ENS 56328: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 22: | Line 22: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
Off-site power available and unaffected. Decay heat removal via main steam line and drains to condenser. Plant is stable in mode 3. | Off-site power available and unaffected. Decay heat removal via main steam line and drains to condenser. Plant is stable in mode 3. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230203en.html#en56328 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 |
Latest revision as of 07:30, 3 February 2023
Where | |
---|---|
Clinton Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-4.05 h-0.169 days <br />-0.0241 weeks <br />-0.00555 months <br />) | |
Opened: | David Dorn 01:40 Feb 1, 2023 |
NRC Officer: | Adam Koziol |
Last Updated: | Feb 1, 2023 |
56328 - NRC Website
| |