISOR, CHEMISTRY (1)

SUPERVISOR, CHEMISTRY (1)

MGR, RAD PRO (Staff: 37) 9 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Radiation Protection Supt, Rad Operations (1)

Health Physicist (9)

Specialist, HP (6)

Supv, Rad Support (1)

Radwaste Handler (3)

Supv, Rad Operations (1)

Supv, Rad Operations (1)

Health Physicist (2)

Health Physicist (8)

Supt, Rad Technical (1)

Health Physicist (2)

Specialist, HP (1)

I I

T I

I

MANAGER, EP (STAFF: 4) 10 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART EMERGENCY PLANNING Specialists, EP (3)

MGR, REG ASSUR Staff: (11) 11 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Regulatory Assurance Supervisor, CAP/

Records (1)

Engineer, Licensing (2)

Specialist, Compliance (2)

Admins (3)

Lead Records Coordinator (1)

CAP Coordinator (1)

MANAGER, TRAINING Staff: (27) 12 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART TRAINING Supt, Ops Training Instructors, Lead (2)

Instructor, Electrical Instructors, Ops (6)

Instructor, Mechanical Instructor, I&C Spec, Simulator Support (2)

Supt, Mtnce/Tech Trng Coordinators, Training (2)

Exam Writers (2)

Instructor, Chemistry Instructor, RP Instructor, Eng Sup Instructor, GET Instructor, EP Asst Mgr, Training

13 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART DOTTED LINE TO SVP MANAGER, FINANCE Reports to HDI CFO Staff (5)

Analyst, Outage (1)

Analyst, O&M (1)

Analyst, Capital (1)

Analyst, Payroll (1)

14 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART QA Organization & ECP Inspector, QC (2)

MANAGER, QA (Staff: 12)

Supervisor, QA (1)

Auditor (3)

Auditor (2)

Supervisor, QA Supplier (1)

Inspector, Receipt (2)

VP, LICENSING Jean Fleming MANAGER, ECP

MANAGER IT

( Staff: 11) 15 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART IT CONSULTANTS, IT (5)

SPECIALISTS, IT (5)

MANAGER, SECURITY (139) 16 Palisades License Restarted Organization Chart 111023 Palisades Nuclear Plant RESTARTED ORGANIZATION CHART Security SR SUPERVISOR, SECURITY (3)

SR SUPERVISOR, TRAINING (1)

Trainers (4)

Supervisor, Access Authorization (1)

Superintendent (1)

Access Personnel (3)

SOS B Team (1)

SOS D Team (1)

SOS A Team (1)

SOS E Team (1)

SOS C Team (1)

SSS (4)

Officers (23)

Officers (23)

SSS (4)

Officers (9)

SSS (2)

Officers (23)

SSS (4)

Officers (23)

SSS (4)

Asst, Admin (1)

KELLY D. TRICE EXPERIENCE

SUMMARY

Thirty-five years of executive management experience as the chief executive, president, or COO of several large companies with full sales, operational and P&L responsibility, serving on multiple boards for independent or affiliated companies. These companies focus on diverse clients which are international and domestic. The services provided range from environmental cleanup/consultation to maintenance and operation of a variety of plants, and large-scale multibillion-dollar Engineering, Procurement and Construction (EPC) programs. The clients include utilities, nuclear power plants, refineries, LNG plants, chemical plants, coal-fired power plants, and combined cycle power plants. Other experience includes deal/contract negotiation, financial management, restructuring and turnaround, and M&A.

President, Holtec International, Nuclear Generation and Decommissioning (3/19 to present) - Served as the chief executive and president of CDI LLC (3/19-8/21), then chief executive and president of HDI LLC (8/21-8/23) before being promoted to the current role. This role includes the P&L responsibility for Holtec International and its subsidiaries, the ambitious restart of the Palisades Energy Center after a year of shutdown, the small modular reactor (SMR) program for design completion, licensing, and ultimate construction/fabrication, as well as the decommissioning of the Oyster Creek Nuclear Station, Pilgrim Nuclear Station, and the Indian Point Energy Center. In total there are five large-scale power reactors in decommissioning plus the restart of Palisades from a decommissioning status, and deployment of SMRs throughout the world. Key duties include executive committee member, DOE loan program negotiation/approval, Michigan grant legislation/approval, and associated political interfaces, as well as SMR deployment throughout the world (including Ukraine during the Russian aggression.)

Executive Vice President, Bruce Power (7/17 to 3/19) - Senior executive responsible for the EPC projects associated with Bruce Power generating station located in Ontario Canada. Bruce Power operates eight nuclear reactors, generating a total of 6.8GW. Primary responsibilities included the setup and refurbishment of six units as well as the ongoing operation of the on-line units. Capital project budgets totaled approximately $14B CAD, and annual revenue of the plant was approximately $3.5B CAD.

President of CB&I Facilities, Plant Services, Environment, and Infrastructure (1/16 to 7/17) - Chief executive of the CB&I plant maintenance and facilities services business. The focus of this unit was to perform maintenance and services on approximately 45 of the 99 operating nuclear power plants in the US, 70 fossil power plants, and approximately 140 chemical, refinery, and LNG processing plants. The business operated out of 70 offices and spanned over four continents. Peak employment of this business was approximately 17,000 people with an annual revenue of approximately $2.5B.

President of CB&I Power (11/14 to 1/16) - Chief executive for the power business unit of CB&I. This business unit posted annual revenue of approximately $3.5B with a backlog of approximately $10B and employed 12,000 people working in the US, Europe, and China. Projects included an assortment of engineering design efforts, construction of combined-cycle power plants, and nine nuclear plants. Led a complex divestiture of the nuclear power unit and consolidated the fossil power business with CB&Is oil and gas unit.

President and CEO of CB&I Project Services Group LLC (2/12 to 7/15) - Chief executive responsible for the nuclear business line, including mega-projects in China, Vogtle, and VC Summer (8 new nuclear plants under construction simultaneously) as well as a 9th nuclear plant under construction called the Mixed Oxide Fuel Fabrication Facility. The total value of the nuclear plants under construction was approximately $25B. The CPSG LLC was established as a proxy entity to satisfy government regulations associated with the foreign ownership and control when dealing with special nuclear materials.

President and CEO of CB&I AREVA MOX Services LLC (4/09 to 11/14)- Responsible for all aspects of the CB&I AREVA MOX Services LLC operation including construction, design, startup, and operation of the mixed oxide fuel fabrication facility and its supporting buildings and infrastructure. This project was an $8.5B effort with follow-on operations totaling approximately $12B. Its purpose was to implement a treaty that the US signed with the Russian Federation to eliminate 68 metric tons of plutonium (17,000 weapons) from the world inventory and process this material into nuclear reactor fuel for commercial sales and usage.

Vice President/Deputy General Manager of East Tennessee Technology Park (4/04 to 4/09) - Large EPC contract for the operation, construction, decommissioning, and reindustrialization of the East Tennessee Technology Park. The project was a $4.0B effort.

Vice President Kaiser-Hill LLC (1997-4/04) - Large EPC contract for the ultimate closure of the Rocky Flats Technology Site located in Golden, Colorado. The total project was a $7.0B effort and involved over 6,300 people at peak operation. Key responsibilities included infrastructure management, construction of all support facilities, demolition of over 700 structures, and management of all nuclear operations as well as the decommissioning of the main plutonium process buildings (771, 371, 779, 776 and 707). The project was completed one year ahead of schedule and approximately $1.0B under budget.

Project Director/Senior Project Manager of various Projects throughout the United States (1990-1997) - Directly managed many EPC projects. The largest of these projects was a $1.5B effort, supervising approximately 700 personnel at the Hanford reservation in Richland, Washington. Directly responsible for the decommissioning of several nuclear reactors and buildings, landfill operations, and numerous environmental cleanup sites. On other projects, key responsibilities included construction of various buildings, engineering and construction of waste processing plants, construction of utilities and infrastructure, excavation of buried wastes, and termination of several NRC licenses.

Lieutenant, U.S. Navy, Submarines (Nuclear), Charleston, SC (1985-1990) - Served as head of six divisions. Responsible for the operation, maintenance, and testing of all submarine sonar equipment, weapons systems, and nuclear propulsion systems.

EDUCATION 1997 MBA University of New Mexico 1987 Nuclear Prototype, Nuclear Power School, Idaho Falls, ID 1986 Nuclear Engineering, Nuclear Power School, Orlando, FL 1985 BS Chemical Engineering (Honors), University of Oklahoma SECURITY CLEARANCE DOE, Q Clearance, Inactive DOD, TS, SIOP, ESI, NATO, Inactive (Served as Lieutenant U.S. Navy, Submarines)

EMPLOYMENT HISTORY March 2019-Present President Holtec Nuclear Generation and Decommissioning 2017-March 2019 Executive Vice President, Bruce Power 2009-2017 President and CEO, CB&I (Several Business Units) 2004-2009 Vice President/Deputy General Manager, Bechtel National Inc.

1997-2004 Vice President, CH2M Hill (Kaiser Hill LLC)

RICHARD J. BURRONI Highly trained leader with over 40 years of experience in Engineering, Maintenance, Operations, and Decommissioning.

Holtec International 8/14/2023 - Present Chief Nuclear Officer x

Lead the organizational, regulatory, and programmatic efforts required to restart the Palisades Nuclear Plant by ensuring regulatory, operational, organizational, and environmental compliance with federal, state, and local requirements in accordance with industry norms and standards. This position will serve as Holtecs principal interface with the NRC, Institute of Nuclear Power Operations (INPO), Nuclear Energy Institute (NEI), and other stakeholders on emerging nuclear issues and challenges.

Holtec Decommissioning International 6/1/2020 - 8/14/2023 Indian Point Energy Center Site Vice President x

Responsible for implementing the prompt decomm philosophy to decommission the IPEC facility in a safe, prompt, and thorough manner. This role provides direction and oversite in daily and critical path activities.

x Budget management of the IPEC decommissioning trust fund allotments to ensure regulatory compliance and fiscally responsible project controls.

x Direct outreach and communication with internal and external stakeholders, state officials, and local politicians in addition to regulators to ensure issues and concerns are well understood and resolved.

Entergy Nuclear Northeast 1/2017 - 6/1/2020 Indian Point Energy Center Director of Special Projects x

Led the IPEC License Renewal team to complete the requirements to permit the continued operation of Unit 2 through May 2020 and Unit 3 through May 2021.

x Led a cross-functional team from IPEC, Entergys Corporate Office, and Holtec employees to prepare the IPEC site for the transition to decommissioning by ensuring all operational, regulatory, programmatic, environmental, and personnel requirements for the successful transfer of the operating license from Entergy to Holtec was accomplished in a professional and timely manner.

Engineering Director 1/2014 - 1/2017 x

Responsible for the delivery of safe, reliable, and timely engineering support at the IPEC. Responsible for maintaining the plant design bases, equipment reliability through preventive maintenance, and optimization and plant system health through aggressive predictive programs and system monitoring.

Entergy Nuclear Northeast 10/2012 - 1/2014 White Plains Corporate Office Chief Engineer / Corporate Functional Area Manager x

Provided timely engineering and technical support to the Entergy Fleet (10 sites in total). Maintained cognizance of key critical issues that affected plant operation and supported the Entergy sites as necessary. Worked with Engineering Managers across the fleet to establish goals and responsibilities to achieve the highest level of performance within the industry.

Performed periodic assessments of engineering activities and performance; developed reports and submitted to senior management as required.

Entergy Nuclear Northeast 10/2006 - 10/2012 Indian Point Energy Center Engineering Manager - Systems, Programs & Components x

Manager of two separate engineering functions directing a dedicated team of over 70 engineers in total, focusing on system and plant component health. Engaged daily with various site departments in the resolution of plant issues to ensure station reliability. Active in initiatives relative to the improvement of system and component health across the fleet. Engaged routinely with industry regulators to address station and system concerns.

Assistant Operations Manager - Support 01/2005 - 10/2006 x

Responsibilities and duties include the management of those Operations Department personnel responsible for procedure development and maintenance in addition to ensuring accuracy in response to issues noted in the site corrective action program.

