Commonwealth 1:dison Company ily ren Generating Station 4150 North German Chun.h Road

', Ily ron, IL 610ltF979 i Tel Hi S-2M5 i 11 July 11, 1996 LTR: BYRON 96-0197 i FILE: 2.7.200 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Enclosed for your information is the Monthly Performance Report j covering Byron Nuclear Power Station for the period 1 June 1 through June 30, 1996.

Sincerely, K. L. Kofron Station Manager Byron Nuclear Power Station KLK/JV/mn 1

cc: H.J. Miller, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nucler.r Safety Regulatory Services Manager Nuclear Fuel Services, PWR Plant Support INPO Records Center G.F. Dick, Jr. - USNRC F. Yost - Utility Data Institute, Inc. l 9607160155 960630 PDR R ADOCK 05000454

. _ PDR (p:\%byritrs\960197wpfc71096\l)

A 1'nicom (nmpany

1 .

1 I

BYRON NUCLEAR POWER S'l ATION UNIT 1 AND UNIT 2 MONTHLY PERFGRMANCE RE? ORT l

COMMONWEALTH EDISON COMPANY I I

NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 I i

i LICENSE NO. NPF-37 LICENSE NO. NPF-66 1

i l

i (p:\96byW , J#4197wpf471096\2) t

l l

I. Monthly Report for Byron UNIT 1 for the month of June, 1996 A. Summary of Operatino Exrerience for Unit 1 The Unit began this reporting period in Mode 5 (Cold Shutdown).

l 1

(p:\%byrttn\960197wpfD71096\3)

.- . ..- - . . . -- . - ~ , - . .. . __

B. OPERATING DATA REPORT UNIT ONE DOCKET NO.:

050-454 UNIT: Byron One DATE: 07/10/96 COMPILED BY: J. Vogl TELEPHONE: (815)234-5441 x2282 OPERATING STATUS

1. Reporting Period: June, 1996 Gross Hours: 720
2. Currently Authorized Power Level: 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any) : None
4. Reasons for Restriction (If Any) : N/A d

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 720 4,367 94,584
6. Rx Critical Hours 6.2 2,288.5 77,507.8
7. Rx Reserve Shutdown Hours 0 0 38
8. Hours Generator on Line 0 2,282.1 76,781.7
9. Unit Reserve Shutdown Hours 0 0 0
  • 10. Gross Thermal Energy (MWH) 0 7,519,181.8 235,284,136.8
11. Gross Elec. Energy (MWH) 0 2,563,845 79,620,103
12. Net Elec. Energy (MWH) -9,525 2,421,755 75,474,215
13. Reactor Service Factor 0.86 52.40 81.95
14. Reactor Availability Factor 0.86 52.40 81.99
15. Unit Service Factor 0 52.26 81.18
16. Unit Availability Factor 0 52.26 81.18
17. Unit Capacity Factor (MDC net) -1.20 50.19 72.21
18. Unit Capacity Factor (DER net) -1.18 49.51 71.25
19. Unit Forced Outage Hrs. 0 0 1,794.5
20. Unit Forced Outage Rate 0 0 2.28
21. Shutdowns Scheduled Over Next 6 Months: None
22. If Shutdown at End of Report Period, Estimated Date of Startup: 7/03/96
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(pn%byritrs\960197wpro710WA4}

. C. AVERAGE DAILY UNIT POWER LEVEL UNIT ONE DOCKET NO.6 050-454 UNIT: Byron Gne DATE: 07/10/96 COMPILED BY: J. Vogl TELEPHONE: (815)234-5441 l x2282 MONTH: June, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l

1. -13 MW 16. -12 MW
2. -13 MW 17. -13 MW ,

l

3. -13 MW 18. -13 MW l
4. -13 MW 19. -13 MW l
5. -13 MW 20. -13 MW l
6. -13 MW 21. -13 MW l
7. -13 MW 22. -13 MW 1
8. -13 MW 23. -14 MW
9. -12 MW 24. -14 MW l
10. -12 MW 25. -14 MW
11. -13 MW 26. -14 MW j i

1

12. -13 MW 27. -14 MW
13. -13 MW 28. -14 MW
14. -13 MW 29. -14 MW
15. -12 MW 20. -14 MW 31.

