ML23065A059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:From:                     Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com>
{{#Wiki_filter:From: Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com>
Sent:                     Monday, February 27, 2023 1:15 PM To:                       Brent Ballard Cc:                       Miller, Michael A
Sent: Monday, February 27, 2023 1:15 PM To: Brent Ballard Cc: Miller, Michael A


==Subject:==
==Subject:==
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions
: Brent, NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR.
: Brent,
 
NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR.
 
Meeting times that currently would work for us include:
Meeting times that currently would work for us include:
* 4/11 beginning either 1030 or 1330 CDT
* 4/11 beginning either 1030 or 1330 CDT
* 4/12 beginning 1130 CDT
* 4/12 beginning 1130 CDT
* 4/14 beginning between 1000 and 1200 CDT However, we are receptive to other times.
* 4/14 beginning between 1000 and 1200 CDT
: Thanks, Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email.
 
However, we are receptive to other times.
: Thanks,
 
Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email.
 
Hearing Identifier: NRR_DRMA Email Number: 1979


Hearing Identifier:      NRR_DRMA Email Number:            1979 Mail Envelope Properties       (DM6PR01MB484176B45CE437F44935E382B5AF9)
Mail Envelope Properties (DM6PR01MB484176B45CE437F44935E382B5AF9)


==Subject:==
==Subject:==
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date:               2/27/2023 1:15:11 PM Received Date:           2/27/2023 1:15:23 PM From:                   Kivi, Jeffrey L Created By:             jeffrey.l.kivi@xcelenergy.com Recipients:
[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date: 2/27/2023 1:15:11 PM Received Date: 2/27/2023 1:15:23 PM From: Kivi, Jeffrey L
 
Created By: jeffrey.l.kivi@xcelenergy.com
 
Recipients:
"Miller, Michael A" <michael.a.miller@xcelenergy.com>
"Miller, Michael A" <michael.a.miller@xcelenergy.com>
Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov>
Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov>
Tracking Status: None Post Office:             DM6PR01MB4841.prod.exchangelabs.com Files                             Size                     Date & Time MESSAGE                           1240                     2/27/2023 1:15:23 PM Options Priority:                         Normal Return Notification:               No Reply Requested:                   No Sensitivity:                       Normal Expiration Date:}}
Tracking Status: None
 
Post Office: DM6PR01MB4841.prod.exchangelabs.com
 
Files Size Date & Time MESSAGE 1240 2/27/2023 1:15:23 PM
 
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}}

Revision as of 05:14, 15 November 2024

NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions
ML23065A059
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/27/2023
From: Kivi J
Northern States Power Co
To: Ballard B
NRC/NRR/DORL/LPL3
Ballard B
References
Download: ML23065A059 (2)


Text

From: Kivi, Jeffrey L <jeffrey.l.kivi@xcelenergy.com>

Sent: Monday, February 27, 2023 1:15 PM To: Brent Ballard Cc: Miller, Michael A

Subject:

[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions

Brent,

NSPM would like to conduct a pre-application meeting for a proposed license amendment request to change TS 3.7.8 (Cooling Water System), Condition B (inoperable cooling water header), Required Actions. The nature of the proposed change will be similar to the one-time change for Amendments 237/225 and would change the logical connector between Required Action B.1 (to verify operability of the 121 motor-driven cooling water pump) and Required Action B.2 (to verify operability of the diesel-driven cooling water pump associated with the operable cooling water header) from an AND to an OR.

Meeting times that currently would work for us include:

  • 4/11 beginning either 1030 or 1330 CDT
  • 4/12 beginning 1130 CDT
  • 4/14 beginning between 1000 and 1200 CDT

However, we are receptive to other times.

Thanks,

Jeff Kivi PE Xcel Energy Sr Licensing Engineer Working from home Mon, Tues, Wed, and Fri; in the office Thus Cell: 612.250.2921 Email: Jeffrey.L.Kivi@xcelenergy.com XCELENERGY.COM Please consider the environment before printing this email.

Hearing Identifier: NRR_DRMA Email Number: 1979

Mail Envelope Properties (DM6PR01MB484176B45CE437F44935E382B5AF9)

Subject:

[External_Sender] Prairie Island request for pre-application meeting for proposed LAR to change TS 3.7.8, Condition B Required Actions Sent Date: 2/27/2023 1:15:11 PM Received Date: 2/27/2023 1:15:23 PM From: Kivi, Jeffrey L

Created By: jeffrey.l.kivi@xcelenergy.com

Recipients:

"Miller, Michael A" <michael.a.miller@xcelenergy.com>

Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov>

Tracking Status: None

Post Office: DM6PR01MB4841.prod.exchangelabs.com

Files Size Date & Time MESSAGE 1240 2/27/2023 1:15:23 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: