Text
.... -
\\
,IB.- OPERATING DATA REPORT UNIT ONE DOCKET NO.:
050-454 UNIT: Byron One l
DATE:
05/13/97 COMPILED BY:
J. Vogl TELEPHONE:
(815)234-5441 l
x2282 l
OPERATING STATUS i
1.
Reporting Period: April, 1997 Gross Hours:
719 2.
Currently Authorized Power Level: 3411 (MWt)
' Design Electrical Ratirg: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
' Max Dependable Capacity: 1105~(MWe-net) 3.
Power Level to Which ' Restricted (If Any) : None-l 4.
Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
719 2,879 101,880 6.
Rx Critical Hours 719 2,421.8 84,307.3 1
7.
Rx Reserve Shutdown Hours 0
0 38 8.
Hours Generator on Line 719 2,415 83,503 l
9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 2,376,249 7,823,890 256,643,160.8
)
- 11. Gross Elec. Energy (MWH) 822,140 2,709,537 86,974,558
- 12. Net Elec. Energy (MWH) 784,507 2,574,285 82,479,040 4
- 13. Reactor Service Factor 100 84.12 82.75
- 14. Reactor Availability Factor 100 84.12 82.79 j
- 15. Unit Service Factor 100 83.88 81.96
- 16. Unit Availability Factor 100 83.88 81.96
- 17. Unit _ Capacity Factor-(MDC net) 98.74 80.92 73.26 18 Unit Capacity Factor (DER net) 97.42 79.84 72.28
- 19. Unit Forced Outage Hrs.
0 0
1,833.4
- 20. Unit Forced Outage Rate 0
0 2.15 I
- 21. Shutdowns Scheduled Over Next 6 Months: B1R08
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation): None l
?
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(p \\97byltrs\\970109.wpf\\4) l l
9706250114 970611 PDR ADOCK 05000454 l
R PDR (pr \\ 94yrlt rs\\ 970134.wp f-18) e n
--4,-,,
\\
?-
.s.
B.
OPERATING DATA REPORT UNIT TWO DOCKET NO..
050-455 j
UNIT:
Byron Two DATE:
05/13/97 i
COMPILED BY:
J. Vogl TELEPHONE:
(815)234-5441 x2282 OPERATING STATUS 1.
Reporting Period: April, 1997.
Gross Hours:
719 2.
Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net) 3.
Power Level to whicn Restricted (If Any). None 4.
Reasons for Restriction (If Any): N/A l
l THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
719 2,879 84,984 6.
Rx Critical Hours 719 2,768.3 74,291 l
7.
Rx Reserve Shutdown Hours 0
0 0
8.
Hours Generator on Line 719 2,742.1 73,588.7 l
9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (HWH) 2,444,797 9,020,666 222,883,140.6
- 11. Gross Elec. Energy (MWH) 842,302 3,101,559 76,002,048
- 12. Net Elec. Energy (MWH) 807,583 2,965,265 72,257,236
- 13. Reactor Service Factor 100 96.15 87.42
- 14. Reactor Availability Factor 100 96.15 87.42 l
- 15. Unit Service Factor 100 95.24 86.59
- 16. Unit Availability Factor 100 95.25 86.59
- 17. Unit Capacity Factor (KDC net) 101.65 93.21 76.95
- 18. Unit Capacity Factor (DER net) 100.29 91.96 75.91
- 19. Unit Forced Outage Hrs.
0 0
1,815.4
- 20. Unit Forced Outage Rate 0
0 2.41
- 21. Shutdowns Scheduled Over Next 6 Months: None
- 22. If Shutdown at End of Report Period, Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation):
None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(p: \\ 97bylt rs\\ 97 00109.wp f \\ 10 )
(p \\97byritrs\\970134.wpf-19)