ML20134N063

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1
ML20134N063
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/31/1996
From: Vogl J
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20134N048 List:
References
NUDOCS 9611260151
Download: ML20134N063 (1)


Text

B .- OPERATING DATA REPORT UNIT ONE DOCKET NO . 050-454 UNIT: Byron One DATE: 08/07/96 COMPILED BY: J. Vogl TELEPHONE: (815)234-5441 x2282 OPERATING STATUS

1. Reporting Period: July, 1996 Gross Hours: 744 I
2. Currently Authorized Power Level: 3411 (MWt) '

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 13."20 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any) . None
4. Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE *
5. Report Period Hrs. 744 5,111 95,328
6. Rx Critical Hours 735.2 3,023.7 78,243.0 l
7. Rx Reserve Shutdown Hours 0 0 38 ,
8. Hours Generator on Line 672.2 2,954.3 77,453.9
9. Unit Reserve Shutdown Hours 0 0 0
  • 10. Gross Thermal Energy (MWH) 1,669,483 9,188,664.8 236,953,619.8
11. Gross Elec. Energy (MWH) 554,592 3,118,437 80,174,695
12. Net Elec. Energy (MWH) 521,160 2,942,915 75,995,375
13. Reactor Service Factor 98.82 59.16 82.08
14. Reactor Availability Factor 98.82 59.16 82.12
15. Unit Service Factor 90.35 57.80 81.25
16. Unit Availability Factor 90.35 57.80 81.25
17. Unit Capacity Factor (MDC net) 63.39 52.11 72.14
18. Unit Capacity Factor (DER net) 62.54 51.41 71.18
19. Unit Forced Outage Hrs. 0 0 1,794.5
20. Unit Forced Outage Rate 0 0 2.26
21. Shutdowns Scheduled Over Next 6 Months: None
22. If Shutdown at End of Report Period, Estimated Date of Startup: None
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

9611260151 961108 PDR ADOCK 05000454 mm,,, . f,.DR