| {{#Wiki_filter:February 22, 2006Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear OfficerP. O. Box 14000 Juno Beach, FL 33408-0420 | | {{#Wiki_filter:February 22, 2006 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWERAND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO. MD0052, NOED NO. 06-2-01] | | NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWER AND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO. MD0052, NOED NO. 06-2-01] |
|
| |
|
| ==Dear Mr. Stall:== | | ==Dear Mr. Stall:== |
|
| |
|
| By letter dated February 17, 2006, you requested that the NRC exercise discretion to notenforce compliance with the actions required in St. Lucie Unit 2 Technical Specification (TS) 3.6.1.7 Action c, which required a plant shutdown if repair of an 8-inch containment purgesupply isolation valve could not be completed within 24 hours. Your letter documented information discussed with the NRC in a teleconference on February 15, 2006 in which yourequested a NOED be granted pursuant to the NRC's policy regarding exercise of discretion foran operating facility, set out in Section VII.C, of the NRC Enforcement Policy, and be effectivefor the period from 4:10 p.m., on February 15, 2006, to March 24, 2006. This letter documentsour telephone conversation of February 15, 2006 at 2:00 p.m., wherein the NRC verballygranted discretion from TS LCO 3.6.1.7 Action c. The principal NRC staff members who participated in the telephone conference included: (1) from Region II - Charles Casto, Director, Division of Reactor Projects (DRP); Joseph Shea, Deputy Director, DRP; Son Ninh, Senior Project Engineer, DRP Branch 3; Rudy Bernhard, Senior Reactor Analyst; Tom Morrissey, Acting Senior Resident Inspector - St. Lucie and (2) from the Office of Nuclear Reactor Regulation - Catherine Haney, Director, Division of Reactor Licensing; Michael Marshall, Chief, Plant Licensing Branch 2-2; Brendan Moroney, Project Manager, St. Lucie; Harold Chernoff, lead Project Manager for NOEDs; James Pulsipher, Reactor Systems Engineer, Containment and Ventilations Systems Branch; and Robert Palla, Senior Reactor Engineer.On February 14, 2006, at 4:10 p.m. Unit 2 inboard 8-inch containment purge supply isolationvalve, FCV-25-36, failed a routine local leak rate test (LLRT) required by TS surveillance4.6.1.7.4, due to the failure of a shear pin that uncoupled the actuator from the valve stem andwas declared inoperable. TS 4.6.1.7.4 states " at least once per 92 days, each 8-inchcontainment purge supply and exhaust isolation valve with resilient material seals shall bedemonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.05 La when pressurized to Pa." TS 3.6.1.7 Action c was entered that requires "With acontainment purge supply and /or exhaust isolation valve(s) having a measured leakage rate exceeding the limits of Surveillance Requirements 4.6.1.7.3 and/or 4.6.1.7.4, restore theinoperable valve(s) to OPERABLE status within 24 hours, otherwise be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours." | | By letter dated February 17, 2006, you requested that the NRC exercise discretion to not enforce compliance with the actions required in St. Lucie Unit 2 Technical Specification (TS) 3.6.1.7 Action c, which required a plant shutdown if repair of an 8-inch containment purge supply isolation valve could not be completed within 24 hours. Your letter documented information discussed with the NRC in a teleconference on February 15, 2006 in which you requested a NOED be granted pursuant to the NRC's policy regarding exercise of discretion for an operating facility, set out in Section VII.C, of the NRC Enforcement Policy, and be effective for the period from 4:10 p.m., on February 15, 2006, to March 24, 2006. This letter documents our telephone conversation of February 15, 2006 at 2:00 p.m., wherein the NRC verbally granted discretion from TS LCO 3.6.1.7 Action c. The principal NRC staff members who participated in the telephone conference included: (1) from Region II - Charles Casto, Director, Division of Reactor Projects (DRP); Joseph Shea, Deputy Director, DRP; Son Ninh, Senior Project Engineer, DRP Branch 3; Rudy Bernhard, Senior Reactor Analyst; Tom Morrissey, Acting Senior Resident Inspector - St. Lucie and (2) from the Office of Nuclear Reactor Regulation - Catherine Haney, Director, Division of Reactor Licensing; Michael Marshall, Chief, Plant Licensing Branch 2-2; Brendan Moroney, Project Manager, St. Lucie; Harold Chernoff, lead Project Manager for NOEDs; James Pulsipher, Reactor Systems Engineer, Containment and Ventilations Systems Branch; and Robert Palla, Senior Reactor Engineer. |
| You stated that Unit 2 would violate the allowed outage time for Action c on February 15, 2006 FP&L2at 4:10 p.m., because the valve could not be restored to OPERABLE status within the allowed24 hours. You verbally requested enforcement discretion to allow the use of a blind flange to satisfy TS 3.6.1.7 Action c requirements during our telephone conference on February 15, 2006. Additionally, you committed to submitting an exigent license amendment request to allow this additional action, which is consistent with the standard Combustion Engineering TS.Your letter of February 17, 2006, stated that the proposed NOED would avoid an unnecessarytransient as a result of compliance with TS 3.6.1.7 Action c; thereby, minimizing the potentialsafety consequences and operational risks. It also stated that the requested NOED wouldprovide adequate time for completing the necessary engineering and administrative activities for implementing a permanent TS change, which would allow installation of a blind flange to satisfy TS 3.6.1.7 Action c requirements for containment purge penetrations that failed therespective LLRT TS surveillance. In addition, your letter indicated that the impact on containment isolation does not contribute to core damage frequency, only large early releasefrequency (LERF), however, the impact of loss of the continuous containment purge/hydrogen purge systems functions would be insignificant to the LERF. As such, your letter concluded thatthe proposed NOED would not be of potential detriment to the public health and safety,because there is no net increase in radiological risk to the public. Moreover, the only compensatory measure implemented is the installation of a passive blind flange. This configuration enhances plant safety. In your letter of February 17, 2006, you confirmed your commitment to submit a followuplicense amendment request (LAR) by close of business February 21, 2006, which incorporates a permanent change contained in this NOED into the St. Lucie Unit 2 TS. We plan to complete our review and disposition of your followup license amendment by March 24, 2006. On the basis of the staff's evaluation of your request, we have concluded that granting thisNOED is consistent with the Enforcement Policy and staff guidance, and has no adverse impact on public health and safety or the environment. Therefore, it is our intention to exercise discretion to not enforce compliance with TS 3.6.1.7 Action c for the period from 3:00 p.m. onFebruary 15, 2006, to March 24, 2006. As stated in the Enforcement Policy, action will be taken, to the extent that violations wereinvolved, for the root cause that led to the noncompliance for which this NOED was necessary.Sincerely,/RA by Loren R. Plisco Acting For/William D. TraversRegional Administrator Docket No.: 50-389License No.: NPF-16cc: (See page 3) | | On February 14, 2006, at 4:10 p.m. Unit 2 inboard 8-inch containment purge supply isolation valve, FCV-25-36, failed a routine local leak rate test (LLRT) required by TS surveillance 4.6.1.7.4, due to the failure of a shear pin that uncoupled the actuator from the valve stem and was declared inoperable. TS 4.6.1.7.4 states at least once per 92 days, each 8-inch containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.05 La when pressurized to Pa. TS 3.6.1.7 Action c was entered that requires With a containment purge supply and /or exhaust isolation valve(s) having a measured leakage rate exceeding the limits of Surveillance Requirements 4.6.1.7.3 and/or 4.6.1.7.4, restore the inoperable valve(s) to OPERABLE status within 24 hours, otherwise be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours. |
| FP&L3 cc:William Jefferson, Jr. | | You stated that Unit 2 would violate the allowed outage time for Action c on February 15, 2006 |
| Site Vice President St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail DistributionG. L. JohnstonPlant General Manager St. Lucie Nuclear Plant Electronic Mail DistributionTerry L. PattersonLicensing Manager St. Lucie Nuclear Plant Electronic Mail DistributionMark Warner, Vice PresidentNuclear Operations Support Florida Power & Light Company Electronic Mail DistributionRajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company Electronic Mail DistributionM. S. Ross, Managing AttorneyFlorida Power & Light Company Electronic Mail DistributionMarjan Mashhadi, Senior AttorneyFlorida Power & Light Company Electronic Mail DistributionWilliam A. PassettiBureau of Radiation Control Department of Health Electronic Mail DistributionCraig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs Electronic Mail DistributionJ. KammelRadiological Emergency Planning Administrator Department of Public Safety Electronic Mail DistributionDouglas AndersonCounty Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982Distribution: (See next page) | | |
| | FP&L 2 at 4:10 p.m., because the valve could not be restored to OPERABLE status within the allowed 24 hours. You verbally requested enforcement discretion to allow the use of a blind flange to satisfy TS 3.6.1.7 Action c requirements during our telephone conference on February 15, 2006. Additionally, you committed to submitting an exigent license amendment request to allow this additional action, which is consistent with the standard Combustion Engineering TS. |
| | Your letter of February 17, 2006, stated that the proposed NOED would avoid an unnecessary transient as a result of compliance with TS 3.6.1.7 Action c; thereby, minimizing the potential safety consequences and operational risks. It also stated that the requested NOED would provide adequate time for completing the necessary engineering and administrative activities for implementing a permanent TS change, which would allow installation of a blind flange to satisfy TS 3.6.1.7 Action c requirements for containment purge penetrations that failed the respective LLRT TS surveillance. In addition, your letter indicated that the impact on containment isolation does not contribute to core damage frequency, only large early release frequency (LERF), however, the impact of loss of the continuous containment purge/hydrogen purge systems functions would be insignificant to the LERF. As such, your letter concluded that the proposed NOED would not be of potential detriment to the public health and safety, because there is no net increase in radiological risk to the public. Moreover, the only compensatory measure implemented is the installation of a passive blind flange. This configuration enhances plant safety. |
| | In your letter of February 17, 2006, you confirmed your commitment to submit a followup license amendment request (LAR) by close of business February 21, 2006, which incorporates a permanent change contained in this NOED into the St. Lucie Unit 2 TS. We plan to complete our review and disposition of your followup license amendment by March 24, 2006. |
| | On the basis of the staff's evaluation of your request, we have concluded that granting this NOED is consistent with the Enforcement Policy and staff guidance, and has no adverse impact on public health and safety or the environment. Therefore, it is our intention to exercise discretion to not enforce compliance with TS 3.6.1.7 Action c for the period from 3:00 p.m. on February 15, 2006, to March 24, 2006. |
| | As stated in the Enforcement Policy, action will be taken, to the extent that violations were involved, for the root cause that led to the noncompliance for which this NOED was necessary. |
| | Sincerely, |
| | /RA by Loren R. Plisco Acting For/ |
| | William D. Travers Regional Administrator Docket No.: 50-389 License No.: NPF-16 cc: (See page 3) |
| | |
| | FP&L 3 cc: |
| | William Jefferson, Jr. J. Kammel Site Vice President Radiological Emergency St. Lucie Nuclear Plant Planning Administrator Florida Power & Light Company Department of Public Safety Electronic Mail Distribution Electronic Mail Distribution G. L. Johnston Douglas Anderson Plant General Manager County Administrator St. Lucie Nuclear Plant St. Lucie County Electronic Mail Distribution 2300 Virginia Avenue Ft. Pierce, FL 34982 Terry L. Patterson Licensing Manager Distribution: (See next page) |
| | St. Lucie Nuclear Plant Electronic Mail Distribution Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution |
| | |
| Letter to Mr. J.A. Stall from William D. Travers dated February 22, 2006 | | Letter to Mr. J.A. Stall from William D. Travers dated February 22, 2006 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWER AND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO MD0052, NOED NO. 06-02-01]Distribution w/encl | | NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWER AND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO MD0052, NOED NO. 06-02-01] |
| :B. Wetzel, OEDO W. Travers, RII, ORAI B. Sheron, ADES C. Haney, DORL E. Hackett, DORL M. Johnson, OE T. Tate, NRR NOED OEWEB J. Munday, RII, DRP C. Evans, RII M. Marshall, NRR B. Moroney, NRR T. Hoeg, RII, DRP RIDSNRRDIPMLIPB PUBLIC
| | Distribution w/encl: |
| | B. Wetzel, OEDO W. Travers, RII, ORAI B. Sheron, ADES C. Haney, DORL E. Hackett, DORL M. Johnson, OE T. Tate, NRR NOED OEWEB J. Munday, RII, DRP C. Evans, RII M. Marshall, NRR B. Moroney, NRR T. Hoeg, RII, DRP RIDSNRRDIPMLIPB PUBLIC |
|
| |
|
| _________________________OFFICENRRRII:DRPRII:DRPRII:ORARII:EICSSIGNATUREJTM for, by telephoneJTMCAC1LRPCFENAMECHaneyJMundayCCastoLPliscoCEvansDATE02/22/0602/22/0602/23/0602/22/0602/22/06 E-MAIL COPY? YESNO YES NO YESNO YESNO YESNO}}
| | _________________________ |
| | OFFICE NRR RII:DRP RII:DRP RII:ORA RII:EICS SIGNATURE JTM for, by telephone JTM CAC1 LRP CFE NAME CHaney JMunday CCasto LPlisco CEvans DATE 02/22/06 02/22/06 02/23/06 02/22/06 02/22/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0605403372006-02-22022 February 2006 Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2 Project stage: Other ML0605403082006-02-22022 February 2006 Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2 Project stage: Other 2006-02-22
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:Notice of Enforcement Discretion (NOED)
MONTHYEARML17214A8112017-08-0202 August 2017 NRC Integrated Inspection Report 2017-002 and Exercise of Enforcement Discretion IR 05000335/20170022017-08-0202 August 2017 St. Lucie Plant - NRC Integrated Inspection Report 2017-002 and Exercise of Enforcement Discretion ML0605403372006-02-22022 February 2006 Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2 ML0605403082006-02-22022 February 2006 Notice of Enforcement Discretion (NOED) for Florida Power and Light Regarding St. Lucie Unit 2 L-2006-056, Notice of Enforcement Discretion Excessive Containment Purge Valve Leakage2006-02-17017 February 2006 Notice of Enforcement Discretion Excessive Containment Purge Valve Leakage ML0335602142003-12-19019 December 2003 Errata Letter for Notice of Enforcement Discretion (NOED) for Florida Power & Light 2017-08-02
[Table view] |
Text
February 22, 2006 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWER AND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO. MD0052, NOED NO. 06-2-01]
Dear Mr. Stall:
By letter dated February 17, 2006, you requested that the NRC exercise discretion to not enforce compliance with the actions required in St. Lucie Unit 2 Technical Specification (TS) 3.6.1.7 Action c, which required a plant shutdown if repair of an 8-inch containment purge supply isolation valve could not be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Your letter documented information discussed with the NRC in a teleconference on February 15, 2006 in which you requested a NOED be granted pursuant to the NRC's policy regarding exercise of discretion for an operating facility, set out in Section VII.C, of the NRC Enforcement Policy, and be effective for the period from 4:10 p.m., on February 15, 2006, to March 24, 2006. This letter documents our telephone conversation of February 15, 2006 at 2:00 p.m., wherein the NRC verbally granted discretion from TS LCO 3.6.1.7 Action c. The principal NRC staff members who participated in the telephone conference included: (1) from Region II - Charles Casto, Director, Division of Reactor Projects (DRP); Joseph Shea, Deputy Director, DRP; Son Ninh, Senior Project Engineer, DRP Branch 3; Rudy Bernhard, Senior Reactor Analyst; Tom Morrissey, Acting Senior Resident Inspector - St. Lucie and (2) from the Office of Nuclear Reactor Regulation - Catherine Haney, Director, Division of Reactor Licensing; Michael Marshall, Chief, Plant Licensing Branch 2-2; Brendan Moroney, Project Manager, St. Lucie; Harold Chernoff, lead Project Manager for NOEDs; James Pulsipher, Reactor Systems Engineer, Containment and Ventilations Systems Branch; and Robert Palla, Senior Reactor Engineer.
