i B. OPERATING DATA REPORT DOCKET NO.:    050-453                  !
UNIT:    Byron Two                '
DATE:    03/10/88 COMPILED BY:      D. J. Spitzer            ;
TELEPHONE:      (815)234-5441 x2023 OPERATING STATUS l
: 1. Reporting Period:  February 1988. Gross Hours: 696                                      !
                                                                                                          )
: 2. Currently Authorised Power Level (MWt): 3411                                            i Design Electrical Rating: 1175 (MWe-gross)                                              !
Design Electrical Rating: 1120 (MWe-net)                                                1 Max Dependable Capacity (MWe-net): NOT DETERMINED l
: 3. Poder Level to Which Restricted (If Any): 1055 (Mwe-net)                                l 1
: 4. Reasons for Restriction (If Any):    Steam Generator Split Flow (65 MW)                  i l
THIS MONTH YR TO DATE CUMULATIVE *            !
: 5. Report Period Hrn.                              696          1440          4633
: 6. Rx Critical Hours                                681.6        1425.6        3754.8
: 7. Rx Reserve Shutdown Hours                          0              0            0
: 8. Hours Generator on Line                          601.3        1345.1      3625.5
: 9. Unit Reserve Shutdown Hours                        0              0            0
: 10. Gross Thermal Energy (MWH)                  1765813        3569270    10041434        I
: 11. Gross Elec. Energy (MWH)                      577812        1183030      3287;41        l 1
: 12. Het Elec. Energy (MWH)                        S43279        1109986      3080887 I
l
: 13. Reactor Service Factor                            98              99            81 l
: 14. Reactor Availatility Factor                        98              99            81
: 15. Unit Service Factor                                86.4            93.4          78.3
: 16. Unit Availability Factor                          86.4            93.4          78.3
: 17. Unit Capacity Factor (MDC net)                    N/A            N/A          N/A
: 18. Unit Capacity Facter (DER net)                    69.7            68.8          59.4    .
: 19. Unit Forced Outage Hrs.                            25.2            25.2        313.2 l
1
: 20. Unit Forced Outage Rate                            4              1.8 1
7.9
: 21. Sh \ downs Sch' aled Over Next 6 Months:
: 22. If Shutdown at End of Report Period, Estimated Date of Startups        3/3/88            I
: 23. Units in Test Statub (Prior to Commercial Operation): None                        -
* Note - The cumulative numbers do not reflect power generated 7 'ar to commerc Al      8 service.
1 (0625N/0062M-16) 4 h!k    knob R
 
Csport Period February, 1988                    UNIT SHUTDOWNS / REDUCTIONS
* BYRON *
(UNIT 2)                                                                                        **************************
re. __Ilate___ Iype 5kour.s Benson Method LER_ Number System Component                                                          __Cause & Correctite Action to Prevent Recurrence
: 3. 02/06/88 S                A      5                  CW                                            Reduced load to allow for 2A CW box cleaning.
: 4. 02/'2/88 F      25.2    A      3    6-2-88-26      FW    2C FW Pp 20 Feedwater pump tripped - attempts to maintain SG level by running back the turbine failed.
: 5. 02/27/88 5      69.7    A      1                  EH                                          Took Unit 2 turbine off line to troubleshoot and repair EH system low pressure. Reactor at 12*. power.
4 cocoooce*******
O    Summary    *
; ocooc*    e*******
  "DfPE                  Reason                                  Me.thod                                                                                                                      System & Component F-Forc;d                A-Equip Failure F-Admin                  1-Manual                                                                                                                    Exhibit F & H S-Sch2d                B-Maint or Test G-Oper Error            2-Manual Scram                                                                                                                Instructions for C-Refueling        H-Other              3-Auto Scram                                                                                                                Preparation of D-Regulatory Restriction                4-Continued                                                                                                                Data Entry Sheet i                        E-Operator Training                      5-Reduced Load                                                                                                              Licensee Event Report
                            & License Examination                9-Other                                                                                                                      (LER) File (NUREG-0161) 1 l
4
:(0625M/0062M-17)
_ - _ _ _ - _ _ _ - _ _ - - _ . - - _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ - _ _ _ - - _ _ - - - _ _ - - _ _ _ _}}

Latest revision as of 17:17, 17 December 2020

Monthly Operating Data Repts for Feb 1988 for Byron Station, Units 1 & 2
ML20155E537
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/28/1988
From: Spitzer D
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20154J380 List:
References
NUDOCS 8806160135
Download: ML20155E537 (2)


Text

.  !

i B. OPERATING DATA REPORT DOCKET NO.: 050-453  !

UNIT: Byron Two '

DATE: 03/10/88 COMPILED BY: D. J. Spitzer  ;

TELEPHONE: (815)234-5441 x2023 OPERATING STATUS l

1. Reporting Period: February 1988. Gross Hours: 696  !

)

2. Currently Authorised Power Level (MWt): 3411 i Design Electrical Rating: 1175 (MWe-gross)  !

Design Electrical Rating: 1120 (MWe-net) 1 Max Dependable Capacity (MWe-net): NOT DETERMINED l

3. Poder Level to Which Restricted (If Any): 1055 (Mwe-net) l 1
4. Reasons for Restriction (If Any): Steam Generator Split Flow (65 MW) i l

THIS MONTH YR TO DATE CUMULATIVE *  !

5. Report Period Hrn. 696 1440 4633
6. Rx Critical Hours 681.6 1425.6 3754.8
7. Rx Reserve Shutdown Hours 0 0 0
8. Hours Generator on Line 601.3 1345.1 3625.5
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal Energy (MWH) 1765813 3569270 10041434 I
11. Gross Elec. Energy (MWH) 577812 1183030 3287;41 l 1
12. Het Elec. Energy (MWH) S43279 1109986 3080887 I

l

13. Reactor Service Factor 98 99 81 l
14. Reactor Availatility Factor 98 99 81
15. Unit Service Factor 86.4 93.4 78.3
16. Unit Availability Factor 86.4 93.4 78.3
17. Unit Capacity Factor (MDC net) N/A N/A N/A
18. Unit Capacity Facter (DER net) 69.7 68.8 59.4 .
19. Unit Forced Outage Hrs. 25.2 25.2 313.2 l

1

20. Unit Forced Outage Rate 4 1.8 1

7.9

21. Sh \ downs Sch' aled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startups 3/3/88 I
23. Units in Test Statub (Prior to Commercial Operation): None -
  • Note - The cumulative numbers do not reflect power generated 7 'ar to commerc Al 8 service.

1 (0625N/0062M-16) 4 h!k knob R

Csport Period February, 1988 UNIT SHUTDOWNS / REDUCTIONS

  • BYRON *

(UNIT 2) **************************

re. __Ilate___ Iype 5kour.s Benson Method LER_ Number System Component __Cause & Correctite Action to Prevent Recurrence

3. 02/06/88 S A 5 CW Reduced load to allow for 2A CW box cleaning.
4. 02/'2/88 F 25.2 A 3 6-2-88-26 FW 2C FW Pp 20 Feedwater pump tripped - attempts to maintain SG level by running back the turbine failed.
5. 02/27/88 5 69.7 A 1 EH Took Unit 2 turbine off line to troubleshoot and repair EH system low pressure. Reactor at 12*. power.

4 cocoooce*******

O Summary *

ocooc* e*******

"DfPE Reason Me.thod System & Component F-Forc;d A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sch2d B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet i E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161) 1 l

4

(0625M/0062M-17)

_ - _ _ _ - _ _ _ - _ _ - - _ . - - _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ - _ _ _ - - _ _ - - - _ _ - - _ _ _ _