Letter Sequence Other |
---|
|
|
MONTHYEARML20098H1851984-09-0505 September 1984 Revised Tech Specs Re Installation of Analog Transmitter Trip Sys Project stage: Other ML20098H1831984-09-0505 September 1984 Application to Amend License DPR-57,changing Tech Specs to Modify Plant Design Re Installation of GE Analog Transmitter Trip Sys Project stage: Request ML20106E4361984-10-18018 October 1984 Proposed Rev to 840905 Tech Spec Changes Re Support Analog Transmitter Trip Sys Installation Project stage: Other ML20106E4301984-10-18018 October 1984 Revised Application to Amend License DPR-57,changing Tech Specs to Support Analog Transmitter Trip Sys Installation. Amend Request Originally Submitted on 840905 Project stage: Request ML20099C3781984-11-0606 November 1984 Forwards Revised Page 4-28a Re HPCI Sys Steam Line High Differential Pressure Trip Instruments,Per 841005 & 18 Proposed Tech Spec Changes to Analog Transmitter Trip Sys. Process Used to Arrive at Instrument Setpoints Described Project stage: Other 1984-11-06
[Table View] |
Proposed Rev to 840905 Tech Spec Changes Re Support Analog Transmitter Trip Sys InstallationML20106E436 |
Person / Time |
---|
Site: |
Hatch ![Southern Nuclear icon.png](/w/images/1/14/Southern_Nuclear_icon.png) |
---|
Issue date: |
10/18/1984 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
References |
---|
TAC-55695, NUDOCS 8410290231 |
Download: ML20106E436 (9) |
|
Similar Documents at Hatch |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained ML20073G9631994-09-23023 September 1994 Proposed Improved Ts,Rev E ML20073D3231994-09-20020 September 1994 Proposed Tech Specs Change to Unit 1 TSs Re EDG Operability Requirements During Reactor Shut Down Conditions ML20072V3641994-08-31031 August 1994 Proposed Tech Specs Re Improved Standard Ts,Rev D ML20072H0571994-08-16016 August 1994 Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys ML20072E4021994-08-0808 August 1994 Proposed Tech Specs Re Rev Insertion Instructions Rev C ML20072B7541994-08-0404 August 1994 Proposed Tech Specs Re Traversing Incore Probe Operability Requirements ML20071H8381994-07-19019 July 1994 Proposed TS 3.3.6.6,allowing Less than Four Traversing in- Core Probe Machines to Be Operable ML20071H6851994-07-0808 July 1994 Proposed Tech Specs Re Improved Std Insertion Instructions, Consistent w/NUREG-1433 ML20069J3101994-06-0707 June 1994 Proposed Tech Specs Allowing Planned Testing at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt ML20059E9231994-01-0606 January 1994 Revised Proposed TS Pages for Increase in Allowable MSIV Leakage Rate & Deletion of MSIV Leakage Control Sys ML20059L2051993-11-0909 November 1993 Proposed Tech Specs Changing Unit 1,Section 4.9 & Unit 2, Section 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20058P8881993-10-19019 October 1993 Proposed Tech Specs Re Time Delay for RPS Electric Power Monitoring Sys Trips ML20046B6061993-07-30030 July 1993 Proposed Tech Specs for Implementation of New 10CFR20 Requirements ML20046B5561993-07-27027 July 1993 Proposed Tech Specs Showing Original & Unrelated Changes Re Removal of Main Steam Line Radiation Monitor Trips ML20045E7281993-06-28028 June 1993 Proposed TS 3.7.A.4 & 3.6.4.1 for Units 1 & 2,respectively, Allowing One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing 1999-07-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained 1999-07-29
[Table view] |
Text
g.
ENCIOSURE NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA701 NUCLEAR PIANT UNIT 1 REVISION OF REQUEST FOR TECINICAL SPECIFICATION CHANGES TO SUPPORT ANAIDG TRANENI7TER TRIP SYSTEM INSTALLATION The following changes should be made to the docment entitled "Edwin I.
Hatch Nudlear Plant Unit 1, Docket No. 50-321, Technical Specifications Revisions Associated With Installation of Analog Transnitter Trip Systen" which 'was enclosed with Georgia Power Company Letter NED-84-436 (dated September 5,1984), using the pages enclosed with this subnittal:
Renove Page Insert Page 4-26 4-26 4-28a 6-2 6-2 6-3 6-3 3.2-6*
3.2-28*
i 3.2-54*
Al-15**
- These pages are new proposed Unit 1 Technical Specification pages and should be added to_the section entitled " Proposed Technical Specifications Revision".
- 1his page contains the significant hazards evaluation required for this revision by 10 CER 50.92 and should be added to Appendix 1.
8410290231 841018 DRADOCK05000g
(T' ~ ,
.;w ;
4.B.12 Miscellaneous Trio Setooint/ Allowable Value Modifications 4.B.12.a. New calculations were performed to determine the new'setpoint value for each ATTS instrument. The setpoint calculations were made using the criteria of Regulatory Guide 1.105. The Plant Hatch analytical limits were used (where applicable) to develop the allowable values and trip setpoints. Unless identified in the text, the analytical
- limits used to develop these setpoints are the values used in the design basis of Plant Hatch. The values that are proposed to be inserted into.the Technical Specifications are the calculated allow-able values. The setpoints used at Plant Hatch will take into consideration instrument drift and will be developed frcm the allow-able values. The proposed Technical Specifications revisions include modifications of the trip setpoints/ allowable values for the follow-ing instruments:
RPS Trio Function Trip Unit MPL No.
- 1. Reactor vessel steam dome B21'N678A,B,C,D pressure - high
- 2. Reactor vessel water level - B21-N6SOA,B,C,0
. Level 3
- 3. Reactor vessel water level - 821-N681A,B,C,D Level 1 ECCS Trio Function Trip Unit MPL No.
- 1. Reactor vessel water level - B21-N691A,B,C,D Level 1
- 2. Reactor vessel steam dome 221-N690A,B,C,0 pressure - low
- 3. Reactor vessel steam dome B21-N690E,F presssure - low B21-N641B,C
- 4. Reactor vessel water B21-N695A,B level - Level 3
- 5. HPCI steamline differential E41-N657A, B pressure - high
. 4-26 Revision 1
V' .
- 5. HPCI steam line differential pressure - high (E41-N657A,B) i The purpose of this instrumentation is to detect HPCI steam line breaks and to isolate the HPCI system to confine the resulting radioactivity release and limit the reactor inventory loss. The HELB analysis assumes that the HPCI turbine trips and the system isolates at 300 percent of rated flow. However, the HELB analysis is used for guillotine breaks which have flows several times higher than 300 percent of rated flow. A conservative analysis shows the leakage detection instrumentation isolates in the 400 percent of rated flow range with less inventory loss and less peak qualification parameters than the inventory loss and the qualification parameters calculated in the extreme HELB analysis. Since operability problems are a concern with setpoints derived from an analytical limit of 300 percent using Regulatory Guide 1.105 methodology for this function, it is proposed that the present Plant Hatch setpoint be maintained. This setpoint has been proven to be acceptable from operability considerations. Using this setpoint, an allowable value of 303 percent of rated flow was selected, taking into account instrument drift.
b i
4-28a Revision 1 I
TABLE 6.1 INSTRUCTIONS FOR INCORPORATING TECHNICAL SPECIFICATIONS REVISIONS If the Technical Specifications revisions are accepted as proposed, the HNP-1 Technical Specifications (Appendix A to Operating License DPR-57) should be incorporated as follows:
Deletions Insertions Applicable SER*<a>
Item (Page) (Page) Section(s) 1 1.0-6 1.0-6 4.B.10 2 1.1-3 1.1-3 4.B.11, 4.B.12 3 1.1-4 1.1-4 4.B.10 4 1.1-5 1.1-5 4.B.3, 4.B.11, 4.B.12 5 1.1-13 1.1-13 4.B.11, 4.B.12 6 1.1-14 1.1-14 4.B.10 7 Fig. 2.1-1 Fig. 2.1-1 4.B.2, 4.B.3, 4.B.4, 4.B.11, 4.B.12 8 1.2-1 1.2-1 4.B.12 9 1.2-2 1.2-2 4.B.9 10 1.2-4 1.2-4 4.B.9 11 1.2-6 1.2-6, 6a 4.B.9 12 3.1-3 3.1-3 4.B.11, 4.B.12 13 3.1-4 3.1-4 4.B.11, 4.8.12
.14 3.1-5 3.1-5 4.B.10 .
15 3.1-7 3.1-7 ATTS, 4.B.11 16 3.1-8 3.1-8 ATTS 17 3.1-11 3.1 11 4.B.11 3.1-12 3.1-12 4.B.11, 4.8.12 18 19 3.1-14 3.1-14 ATTS 20 3.1-15 3.1-15 ATTS 21 3.1-17 3.1-17 ATTS 22 3.1-18 3.1-18 ATTS 23 3.2-1 3.2-1 4.8.1 24 3.2-2 3.2-2 4.B.2, 4.B.3, 4.B.6, 4.3.11, 4.B.12 25 3.2-5 3. 2- 5 4.B . 3, 4.B .4, 4.B .11, 4. B.12 26 3.2-6 3.2-6 4.B.12 l' 27 3.2-8 3.2-8 4.B. 3, 4.B . 4, 4. B . 5, 4.B .11, 4.B .12 28 3.2-10 3.2-10 4.B.ll , 4.B.12 29 3.2-11 3.2-11 4.B .ll , 4.B.12 30 3.2-14 3.2-14 4.B.11, 4.B.12 31 3.2-20 3.2-20 4.B.3 32 3.2-22 3.2-22 4.B.8 33 3.2-23c 4.B.1 34 3.2-24 3.2-24 ATTS, 4.B.11 35 3.2-27 3.2-27 ATTS, 4.B.11 36 3.2-28 3.2-28 ATTS 3.2-30 3.2-30 ATTS, 4.B.11 l 37 38 3.2-33 3.2-33 ATTS, 4.B.ll 39 3.2-35 3.2-35 ATTS, 4.B.11 40 3.2-38 3.2-38 ATIS, 4.B.ll 6-2 Revision 1
Insertions Deletions Applicable _SER"ca>
Item -(Page) (Page) Section(s) 41' 3.2-45 3.2-45 4.B.11 42 3.2-49c 4.B.1 43 3.2-50 3.2-50,-50a 4.B.2, 4.B.3, 4.B.6, 4.B.9, 4.3.11, 4.B.12 44 3.2-52 3.2-52 Editorial, 4.B.3, 4.B.11, 4.B.12 45 .3.2-53 3.2-53 ATTS t 4.B.4, 4.B.11, 4.B.12 46 3.2-54 3.2-54 4.B .12 l 47 3.2-55 3.2-55 Editoria l , ATTS , 4.B.3, 4.B.11 48 3.2-56 3.2-56 ATTS, 4.B.4, 4.B.5, 4.B.11, 49 3.2-58 3.2-58 4.B.11, 4.B.12 50 3.2-59 3.2-59 4.B.12 51 -3.2-60 3.2-60 4.B.12 52 3.2-62 3.2-62 4.B.11, 4.B.12 53 3.2-68a 3.2-68a 4.B.1 54 3.2-69 3.2-69 ATTS 55 3.6-9 3.6-9 4.B.1 56 3.6-9a 3.6-9a, 9b 4.B.1 57 3.6-21 3.6-21 4.B.1 58 3.6-22 3.6-22 4.B.1 59 3.7-17 3.7-17 4.B.7 60 3.7-18 3.7-1? 4.B.7
~
61 3.7-19 3.7-19 4.B.7, 4.B.11, 4.B.6, 4.B.2 62 3.7-35 3.7-35 4.B.2, 4.B.6, 4.B.7, 4.B.11 SER-Safety Evaluation Report a.- 1. ATTS refers to proposed revisions justified in Section III of this submittal.
- 2. 48.1 through 48.12 refer *.o justifications presented in Section IV of this submittal.
- 3. Editorial refers to the correction of a typographical error.
Revision 1
_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 6_-3
n- 7 g
v.
Table 3.2-2 (Cont.)
Recpired Operable Ref. Trip Channels No. Condition . per Trip (a) Instmment - . Nomenclature System (b) Trip Setting Remark
- 9. HPCI Steam Line Pressure Iow 2 2 100 psig Closes isolation valves.in HPCI system, trips 'HPCI turbine.
- 10. HPCI Steam Line AP (Flow) High 1 5 303% rated Close isolation valtes in HPCI flow system, trips HPCI turbine,
- 11. HPCI 'nirbine Exhaust High 1 $ 10 psig Close isolation valtes in HPCI' Diaphragm Pressure system, trips HPCI turbine.
g 12. Suppression Chamber Area High 1 11790F Close isolation valtes in HPCI-m Jabient Tenperature system, trips HPCI turbine.
E
- 13. Suppression Chamber Area High 1 5500F ,
Close isolation valves An hPCI Differential Air Tenperature -
system, trips HPCI turbine.
- 14. Condensate Storage Tank Inw 2 10 inches hitomatic interlock switches Invel suction from CSP to suppression chamber
- 15. Suppression Chamber inter High 2 s 0 inches Altomatic interlock switches Letel alction from CIS to alppression chamber
- 16. HPCI Ingic Power Failure 1 Not Applicable Monitors availability of power Monitor to logic system.
- a. 'Ite colunn entitled "Ref. No." is only for convenience so that a one-to-one relationship can be established between items in Table 3.2-2 and items in Table 4.2-2.
