PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel
Letter Sequence Request | |
---|---|
EPID:L-2024-LNE-0003, Regulatory Path to Reauthorize Power Operations (Approved, Closed) | |
Initiation Administration Questions
Results Other: ML24152A134, ML24152A195, ML24152A199, ML24155A003, ML24155A010, ML24155A026, ML24163A055, ML24163A082, ML24163A083, ML24163A109, ML24163A147, ML24163A192, ML24163A239, ML24183A127, ML24183A128, ML24183A129, ML24183A130, ML24183A131, ML24183A132, ML24183A133, ML24183A134, ML24183A135, ML24183A136, ML24183A137, ML24183A138, ML24183A139, ML24183A140, ML24183A141, ML24183A142, ML24183A143, ML24183A144, ML24183A145, ML24183A146, ML24183A147, ML24183A148, ML24183A149, ML24183A150, ML24183A151, ML24183A153, ML24183A154, ML24183A155, ML24183A156, ML24183A157, ML24183A158, ML24183A159, ML24183A160, ML24183A161, ML24219A420, ML24292A007, ML24292A049... further results | |
MONTHYEARPNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022
[Table View]Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel Project stage: Request PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations Project stage: Request ML23107A1252023-03-16016 March 2023, 20 March 2023, 20 April 2023 Summary of March 20, 2023, Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant Project stage: Request ML23107A0652023-03-31031 March 2023 Revision 36 to Updated Final Safety Analysis Report Project stage: Request ML23171B1242023-05-19019 May 2023, 24 May 2023, 22 June 2023 Summary of May 24, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant Project stage: Request PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 Project stage: Request PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments Project stage: Request PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations Project stage: Request PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations Project stage: Request PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations Project stage: Request ML24178A0002024-05-21021 May 2024 U.S. Fish and Wildlife List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project Michigan Ecological Services Field Office Palisades Restart Review Project stage: Request ML24149A0022024-06-24024 June 2024 Federal Register Notice - Noi to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization to Power Operation Project stage: Request ML24155A0262024-06-27027 June 2024 Jean A. Fleming, VP Licensing, Holtec-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003; Docket 50-0255 Project stage: Other ML24163A1472024-06-28028 June 2024 Scott Hicks, FWS-Palisades-NOI to Conduct Scoping Process and Prepare an EA-EPID No. L-2024-LNE-0003-Docket No.50-0255 Project stage: Other ML24183A1372024-07-0101 July 2024 Tribal Letter-Lac Courte Oreilles Band of Lake Superior Chippewa Project stage: Other ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe Project stage: Other ML24183A1562024-07-0101 July 2024 Tribal Letter - Saginaw Chippewa Indian Tribe of Michigan Project stage: Other ML24183A1292024-07-0101 July 2024 Tribal Letter-Bois Forte Band Project stage: Other ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa Project stage: Other ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma Project stage: Other ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians Project stage: Other ML24183A1402024-07-0101 July 2024 Tribal Letter-Leech Lake Band of Ojibwe Project stage: Other ML24183A1432024-07-0101 July 2024 Tribal Letter- Match-e-be-Nash-She-Wish Band of Pottawatomi Indians Project stage: Other ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin Project stage: Other ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians Project stage: Other ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation Project stage: Other ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community Project stage: Other ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community Project stage: Other ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin Project stage: Other ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians Project stage: Other ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation Project stage: Other ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians Project stage: Other ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians Project stage: Other ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community Project stage: Other ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians Project stage: Other ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community Project stage: Other ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation Project stage: Other ML24183A1482024-07-0101 July 2024 Tribal Letter - Ottawa Tribe of Oklahoma Project stage: Other ML24183A1512024-07-0101 July 2024 Tribal Letter-Prairie Island Indian Community Project stage: Other ML24183A1612024-07-0101 July 2024 Tribal Letter White Earth Band of Minnesota Chippewa Tribe Project stage: Other ML24183A1602024-07-0101 July 2024 Tribal Letter - Turtle Mountain Band of Chippewa Indians Project stage: Other ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians Project stage: Other ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa Project stage: Other ML24183A1472024-07-0101 July 2024 Tribal Letter - Nottawaseppi Huron Band of the Potawatomi Project stage: Other ML24183A1362024-07-0101 July 2024 Tribal Letter - Keweenaw Bay Indian Community Project stage: Other ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa Project stage: Other ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation Project stage: Other ML24163A2602024-07-0101 July 2024 Randy Claramunt, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID L-2024-LNE-0003, Docket No.50-0255 Project stage: Approval ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 Project stage: Other ML24163A1092024-07-0101 July 2024 Tribal Letter-Grand Traverse Band Project stage: Other 2023-09-28 |
ML22164A067 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 06/13/2022 |
From: | Corbin D Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
PNP 2022-010 | |
Download: ML22164A067 (2) | |
Similar Documents at Palisades | |
---|---|
Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024
[Table view]Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02 |
Text
E) entergy Darrell W. Corbin Site Vice President Palisades Nuclear Plant 269-764-2000
PNP 2022-010 10 CFR 50.82(a)(1)
June 13, 2022
A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Certifications of Permanent Cessation of Power Ope rations and Permanent Removal of Fuel from the Reacto r Vessel
Palisades Nuclear Plant NRC Docket No. 50-255 Renewed Facility Operating License No. DPR-20
Reference:
Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission, Supplement to Certification of Permanent Cessation of Power Operations, (ADAMS Accession No. ML17292A032),
dated October 19, 2017
In the referenced letter, in accordance with Title 1 O of the Code of Federal Regulations, Part 50, Section 82 (1 O CFR 50.82), Termination of license, subparagraph 50.82(a)(1 )(i), Entergy Nuclear Operations, Inc. (Entergy) certified to the U.S. Nuclear Regulatory Commission (NRC) that it had decided to permanently cease power operations at Palisades Nuclear Plant (PNP) no later than May 31, 2022.
In this letter Entergy hereby certif ies to the NRC in accordance with 1 O CFR 50.82(a)(1 )(i) that power operations ceased at PNP on May 20, 2022. In addition, in accordance with 1 O CFR 50.82(a)(1 )(ii), Entergy also certifies that the fuel was permanently removed from the PNP reactor vessel and placed in the PNP spent fuel pool on June 10, 2022. Entergy understands and acknowledges that upon docketing of these certifications, the PNP 1 O CFR Part 50 license no longer au t horizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.
This letter contains no new commitments and no revised commitments.
Should you have any questions or require additional information, please contact Jim Miksa, regulatory assurance engineer at (269) 764-2945.
Enterg Nuclear Operations, Inc., 27780 Blue Star Memorial Highway, Covert, Ml 49043-9530 PNP 2022-010 Page 2 of 2
I declare under penalty of perjury; the foregoing is true and correct. Executed on June 13, 2022.
Respectfully,
Darrell W. Corbin
DWC/jpm
cc: NRC Region Ill Regional Administrator NRC Senior Resident Inspector - Palisades Nuclear Plant NRC Project Manager - Palisades Nuclear Plant State of Michigan