{{#Wiki_filter:Westinghouse Non-Proprietary Class 3 Draft Slide Presentation for the NRC/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
{{#Wiki_filter:Westinghouse Non-Proprietary Class 3 Draft Slide Presentation for the NRC/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
© 2006 Westinghouse Electric Company LLC All Rights Reserved Westinghouse Non-Proprietary Class 3 DRAFT Implementation of Improved Fuel Design for CE 16x NSSS Presentation to NRC October 19, 2006 White Flint, Rockville, MD Tom Rodack & Zeses Karoutas (Westinghouse) and Dana Millar (Entergy)*BNFL Slide 1 GWestinghouse DRAFT-Agenda" Meeting Objectives" Background
    © 2006 Westinghouse Electric Company LLC All Rights Reserved
* Fuel Design* Topical Reports Supporting Design Implementation
 
* Implementation Plan* Topical Report Status* Summary*BNFL Slide 2 GWestinghouse DRAFT Meeting Objectives
Westinghouse Non-Proprietary Class 3 DRAFT Implementation of Improved Fuel Design for CE 16x NSSS Presentation to NRC October 19, 2006 White Flint, Rockville, MD Tom Rodack &Zeses Karoutas (Westinghouse) and Dana Millar (Entergy)
* Explain why Next Generation Fuel will be deployed for CE 16 NSSS* Present overall licensing plan" Provide an opportunity for NRC feedback*DBNFL Slide 3 OWestinghouse DRAFT Background
*BNFL                             Slide 1               GWestinghouse
* Westinghouse fully supports INPO initiative to drive to zero fuel leakers by 2010-Zero Leaking Fuel a strategic objective since 2004* Grid-to-rod fretting is the primary PWR leaker mechanism-Fretting leakers typically occur in thrice burned fuel[ ] a, c.[I a, c-Improvements being discussed or implemented on designs for all fuel currently supplied*DBNFL Slide 4 Slide 4 ~OWesfingtiouse DRAFT Fuel Performance Overview by Product a, c*'BNFL Slide 5 ld5Westinghouse DRAFT Background
 
* CE 16 Next Generation Fuel is key to promoting zero leakers in CE NSSS-Significant increase in grid-to-rod fretting margin" CE NGF features same type of spacer grid as 1 4x TURBO fuel that has demonstrated improved grid-to-rod fretting performance
DRAFT
-Increases other design and operating margins° CE 16 NGF LTAs in 1 st cycle at Waterford-Scheduled for exam in December 0 Region deployment planned for Spring 2008 in ANO-2 and Waterford* BNFL Slide 6 OWestinghouse DRAFT Implementation of Improved Designs for CE NSSS a, c Slide 7 ~Westinghouse
-Agenda
*BNFL Slide 7 OWestinghouse DRAFT CE 16 NGF Fuel Design Zeses Karoutas*BNFL Slide 8 S 8Westinghouse DRAFT CE 16x NGF Fuel Design a, c*)BNFL Slide 9 OWestinghouse DRAFT General Program Status a, c Slide 10 ~Westinghouse
  "   Meeting Objectives
*DBNFL Slide 10 OWeslinghouse DRAFT Topical Reports Supporting CE 16 NGF Implementation Zeses Karoutas*DBNFL Slide 11 OWestinghouse DRAFT Core Reference Report (WCAP-1 6500-P)0 Submitted February 28,2006 a, c*)BNFL Slide 12 OWestinghouse DRAFT Critical Heat Flux Correlation Report (WCAP-1 6523-P)° Submitted March 20, 2006* New DNB correlation form similar to ABB-NV & ABB-TV correlations approved in Topical CENPD-387-P-A a, c Slide 13 Westinghouse
  " Background
*DBNFL Slide 13 ice Westinghouse DRAFT LOCA Model Grid Heat Transfer (CENPD-1 32-P-A, Sup. 4-P, Add. I -P)° Submitted-As Appendix to Core Reference Report February 28, 2006-Re-submitted separately at NRC's request May 11, 2006 a, c 2*BNFL Slide 14 OWestingtiouse DRAFT Optimized ZIRLO T M Report (CENPD-404-P-A Add. I-A)Provides the basis for use of Optimized ZIRLO T M cladding in fuel for CE and W NSSS Approved June 10, 2005 a, c*)BNFL Slide 15 1Westinghouse DRAFT NGF Implementation Plan for ANO-2 and Waterford Dana Millar*OBNFL Slide 16 eWestinghouse DRAFT Implementation Plan Summary* License Amendment Requests (LARs) planned to be submitted for both ANO-2 and Waterford Requests for Exemption from 10 CFR 50.46 and Appendix K to be submitted because of Optimized ZIRLO T M cladding PLACEHOLDER TO PROVIDE, OVERVIEW OF CONTENT SLIDE WILL BE REVISED*BNFL Slide 17 (Westinghbuse DRAFT Topical Report Status and Summary Tom Rodack*BNFL Slide 18 S 1Westinghouse DRAFT Licensing Scope" License Amendment requests for implementation of NGF in ANO-2 and Waterford will reference:
* Fuel Design
-Core Reference Report (WCAP-1 6500-P)-Critical Heat Flux Correlation Report (WCAP-1 6523-P)-Improved LOCA Model (CENPD-i 32-P-A, Sup. 4-P, Add. I-P)* Request for Exemption from 10 CRF 50.46 and Appendix K will also be required for Optimized ZIRLO T h-Optimized ZIRLOT Report (CENPD-404-P-A Add. 1-A)*BNFL Slide 19 eWesfing~house DRAFT Licensing Status-a, C 9 BNFL Slide 20 Se)Westinghouse DRAFT Summary" Deployment of CE 16 NGF design is key to reducing fuel leakers" Topical reports supporting the design are under review and receiving attention" Plant specific submittals are planned for early 2007 to support fuel load in Spring 2008*BNFL Slide 21 OWestinghouse}}
* Topical Reports Supporting Design Implementation
* Implementation Plan
* Topical Report Status
* Summary Slide 2
*BNFL                                               GWestinghouse
 
DRAFT Meeting Objectives
* Explain why Next Generation Fuel will be deployed for CE 16 NSSS
* Present overall licensing plan
  " Provide an opportunity for NRC feedback Slide 3
*DBNFL                                                               OWestinghouse
 
DRAFT
 
===Background===
* Westinghouse fully supports INPO initiative to drive to zero fuel leakers by 2010
    - Zero Leaking Fuel a strategic objective since 2004
* Grid-to-rod fretting is the primary PWR leaker mechanism
    -   Fretting leakers typically occur in thrice burned fuel
[                                                 ]a,c
  . [                                                           I a,c
    -   Improvements being discussed or implemented on designs for all fuel currently supplied Slide 4                         Slide 4 ~OWesfingtiouse
*DBNFL
 
DRAFT Fuel Performance Overview by Product a, c Slide 5
*'BNFL                                 ld5Westinghouse
 
DRAFT
 
===Background===
* CE 16 Next Generation Fuel is key to promoting zero leakers in CE NSSS
    - Significant increase in grid-to-rod fretting margin
        " CE NGF features same type of spacer grid as 14x TURBO fuel that has demonstrated improved grid-to-rod fretting performance
    - Increases other design and operating margins
° CE 16 NGF LTAs in 1st cycle at Waterford
    - Scheduled for exam in December 0 Region deployment planned for Spring 2008 in ANO-2 and Waterford
* BNFL                                     Slide 6                       OWestinghouse
 
DRAFT Implementation of Improved Designs for CE NSSS a, c
                                                ~Westinghouse Slide 77
*BNFL                                           OWestinghouse
 
DRAFT CE 16 NGF Fuel Design Zeses Karoutas
*BNFL             Slide 8 S 8Westinghouse
 
DRAFT CE 16x NGF Fuel Design a, c
*)BNFL Slide 9 OWestinghouse
 
DRAFT General Program Status a, c
                                ~Westinghouse 10 Slide 10
*DBNFL                           OWeslinghouse
 
DRAFT Topical Reports Supporting CE 16 NGF Implementation Zeses Karoutas
*DBNFL Slide 11     OWestinghouse
 
DRAFT Core Reference Report (WCAP-1 6500-P) 0 Submitted February 28,2006 a, c
*)BNFL Slide 12 OWestinghouse
 
DRAFT Critical Heat Flux Correlation Report (WCAP-1 6523-P)
  ° Submitted March 20, 2006
* New DNB correlation form similar to ABB-NV &ABB-TV correlations approved in Topical CENPD-387-P-A a, c Westinghouse
*DBNFL                                   Slide 13 Slide 13 ice Westinghouse
 
DRAFT LOCA Model Grid Heat Transfer (CENPD-1 32-P-A, Sup. 4-P, Add. I -P)
  ° Submitted
      - As Appendix to Core Reference Report February 28, 2006
      - Re-submitted separately at NRC's request May 11, 2006 a, c 2
*BNFL                                     Slide 14             OWestingtiouse
 
DRAFT Optimized ZIRLOTM Report (CENPD-404-P-A Add. I-A)
Provides the basis for use of Optimized ZIRLO T cladding in fuel for CE and W NSSS M
Approved June 10, 2005 a, c Slide 15
*)BNFL                                                                         1Westinghouse
 
DRAFT NGF Implementation Plan for ANO-2 and Waterford Dana Millar Slide 16
*OBNFL                             eWestinghouse
 
DRAFT Implementation Plan Summary
* License Amendment Requests (LARs) planned to be submitted for both ANO-2 and Waterford Requests for Exemption from 10 CFR 50.46 and Appendix Kto be submitted because of Optimized ZIRLOTM cladding PLACEHOLDER TO PROVIDE, OVERVIEW OF CONTENT SLIDE WILL BE REVISED
*BNFL Slide 17                         (Westinghbuse
 
DRAFT Topical Report Status and Summary Tom Rodack Slide 18
*BNFL                       S 1Westinghouse
 
DRAFT Licensing Scope
  " License Amendment requests for implementation of NGF in ANO-2 and Waterford will reference:
      - Core Reference Report (WCAP-1 6500-P)
      - Critical Heat Flux Correlation Report (WCAP-1 6523-P)
      - Improved LOCA Model (CENPD-i 32-P-A, Sup. 4-P, Add. I-P)
* Request for Exemption from 10 CRF 50.46 and Appendix Kwill also be required for Optimized ZIRLOTh
      - Optimized ZIRLOT Report (CENPD-404-P-A Add. 1-A)
*BNFL Slide 19                       eWesfing~house
 
DRAFT Licensing Status
                                        -a, C 9 BNFL           Slide 20 Se)Westinghouse
 
DRAFT Summary
  " Deployment of CE 16 NGF design is key to reducing fuel leakers
  " Topical reports supporting the design are under review and receiving attention
  " Plant specific submittals are planned for early 2007 to support fuel load in Spring 2008
*BNFL Slide 21                           OWestinghouse}}

Latest revision as of 13:29, 23 November 2019

Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)
ML062770324
Person / Time
Site: Arkansas Nuclear, Waterford  Entergy icon.png
Issue date: 10/19/2006
From: Karoutas Z, Miller D, Rodack T
Entergy Corp, Westinghouse
To:
Office of Nuclear Reactor Regulation
References
AW-06-2203, LTR-NRC-06-55
Download: ML062770324 (7)


Text

Westinghouse Non-Proprietary Class 3 Draft Slide Presentation for the NRC/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary)

Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355

© 2006 Westinghouse Electric Company LLC All Rights Reserved

Westinghouse Non-Proprietary Class 3 DRAFT Implementation of Improved Fuel Design for CE 16x NSSS Presentation to NRC October 19, 2006 White Flint, Rockville, MD Tom Rodack &Zeses Karoutas (Westinghouse) and Dana Millar (Entergy)

  • BNFL Slide 1 GWestinghouse

DRAFT

-Agenda

" Meeting Objectives

" Background

  • Fuel Design
  • Topical Reports Supporting Design Implementation
  • Implementation Plan
  • Topical Report Status
  • Summary Slide 2
  • BNFL GWestinghouse

DRAFT Meeting Objectives

  • Explain why Next Generation Fuel will be deployed for CE 16 NSSS
  • Present overall licensing plan

" Provide an opportunity for NRC feedback Slide 3

  • DBNFL OWestinghouse

DRAFT

Background

  • Westinghouse fully supports INPO initiative to drive to zero fuel leakers by 2010

- Zero Leaking Fuel a strategic objective since 2004

  • Grid-to-rod fretting is the primary PWR leaker mechanism

- Fretting leakers typically occur in thrice burned fuel

[ ]a,c

. [ I a,c

- Improvements being discussed or implemented on designs for all fuel currently supplied Slide 4 Slide 4 ~OWesfingtiouse

  • DBNFL

DRAFT Fuel Performance Overview by Product a, c Slide 5

  • 'BNFL ld5Westinghouse

DRAFT

Background

  • CE 16 Next Generation Fuel is key to promoting zero leakers in CE NSSS

- Significant increase in grid-to-rod fretting margin

" CE NGF features same type of spacer grid as 14x TURBO fuel that has demonstrated improved grid-to-rod fretting performance

- Increases other design and operating margins

° CE 16 NGF LTAs in 1st cycle at Waterford

- Scheduled for exam in December 0 Region deployment planned for Spring 2008 in ANO-2 and Waterford

  • BNFL Slide 6 OWestinghouse

DRAFT Implementation of Improved Designs for CE NSSS a, c

~Westinghouse Slide 77

  • BNFL OWestinghouse

DRAFT CE 16 NGF Fuel Design Zeses Karoutas

  • BNFL Slide 8 S 8Westinghouse

DRAFT CE 16x NGF Fuel Design a, c

  • )BNFL Slide 9 OWestinghouse

DRAFT General Program Status a, c

~Westinghouse 10 Slide 10

  • DBNFL OWeslinghouse

DRAFT Topical Reports Supporting CE 16 NGF Implementation Zeses Karoutas

  • DBNFL Slide 11 OWestinghouse

DRAFT Core Reference Report (WCAP-1 6500-P) 0 Submitted February 28,2006 a, c

  • )BNFL Slide 12 OWestinghouse

DRAFT Critical Heat Flux Correlation Report (WCAP-1 6523-P)

° Submitted March 20, 2006

  • New DNB correlation form similar to ABB-NV &ABB-TV correlations approved in Topical CENPD-387-P-A a, c Westinghouse
  • DBNFL Slide 13 Slide 13 ice Westinghouse

DRAFT LOCA Model Grid Heat Transfer (CENPD-1 32-P-A, Sup. 4-P, Add. I -P)

° Submitted

- As Appendix to Core Reference Report February 28, 2006

- Re-submitted separately at NRC's request May 11, 2006 a, c 2

  • BNFL Slide 14 OWestingtiouse

DRAFT Optimized ZIRLOTM Report (CENPD-404-P-A Add. I-A)

Provides the basis for use of Optimized ZIRLO T cladding in fuel for CE and W NSSS M

Approved June 10, 2005 a, c Slide 15

  • )BNFL 1Westinghouse

DRAFT NGF Implementation Plan for ANO-2 and Waterford Dana Millar Slide 16

  • OBNFL eWestinghouse

DRAFT Implementation Plan Summary

  • License Amendment Requests (LARs) planned to be submitted for both ANO-2 and Waterford Requests for Exemption from 10 CFR 50.46 and Appendix Kto be submitted because of Optimized ZIRLOTM cladding PLACEHOLDER TO PROVIDE, OVERVIEW OF CONTENT SLIDE WILL BE REVISED
  • BNFL Slide 17 (Westinghbuse

DRAFT Topical Report Status and Summary Tom Rodack Slide 18

  • BNFL S 1Westinghouse

DRAFT Licensing Scope

" License Amendment requests for implementation of NGF in ANO-2 and Waterford will reference:

- Core Reference Report (WCAP-1 6500-P)

- Critical Heat Flux Correlation Report (WCAP-1 6523-P)

- Improved LOCA Model (CENPD-i 32-P-A, Sup. 4-P, Add. I-P)

  • Request for Exemption from 10 CRF 50.46 and Appendix Kwill also be required for Optimized ZIRLOTh

- Optimized ZIRLOT Report (CENPD-404-P-A Add. 1-A)

  • BNFL Slide 19 eWesfing~house

DRAFT Licensing Status

-a, C 9 BNFL Slide 20 Se)Westinghouse

DRAFT Summary

" Deployment of CE 16 NGF design is key to reducing fuel leakers

" Topical reports supporting the design are under review and receiving attention

" Plant specific submittals are planned for early 2007 to support fuel load in Spring 2008

  • BNFL Slide 21 OWestinghouse