Entergy Nuclear Northeast / New York Power Authority 09/1991 - 12/2004 Indian Point Energy Center (Transition Period)

Instrument & Control Department Management x

Started in this department as an Engineering Supervisor in charge of 8 component engineers whose primary duties were to monitor instrumentation health and performance.

x Transitioned to Manager of the I&C Department, first at Unit 3, then Unit 2, and finally at both Units following the merger directed by Entergy. The merger resulted in a staff of approximately 80 plant personnel. Focus was on integrating I&C personnel from both units to increase the efficiency/flexibility of the department. Success was noted in the integrated procedure group, training program, increased instrumentation reliability and performance, and outage work force.

New York Power Authority 09/ 1990 - 09/1991 Indian Point 3 NPP Engineering Supervisor: Performance Dept.

x Responsibilities included the supervision of 8 Performance Dept. Engineers. Duties included the revision and development of plant surveillance test procedures, in addition to the development of post-work test requirements following plant maintenance and modification activities.

Engineer: Technical Services Dept.

06/1980 - 09/1991 x

During this +10-year period, progressed from an Assistant Plant Electrical Engineer to Senior Plant Engineer II. Duties included the preparation of engineering modifications and procedures, as well as providing responses to technical concerns raised by regulatory agencies and station audits.

x Was afforded the opportunity to attend Senior Reactor Operator (SRO) training during this time period and received an SRO license in April 1986.

EDUCATION / LICENSES:

New York Inst. of Technology - Old Westbury, NY (B.S. Electrical Engineering) 1976 - 1980 Pace University - Pleasantville, NY (M.S. Management Science) 1992 - 1994 Nuclear Regulatory Commission - Senior Reactor Operator License (SOP-10482) 1986 - 1988 INDUSTRY / SITE INVOLVEMENT:

x Involved in numerous INPO Assessment visits as both an Industry and Host Peer.

x INPO Senior Nuclear Plant Mangers course in the spring 2010.

x Member of the Pressurized Water Reactor Owners Group (PWROG) - member of the System Engineering and Equipment Subcommittee as well as the Management Committee.

x Held Outage Support and Emergency Planning roles in all of the positions noted above

JEAN A. FLEMING FlemingJean@hotmail.com PROFESSIONAL

SUMMARY

Highly trained leader with over 18 years of experience in nuclear regulatory assurance and licensing, decommissioning licensing and compliance, nuclear power plant operations, work management, and emergency preparedness.

EXPERIENCE HIGHLIGHTS Holtec International - Camden, New Jersey Vice President of Licensing, Regulatory and Probabilistic Safety Analysis (PSA) (2021 - Present) x Responsible for federal, state, and local licensing, environmental and regulatory compliance for five Holtec Decommissioning International, LLC (HDI) nuclear sites, nuclear dry storage and transport cask licensing, small modular reactor (SMR-160) pre-application engagement and licensing activities, and PSA activities.

x Executive member of Palisades restart project, leading the nuclear regulatory engagement and execution plan to support the regulatory path for restart efforts.

PSEG - Salem and Hope Creek Nuclear Generating Station - Salem, New Jersey Director of Site Regulatory Compliance and Licensing (2017 - 2021) - REGULATORY AFFAIRS

  • Responsible for the management of the fleet nuclear regulatory compliance including the strategic management of regulatory relationships and comprehensive assessment of regulatory margin to ensure leadership engagement with issue response.
  • Direct the preparation, submittal, issuance, and implementation of fleet license amendments and relief requests to the Nuclear Regulatory Commission to enhance the operational flexibility while preserving nuclear safety.

x Engage with industry through the nuclear policy organization to address issues that impact the nuclear industry and develop strategies for the timely and efficient resolution of nuclear regulatory issues.

x Direct the emergency preparedness operational and communications response teams in response to drill and actual emergency events.

x Organized, facilitated, and moderated multiple womens leadership forums to develop and promote diversity, equity and inclusion within PSEG and the nuclear industry.

Salem Online Work Management - Operations Work Week Senior Reactor Operator (2013-2017) - OPERATIONS

  • Coordinate the preparation and approval of clearance orders to support scheduled and emergent work activities to ensure compliance with regulatory requirements, improve plant safety and equipment reliability, identify risk-significant work, provide operational focus, and ensure production risk analysis is performed for all scheduled work activities.

Salem Control Room Supervisor - Senior Reactor Operator & Shift Technical Advisor (2008-2017) - OPERATIONS

  • Direct safe and efficient operations by supervising, controlling, and coordinating activities and plant evolutions with emphasis on safety and adherence to established regulations and standards of performance.
  • Authorize testing, surveillance and maintenance on all equipment and systems affecting plant safety or that place the plant in a degraded mode and ensure equipment is properly restored following completion of these activities.

UNITED STATES NAVY - Surface Warfare Officer - Nuclear Operations Officer (Lieutenant, O-3)

USS HARRY S. TRUMAN (CVN 75) - Norfolk, Virginia Propulsion Plant Watch Officer & Reactor Laboratories Manager (2006-2008)

  • Led, trained, and supervised 32+ sailors in nuclear propulsion plant operations and the reactor laboratory divisions.

USS VALLEY FORGE (CG 50) - San Diego, California Operations Intelligence Division Manager & Public Affairs Officer (2003-2004)

  • Led 35 enlisted Operations Specialists onboard a guided missile cruiser in handling air/surface/subsurface monitoring and intelligence gathering duties in support of inter-deployment training cycles and a Counter-Drug Smuggling deployment.

LICENSES, EDUCATION & TRAINING EXECUTIVE TRAINING PROGRAMS Women in Nuclear - Nuclear Executives of Tomorrow (NEXT) Leadership Program, INPO (2021)

Senior Nuclear Plant Management Course, INPO (2019)

Nuclear Regulatory Commission Licensed Senior Reactor Operator - Salem Unit 1 and 2 (2010)

UNITED STATES NAVY SCHOOLS & FORMAL TRAINING PROGRAMS

  • Nuclear Power School and Training Unit, Charleston, South Carolina (2005-2006)
  • Navy Qualified Nuclear Propulsion Plant Watch Officer on A4W and S5W Reactors DREXEL UNIVERSITY - Philadelphia, Pennsylvania Bachelor of Science Degree in Biomedical Engineering (2003) Summa Cum Laude

Michael G. Mlynarek

SUMMARY

(June 2022 - Present)

Holtec Palisades Site Vice President x Holtec Palisades Site Vice President responsible for strategic planning, resource accountability, organizational effectiveness, and knowledge transfer. Experience and background enable safe, error free, and predictable performance.

x Drives competitive positioning through mitigation of internal and external risks and knowledge sharing. Believe mutual performance and accountability amongst a diverse workforce is achieved through effective communication and valuing traditions.

x Accomplishments reflect producing empowered, motivated and disciplined teams. Demonstrated success includes establishing team cultures that achieve sustainable results and enable continuous learning and performance improvement. Focus and team development include values and behaviors that leverage high degrees of self-awareness and engagement that drive goal achievement through integrated risk recognition and mitigation including high standards and low thresholds for action and correction. Methods include vertical alignment and horizontal integration of roles and responsibilities.

LEADERSHIP EXPERIENCE Manager, Decommissioning Planning Organization (DPO) (June 2020 - May 2022) x Responsible for leading the Palisades team through transaction (sale preparation) and transition (operational to post defuel organization). Included managing interface and alignments between Palisades and corporate transaction and transition planning teams and associated functional area change management plans.

Palisades, MI Manager, Nuclear Independent Oversight (NIOS) (June 2017 - May 2020) x Responsible for corporate independent oversight of Palisades performance including regulatory auditing, quality control, and cross-functional assessment to identify station performance shortfalls and effectively communicate for sustained safe and error free performance.

x Team Manager for Susquehanna NIEP (Jun18) x Consumers Energy Grid Management Assessment (Mar18)

Palisades, MI INPO Operations Senior Evaluator & Assistance (June 2015 - June 2017)

Atlanta, GA x In addition to primary role evaluating Operations performance, focus was on leadership team organizational effectiveness and driving proficiency principles of worker and team risk recognition and mitigation through self and situational awareness.

x Cumulative career supporting Nuclear station teams: International (6 stations) - 12 weeks; Domestic (17 stations) - 33 weeks Organizations evaluated & supported:

x Wolf Creek / Vogel 1&2 / Turkey Point / Byron / Harris / Kozloduy, Bulgaria / Oconee / Millstone / Fessenheim, France / Davis Besse / Barakah, UAE / Olkiluoto, Finland / Three Mile Island / Sequoyah x Higashidori, Japan (WANO/JANSI - first Japanese Peer Review; 2013) Braidwood (WANO Mid-Cycle; 2010) /

British Energy Hartlepool Station (WANO Config Cntl; 2009) / River Bend Station (OPS; 2008) / Arkansas Nuclear One (Conduct of Operations; 2008) / Calvert Cliffs (INPO Site Eval; 2006) / Diablo Canyon (INPO Training Accreditation Eval; 2003) / Millstone (INPO Site Eval; 1996) / DC Cook (Conduct of Operations; 1995)

Supervisor, Reactor Engineering (November 2013 - May 2015; 1988 - 1992) x Managed station alignments with NRC region and Entergy corporate fuels group for self-identified Spent Fuel Pool criticality non-conformances.

Palisades, MI x Leadership focus addressed individual and team gaps in behaviors resulting in safe and error free performance.

Manager, Chemistry (July 2011 - October 2013) x Leadership focus corrected staff and technician individual and team significant gaps in behaviors. This resulted in safe and error free performance.

x Results recognized by INPO Chemistry Manager in 2017 as industry leading and sustained performance.

x Gained proficiency in radiological and non-radiological environmental programs.

Palisades, MI

Shift Manager, Operations (January 2000 - June 2011)

Palisades, MI x Reestablished Operations Training Accreditation after station-imposed probation, 2000-2002.

x Focus on individual and crew team performance including reputation for correcting people-problem issues.

x Station achieved INPO 1 performance, 2010.

x Day shift Operations Manager, R021: Station achieved best in Entergy fleet refueling outage performance for safety and duration, 2010.

Control Room Supervisor, Operations (1995 - 1999) x First Engineer to assume position. Established crew role clarification and performance optimization for all modes of plant operation including Simulator training and evaluation.

x Developed and implemented SE/STA Training program focusing on oversight roles, responsibilities (1996).

Palisades, MI PROJECT MANAGEMENT EXPERIENCE Project Management Professional (PMP) Training (2006)

Grand Rapids, MI x Six-week course encompassing fundamentals of effective project management controls.

Work Control Center (WCC) Supervisor (2005) x First Operations single point responsible for WCC implementation including work week protocol and execution.

Safety Committee Chair (2005) x Established station system for safety work order prioritization and execution.

Manager, Operations Training Excellence Program (2000 - 2002) x Led team responsible for re-validation of the six Operations Accredited Training Programs. Included establishment of standards and ownership culture between line and training personnel.

Reactor Engineer (1985 - 1988) x Procured and implemented industry first design for hafnium tipped control blades.

x Managed logistics associated with industry-first demonstration of mixed-oxide fuel.

EDUCATION Big Rock Point, MI Palisades, MI Palisades, MI Palisades, MI Aquinas College Grand Rapids, MI x Masters in Management (1999)

University of Michigan - School of Engineering Ann Arbor, MI x Bachelor of Science in Nuclear Engineering (1985)

LICENSE AND CERTIFICATIONS State of Michigan Professional Engineering License (1992 - Present)

  1. 102198891 NRC Senior Reactor Operator License (1994-2011)

ADDITIONAL Evans Scholarship recipient: Four years tuition / housing at University of Michigan Professional

References:

Available upon request

Encl. 1 Att. E p.1 Attachment E Regulatory Commitments This table identifies actions discussed in this Application for which, upon approval, Holtec Decommissioning International, LLC (HDI), Holtec Palisades, LLC (Holtec Palisades), or Palisades Energy, LLC (OPCO) commits to perform. Any other actions discussed in this submittal are described for the U.S. Nuclear Regulatory Commissions (NRC) information and are not commitments.

COMMITMENT TYPE (Check One)

SCHEDULED COMPLETION DATE (If Required)

ONE-TIME ACTION CONTINUING COMPLIANCE HDI will provide notice of the planned closing date for proposed transaction and transfer of operating authority so that NRC can issue the license amendment.

X At least five business days before the planned transfer date.

OPCO will provide to NRC proof that on-site property damage insurance coverage and off-site nuclear liability coverage, as required by NRC, has been obtained and that coverage will be in place on the effective date of the transfer.

X At least five business days before the planned transfer date.

