ML21285A068: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:October 28, 2021 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801 | ||
==SUBJECT:== | |||
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 319, 342, AND 302 REGARDING THE ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-582, REVISION 2 (EPID L-2021-LLA-0037) | |||
==Dear Mr. Barstow:== | |||
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment Nos. 319, 342, and 302 to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3, respectively. | |||
These amendments are in response to your application dated March 5, 2021. | |||
The amendments revise technical specifications (TSs) related to reactor pressure vessel water inventory control based on Technical Specification Task Force (TSTF) Traveler TSTF-582, Revision 0, RPV WIC Enhancements. | |||
J. Barstow A copy of our related Safety Evaluation is also enclosed. Notice of issuance will be included in the Commissions monthly Federal Register notice. | |||
If you have any questions regarding this matter, please contact me at (301) 415-6459 or by e-mail at Michael.Wentzel@nrc.gov. | |||
Sincerely, | |||
/RA/ | |||
Michael J. Wentzel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259; 50-260; and 50-296 | |||
==Enclosures:== | |||
: 1. Amendment No. 319 to DPR-33 | |||
: 2. Amendment No. 342 to DPR-52 | |||
: 3. Amendment No. 302 to DPR-68 | |||
: 4. Safety Evaluation cc: Listserv | |||
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 319 Renewed License No. DPR-33 | |||
: 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by the Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) | |||
Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied. | |||
Enclosure 1 | |||
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-33 is hereby amended to read as follows: | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
: 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20). | |||
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:48:15 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | |||
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021 Enclosure 1 | |||
ATTACHMENT TO AMENDMENT NO. 319 BROWNS FERRY NUCLEAR PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-33 DOCKET NO. 50-259 Replace page 3 of Renewed Facility Operating License No. DPR-33 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change. | |||
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | |||
Remove Page Insert Page 1.1-3 1.1-3 3.3-47a 3.3-47a 3.3-47b 3.3-47b 3.3-47c 3.3-47c 3.3-70 3.3-70 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18 | |||
(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | |||
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: | |||
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | |||
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal. | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
For Surveillance Requirements (SRs) that are new in Amendment 234 to Facility Operating License DPR-33, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 234. For SRs that existed prior to Amendment 234, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 234. | |||
BFN-UNIT 1 Renewed License No. DPR-33 Amendment No. 319 | |||
'HILQLWLRQV | |||
'HILQLWLRQV FRQWLQXHG | |||
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV | |||
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG | |||
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG | |||
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK | |||
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV | |||
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV | |||
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ | |||
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH | |||
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF | |||
PL[WXUHRI,,,,DQG,DFWXDOO\ | |||
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU | |||
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI | |||
7,'$(&&DOFXODWLRQRI'LVWDQFH | |||
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV | |||
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU | |||
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO | |||
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$) VHDWHG | |||
LQWKH539DVVXPLQJ | |||
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH | |||
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW | |||
3HQHWUDWLRQIORZSDWKVFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHVWKDW SUHYHQWIORZRIUHDFWRUFRRODQWWKURXJKWKH SHQHWUDWLRQIORZSDWKV | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
BBB | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
,167580(17$7,21 | |||
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK | |||
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/( | |||
$33/,&$%,/,7< $FFRUGLQJWR7DEOH | |||
$&7,216 | |||
127( | |||
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 | |||
7,0( | |||
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\ | |||
LQRSHUDEOH FKDQQHOLQWULS | |||
25 | |||
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\ | |||
SHQHWUDWLRQIORZSDWK V | |||
LQFDSDEOHRIDXWRPDWLF | |||
LVRODWLRQ | |||
$1' | |||
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\ | |||
FDOFXODWH'5$,17,0( | |||
%)181,7 D $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
6859(,//$1&(5(48,5(0(176 | |||
127( | |||
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH | |||
6859(,//$1&( )5(48(1&< | |||
65 3HUIRUP&+$11(/&+(&. ,Q DFFRUGDQFH ZLWK WKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
%)181,7 E | |||
$PHQGPHQW1R | |||
RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 1) | |||
RPV Water Inventory Control Instrumentation APPLICABLE MODES REQUIRED OR OTHER CHANNELS SPECIFIED PER ALLOWABLE FUNCTION CONDITIONS FUNCTION VALUE | |||
Shutdown Cooling System Isolation D Reactor Vessel Water (a) 1 per trip system t 528 inches Level - Low, Level 3 above vessel zero | |||
Reactor Water Cleanup (RWCU) System Isolation D Reactor Vessel Water (a) 1 per trip system t 528 inches Level - Low, Level 3 above vessel zero | |||
Recirculation Loop Sample Isolation D Reactor Vessel Water (a) SHU trip system t 398 inches Level - Low Low Low above vessel Level 1 zero | |||
Recirculation Pump Discharge Isolation D Reactor Vessel Water (a) LQRQH trip system t 398 inches Level - Low Low Low above vessel Level 1 zero E Reactor Steam Dome (a) LQRQH trip system t 215 psig Pressure - Low (Recirculation Discharge Valve Permissive (a) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME. | |||
BFN-UNIT 1 3.3-47c Amendment No. 311, 000 | |||
LOP Instrumentation 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Table 3.3.8.1-1 Function on 4 kV shutdown boards A, B, C, and D shall be OPERABLE. | |||
APPLICABILITY: MODES 1, 2, and 3. | |||
ACTIONS | |||
-------------------------------------------------------NOTE--------------------------------------------------- | |||
Separate Condition entry is allowed for each channel. | |||
CONDITION REQUIRED ACTION COMPLETION TIME A. One degraded voltage A.1 Verify by administrative Immediately relay channel inoperable means that the other two on one or more shutdown degraded voltage relay board(s). channels and associated timers on the affected AND shutdown board(s) are OPERABLE. | |||
The loss of voltage relay channels on the affected AND shutdown board(s) are OPERABLE. A.2 Place the degraded 15 days voltage relay channel in trip. | |||
(continued) | |||
BFN-UNIT 1 3.3-70 Amendment No. 234, 000 | |||
RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control LCO 3.5.2 DRAIN TIME of RPV water inventory to the top of active fuel (TAF) shall be 36 hours AND One low pressure ECCS injection/spray subsystem shall be OPERABLE. | |||
APPLICABILITY: MODES 4 and 5. | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS A.1 Restore required ECCS 4 hours injection/spray subsystem injection/spray subsystem inoperable. to OPERABLE status. | |||
B. Required Action and B.1 Initiate action to establish Immediately associated Completion a method of water Time of Condition A not injection capable of met. operating without electrical power. | |||
C. DRAIN TIME < 36 hours C.1 Verify secondary 4 hours and 8 hours. containment boundary is capable of being established in less than the DRAIN TIME. | |||
AND (continued) | |||
BFN-UNIT 1 3.5-8 Amendment No. 234, 311, 000 | |||
RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2 Verify each secondary 4 hours containment penetration flow path is capable of being isolated in less than the DRAIN TIME. | |||
AND C.3 Verify two standby gas 4 hours treatment (SGT) subsystems are capable of being placed in operation in less than the DRAIN TIME. | |||
D. DRAIN TIME < 8 hours. D.1 ---------- NOTE ------------ | |||
Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power. | |||
Initiate action to establish Immediately an additional method of water injection with water sources capable of maintaining RPV water level > TAF for 36 hours. | |||
AND D.2 Initiate action to establish Immediately secondary containment boundary. | |||
AND (continued) | |||
BFN-UNIT 1 3.5-9 Amendment No. 234, 311, 000 | |||
539:DWHU,QYHQWRU\&RQWURO | |||
$&7,216 FRQWLQXHG | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\ | |||
HDFKVHFRQGDU\ | |||
FRQWDLQPHQWSHQHWUDWLRQ | |||
IORZSDWKRUYHULI\LWFDQ | |||
EHDXWRPDWLFDOO\RU | |||
PDQXDOO\LVRODWHGIURPWKH | |||
FRQWUROURRP | |||
$1' | |||
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\ | |||
6*7VXEV\VWHPVDUH | |||
FDSDEOHRIEHLQJSODFHG | |||
LQRSHUDWLRQ | |||
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\ | |||
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR | |||
7LPHRI&RQGLWLRQ&RU' KRXUV | |||
QRWPHW | |||
25 | |||
'5$,17,0(KRXU | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
6859(,//$1&(5(48,5(0(176 | |||
6859(,//$1&( )5(48(1&< | |||
65 9HULI\'5$,17,0(KRXUV ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPWKHVXSSUHVVLRQSRROZDWHUOHYHOLV ZLWKWKH | |||
LQFKHVZLWKRULQFKHVZLWKRXW 6XUYHLOODQFH | |||
GLIIHUHQWLDOSUHVVXUHFRQWURO )UHTXHQF\ | |||
&RQWURO3URJUDP | |||
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPWKHSLSLQJLVILOOHGZLWKZDWHUIURP ZLWKWKH | |||
WKHSXPSGLVFKDUJHYDOYHWRWKHLQMHFWLRQYDOYH 6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
SR 3.5.2.4 ----------------------NOTES-------------------------- ,QDFFRUGDQFH | |||
Operation may be through the test return ZLWKWKH | |||
line. 6XUYHLOODQFH | |||
Credit may be taken for normal system )UHTXHQF\ | |||
operation to satisfy this SR. &RQWURO3URJUDP | |||
Operate the required ECCS injection/spray subsystem for 10 minutes. | |||
SR 3.5.2.5 9HULI\HDFKYDOYHFUHGLWHGIRU ,QDFFRUGDQFH | |||
DXWRPDWLFDOO\isolating a penetration flow ZLWKWKH | |||
path actuates to the isolation position on 6XUYHLOODQFH | |||
an actual or simulated isolation signal. )UHTXHQF\ | |||
&RQWURO3URJUDP | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
6859(,//$1&(5(48,5(0(176 FRQWLQXHG | |||
6859(,//$1&( )5(48(1&< | |||
65 127( | |||
9HVVHOLQMHFWLRQVSUD\PD\EHH[FOXGHG | |||
9HULI\WKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPFDQEHPDQXDOO\RSHUDWHG ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
%)181,7 D $PHQGPHQW1R | |||
AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 --------------------------NOTE------------------------- | |||
The following SRs are not required to be performed: SR 3.8.1.2, SR 3.8.1.5, DQG SR 3.8.1.7. | |||
The following SRs are applicable for Unit 1 In accordance and 2 AC sources required to be OPERABLE: with applicable SRs SR 3.8.1.1, SR 3.8.1.2, SR 3.8.1.3, SR 3.8.1.5, SR 3.8.1.DQG65. | |||
SR 3.8.2.2 For the required Unit 3 DG, the SRs of Unit 3 In accordance Technical Specifications are applicable. with applicable SRs BFN-UNIT 1 3.8-18 Amendment No. 234, 311, 0000 | |||
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 342 License No. DPR-52 | |||
: 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied. | |||
Enclosure 2 | |||
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-52 is hereby amended to read as follows: | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
: 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20). | |||
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:48:50 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | |||
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021 | |||
ATTACHMENT TO AMENDMENT NO. 342 BROWNS FERRY NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE NO. DPR-52 DOCKET NO. 50-260 Replace page 3 of Renewed Facility Operating License No. DPR-52 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change. | |||
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | |||
Remove Page Insert Page 1.1-3 1.1-3 1.1-3a 1.1-3a 3.3-48a 3.3-48a 3.3-48b 3.3-48b 3.3-48c 3.3-48c 3.3-71 3.3-71 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18 | |||
sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | |||
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: | |||
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | |||
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal. | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
For Surveillance Requirements (SRs) that are new in Amendment 253 to Facility Operating License DPR-52, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 253. For SRs that existed prior to Amendment 253, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 253. | |||
: 3) The licensee is authorized to relocate certain requirements included in Appendix A and the former Appendix B to licensee-controlled documents. | |||
Implementation of this amendment shall include the relocation of these requirements to the appropriate documents, as described in the licensee's BFN-UNIT 2 Renewed License No. DPR-52 Amendment No. 342 | |||
'HILQLWLRQV | |||
'HILQLWLRQV FRQWLQXHG | |||
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV | |||
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG | |||
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG | |||
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK | |||
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV | |||
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV | |||
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ | |||
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH | |||
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF | |||
PL[WXUHRI,,,,DQG,DFWXDOO\ | |||
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU | |||
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI | |||
7,'$(&&DOFXODWLRQRI'LVWDQFH | |||
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV | |||
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU | |||
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO | |||
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$) | |||
VHDWHGLQWKH539DVVXPLQJ | |||
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH | |||
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW | |||
3HQHWUDWLRQIORZSDWKFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
'HILQLWLRQV | |||
'HILQLWLRQV FRQWLQXHG | |||
'5$,17,0( FRQWLQXHG DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG | |||
DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG | |||
SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHV | |||
WKDWSUHYHQWIORZRIUHDFWRUFRRODQWWKURXJK | |||
WKHSHQHWUDWLRQIORZSDWKV | |||
3HQHWUDWLRQIORZSDWKVFDSDEOHRIEHLQJ LVRODWHGE\YDOYHVWKDWZLOOFORVHDXWRPDWLFDOO\ | |||
ZLWKRXWRIIVLWHSRZHUSULRUWRWKH539ZDWHU OHYHOEHLQJHTXDOWRWKH7$)ZKHQDFWXDWHGE\ | |||
539ZDWHUOHYHOLVRODWLRQLQVWUXPHQWDWLRQ RU | |||
3HQHWUDWLRQIORZSDWKVZLWKLVRODWLRQGHYLFHV WKDWFDQEHFORVHGSULRUWRWKH539ZDWHUOHYHO EHLQJHTXDOWRWKH7$)E\DGHGLFDWHG RSHUDWRUWUDLQHG LQWKHWDVNZKR LVLQ FRQWLQXRXVFRPPXQLFDWLRQ ZLWKWKH FRQWURO URRPLVVWDWLRQHGDW WKHFRQWUROVDQGLV FDSDEOHRIFORVLQJWKH SHQHWUDWLRQIORZSDWK LVRODWLRQGHYLFHVZLWKRXWRIIVLWHSRZHU | |||
F 7KHSHQHWUDWLRQIORZSDWKVUHTXLUHGWREH HYDOXDWHGSHUSDUDJUDSKEDUHDVVXPHGWRRSHQ LQVWDQWDQHRXVO\DQGDUHQRWVXEVHTXHQWO\LVRODWHG | |||
DQGQRZDWHULVDVVXPHGWREHVXEVHTXHQWO\ | |||
DGGHGWRWKH539ZDWHULQYHQWRU\ | |||
G 1RDGGLWLRQDOGUDLQLQJHYHQWVRFFXUDQG H 5HDOLVWLFFURVVVHFWLRQDODUHDVDQGGUDLQUDWHVDUH XVHG | |||
$ERXQGLQJ'5$,17,0(PD\EHXVHGLQOLHXRI | |||
DFDOFXODWHGYDOXH | |||
,16(9,&( 7(67,1* 7KH ,16(59,&(7(67,1*352*5$0LVWKH | |||
352*5$0 OLFHQVHHSURJUDPWKDWIXOILOOVWKHUHTXLUHPHQWVRI | |||
&)5D I | |||
FRQWLQXHG | |||
%)181,7 D | |||
$PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
,167580(17$7,21 | |||
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK | |||
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/( | |||
$33/,&$%,/,7< $FFRUGLQJWR7DEOH | |||
$&7,216 | |||
127( | |||
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 | |||
7,0( | |||
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\ | |||
LQRSHUDEOH FKDQQHOLQWULS | |||
25 | |||
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\ | |||
SHQHWUDWLRQIORZSDWK V | |||
LQFDSDEOHRIDXWRPDWLF | |||
LVRODWLRQ | |||
$1' | |||
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\ | |||
FDOFXODWH'5$,17,0( | |||
%)181,7 D $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
6859(,//$1&(5(48,5(0(176 | |||
127( | |||
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH | |||
6859(,//$1&( )5(48(1&< | |||
65 3HUIRUP&+$11(/&+(&. ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
%)181,7 E $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
7DEOH SDJHRI | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
$33/,&$%/( | |||
02'(6 5(48,5(' | |||
2527+(5 &+$11(/6 | |||
63(&,),(' 3(5 $//2:$%/( | |||
)81&7,21 &21',7,216 )81&7,21 9$/8( | |||
6KXWGRZQ&RROLQJ6\VWHP | |||
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP t LQFKHV | |||
/HYHO/RZ/HYHO DERYH YHVVHO | |||
]HUR | |||
5HDFWRU:DWHU&OHDQXS 5:&8 6\VWHP,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV | |||
/HYHO/RZ/HYHO DERYHYHVVHO | |||
]HUR | |||
5HFLUFXODWLRQ/RRS6DPSOH | |||
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP t LQFKHV | |||
/HYHO+/-/RZ/RZ/RZ DERYH YHVVHO | |||
/HYHO ]HUR | |||
5HFLUFXODWLRQ3XPS | |||
'LVFKDUJH,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D LQRQHWULSV\VWHP t LQFKHV | |||
/HYHO+/-/RZ/RZ/RZ DERYH YHVVHO | |||
/HYHO ]HUR E 5HDFWRU6WHDP'RPH D LQRQHWULSV\VWHP t SVLJ 3UHVVXUH+/-/RZ 5HFLUFXODWLRQ'LVFKDUJH 9DOYH3HUPLVVLYH D :KHQDXWRPDWLFLVRODWLRQRIWKHDVVRFLDWHGSHQHWUDWLRQIORZSDWK V LVFUHGLWHGLQ FDOFXODWLQJ'5$,17,0( | |||
%)181,7 F $PHQGPHQW1R | |||
/23,QVWUXPHQWDWLRQ | |||
,167580(17$7,21 | |||
/RVVRI3RZHU /23 ,QVWUXPHQWDWLRQ | |||
/&2 7KH/23LQVWUXPHQWDWLRQIRUHDFK7DEOH)XQFWLRQRQN9 | |||
VKXWGRZQERDUGV$%&DQG'VKDOOEH23(5$%/( | |||
$33/,&$%,/,7< 02'(6DQG | |||
$&7,216 | |||
127( | |||
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
$ 2QHGHJUDGHGYROWDJH $ 9HULI\E\DGPLQLVWUDWLYH ,PPHGLDWHO\ | |||
UHOD\FKDQQHOLQRSHUDEOH PHDQVWKDWWKHRWKHUWZR | |||
RQRQHRUPRUHVKXWGRZQ GHJUDGHGYROWDJHUHOD\ | |||
ERDUG V FKDQQHOVDQGDVVRFLDWHG | |||
WLPHUVRQWKHDIIHFWHG | |||
$1' VKXWGRZQERDUG V DUH | |||
23(5$%/( | |||
7KHORVVRIYROWDJHUHOD\ | |||
FKDQQHOVRQWKHDIIHFWHG $1' | |||
VKXWGRZQERDUG V DUH 23(5$%/( $ 3ODFHWKHGHJUDGHG GD\V | |||
YROWDJHUHOD\FKDQQHOLQ | |||
WULS | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
(0(5*(1&<&25(&22/,1*6<67(06 (&&6 539:$7(5,19(1725< | |||
&21752/$1'5($&725&25(,62/$7,21&22/,1* 5&,& 6<67(0 | |||
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO | |||
/&2 '5$,17,0(RI539ZDWHULQYHQWRU\WRWKHWRSRIDFWLYHIXHO 7$) | |||
VKDOOEHKRXUV | |||
$1' | |||
2QHORZSUHVVXUH(&&6LQMHFWLRQVSUD\VXEV\VWHPVVKDOOEH | |||
23(5$%/( | |||
$33/,&$%,/,7< 02'(6DQG | |||
$&7,216 | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 | |||
7,0( | |||
$ 5HTXLUHG(&&6 $ 5HVWRUHUHTXLUHG(&&6 KRXUV | |||
LQMHFWLRQVSUD\VXEV\VWHP LQMHFWLRQVSUD\VXEV\VWHP | |||
LQRSHUDEOH WR23(5$%/(VWDWXV | |||
% 5HTXLUHG$FWLRQDQG % ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
DVVRFLDWHG&RPSOHWLRQ DPHWKRGRIZDWHU | |||
7LPHRI&RQGLWLRQ$QRW LQMHFWLRQFDSDEOHRI | |||
PHW RSHUDWLQJZLWKRXW | |||
HOHFWULFDOSRZHU | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
$&7,216 FRQWLQXHG | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
& '5$,17,0(KRXUV & 9HULI\VHFRQGDU\ KRXUV | |||
DQGKRXUV FRQWDLQPHQWERXQGDU\LV | |||
FDSDEOHRIEHLQJ | |||
HVWDEOLVKHGLQOHVVWKDQWKH | |||
'5$,17,0( | |||
$1' | |||
& 9HULI\HDFKVHFRQGDU\ KRXUV | |||
FRQWDLQPHQWSHQHWUDWLRQ | |||
IORZSDWKLVFDSDEOHRI | |||
EHLQJLVRODWHGLQOHVVWKDQ | |||
WKH'5$,17,0( | |||
$1' | |||
& 9HULI\WZRVWDQGE\JDV KRXUV | |||
WUHDWPHQW 6*7 | |||
VXEV\VWHPVDUHFDSDEOHRI | |||
EHLQJSODFHGLQRSHUDWLRQLQ | |||
OHVVWKDQWKH'5$,17,0( | |||
' '5$,17,0(KRXUV ' 127( | |||
5HTXLUHG(&&6 | |||
LQMHFWLRQVVSUD\VXEV\VWHP | |||
RUDGGLWLRQDOPHWKRGRI | |||
ZDWHULQMHFWLRQVKDOOEH | |||
FDSDEOHRIRSHUDWLQJ | |||
ZLWKRXWRIIVLWHHOHFWULFDO | |||
SRZHU | |||
,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
DQDGGLWLRQDOPHWKRGRI | |||
ZDWHULQMHFWLRQZLWKZDWHU | |||
VRXUFHVFDSDEOHRI | |||
PDLQWDLQLQJ539ZDWHU | |||
OHYHO!7$)IRUKRXUV | |||
$1' | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
$&7,216 | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
VHFRQGDU\FRQWDLQPHQW | |||
ERXQGDU\ | |||
$1' | |||
' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\ | |||
HDFKVHFRQGDU\ | |||
FRQWDLQPHQWSHQHWUDWLRQ | |||
IORZSDWKRUYHULI\LWFDQ | |||
EHDXWRPDWLFDOO\RU | |||
PDQXDOO\LVRODWHGIURPWKH | |||
FRQWUROURRP | |||
$1' | |||
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\ | |||
6*7VXEV\VWHPVDUH | |||
FDSDEOHRIEHLQJSODFHG | |||
LQRSHUDWLRQ | |||
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\ | |||
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR | |||
7LPHRI&RQGLWLRQ&RU' KRXUV | |||
QRWPHW | |||
25 | |||
'5$,17,0(KRXU | |||
%)181,7 $PHQGPHQW1R | |||
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify DRAIN TIME 36 hours. In accordance with the Surveillance Frequency Control Program SR 3.5.2.2 Verify, for the required ECCS injection/spray In accordance subsystem, the suppression pool water level is with the | |||
-6.25 inches with or -7.25 inches without Surveillance differential pressure control. Frequency Control Program SR 3.5.2.3 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from with the the pump discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.2.4 127(6 In accordance | |||
2SHUDWLRQPD\EHWKURXJKWKHWHVWUHWXUQ with the OLQH Surveillance | |||
&UHGLWPD\EHWDNHQIRUQRUPDOV\VWHP Frequency Control Program RSHUDWLRQWRVDWLVI\WKLV65 | |||
2SHUDWHWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ | |||
VXEV\VWHPIRUPLQXWHV | |||
SR 3.5.2. Verify each valve credited for automatically In accordance isolating a penetration flow path actuates to with the the isolation position on an actual or Surveillance simulated isolation signal. Frequency Control Program (continued) | |||
BFN-UNIT 2 3.5-11 Amendment No. 255, 325, | |||
000 | |||
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued) | |||
SURVEILLANCE FREQUENCY SR 3.5.2. -----------------------------NOTE------------------------ | |||
Vessel injection/spray may be excluded. | |||
Verify the required ECCS injection/spray In accordance subsystem can be manually operated. with the Surveillance Frequency Control Program. | |||
BFN-UNIT 2 3.5-11a Amendment No. 000 | |||
$&6RXUFHV6KXWGRZQ | |||
6859(,//$1&(5(48,5(0(176 | |||
6859(,//$1&( )5(48(1&< | |||
65 127( | |||
7KHIROORZLQJ65VDUHQRWUHTXLUHGWREH | |||
SHUIRUPHG6565DQG 65 | |||
7KHIROORZLQJ65VDUHDSSOLFDEOHIRU8QLW ,QDFFRUGDQFH | |||
DQG$&VRXUFHVUHTXLUHGWREH23(5$%/( ZLWKDSSOLFDEOH | |||
65V | |||
656565 | |||
6565DQG65 | |||
65 )RUWKHUHTXLUHG8QLW'*WKH65VRI8QLW ,QDFFRUGDQFH | |||
7HFKQLFDO6SHFLILFDWLRQVDUHDSSOLFDEOH ZLWKDSSOLFDEOH | |||
65V | |||
%)181,7 $PHQGPHQW1R | |||
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 302 License No. DPR-68 | |||
: 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied. | |||
Enclosure 3 | |||
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-68 is hereby amended to read as follows: | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 302, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
: 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20). | |||
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:49:31 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | |||
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021 | |||
ATTACHMENT TO AMENDMENT NO. 302 BROWNS FERRY NUCLEAR PLANT, UNIT 3 FACILITY OPERATING LICENSE NO. DPR-68 DOCKET NO. 50-296 Replace page 3 of Renewed Facility Operating License No. DPR-68 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change. | |||
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | |||
Remove Page Insert Page 1.1-3 1.1-3 3.3-48a 3.3-48a 3.3-48b 3.3-48b 3.3-48c 3.3-48c 3.3-71 3.3-71 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18 | |||
(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | |||
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: | |||
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | |||
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal. | |||
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 302, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
For Surveillance Requirements (SRs) that are new in Amendment 212 to Facility Operating License DPR-68, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 212. For SRs that existed prior to Amendment 212, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 212. | |||
BFN-UNIT 3 Renewed License No. DPR-68 Amendment No. 302 | |||
'HILQLWLRQV | |||
'HILQLWLRQV FRQWLQXHG | |||
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV | |||
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG | |||
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG | |||
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK | |||
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV | |||
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV | |||
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ | |||
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH | |||
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF | |||
PL[WXUHRI,,,,DQG,DFWXDOO\ | |||
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU | |||
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI | |||
7,'$(&&DOFXODWLRQRI'LVWDQFH | |||
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV | |||
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU | |||
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO | |||
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$) VHDWHG | |||
LQWKH539DVVXPLQJ | |||
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH | |||
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW | |||
3HQHWUDWLRQIORZSDWKVFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHVWKDW SUHYHQWIORZRIUHDFWRUFRRODQWWKURXJKWKH SHQHWUDWLRQIORZSDWKV | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
BBB | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
,167580(17$7,21 | |||
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK | |||
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/( | |||
$33/,&$%,/,7< $FFRUGLQJWR7DEOH | |||
$&7,216 | |||
127( | |||
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 | |||
7,0( | |||
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\ | |||
LQRSHUDEOH FKDQQHOLQWULS | |||
25 | |||
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\ | |||
SHQHWUDWLRQIORZSDWK V | |||
LQFDSDEOHRIDXWRPDWLF | |||
LVRODWLRQ | |||
$1' | |||
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\ | |||
FDOFXODWH'5$,17,0( | |||
%)181,7 D $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
6859(,//$1&(5(48,5(0(176 | |||
127( | |||
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH | |||
6859(,//$1&( )5(48(1&< | |||
65 3HUIRUP&+$11(/&+(&. ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
%)181,7 E $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
7DEOH SDJHRI | |||
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ | |||
$33/,&$%/( | |||
02'(6 5(48,5(' | |||
2527+(5 &+$11(/6 | |||
63(&,),(' 3(5 $//2:$%/( | |||
)81&7,21 &21',7,216 )81&7,21 9$/8( | |||
6KXWGRZQ&RROLQJ6\VWHP | |||
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV | |||
/HYHO/RZ/HYHO DERYHYHVVHO | |||
]HUR | |||
5HDFWRU:DWHU&OHDQXS 5:&8 6\VWHP,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV | |||
/HYHO/RZ/HYHO DERYHYHVVHO | |||
]HUR | |||
5HFLUFXODWLRQ/RRS6DPSOH | |||
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV | |||
/HYHO+/-/RZ/RZ/RZ DERYHYHVVHO | |||
/HYHO ]HUR | |||
5HFLUFXODWLRQ3XPS | |||
'LVFKDUJH,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D LQRQHWULSV\VWHP tLQFKHV | |||
/HYHO+/-/RZ/RZ/RZ DERYHYHVVHO | |||
/HYHO ]HUR | |||
E 5HDFWRU6WHDP'RPH D LQRQHWULSV\VWHP tSVLJ | |||
3UHVVXUH+/-/RZ 5HFLUFXODWLRQ'LVFKDUJH 9DOYH3HUPLVVLYH D :KHQDXWRPDWLFLVRODWLRQRIWKHDVVRFLDWHGSHQHWUDWLRQIORZSDWK V LVFUHGLWHGLQ FDOFXODWLQJ'5$,17,0( | |||
%)181,7 F $PHQGPHQW1R | |||
/23,QVWUXPHQWDWLRQ | |||
,167580(17$7,21 | |||
/RVVRI3RZHU /23 ,QVWUXPHQWDWLRQ | |||
/&2 7KH/23LQVWUXPHQWDWLRQIRUHDFK7DEOH)XQFWLRQRQN9 | |||
VKXWGRZQERDUGV($(%(&DQG('VKDOOEH23(5$%/( | |||
$33/,&$%,/,7< 02'(6DQG | |||
$&7,216 | |||
127( | |||
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
$ 2QHGHJUDGHGYROWDJH $ 9HULI\E\DGPLQLVWUDWLYH ,PPHGLDWHO\ | |||
UHOD\FKDQQHOLQRSHUDEOH PHDQVWKDWWKHRWKHUWZR | |||
RQRQHRUPRUHVKXWGRZQ GHJUDGHGYROWDJHUHOD\ | |||
ERDUG V FKDQQHOVDQGDVVRFLDWHG | |||
WLPHUVRQWKHDIIHFWHG | |||
$1' VKXWGRZQERDUG V DUH | |||
23(5$%/( | |||
7KHORVVRIYROWDJHUHOD\ | |||
FKDQQHOVRQWKHDIIHFWHG $1' | |||
VKXWGRZQERDUG V DUH 23(5$%/( $ 3ODFHWKHGHJUDGHG GD\V | |||
YROWDJHUHOD\FKDQQHOLQ | |||
WULS | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
(0(5*(1&<&25(&22/,1*6<67(06 (&&6 539:$7(5,19(1725< | |||
&21752/$1'5($&725&25(,62/$7,21&22/,1* 5&,& 6<67(0 | |||
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO | |||
/&2 '5$,17,0(RI539ZDWHULQYHQWRU\WRWKHWRSRIDFWLYHIXHO 7$) | |||
VKDOOEHKRXUV | |||
$1' | |||
2QHORZSUHVVXUH(&&6LQMHFWLRQVSUD\VXEV\VWHPVVKDOOEH | |||
23(5$%/( | |||
$33/,&$%,/,7< 02'(6DQG | |||
$&7,216 | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
$ 5HTXLUHG(&&6 $ 5HVWRUHUHTXLUHG(&&6 KRXUV | |||
LQMHFWLRQVSUD\VXEV\VWHP LQMHFWLRQVSUD\VXEV\VWHP | |||
LQRSHUDEOH WR23(5$%/(VWDWXV | |||
% 5HTXLUHG$FWLRQDQG % ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
DVVRFLDWHG&RPSOHWLRQ DPHWKRGRIZDWHU | |||
7LPHRI&RQGLWLRQ$QRW LQMHFWLRQFDSDEOHRI | |||
PHW RSHUDWLQJZLWKRXW | |||
HOHFWULFDOSRZHU | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
$&7,216 FRQWLQXHG | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 | |||
7,0( | |||
& '5$,17,0(KRXUV & 9HULI\VHFRQGDU\ KRXUV | |||
DQGKRXUV FRQWDLQPHQWERXQGDU\LV | |||
FDSDEOHRIEHLQJ | |||
HVWDEOLVKHGLQOHVVWKDQ | |||
WKH'5$,17,0( | |||
$1' | |||
& 9HULI\HDFKVHFRQGDU\ KRXUV | |||
FRQWDLQPHQWSHQHWUDWLRQ | |||
IORZSDWKLVFDSDEOHRI | |||
EHLQJLVRODWHGLQOHVVWKDQ | |||
WKH'5$,17,0( | |||
$1' | |||
& 9HULI\WZRVWDQGE\JDV KRXUV | |||
WUHDWPHQW 6*7 | |||
VXEV\VWHPVDUHFDSDEOH | |||
RIEHLQJSODFHGLQ | |||
RSHUDWLRQLQOHVVWKDQWKH | |||
'5$,17,0( | |||
' '5$,17,0(KRXUV ' 127( | |||
5HTXLUHG(&&6 | |||
LQMHFWLRQVSUD\VXEV\VWHP | |||
RUDGGLWLRQDOPHWKRGRI | |||
ZDWHULQMHFWLRQVKDOOEH | |||
FDSDEOHRIRSHUDWLQJ | |||
ZLWKRXWRIIVLWHHOHFWULFDO | |||
SRZHU | |||
,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
DQDGGLWLRQDOPHWKRGRI | |||
ZDWHULQMHFWLRQZLWKZDWHU | |||
VRXUFHVFDSDEOHRI | |||
PDLQWDLQLQJ539ZDWHU | |||
OHYHO!7$)IRU | |||
KRXUV | |||
$1' | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
$&7,216 | |||
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0( | |||
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\ | |||
VHFRQGDU\FRQWDLQPHQW | |||
ERXQGDU\ | |||
$1' | |||
' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\ | |||
HDFKVHFRQGDU\ | |||
FRQWDLQPHQWSHQHWUDWLRQ | |||
IORZSDWKRUYHULI\LWFDQ | |||
EHDXWRPDWLFDOO\RU | |||
PDQXDOO\LVRODWHGIURPWKH | |||
FRQWUROURRP | |||
$1' | |||
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\ | |||
6*7VXEV\VWHPVDUH | |||
FDSDEOHRIEHLQJSODFHG | |||
LQRSHUDWLRQ | |||
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\ | |||
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR | |||
7LPHRI&RQGLWLRQ&RU' KRXUV | |||
QRWPHW | |||
25 | |||
'5$,17,0(KRXU | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
6859(,//$1&(5(48,5(0(176 | |||
6859(,//$1&( )5(48(1&< | |||
65 9HULI\'5$,17,0(KRXUV ,QDFFRUGDQFH | |||
ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPWKHVXSSUHVVLRQSRROZDWHUOHYHOLV ZLWKWKH | |||
LQFKHVZLWKRULQFKHVZLWKRXW 6XUYHLOODQFH | |||
GLIIHUHQWLDOSUHVVXUHFRQWURO )UHTXHQF\ | |||
&RQWURO3URJUDP | |||
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPWKHSLSLQJLVILOOHGZLWKZDWHUIURP ZLWKWKH | |||
WKHSXPSGLVFKDUJHYDOYHWRWKHLQMHFWLRQYDOYH 6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
65 127(6 ,QDFFRUGDQFH | |||
ZLWKWKH | |||
2SHUDWLRQPD\EHWKURXJKWKHWHVWUHWXUQ 6XUYHLOODQFH | |||
OLQH )UHTXHQF\ | |||
&UHGLWPD\EHWDNHQIRUQRUPDOV\VWHP &RQWURO3URJUDP | |||
RSHUDWLRQWRVDWLVI\WKLV65 | |||
2SHUDWHWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ | |||
VXEV\VWHPIRU PLQXWHV | |||
65 9HULI\HDFKYDOYHFUHGLWHGIRUDXWRPDWLFDOO\ ,QDFFRUGDQFH | |||
LVRODWLQJDSHQHWUDWLRQIORZSDWKDFWXDWHVWRWKH ZLWKWKH | |||
LVRODWLRQSRVLWLRQRQDQDFWXDORUVLPXODWHG 6XUYHLOODQFH | |||
LVRODWLRQVLJQDO )UHTXHQF\ | |||
&RQWURO3URJUDP | |||
FRQWLQXHG | |||
%)181,7 $PHQGPHQW1R | |||
539:DWHU,QYHQWRU\&RQWURO | |||
6859(,//$1&(5(48,5(0(176 FRQWLQXHG | |||
6859(,//$1&( )5(48(1&< | |||
65 127( | |||
9HVVHOLQMHFWLRQVSUD\PD\EHH[FOXGHG | |||
9HULI\WKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH | |||
VXEV\VWHPFDQEHPDQXDOO\RSHUDWHG ZLWKWKH | |||
6XUYHLOODQFH | |||
)UHTXHQF\ | |||
&RQWURO3URJUDP | |||
%)181,7 D $PHQGPHQW1R | |||
$&6RXUFHV6KXWGRZQ | |||
6859(,//$1&(5(48,5(0(176 | |||
6859(,//$1&( )5(48(1&< | |||
65 127( | |||
7KHIROORZLQJ65VDUHQRWUHTXLUHGWREH | |||
SHUIRUPHG6565DQG | |||
65 | |||
7KHIROORZLQJ65VDUHDSSOLFDEOHIRU8QLW ,QDFFRUGDQFH | |||
$&VRXUFHVUHTXLUHGWREH23(5$%/( ZLWKDSSOLFDEOH | |||
65V | |||
656565 | |||
6565DQG65 | |||
65 )RUWKHUHTXLUHG8QLWDQG'*WKH65VRI ,QDFFRUGDQFH | |||
8QLWDQG7HFKQLFDO6SHFLILFDWLRQVDUH ZLWKDSSOLFDEOH | |||
DSSOLFDEOH 65V | |||
%)181,7 $PHQGPHQW1R | |||
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 319, 342, AND 302 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-33, DPR-52, AND DPR-68 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DOCKET NOS. 50-259, 50-260, AND 50-296 | |||
==1.0 INTRODUCTION== | |||
Tennessee Valley Authority (TVA, the licensee) requested changes to the technical specifications (TSs) for Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3 by license amendment request (LAR), dated March 5, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21064A508). In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed LAR under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the TSs related to reactor pressure vessel (RPV) water inventory control (WIC) based on Technical Specifications Task Force (TSTF) -582, Revision 0, RPV WIC Enhancements (ADAMS Accession No. ML19240A260) and the associated NRC staff safety evaluation (SE) of TSTF-582 (ADAMS Accession No. ML20219A333). | |||
The boiling water reactor (BWR) RPV design includes multiple penetrations located below the top of active fuel (TAF). These penetrations provide entry for control rods, recirculation flow, reactor water cleanup (RWCU), and shutdown cooling. Since these penetrations are below the TAF, this creates a potential to drain the RPV water inventory and lose effective core cooling. | |||
The loss of water inventory and effective core cooling can potentially lead to fuel cladding failure and radioactive release. Drain Time is the time it would take for the water inventory in and above the RPV to drain to the TAF. | |||
1.1 Proposed TS Changes to Adopt TSTF-582 In accordance with NRC staff-approved TSTF-582, the licensee proposed changes that would revise the Browns Ferry TSs related to RPV WIC to incorporate operating experience and to correct errors and omissions that the licensee incorporated into the TSs when adopting TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (ADAMS Accession No. ML16074A448). Specifically, the licensee proposed the following changes to adopt TSTF-582: | |||
Enclosure 4 | |||
The Drain Time definition in TS 1.1 would be revised to move the examples of common mode failure mechanisms to the Bases and delete seismic events. | |||
In TS 1.1, Drain Time definition, the exception from considering the Drain Time for penetration flow paths isolated with manual or automatic valves that are locked, sealed, or otherwise secured would be revised to apply the exception for manual or automatic valves that are closed and administratively controlled. | |||
The Actions of TS 3.3.5.2 would be revised to permit placing an inoperable isolation channel in trip as an alternative to declaring the associated penetration flow path incapable of automatic isolation. | |||
TS 3.3.5.2, Required Action B.2 requires calculating Drain Time with a Completion Time of immediately. The Required Action would be renumbered as A.2.2 and revised to state, Initiate action to calculate Drain Time. | |||
The Browns Ferry design contains additional isolation instrumentation functions based on low RPV water level that could be credited when calculating Drain Time. Those functions would be added to the required functions in TS 3.3.5.2. | |||
In TS 3.5.2, the first use of the acronym SGT would be defined in Required Action C.3 and the acronym SGT would be used in Required Action D.4. | |||
TS 3.3.5.2 and TS 3.5.2 would be revised to eliminate the requirement for a manual emergency core cooling system (ECCS) initiation signal to start the required ECCS injection/spray subsystem, and to instead rely on manual valve alignment and pump start. TS 3.5.2 Surveillance Requirements (SRs) related to manual initiation using the ECCS signal (such as verifying automatic alignment of valves on an initiation signal) would be eliminated. Related to this change, the TS 3.3.5.2 functions, SRs, and Actions that only support manual initiate on using an ECCS signal (including interlocks and minimum flow instruments) would be eliminated. | |||
TS 3.8.2, AC [Alternating Current] Sources - Shutdown, SR 3.8.2.1, would be revised to not require SRs that test the ability of the automatic diesel generator to start in Modes 4 and 5. TSTF-542 eliminated the automatic ECCS initiation in Modes 4 and 5. | |||
1.2 Additional Proposed TS Changes The licensee proposed to make the following additional changes: | |||
TS 3.3.8.1, Loss of Power (LOP) Instrumentation, would be revised to delete When the associated diesel generator [DG] is required to be OPERABLE by LCO [limiting condition for operation 3.8.2, AC Sources - Shutdown, from the Applicability. | |||
SR 3.8.2.1 would be revised to add SR 3.8.1.4 and SR 3.8.1.18 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1. | |||
The NRC staff notes that the above proposed changes are consistent with TSTF-583-T, Revision 0, TSTF-582 Diesel Generator Variation (ADAMS Accession No. ML20248H330). | |||
1.2.1 Variations The licensee proposed to correct editorial errors in the spelling of DRAIN TIME in the last paragraph of the Browns Ferry, Unit 2 TS Section 1.1 DRAIN TIME definition. | |||
Additionally, Browns Ferry, Unit 2 TS 3.5.2 Required Action D.4 corrects the spelling of subsystems. | |||
The licensee proposed to create Mode 4 and 5 operability requirements to allow crediting auto-isolation of the recirculation loop sample valves in support of the Exception 2 in the Drain Time definition for penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation. This change would add the Recirculation Loop Sample Isolation Instrumentation and Recirculation Pump Discharge Isolation Functions to TS Table 3.3.5.2-1. | |||
==2.0 REGULATORY EVALUATION== | |||
2.1 Regulatory Requirements The regulation at 10 CFR 50.36(c)(2) requires that TSs include LCOs. Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TS until the condition can be met. | |||
The regulation at 10 CFR 50.36(c)(3) requires that TSs include items in the category of SRs, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met. | |||
2.2 Regulatory Guidance The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared standard TSs (STSs) for each of the LWR nuclear designs. | |||
Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the Standard Technical Specifications, General Electric BWR/4 Plants, NUREG-1434, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, April 2012 (ADAMS Accession Nos. ML12104A192 and ML12104A193, respectively), as modified by NRC-approved travelers. | |||
Traveler TSTF-582 revised the STSs related to RPV WIC to incorporate operating experience and to correct editorial errors in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (ADAMS Accession No. ML16074A448). The NRC approved TSTF-542, Revision 2, on December 20, 2016 (ADAMS Package Accession No. ML16343B066). The NRC staff approved TSTF-582 under the CLIIP in {{letter dated|date=August 13, 2020|text=letter dated August 13, 2020}} (ADAMS Accession No. ML20219A333). The TSTF-582 SE states that a licensee may adopt the STS changes approved in TSTF-582, if the licensee has already adopted the STS changes approved in TSTF-542. | |||
==3.0 TECHNICAL EVALUATION== | |||
3.1 Proposed TS Changes to Adopt TSTF-582 The NRC staff compared the licensees proposed TS changes in Section 1.0 of this SE against the changes approved in TSTF-582. In accordance with the SRP Chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-582 are applicable to the Browns Ferry TSs because Browns Ferry Units 1, 2, and 3 are of BWR/4 design and the NRC staff approved the TSTF-582 changes for BWR/4 designs. The licensee meets the TSTF-582 SE provision for adoption of TSTF-582 since the licensee adopted Traveler TSTF-542 on December 26, 2019 (ADAMS Accession No. ML19294A011) in Amendment Nos. 311, 334, and 294 for Browns Ferry, Units 1, 2, and 3, respectively. Therefore, the NRC staff concludes that the licensees proposed changes to the Browns Ferry TSs in Section 1.0 of this SE are acceptable in that they are consistent with TSTF-582 and the terms for use stated in the NRC staffs SE of TSTF-582. | |||
The NRC staff finds that proposed changes to the TS 1.1 definition, and LCOs 3.3.5.2 and 3.5.2 correctly specify the lowest functional capability or performance levels of equipment required for safe operation of the facility in accordance with 10 CFR 50.36(c)(2)(i). Also, the NRC staff finds that proposed changes to the Actions of LCOs 3.3.5.2 and 3.5.2 are adequate remedial actions to be taken until each LCO can be met to provide protection to the health and safety of the public, thereby satisfying 10 CFR 50.36(c)(2)(i). | |||
The NRC staff finds that the proposed revisions to the SRs in TS 3.3.5.2, 3.5.2, and 3.8.2 continue to provide requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met in accordance with 10 CFR 50.36(c)(3). | |||
Thus, the proposed changes continue to meet the requirements of 10 CFR 50.36(c)(2)(i) and 10 CFR 50.36(c)(3) as discussed in Section 3.0 of the NRC staffs SE of TSTF-582. | |||
3.2 Additional Proposed TS Changes 3.2.1 TS 3.3.8.1, Applicability The licensee stated that TS 3.8.2 does not require automatic start and loading of a DG within 10 seconds on an ECCS initiation signal or a loss of offsite power signal. Currently, TS 3.3.8.1, Loss of Power (LOP) Instrumentation, is applicable in Modes 1, 2, and 3, and when the associated DG is required to be operable by TS 3.8.2. The NRC staff confirmed that TS 3.8.2 no longer requires automatic start and loading of a DG on a LOP signal. The NRC staff finds it acceptable to revise the Applicability of LCO 3.3.8.1 by deleting When the associated diesel generator is required to be OPERABLE by LCO 3.8.2, AC Sources - Shutdown, because the LOP instrumentation that generates the LOP signal does not need to be operable when the DG | |||
is required to be operable by TS 3.8.2. Therefore, the NRC staff concludes that the LCO applicability changes will continue to provide for the lowest functional capability or performance levels of equipment required for safe operation of the facility and, therefore, meet the LCO requirements of 10 CFR 50.36(c)(2). | |||
3.2.2 SR 3.8.2.1 LCO 3.8.2, AC Sources - Shutdown, requires one offsite circuit and one DG capable of supplying one division of the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems - Shutdown, to be operable in shutdown conditions. The existing SR 3.8.2.1 lists the TS 3.8.1 SRs that are applicable in shutdown conditions with some exceptions. | |||
TS SR 3.8.1.4 states, Verify each DG starts from standby condition and achieves, in 10 seconds, voltage 3940 V and frequency 58.8 Hz. Verify after DG fast start from standby conditions that the DG achieves steady state voltage 3940 V and 4400 V and frequency 58.8 Hz and 61.2 Hz. The 10 second start requirement associated with the DG automatic start supports the assumptions in the design basis LOCA analysis. The NRC staff confirmed that 10 second timing is not required during a manual DG start to respond to a draining event, which has a minimum Drain Time of 1 hour. In addition, SR 3.8.1.2, which requires the DG to start from standby conditions and achieve the required steady state voltage and frequency ranges, is applicable under SR 3.8.2. The NRC staff finds that the SR 3.8.1.4 testing for the DGs capability to achieve required steady state voltage and frequency ranges will be performed in SR 3.8.1.2 since SR 3.8.1.2 provides the test for this DG capability. | |||
Therefore, the NRC staff finds it acceptable to add SR 3.8.1.4 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1. | |||
TS SR 3.8.1.8 states, Verify interval between each sequenced load block is within the allowable values for each load sequencer timer. This SR verifies the load sequence time interval tolerance between each sequenced load block when loads are sequentially connected to the engineered safety features (ESF) bus by automatic sequencer while the DG is tied to the ESF bus. TS 3.5.2 requires manual starting of the equipment for water injection to respond to a draining event so that the DG will be manually loaded during a draining event. No other postulated events require automatic loading of the DG during shutdown conditions. The NRC staff confirmed that with respect to SR 3.8.8, the load sequencers are used for the automatic loading of the DG and are not used during a manual loading of the DG. Therefore, the NRC staff finds it acceptable to add SR 3.8.1.8 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1. | |||
The NRC staff finds that the proposed changes to revise SR 3.8.2.1 are acceptable because the remaining applicable SRs will continue to demonstrate the operability of the required AC power sources and, as such, ensure the availability of the AC power required to operate the plant in a safe manner and mitigate postulated events during shutdown conditions. Therefore, the NRC staff finds the proposed changes to SR 3.8.2.1 are acceptable because the changes continue to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the associated LCO will continue to be met in accordance with 10 CFR 50.36(c)(3). | |||
3.2.3 LCO 3.5.2 Note Browns Ferry SR 3.5.2.5 requires operating the ECCS subsystem periodically to verify its operability. TSTF-582 added a Note to Browns Ferry SR 3.5.2.5 (and renamed it to SR 3.5.2.4) that permits a subsystem to be credited for operating in normal mode as demonstrating operation of the required ECCS subsystem. As stated in the TSTF-582 justification, This Note permits crediting the normal operation of an RHR Shutdown Cooling subsystem to satisfy the SR. The revised SR continues to ensure the ECCS injection/spray subsystem can inject water into the RPV if needed for defense-in-depth, while eliminating unnecessary testing. | |||
The NRC staff confirmed that removal of SR 3.5.2.4 by TSTF-582 and the addition of the SR Note to SR 3.5.2.5 (renumbered SR 3.5.2.4) eliminates the need for the LCO Note to consider the ECCS subsystem operable while operating in decay heat removal mode. The NRC staff finds the proposed change to LCO 3.5.2 acceptable because the NOTE of SR 3.5.2.4 will continue to demonstrate the operability of the ECCS subsystem and the associated LCO will continue to be met in accordance with 10 CFR 50.36(c)(3). | |||
3.2.4 Variations The licensee proposed changes to add RPV WIC Instrumentation functions for Recirculation Loop Sample Isolation Instrumentation and Recirculation Pump Discharge Isolation Instrumentation within TS Table 3.3.5.2-1. The addition of these two functions would allow crediting automatic isolation of the recirculation loop sample valves and recirculation pump discharge isolation valves in support of Exception 2 in the Drain Time definition for penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation. | |||
The NRC staff reviewed the proposed addition of the above functions to Table 3.3.5.2-1, Functions 3.a and 4.a, Reactor Vessel Water Level - Low Low Low, Level 1, and Function 4.b, Reactor Steam Dome Pressure - Low (Recirculation Discharge Valve Permissive). | |||
Function 3.a controls Group 1 primary containment isolation valves, including the recirculation loop sample isolation valves, and requires two channels per trip system for a total of four operable channels to account for a single active failure. Functions 4.a and 4.b controls automatic closure of the recirculation pump discharge isolation valves and requires four channels per function. The four reactor water level channels input to two two-out-of-two trip systems, with each of the two trip systems associated with one of the two recirculation pump discharge isolation valves, to account for a single active failure. | |||
TSTF-542 states that, with one ECCS injection/spray subsystem and non-safety related injection sources, defense-in-depth will be maintained. The defense-in-depth measure is consistent with other events considered during shutdown with no additional single failure assumed. The drain time controls, in addition to the required ECCS injection/spray subsystem, provide reasonable assurance that an unexpected draining event can be prevented or mitigated before the RPV water level would be lowered to the TAF. | |||
The licensee proposed requiring only a single recirculation loop sample isolation valve to be operable to be credited in the Drain Time Exception, and thus one channel in both trip systems are required to be operable for proposed Function 3.a. The Allowable Value (AV) of 398 inches above vessel zero, is consistent with the AV for TS Table 3.3.6.1-1 Function 1.a. | |||
Proposed Functions 4.a and 4.b would require the recirculation pump discharge valve credited | |||
in the Drain Time Exception to have two channels in one trip system operable, with AVs of 398 inches above vessel zero, and 215 psig, respectively, which are consistent with the AVs for TS Table 3.3.5.1-1 Functions 2.a and 2.d. | |||
Based on the information above, the NRC staff determined that the proposed additional functions continue to meet the requirements of TS 3.3.5.2 and 10 CFR 50.36, and therefore the addition of Functions 3.a, 4.a, and 4.b to Table 3.3.5.2-1, is acceptable. | |||
3.2.5 Editorial The licensee proposed to correct and error in the spelling of DRAIN TIME in the last paragraph of the Browns Ferry, Unit 2 TS Section 1.1 DRAIN TIME definition. Additionally, Browns Ferry, Unit 2 TS 3.5.2 Required Action D.4 corrects the spelling of subsystems. The NRC staff reviewed the proposed changes and determined that they are acceptable because they are editorial clarifications and do not substantively change TS requirements. | |||
==4.0 STATE CONSULTATION== | |||
In accordance with the Commissions regulations, the Alabama State official was notified of the proposed issuance of the amendment on October 4, 2021. The State official had no comments. | |||
==5.0 ENVIRONMENTAL CONSIDERATION== | |||
The amendments change the requirements with respect to installation or use of a facilitys components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on May 18, 2021 (86 FR 26956), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments. | |||
==6.0 CONCLUSION== | |||
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. | |||
Principal Contributor: T. Sweat, NRR Date: October 28, 2021 | |||
ML21285A068 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DEX/EICB/BC NRR/DSS/STSB/BC(A) | |||
NAME LHaeg RButler MWaters NJordan DATE 10/12/2021 10/14/2021 10/25/2021 10/4/2021 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona MWentzel DATE 10/28/2021 10/28/2021}} | |||
Revision as of 13:40, 18 January 2022
| ML21285A068 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/28/2021 |
| From: | Michael Wentzel Plant Licensing Branch II |
| To: | Jim Barstow Tennessee Valley Authority |
| Wentzel M | |
| References | |
| EPID L-2021-LLA-0037 | |
| Download: ML21285A068 (56) | |
Text
October 28, 2021 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - ISSUANCE OF AMENDMENT NOS. 319, 342, AND 302 REGARDING THE ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-582, REVISION 2 (EPID L-2021-LLA-0037)
Dear Mr. Barstow:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment Nos. 319, 342, and 302 to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3, respectively.
These amendments are in response to your application dated March 5, 2021.
The amendments revise technical specifications (TSs) related to reactor pressure vessel water inventory control based on Technical Specification Task Force (TSTF) Traveler TSTF-582, Revision 0, RPV WIC Enhancements.
J. Barstow A copy of our related Safety Evaluation is also enclosed. Notice of issuance will be included in the Commissions monthly Federal Register notice.
If you have any questions regarding this matter, please contact me at (301) 415-6459 or by e-mail at Michael.Wentzel@nrc.gov.
Sincerely,
/RA/
Michael J. Wentzel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259; 50-260; and 50-296
Enclosures:
- 1. Amendment No. 319 to DPR-33
- 2. Amendment No. 342 to DPR-52
- 3. Amendment No. 302 to DPR-68
- 4. Safety Evaluation cc: Listserv
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 319 Renewed License No. DPR-33
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)
Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-33 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20).
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:48:15 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021 Enclosure 1
ATTACHMENT TO AMENDMENT NO. 319 BROWNS FERRY NUCLEAR PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-33 DOCKET NO. 50-259 Replace page 3 of Renewed Facility Operating License No. DPR-33 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Page Insert Page 1.1-3 1.1-3 3.3-47a 3.3-47a 3.3-47b 3.3-47b 3.3-47c 3.3-47c 3.3-70 3.3-70 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18
(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 234 to Facility Operating License DPR-33, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 234. For SRs that existed prior to Amendment 234, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 234.
BFN-UNIT 1 Renewed License No. DPR-33 Amendment No. 319
'HILQLWLRQV
'HILQLWLRQV FRQWLQXHG
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF
PL[WXUHRI,,,,DQG,DFWXDOO\
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI
7,'$(&&DOFXODWLRQRI'LVWDQFH
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$) VHDWHG
LQWKH539DVVXPLQJ
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW
3HQHWUDWLRQIORZSDWKVFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHVWKDW SUHYHQWIORZRIUHDFWRUFRRODQWWKURXJKWKH SHQHWUDWLRQIORZSDWKV
FRQWLQXHG
%)181,7 $PHQGPHQW1R
BBB
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
,167580(17$7,21
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/(
$33/,&$%,/,7< $FFRUGLQJWR7DEOH
$&7,216
127(
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO
&21',7,21 5(48,5('$&7,21 &203/(7,21
7,0(
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\
LQRSHUDEOH FKDQQHOLQWULS
25
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\
SHQHWUDWLRQIORZSDWK V
LQFDSDEOHRIDXWRPDWLF
LVRODWLRQ
$1'
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\
FDOFXODWH'5$,17,0(
%)181,7 D $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
6859(,//$1&(5(48,5(0(176
127(
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH
6859(,//$1&( )5(48(1&<
65 3HUIRUP&+$11(/&+(&. ,Q DFFRUGDQFH ZLWK WKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
%)181,7 E
$PHQGPHQW1R
RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 1)
RPV Water Inventory Control Instrumentation APPLICABLE MODES REQUIRED OR OTHER CHANNELS SPECIFIED PER ALLOWABLE FUNCTION CONDITIONS FUNCTION VALUE
Shutdown Cooling System Isolation D Reactor Vessel Water (a) 1 per trip system t 528 inches Level - Low, Level 3 above vessel zero
Reactor Water Cleanup (RWCU) System Isolation D Reactor Vessel Water (a) 1 per trip system t 528 inches Level - Low, Level 3 above vessel zero
Recirculation Loop Sample Isolation D Reactor Vessel Water (a) SHU trip system t 398 inches Level - Low Low Low above vessel Level 1 zero
Recirculation Pump Discharge Isolation D Reactor Vessel Water (a) LQRQH trip system t 398 inches Level - Low Low Low above vessel Level 1 zero E Reactor Steam Dome (a) LQRQH trip system t 215 psig Pressure - Low (Recirculation Discharge Valve Permissive (a) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
BFN-UNIT 1 3.3-47c Amendment No. 311, 000
LOP Instrumentation 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Table 3.3.8.1-1 Function on 4 kV shutdown boards A, B, C, and D shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE---------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One degraded voltage A.1 Verify by administrative Immediately relay channel inoperable means that the other two on one or more shutdown degraded voltage relay board(s). channels and associated timers on the affected AND shutdown board(s) are OPERABLE.
The loss of voltage relay channels on the affected AND shutdown board(s) are OPERABLE. A.2 Place the degraded 15 days voltage relay channel in trip.
(continued)
BFN-UNIT 1 3.3-70 Amendment No. 234, 000
RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control LCO 3.5.2 DRAIN TIME of RPV water inventory to the top of active fuel (TAF) shall be 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> AND One low pressure ECCS injection/spray subsystem shall be OPERABLE.
APPLICABILITY: MODES 4 and 5.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS A.1 Restore required ECCS 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> injection/spray subsystem injection/spray subsystem inoperable. to OPERABLE status.
B. Required Action and B.1 Initiate action to establish Immediately associated Completion a method of water Time of Condition A not injection capable of met. operating without electrical power.
C. DRAIN TIME < 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.1 Verify secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. containment boundary is capable of being established in less than the DRAIN TIME.
AND (continued)
BFN-UNIT 1 3.5-8 Amendment No. 234, 311, 000
RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2 Verify each secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> containment penetration flow path is capable of being isolated in less than the DRAIN TIME.
AND C.3 Verify two standby gas 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> treatment (SGT) subsystems are capable of being placed in operation in less than the DRAIN TIME.
D. DRAIN TIME < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. D.1 ---------- NOTE ------------
Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.
Initiate action to establish Immediately an additional method of water injection with water sources capable of maintaining RPV water level > TAF for 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
AND D.2 Initiate action to establish Immediately secondary containment boundary.
AND (continued)
BFN-UNIT 1 3.5-9 Amendment No. 234, 311, 000
539:DWHU,QYHQWRU\&RQWURO
$&7,216 FRQWLQXHG
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\
HDFKVHFRQGDU\
FRQWDLQPHQWSHQHWUDWLRQ
IORZSDWKRUYHULI\LWFDQ
EHDXWRPDWLFDOO\RU
PDQXDOO\LVRODWHGIURPWKH
FRQWUROURRP
$1'
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\
6*7VXEV\VWHPVDUH
FDSDEOHRIEHLQJSODFHG
LQRSHUDWLRQ
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR
7LPHRI&RQGLWLRQ&RU' KRXUV
QRWPHW
25
'5$,17,0(KRXU
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
6859(,//$1&(5(48,5(0(176
6859(,//$1&( )5(48(1&<
65 9HULI\'5$,17,0(KRXUV ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPWKHVXSSUHVVLRQSRROZDWHUOHYHOLV ZLWKWKH
LQFKHVZLWKRULQFKHVZLWKRXW 6XUYHLOODQFH
GLIIHUHQWLDOSUHVVXUHFRQWURO )UHTXHQF\
&RQWURO3URJUDP
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPWKHSLSLQJLVILOOHGZLWKZDWHUIURP ZLWKWKH
WKHSXPSGLVFKDUJHYDOYHWRWKHLQMHFWLRQYDOYH 6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
SR 3.5.2.4 ----------------------NOTES-------------------------- ,QDFFRUGDQFH
Operation may be through the test return ZLWKWKH
line. 6XUYHLOODQFH
Credit may be taken for normal system )UHTXHQF\
operation to satisfy this SR. &RQWURO3URJUDP
Operate the required ECCS injection/spray subsystem for 10 minutes.
SR 3.5.2.5 9HULI\HDFKYDOYHFUHGLWHGIRU ,QDFFRUGDQFH
DXWRPDWLFDOO\isolating a penetration flow ZLWKWKH
path actuates to the isolation position on 6XUYHLOODQFH
an actual or simulated isolation signal. )UHTXHQF\
&RQWURO3URJUDP
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
6859(,//$1&(5(48,5(0(176 FRQWLQXHG
6859(,//$1&( )5(48(1&<
65 127(
9HVVHOLQMHFWLRQVSUD\PD\EHH[FOXGHG
9HULI\WKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPFDQEHPDQXDOO\RSHUDWHG ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
%)181,7 D $PHQGPHQW1R
AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 --------------------------NOTE-------------------------
The following SRs are not required to be performed: SR 3.8.1.2, SR 3.8.1.5, DQG SR 3.8.1.7.
The following SRs are applicable for Unit 1 In accordance and 2 AC sources required to be OPERABLE: with applicable SRs SR 3.8.1.1, SR 3.8.1.2, SR 3.8.1.3, SR 3.8.1.5, SR 3.8.1.DQG65.
SR 3.8.2.2 For the required Unit 3 DG, the SRs of Unit 3 In accordance Technical Specifications are applicable. with applicable SRs BFN-UNIT 1 3.8-18 Amendment No. 234, 311, 0000
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 342 License No. DPR-52
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-52 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20).
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:48:50 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021
ATTACHMENT TO AMENDMENT NO. 342 BROWNS FERRY NUCLEAR PLANT, UNIT 2 FACILITY OPERATING LICENSE NO. DPR-52 DOCKET NO. 50-260 Replace page 3 of Renewed Facility Operating License No. DPR-52 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Page Insert Page 1.1-3 1.1-3 1.1-3a 1.1-3a 3.3-48a 3.3-48a 3.3-48b 3.3-48b 3.3-48c 3.3-48c 3.3-71 3.3-71 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18
sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 253 to Facility Operating License DPR-52, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 253. For SRs that existed prior to Amendment 253, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 253.
- 3) The licensee is authorized to relocate certain requirements included in Appendix A and the former Appendix B to licensee-controlled documents.
Implementation of this amendment shall include the relocation of these requirements to the appropriate documents, as described in the licensee's BFN-UNIT 2 Renewed License No. DPR-52 Amendment No. 342
'HILQLWLRQV
'HILQLWLRQV FRQWLQXHG
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF
PL[WXUHRI,,,,DQG,DFWXDOO\
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI
7,'$(&&DOFXODWLRQRI'LVWDQFH
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$)
VHDWHGLQWKH539DVVXPLQJ
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW
3HQHWUDWLRQIORZSDWKFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU FRQWLQXHG
%)181,7 $PHQGPHQW1R
'HILQLWLRQV
'HILQLWLRQV FRQWLQXHG
'5$,17,0( FRQWLQXHG DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG
DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG
SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHV
WKDWSUHYHQWIORZRIUHDFWRUFRRODQWWKURXJK
WKHSHQHWUDWLRQIORZSDWKV
3HQHWUDWLRQIORZSDWKVFDSDEOHRIEHLQJ LVRODWHGE\YDOYHVWKDWZLOOFORVHDXWRPDWLFDOO\
ZLWKRXWRIIVLWHSRZHUSULRUWRWKH539ZDWHU OHYHOEHLQJHTXDOWRWKH7$)ZKHQDFWXDWHGE\
539ZDWHUOHYHOLVRODWLRQLQVWUXPHQWDWLRQ RU
3HQHWUDWLRQIORZSDWKVZLWKLVRODWLRQGHYLFHV WKDWFDQEHFORVHGSULRUWRWKH539ZDWHUOHYHO EHLQJHTXDOWRWKH7$)E\DGHGLFDWHG RSHUDWRUWUDLQHG LQWKHWDVNZKR LVLQ FRQWLQXRXVFRPPXQLFDWLRQ ZLWKWKH FRQWURO URRPLVVWDWLRQHGDW WKHFRQWUROVDQGLV FDSDEOHRIFORVLQJWKH SHQHWUDWLRQIORZSDWK LVRODWLRQGHYLFHVZLWKRXWRIIVLWHSRZHU
F 7KHSHQHWUDWLRQIORZSDWKVUHTXLUHGWREH HYDOXDWHGSHUSDUDJUDSKEDUHDVVXPHGWRRSHQ LQVWDQWDQHRXVO\DQGDUHQRWVXEVHTXHQWO\LVRODWHG
DQGQRZDWHULVDVVXPHGWREHVXEVHTXHQWO\
DGGHGWRWKH539ZDWHULQYHQWRU\
G 1RDGGLWLRQDOGUDLQLQJHYHQWVRFFXUDQG H 5HDOLVWLFFURVVVHFWLRQDODUHDVDQGGUDLQUDWHVDUH XVHG
$ERXQGLQJ'5$,17,0(PD\EHXVHGLQOLHXRI
DFDOFXODWHGYDOXH
,16(9,&( 7(67,1* 7KH ,16(59,&(7(67,1*352*5$0LVWKH
352*5$0 OLFHQVHHSURJUDPWKDWIXOILOOVWKHUHTXLUHPHQWVRI
&)5D I
FRQWLQXHG
%)181,7 D
$PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
,167580(17$7,21
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/(
$33/,&$%,/,7< $FFRUGLQJWR7DEOH
$&7,216
127(
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO
&21',7,21 5(48,5('$&7,21 &203/(7,21
7,0(
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\
LQRSHUDEOH FKDQQHOLQWULS
25
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\
SHQHWUDWLRQIORZSDWK V
LQFDSDEOHRIDXWRPDWLF
LVRODWLRQ
$1'
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\
FDOFXODWH'5$,17,0(
%)181,7 D $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
6859(,//$1&(5(48,5(0(176
127(
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH
6859(,//$1&( )5(48(1&<
65 3HUIRUP&+$11(/&+(&. ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
%)181,7 E $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
7DEOH SDJHRI
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
$33/,&$%/(
02'(6 5(48,5('
2527+(5 &+$11(/6
63(&,),(' 3(5 $//2:$%/(
)81&7,21 &21',7,216 )81&7,21 9$/8(
6KXWGRZQ&RROLQJ6\VWHP
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP t LQFKHV
/HYHO/RZ/HYHO DERYH YHVVHO
]HUR
5HDFWRU:DWHU&OHDQXS 5:&8 6\VWHP,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV
/HYHO/RZ/HYHO DERYHYHVVHO
]HUR
5HFLUFXODWLRQ/RRS6DPSOH
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP t LQFKHV
/HYHO+/-/RZ/RZ/RZ DERYH YHVVHO
/HYHO ]HUR
5HFLUFXODWLRQ3XPS
'LVFKDUJH,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D LQRQHWULSV\VWHP t LQFKHV
/HYHO+/-/RZ/RZ/RZ DERYH YHVVHO
/HYHO ]HUR E 5HDFWRU6WHDP'RPH D LQRQHWULSV\VWHP t SVLJ 3UHVVXUH+/-/RZ 5HFLUFXODWLRQ'LVFKDUJH 9DOYH3HUPLVVLYH D :KHQDXWRPDWLFLVRODWLRQRIWKHDVVRFLDWHGSHQHWUDWLRQIORZSDWK V LVFUHGLWHGLQ FDOFXODWLQJ'5$,17,0(
%)181,7 F $PHQGPHQW1R
/23,QVWUXPHQWDWLRQ
,167580(17$7,21
/RVVRI3RZHU /23 ,QVWUXPHQWDWLRQ
/&2 7KH/23LQVWUXPHQWDWLRQIRUHDFK7DEOH)XQFWLRQRQN9
VKXWGRZQERDUGV$%&DQG'VKDOOEH23(5$%/(
$33/,&$%,/,7< 02'(6DQG
$&7,216
127(
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
$ 2QHGHJUDGHGYROWDJH $ 9HULI\E\DGPLQLVWUDWLYH ,PPHGLDWHO\
UHOD\FKDQQHOLQRSHUDEOH PHDQVWKDWWKHRWKHUWZR
RQRQHRUPRUHVKXWGRZQ GHJUDGHGYROWDJHUHOD\
ERDUG V FKDQQHOVDQGDVVRFLDWHG
WLPHUVRQWKHDIIHFWHG
$1' VKXWGRZQERDUG V DUH
23(5$%/(
7KHORVVRIYROWDJHUHOD\
FKDQQHOVRQWKHDIIHFWHG $1'
VKXWGRZQERDUG V DUH 23(5$%/( $ 3ODFHWKHGHJUDGHG GD\V
YROWDJHUHOD\FKDQQHOLQ
WULS
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
(0(5*(1&<&25(&22/,1*6<67(06 (&&6 539:$7(5,19(1725<
&21752/$1'5($&725&25(,62/$7,21&22/,1* 5&,& 6<67(0
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO
/&2 '5$,17,0(RI539ZDWHULQYHQWRU\WRWKHWRSRIDFWLYHIXHO 7$)
VKDOOEHKRXUV
$1'
2QHORZSUHVVXUH(&&6LQMHFWLRQVSUD\VXEV\VWHPVVKDOOEH
23(5$%/(
$33/,&$%,/,7< 02'(6DQG
$&7,216
&21',7,21 5(48,5('$&7,21 &203/(7,21
7,0(
$ 5HTXLUHG(&&6 $ 5HVWRUHUHTXLUHG(&&6 KRXUV
LQMHFWLRQVSUD\VXEV\VWHP LQMHFWLRQVSUD\VXEV\VWHP
LQRSHUDEOH WR23(5$%/(VWDWXV
% 5HTXLUHG$FWLRQDQG % ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
DVVRFLDWHG&RPSOHWLRQ DPHWKRGRIZDWHU
7LPHRI&RQGLWLRQ$QRW LQMHFWLRQFDSDEOHRI
PHW RSHUDWLQJZLWKRXW
HOHFWULFDOSRZHU
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
$&7,216 FRQWLQXHG
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
& '5$,17,0(KRXUV & 9HULI\VHFRQGDU\ KRXUV
DQGKRXUV FRQWDLQPHQWERXQGDU\LV
FDSDEOHRIEHLQJ
HVWDEOLVKHGLQOHVVWKDQWKH
'5$,17,0(
$1'
& 9HULI\HDFKVHFRQGDU\ KRXUV
FRQWDLQPHQWSHQHWUDWLRQ
IORZSDWKLVFDSDEOHRI
EHLQJLVRODWHGLQOHVVWKDQ
WKH'5$,17,0(
$1'
& 9HULI\WZRVWDQGE\JDV KRXUV
WUHDWPHQW 6*7
VXEV\VWHPVDUHFDSDEOHRI
EHLQJSODFHGLQRSHUDWLRQLQ
OHVVWKDQWKH'5$,17,0(
' '5$,17,0(KRXUV ' 127(
5HTXLUHG(&&6
LQMHFWLRQVVSUD\VXEV\VWHP
RUDGGLWLRQDOPHWKRGRI
ZDWHULQMHFWLRQVKDOOEH
FDSDEOHRIRSHUDWLQJ
ZLWKRXWRIIVLWHHOHFWULFDO
SRZHU
,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
DQDGGLWLRQDOPHWKRGRI
ZDWHULQMHFWLRQZLWKZDWHU
VRXUFHVFDSDEOHRI
PDLQWDLQLQJ539ZDWHU
OHYHO!7$)IRUKRXUV
$1'
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
$&7,216
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
VHFRQGDU\FRQWDLQPHQW
ERXQGDU\
$1'
' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\
HDFKVHFRQGDU\
FRQWDLQPHQWSHQHWUDWLRQ
IORZSDWKRUYHULI\LWFDQ
EHDXWRPDWLFDOO\RU
PDQXDOO\LVRODWHGIURPWKH
FRQWUROURRP
$1'
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\
6*7VXEV\VWHPVDUH
FDSDEOHRIEHLQJSODFHG
LQRSHUDWLRQ
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR
7LPHRI&RQGLWLRQ&RU' KRXUV
QRWPHW
25
'5$,17,0(KRXU
%)181,7 $PHQGPHQW1R
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify DRAIN TIME 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. In accordance with the Surveillance Frequency Control Program SR 3.5.2.2 Verify, for the required ECCS injection/spray In accordance subsystem, the suppression pool water level is with the
-6.25 inches with or -7.25 inches without Surveillance differential pressure control. Frequency Control Program SR 3.5.2.3 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from with the the pump discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.2.4 127(6 In accordance
2SHUDWLRQPD\EHWKURXJKWKHWHVWUHWXUQ with the OLQH Surveillance
&UHGLWPD\EHWDNHQIRUQRUPDOV\VWHP Frequency Control Program RSHUDWLRQWRVDWLVI\WKLV65
2SHUDWHWKHUHTXLUHG(&&6LQMHFWLRQVSUD\
VXEV\VWHPIRUPLQXWHV
SR 3.5.2. Verify each valve credited for automatically In accordance isolating a penetration flow path actuates to with the the isolation position on an actual or Surveillance simulated isolation signal. Frequency Control Program (continued)
BFN-UNIT 2 3.5-11 Amendment No. 255, 325,
000
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2. -----------------------------NOTE------------------------
Vessel injection/spray may be excluded.
Verify the required ECCS injection/spray In accordance subsystem can be manually operated. with the Surveillance Frequency Control Program.
BFN-UNIT 2 3.5-11a Amendment No. 000
$&6RXUFHV6KXWGRZQ
6859(,//$1&(5(48,5(0(176
6859(,//$1&( )5(48(1&<
65 127(
7KHIROORZLQJ65VDUHQRWUHTXLUHGWREH
SHUIRUPHG6565DQG 65
7KHIROORZLQJ65VDUHDSSOLFDEOHIRU8QLW ,QDFFRUGDQFH
DQG$&VRXUFHVUHTXLUHGWREH23(5$%/( ZLWKDSSOLFDEOH
65V
656565
6565DQG65
65 )RUWKHUHTXLUHG8QLW'*WKH65VRI8QLW ,QDFFRUGDQFH
7HFKQLFDO6SHFLILFDWLRQVDUHDSSOLFDEOH ZLWKDSSOLFDEOH
65V
%)181,7 $PHQGPHQW1R
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 302 License No. DPR-68
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated March 5, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 3
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-68 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 302, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented prior to the start of the interval beginning with the Browns Ferry Nuclear Plant, Unit 3, spring 2022, Cycle 20, refueling outage (3U20).
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by David David J. J. Wrona Date: 2021.10.28 Wrona 13:49:31 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications Date of Issuance: October 28, 2021
ATTACHMENT TO AMENDMENT NO. 302 BROWNS FERRY NUCLEAR PLANT, UNIT 3 FACILITY OPERATING LICENSE NO. DPR-68 DOCKET NO. 50-296 Replace page 3 of Renewed Facility Operating License No. DPR-68 with the attached revised page 3. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Page Insert Page 1.1-3 1.1-3 3.3-48a 3.3-48a 3.3-48b 3.3-48b 3.3-48c 3.3-48c 3.3-71 3.3-71 3.5-8 3.5-8 3.5-9 3.5-9 3.5-10 3.5-10 3.5-11 3.5-11 3.5-11a 3.5-11a 3.8-18 3.8-18
(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3952 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 302, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 212 to Facility Operating License DPR-68, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 212. For SRs that existed prior to Amendment 212, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 212.
BFN-UNIT 3 Renewed License No. DPR-68 Amendment No. 302
'HILQLWLRQV
'HILQLWLRQV FRQWLQXHG
&25(23(5$7,1*/,0,76 7KH&2/5LVWKHXQLWVSHFLILFGRFXPHQWWKDWSURYLGHV
5(3257 &2/5 F\FOHVSHFLILFSDUDPHWHUOLPLWVIRUWKHFXUUHQWUHORDG
F\FOH7KHVHF\FOHVSHFLILFOLPLWVVKDOOEHGHWHUPLQHG
IRUHDFKUHORDGF\FOHLQDFFRUGDQFHZLWK
6SHFLILFDWLRQ3ODQWRSHUDWLRQZLWKLQWKHVHOLPLWV
LVDGGUHVVHGLQLQGLYLGXDO6SHFLILFDWLRQV
'26((48,9$/(17, '26((48,9$/(17,VKDOOEHWKDWFRQFHQWUDWLRQ
RI, PLFURFXULHVJUDP WKDWDORQHZRXOGSURGXFH
WKHVDPHWK\URLGGRVHDVWKHTXDQWLW\DQGLVRWRSLF
PL[WXUHRI,,,,DQG,DFWXDOO\
SUHVHQW7KHWK\URLGGRVHFRQYHUVLRQIDFWRUVXVHGIRU
WKLVFDOFXODWLRQVKDOOEHWKRVHOLVWHGLQ7DEOH,,,RI
7,'$(&&DOFXODWLRQRI'LVWDQFH
)DFWRUVIRU3RZHUDQG7HVW5HDFWRU6LWHV
'5$,17,0( 7KH'5$,17,0(LVWKHWLPHLWZRXOGWDNHIRUWKHZDWHU
LQYHQWRU\LQDQGDERYHWKH5HDFWRU3UHVVXUH9HVVHO
539 WRGUDLQWRWKHWRSRIWKHDFWLYHIXHO 7$) VHDWHG
LQWKH539DVVXPLQJ
D 7KHZDWHULQYHQWRU\DERYHWKH7$)LVGLYLGHGE\WKH OLPLWLQJGUDLQUDWH
E 7KHOLPLWLQJGUDLQUDWHLVWKHODUJHURIWKHGUDLQUDWH WKURXJKDVLQJOHSHQHWUDWLRQIORZSDWKZLWKWKH KLJKHVWIORZUDWHRUWKHVXPRIWKHGUDLQUDWHV WKURXJKPXOWLSOHSHQHWUDWLRQIORZSDWKVVXVFHSWLEOH WRDFRPPRQPRGHIDLOXUHIRUDOOSHQHWUDWLRQIORZ SDWKVEHORZWKH7$)H[FHSW
3HQHWUDWLRQIORZSDWKVFRQQHFWHGWRDQLQWDFW FORVHGV\VWHPRULVRODWHGE\PDQXDORU DXWRPDWLFYDOYHVWKDWDUHFORVHGDQG DGPLQLVWUDWLYHO\FRQWUROOHGLQWKHFORVHG SRVLWLRQEODQNIODQJHVRURWKHUGHYLFHVWKDW SUHYHQWIORZRIUHDFWRUFRRODQWWKURXJKWKH SHQHWUDWLRQIORZSDWKV
FRQWLQXHG
%)181,7 $PHQGPHQW1R
BBB
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
,167580(17$7,21
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
/&2 7KH539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQIRUHDFK
)XQFWLRQLQ7DEOHVKDOOEH23(5$%/(
$33/,&$%,/,7< $FFRUGLQJWR7DEOH
$&7,216
127(
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO
&21',7,21 5(48,5('$&7,21 &203/(7,21
7,0(
$ 2QHRUPRUHFKDQQHOV $ ,QLWLDWHDFWLRQWRSODFH ,PPHGLDWHO\
LQRSHUDEOH FKDQQHOLQWULS
25
$ 'HFODUHDVVRFLDWHG ,PPHGLDWHO\
SHQHWUDWLRQIORZSDWK V
LQFDSDEOHRIDXWRPDWLF
LVRODWLRQ
$1'
$ ,QLWLDWHDFWLRQWR ,PPHGLDWHO\
FDOFXODWH'5$,17,0(
%)181,7 D $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
6859(,//$1&(5(48,5(0(176
127(
7KHVH65VDSSO\WRHDFK)XQFWLRQLQ7DEOH
6859(,//$1&( )5(48(1&<
65 3HUIRUP&+$11(/&+(&. ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP 65 3HUIRUP&+$11(/)81&7,21$/7(67 ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
%)181,7 E $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
7DEOH SDJHRI
539:DWHU,QYHQWRU\&RQWURO,QVWUXPHQWDWLRQ
$33/,&$%/(
02'(6 5(48,5('
2527+(5 &+$11(/6
63(&,),(' 3(5 $//2:$%/(
)81&7,21 &21',7,216 )81&7,21 9$/8(
6KXWGRZQ&RROLQJ6\VWHP
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV
/HYHO/RZ/HYHO DERYHYHVVHO
]HUR
5HDFWRU:DWHU&OHDQXS 5:&8 6\VWHP,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV
/HYHO/RZ/HYHO DERYHYHVVHO
]HUR
5HFLUFXODWLRQ/RRS6DPSOH
,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D SHUWULSV\VWHP tLQFKHV
/HYHO+/-/RZ/RZ/RZ DERYHYHVVHO
/HYHO ]HUR
5HFLUFXODWLRQ3XPS
'LVFKDUJH,VRODWLRQ D 5HDFWRU9HVVHO:DWHU D LQRQHWULSV\VWHP tLQFKHV
/HYHO+/-/RZ/RZ/RZ DERYHYHVVHO
/HYHO ]HUR
E 5HDFWRU6WHDP'RPH D LQRQHWULSV\VWHP tSVLJ
3UHVVXUH+/-/RZ 5HFLUFXODWLRQ'LVFKDUJH 9DOYH3HUPLVVLYH D :KHQDXWRPDWLFLVRODWLRQRIWKHDVVRFLDWHGSHQHWUDWLRQIORZSDWK V LVFUHGLWHGLQ FDOFXODWLQJ'5$,17,0(
%)181,7 F $PHQGPHQW1R
/23,QVWUXPHQWDWLRQ
,167580(17$7,21
/RVVRI3RZHU /23 ,QVWUXPHQWDWLRQ
/&2 7KH/23LQVWUXPHQWDWLRQIRUHDFK7DEOH)XQFWLRQRQN9
VKXWGRZQERDUGV($(%(&DQG('VKDOOEH23(5$%/(
$33/,&$%,/,7< 02'(6DQG
$&7,216
127(
6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKFKDQQHO
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
$ 2QHGHJUDGHGYROWDJH $ 9HULI\E\DGPLQLVWUDWLYH ,PPHGLDWHO\
UHOD\FKDQQHOLQRSHUDEOH PHDQVWKDWWKHRWKHUWZR
RQRQHRUPRUHVKXWGRZQ GHJUDGHGYROWDJHUHOD\
ERDUG V FKDQQHOVDQGDVVRFLDWHG
WLPHUVRQWKHDIIHFWHG
$1' VKXWGRZQERDUG V DUH
23(5$%/(
7KHORVVRIYROWDJHUHOD\
FKDQQHOVRQWKHDIIHFWHG $1'
VKXWGRZQERDUG V DUH 23(5$%/( $ 3ODFHWKHGHJUDGHG GD\V
YROWDJHUHOD\FKDQQHOLQ
WULS
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
(0(5*(1&<&25(&22/,1*6<67(06 (&&6 539:$7(5,19(1725<
&21752/$1'5($&725&25(,62/$7,21&22/,1* 5&,& 6<67(0
5HDFWRU3UHVVXUH9HVVHO 539 :DWHU,QYHQWRU\&RQWURO
/&2 '5$,17,0(RI539ZDWHULQYHQWRU\WRWKHWRSRIDFWLYHIXHO 7$)
VKDOOEHKRXUV
$1'
2QHORZSUHVVXUH(&&6LQMHFWLRQVSUD\VXEV\VWHPVVKDOOEH
23(5$%/(
$33/,&$%,/,7< 02'(6DQG
$&7,216
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
$ 5HTXLUHG(&&6 $ 5HVWRUHUHTXLUHG(&&6 KRXUV
LQMHFWLRQVSUD\VXEV\VWHP LQMHFWLRQVSUD\VXEV\VWHP
LQRSHUDEOH WR23(5$%/(VWDWXV
% 5HTXLUHG$FWLRQDQG % ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
DVVRFLDWHG&RPSOHWLRQ DPHWKRGRIZDWHU
7LPHRI&RQGLWLRQ$QRW LQMHFWLRQFDSDEOHRI
PHW RSHUDWLQJZLWKRXW
HOHFWULFDOSRZHU
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
$&7,216 FRQWLQXHG
&21',7,21 5(48,5('$&7,21 &203/(7,21
7,0(
& '5$,17,0(KRXUV & 9HULI\VHFRQGDU\ KRXUV
DQGKRXUV FRQWDLQPHQWERXQGDU\LV
FDSDEOHRIEHLQJ
HVWDEOLVKHGLQOHVVWKDQ
WKH'5$,17,0(
$1'
& 9HULI\HDFKVHFRQGDU\ KRXUV
FRQWDLQPHQWSHQHWUDWLRQ
IORZSDWKLVFDSDEOHRI
EHLQJLVRODWHGLQOHVVWKDQ
WKH'5$,17,0(
$1'
& 9HULI\WZRVWDQGE\JDV KRXUV
WUHDWPHQW 6*7
VXEV\VWHPVDUHFDSDEOH
RIEHLQJSODFHGLQ
RSHUDWLRQLQOHVVWKDQWKH
'5$,17,0(
' '5$,17,0(KRXUV ' 127(
5HTXLUHG(&&6
LQMHFWLRQVSUD\VXEV\VWHP
RUDGGLWLRQDOPHWKRGRI
ZDWHULQMHFWLRQVKDOOEH
FDSDEOHRIRSHUDWLQJ
ZLWKRXWRIIVLWHHOHFWULFDO
SRZHU
,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
DQDGGLWLRQDOPHWKRGRI
ZDWHULQMHFWLRQZLWKZDWHU
VRXUFHVFDSDEOHRI
PDLQWDLQLQJ539ZDWHU
OHYHO!7$)IRU
KRXUV
$1'
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
$&7,216
&21',7,21 5(48,5('$&7,21 &203/(7,21 7,0(
' FRQWLQXHG ' ,QLWLDWHDFWLRQWRHVWDEOLVK ,PPHGLDWHO\
VHFRQGDU\FRQWDLQPHQW
ERXQGDU\
$1'
' ,QLWLDWHDFWLRQWRLVRODWH ,PPHGLDWHO\
HDFKVHFRQGDU\
FRQWDLQPHQWSHQHWUDWLRQ
IORZSDWKRUYHULI\LWFDQ
EHDXWRPDWLFDOO\RU
PDQXDOO\LVRODWHGIURPWKH
FRQWUROURRP
$1'
' ,QLWLDWHDFWLRQWRYHULI\WZR ,PPHGLDWHO\
6*7VXEV\VWHPVDUH
FDSDEOHRIEHLQJSODFHG
LQRSHUDWLRQ
( 5HTXLUHG$FWLRQDQG ( ,QLWLDWHDFWLRQWRUHVWRUH ,PPHGLDWHO\
DVVRFLDWHG&RPSOHWLRQ '5$,17,0(WR
7LPHRI&RQGLWLRQ&RU' KRXUV
QRWPHW
25
'5$,17,0(KRXU
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
6859(,//$1&(5(48,5(0(176
6859(,//$1&( )5(48(1&<
65 9HULI\'5$,17,0(KRXUV ,QDFFRUGDQFH
ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPWKHVXSSUHVVLRQSRROZDWHUOHYHOLV ZLWKWKH
LQFKHVZLWKRULQFKHVZLWKRXW 6XUYHLOODQFH
GLIIHUHQWLDOSUHVVXUHFRQWURO )UHTXHQF\
&RQWURO3URJUDP
65 9HULI\IRUWKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPWKHSLSLQJLVILOOHGZLWKZDWHUIURP ZLWKWKH
WKHSXPSGLVFKDUJHYDOYHWRWKHLQMHFWLRQYDOYH 6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
65 127(6 ,QDFFRUGDQFH
ZLWKWKH
2SHUDWLRQPD\EHWKURXJKWKHWHVWUHWXUQ 6XUYHLOODQFH
OLQH )UHTXHQF\
&UHGLWPD\EHWDNHQIRUQRUPDOV\VWHP &RQWURO3URJUDP
RSHUDWLRQWRVDWLVI\WKLV65
2SHUDWHWKHUHTXLUHG(&&6LQMHFWLRQVSUD\
VXEV\VWHPIRU PLQXWHV
65 9HULI\HDFKYDOYHFUHGLWHGIRUDXWRPDWLFDOO\ ,QDFFRUGDQFH
LVRODWLQJDSHQHWUDWLRQIORZSDWKDFWXDWHVWRWKH ZLWKWKH
LVRODWLRQSRVLWLRQRQDQDFWXDORUVLPXODWHG 6XUYHLOODQFH
LVRODWLRQVLJQDO )UHTXHQF\
&RQWURO3URJUDP
FRQWLQXHG
%)181,7 $PHQGPHQW1R
539:DWHU,QYHQWRU\&RQWURO
6859(,//$1&(5(48,5(0(176 FRQWLQXHG
6859(,//$1&( )5(48(1&<
65 127(
9HVVHOLQMHFWLRQVSUD\PD\EHH[FOXGHG
9HULI\WKHUHTXLUHG(&&6LQMHFWLRQVSUD\ ,QDFFRUGDQFH
VXEV\VWHPFDQEHPDQXDOO\RSHUDWHG ZLWKWKH
6XUYHLOODQFH
)UHTXHQF\
&RQWURO3URJUDP
%)181,7 D $PHQGPHQW1R
$&6RXUFHV6KXWGRZQ
6859(,//$1&(5(48,5(0(176
6859(,//$1&( )5(48(1&<
65 127(
7KHIROORZLQJ65VDUHQRWUHTXLUHGWREH
SHUIRUPHG6565DQG
65
7KHIROORZLQJ65VDUHDSSOLFDEOHIRU8QLW ,QDFFRUGDQFH
$&VRXUFHVUHTXLUHGWREH23(5$%/( ZLWKDSSOLFDEOH
65V
656565
6565DQG65
65 )RUWKHUHTXLUHG8QLWDQG'*WKH65VRI ,QDFFRUGDQFH
8QLWDQG7HFKQLFDO6SHFLILFDWLRQVDUH ZLWKDSSOLFDEOH
DSSOLFDEOH 65V
%)181,7 $PHQGPHQW1R
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 319, 342, AND 302 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-33, DPR-52, AND DPR-68 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DOCKET NOS. 50-259, 50-260, AND 50-296
1.0 INTRODUCTION
Tennessee Valley Authority (TVA, the licensee) requested changes to the technical specifications (TSs) for Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3 by license amendment request (LAR), dated March 5, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21064A508). In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed LAR under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the TSs related to reactor pressure vessel (RPV) water inventory control (WIC) based on Technical Specifications Task Force (TSTF) -582, Revision 0, RPV WIC Enhancements (ADAMS Accession No. ML19240A260) and the associated NRC staff safety evaluation (SE) of TSTF-582 (ADAMS Accession No. ML20219A333).
The boiling water reactor (BWR) RPV design includes multiple penetrations located below the top of active fuel (TAF). These penetrations provide entry for control rods, recirculation flow, reactor water cleanup (RWCU), and shutdown cooling. Since these penetrations are below the TAF, this creates a potential to drain the RPV water inventory and lose effective core cooling.
The loss of water inventory and effective core cooling can potentially lead to fuel cladding failure and radioactive release. Drain Time is the time it would take for the water inventory in and above the RPV to drain to the TAF.
1.1 Proposed TS Changes to Adopt TSTF-582 In accordance with NRC staff-approved TSTF-582, the licensee proposed changes that would revise the Browns Ferry TSs related to RPV WIC to incorporate operating experience and to correct errors and omissions that the licensee incorporated into the TSs when adopting TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (ADAMS Accession No. ML16074A448). Specifically, the licensee proposed the following changes to adopt TSTF-582:
Enclosure 4
The Drain Time definition in TS 1.1 would be revised to move the examples of common mode failure mechanisms to the Bases and delete seismic events.
In TS 1.1, Drain Time definition, the exception from considering the Drain Time for penetration flow paths isolated with manual or automatic valves that are locked, sealed, or otherwise secured would be revised to apply the exception for manual or automatic valves that are closed and administratively controlled.
The Actions of TS 3.3.5.2 would be revised to permit placing an inoperable isolation channel in trip as an alternative to declaring the associated penetration flow path incapable of automatic isolation.
TS 3.3.5.2, Required Action B.2 requires calculating Drain Time with a Completion Time of immediately. The Required Action would be renumbered as A.2.2 and revised to state, Initiate action to calculate Drain Time.
The Browns Ferry design contains additional isolation instrumentation functions based on low RPV water level that could be credited when calculating Drain Time. Those functions would be added to the required functions in TS 3.3.5.2.
In TS 3.5.2, the first use of the acronym SGT would be defined in Required Action C.3 and the acronym SGT would be used in Required Action D.4.
TS 3.3.5.2 and TS 3.5.2 would be revised to eliminate the requirement for a manual emergency core cooling system (ECCS) initiation signal to start the required ECCS injection/spray subsystem, and to instead rely on manual valve alignment and pump start. TS 3.5.2 Surveillance Requirements (SRs) related to manual initiation using the ECCS signal (such as verifying automatic alignment of valves on an initiation signal) would be eliminated. Related to this change, the TS 3.3.5.2 functions, SRs, and Actions that only support manual initiate on using an ECCS signal (including interlocks and minimum flow instruments) would be eliminated.
TS 3.8.2, AC [Alternating Current] Sources - Shutdown, SR 3.8.2.1, would be revised to not require SRs that test the ability of the automatic diesel generator to start in Modes 4 and 5. TSTF-542 eliminated the automatic ECCS initiation in Modes 4 and 5.
1.2 Additional Proposed TS Changes The licensee proposed to make the following additional changes:
TS 3.3.8.1, Loss of Power (LOP) Instrumentation, would be revised to delete When the associated diesel generator [DG] is required to be OPERABLE by LCO [limiting condition for operation 3.8.2, AC Sources - Shutdown, from the Applicability.
SR 3.8.2.1 would be revised to add SR 3.8.1.4 and SR 3.8.1.18 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1.
The NRC staff notes that the above proposed changes are consistent with TSTF-583-T, Revision 0, TSTF-582 Diesel Generator Variation (ADAMS Accession No. ML20248H330).
1.2.1 Variations The licensee proposed to correct editorial errors in the spelling of DRAIN TIME in the last paragraph of the Browns Ferry, Unit 2 TS Section 1.1 DRAIN TIME definition.
Additionally, Browns Ferry, Unit 2 TS 3.5.2 Required Action D.4 corrects the spelling of subsystems.
The licensee proposed to create Mode 4 and 5 operability requirements to allow crediting auto-isolation of the recirculation loop sample valves in support of the Exception 2 in the Drain Time definition for penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation. This change would add the Recirculation Loop Sample Isolation Instrumentation and Recirculation Pump Discharge Isolation Functions to TS Table 3.3.5.2-1.
2.0 REGULATORY EVALUATION
2.1 Regulatory Requirements The regulation at 10 CFR 50.36(c)(2) requires that TSs include LCOs. Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TS until the condition can be met.
The regulation at 10 CFR 50.36(c)(3) requires that TSs include items in the category of SRs, which are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met.
2.2 Regulatory Guidance The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared standard TSs (STSs) for each of the LWR nuclear designs.
Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the Standard Technical Specifications, General Electric BWR/4 Plants, NUREG-1434, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, April 2012 (ADAMS Accession Nos. ML12104A192 and ML12104A193, respectively), as modified by NRC-approved travelers.
Traveler TSTF-582 revised the STSs related to RPV WIC to incorporate operating experience and to correct editorial errors in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (ADAMS Accession No. ML16074A448). The NRC approved TSTF-542, Revision 2, on December 20, 2016 (ADAMS Package Accession No. ML16343B066). The NRC staff approved TSTF-582 under the CLIIP in letter dated August 13, 2020 (ADAMS Accession No. ML20219A333). The TSTF-582 SE states that a licensee may adopt the STS changes approved in TSTF-582, if the licensee has already adopted the STS changes approved in TSTF-542.
3.0 TECHNICAL EVALUATION
3.1 Proposed TS Changes to Adopt TSTF-582 The NRC staff compared the licensees proposed TS changes in Section 1.0 of this SE against the changes approved in TSTF-582. In accordance with the SRP Chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-582 are applicable to the Browns Ferry TSs because Browns Ferry Units 1, 2, and 3 are of BWR/4 design and the NRC staff approved the TSTF-582 changes for BWR/4 designs. The licensee meets the TSTF-582 SE provision for adoption of TSTF-582 since the licensee adopted Traveler TSTF-542 on December 26, 2019 (ADAMS Accession No. ML19294A011) in Amendment Nos. 311, 334, and 294 for Browns Ferry, Units 1, 2, and 3, respectively. Therefore, the NRC staff concludes that the licensees proposed changes to the Browns Ferry TSs in Section 1.0 of this SE are acceptable in that they are consistent with TSTF-582 and the terms for use stated in the NRC staffs SE of TSTF-582.
The NRC staff finds that proposed changes to the TS 1.1 definition, and LCOs 3.3.5.2 and 3.5.2 correctly specify the lowest functional capability or performance levels of equipment required for safe operation of the facility in accordance with 10 CFR 50.36(c)(2)(i). Also, the NRC staff finds that proposed changes to the Actions of LCOs 3.3.5.2 and 3.5.2 are adequate remedial actions to be taken until each LCO can be met to provide protection to the health and safety of the public, thereby satisfying 10 CFR 50.36(c)(2)(i).
The NRC staff finds that the proposed revisions to the SRs in TS 3.3.5.2, 3.5.2, and 3.8.2 continue to provide requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met in accordance with 10 CFR 50.36(c)(3).
Thus, the proposed changes continue to meet the requirements of 10 CFR 50.36(c)(2)(i) and 10 CFR 50.36(c)(3) as discussed in Section 3.0 of the NRC staffs SE of TSTF-582.
3.2 Additional Proposed TS Changes 3.2.1 TS 3.3.8.1, Applicability The licensee stated that TS 3.8.2 does not require automatic start and loading of a DG within 10 seconds on an ECCS initiation signal or a loss of offsite power signal. Currently, TS 3.3.8.1, Loss of Power (LOP) Instrumentation, is applicable in Modes 1, 2, and 3, and when the associated DG is required to be operable by TS 3.8.2. The NRC staff confirmed that TS 3.8.2 no longer requires automatic start and loading of a DG on a LOP signal. The NRC staff finds it acceptable to revise the Applicability of LCO 3.3.8.1 by deleting When the associated diesel generator is required to be OPERABLE by LCO 3.8.2, AC Sources - Shutdown, because the LOP instrumentation that generates the LOP signal does not need to be operable when the DG
is required to be operable by TS 3.8.2. Therefore, the NRC staff concludes that the LCO applicability changes will continue to provide for the lowest functional capability or performance levels of equipment required for safe operation of the facility and, therefore, meet the LCO requirements of 10 CFR 50.36(c)(2).
3.2.2 SR 3.8.2.1 LCO 3.8.2, AC Sources - Shutdown, requires one offsite circuit and one DG capable of supplying one division of the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems - Shutdown, to be operable in shutdown conditions. The existing SR 3.8.2.1 lists the TS 3.8.1 SRs that are applicable in shutdown conditions with some exceptions.
TS SR 3.8.1.4 states, Verify each DG starts from standby condition and achieves, in 10 seconds, voltage 3940 V and frequency 58.8 Hz. Verify after DG fast start from standby conditions that the DG achieves steady state voltage 3940 V and 4400 V and frequency 58.8 Hz and 61.2 Hz. The 10 second start requirement associated with the DG automatic start supports the assumptions in the design basis LOCA analysis. The NRC staff confirmed that 10 second timing is not required during a manual DG start to respond to a draining event, which has a minimum Drain Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. In addition, SR 3.8.1.2, which requires the DG to start from standby conditions and achieve the required steady state voltage and frequency ranges, is applicable under SR 3.8.2. The NRC staff finds that the SR 3.8.1.4 testing for the DGs capability to achieve required steady state voltage and frequency ranges will be performed in SR 3.8.1.2 since SR 3.8.1.2 provides the test for this DG capability.
Therefore, the NRC staff finds it acceptable to add SR 3.8.1.4 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1.
TS SR 3.8.1.8 states, Verify interval between each sequenced load block is within the allowable values for each load sequencer timer. This SR verifies the load sequence time interval tolerance between each sequenced load block when loads are sequentially connected to the engineered safety features (ESF) bus by automatic sequencer while the DG is tied to the ESF bus. TS 3.5.2 requires manual starting of the equipment for water injection to respond to a draining event so that the DG will be manually loaded during a draining event. No other postulated events require automatic loading of the DG during shutdown conditions. The NRC staff confirmed that with respect to SR 3.8.8, the load sequencers are used for the automatic loading of the DG and are not used during a manual loading of the DG. Therefore, the NRC staff finds it acceptable to add SR 3.8.1.8 to the list of TS 3.8.1 SRs that are not applicable under SR 3.8.2.1.
The NRC staff finds that the proposed changes to revise SR 3.8.2.1 are acceptable because the remaining applicable SRs will continue to demonstrate the operability of the required AC power sources and, as such, ensure the availability of the AC power required to operate the plant in a safe manner and mitigate postulated events during shutdown conditions. Therefore, the NRC staff finds the proposed changes to SR 3.8.2.1 are acceptable because the changes continue to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the associated LCO will continue to be met in accordance with 10 CFR 50.36(c)(3).
3.2.3 LCO 3.5.2 Note Browns Ferry SR 3.5.2.5 requires operating the ECCS subsystem periodically to verify its operability. TSTF-582 added a Note to Browns Ferry SR 3.5.2.5 (and renamed it to SR 3.5.2.4) that permits a subsystem to be credited for operating in normal mode as demonstrating operation of the required ECCS subsystem. As stated in the TSTF-582 justification, This Note permits crediting the normal operation of an RHR Shutdown Cooling subsystem to satisfy the SR. The revised SR continues to ensure the ECCS injection/spray subsystem can inject water into the RPV if needed for defense-in-depth, while eliminating unnecessary testing.
The NRC staff confirmed that removal of SR 3.5.2.4 by TSTF-582 and the addition of the SR Note to SR 3.5.2.5 (renumbered SR 3.5.2.4) eliminates the need for the LCO Note to consider the ECCS subsystem operable while operating in decay heat removal mode. The NRC staff finds the proposed change to LCO 3.5.2 acceptable because the NOTE of SR 3.5.2.4 will continue to demonstrate the operability of the ECCS subsystem and the associated LCO will continue to be met in accordance with 10 CFR 50.36(c)(3).
3.2.4 Variations The licensee proposed changes to add RPV WIC Instrumentation functions for Recirculation Loop Sample Isolation Instrumentation and Recirculation Pump Discharge Isolation Instrumentation within TS Table 3.3.5.2-1. The addition of these two functions would allow crediting automatic isolation of the recirculation loop sample valves and recirculation pump discharge isolation valves in support of Exception 2 in the Drain Time definition for penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation.
The NRC staff reviewed the proposed addition of the above functions to Table 3.3.5.2-1, Functions 3.a and 4.a, Reactor Vessel Water Level - Low Low Low, Level 1, and Function 4.b, Reactor Steam Dome Pressure - Low (Recirculation Discharge Valve Permissive).
Function 3.a controls Group 1 primary containment isolation valves, including the recirculation loop sample isolation valves, and requires two channels per trip system for a total of four operable channels to account for a single active failure. Functions 4.a and 4.b controls automatic closure of the recirculation pump discharge isolation valves and requires four channels per function. The four reactor water level channels input to two two-out-of-two trip systems, with each of the two trip systems associated with one of the two recirculation pump discharge isolation valves, to account for a single active failure.
TSTF-542 states that, with one ECCS injection/spray subsystem and non-safety related injection sources, defense-in-depth will be maintained. The defense-in-depth measure is consistent with other events considered during shutdown with no additional single failure assumed. The drain time controls, in addition to the required ECCS injection/spray subsystem, provide reasonable assurance that an unexpected draining event can be prevented or mitigated before the RPV water level would be lowered to the TAF.
The licensee proposed requiring only a single recirculation loop sample isolation valve to be operable to be credited in the Drain Time Exception, and thus one channel in both trip systems are required to be operable for proposed Function 3.a. The Allowable Value (AV) of 398 inches above vessel zero, is consistent with the AV for TS Table 3.3.6.1-1 Function 1.a.
Proposed Functions 4.a and 4.b would require the recirculation pump discharge valve credited
in the Drain Time Exception to have two channels in one trip system operable, with AVs of 398 inches above vessel zero, and 215 psig, respectively, which are consistent with the AVs for TS Table 3.3.5.1-1 Functions 2.a and 2.d.
Based on the information above, the NRC staff determined that the proposed additional functions continue to meet the requirements of TS 3.3.5.2 and 10 CFR 50.36, and therefore the addition of Functions 3.a, 4.a, and 4.b to Table 3.3.5.2-1, is acceptable.
3.2.5 Editorial The licensee proposed to correct and error in the spelling of DRAIN TIME in the last paragraph of the Browns Ferry, Unit 2 TS Section 1.1 DRAIN TIME definition. Additionally, Browns Ferry, Unit 2 TS 3.5.2 Required Action D.4 corrects the spelling of subsystems. The NRC staff reviewed the proposed changes and determined that they are acceptable because they are editorial clarifications and do not substantively change TS requirements.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Alabama State official was notified of the proposed issuance of the amendment on October 4, 2021. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change the requirements with respect to installation or use of a facilitys components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on May 18, 2021 (86 FR 26956), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: T. Sweat, NRR Date: October 28, 2021
ML21285A068 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DEX/EICB/BC NRR/DSS/STSB/BC(A)
NAME LHaeg RButler MWaters NJordan DATE 10/12/2021 10/14/2021 10/25/2021 10/4/2021 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona MWentzel DATE 10/28/2021 10/28/2021