Other: ML24152A134, ML24152A195, ML24152A199, ML24155A003, ML24155A010, ML24155A026, ML24163A055, ML24163A082, ML24163A083, ML24163A109, ML24163A147, ML24163A192, ML24163A239, ML24183A127, ML24183A128, ML24183A129, ML24183A130, ML24183A131, ML24183A132, ML24183A133, ML24183A134, ML24183A135, ML24183A136, ML24183A137, ML24183A138, ML24183A139, ML24183A140, ML24183A141, ML24183A142, ML24183A143, ML24183A144, ML24183A145, ML24183A146, ML24183A147, ML24183A148, ML24183A149, ML24183A150, ML24183A151, ML24183A153, ML24183A154, ML24183A155, ML24183A156, ML24183A157, ML24183A158, ML24183A159, ML24183A160, ML24183A161, ML24219A420, ML24292A007, ML24292A026... further results
|
MONTHYEARPNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel Project stage: Request L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement Project stage: Request ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant Project stage: Request ML22321A2862022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Units 1 and 2 and Holtec Indian Point 3, LLC Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Unit 3 Project stage: Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations Project stage: Request PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations Project stage: Request ML23107A1252023-03-16016 March 2023, 20 March 2023, 20 April 2023 Summary of March 20, 2023, Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant Project stage: Request L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Project stage: Request ML23107A0652023-03-31031 March 2023 Revision 36 to Updated Final Safety Analysis Report Project stage: Request PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report Project stage: Request PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports Project stage: Request ML23171B1242023-05-19019 May 2023, 24 May 2023, 22 June 2023 Summary of May 24, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant Project stage: Request PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 Project stage: Request PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments Project stage: Request PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations Project stage: Request PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations Project stage: Request PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations Project stage: Request ML24178A0002024-05-21021 May 2024 U.S. Fish and Wildlife List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project Michigan Ecological Services Field Office Palisades Restart Review Project stage: Request ML24149A0022024-06-24024 June 2024 Federal Register Notice - Noi to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization to Power Operation Project stage: Request ML24155A0262024-06-27027 June 2024 Jean A. Fleming, VP Licensing, Holtec-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003; Docket 50-0255 Project stage: Other ML24163A1472024-06-28028 June 2024 Scott Hicks, FWS-Palisades-NOI to Conduct Scoping Process and Prepare an EA-EPID No. L-2024-LNE-0003-Docket No.50-0255 Project stage: Other ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe Project stage: Other ML24152A1952024-07-0101 July 2024 Carin Speidel, Acting Division Director, Environmental Health - Palisades - Noi to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003, Docket No. 50-0255 Project stage: Other ML24152A1342024-07-0101 July 2024 Nancy Ann Whaley, Geneva Township-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003-Docket No. 50-0255 Project stage: Other ML24152A1992024-07-0101 July 2024 Richie Garcia, Water Filtration Supervisor-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No. 50-0255 Project stage: Other ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 Project stage: Other ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P Project stage: Other ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 Project stage: Approval ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 Project stage: Other ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger ACHP Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant Project stage: Other ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 Project stage: Other ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant Project stage: Other ML24163A1092024-07-0101 July 2024 Tribal Letter-Grand Traverse Band Project stage: Other ML24183A1372024-07-0101 July 2024 Tribal Letter-Lac Courte Oreilles Band of Lake Superior Chippewa Project stage: Other ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians Project stage: Other ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community Project stage: Other ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians Project stage: Other ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians Project stage: Other ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation Project stage: Other ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians Project stage: Other ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin Project stage: Other ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community Project stage: Other ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community Project stage: Other ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation Project stage: Other ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians Project stage: Other ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians Project stage: Other ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin Project stage: Other ML24183A1432024-07-0101 July 2024 Tribal Letter- Match-e-be-Nash-She-Wish Band of Pottawatomi Indians Project stage: Other ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 Project stage: Other ML24183A1402024-07-0101 July 2024 Tribal Letter-Leech Lake Band of Ojibwe Project stage: Other 2023-04-18
[Table View] |
Text
~July 11, 2024 Docket ID NRC-2024-0076 1 of 2 Due to the imposed time constraints for comments today, I have submitted the full text of my statement to the NRC Docket and members of the press. I regret that the public will not have the opportunity to hear my complete comment today.
My name is Alan Blind, and I am a resident of Baroda, Michigan. I am speaking on behalf of the residents of Palisades Park in Covert, Michigan.
Governor Whitmer supported continuing operations at Palisades, yet Entergy shut down the plant, surrendered its operating license, and sold it as "junk," suitable only for decommissioning. These actions should not be easily reversible.
Holtec has proposed exploiting a loophole from a NRC denial letter concerning a 2019 Petition for Rulemaking for a fast and easy way to allow it to reload fuel and operate Palisades.
If allowed, this will permit Holtec and the NRC to evaluate today's proceedings with very little public involvement under a "fast and simple" process. This process has already been used to allow NRC to agree with Holtec's "Motion for Secretary Order, denying public hearings" The petitioner appealed the Holtec proposed order to not allow public hearings; and captured our concern today:
411,2024 Docket ID NRC-2024-0076 2of2 The device of exemption here is being invoked to camouflage the actual nature of the request, which is a license amendment. The exemption being sought would relieve Holtec from adhering to the core regulations the Atomic Entergy Act imposes to ensure safe regulation of commercial nuclear power plants in the interest of public health and safety, as well as environmental protection.
Exemptions are for short-duration bypasses of NRC regulations, not for reversing a major licensing event. This request for permission to restart is a major change that requires full-blown... licensing proceedings."
Back to my comment today, The residents of Palisades Park and 1 request that the NRC General Counsel approve the current NRC staff interpretation of the Holtec/NRC's use of selected words, in part and in whole, taken out of context from the denial of "PRM-50-117", dated February 19, 2019.
As a better approach, we request that the NRC agree with our Petition for Rulemaking to include an NRC Commission-approved process for returning a decommissioned plant to operational status.
Thank you.
Who Am I?
- 1975-1997: Site Vice President: American Electric Power Cook Nuclear
- 1997 - 2002: Consolidated Edison of NY. Indian Point. Vice President Nuclear
- 2002-2003: Ontario Power Generation: Pickering. Pickering One Restart
- 2006 - 2013: Entergy Nuclear Operations. Palisades. Engineering Director.
Definition of "Is it Safe?".
My standard of safety is met when any nuclear plant, including Palisades, meets all NRG Design Criteria.
1 0CFR50 includes all of the NRG requirements, including Design Criteria. Current Design Standards includes all of the collective experience over the last 50 years of commercial power design.
building and operations.
What are my concerns about a Palisades Restart?
Broadly speaking, I have two concerns; 1) NRC Full Commission Must be Involved, and 2) project justification, cost and schedule. This is a mater of public interest given the use of Sta~e and Federal subsidies.
I petition the full NRG Commissioners to codify the process used to define the required, minimum design basis for Palisades. NRC staff recognizes there are no codified regulations for restarting, such as Palisades. Holtec is asking to use a modern process, meant for new
plants, at the same time requesting a design basis that predated NRC design requirements, be used. This is unreasonable and the full commission needs to step in and define the startup process for Palisades.
Basic project management requirements include firm scope definition. Given the large number of unknowns stemming from the lack of information of equipment condition, especially the steam generators, and unknown number of safety upgrades, and lack of an agreed upon design standard and NRC_ inspection program, it is impossible for any company to plan out, schedule and cost estimate a large project such a Holtec is proposing. Given even the current cost and schedule estimates, the project cannot possibly be in the state, federal, and rate payers interest.