INSTRUCTIONS on this form list the average daily unit power level in MWe-Net for each day in l the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(p:\%by ritrs'.960197 wpfs0710960 )

UNIT SHUTDOWNS / REDUCTIONS

  • BYRON * -
  • Report Period: June 1996 (UNIT 1) **************************

No. Date Type li2urs j Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 3 6/01/96 S 720 C 4 Continue BIR07

  • Summary
  • TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet

$ E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161) i j (p:\96byrttrs\960197wpf\071096%)

E. UNIOUE REPORTING REOUIREMENTS (UNIT 1) for the month of June, 1996

1. Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None

2. Licensee generated changes to ODCM.

None

3. Indications of failed fuel.

No. Fuel Reliability Indicator: N/A l

l (p:\96byritrsW)l97wpf'D71096\7)

i 1

F. LICE 14SEE EVENT REPORTS (UNIT 1) l The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, occurring during the reporting period, June 1, 1996 through June 30, 1996. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence l

l 454-180-96-0010 06/25/96 Manual Reactor Trip Due To Rod Control System Problems.

I 1

l (p:\%byrttrs;960197wpfC710%8)

II. Monthly Report for Byron UNIT 2 for the month of June, 1996 l

l A. Summary of Operatina Experience for Unit 2 i

The Unit began this reporting period in Mode 1 (Power Operations).

l l

l l

l I

l 1

1 I

(p:\%byrttrs\W/)197wpNU1096\9)

l.

I l

B. OPERATING DATA REPORT UNIT TWO

, DOCKET NO., 050-455 UNIT: Byron Two l

DATE: 07/10/96 l COMPILED BY: J. Vogl TELEPHONE: (815)234-5441 x2282 OPERATING STATUS

1. Reporting Period: June, 1996. Gross Hours: 720
2. Currently Authorized Power Level: 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any)2 None
4. Reasons for Restriction (If Any). N/A THIS MONTH YR TO DATE CUMULATIVE *
5. Report Period Hrs. 720 4,367 77,688
6. Rx Critical Hours 720 4,208.5 68,463.4
7. Rx Reserve Shutdown Hours 0 0 0
8. Hours Generator on Line 720 4,204.1 67,824.8
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thernal Energy (MWH) 2,445,046 14,193,706.6 204,194,909.6
11. Gross Elec. Energy (MWH) 833,358 4,878,508 69,584,173
12. Net Elec. Energy (MWH) 798,242 4,677,348 66,148,515
13. Reactor Service Factor 100 96.37 88.13
14. Reactor Availability Factor 100 96.37 88.13
15. Unit Service Factor 100 96.27 87.30
16. Unit Availability Factor 100 96.27 87.30
17. Unit Capacity Factor (MDC net) 100.33 96.93 77.06
18. Unit Capacity Factor (DER net) 98.99 95.63 76.02
19. Unit Forced Outage Hrs. 0 162.9 1,562.1
20. Unit Forced Outage Rate 0 3.73 2.25
21. Shutdowns Scheduled Over Next 6 Months: 1 (B2R06)
22. If Shutdown at End of Report Period, Date of Startup: None
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

l 1

(p:\Whyritn\9&)l77mpre071&E10)

1 C. AVERAGE DAILY UNIT POWER LEVEL UNIT TWO l DOCKET NO.. 050-455 UNIT: Byron Two DATE: 07/10/96 COMPILED BY: J. Vogl TELEPHONE: (815)234-5441 x2282 MONTH: June, 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

1. 1110 MW 16. 1070 MW
2. 1115 MW 17. 1108 MW
3. 1121 MW 18, 1109 MW
4. 1126 MW 19. 1112 MW
5. 1124 MW 20. 1110 MW
6. 1118 MW 21, 1101 MW
7. 1126 MW 22. 1100 MW
8. 1134 MW 23. 1101 MW
9. 1133 MW 24. 1094 MW
10. 1127 MW 25. 1097 MW
11. 1121 MW 26, 1096 MW 12, 1118 MW 27. 1090 MW
13. 1109 MW 28. 1085 MW
14. 1113 MW "9. 1080 MW
15. 1113 MW 30, 1086 MW 31.

INSTRUCTIONS on this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the nat electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(p:\96by rttn\960197 wpf071096s i l )

~

  • BYRON-
  • Report Period: June, 1996 UNIT SHUTDOWNS / REDUCTIONS (UNIT 2) **************************

No. Date Tvoe Hours Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence NO SHUTDOWNS FOR UNIT TWO IN JUNE

  • Summary
  • TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructienc for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NOREG-0161)

(p:\96by rttrs\960197wpf'471096\ 12 )

E. UNIOUE REPORTING REOUIREMENTS (UNIT 2) for the month of June, 1996

1. Safety / Relief valve operations for Unit Two.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None

2. Licensee generated changes to ODCM.

None

3. Indications of failed fuel.

No. Fuel Reliability Indicator: FRI = 2.4 E-5 pCi/CC (p:\%byrltrs;960197wpfo71096\ l 3 )

F. LICENSEE EVENT REPORTS (UNIT 2)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, June 1, 1996 through June 30, 1996. This information is provided pursuant to the reportable occurrence reporting requiretcents as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence None l

l l

l (p:i%byritrsWA197wpfC71096\l4)