O.
iTable 4.2-2 (Cont'd)
Ref. Instnament Oeck - Instmment RInctional Test - ' Instmment Calibration 1 No. Miniinlm FreqJency Minim 1m Freq2ency. Minin1m Freq2ency (a) (b) - (c)-
10 -HPCI Steam Line Once/ Shift Once/ month. 'Once/ operating cycle l AP (Flow) -
11 HPCI 'R1rbine Exhalst None (d) D ery 3 months Diaphragm Presaire 12 alppression Gamber Area None (d) Every 3 months Ambient Tenperature 13 alppression Gamber Area -None (d) Dery 3 months Differential Air Tenperature
, 14 Cordensate Storage None (d) Dery 3 months
, Tank Iesel i
5 15 alppression Gamber None (d) Dery 3 months eter Iasel 16 HPCI Iogic Power .None Once/ operating cycle None Failure Monitor Notes for Table 4.2-2
- a. 'Ibe colunn entitled "Ref. No." 'is only for convenience so that a one-to-one relationship can be established between items in table 4.2-2 and items in Table 3.2-2.
y
. i BASES FOR LIMITING CONDITIONS FOR OPERATION 3.2.B.8 HPCI Riuipnent Rom Teperature High (Continued) tmperature setting 900F + abient was selected to be far enough above anticipated normal HPCI systs operational levels to avoid spurious isolation but low enough to provide timely detection of HPCI turbine stem line break. h e high tmperature trip initiates a timer which isolates the HPCI turbine stem line if the ta perature is not reduced below the setpoint.
- 9. HPCI Stem Line Pressure Iow Iow pressure in the HPCI stem line could indicate a break in the HPCI stem line. %erefore, the HPCI stem line isolation valves are autmatically closed. ne stem line low pressure function is provided so in the event that a gross rupture of the HPCI stem line occurred upstrem fra the high flow sensing location, thus negating the high flow indicating function, isolation would be effected on low pressure. %e allowable value of &100 psig is selected at a pressure sufficiently high so as to prevent turbine stall.
- 10. HPCI Stem Line AP (Flow) High HPCI stem line high flow could indicate a break in the HPCI l turbine stem line. %e automatic closure of the HPCI stem line isolation valves prevents the excessive loss of reactor coolant and the release of significant mount of radioactive materials fra the nuclear system process barrier. . Upon detection of HPCI stem linc high flow the HPCI turbine stem line is isolated. %e high stem flow trip setting of 303% flow was selected high enough to avoid l spurious isolation, i.e., above the high stem flow rate encountered during turbine starts. %e setting was selected low enough to provide timely detection of an HPCI turbine stem line break.
- 11. HPCI Turbine Exhaust Diaphragn Pressure High High pressure in the HPCI turbine exhaust could indicate that the turbine rotor is not turning, thus allowing reactor pressure to act on the turbine exhaust line. 'Ihe HPCI stem line isolation valves are autmatically closed to prevent overpressurization of the turbine exhaust line. 'Ihe turbine exhaust diaphragm pressure trip setting of 510 psig is selected high enough to avoid isolation of the HICI if the turbine is operating, yet low enough to effect isolation before the turbine exhaust line is unduly pressurized.
- 12. Suppression Chaber Area Air Teperature High As in the HPCI quipment room, and for the see reason, a taperature of 900F+ ambient will initiate a timer to isolate the HPCI turbine stem line.
3.2-54
10 CFR 50.92 Evaluation for the Proposed HPCI Steamline Differential Trip
~Setpoint/ Allowable Edwin I. Hatch Value Nuclear Modificati9n)to Plant-Unit lla the Technical Specifications for Georgia Power Company (GPC) reviewed the requirements of 10 CFR 50.92 as they relate to the proposed HPCI steamline differential pressure trip setpoint/
allowable value modification to the Technical Specifications. The purpose of this change is to update the Technical Specifications trip setpoint for these instruments which are being replaced by the analog transmitter trip system (ATTS). Since the time that original setpoint was determined, a better calculational method has been developed. This proposed change uses the Regulatory Guide 1.105 methodology in updating the setpoint for the new ATTS instruments, and takes credit for the improved error and drift characteristics of the new system. This change replaces the trip setpoint listed in the Technical Specifications with the newly evaluated allowable value determined through Regulatory Guide 1.105 methodology.
GPC reviewed the proposed change and considers it not to involve a significant hazards consideration for the following reasons:
- 1. It will not significantly increase the probability or consequences of an accident previously evaluated, because the new ATTS instruments are of a superior design as compared to the current instruments. In addition, the setpoint was determined using the criteria of Regulatory Guide 1.105, and therefore, still meets the Final Safety Analysis Report (FSAR) criteria.
- 2. It will not create the possibility of a new or different kind of accident from any accident previously evaluated, because the basic trip function, as described in the FSAR, is unchanged.
- 3. It will not involve a significant reduction in a margin of safety, because the original design basis was maintained. In addition, Regulatory Guide 1.105 criteria were used in the calculation of the new setpoint, e
- a. See subsection 4B.12.b.5 (page 4-28a) for discussion of proposed revisions.
Al-15 Revision 1