ML20141C313
| ML20141C313 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 02/28/1997 |
| From: | Vogl J COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20141C301 | List: |
| References | |
| NUDOCS 9706250102 | |
| Download: ML20141C313 (2) | |
Text
1 s
B.
OPERATING DATA REPORT UNIT ONE DOCKET NO.-
050-454 UNIT: Byron One DATE:
03/10/97 COMPILED BY:
J. Vogl TELEPHONE:
(815)234-5441 x2282 I
OPERATING STATUS 1.
Reporting Period: February, 1997 Gross Hours:
672 1
2.
Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net) 3.
Power Level to Which Restricted (If Any) : None 4.
Reasons for Restriction (If Any) ;
N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Mrs.
672 1416 100,417 6.
Rx Critical Hours 323.9 1067.9 82,953.4 7.
Rx Reserve Shutdown Hours 0
0 38 8.
Hours Generator on Line 323.1 1067.1 82,155.1 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 1,036,750 3,485,016 252,304,286.8
- 11. Gross Elec. Energy (MWH) 362,346 1,209,849 85,474,870
- 12. Net Elec. Energy (MWH) 339,781 1,148,007 81,052,762
- 13. Reactor Service Factor 48.20 75.42 82.61
)
- 14. Reactor Availability Factor 48.20 75.42 82.65
- 15. Unit Service Factor 48.08 75.36 81.81
- 16. Unit Availability Factor 48.08 75.36 81.81
- 17. Unit Capacity Factor (MDC net) 45.76 73.37 73.05
- 18. Unit Capacity Factor (DER net) 45.15 72.39 72.07
- 19. Unit Forced Outage Hrs.
0 0
1,833.4
- 20. Unit Forced Outage Rate 0
0 2.18
- 21. Shutdowns Scheduled Over Next 6 Months: None
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 3/05/97
- 23. Units in Test Status (Prior to Commercial Operation). None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(p:\\97byltrs\\970046.wpf\\4) 9706250102 970611 PDR ADOCK 050004 4 R
Y e?"
BYRON Report Period: February, 1997 UNIT SHUTDOWNS / REDUCTIONS (UNIT 1)
No.
Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 1
2/14/97 S 348.56 B
1 SX RCFC Cooling Coils - RCFC Repairs co*************
o Summary oo*************
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F&H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161) t i
(p: \\ 97bylt rs\\ 97 00 4 6.wpf \\ 6) tp:\\97byrltrs\\970134.wpt-16)
.