HDI will provide evidence that the Holtec Palisades has provided sufficient financial assurance for decommissioning to satisfy the requirements applicable to an operating reactor pursuant to 10 CFR 50.75 and 72.30.

X At least five business days before the planned transfer date.

HDI will provide evidence that the PNP organization meets the staffing and qualification requirements set forth in the power operations Technical Specifications, Physical Security Plan, Emergency Plan, QAPM, and UFSAR.

X At least five business days before the planned transfer date.

Encl. 2 p.1 ENCLOSURE 2 AFFIDAVIT OF JASON DAY SUPPORTING HOLTEC DECOMMISSIONING INTERNATIONAL, LLCS APPLICATION TO WITHHOLD CERTAIN DOCUMENTS FROM PUBLIC DISCLOSURE I, Jason Day, General Counsel for Holtec Decommissioning International, LLC (HDI), declare the following under penalty of perjury:

1. I am authorized to execute this declaration on behalf of HDI, for itself and Holtec International, Holtec Palisades, LLC, and Palisades Energy, LLC (collectively Holtec).
2. Holtec is providing information to the U.S. Nuclear Regulatory Commission (NRC) in support of their Application for Order Consenting to Transfer of License. The proprietary version of Enclosures 3A and 4A of this submittal contains financial information, including pro forma income statements, related to anticipated revenues from sales of electricity and capacity from the Palisades Nuclear Plant, as well as plant operating and maintenance costs and internal financial information related to the ultimate parent company. These documents constitute proprietary commercial and financial information that should be held in confidence by NRC pursuant to the policy reflected in 10 CFR 2.390(a)(4) because:

a.

They contain information that is held in confidence by Holtec and their affiliates.

b. This information is of a type that is customarily held in confidence by Holtec and their affiliates and the information contains sensitive financial competitive information concerning Holtecs anticipated revenues and operating expenses.

c.

This information is being transmitted to NRC in confidence.

d. This information is not available in public sources and could not be gathered readily from publicly available information.

e.

Public disclosure of this information would create substantial financial harm to the competitive position of Holtec and their affiliates by disclosing their internal financial and commercial information to other parties whose commercial interests may be adverse to those of Holtec.

3. Accordingly, Holtec requests that Enclosures 3A and 4A be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4).
4. Holtec also requests that the citizenship information contained in Enclosure 1A be withheld from public disclosure to protect the personal information of the individuals listed therein.

The disclosure of this information would constitute a clearly unwarranted invasion of personal privacy, and as such Holtec requests that the information be withheld under 10 CFR 2.390(a)(6).

I declare that the foregoing is true and correct.

{

Executed on December iO, 2023.

Jason Day General Counsel Encl. 2 p.2

Encl. 3 p.1 ENCLOSURE 3 PROJECTED INCOME STATEMENT AND OPENING BALANCE SHEET OF HOLTEC PALISADES, LLC (NON-PROPRIETARY)

Encl. 3 p.2 Holtec Palisades, LLC Pro Forma Income Statement Base Case Projected Financial Data - Unaudited, Non-GAAP

[

]

Revenue Generation (TW)

[

]

Capacity revenue

[

]

Energy revenue

[

]

Ancillary revenue

[

]

Total Revenue

[

]

Expenses Fuel expense

[

]

Labor costs

[

]

Non-labor operating costs [

]

Outage costs

[

]

Property tax

[

]

Total Opex [

]

Net Income EBITDA (excl. amortized fuel and outage)

[

]

Depreciation & Amortization

[

]

Operating Income (incl.

amortized fuel and outage)

[

]

Interest [

]

Income tax

[

]

Production tax credits

[

]

Net Income

[

]

$ Millions, rounded Notes:

1.

[

]

2.

Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles.

3.

Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.

4.

[

]

5.

[

]

6.

Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.

Encl. 3 p.3 Sensitivity Case - 10% Reduction in Capacity Projected Financial Data - Unaudited, Non-GAAP

[

]

Revenue Generation (TW)

[

]

Capacity revenue

[

]

Energy revenue

[

]

Ancillary revenue

[

]

Total Revenue

[

]

Expenses Fuel expense

[

]

Labor costs

[

]

Non-labor operating costs [

]

Outage costs

[

]

Property tax

[

]

Total Opex [

]

Net Income EBITDA (excl. amortized fuel and outage)

[

]

Depreciation & Amortization

[

]

Operating Income (incl.

amortized fuel and outage)

[

]

Interest [

]

Income tax

[

]

Production tax credits

[

]

Net Income

[

]

$ Millions, rounded Notes:

1.

[

]

2.

Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles. Reduced by 10%

to reflect the sensitivity analysis.

3.

Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc.

4.

[

]

5.

[

]

6.

Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts. Costs conservatively assumed not to be reduced for this sensitivity study.

Encl. 3 p.4 Sensitivity Case - 10% Reduction in Energy Revenue Projected Financial Data - Unaudited, Non-GAAP

[

]

Revenue Generation (TW)

[

]

Capacity revenue

[

]

Energy revenue

[

]

Ancillary revenue

[

]

Total Revenue

[

]

Expenses Fuel expense

[

]

Labor costs

[

]

Non-labor operating costs [

]

Outage costs

[

]

Property tax

[

]

Total Opex [

]

Net Income EBITDA (excl. amortized fuel and outage)

[

]

Depreciation & Amortization

[

]

Operating Income (incl.

amortized fuel and outage)

[

]

Interest [

]

Income tax

[

]

Production tax credits

[

]

Net Income

[

]

$ Millions, rounded Notes:

1.

[

]

2.

Generation volumes reflect historical PNP capacity factor and 18-month refueling cycles. Reduced by 10%

to reflect the sensitivity analysis.

3.

Energy revenue based on energy prices set forth in the Power Purchase Agreements (PPA) between Holtec Palisades and each of Wolverine Power Supply Cooperative, Inc. and Hoosier Energy Rural Electric Cooperative, Inc., reduced by 10% to illustrate this sensitivity analysis (despite the fact that the PPA pricing is fixed).

4.

[

]

5.

[

]

6.

Operating expenses informed by historical operating costs, taking into account current labor rates, inflation and forward-looking contracts.

Encl. 3 p.5 Holtec Palisades, LLC Opening Balance Sheet Projected Financial Data - Unaudited, Non-GAAP Assets

[

]

Cash

[

]

Loan Reserves / Escrows

[

]

Accounts Receivable

[

]

Tax Receivable

[

]

Plant

[

]

Deferred Outage

[

]

Nuclear Fuel

[

]

Less: Accumulated Depreciation and Amortization

[

]

Total Assets

[

]

Liabilities and Equity

[

]

Liabilities Accounts Payable

[

]

Tax Payable

[

]

LPO Debt

[

]

Total liabilities

[

]

Equity Michigan State Grant

[

]

Owner Paid

[

]

Retained Earnings

[

]

Total Equity

[

]

Total Liabilities and Equity

[

]

$ Millions, rounded Notes:

[

]

Encl. 5 p.1 ENCLOSURE 5 FORM OF OPERATOR SERVICES AGREEMENT BETWEEN HOLTEC PALISADES, LLC AND PALISADES ENERGY, LLC THIS OPERATOR SERVICES AGREEMENT (the Agreement) is effective as of the ___ day of ____,

20__, between HOLTEC PALISADES, LLC (Owner), and PALISADES ENERGY, LLC, a Delaware limited liability company (Operator), each a Party and together, Parties to this Agreement.

R E C I T A L S:

a.

Owner owns the Palisades Nuclear Generation Station (the Palisades Station) and its associated Independent Spent Fuel Storage Installation (the Palisades ISFSI), both located near Covert, Michigan, which are licensed by the U.S. Nuclear Regulatory Commission (NRC) pursuant to Renewed Facility Operating License No. DPR-20.

b.

The Palisades Station and Palisades ISFSI will be collectively referred to herein as the Facility, and the NRC license will be referred to as the NRC Operating License.

c.

Owner and Operator are indirect wholly owned subsidiaries of Holtec International.

d.

Owner and Operator desire that Operator possess, use, operate, and maintain (Operate) the Facility for Owner under the terms of this Agreement.

A G R E E M E N T:

NOW, THEREFORE, for the mutual covenants and consideration referenced in this Agreement, Owner and Operator agree as follows:

1.

Agency. Operator is hereby appointed as the agent of Owner to act on its behalf for the purposes set forth in this Agreement. Owner shall have the sole right to control and directly supervise the method, manner and detail of Operators duties and responsibilities hereunder, provided, however, that Operator shall have sole discretion with respect to its obligations to comply with the requirements of the NRC Operating License, and all applicable NRC or other applicable requirements of law with respect to Operation of the Facility.

2.

Duties of Operator. Operator shall do and perform all such things as shall be reasonably necessary to Operate and maintain the Facility on behalf of Owner. Operator shall conduct all operations of the Facility in compliance with the NRC Operating License and all applicable NRC requirements, in a good and workmanlike manner, and in accordance with generally accepted industry standards. Operators responsibilities will include, without limitation, the following activities:

2.1.

engage and supervise, as employees of Operator or as personnel assigned to provide services to Operator under a service agreement, all personnel reasonably required to Operate the Facility;

Encl. 5 p.2 2.2.

negotiate, enter into, supervise and administer, in Operators name, or in Operators name and as agent for Owner, all contracts reasonably necessary for possession, use, operation, and maintenance of the Facility (Operations), including, without limitation, equipment purchase orders and agreements, and agreements with contractors and service providers; 2.3.

procure and furnish all materials, equipment, services, supplies and labor determined by Operator to be reasonably necessary or desirable to Operate the Facility and to otherwise carry out Operators responsibilities hereunder; 2.4.

use its best efforts to abide by and conform with all valid applicable laws, orders, rules and regulations that affect the Facility or Operators duties under this Agreement; 2.5.

file (and keep current) all reports, and filings required by law with respect to the Facility, and pay any fees in connection therewith; 2.6.

obtain and use its best efforts to comply and to conduct all Operations at the Facility in accordance with all licenses, permits and authorizations required by law already obtained or to be obtained by Owner, Operator or the Facility; 2.7.

keep an accurate record of all significant operations of the Facility and furnish, from time to time, upon reasonable request of Owner, such reports and other information (or access thereto);

and 2.8.

do such other and further acts and deeds as may be necessary to accomplish fully and to perform its duties under this Agreement, subject to the limitations herein provided.

3.

Right to Audit. Either party may audit any and all records of the other party relating to the Facility or the services provided hereunder on such dates and at such times as a party may reasonably request.

4.

Term. The term of this Agreement shall commence as of the date noted above, which is the same day as the NRC Operating License is being transferred to Operator, and the term shall continue until terminated pursuant to Section 5 of this Agreement.

5.

Termination. This Agreement may be terminated upon notice by either Party and upon the expiration of the Transition Period contemplated by Section 6, or upon termination of the NRC Operating License.

6.

Transition Period. A period of not less than six (6) months during which Operator will cooperate with another operator selected by Owner in order to prepare for the transfer of operating responsibility pursuant to the NRC Operating License to a new operator, including obtaining the required approval of NRC and any other required regulatory approvals. The Transition Period shall end upon the transfer of operating responsibility, which shall occur no later ten (10) business days after receiving all required regulatory approvals. Operator agrees to cooperate and execute such documents as may be necessary to affect the transfer.

Encl. 5 p.3 7.

Survival. The indemnification, release, and limitation of liability provisions contained in this Agreement shall survive termination to the extent they pertain to events giving rise to such indemnification, release and liability that occurred during the term of this Agreement. Further, it is agreed that in no event shall this Agreement terminate unless all payments required under this Agreement to have been made by the Owner to Operator shall have been made and all necessary regulatory approvals for termination of the NRC Operating License or transfer of responsibility for the Facility shall have been obtained.

8.

Responsibilities of Owner. Owner shall cooperate with and assist Operator and provide Operator with correct and reliable information and access to the Facility, as reasonably necessary for Operator to carry out and perform its duties under this Agreement.

9.

Price for Services. The price for the services provided by Operator to Owner pursuant to this Agreement shall be the sum of all of Operators costs arising out of, or associated with, the performance of this Agreement by Operator and its agents or contractors, including but not limited to, direct labor costs, supervisory and clerical costs, employee benefits costs, utility costs, materials and supplies costs, contractor costs, liability, property and other insurance costs, federal, state and local taxes, administrative and general overhead costs allocable to the performance of this Agreement, depreciation and amortization costs, interest expense, and expenses incurred to lease or rent equipment for performance under this Agreement.

10.

Monthly Reports. Upon request by Owner, Operator shall furnish Owner with a closing statement for each month, which statement shall report the significant operations of the Facility for the month in question.

11.

Insurance. Unless otherwise directed by Owner, Operator shall procure and maintain for Owner insurance coverage of the types and in the amounts as required by applicable NRC regulations and as generally maintained by the industry.

12.

Release of Operator. In no event shall Operator be liable to Owner for any direct, indirect, incidental or consequential damages, including, without limitation, liabilities for loss of profits or loss of use or cost of replacement power or any claim or demand against Owner by any person or entity, arising out of Operators performance or failure to perform this Agreement (including, without limitation, Operators, or any of its officers, directors or employees, own negligence or other basis, whether arising in or based upon tort, fraud, contract, strict liability, negligence, breach of fiduciary duty or any other theory of legal liability), even if Operator has been advised of the possibility of such liabilities, and Owner hereby release Operator for any liabilities arising out of Operators performance or failure to perform this Agreement. Operator does not assume liability or responsibility to Owner for liabilities that may be suffered by Owner as a result of any action or inaction of Operator; provided, however, that nothing herein shall relieve any party or person, other than Operator, from any responsibility to Operator or to Owner, whether assumed by contract or by operation of law.

13.

Indemnity. Owner shall protect, indemnify and hold Operator (including its officers, directors and employees) free and harmless from and against any and all liabilities (including, without limitation, all costs in connection with liabilities and in connection with the defense of causes of action, suits or other proceedings, including attorneys fees) of every kind and character, arising from or connected with the operation the Facility thereof or for any damage thereto, whether arising in or based upon tort, fraud, contract, strict liability, negligence, breach of fiduciary duty or any other theory of legal liability or as a result of fines or other penalties imposed by NRC or other governmental authority.

Encl. 5 p.4 14.

Scope of Indemnity and Release. OWNER ACKNOWLEDGES TO OPERATOR THAT THE PROVISIONS OF THIS AGREEMENT WHICH RELEASE OPERATOR OR PROVIDE FOR THE INDEMNIFICATION BY OWNER OF OPERATOR ARE INTENDED BY OWNER, TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW FROM TIME TO TIME, TO RELEASE AND SAVE AND HOLD HARMLESS AND INDEMNIFY OPERATOR FROM THE CONSEQUENCES OF OPERATORS OWN NEGLIGENCE (WHETHER ORDINARY OR GROSS, SOLE, JOINT OR CONCURRENT, OR ACTIVE OR PASSIVE) AND RECKLESS OR INTENTIONAL CONDUCT OR STRICT LIABILITY OF OPERATOR.

15.

Capacity, Liability and Release. Operator is entering into this Agreement as agent for and on behalf of Owner, and all obligations of Operator under this Agreement are being incurred solely on behalf of, and shall be enforceable solely against, Owner. Rights being granted in favor of or retained by Operator herein shall be held and enforceable by Operator, in its individual or corporate capacity. In no event shall Operator be liable to Owner for any damages of any kind, direct, incidental or consequential, and Owner hereby releases Operator from liability for damages arising out of Operators performance, nonperformance or breach of this Agreement.

16.

Material Consideration. The Parties agree that the limitations on liability and indemnity provisions set forth in this Agreement are supported by the Parties respective contractual undertakings and other good and valuable consideration and acknowledge that the Parties would not have entered into this Agreement in the absence of the indemnification obligations and the limitations on liability undertaken by either or both Parties.

17.

Confidentiality. Any information belonging to a party hereto which such party designates as confidential or proprietary shall not be disclosed to any other person or entity by the party receiving such information, except to the extent disclosure is required by law or as otherwise permitted with the consent of the non-disclosing party.

18.

Power of Attorney. Owner hereby irrevocably appoints Operator, and any officer or agent thereof, with full power of substitution, as its true and lawful attorney-in-fact with full and irrevocable power and authority in the place and stead of Owner and in the name of Owner for the purpose of carrying out the terms of this Agreement, to take any and all appropriate action and to execute any and all reports, contracts, documents and instruments which may be necessary or desirable to accomplish the purposes of this Agreement.

19.

Force Majeure. Operators performance of its obligations hereunder shall be excused to the extent that performance is prevented by an event beyond the reasonable control of Operator. Operator will use its reasonable efforts to remedy any such event as soon as possible, and performance shall be resumed as soon as reasonably practicable after the cause has been removed.

20.

Notices. Notices, requests, consents, elections, reports, payments, or other communications required or permitted to be given or made hereunder shall be in writing and shall be deemed to be delivered upon delivery to the Operator or Owner at their principal place of business during regular business hours on a business day. Notices delivered after hours or on a weekend or legal holiday will be effective on the next business day. Addresses shown below shall be considered the principal place of business of each unless and until the other is notified in writing.

Encl. 5 p.5 Owner:

Holtec Palisades, LLC Holtec Technology Campus 1 Holtec Blvd Camden, NJ 08104 Attention: William Gill Operator:

Palisades Energy, LLC Holtec Technology Campus 1 Holtec Blvd Camden, NJ 08104 Attention: Kelly Trice 21.

Successors in Interest; Assignment. Each and all of the covenants, agreements, terms, and provisions of this Agreement shall be binding on and inure to the benefit of the parties hereto and, to the extent permitted by this Agreement, their respective heirs, executors, administrators, personal representatives, successors and assigns. Neither party may assign this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld; provided, that either party may assign this Agreement to a wholly-owned affiliate of Holtec International upon written notice to the other party and receipt of any required regulatory approvals.

22.

Severability. Any provision of this Agreement which is invalid, illegal, or unenforceable in any respect in any jurisdiction shall be, as to such jurisdiction, ineffective to the extent of such invalidity, illegality or unenforceability without in any way affecting the validity, legality or enforceability of the remaining provisions hereof, and any such invalidity, illegality or unenforceability in any jurisdiction shall not invalidate or in any way affect the validity, legality or enforceability of such provision in any other jurisdiction.

23.

Waivers. The failure or delay of any party to seek redress for violation of or to insist upon the strict performance of any obligation in this Agreement shall not be a waiver of that violation or obligation or a waiver of a subsequent act.

24.

Third-Party Rights. Nothing in this Agreement, expressed or implied, is intended, nor shall same be construed or interpreted, to confer any rights or remedies upon any person or entity not a party hereto, other than the permitted successors or assigns of a party hereto.

25.

Entire Agreement; Amendments. This Agreement contains the entire agreement and understanding between Owner and Operator concerning the operation of the Facility, and supersedes and replaces any and all prior agreements, both verbal and written. This Agreement may only be amended in writing, signed by both parties.

26.

No Partnership or Joint Venture. Nothing in this Agreement shall be deemed or construed to create a partnership, joint venture or any similar relationship or create any fiduciary duties between Operator and Owner.

Encl. 5 p.6 IN WITNESS WHEREOF, the parties hereto have executed and delivered this Agreement as of the day and year first above written.

OWNER:

HOLTEC PALISADES, LLC By:

Name:

Title:

OPERATOR:

PALISADES ENERGY, LLC By:

Name:

Title:

Encl. 6 p.1 ENCLOSURE 6 FORM OF SUPPORT AGREEMENT THIS SUPPORT AGREEMENT (as amended, supplemented or otherwise modified from time to time, this Agreement), dated as of _______, 20__, between Holtec International, a Delaware limited liability company (the Parent), and Holtec Palisades, LLC, a Delaware limited liability company (the Owner).

WHEREAS, the Parent indirectly owns and controls the limited liability company interests of the Owner; WHEREAS, the Owner is the NRC-licensed owner of the Palisades Nuclear Plant (Palisades) and its associated Independent Spent Fuel Storage Installation (ISFSI) (collectively, the Facility);

WHEREAS, Parents subsidiary Palisades Energy, LLC (Operator) is the licensed operator of the Facility and Owners agent pursuant to an Operator Services Agreement between Owner and Operator dated even herewith; and WHEREAS, in connection with the return to full power operations and the transfer of control of the Facilitys NRC license, Parent and Owner desire to take certain actions to enhance and maintain the financial condition of the Owner as hereinafter set forth in order to ensure its ability to pay the costs and expenses relating to the operations and maintenance of the Facility; NOW THEREFORE, in consideration of the mutual promises herein contained, the parties hereto agree as follows:

1.

Subsidiary Payments. At all times while this Agreement is in effect and subject to the limitations set forth in paragraphs 3 and 4, the Parent agrees that it will make, or cause one of its subsidiaries to make, to the extent necessary, a Support Payment (as defined in paragraph 2) to the Owner in order to ensure that the Owner has sufficient liquidity in order to pay the costs and expenses relating to the operations and maintenance of the Facility. Any Support Payments required by this Agreement shall be made not later than the end of the next fiscal quarter.

2.

Commitment to Provide Capital. If during the term of this Agreement, the Parent is required to make a Support Payment to the Owner, such payment may be provided by the Parent, or any subsidiary of the Parent, at the Parents option, either as an equity investment or capital contribution or as a loan, in each case in cash or other liquid assets (any of the foregoing, a Support Payment). If such payment is advanced to the Owner as a loan, the loan shall be on such terms and conditions, including maturity and rate of interest, as the Parent and the Owner shall agree.

3.

Limitation of the Parents Support Obligations. Each of the Parent and the Owner agrees that the Parent shall not be required to make, or cause its subsidiaries or affiliates to make, Support Payments to the Subsidiary Owner in excess of $75 million in the aggregate.

4.

Not a Guaranty. This Agreement, its provisions and any actions pursuant hereto by the Parent shall not constitute or be deemed to constitute a direct or indirect guaranty by the Parent of any indebtedness for borrowed money or other obligation or liability of any kind or character whatsoever of the Owner.

Encl. 6 p.2 5.

Rights of Participants and Creditors. The obligations of the Parent pursuant to this Agreement are to the Owner only and do not run to and are not enforceable directly by any creditor of the Owner or other entity or person, nor shall this Agreement cause the Parent to be responsible for payment of any obligation of the Owner to any creditor or other entity or person or give rise to any recourse by any creditor or other entity or person to or against the Parent or any of its assets or properties.

6.

Waivers. Any failure by any party hereto, at any time or times hereafter, to require strict performance by the other party of any provision of this Agreement shall not waive, affect or diminish any right of any party thereafter to demand strict compliance and performance therewith. None of the agreements contained in this Agreement shall be deemed to have been suspended or waived by any party hereto unless such suspension or waiver is in writing.

7.

Amendments and Termination. Subject to paragraph 10, this Agreement may be amended, modified or terminated at any time by the parties hereto only by a written instrument signed by both the Parent and the Owner. This Agreement shall terminate at such time as Parent is no longer the direct or indirect owner of any of the ownership interests in Owner. This Agreement shall also terminate whenever the Facility permanently ceases commercial operations and certification is made as to the permanent removal of fuel from the reactor vessel.

8.

Successors. This Agreement shall be binding upon, and shall inure to the benefit of, the parties hereto and their respective successors and assigns, provided that the Owner may not assign, transfer or pledge its rights hereunder without the prior written consent of the Parent. This Agreement is not intended for the benefit of any entity or person other than the parties hereto, and shall not confer or be deemed to confer upon any other such entity or person any benefits, rights or remedies hereunder.

9.

Governing Law; Severability. This Agreement and all rights and obligations hereunder shall be governed by and construed and enforced in accordance with the laws of the State of _____. Whenever possible, each provision of this Agreement shall be interpreted in such a manner as to be effective and valid under applicable law, but if any provision of this Agreement shall be prohibited by or invalid under applicable law, such provision shall be ineffective only to the extent of such prohibition or invalidity, without it invalidating the remainder of such provisions or the remaining provisions of this Agreement.

10. Notice to NRC. Owner shall take no action to cause Parent, or its successors and assigns, to void, cancel, or modify the commitment to provide financial support to Owner as set forth in this Agreement or cause Parent to fail to perform or impair its performance under the commitment, or remove or interfere with Owners ability to draw upon the commitment, without the prior written consent of the Director of the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission (NRC). Also, Owner shall inform NRC in writing any time that it draws upon the commitment to provide capital by obtaining a Support Payment.

[Signatures on Following Page]

Encl. 6 p.3 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and delivered by their respective officers thereunto duly authorized as of the day and year first above written.

HOLTEC INTERNATIONAL Name:

Title:

HOLTEC PALISADES, LLC Name:

Title: