B.- OPERATING DATA REPORT UNIT ONE DOCKET NO.
050-454 UNIT: Byron One DATE:
08/07/96 COMPILED BY:
J. Vogl TELEPHONE: (815)234-5441 x2282 OPERATING STATUS 1.
Reporting Period: July, 1996 Gross Hours:
744 I
2.
Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 13."20 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net) 3.
Power Level to Which Restricted (If Any). None 4.
Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
744 5,111 95,328 6.
Rx Critical Hours 735.2 3,023.7 78,243.0 l
7.
Rx Reserve Shutdown Hours 0
0 38 8.
Hours Generator on Line 672.2 2,954.3 77,453.9 9.
Unit Reserve Shutdown Hours 0
0 0
- 10.
Gross Thermal Energy (MWH) 1,669,483 9,188,664.8 236,953,619.8
- 11. Gross Elec. Energy (MWH) 554,592 3,118,437 80,174,695
- 12. Net Elec. Energy (MWH) 521,160 2,942,915 75,995,375
- 13. Reactor Service Factor 98.82 59.16 82.08
- 14. Reactor Availability Factor 98.82 59.16 82.12
- 15. Unit Service Factor 90.35 57.80 81.25
- 16. Unit Availability Factor 90.35 57.80 81.25
- 17. Unit Capacity Factor (MDC net) 63.39 52.11 72.14
- 18. Unit Capacity Factor (DER net) 62.54 51.41 71.18
- 19. Unit Forced Outage Hrs.
0 0
1,794.5
- 20. Unit Forced Outage Rate 0
0 2.26
- 21. Shutdowns Scheduled Over Next 6 Months: None
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.