. . . . , . . ~ _ - . . ~ ~ - ~ . . ~. _ - . . . . . . . . - - . . , - . - . . . . - .
b 1
.
.
,
t >" 8 8 %4 UNITED STATES
- .,% 4 NUCLEAR REGULATORY COMMISSION
REGloN IV
,
- ? ' , 4
t
611 RYAN PLAZA DRIVE, SUITE 400
,
$
9.....[ AR LINGToN. TEXAS 76011 8064
March 11, 1997
EA 97 037
Mr. Rodney D. Ballard, Vice President
Construction Testing & Engineering, Inc.
2414 Vineyard Ave, Suite G
Escondido, California 92029
SUBJECT: RESPONSE TO NOTICE OF VIOLATION
(NRC INSPECTION REPORT 150-00004/96-17) ,
Dear Mr. Ballard:
Thank you for your letter dated February 25,1997,in response to our letter and Notice of
Violation dated February 11,1997. We have reviewed your reply and find it responsive to
the concerns raised in our Notice of Violation. We will review the implementation of your
corrective actions during a future inspection to determine that full compliance has been
achieved and will be maintained. ;
I
We will respond to the information provided during the predecisional enforcement
'
conference held on February 26,1997, regarding the apparent violations described in the '
subject inspection report by separate correspondence.
Sincerely,
.
Linda L. Howell, Chief
Nuclear Materials inspection
and Fuel Cycle / Decommissioning Branch
Docket: 150-00004
License: California 5309-80
cc: California Radiation Control Program Director
9703170145 970311
PDR STPRG ESGCA
Sw% ###8PPPPP!8 l
. . . . _ _ _ __ _ _ _ . _ . . _ _ . _
.
, .g
Construction Testing & -2-
Engineering, Inc. j
bec:
E-Mail report to Document Control Desk (DOCDESK)
l
l
bec to DCD (IEO7) ~
1
bec distrib. by RIV: l
RIV Regional Administrator
GFSanborn
WLBrown
JJHolonich, NMSS (T-7J9)
CLCain
LLHowell
FAWenslawski
KMPrendergast
DBSpitzberg
MCHernandez (2)
NMi&FC\DB
MIS System
WCFO (Reciprocity File)
241 File - 5th floor
e-mail dist. by RIV:
OEMAIL
DOCUMENT NAME: G:\CTE.TL3
To receive copy of document. Indicate in box: "C" Copy without enclosures "E" = Copy with enclosures "N" = No copy
MB:WCF0 / C:NMI&FC/DEfp - -
l l l
KMPrendergast&r _ , , LLI:owell g(
03/07/97.-gefW * 03/fo /9n 1
W FICIAI_ RECORD COPY
. .. . .. . - _ . . - - - . . .
s
.
Construction Testing & -2-
Engineering, Inc.
bec:
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE07)
bec distrib. by RIV:
RIV Regional Administrator
GFSanborn
WLBrown
JJHolonich, NMSS (T-7J9)
CLCain
LLHowell-
FAWenslawski
KMPrendergast
- DBSpitzberg
MCHernandez (2)
NMi&FC\DB
MIS System
WCFO (Reciprocity File)
241 File - 5th floor
e-mail dist. by RIV:
OEMAll
i
i
!
!
DOCUMENT NAME: G:\CTE.TL3
To receive copy of document, Indicate in box: "C" Copy weout enclosures "E" = Copy with enclosures "N" = No copy
MB:WCF0 i C:NMI&FC/DEfp - -
l l l
'
KMPrendergast{L LLHowel1 g:
03/07/9kmpC * 03/10 /9G l
W FICIA'.. RECORD COPY ;
l
I
l
- .'
~ ~ ^
J
. 3ho7
,
,
ONSTRUCTION DTING & ENGINEERING,INC.
I.f SAN DIEGO, CA RIVERSIDE, CA . VFNTURA, CA . MODESTo,CA IANCAfrER,CA IAS VEGAS,NV SEATTIA WA
O 2414 Vineyard Ave.
,
3 9? Suite G
490 L Pnnceland Ct.
Suite 7
1645 Paanc Ave.
Sune 105
3540 Oakdale Rd.
Sune A2
4215610th St W.
Unn K
4560i VaBey View 235 SW 41st SL
Suite A3
i
l
tenten. TA 98055
Escondulo, CA92029 Corona.CA91719 0xnant CA 93033 Modesto,CA 95357 Lancaster,CA 93534 tas Vegas, NV 89103 (206) 6561266
'
jd (619) 7 4 4955 (909) 371 1890 (805) 4866475 (209) 551 2271 (805)7269676 (702) 795 2278 (206) 6561265 au
l '
ENGINEERING,1NC. (6i9) 7469806 ru (909) 37I 2168 ru (805) 4869016 ru (209) 5513593 ru (805) 7269676 ru (702) 7264485 ru
. . . . - _
February 25,1997 h'h,Ik
'"
O 0 f4 Q
t
UNITED STATES NUCLEAR -
M4i- 3W (j U) d[
REGULATORY COMMISSION .
~
ATT.: Document Control Desk '
hEGION N
Washington, DC 20555 '
- - - ----
. _ J
SUBJECT: Reply to Notice of Violation ,
Docket No: 150-800004
License W. CA 5309-80
To Whom It May Concern:
The following is Construction Testing and Engineering's response to the noted violations during an
NRC Inspection conducted on December 11,1996.
The violation noted consists of, as CTE understands it, the requirement to provide Hazmat Training ,
to all employees who transport licensed material on public highways or who deliver licensed l
material in accordance with 49CFR 172. l
l
1. Reason for the Violation. i
Our response to the violation is that CTE was not in compliance with the requirements and j
'
were unaware of the extensive Hazmat training that was required for CTE personnel. All
CTE personnel who have transported licensed material have taken an 8-hour course on
nuclear gauge safety which included safety instruction, labeling and notification
requirements when transporting the licensed materials.
213. Corrective Stens That Have Been Taken. l
Upon notification of the violation CTE's Radiation Safety Officer researched the
requirements and based on his review the following is required to comply with 49CFR172:
Each Hazmat Employer must:
. Train and test; l
. Certify: and
. Develop and retain records of current training for each Hazmat employee. !
Offf }{'] Q
GEOTECIINICAL AND CONSTRUCTION ENGINEERING TESTING AND INSPECTION
- .
.
i
'
U.S. Nuclear Regulatory Commission
Subject: Reply to Notice of Violation
February,25,1997 Page 2
Hazmat Training must include:
l
-
General Awareness / Familiarization
.
Function specific
. Safety
.
Driver Training
.
i
Frequency of Training:
.
Initial training must be completed within 90 days.
.
Retraining every two years.
To fulfill the requirements as set forth above, CTE has ordered and obtained a copy of l
" Awareness for Initial Response to Hazardous Materials" from the Department of
Transportation. These materials will satisfy the general awareness / familiarization
requirements. To fulfill the remainder of the requirements, the Radiation Safety Officer, I
(Mr. Ramzi Jamma) will attend a Department of Transportation course " Instruction Training l
'
Hazardous Materials Transportation" The next course is scheduled for May 20-22,1997.
At the completion of the course Mr. Jamma will be given the DOT Hazardous Materials i
Transportation Training Modules. These modules will be used by Mr. Jamma to train all
l
other employees. i
4. Reouired Period to Brine Firm into Comoliance.
CTE will begin training immediately by requiring all affected employees to view DOT's
" Awareness for Initial Response to Hazardous Materials" and will conduct training to fulfill l
the function specific, safety and driver training requirements. Each employee will be tested l
and certified within a period of 60 days. l
In addition. upon Mr. Jamma's completion of the DOT training in May all affected l
employees will be required to view and be tested on the DOT Hazardous Materials
Transportation Training Modules. It is expected that this additional training will be
completed 30 days after completion of the course.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
Acknowledged by:
, -inn
Ramzi)arnm,a
Radiation Safety Officer 4<-
Rod Bahard
Vice President
..
- , .p.
_.
' 4, .
U.S. Nuclear Regulatory Commission
Subject: Reply to Notice ~of Violation
February,25,1997 Page 3 -
'cc: Regional Administration Region IV
611 Ryan Plaza Drive, Suite 400
Arlington, TX 76011
Region IV Walnut Creek Field Office
1450 Maria Lane
Walnut Creek, CA 94596 -
I
C PROJECT 5;LET11R$BALLARDtTR20 % PD