{{#Wiki_filter:energy harbor                                                  Energy Harbor Nuclear Corp.
{{#Wiki_filter:}}
                                                                            /68 E. Market Street Akron, Ohio 44308 Darin M. Benyak                                                                  330-436-1380 Senior Vice President. Fleet Nuclear Operations March 11, 2021 L-21-064                                                          10 CFR 72.48 ATTN: Document Control Desk Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
 
Davis-Besse Nuclear Power Station Part 50 Docket No. 50-346, License No. NPF-3 Part 72 Docket No. 72-014 Perry Nuclear Power Plant Part 50 Docket No. 50-440, License No. NPF-58 Part 72 Docket No. 72-069 Independent Spent Fuel Storage Installation Changes. Tests. and Experiments Pursuant to 10 CFR 72.48(d)(2), this letter serves as the Energy Harbor Nuclear Corp .
summary report of the changes, tests, and experiments associated with the Davis-Besse Nuclear Power Station (DBNPS) and the Perry Nuclear Power Plant (PNPP) independent spent fuel storage installations (ISFSls).
There were no 10 CFR 72.48 evaluations conducted to implement changes, tests, and experiments to the DBNPS and PNPP ISFSls during the reporting period of January 1, 2019 through December 31, 2020.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.
i::V\l Darin M. Beny~
L cc:    NRC Region Ill Administrator NRC Project Manager NRC Resident Inspectors Utility Radiological Safety Board}}

Revision as of 00:58, 18 January 2022

and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes. Tests. and Experiments
ML21070A364
Person / Time
Site: Davis Besse, Perry, 07200069  Cleveland Electric icon.png
Issue date: 03/11/2021
From: Benyak D
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-21-064
Download: ML21070A364 (1)


Text