On February 14, 2006, at 4:10 p.m. Unit 2 inboard 8-inch containment purge supply isolation valve, FCV-25-36, failed a routine local leak rate test (LLRT) required by TS surveillance 4.6.1.7.4, due to the failure of a shear pin that uncoupled the actuator from the valve stem and was declared inoperable. TS 4.6.1.7.4 states at least once per 92 days, each 8-inch containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.05 La when pressurized to Pa. TS 3.6.1.7 Action c was entered that requires With a containment purge supply and /or exhaust isolation valve(s) having a measured leakage rate exceeding the limits of Surveillance Requirements 4.6.1.7.3 and/or 4.6.1.7.4, restore the inoperable valve(s) to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
You stated that Unit 2 would violate the allowed outage time for Action c on February 15, 2006
FP&L 2 at 4:10 p.m., because the valve could not be restored to OPERABLE status within the allowed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. You verbally requested enforcement discretion to allow the use of a blind flange to satisfy TS 3.6.1.7 Action c requirements during our telephone conference on February 15, 2006. Additionally, you committed to submitting an exigent license amendment request to allow this additional action, which is consistent with the standard Combustion Engineering TS.
Your letter of February 17, 2006, stated that the proposed NOED would avoid an unnecessary transient as a result of compliance with TS 3.6.1.7 Action c; thereby, minimizing the potential safety consequences and operational risks. It also stated that the requested NOED would provide adequate time for completing the necessary engineering and administrative activities for implementing a permanent TS change, which would allow installation of a blind flange to satisfy TS 3.6.1.7 Action c requirements for containment purge penetrations that failed the respective LLRT TS surveillance. In addition, your letter indicated that the impact on containment isolation does not contribute to core damage frequency, only large early release frequency (LERF), however, the impact of loss of the continuous containment purge/hydrogen purge systems functions would be insignificant to the LERF. As such, your letter concluded that the proposed NOED would not be of potential detriment to the public health and safety, because there is no net increase in radiological risk to the public. Moreover, the only compensatory measure implemented is the installation of a passive blind flange. This configuration enhances plant safety.
In your letter of February 17, 2006, you confirmed your commitment to submit a followup license amendment request (LAR) by close of business February 21, 2006, which incorporates a permanent change contained in this NOED into the St. Lucie Unit 2 TS. We plan to complete our review and disposition of your followup license amendment by March 24, 2006.
On the basis of the staff's evaluation of your request, we have concluded that granting this NOED is consistent with the Enforcement Policy and staff guidance, and has no adverse impact on public health and safety or the environment. Therefore, it is our intention to exercise discretion to not enforce compliance with TS 3.6.1.7 Action c for the period from 3:00 p.m. on February 15, 2006, to March 24, 2006.
As stated in the Enforcement Policy, action will be taken, to the extent that violations were involved, for the root cause that led to the noncompliance for which this NOED was necessary.
Sincerely,
/RA by Loren R. Plisco Acting For/
William D. Travers Regional Administrator Docket No.: 50-389 License No.: NPF-16 cc: (See page 3)
FP&L 3 cc:
William Jefferson, Jr. J. Kammel Site Vice President Radiological Emergency St. Lucie Nuclear Plant Planning Administrator Florida Power & Light Company Department of Public Safety Electronic Mail Distribution Electronic Mail Distribution G. L. Johnston Douglas Anderson Plant General Manager County Administrator St. Lucie Nuclear Plant St. Lucie County Electronic Mail Distribution 2300 Virginia Avenue Ft. Pierce, FL 34982 Terry L. Patterson Licensing Manager Distribution: (See next page)
St. Lucie Nuclear Plant Electronic Mail Distribution Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution
Letter to Mr. J.A. Stall from William D. Travers dated February 22, 2006
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR FLORIDA POWER AND LIGHT REGARDING ST. LUCIE UNIT 2 [TAC NO MD0052, NOED NO. 06-02-01]
Distribution w/encl:
B. Wetzel, OEDO W. Travers, RII, ORAI B. Sheron, ADES C. Haney, DORL E. Hackett, DORL M. Johnson, OE T. Tate, NRR NOED OEWEB J. Munday, RII, DRP C. Evans, RII M. Marshall, NRR B. Moroney, NRR T. Hoeg, RII, DRP RIDSNRRDIPMLIPB PUBLIC
_________________________
OFFICE NRR RII:DRP RII:DRP RII:ORA RII:EICS SIGNATURE JTM for, by telephone JTM CAC1 LRP CFE NAME CHaney JMunday CCasto LPlisco CEvans DATE 02/22/06 02/22/06 02/23/06 02/22/06 02/22/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO