ML20141G870: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20141G870
| number = ML20141G870
| issue date = 05/20/1997
| issue date = 05/20/1997
| title = Ack Receipt of 970417 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 15000004/96-17
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 15000004/96-17
| author name = Scarano R
| author name = Scarano R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 15000004-96-17, EA-97-037, EA-97-37, NUDOCS 9705230044
| document report number = 15000004-96-17, EA-97-037, EA-97-37, NUDOCS 9705230044
| title reference date = 04-17-1997
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 11:47, 12 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 15000004/96-17
ML20141G870
Person / Time
Site: 15000004
Issue date: 05/20/1997
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ballard R
CONSTRUCTION TESTING ENGINEERS
References
15000004-96-17, EA-97-037, EA-97-37, NUDOCS 9705230044
Download: ML20141G870 (2)


See also: IR 015000004/1996017

Text

- . - . . . . . . . . ..

'.-

-

i

l

3 58 "' C UNITED STATES

.,#(,  %,$

% NUCLEAR REGULATORY COMMISSION ,

..-

REGION IV

  • A , t

3s 4- 611 RY AN PLAZA DRIVE, SUITE 400

%#

%

9.....[ AR LINGTON, T EXAS 76011 8064

May 20, 1997

>

k

EA 97-037

Mr. Rodney D. Ballard, Vice President

Construction Testing & Engineering, Inc.

2414 Vineyard Ave, Suite G

Escondido, California 92029

SUBJECT: NRC INSPECTION REPORT 150-00004/96-17 AND NOTICE OF VIOLATION

Dear Mr. Ballard:

J

Thank you for your letter dated April 17,1997,in response to our letter and Notice '

of Violation dated March 17,1997. We have reviewed your reply and find it responsive to

,

the concerns raised in our Notice of Violation. We will review the implementation of your

corrective actions during a future inspection to determine that full compliance has been

achieved and will be maintained.

Sincerely,

.

I

oss A. Scarano, Director

Division of Nuclear Materials Safety  !

Docket No.: 150-00004

License No.: California 5309-80

cc: State of California Radiation Control Program Director

\ l

1

~

i

'

9705230044 970520 l

PDR STPRC ESOCA

PDR -

kk kkfk ,

ww

_ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ - _ _ _ - _ _ _ _ - - - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - _ - _ _ _ - _ _ _ _ _ _ - - _ _ _ _ . . _ _ _ _ _ _ _ .

.

i

.

!

' Construction Testing & Engineering, Inc. -2-

E-Mail copy of Report to Document Control Desk (DOCDESK)

bec to DMB (IEO7)

bec distrib. by RIV:

Regional Administrator

JEDyer

JLieberman, OE (0-7H5)

DACool, NMSS (T-8FS)

PKHolahan, NMSS (T-8F5)

GFSanborn I

WLBrown

CLCain

LLHowell

. FAWenslawski

KPrendergast

DBSpitzberg

MCHernandez 12)

NMi&FC\DB

MIS System

RIV 241 File - 5th Floor >

WCFO Materials File (2)

i

DOCUMENT NAME: G:\CTE.THK

To receive copy of document. Indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = N,o copy

_

l RIV:WCFO:MB C:NMi&FC/DB EO ff3M ADD:DNMb D:DNMjV

KMPrendergast BSpitzbergW- GF$atifiorn LLHowel@/ RASegrano i

05/ /97 05/f97 05$97 05/1497(/ D 05/ /97 l

/

OFFICIAL RECORD COPY  :

l .

1

-

i

l l

L l

.x.-.-...- . . . - ~ . - - . _ . - - - . . - ~ . . . . ~ . - . . - . _ _ . . . - - - - . _ - . . . . . . - . . . ~ . . . - .

t

1:..  ?

>-

,

l

l4 1

l

Construction Testing & Engineering, Inc. -2-  !

..  !

i1

E-Mail copy of Report to Document Control Desk (DOCDESK)' ,

!

)

bec to DMB (IE07)

]

[ 'bec distrib by RIV:

,

! Reg;onal Administrator ,

l JEDyer

' ]

JLieberman, OE (0-7H5)

' DACool, NMSS (T-8F5)

PKHolahan, NMSS (T-8F5)

GFSanborn

WLBrown

CLCain

LLHowell

FAWenslawcki

KPrendergast

DBSpitzberg

i MCHernandez (2)

NMi&FC\DB

MIS System

RIV 241 File - 5th Floor

WCFO Materials File (2)

L

i

l

l

!

i

DOCUMENT NAME: G:\CTE.THK

To voceive copy of document, indicate in box: "C" = Copy wthout enclosures "E" n Copy wth enclosures *N" = No copy

_

RIV:WCFO:MB l C:NMi&FC/DB EO @ ADD.DNMShj D:DNMjV

i Kh'.-rendergast BSpitzbergp GFSatifiorn LLHowelV@ RASegrano  ;

05/ /97 05/f97 05$97 05/2A97(/ D 05f//97 l

! / .l

l OFFICIAL RECORD COPY

!

. . . -

. . -

. . . --. ._. . -.

.

.

-

.L Eo7

l' #

a (ONSTRUCTION DTING & ENGINEERING,INC.

l

qh ,

SAN DIEGo, CA . RDT.RSIDE, CA . )T_YrURA, CA . MoDESTo, CA . lANCASTER, CA . IAS VEGAS NY SEATTLI, WA

c v 2414 Vuneyard Ave. 490 E. Pnncrimi Ct. 1695 Pacific Ave 3540 Oddale M 4215610th St T 4560 i Valley Vev 235 LW. 4ist SL

jA7 9? Sete G Smte 7 Sete 105 Saite A2 Unit K Suite A3 tenton,TA 98055

Escondalo, G 92029 Corona G 91719 0xad,G 93033 Modesto. G 95357 bucaster.G 93534 hs Vegas, NV 89103 (206) 6%1266

'[

l

(619) 7464955 (909) 371 1890 (805) 4866475 (209) 551127f (805) 726 % 76 (702) 795 1278 (206) 6%1265 ra

' ENGINEERING, INC. (619) 74G9806 ru (909) 3712168 ra (805) 4869016 ra (209) 5513593 to (805) 726%76 ru (702) 7244485 ra

m.w,

'

April 17,1997 h~p

APR?9 99', d

7

UNITED STATES NUCLEAR

REGULATORY COMMISSION ' '  !

ATT.: Document Control Desk

Washington, DC 20555

SUBJECT: Reply to Notice of Violation

Docket No: 030-34317

License No. 04-29106-01

EA 97-037

To Whom It May Concern:

The following is Constmetion Testing and Engineering's response to the noted violations during an

NRC Inspection conducted on December 11,1996.

The violations as noted on the attached Notice of Violation, Enclosure 1, consisted of the following:

A. 10 CFR 30.3 required, in part. that except for persons exempted, no person shall possess or

use byproduct material except as authorized by a specific or general license issued pursuant

to Title 10. Chapter 1, Code of Federal Regulations.

Contrary to the above, from January 2, to May 31,1996, Construction Testing &

Engineering, Inc. (CTE) possessed and used byproduct material in areas under exclusive

federal jurisdiction within an Agreement State without a valid NRC license and was not

exempted from the requirement for a license. (01013)

This is a Severity Level Ill violation (Supplement VI).

B. 10 CFR 30.9(a) required in part, that information provided to the commission by a licensee

i

be complete and accurate in all material respects.

Contrary to the above, the licensee provided information to the Commission that was not

! complete and accurate in all material respects. Specifically, on October 16,1997 and

December 12. 1997, CTE provided information that was incomplete regarding CTEN

activities insolving use of byproduct materials in areas of exclusive federal jurisdiction

without a valid NRC license. This information was material because it involved use of

- Q-7f>'l9iD h W2- 'h> D

. _ . - -. -. - -- . - - - . - .~ - - - . - - . - .

'

l

l

-

,

.

..

!

United States nuclear Regulatory Commission i

Attn: Document Control Desk  !

Reply to Notice of Violation i

April 17.1997 Page 2  !

l

byproduct material requiring an NRC license. (02014)

,

)

-This is a Severity Level IV violation (Supplement VII).

'

!

l

RESPONSE TO VIOLATIONS I

Violation A _

f 1. Reason'for the Violation. l

l In a previous response prepared by CTE dated February 25, Enclosure 2, CTE fully admitted

'

to the violation. The infmetion occurred due to an administrative oversight of filing of NRC

l

Form 241. This oversight resulted in CTE being out of compliance from January through  ;

May 1996. . Once the oversight was detected CTE applied for, paid for, and obtained the i

! NRC Form 241.

l

2 13. Corrective Steos That Have Been Taken.

To prevent reoccurrence of this administrative oversight, CTE has applied for and obtained

a separate NRC General License (License #04-29106-01)

4. Required Period to Bring Firm into Comoliance, j

CTE obtained the General License on December 31,1996 for the 1997 year and therefoie

are currently in compliance. CTE will continue to renew the General NRC License until

. such time CTE no longer utilizes the radioactive sources on Federaljurisdiction properties.

Violation B {

l

1. Reason for Violation.

As stated in Enclosure 2. CTE fully admitted to unintentionally providing incomplete  !'

information regarding site visitations to Federal Jurisdiction properties during 1996 ca!endar

year. The infraction, as described in the February 25,1997 response, occurred due to the  !

vast information requiring review to compile the requested information, i.e., from all six of

CTE offices, and CTE's hurried attempt to provide the inspector with the information as

soon as possible. Again, as described in Enclosure 2, the infraction was unintentional.

J

l 213. Corrective Stens That Have Been Takeit.

I

To prevent any inaccurate ieporting to occur in the future, CTE has dedicated an individual

to be RSO and provided him with adequate time each day to accomplish the RSO duties.

The dedication of this individual occurred in January 1997.

, . .- .- .- ._

~ _ - _.

l

l *

I

!.

l U.S. Nuclear Regulatory Comrnission

l Subject: Reply to Notice of Violation

l April 17,1997 Page 3

4. Reauired Period to Brine Firm into Comnliance.

l , . . .

.

..-- ,

l CTE is currently in full reponing compliance with the NRC. Open communications between

l the NRC area inspector and CTE RSO are ongoing. CTE 'will contact the NRC area

inspector periodically to inform him of progress on our Radiation Safety Program.

Ifyou have additional questions regarding this response, please do not hesitate to contract this office.

l

Respectfully submitted,

CONSTRUCTION TESTING & ENGINEERING, INC.

l

l

r

odney D. Ballard

l Vice President

cc: Regional Administration Region IV

, 611 Ryan Plaza Dri e, Suite 400

!

Arlington, TX 760,I

i

l Region IV Walnut Creek Field Office

1450 Maria Lane

Walnut Creek. CA 94596

l

,

!

l

(' PRuit f ikt E TTERMBALL ARiy&Tp 41 WPD

_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _