{{#Wiki_filter:LBP-11-13 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
{{#Wiki_filter:LBP-11-13 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of:                                 Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING                     ASLBP No. 11-907-01-LR-BD01 COMPANY April 26, 2011 (Davis-Besse Nuclear Power Station, Unit 1)
FirstEnergy NUCLEAR OPERATING COMPANY (Davis-Besse Nuclear Power Station, Unit 1)  
MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)


Docket No. 50-346-LR ASLBP No. 11-907-01-LR-BD01 April 26, 2011 MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)  
ii TABLE OF CONTENTS I. Procedural Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II. Analysis of Timeliness, Standing and Representation . . . . . . . . . . . . . . . . . . . . . . . . . . . .      A. Timeliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      B. Standing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      C. Representation by Member, Officer or Attorney . . . . . . . . . . . . . . . . . . . . . . . . . III. Analysis of Contention Admissibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      A. Contentions One, Two and Three . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            1.      Legal standards for alternatives analysis in an ER . . . . . . . . . . . . . . . .            2.      Treatment of wind and solar alternatives in the ER . . . . . . . . . . . . . . . .            3.      Analysis of Joint Petitioners contentions. . . . . . . . . . . . . . . . . . . . . . . . .            4.      Issues that are out of scope, not material or not supported . . . . . . . . . .            5.      Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . .      B. Contention Four . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            1.      Issues that are out of scope (Small impact of severe accidents; Spent fuel pool) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            2.      Issues that are not material (Sabotage risk; Quality assurance) . . . . . . .            3.      Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; Myriad of other economic costs; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties) . . . . . . . . . . . . . . .            4.      Issues that do not dispute the Application (Fire hosing and plowing) . . . .            5.      Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . .                    a.      Source terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                    b.      Gaussian plume . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                    c.      Particle size and clean-up costs for urban areas . . . . . . . . . . . . .
iii IV. Selection of Hearing Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.      Legal Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.      Ruling on Hearing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V. Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of:                                      Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING                          ASLBP No. 11-907-01-LR-BD01 COMPANY April 26, 2011 (Davis-Besse Nuclear Power Station, Unit 1)
MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)
Before this Atomic Safety and Licensing Board (Board) is a petition to intervene and a request for a hearing (Petition) filed jointly by four organizations: Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario (CEA), Dont Waste Michigan, and the Green Party of Ohio (collectively, Joint Petitioners).1 The Joint Petitioners challenge the application (Application) filed by FirstEnergy Nuclear Operating Company (FirstEnergy) to extend its operating license for the Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty years from the current expiration date of April 22, 2017 to April 22, 2037, pursuant to Part 54 of Title 10 of the Code of Federal Regulations.2 Davis-Besse is located on the southwestern shore of 1
Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio Request for Public Hearing and Petition for Leave to Intervene (Dec.
27, 2010) [hereinafter Petition].
2 License Renewal Application; Davis-Besse Nuclear Power Station 1.0-1, 1.1-1 (Aug. 2010)
(ADAMS Accession Nos. ML102450567, ML102450563) [hereinafter Application]. The application also seeks renewal of the associated source material, special nuclear material, and by-product material licenses under 10 C.F.R. Parts 30, 40, and 70. Id. at 1.0-1.


ii    TABLE OF CONTENTS I. Procedural Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Lake Erie in Ottawa County in northwestern Ohio, approximately twenty miles east of Toledo.3 The Joint Petitioners have proffered four contentions. FirstEnergy and the NRC Staff contend that CEA does not have standing and that each proffered contention is inadmissible on one or more grounds. FirstEnergy also argues the Petition should be rejected because it is untimely and that CEA has not demonstrated that it authorized any officer or member to represent it in this proceeding.
II. Analysis of Timeliness, Standing and Representation . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A. Timeliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
B. Standing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C. Representation by Member, Officer or Attorney . . . . . . . . . . . . . . . . . . . . . . . . . III. Analysis of Contention Admissibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Contentions One, Two and Three . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Legal standards for alternatives analysis in an ER . . . . . . . . . . . . . . . . 2. Treatment of wind and solar alternatives in the ER . . . . . . . . . . . . . . . .
: 3. Analysis of Joint Petitioners' contentions. . . . . . . . . . . . . . . . . . . . . . . . . 4. Issues that are out of scope, not material or not supported . . . . . . . . . . 5. Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . .
B. Contention Four . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Issues that are out of scope (Small impact of severe accidents; Spent fuel pool) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
: 2. Issues that are not material (Sabotage risk; Quality assurance) . . . . . . . 3. Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; "Myriad of other economic costs"; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties) . . . . . . . . . . . . . . .      4. Issues that do not dispute the Application (Fire hosing and plowing) . . . .
: 5. Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . .
: a. Source terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
: b. Gaussian plume . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
: c. Particle size and clean-up costs for urban areas . . . . . . . . . . . . . 
 
iii  IV. Selection of Hearing Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Legal Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B. Ruling on Hearing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V. Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
UNITED STATES OF AMERICA  NUCLEAR REGULATORY COMMISSION  ATOMIC SAFETY AND LICENSING BOARD  Before Administrative Judges:
William J. Froehlich, Chairman  Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of: FirstEnergy NUCLEAR OPERATING COMPANY (Davis-Besse Nuclear Power Station, Unit 1)
 
Docket No. 50-346-LR ASLBP No. 11-907-01-LR-BD01 April 26, 2011 MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)  Before this Atomic Safety and Licensing Board (Board) is a petition to intervene and a request for a hearing (Petition) filed jointly by four organizations:  Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario (CEA), Don't Waste Michigan, and the Green Party of Ohio (collectively, Joint Petitioners).
1  The Joint Petitioners challenge the application (Application) filed by FirstEnergy Nuclear Operating Company (FirstEnergy) to extend its operating license for the Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty years from the current expiration date of April 22, 2017 to April 22, 2037, pursuant to Part 54 of Title 10 of the Code of Federal Regulations.
2  Davis-Besse is located on the southwestern shore of 1 Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan, and the Green Party of Ohio Request for Public Hearing and Petition for Leave to Intervene (Dec. 27, 2010) [hereinafter Petition].
2 License Renewal Application; Davis-Besse Nuclear Power Station 1.0-1, 1.1-1 (Aug. 2010) (ADAMS Accession Nos. ML102450567, ML102450563) [hereinafter Application]. The application also seeks renewal of the associated source material, special nuclear material, and by-product material licenses under 10 C.F.R. Parts 30, 40, and 70. Id. at 1.0-1. Lake Erie in Ottawa County in northwestern Ohio, approximately twenty miles east of Toledo.
3 The Joint Petitioners have proffered four contentions. FirstEnergy and the NRC Staff contend that CEA does not have standing and that each proffered contention is inadmissible on one or more grounds. FirstEnergy also argues the Petition should be rejected because it is untimely and that CEA has not demonstrated that it authorized any officer or member to represent it in this proceeding.
The Board grants the intervention petition because the Joint Petitioners have demonstrated standing and have collectively proffered at least one contention that is admissible, in whole or in part, pursuant to 10 C.F.R. § 2.309(f)(1). In accordance with 10 C.F.R. § 2.309(a), we therefore grant the request for public hearing and admit each petitioner as a party to this proceeding. As limited by the Board, the admitted contentions will be heard under the procedures set forth at 10 C.F.R. Part 2, Subpart L.
The Board grants the intervention petition because the Joint Petitioners have demonstrated standing and have collectively proffered at least one contention that is admissible, in whole or in part, pursuant to 10 C.F.R. § 2.309(f)(1). In accordance with 10 C.F.R. § 2.309(a), we therefore grant the request for public hearing and admit each petitioner as a party to this proceeding. As limited by the Board, the admitted contentions will be heard under the procedures set forth at 10 C.F.R. Part 2, Subpart L.
I. Procedural Background FirstEnergy 4 filed the Application to renew its operating license for Davis-Besse 5 on August 27, 2010.6 A notice published in the Federal Register on October 25, 2010 stated that the NRC Staff would review the Application and that persons whose interests might be affected by the proposed license renewal would have until December 27, 2010 to petition to intervene in the 3 Id. at 1.2-1.
I.       Procedural Background FirstEnergy4 filed the Application to renew its operating license for Davis-Besse5 on August 27, 2010.6 A notice published in the Federal Register on October 25, 2010 stated that the NRC Staff would review the Application and that persons whose interests might be affected by the proposed license renewal would have until December 27, 2010 to petition to intervene in the 3
Id. at 1.2-1.
4 FirstEnergy applied on its own behalf and as agent for FirstEnergy Nuclear Generation Corp., the owner and licensee. Id. at 1.1-1.
4 FirstEnergy applied on its own behalf and as agent for FirstEnergy Nuclear Generation Corp., the owner and licensee. Id. at 1.1-1.
5 Davis-Besse has a pressurized water reactor nuclear steam supply system furnished by the Babcock & Wilcox Company. Id. at 1.2-1. The licensed core power level is 2817 megawatts-thermal (MWt). Id. Davis-Besse's gross electrical output is 908 megawatts-electric (MWe). Id.
5 Davis-Besse has a pressurized water reactor nuclear steam supply system furnished by the Babcock & Wilcox Company. Id. at 1.2-1. The licensed core power level is 2817 megawatts-thermal (MWt). Id. Davis-Besses gross electrical output is 908 megawatts-electric (MWe). Id.
6 Notice of Acceptance for Docketing of the Application, Notice of Opportunity for Hearing for Facility Operating License No. NPF-003 for an Additional 20-Year Period; First[E]nergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Unit 1, 75 Fed. Reg. 65,528, 65,528-29 (Oct. 25, 2010) [hereinafter Hearing Notice]. Notice of receipt of FirstEnergy's license renewal application was published in the Federal Register on September 20, 2010. FirstEnergy Nuclear Operating Company; Notice of Receipt and Availability of Application for Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57,299 (Sept. 20, 2010). proceeding and to request a hearing.
6 Notice of Acceptance for Docketing of the Application, Notice of Opportunity for Hearing for Facility Operating License No. NPF-003 for an Additional 20-Year Period; First[E]nergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Unit 1, 75 Fed. Reg. 65,528, 65,528-29 (Oct. 25, 2010) [hereinafter Hearing Notice]. Notice of receipt of FirstEnergys license renewal application was published in the Federal Register on September 20, 2010. FirstEnergy Nuclear Operating Company; Notice of Receipt and Availability of Application for Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57,299 (Sept. 20, 2010).
7 The Joint Petitioners filed the Petition and several exhibits on December 27.
 
8 Between midnight and 3:10 a.m. on December 28, the Joint Petitioners filed nearly seventy more exhibits one at a time.
proceeding and to request a hearing.7 The Joint Petitioners filed the Petition and several exhibits on December 27.8 Between midnight and 3:10 a.m. on December 28, the Joint Petitioners filed nearly seventy more exhibits one at a time.9 They filed two final exhibits at 12:15 p.m. on December 28.10 Joint Petitioners filed an Errata to correct errors in the Petition on January 5, 2011.11 The Petitions first three contentions allege that the Applications environmental report (ER) does not adequately analyze, as reasonable baseload power alternatives, allegedly environmentally superior systems of renewable energy12respectively, wind power,13 solar power,14 and a combination of wind and solar power15with compressed air storage.16 The Petitions fourth contention concerns the ERs severe accident mitigation alternatives (SAMA) analysis.17 7
9 They filed two final exhibits at 12:15 p.m. on December 28.
Hearing Notice, 75 Fed. Reg. at 65,529.
10 Joint Petitioners filed "an Errata to correct errors" in the Petition on January 5, 2011.11 The Petition's first three contentions allege that the Application's environmental report (ER) does not adequately analyze, as reasonable baseload power alternatives, allegedly environmentally superior sy stems of renewable energy 12-respectively, wind power, 13 solar power, 14 and a combination of wind and solar power 15-with compressed air storage.
8 Petition; Declarations in Support of Standing from Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan and Green Party of Ohio, and Individual Organization Members (Dec. 27, 2010) [hereinafter Standing Decls.]; Exhibits in support of the Petition to Intervene in the License Renewal proceeding for Davis[-]Besse [hereinafter Petition Attachments].
16 The Petition's fourth contention concerns the ER's severe accident mitigation alternatives (SAMA) analysis.17 7 Hearing Notice, 75 Fed. Reg. at 65,529.
9 Declaration and Curriculum Vitae of Alvin Compaan, Intervenors Expert Witness on Contention
8 Petition; Declarations in Support of Standing from Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan and Green Party of Ohio, and Individual Organization Members (Dec. 27, 2010) [hereinafter Standing Decls.]; Exhibits in support of the Petition to Intervene in the License Renewal proceeding for Davis[-]Besse [hereinafter Petition Attachments].
#2 (signed Dec. 27, 2010, submitted Dec. 28, 2010) [hereinafter Compaan Decl.]; Petition Attachments.
9 Declaration and Curriculum Vitae of Alvin Compaan, Intervenors' Expert Witness on Contention #2 (signed Dec. 27, 2010, submitted Dec. 28, 2010) [hereinafter Compaan Decl.]; Petition Attachments.
10 Petition Attachments.
10 Petition Attachments.
11 Errata (Jan. 5, 2011).
11 Errata (Jan. 5, 2011).
12 Petition at 15-17, 27-28, 71, 82-83.
12 Petition at 15-17, 27-28, 71, 82-83.
13 Id. at 10. 14 Id. at 68-69.
13 Id. at 10.
15 Id. at 93. 16 Id. at 28, 71.
14 Id. at 68-69.
17 Id. at 100. FirstEnergy and the NRC Staff filed answers on January 21, 2011.
15 Id. at 93.
18 Both argue that petitioner CEA lacks standing and that every proffered contention is inadmissible.
16 Id. at 28, 71.
19 FirstEnergy further argues that the entire petition should be dismissed as untimely and that CEA has not shown that it authorized anyone to represent it.
17 Id. at 100.
20 Joint Petitioners filed a combined reply on January 28.
 
21 FirstEnergy moved to strike portions of this reply on February 7, arguing that it impermissibly expanded the scope of the original Petition without satisfying the standards governing new or amended contentions.
FirstEnergy and the NRC Staff filed answers on January 21, 2011.18 Both argue that petitioner CEA lacks standing and that every proffered contention is inadmissible.19 FirstEnergy further argues that the entire petition should be dismissed as untimely and that CEA has not shown that it authorized anyone to represent it.20 Joint Petitioners filed a combined reply on January 28.21 FirstEnergy moved to strike portions of this reply on February 7, arguing that it impermissibly expanded the scope of the original Petition without satisfying the standards governing new or amended contentions.22 Joint Petitioners filed an errata to their reply on February 1023 and an opposition to the motion to strike on February 17.24 On February 18 this Board granted FirstEnergys motion to strike and ordered Joint Petitioners to re-file a revised reply with the disputed portions deleted, the errata incorporated, and the pages numbered.25 Joint Petitioners filed a revised reply on February 2326 18 FirstEnergys Answer Opposing Request for Public Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter FirstEnergy Answer]; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter NRC Staff Answer].
22 Joint Petitioners filed an errata to their reply on February 10 23 and an opposition to the motion to strike on February 17.
19 FirstEnergy Answer at 2-3; NRC Staff Answer at 2, 6-7. FirstEnergy argued in its answer that petitioner Dont Waste Michigan also lacks standing, id. at 2-3, but withdrew this challenge during oral argument. Tr. at 38-39.
24 On February 18 this Board granted FirstEnergy's motion to strike and ordered Joint Petitioners to re-file a revised reply with the disputed portions deleted, the errata incorporated, and the pages numbered.
25 Joint Petitioners filed a revised reply on February 23 26 18 FirstEnergy's Answer Opposing Request for Public Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter FirstEnergy Answer];
NRC Staff's Answer to Joint Petitioners' Request for a Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter NRC Staff Answer].
19 FirstEnergy Answer at 2-3; NRC Staff Answer at 2, 6-7. FirstEnergy argued in its answer that petitioner Don't Waste Michigan also lacks standing, id. at 2-3, but withdrew this challenge during oral argument. Tr. at 38-39.
20 FirstEnergy Answer at 2.
20 FirstEnergy Answer at 2.
21 Joint Intervenors' Combined Reply in Support of Petition for Leave to Intervene (Jan. 28, 2011).
21 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (Jan. 28, 2011).
22 FirstEnergy's Motion to Strike Portions of Petitioners' Combined Reply (Feb. 7, 2011) at 1 (citing 10 C.F.R. § 2.309(c), (f)(2)).
22 FirstEnergys Motion to Strike Portions of Petitioners Combined Reply (Feb. 7, 2011) at 1 (citing 10 C.F.R. § 2.309(c), (f)(2)).
23 Errata (Feb. 10, 2011).
23 Errata (Feb. 10, 2011).
24 Joint Intervenors' Combined Reply in Opposition to FENOC's 'Motion to Strike' (Feb. 17, 2011).
24 Joint Intervenors Combined Reply in Opposition to FENOCs Motion to Strike (Feb. 17, 2011).
25 Licensing Board Order (Granting Motion To Strike and Requiring Re-filing of Reply) (Feb. 18, 2011) at 4 (unpublished).
25 Licensing Board Order (Granting Motion To Strike and Requiring Re-filing of Reply) (Feb. 18, 2011) at 4 (unpublished).
26 Joint Intervenors' Combined Reply in Support of Petition for Leave to Intervene (Corrected Version) (Feb. 23, 2011). and a final revised reply on February 24.
26 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (Corrected Version) (Feb. 23, 2011).
27 This Board heard oral argument on the Petition in Port Clinton, Ohio, on March 1, 2011.
 
28   On the eve of oral argument, Joint Petitioners submitted a notice seeking to bring to the Board's attention a recently published Licensing Board order.
and a final revised reply on February 24.27 This Board heard oral argument on the Petition in Port Clinton, Ohio, on March 1, 2011.28 On the eve of oral argument, Joint Petitioners submitted a notice seeking to bring to the Boards attention a recently published Licensing Board order.29 II.       Analysis of Timeliness, Standing and Representation Any person or organization seeking to intervene as a party in a NRC adjudicatory proceeding addressing a proposed licensing action must: (1) establish standing; and (2) proffer at least one admissible contention.30 In addition, an officer, member or attorney representing an organization in such a proceeding must file a written notice of appearance stating, among other things, his or her basis for representing the organization.31 Before analyzing standing, representation and contention admissibility, we first address the timeliness of the Petition.
29 II. Analysis of Timeliness, Standing and Representation Any person or organization seeking to intervene as a party in a NRC adjudicatory proceeding addressing a proposed licensing action must: (1) establish standing; and (2) proffer at least one admissible contention.
A.     Timeliness FirstEnergy argues the Petition is untimely and should be rejected because Joint Petitioners filed 67 exhibits and an expert affidavit after the deadline for submitting an intervention petition challenging the Davis-Besse renewal application, which was 11:59 p.m. Eastern Time on 27 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (2nd, Final Corrected Version) (Feb. 24, 2011) [hereinafter Reply]. Beyond Nuclears representative explained at oral argument that he filed the February 24 reply because he had inadvertently retained, in the February 23 reply, material the Board had struck. Tr. at 35-37.
30 In addition, an officer, member or attorney representing an organization in such a proceeding must file a written notice of appearance stating, among other things, his or her basis for representing the organization.
31 Before analyzing standing, representation and contention admissibility, we first address the timeliness of the Petition.
A. Timeliness FirstEnergy argues the Petition "is untimely and should be rejected" because Joint Petitioners filed "67 exhibits and an expert affidavit" after the deadline for submitting an intervention petition challenging the Davis-Besse renewal application, which was 11:59 p.m. Eastern Time on 27 Joint Intervenors' Combined Reply in Support of Petition for Leave to Intervene (2nd, Final Corrected Version) (Feb. 24, 2011) [hereinafter Reply]. Beyond Nuclear's representative explained at oral argument that he filed the February 24 reply because he had inadvertently retained, in the February 23 reply, material the Board had struck. Tr. at 35-37.
28 Tr. at 1-239.
28 Tr. at 1-239.
29 Joint Intervenors' Notice of Additional Authority (Feb. 28, 2011) (attaching NextEra Energy Seabrook LLC (Seabrook Station, Unit 1), LBP-11-02, 73 NRC __ (slip op.) (Feb. 15, 2011)). In response to FirstEnergy's objection at oral argument that Joint Petitioners inappropriately included five pages of supplemental legal argument in the notice, Tr. at 229-30, this Board stated that it is aware of the order, that the order is not binding on this Board, that it will use the order to the extent it is helpful, and that it will disregard the supplemental legal argument that came with the filing. Id.
29 Joint Intervenors Notice of Additional Authority (Feb. 28, 2011) (attaching NextEra Energy Seabrook LLC (Seabrook Station, Unit 1), LBP-11-02, 73 NRC __ (slip op.) (Feb. 15, 2011)). In response to FirstEnergys objection at oral argument that Joint Petitioners inappropriately included five pages of supplemental legal argument in the notice, Tr. at 229-30, this Board stated that it is aware of the order, that the order is not binding on this Board, that it will use the order to the extent it is helpful, and that it will disregard the supplemental legal argument that came with the filing. Id.
at 230-31.
at 230-31.
30 10 C.F.R. § 2.309(a).
30 10 C.F.R. § 2.309(a).
31 Id. § 2.314(b). December 27, 2010.
31 Id. § 2.314(b).
32 FirstEnergy reasons that because "an electronic filing is only complete 'when the filer performs the last act that it must perform to transmit a document, in its entirety
 
,'" the entire Petition is untimely.
December 27, 2010.32 FirstEnergy reasons that because an electronic filing is only complete when the filer performs the last act that it must perform to transmit a document, in its entirety, the entire Petition is untimely.33 At oral argument FirstEnergy stated the filing deadline is akin to a statute of limitations.34 Joint Petitioners assert that this was the first adjudicatory filing situation for the inexperienced, pro se coordinator35 who was the Joint Petitioners point person when the Petition was filed.36 Joint Petitioners argue that, because they were proceeding pro se at that time, they should be shown greater leeway on the question of whether they have demonstrated good cause for lateness than petitioners represented by counsel.37 The Commission has directed that pro se litigants generally be extended some latitude, although they are still expected to comply with procedural rules.38 While the petition itself was timely filed, we must balance the eight factors set forth in 10 C.F.R. § 2.309(c)(1) to determine whether we can consider Joint Petitioners late-filed exhibits.
33 At oral argument FirstEnergy stated the filing deadline is akin to a statute of limitations.
Good cause for the failure to file on time is the most important factor.39 32 FirstEnergy Answer at 2 (citing Hearing Notice, 75 Fed. Reg. 65,528; 10 C.F.R. § 2.306(c)).
34 Joint Petitioners assert that this was the "first adjudicatory filing situation" for the "inexperienced, pro se coordinator" 35 who was the "Joint Petitioners' point person" when the Petition was filed.
36 Joint Petitioners argue that, because they were proceeding pro se at that time, they should be "shown greater leeway on the question of whether they have demonstrated good cause for lateness than petitioners represented by counsel."
37 The Commission has directed that pro se litigants generally be extended some latitude, although they are still expected to comply with procedural rules.
38 While the petition itself was timely filed, we must balance the eight factors set forth in 10 C.F.R. § 2.309(c)(1) to determine whether we can consider Joint Petitioners' late-filed exhibits. Good cause for the failure to file on time is the most important factor.
39 32 FirstEnergy Answer at 2 (citing Hearing Notice, 75 Fed. Reg. 65,528; 10 C.F.R. § 2.306(c)).
33 Id. (quoting 10 C.F.R. § 2.302(d)(1)) (emphasis added in FirstEnergy Answer).
33 Id. (quoting 10 C.F.R. § 2.302(d)(1)) (emphasis added in FirstEnergy Answer).
34 Tr. at 35.
34 Tr. at 35.
35 Reply at 5.
35 Reply at 5.
36 Reply, Attach., Declaration of Kevin Kamps, Beyond Nuclear ¶ 1 (Jan. 28, 2011) [hereinafter Kamps Decl.].
36 Reply, Attach., Declaration of Kevin Kamps, Beyond Nuclear ¶ 1 (Jan. 28, 2011) [hereinafter Kamps Decl.].
37 Id. at 4-5 (citing Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), LBP-03-23, 58 NRC 372, 378 (2003)). Joint Petitioners also argue FirstEnergy "can make no credible showing of prejudice.Id. at 5. We do not consider whether FirstEnergy was prejudiced by the late filing because prejudice is not a factor in the balancing test for nontimely filings. 10 C.F.R. § 2.309(c)(1).
37 Id. at 4-5 (citing Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), LBP-03-23, 58 NRC 372, 378 (2003)). Joint Petitioners also argue FirstEnergy can make no credible showing of prejudice. Id. at 5. We do not consider whether FirstEnergy was prejudiced by the late filing because prejudice is not a factor in the balancing test for nontimely filings. 10 C.F.R.
§ 2.309(c)(1).
38 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-01, 71 NRC __, __ (slip op. at 5) (Jan. 7, 2010) (citations omitted).
38 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-01, 71 NRC __, __ (slip op. at 5) (Jan. 7, 2010) (citations omitted).
39 Crow Butte Res., Inc. (North Trend Expansion Project), CLI-09-12, 69 NRC 535, 549 n.61 (2009) (referring to 10 C.F.R. § 2.309(c)(1)(i)). In their reply, Joint Petitioners assert they have "'good cause' to have their Petition deemed timely,"40 explaining that they "experienced major difficulties with NRC's Electronic Information Exchange system on the night of . . . December 27, 2010."
39 Crow Butte Res., Inc. (North Trend Expansion Project), CLI-09-12, 69 NRC 535, 549 n.61 (2009)
41 Allegedly, when it "quickly became apparent that the EIE system was not working properly" for the point person, a second representative "rac[ed] to the Beyond Nuclear office" after 11:00 p.m.-on a day his organization observes as a holiday-to "successful[ly] fil[e] several key documents ahead of midnight" and to submit "73 items in all, one at a time."
(referring to 10 C.F.R. § 2.309(c)(1)(i)).
42 Two additional documents were filed after four hours of assistance from the agency's E-Filing Help Desk once it opened for the day.
 
43 The NRC Staff does not challenge the timeliness of the Petition.
In their reply, Joint Petitioners assert they have good cause to have their Petition deemed timely,40 explaining that they experienced major difficulties with NRCs Electronic Information Exchange system on the night of . . . December 27, 2010.41 Allegedly, when it quickly became apparent that the EIE system was not working properly for the point person, a second representative rac[ed] to the Beyond Nuclear office after 11:00 p.m.on a day his organization observes as a holidayto successful[ly] fil[e] several key documents ahead of midnight and to submit 73 items in all, one at a time.42 Two additional documents were filed after four hours of assistance from the agencys E-Filing Help Desk once it opened for the day.43 The NRC Staff does not challenge the timeliness of the Petition.44 They suggested at oral argument, however, that it would have been helpful if the parties had not had to wait until the reply to know about the difficulties the Joint Petitioners experienced with the E-Filing system.45 In this case, the Petitioncomplete with active embedded links to most of the exhibitsthe standing declarations, and eight exhibits were submitted before the deadline.46 The balance of the exhibits was filed overnight and into the next day.47 All parties to an adjudicatory proceeding have an obligation to prepare and to file their pleadings and submissions in a timely manner and in accordance with the regulations. The Board believes thatfor lengthy documents with multiple attachmentsthis means beginning the filing process sufficiently in advance of the deadline so that if unforeseen problems arise, the document and all referenced exhibits and attachments can 40 Reply at 4.
44 They suggested at oral argument, however, that "it would have been helpful" if the parties had not had to wait until the reply to know about the difficulties the Joint Petitioners experienced with the E-Filing system.
41 Id. at 2.
45 In this case, the Petition-complete with active embedded links to most of the exhibits-the standing declarations, and eight exhibits were submitted before the deadline.
42 Id. at 2-4; accord Kamps Decl. ¶¶ 4-7.
46 The balance of the exhibits was filed overnight and into the next day.
47 All parties to an adjudicatory proceeding have an obligation to prepare and to file their pleadings and submissions in a timely manner and in accordance with the regulations. The Board believes that-for lengthy documents with multiple attachments-this means beginning the filing process sufficiently in advance of the deadline so that if unforeseen problems arise, the document and all referenced exhibits and attachments can 40 Reply at 4.
41 Id. at 2. 42 Id. at 2-4; accord Kamps Decl. ¶¶ 4-7.
43 Kamps Decl. ¶ 11; accord Reply at 4.
43 Kamps Decl. ¶ 11; accord Reply at 4.
44 Tr. at 33.
44 Tr. at 33.
45 Id. 46 Petition; Standing Decls.; Petition Attachments; accord Reply at 3.
45 Id.
47 Compaan Decl.; Petition Attachments. still be filed in their entirety prior to the deadline.
46 Petition; Standing Decls.; Petition Attachments; accord Reply at 3.
48 If a petitioner encounters problems with a particular document or with the agency's E-Filing system so that the document cannot be filed before the deadline, it is incumbent upon that petitioner to explain the circumstances surrounding the problem as soon as possible to the Board and the parties, by promptly filing a motion seeking leave from the Board to accept the document out of time. In this situation, it appears the Joint Petitioners began the filing process approximately one hour before the deadline.
47 Compaan Decl.; Petition Attachments.
49 Given the problems they encountered and the size of the filing, one hour was not sufficient time to complete the filing. However, the Joint Petitioners were able timely to file the Petition in its entirety and some of the exhibits. Most of the exhibits were filed after the deadline, and for those exhibits the Petitioners should have filed a motion seeking leave to have them accepted out of time. Given the Joint Petitioners' inexperienced pro se coordinator (and first-time filer) and the apparent problems with the E-Filing system, we conclude that Joint Petitioners' efforts, as outlined in their reply pleading, demonstrate the required good cause for us to accept their untimely submissions. We therefore accept the nontimely exhibits for further consideration with the timely filed Petition. In the future Joint Petitioners are strongly advised to prepare their pleadings well in advance of any deadlines, and if any portion of a filing is untimely tendered, it must be accompanied by a motion pursuant to 10 C.F.R. §§ 2.309(c)(1) and 2.323.
 
B. Standing Joint Petitioners assert each has standing to intervene as the representative of its members living in geographic proximity to the Davis-Besse facility.
still be filed in their entirety prior to the deadline.48 If a petitioner encounters problems with a particular document or with the agencys E-Filing system so that the document cannot be filed before the deadline, it is incumbent upon that petitioner to explain the circumstances surrounding the problem as soon as possible to the Board and the parties, by promptly filing a motion seeking leave from the Board to accept the document out of time. In this situation, it appears the Joint Petitioners began the filing process approximately one hour before the deadline.49 Given the problems they encountered and the size of the filing, one hour was not sufficient time to complete the filing. However, the Joint Petitioners were able timely to file the Petition in its entirety and some of the exhibits. Most of the exhibits were filed after the deadline, and for those exhibits the Petitioners should have filed a motion seeking leave to have them accepted out of time. Given the Joint Petitioners inexperienced pro se coordinator (and first-time filer) and the apparent problems with the E-Filing system, we conclude that Joint Petitioners efforts, as outlined in their reply pleading, demonstrate the required good cause for us to accept their untimely submissions. We therefore accept the nontimely exhibits for further consideration with the timely filed Petition.
50 When an organization seeks to intervene in a representative capacity it must: (1) show that the interests it seeks to protect are 48 10 C.F.R. § 2.302(d)(1) provides that a filing by electronic transmission is complete only when "the filer performs the last act that it must perform to transmit a document, in its entirety."
In the future Joint Petitioners are strongly advised to prepare their pleadings well in advance of any deadlines, and if any portion of a filing is untimely tendered, it must be accompanied by a motion pursuant to 10 C.F.R. §§ 2.309(c)(1) and 2.323.
B.       Standing Joint Petitioners assert each has standing to intervene as the representative of its members living in geographic proximity to the Davis-Besse facility.50 When an organization seeks to intervene in a representative capacity it must: (1) show that the interests it seeks to protect are 48 10 C.F.R. § 2.302(d)(1) provides that a filing by electronic transmission is complete only when the filer performs the last act that it must perform to transmit a document, in its entirety.
49 Kamps Decl. ¶ 4.
49 Kamps Decl. ¶ 4.
50 Petition at 4-6. germane to its own purpose; (2) identify, by name and address, 51 at least one member who qualifies for standing in his or her own right; and (3) show that it is authorized by that member to request a hearing on his or her behalf.
50 Petition at 4-6.
52 In determining whether an individual member of an organization qualifies for standing in his or her own right, the NRC generally applies traditional judicial standing concepts, 53 which require a showing that the individual has suffered or might suffer a concrete and particularized injury that is:
 
(1) fairly traceable to the challenged action; (2) likely redressible by a favorable decision; 54 and (3) arguably within zone of interests protected by the governing statutes 55-e.g. the Atomic Energy Act of 1954 (AEA) 56 and the National Environmental Policy Act of 1969 (NEPA).
germane to its own purpose; (2) identify, by name and address,51 at least one member who qualifies for standing in his or her own right; and (3) show that it is authorized by that member to request a hearing on his or her behalf.52 In determining whether an individual member of an organization qualifies for standing in his or her own right, the NRC generally applies traditional judicial standing concepts,53 which require a showing that the individual has suffered or might suffer a concrete and particularized injury that is:
57 These standing requirements are codified at 10 C.F.R. § 2.309(d)(1)(ii)-(iv). In reactor license renewal cases, however, petitioners are entitled to invoke what has come to be known as the proximity presumption. This presumption of standing excuses petitioners from 51 Power Authority of New York (James A. FitzPatrick Nuclear Power Plant; Indian Point, Unit 3), CLI-00-22, 52 N.R.C. 266, 293 (2000).
(1) fairly traceable to the challenged action; (2) likely redressible by a favorable decision;54 and (3) arguably within zone of interests protected by the governing statutes55e.g. the Atomic Energy Act of 1954 (AEA)56 and the National Environmental Policy Act of 1969 (NEPA).57 These standing requirements are codified at 10 C.F.R. § 2.309(d)(1)(ii)-(iv).
52 Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-18, 65 NRC 399, 409 (2007) (citations omitted); cf. Friends of the Earth, Inc. v. Laidlaw Envtl. Servs. (TOC), Inc., 528 U.S. 167, 181 (2000) ("An association has standing to bring suit on behalf of its members when its members would otherwise have standing to sue in their own right, the interests at stake are germane to the organization's purpose, and neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit." (citing Hunt v. Wash. State Apple Adver.
In reactor license renewal cases, however, petitioners are entitled to invoke what has come to be known as the proximity presumption. This presumption of standing excuses petitioners from 51 Power Authority of New York (James A. FitzPatrick Nuclear Power Plant; Indian Point, Unit 3),
Comm'n , 432 U.S. 333, 343 (1977))).
CLI-00-22, 52 N.R.C. 266, 293 (2000).
53 Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), CLI-06-6, 63 NRC 161, 163 (2006) (citing U.S. Dep't of Energy (Plutonium Export License), CLI-04-17, 59 NRC 357, 363 (2004); Sacramento Mun. Util. Dist. (Rancho Seco Nuclear Generating Station), CLI-92-2, 35 NRC 47, 56 (1992)).
52 Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-18, 65 NRC 399, 409 (2007)
(citations omitted); cf. Friends of the Earth, Inc. v. Laidlaw Envtl. Servs. (TOC), Inc., 528 U.S. 167, 181 (2000) (An association has standing to bring suit on behalf of its members when its members would otherwise have standing to sue in their own right, the interests at stake are germane to the organizations purpose, and neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit. (citing Hunt v. Wash. State Apple Adver.
Commn, 432 U.S. 333, 343 (1977))).
53 Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), CLI-06-6, 63 NRC 161, 163 (2006) (citing U.S. Dept of Energy (Plutonium Export License), CLI-04-17, 59 NRC 357, 363 (2004); Sacramento Mun. Util. Dist. (Rancho Seco Nuclear Generating Station), CLI-92-2, 35 NRC 47, 56 (1992)).
54 Georgia Inst. of Tech. (Georgia Tech Research Reactor, Atlanta Georgia), CLI-95-12, 42 NRC 111, 115 (1995) (citing Lujan v. Defenders of Wildlife, 504 U.S. 555, 560-61 (1992)).
54 Georgia Inst. of Tech. (Georgia Tech Research Reactor, Atlanta Georgia), CLI-95-12, 42 NRC 111, 115 (1995) (citing Lujan v. Defenders of Wildlife, 504 U.S. 555, 560-61 (1992)).
55 Yankee Atomic Elec. Co. (Yankee Nuclear Power Station), CLI-96-1, 43 NRC 1, 6 (1996) (citing Cleveland Elec. Illuminating Co. (Perry Nuclear Power Plant, Unit 1), CLI-93-21, 38 NRC 87, 92 (1993)). 56 42 U.S.C. §§ 2011-2297.
55 Yankee Atomic Elec. Co. (Yankee Nuclear Power Station), CLI-96-1, 43 NRC 1, 6 (1996) (citing Cleveland Elec. Illuminating Co. (Perry Nuclear Power Plant, Unit 1), CLI-93-21, 38 NRC 87, 92 (1993)).
57 Id. §§ 4321-4346. the need to show an injury.
56 42 U.S.C. §§ 2011-2297.
The Commission has applied this geographic proximity presumption as follows: In practice, we have found standing based on this "proximity presumption" if a petitioner (or a representative of a petitioner organization) resides within approximately 50 miles of the facility in question.
57 Id. §§ 4321-4346.
58 The proximity presumption also applies if a petitioner "has frequent contacts with" this geographic zone of potential harm.
59  This presumption's rationale is that "persons living within the roughly 50-mile radius of the facility 'face a realistic threat of harm' if a release from the facility of radioactive


material were to occur."
the need to show an injury. The Commission has applied this geographic proximity presumption as follows:
60 The Joint Petitioners have each articulated how the interests it seeks to protect are germane to its own purpose. Beyond Nuclear's name implies that the organization is concerned about nuclear issues. It claims to have "over 6,000 members of whom a number reside, work and recreate" near the Davis-Besse Nuclear Power Station.
In practice, we have found standing based on this proximity presumption if a petitioner (or a representative of a petitioner organization) resides within approximately 50 miles of the facility in question.58 The proximity presumption also applies if a petitioner has frequent contacts with this geographic zone of potential harm.59 This presumptions rationale is that persons living within the roughly 50-mile radius of the facility face a realistic threat of harm if a release from the facility of radioactive material were to occur.60 The Joint Petitioners have each articulated how the interests it seeks to protect are germane to its own purpose. Beyond Nuclears name implies that the organization is concerned about nuclear issues. It claims to have over 6,000 members of whom a number reside, work and recreate near the Davis-Besse Nuclear Power Station.61 CEA asserts that it favor[s] the increased deployment of environmentally benign energy sources.62 Dont Waste Michigan asserts its articles of incorporation state its dedicat[ion] to educating the public about the dangers nuclear contamination poses to human health and the environment.63 The Green Party of Ohio asserts that it is concerned with the issue of alternative energy.64 Each of the Joint Petitioners also identifies at least one member qualified for standing in his or her own right based on the proximity presumption, and each of these members authorizes the 58 Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), CLI-09-20, 70 NRC 911, 915-16 (2009) (emphasis added).
61 CEA asserts that it "favor[s] the increased deployment of environmentally benign energy sources."
59 Id. at 915.
62 Don't Waste Michigan asserts its articles of incorporation state its "dedicat[ion] to educating the public about the dangers nuclear contamination poses to human health and the environment."
60 Id. at 917 (quoting Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP-09-4, 69 NRC 170, 183 (2009)) (emphasis added).
63 The Green Party of Ohio asserts that it is concerned with the issue of alternative energy.
64 Each of the Joint Petitioners also identifies at least one member qualified for standing in his or her own right based on the proximity presumption, and each of these members authorizes the 58 Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), CLI-09-20, 70 NRC 911, 915-16 (2009) (emphasis added).
59 Id. at 915. 60 Id. at 917 (quoting Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP-09-4, 69 NRC 170, 183 (2009)) (emphasis added).
61 Petition at 4.
61 Petition at 4.
62 Id. at 4. 63 Reply at 8.
62 Id. at 4.
64 Petition at 6. respective organization to represent his or her interests. Beyond Nuclear relies on the declaration of member Phyllis Oster, who provides a home address that is less than forty miles from the power station and states her interests will not be adequately represented unless Beyond Nuclear participates in this proceeding, impliedly authorizing the organization to represent her interests.
63 Reply at 8.
65 CEA provides declarations from two members, Derek and Richard Coronado (the Coronados), who state that their home is within a 50-mile radius of the Davis-Besse plant and designate CEA to represent their interests.
64 Petition at 6.
66 Don't Waste Michigan relies on the declaration of member Michael J. Keegan, who provides a home address that is less than twenty-five miles from the power station and designates Don't Waste Michigan to represent his interests.
 
67 The Green Party of Ohio provides declarations from three members, An ita Rios, Joseph R. DeMare, and Sean Nestor, who each provide a home address within twenty-five miles of the power station and designate the Green Party of Ohio to represent their interests.
respective organization to represent his or her interests. Beyond Nuclear relies on the declaration of member Phyllis Oster, who provides a home address that is less than forty miles from the power station and states her interests will not be adequately represented unless Beyond Nuclear participates in this proceeding, impliedly authorizing the organization to represent her interests.65 CEA provides declarations from two members, Derek and Richard Coronado (the Coronados), who state that their home is within a 50-mile radius of the Davis-Besse plant and designate CEA to represent their interests.66 Dont Waste Michigan relies on the declaration of member Michael J.
68 FirstEnergy and the NRC Staff contest the standing of only Derek and Richard Coronado and their organization, CEA.
Keegan, who provides a home address that is less than twenty-five miles from the power station and designates Dont Waste Michigan to represent his interests.67 The Green Party of Ohio provides declarations from three members, Anita Rios, Joseph R. DeMare, and Sean Nestor, who each provide a home address within twenty-five miles of the power station and designate the Green Party of Ohio to represent their interests.68 FirstEnergy and the NRC Staff contest the standing of only Derek and Richard Coronado and their organization, CEA.69 FirstEnergy contends that CEA cannot rely on the proximity presumption to establish standing because the Coronados appear to live slightly more than 50 miles from Davis-Besse.70 The NRC Staff agree that CEA has not shown standing because the Coronados do not qualify for the proximity presumption and CEA has not otherwise alleged and demonstrated an appropriate 65 See Declaration of Phyllis Oster (Dec. 24, 2010).
69 FirstEnergy contends that CEA "cannot rely on the proximity presumption to establish standing" because "the Coronados appear to live slightly more than 50 miles from Davis-Besse."
70 The NRC Staff agree that CEA has not shown standing because the Coronados do not qualify for the proximity presumption and CEA has not otherwise alleged and demonstrated an appropriate 65 See Declaration of Phyllis Oster (Dec. 24, 2010).
66 Declaration of Derek Coronado (Dec. 26, 2010) [hereinafter D. Coronado Decl.]; Declaration of Richard Coronado (Dec. 26, 2010) [hereinafter R. Coronado Decl.].
66 Declaration of Derek Coronado (Dec. 26, 2010) [hereinafter D. Coronado Decl.]; Declaration of Richard Coronado (Dec. 26, 2010) [hereinafter R. Coronado Decl.].
67 See Declaration of Michael J. Keegan (Dec. 27, 2010).
67 See Declaration of Michael J. Keegan (Dec. 27, 2010).
68 See Declaration of Anita Rios (Dec. 26, 2010); Declaration of Joseph R. DeMare (Dec. 14, 2010); Declaration of Sean Nestor (Dec. 26, 2010).
68 See Declaration of Anita Rios (Dec. 26, 2010); Declaration of Joseph R. DeMare (Dec. 14, 2010); Declaration of Sean Nestor (Dec. 26, 2010).
69 FirstEnergy Answer at 8-9; NRC Staff Answer at 6-7.
69 FirstEnergy Answer at 8-9; NRC Staff Answer at 6-7.
70 FirstEnergy Answer at 9. injury.71  The NRC Staff calculates that the Coronado's residence is "approximately 300 feet" outside the 50-mile radius of Davis-Besse, 72 measuring from the center line of the reactor to the nearest corner of the Coronado's property, 73 and FirstEnergy calculates the deficit as 0.024 miles.74  FirstEnergy's calculations place the Coronado residence 127 feet beyond a 50-mile radius from the center line of the reactor. The Joint Petitioners respond that the Coronados "are within 49.751 miles of the containment building at Davis-Besse" when they "are at work or meeting" in the CEA office.
70 FirstEnergy Answer at 9.
75  The Petition identifies the Coronados as CEA's coordinators and provides the address of the CEA


office.76 If Joint Petitioners' calculation is converted from miles to feet, CEA's office is 1314.7 feet within the 50-mile radius. Following the Commission's example, we "construe the petition in favor of the petitioner" in determining whether a petitioner has demonstrated standing.
injury.71 The NRC Staff calculates that the Coronados residence is approximately 300 feet outside the 50-mile radius of Davis-Besse,72 measuring from the center line of the reactor to the nearest corner of the Coronados property,73 and FirstEnergy calculates the deficit as 0.024 miles.74 FirstEnergys calculations place the Coronado residence 127 feet beyond a 50-mile radius from the center line of the reactor.
77 As previously mentioned, a petitioner may avail himself or herself of the proximity presumption if he or she lives within approximately 50 miles of the facility or otherwise has frequent contacts within this area.
The Joint Petitioners respond that the Coronados are within 49.751 miles of the containment building at Davis-Besse when they are at work or meeting in the CEA office.75 The Petition identifies the Coronados as CEAs coordinators and provides the address of the CEA office.76 If Joint Petitioners calculation is converted from miles to feet, CEAs office is 1314.7 feet within the 50-mile radius.
78 We are satisfied that the filed pleadings and the oral argument indicate that the Coronados' residence is approximately 50 miles from Davis-Besse and their work address is less than 50 miles from Davis-Besse. Further, common sense would dictate that the Coronados would have frequent contacts within the 50-mile radius of the plant because of where they live and where they work.
Following the Commissions example, we construe the petition in favor of the petitioner in determining whether a petitioner has demonstrated standing.77 As previously mentioned, a petitioner may avail himself or herself of the proximity presumption if he or she lives within approximately 50 miles of the facility or otherwise has frequent contacts within this area.78 We are satisfied that the filed pleadings and the oral argument indicate that the Coronados residence is approximately 50 miles from Davis-Besse and their work address is less than 50 miles from Davis-Besse. Further, common sense would dictate that the Coronados would have frequent contacts within the 50-mile radius of the plant because of where they live and where they work.
71 NRC Staff Answer at 6-7.
71 NRC Staff Answer at 6-7.
72 Id. at 6. 73 Tr. at 40-42.
72 Id. at 6.
73 Tr. at 40-42.
74 See FirstEnergy Answer at 9 n.31.
74 See FirstEnergy Answer at 9 n.31.
75 Reply at 7; accord Tr. at 45-46.
75 Reply at 7; accord Tr. at 45-46.
76 Petition at 5.
76 Petition at 5.
77 Georgia Tech., CLI-95-12, 42 NRC at 115.
77 Georgia Tech., CLI-95-12, 42 NRC at 115.
78 Calvert Cliffs, CLI-09-20, 70 NRC at 915-16. Accordingly, the Coronados qualify for the proximity presumption and CEA may assert representational standing on their behalf.
78 Calvert Cliffs, CLI-09-20, 70 NRC at 915-16.
79 C. Representation by Member, Officer or Attorney FirstEnergy also challenges CEA's participation on the ground that Joint Petitioners fail to include documentation showing that CEA has authorized Derek Coronado or any other officer or member of the organization to represent it.
 
80 10 C.F.R. § 2.314(b) provides that a "duly authorized member or officer" may represent his or her "partnership, corporation, or unincorporated association" even if he or she is not an attorney at law, but the representative's notice of appearance must state "the basis of his or her authority to act on behalf of the party.An organization's standing can be demonstrated through the interests of its members, but if a member acts or speaks on behalf of the organization, "that member must also demonstrate authorization by that organization to represent it."
Accordingly, the Coronados qualify for the proximity presumption and CEA may assert representational standing on their behalf.79 C. Representation by Member, Officer or Attorney FirstEnergy also challenges CEAs participation on the ground that Joint Petitioners fail to include documentation showing that CEA has authorized Derek Coronado or any other officer or member of the organization to represent it.80 10 C.F.R. § 2.314(b) provides that a duly authorized member or officer may represent his or her partnership, corporation, or unincorporated association even if he or she is not an attorney at law, but the representatives notice of appearance must state the basis of his or her authority to act on behalf of the party. An organizations standing can be demonstrated through the interests of its members, but if a member acts or speaks on behalf of the organization, that member must also demonstrate authorization by that organization to represent it.81 Accordingly, although the Coronados declarations show they authorize CEA to represent their interests,82 to act as CEAs representatives they would also have to demonstrate that the organization in turn has authorized them to represent it.
81 Accordingly, although the Coronados' declarations show they authorize CEA to represent their interests, 82 to act as CEA's representatives they would also have to demonstrate that the organization in turn has authorized them to represent it.
On February 22, 2011 Terry J. Lodge filed a notice of appearance.83 The notice of appearance indicates Mr. Lodge is a member of the bar of the Supreme Court of Ohio and further indicates that he is attorney of record in this matter for CEA, Dont Waste Michigan, and the Green 79 We note that the arguments of both the NRC Staff and FirstEnergy in this regard are approximately 1000 feet past the point from which frivolous arguments are measured.
On February 22, 2011 Terry J. Lodge filed a notice of appearance.
83 The notice of appearance indicates Mr. Lodge is a member of the bar of the Supreme Court of Ohio and further indicates that he is attorney of record in this matter for CEA, Don't Waste Michigan, and the Green 79 We note that the arguments of both the NRC Staff and FirstEnergy in this regard are approximately 1000 feet past the point from which frivolous arguments are measured.
80 FirstEnergy Answer at 8.
80 FirstEnergy Answer at 8.
81 See Detroit Edison Co. (Enrico Fermi Atomic Power Plant, Unit 2), LBP-78-37, 8 NRC 575, 583 (1978) (citing Tenn. Valley Auth. (Watts Bar Nuclear Plant, Units 1 and 2), ALAB-413, 5 NRC 1418, 1421 (1977))).
81 See Detroit Edison Co. (Enrico Fermi Atomic Power Plant, Unit 2), LBP-78-37, 8 NRC 575, 583 (1978) (citing Tenn. Valley Auth. (Watts Bar Nuclear Plant, Units 1 and 2), ALAB-413, 5 NRC 1418, 1421 (1977))).
82 D. Coronado Decl.; R. Coronado Decl.
82 D. Coronado Decl.; R. Coronado Decl.
83 Notice of Appearance of Counsel for Citizens Environmental Alliance of Southwestern Ontario, Don't Waste Michigan, and Green Party of Ohio (Feb. 22, 2011). Party of Ohio.
83 Notice of Appearance of Counsel for Citizens Environmental Alliance of Southwestern Ontario, Dont Waste Michigan, and Green Party of Ohio (Feb. 22, 2011).
84 His notice of appearance also includes his state bar number.
 
85 The notice of appearance and the fact that CEA is now represented by an attorney cures any possible deficiency in representation which may have existed when the Petition was filed by its pro se representative.
Party of Ohio.84 His notice of appearance also includes his state bar number.85 The notice of appearance and the fact that CEA is now represented by an attorney cures any possible deficiency in representation which may have existed when the Petition was filed by its pro se representative.86 We are lenient in permitting pro se petitioners the opportunity to cure procedural defects in petitions to intervene regarding standing.87 And although an allegation that a purported representative is acting without his or her organizations authorizationi.e. is acting ultra viresis distinct from a challenge to the organizations standing,88 a petitioner may cure such a defect in representation as well.89 In summary, Beyond Nuclear, CEA, Dont Waste Michigan, and the Green Party of Ohio all have shown that the interests they seek to protect are germane to their organizational purposes.
86 We are "lenient in permitting pro se petitioners the opportunity to cure procedural defects in petitions to intervene regarding standing."
Their individual declarants all have established standing to intervene in their own right and have authorized their respective organizations to represent their interests. Accordingly, each 84 Id.
87 And although an allegation that a purported representative is acting without his or her organization's authorization-i.e. is acting ultra vires-is distinct from a challenge to the organization's standing, 88 a petitioner may cure such a defect in representation as well.
85 Id.
89 In summary, Beyond Nuclear, CEA, Don't Waste Michigan, and the Green Party of Ohio all have shown that the interests they seek to protect are germane to their organizational purposes. Their individual declarants all have established standing to intervene in their own right and have authorized their respective organizations to represent their interests. Accordingly, each 84 Id. 85 Id. 86 An attorney who purports to represent a client without authorization is subject to disciplinary proceedings by the state bar association. See Ohio Rules of Prof'l Conduct R. 3.3(a)(1) (2007) (prohibiting lawyer from knowingly making a false statement of law or fact to a tribunal); Disciplinary Counsel v. Bursey, 919 N.E.2d 198, 204-06 (Ohio 2009) (disbarring permanently an attorney whose violations of the Rules of Professional Conduct included negotiating a settlement for a client that had never given him settlement authority, forging client's name on settlement check, and depositing it into attorney's bank account).
86 An attorney who purports to represent a client without authorization is subject to disciplinary proceedings by the state bar association. See Ohio Rules of Profl Conduct R. 3.3(a)(1) (2007)
87 PPL Bell Bend LLC (Bell Bend Nuclear Power Plant), LBP-09-18, 70 NRC 385, 396 (2009) (citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-7, 33 NRC 179, 195 (1991)); see, e.g., Virgil C. Summer Nuclear Station , CLI-10-01, 71 NRC at __ (slip op. at 6-8) (allowing petitioner to clarify standing declarations by submitting revised declarations with reply).
(prohibiting lawyer from knowingly making a false statement of law or fact to a tribunal);
88 See Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-535, 9 NRC 377, 395-96 (1979) (distinguishing the authority of an officer or attorney to sign a petition from an authorization "addressed to the organization's standing to intervene" (emphasis omitted)).
Disciplinary Counsel v. Bursey, 919 N.E.2d 198, 204-06 (Ohio 2009) (disbarring permanently an attorney whose violations of the Rules of Professional Conduct included negotiating a settlement for a client that had never given him settlement authority, forging clients name on settlement check, and depositing it into attorneys bank account).
89 See id. (stating how petitioner could have appropriately responded to "an intimation of ultra vires conduct" had the argument been raised). organization has demonstrated representational standing.
87 PPL Bell Bend LLC (Bell Bend Nuclear Power Plant), LBP-09-18, 70 NRC 385, 396 (2009)
90 And Attorney Lodge's notice of appearance cures the absence of a declaration or affidavit showing that CEA authorized any member or officer to represent it. III. Analysis of Contention Admissibility As previously noted, to participate as a party, a petitioner must not only establish standing, but must also proffer at least one admissible contention that meets the requirements of 10 C.F.R.  
(citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-7, 33 NRC 179, 195 (1991)); see, e.g., Virgil C. Summer Nuclear Station, CLI-10-01, 71 NRC at __ (slip op. at 6-8)
§ 2.309(f)(1). An admissible contention must: (i) provide a specific statement of the issue of law or fact to be raised; (ii) provide a brief explanation of the basis for the contention; (iii) demonstrate that the issue raised is within the proceeding's scope; (iv) demonstrate that the issue raised is material to the findings the NRC must make to s upport the action that is involved in the proceeding; (v) provide a concise statement of the alleged facts or expert opinions, including references to specific sources and documents, that support the petitioner's position and upon which the petitioner intends to rely at hearing; and (vi) show that a genuine dispute exists on a material issue of law or fact by referring to specific portions of the application that the petitioner disputes or, if the application is alleged to be deficient, by identifying such deficiencies and the supporting reasons for this allegation.
(allowing petitioner to clarify standing declarations by submitting revised declarations with reply).
91 In explaining these requirements, the Commission has said the agency "should not have to expend resources to support the hearing process unless there is an issue that is appropriate for, and susceptible to, resolution in an NRC hearing."
88 See Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-535, 9 NRC 377, 395-96 (1979) (distinguishing the authority of an officer or attorney to sign a petition from an authorization addressed to the organizations standing to intervene (emphasis omitted)).
92 Alternatives for reducing adverse 90 We deny Ms. Rios, Mr. DeMare, and Mr. Nestor's requests in the alternative for individual standing, Tr. at 37; Petition at 6, because the Green Party of Ohio has demonstrated representational standing. Tr. at 37. An individual may not intervene in his or her own right while simultaneously being represented by another petitioner in the same proceeding. Powertech (USA), Inc. (Dewey-Burdock In Situ Uranium Recovery Facility), LBP-10-16, 72 NRC __, __ (slip op. at 21) (Aug. 5, 2010).
89 See id. (stating how petitioner could have appropriately responded to an intimation of ultra vires conduct had the argument been raised).
 
organization has demonstrated representational standing.90 And Attorney Lodges notice of appearance cures the absence of a declaration or affidavit showing that CEA authorized any member or officer to represent it.
III. Analysis of Contention Admissibility As previously noted, to participate as a party, a petitioner must not only establish standing, but must also proffer at least one admissible contention that meets the requirements of 10 C.F.R.
§ 2.309(f)(1). An admissible contention must: (i) provide a specific statement of the issue of law or fact to be raised; (ii) provide a brief explanation of the basis for the contention; (iii) demonstrate that the issue raised is within the proceedings scope; (iv) demonstrate that the issue raised is material to the findings the NRC must make to support the action that is involved in the proceeding; (v) provide a concise statement of the alleged facts or expert opinions, including references to specific sources and documents, that support the petitioners position and upon which the petitioner intends to rely at hearing; and (vi) show that a genuine dispute exists on a material issue of law or fact by referring to specific portions of the application that the petitioner disputes or, if the application is alleged to be deficient, by identifying such deficiencies and the supporting reasons for this allegation.91 In explaining these requirements, the Commission has said the agency should not have to expend resources to support the hearing process unless there is an issue that is appropriate for, and susceptible to, resolution in an NRC hearing.92 Alternatives for reducing adverse 90 We deny Ms. Rios, Mr. DeMare, and Mr. Nestors requests in the alternative for individual standing, Tr. at 37; Petition at 6, because the Green Party of Ohio has demonstrated representational standing. Tr. at 37. An individual may not intervene in his or her own right while simultaneously being represented by another petitioner in the same proceeding. Powertech (USA), Inc. (Dewey-Burdock In Situ Uranium Recovery Facility), LBP-10-16, 72 NRC __, __ (slip op. at 21) (Aug. 5, 2010).
91 10 C.F.R. § 2.309(f)(1)(i)-(vi).
91 10 C.F.R. § 2.309(f)(1)(i)-(vi).
92 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004). environmental impacts, including impacts of severe accidents, 93 are among the limited issues within the scope of a license renewal proceeding.
92 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004).
94  A challenge to a Commission rule or regulation, however, is outside the scope of an adjudicatory hearing unless the petitioner first obtains a waiver.
95 For example, the Commission has codified generic determinations for certain environmental issues, identified as Category 1 issues, for license renewal proceedings.
96  Category 1 issues are not subject to challenge in a relicensing proceeding because they "involve environmental effects that are essentially similar for all plants [and] need not be assessed repeatedly on a site-specific


basis."97 Pursuant to 10 C.F.R. § 2.335, Category 1 issues cannot be addressed in a license renewal proceeding absent a waiver. Issues that require site-specific analysis, on the other hand, are identified as Category 2 issues.
environmental impacts, including impacts of severe accidents,93 are among the limited issues within the scope of a license renewal proceeding.94 A challenge to a Commission rule or regulation, however, is outside the scope of an adjudicatory hearing unless the petitioner first obtains a waiver.95 For example, the Commission has codified generic determinations for certain environmental issues, identified as Category 1 issues, for license renewal proceedings.96 Category 1 issues are not subject to challenge in a relicensing proceeding because they involve environmental effects that are essentially similar for all plants [and] need not be assessed repeatedly on a site-specific basis.97 Pursuant to 10 C.F.R. § 2.335, Category 1 issues cannot be addressed in a license renewal proceeding absent a waiver. Issues that require site-specific analysis, on the other hand, are identified as Category 2 issues.98 Category 2 issues must be reviewed on a site-specific basis because they have not been determined to be essentially similar for all plants;99 accordingly, challenges relating to these issues are properly part of a license renewal proceeding.
98 Category 2 issues must be reviewed on a site-specific basis because they have not been determined to be "essentially similar" for all plants; 99 accordingly, challenges relating to these issues are properly part of a license renewal proceeding. Although "[m]ere 'notice pleading' is insufficient" in NRC proceedings, 100 a petitioner does not have to prove its contentions at the admissibility stage, 101 and we do not adjudicate disputed 93 10 C.F.R. § 51.53(c)(3)(ii)(L).
Although [m]ere notice pleading is insufficient in NRC proceedings,100 a petitioner does not have to prove its contentions at the admissibility stage,101 and we do not adjudicate disputed 93 10 C.F.R. § 51.53(c)(3)(ii)(L).
9442 U.S.C. § 4332(2)(C)(iii); 10 C.F.R. §§ 54.29(b), 51.53(c)(2), 51.53(c)(3)(iii).
94 42 U.S.C. § 4332(2)(C)(iii); 10 C.F.R. §§ 54.29(b), 51.53(c)(2), 51.53(c)(3)(iii).
95 10 C.F.R. § 2.335(a).
95 10 C.F.R. § 2.335(a).
96 10 C.F.R. Part 51, subpt. A, app. B, n.2.
96 10 C.F.R. Part 51, subpt. A, app. B, n.2.
97 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11 (2001).
97 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11 (2001).
98 10 C.F.R. Part 51, subpt. A, app. B, n.2.
98 10 C.F.R. Part 51, subpt. A, app. B, n.2.
99 Id. 100 Fansteel, Inc. (Muskogee, Oklahoma, Site), CLI-03-13, 58 NRC 195, 203 (2003).
99 Id.
101 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 139 (2004). facts at this juncture.
100 Fansteel, Inc. (Muskogee, Oklahoma, Site), CLI-03-13, 58 NRC 195, 203 (2003).
102 The factual support required is "'a minimal showing that material facts are in dispute.'"
101 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 139 (2004).
103 All that is needed at this juncture is "alleged facts" and the factual support "need not be in affidavit or formal evidentiary form and need not be of the quality necessary to withstand a summary disposition motion."
 
104 A. Contentions One, Two and Three Although styled as separate contentions, Contentions One, Two and Three allege that FirstEnergy should have considered renewable ener gy sources in a more comprehensive manner in its ER. Contention One, simply titled Wind Power, states the "Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse."
facts at this juncture.102 The factual support required is a minimal showing that material facts are in dispute.103 All that is needed at this juncture is alleged facts and the factual support need not be in affidavit or formal evidentiary form and need not be of the quality necessary to withstand a summary disposition motion.104 A.     Contentions One, Two and Three Although styled as separate contentions, Contentions One, Two and Three allege that FirstEnergy should have considered renewable energy sources in a more comprehensive manner in its ER. Contention One, simply titled Wind Power, states the Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse.105 Likewise, Contention Two, entitled Solar Power, alleges the Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter solar power),
105 Likewise, Contention Two, entitled Solar Power, alleges the "Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter 'solar power'),
to offset the loss of energy production from Davis-Besse.106 In Contention Three, Joint Petitioners state NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power.107 The essence of Contentions One, Two and Three is that FirstEnergy should have evaluated wind power, solar photovoltaic power, or a combination of both, bolstered by energy storage, in a 102 Mississippi Power & Light, Co. (Grand Gulf Nuclear Station, Units 1 & 2), ALAB-130, 6 AEC 423, 426 (1973).
to offset the loss of energy production from Davis-Besse."
106 In Contention Three, Joint Petitioners state "NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power."
107 The essence of Contentions One, Two and Three is that FirstEnergy should have evaluated wind power, solar photovoltaic power, or a combination of both, bolstered by energy storage, in a 102 Mississippi Power & Light, Co. (Grand Gulf Nuclear Station, Units 1 & 2), ALAB-130, 6 AEC 423, 426 (1973).
103 Gulf States Utils. Co. (River Bend Station, Unit 1), CLI-94-10, 40 NRC 43, 51 (1994) (quoting Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) [hereinafter Procedural Changes]).
103 Gulf States Utils. Co. (River Bend Station, Unit 1), CLI-94-10, 40 NRC 43, 51 (1994) (quoting Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) [hereinafter Procedural Changes]).
104 Procedural Changes, 54 Fed. Reg. at 33,171.
104 Procedural Changes, 54 Fed. Reg. at 33,171.
105 Petition at 10.
105 Petition at 10.
106 Id. at 68-69.
106 Id. at 68-69.
107 Id. at 93. more comprehensive manner in its ER as an alternative to the renewal of Davis-Besse's operating license.108  1. Legal standards for alternatives analysis in an ER The Commission's regulations require an applicant seeking a license renewal to file an ER that includes an alternatives analysis that "cons iders and balances . . . the environmental impacts of alternatives to the proposed action, and altern atives available for reducing or avoiding adverse environmental effects."
107 Id. at 93.
109  An ER's adequacy is examined under the auspices of NEPA because the ER is the foundation upon which NRC's environmental impact statement (EIS) is prepared.
110  Therefore, an applicant's alternatives analysis must be "sufficiently complete to aid the


Commission in developing and exploring, pursuant to section 102(2)(E) of NEPA, 'appropriate alternatives'" to the proposed action.
more comprehensive manner in its ER as an alternative to the renewal of Davis-Besses operating license.108
111 Generally, NEPA requires that an environmental review provide a sufficient discussion of alternatives to "'enable the decisionmaker to take a "hard look" at environmental factors, and to make a reasoned decision.'"
: 1. Legal standards for alternatives analysis in an ER The Commissions regulations require an applicant seeking a license renewal to file an ER that includes an alternatives analysis that considers and balances . . . the environmental impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding adverse environmental effects.109 An ERs adequacy is examined under the auspices of NEPA because the ER is the foundation upon which NRCs environmental impact statement (EIS) is prepared.110 Therefore, an applicants alternatives analysis must be sufficiently complete to aid the Commission in developing and exploring, pursuant to section 102(2)(E) of NEPA, appropriate alternatives to the proposed action.111 Generally, NEPA requires that an environmental review provide a sufficient discussion of alternatives to enable the decisionmaker to take a hard look at environmental factors, and to make a reasoned decision.112 An applicants alternatives analysis need not discuss every conceivable alternative to the proposed action. Rather, NEPA requires only consideration of feasible, nonspeculative, and reasonable alternatives.113 In defining the scope of alternatives that applicants must consider, the 108 Id. at 10-11, 28, 68-69, 71, 93.
112 An applicant's alternatives analysis need not discuss every conceivable alternative to the proposed action. Rather, NEPA requires only consideration of "feasible, nonspeculative, and reasonable alternatives."
113 In defining the scope of alternatives that applicants must consider, the 108 Id. at 10-11, 28, 68-69, 71, 93.
109 10 C.F.R. § 51.45(c).
109 10 C.F.R. § 51.45(c).
110 See Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), CLI-10-02, 71 NRC__, __ (slip op. at 8) (Jan. 7, 2010) (stating that to facilitate the NRC's compliance with NEPA, the agency requires an applicant to submit "a complete environmental report with its application, which is essentially the applicant's proposal for the draft environmental impact statement" and that "contentions that seek compliance with NEPA must be based on that environmental report" (internal citations omitted)).
110 See Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), CLI 02, 71 NRC__, __ (slip op. at 8) (Jan. 7, 2010) (stating that to facilitate the NRCs compliance with NEPA, the agency requires an applicant to submit a complete environmental report with its application, which is essentially the applicants proposal for the draft environmental impact statement and that contentions that seek compliance with NEPA must be based on that environmental report (internal citations omitted)).
111 10 C.F.R. § 51.45(b)(3) (referring to 42 U.S.C. § 4332(2)(E)).
111 10 C.F.R. § 51.45(b)(3) (referring to 42 U.S.C. § 4332(2)(E)).
112 Tongass Conservation Soc'y v. Cheney, 924 F.2d 1137, 1140 (D.C. Cir. 1991) (quoting Natural Res. Def. Council, Inc. v. Hodel, 865 F.2d 288, 294 (D.C. Cir. 1988)).
112 Tongass Conservation Socy v. Cheney, 924 F.2d 1137, 1140 (D.C. Cir. 1991) (quoting Natural Res. Def. Council, Inc. v. Hodel, 865 F.2d 288, 294 (D.C. Cir. 1988)).
113 Entergy Nuclear Operations, Inc (Indian Point, Units 2 and 3), LBP-08-13, 68 NRC 43, 95 (2008) (citing Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP-05-31, 62 NRC   Commission has indicated that an ER need only consider the range of alternatives that are capable of achieving the goals of the proposed action.
113 Entergy Nuclear Operations, Inc (Indian Point, Units 2 and 3), LBP-08-13, 68 NRC 43, 95 (2008) (citing Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP-05-31, 62 NRC
114 The NRC generally defers to an applicant's stated purpose "so long as that purpose is not so narrow as to eliminate alternatives."
 
115 Generation of baseload power is an acceptable purpose for a licensing action and has been determined to be broad enough "to permit consideration of a host of energy generating alternatives."
Commission has indicated that an ER need only consider the range of alternatives that are capable of achieving the goals of the proposed action.114 The NRC generally defers to an applicants stated purpose so long as that purpose is not so narrow as to eliminate alternatives.115 Generation of baseload power is an acceptable purpose for a licensing action and has been determined to be broad enough to permit consideration of a host of energy generating alternatives.116 Here, the goal of the proposed license renewal is to deliver approximately 910 MWe of baseload power,117 beginning on April 22, 2017 and available for a period of 20 years.
116 Here, the goal of the proposed license renewal is to deliver "approximately 910 MWe" of baseload power, 117 beginning on April 22, 2017 and available for a period of 20 years. 2. Treatment of wind and solar alternatives in the ER FirstEnergy's ER devotes only four paragraphs to wind power, three paragraphs to solar power, and two paragraphs to a mix of renewable energy with natural gas generation, among other things, as alternatives to the Davis-Besse license renewal.
: 2. Treatment of wind and solar alternatives in the ER FirstEnergys ER devotes only four paragraphs to wind power, three paragraphs to solar power, and two paragraphs to a mix of renewable energy with natural gas generation, among other things, as alternatives to the Davis-Besse license renewal.118 The ER concludes, however, that none of these alternatives is reasonable.119 According to the ER, wind power cannot serve as a large base-load generator because it has a high degree of intermittency and relatively low average annual capacity and because 735, 753 (2005)); accord City of Carmel-by-the-Sea v. Dept of Transp., 123 F.3d 1142, 1155 (9th Cir. 1997); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-2, 33 NRC 61, 71 (1991).
118 The ER concludes, however, that none of these alternatives is reasonable.
114 See Hydro Res., Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-01-4, 53 NRC 31, 55 (2001) (Agencies need only discuss those alternatives that are reasonable and will bring about the ends of the proposed action. (quoting Citizens Against Burlington, Inc. v. Busey, 938 F.2d 190, 195 (D.C. Cir. 1991))).
119 According to the ER, wind power cannot "serve as a large base-load generator" because it has a "high degree of intermittency" and "relatively low" average annual capacity and because 735, 753 (2005)); accord City of Carmel-by-the-Sea v. Dep't of Transp., 123 F.3d 1142, 1155 (9th Cir. 1997); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-2, 33 NRC 61, 71 (1991).
114 See Hydro Res., Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-01-4, 53 NRC 31, 55 (2001) ("Agencies need only discuss those alternatives that are reasonable and 'will bring about the ends' of the proposed action." (quoting Citizens Against Burlington, Inc. v. Busey , 938 F.2d 190, 195 (D.C. Cir. 1991))).
115 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), LBP-09-2, 69 NRC 87, 110 (2009).
115 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), LBP-09-2, 69 NRC 87, 110 (2009).
116 Envtl. Law & Policy Ctr. v. NRC, 470 F.3d 676, 684 (7th Cir. 2006).
116 Envtl. Law & Policy Ctr. v. NRC, 470 F.3d 676, 684 (7th Cir. 2006).
117 Appendix E; Applicant's Environmental Report; Operating License Renewal Stage; Davis-Besse Nuclear Power Station at 7.2-7 (Aug. 2010) [hereinafter ER].
117 Appendix E; Applicants Environmental Report; Operating License Renewal Stage; Davis-Besse Nuclear Power Station at 7.2-7 (Aug. 2010) [hereinafter ER].
118 Id. at 7.2-9 to 7.2-10, 7.2-12 to 7.2-13.
118 Id. at 7.2-9 to 7.2-10, 7.2-12 to 7.2-13.
119 Id. at 7.2-12.   "current energy storage technologies are too expensive."
119 Id. at 7.2-12.
120  The ER's conclusion that wind power is not a reasonable alternative also rests in part on the "large land requirements and associated aesthetic impacts" of wind power.
121  Similarly, the ER concludes solar power is not a reasonable alternative because:  (1) it would require energy storage or supplemental energy sources because it is intermittent; (2) many solar technologies are "still in the demonstration phase of development" and are not "competitive with fossil or nuclear-based technologies . . . due to high costs"; and (3) it would require a large area of land-nearly 13,000 acres-to replace Davis-Besse's generating capacity.
122 Finally, the ER concludes that "[w]hen considered in various combinations . . . , these same renewable . . . energy resources still fail to be reasonable alternatives to renewal of Davis-Besse's


operating license."
current energy storage technologies are too expensive.120 The ERs conclusion that wind power is not a reasonable alternative also rests in part on the large land requirements and associated aesthetic impacts of wind power.121 Similarly, the ER concludes solar power is not a reasonable alternative because: (1) it would require energy storage or supplemental energy sources because it is intermittent; (2) many solar technologies are still in the demonstration phase of development and are not competitive with fossil or nuclear-based technologies . . . due to high costs; and (3) it would require a large area of landnearly 13,000 acresto replace Davis-Besses generating capacity.122 Finally, the ER concludes that [w]hen considered in various combinations . . . , these same renewable . . . energy resources still fail to be reasonable alternatives to renewal of Davis-Besses operating license.123 Putting forward a mix of 25 percent renewable energy and 75 percent natural gas generation as an example, the ER reasons that: (1) the fluctuation of wind and solar resources would cause increased uncertainty in energy output; (2) the land-use environmental impact of siting the resources would likely exceed the environmental impacts of Davis-Besses continued operation; and (3) the natural gas plants air quality impacts would greatly exceed continued operations environmental impacts.124
123 Putting forward a mix of 25 percent renewable energy and 75 percent natural gas generation as an example, the ER reasons that: (1) the "fluctuation of wind and solar resources" would cause "increased uncertainty in energy output"; (2) the land-use environmental impact of siting the resources would "likely exceed" the environmental impacts of Davis-Besse's continued operation; and (3) the natural gas plant's air quality impacts would "greatly exceed" continued operation's environmental impacts.
: 3.     Analysis of Joint Petitioners contentions Contention One states the ER fails to adequately evaluate the full potential for renewable 120 Id. at 7.2-9 (citing Division of Regulatory Applications, Office of Reactor Regulatory Research, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Vol. 1, § 8.3.1 (1996) [hereinafter GEIS, NUREG-1437, Vol. 1]; Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Beaver Valley Power Station, Units 1 and 2, NUREG-1437, Supp. 36, § 8.2.5.2 (May 2009)).
124 3. Analysis of Joint Petitioners' contentions   Contention One states the ER "fails to adequately evaluate the full potential for renewable 120 Id. at 7.2-9 (citing Division of Regulatory Applications, Office of Reactor Regulatory Research, Generic Environmental Impact Statement for Li cense Renewal of Nuclear Plants, NUREG-1437, Vol. 1, § 8.3.1 (1996) [hereinafter GEIS, NUREG-1437, Vol. 1]; Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Beaver Valley Power Station, Units 1 and 2, NUREG-1437, Supp. 36, § 8.2.5.2 (May 2009)).
121 Id.
121 Id. 122 Id. at 7.2-9 to 7.2-10 (citing GEIS, NUREG-1437, Vol. 1, §§ 8.3.2, 8.3.3).
122 Id. at 7.2-9 to 7.2-10 (citing GEIS, NUREG-1437, Vol. 1, §§ 8.3.2, 8.3.3).
123 Id. at 7.2-12.
123 Id. at 7.2-12.
124 Id. at 7.2-12 to 7.2-13. energy sources, such as wind power."
124 Id. at 7.2-12 to 7.2-13.
125 Contention Two is identical to Contention One except that it substitutes solar power for wind power.
 
126 Contention Three alleges: "NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-125 Petition at 10. The full contention reads: Contention One: Wind Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary. In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as wind power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the SEIS is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besse's remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOC's requested license extension period (2017 to 2037).
energy sources, such as wind power.125 Contention Two is identical to Contention One except that it substitutes solar power for wind power.126 Contention Three alleges: NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-125 Petition at 10. The full contention reads:
Contention One: Wind Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary.
In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as wind power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the SEIS is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besses remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOCs requested license extension period (2017 to 2037).
Id. at 10-11.
Id. at 10-11.
126 Id. at 68. The full contention reads: Contention Two: Solar Electric (Photovoltaic) Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter "solar power"), to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary. In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as solar power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the Supplemental Environment Impact Statement (SEIS) is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besse's remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOC's requested license extension period (2017 to  
126 Id. at 68. The full contention reads:
Contention Two: Solar Electric (Photovoltaic) Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter solar power), to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary. In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as solar power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the Supplemental Environment Impact Statement (SEIS) is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besses remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOCs requested license extension period (2017 to 2037).
Id. at 68-69.


2037). Id. at 68-69. generated baseload power."
generated baseload power.127 In the introduction to the third contention the Joint Petitioners seek to incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition.128 The NRC Staff and FirstEnergy argue that all three contentions are inadmissible. They assert that the Joint Petitioners do not demonstrate the existence of a material factual dispute with the ER as required by 10 C.F.R. § 2.309(f)(1)(vi).129 The NRC Staff argues that Joint Petitioners do not succeed at demonstrating that solar power can replace the 910 MWe of baseload power that Davis-Besse provides.130 NRC Staff also argues that Joint Petitioners have not provided sufficient information to support their assertions that offshore and onshore wind energy can replace Davis-Besses baseload power generation.131 Likewise FirstEnergy posits that Petitioners have not provided sufficient alleged facts or expert opinion to support their contentions.132 We will analyze Contentions One, Two and Three as if they were a single contention that challenges the sufficiency of the ERs analysis of renewable energy sources, specifically wind, solar or a combination of wind and solar, as a reasonable alternative to the renewal of Davis-127 The full contention reads:
127 In the introduction to the third contention the Joint Petitioners seek to "incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition."
Contention Three: Solar and Wind in Combination. The Relicensing GEIS Is Stale, Dated and NEPA Non-Compliant; Commercial Wind And Solar Photovoltaic Baseload Power Should Be Considered Under NEPA as a Single, Combined-Source Alternative. ¶ 158.
128 The NRC Staff and FirstEnergy argue that all three contentions are inadmissible. They assert that the Joint Petitioners do not demonstrate the existence of a material factual dispute with the ER as required by 10 C.F.R. § 2.309(f)(1)(vi).
NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power. Petitioners incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition.
129 The NRC Staff argues that Joint Petitioners do not succeed at demonstrating that solar power can replace the 910 MWe of baseload power that Davis-Besse provides.
Id. at 93.
130 NRC Staff also argues that Joint Petitioners have not "provided sufficient information to support their assertions that offshore and onshore wind energy can replace Davis-Besse's baseload power generation."
128 Petition at 93. Following Joint Petitioners lead, FirstEnergy incorporates by reference its responses to Contentions One and Two in its answer to Contention Three. FirstEnergy Answer at 64.
131 Likewise FirstEnergy posits that Petitioners have not provided sufficient alleged facts or expert opinion to support their contentions.
129 NRC Staff Answer at 20; FirstEnergy Answer at 33-34, 43, 45, 54, 59, 63-64, 65.
132 We will analyze Contentions One, Two and Three as if they were a single contention that challenges the sufficiency of the ER's analysis of renewable energy sources, specifically wind, solar or a combination of wind and solar, as a reasonable alternative to the renewal of Davis-127 The full contention reads: Contention Three: Solar and Wind in Combination. The Relicensing GEIS Is Stale, Dated and NEPA Non-Compliant; Commercial Wind And Solar Photovoltaic Baseload Power  
 
Should Be Considered Under NEPA as a Single, Combined-Source Alternative. ¶ 158. NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power. Petitioners incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition.
Id. at 93. 128 Petition at 93. Following Joint Petitioners' lead, FirstEnergy incorporates by reference its responses to Contentions One and Two in its answer to Contention Three. FirstEnergy Answer at
: 64. 129 NRC Staff Answer at 20; FirstEnergy Answer at 33-34, 43, 45, 54, 59, 63-64, 65.
130 NRC Staff Answer at 26.
130 NRC Staff Answer at 26.
131 Id. at 27. 132 FirstEnergy Answer at 47-48, 61-62. Besse's operating license.
131 Id. at 27.
133  As we review these three contentions, we will first eliminate those portions of the contention that are clearly extraneous to this proceeding, i.e. are outside the scope of this proceeding, are not material to this proceeding, or fail to raise a genuine dispute with the ER.134  4. Issues that are out of scope, not material or not supported  To the extent that Contentions One 135 and Two 136 refer to events that would "materialize over two decades to come . . . (2017 to 2037),"
132 FirstEnergy Answer at 47-48, 61-62.
137 we find any reference to events that will occur during that period of time not to be material to this proceeding and thus inadmissible. As conceded by Joint Petitioners, 138 any reasonable alternative to be evaluated in depth must be an alternative that is available now or in the near future and in any event no later than April 22, 2017, the expiration date of the current license. The Joint Petitioners raise a second extraneous issue in their assertion that "[t]he scope of the SEIS [sic] is improperly narrow, and the issue of the need for


Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix."
Besses operating license.133 As we review these three contentions, we will first eliminate those portions of the contention that are clearly extraneous to this proceeding, i.e. are outside the scope of this proceeding, are not material to this proceeding, or fail to raise a genuine dispute with the ER.134
139 The Joint Petitioners' argument about the need for power from Davis-Besse during the license renewal period is outside the scope of this proceeding and inadmissible under 10 C.F.R. § 2.309(f)(1)(iii) because it challenges 10 C.F.R. § 51.53(c)(2), which states that a license renewal ER "is not 133 Crow Butte, CLI-09-12, 69 NRC at 552 (stating boards may reformulate contentions "'to consolidate issues for a more efficient proceeding.'" (quoting Shaw Areva MOX Servs. (Mixed Oxide Fuel Fabrication Facility), LBP-08-11, 67 NRC 460, 482 (2008))).
: 4.      Issues that are out of scope, not material or not supported To the extent that Contentions One135 and Two136 refer to events that would materialize over two decades to come . . . (2017 to 2037),137 we find any reference to events that will occur during that period of time not to be material to this proceeding and thus inadmissible. As conceded by Joint Petitioners,138 any reasonable alternative to be evaluated in depth must be an alternative that is available now or in the near future and in any event no later than April 22, 2017, the expiration date of the current license. The Joint Petitioners raise a second extraneous issue in their assertion that [t]he scope of the SEIS [sic] is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix.139 The Joint Petitioners argument about the need for power from Davis-Besse during the license renewal period is outside the scope of this proceeding and inadmissible under 10 C.F.R. § 2.309(f)(1)(iii) because it challenges 10 C.F.R. § 51.53(c)(2), which states that a license renewal ER is not 133 Crow Butte, CLI-09-12, 69 NRC at 552 (stating boards may reformulate contentions to consolidate issues for a more efficient proceeding. (quoting Shaw Areva MOX Servs. (Mixed Oxide Fuel Fabrication Facility), LBP-08-11, 67 NRC 460, 482 (2008))).
134 Authority for narrowing the scope of a contention is found in 10 C.F.R. § 2.319(e) which authorizes the presiding officer to "[r]estrict irrelevant, immaterial, unreliable, duplicative or cumulative evidence and/or arguments."
134 Authority for narrowing the scope of a contention is found in 10 C.F.R. § 2.319(e) which authorizes the presiding officer to [r]estrict irrelevant, immaterial, unreliable, duplicative or cumulative evidence and/or arguments.
135 Petition at 10-11.
135 Petition at 10-11.
136 Id. at 69. 137 Id. at 11, 69.
136 Id. at 69.
137 Id. at 11, 69.
138 Tr. at 69.
138 Tr. at 69.
139 Petition at 10; accord id. at 69. required to include discussion of need for power.Under 10 C.F.R. § 2.335(a), this and other rules and regulations of the Commission are not subject to challenge in any adjudicatory proceeding in the absence of a waiver. Joint Petitioners have neither sought nor received a waiver of Section 51.53(c)(2).
139 Petition at 10; accord id. at 69.
A third extraneous issue the Joint Petitioners raise is the role the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) 140 should play in defining the range of alternatives to be considered in the ER. To the extent they urge that the "1996 Generic EIS' parameter s must be deemed legally void under NEPA[],"
 
141 the Joint Petitioners raise an issue that is both outside the scope of the proceeding and not material to any findings the NRC must make to support the requested action. Similarly, the Joint Petitioners' allegation, in the introduction to Contention Three, that the relicensing GEIS is "stale, dated and NEPA non-compliant" 142 is inadmissible because it raises issues that are beyond the scope of this proceeding and are not material, and therefore violates 10 C.F.R. §§ 2.309(f)(1)(iii) and (iv). 5. Admissible contention as narrowed by the Board The elimination of these extraneous issues reveals the admissible core of Contentions One, Two and Three. This core is the Joint Petitioners' challenge to the ER's failure to consider in a comprehensive manner combinations of wind and/or solar photovoltaic energy sources as an alternative to the Davis-Besse relicensing. Joint Petitioners charge that the ER contains a "vague and superficial" 143 discussion of wind, solar, and other renewable energy alternatives, 144 and 140 GEIS, NUREG-1437, Vol. 1.
required to include discussion of need for power. Under 10 C.F.R. § 2.335(a), this and other rules and regulations of the Commission are not subject to challenge in any adjudicatory proceeding in the absence of a waiver. Joint Petitioners have neither sought nor received a waiver of Section 51.53(c)(2).
A third extraneous issue the Joint Petitioners raise is the role the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)140 should play in defining the range of alternatives to be considered in the ER. To the extent they urge that the 1996 Generic EIS parameters must be deemed legally void under NEPA[],141 the Joint Petitioners raise an issue that is both outside the scope of the proceeding and not material to any findings the NRC must make to support the requested action. Similarly, the Joint Petitioners allegation, in the introduction to Contention Three, that the relicensing GEIS is stale, dated and NEPA non-compliant142 is inadmissible because it raises issues that are beyond the scope of this proceeding and are not material, and therefore violates 10 C.F.R.
§§ 2.309(f)(1)(iii) and (iv).
: 5.     Admissible contention as narrowed by the Board The elimination of these extraneous issues reveals the admissible core of Contentions One, Two and Three. This core is the Joint Petitioners challenge to the ERs failure to consider in a comprehensive manner combinations of wind and/or solar photovoltaic energy sources as an alternative to the Davis-Besse relicensing. Joint Petitioners charge that the ER contains a vague and superficial143 discussion of wind, solar, and other renewable energy alternatives,144 and 140 GEIS, NUREG-1437, Vol. 1.
141 Petition at 95.
141 Petition at 95.
142 Id. at 93 (capitalization altered).
142 Id. at 93 (capitalization altered).
143 Id. at 19. 144 Id. at 20-22, 36-38, 69-70. contend this discussion is inadequate.
143 Id. at 19.
145 Joint Petitioners allege that FirstEnergy "has not undertaken the requisite 'hard look' at commercial wind energy or solar as alternatives."
144 Id. at 20-22, 36-38, 69-70.
146 The Joint Petitioners controvert the ER's conclusion that wind, solar, or a combination of wind and solar cannot meet the baseload output of the Davis-Besse plant by 2017. Section 2.309(f)(1)(i) requires a proposed contention to provide a specific statement of the issue of law or fact to be raised or controverted. Joint Petitioners provide a specific statement for Contention One as follows: "The FirstEnergy . . . Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary."
 
147 Joint Petitioners provide a specific statement for Contention Two that is identical except for the substitution of the words "solar electric power or photovoltaics (hereinafter  
contend this discussion is inadequate.145 Joint Petitioners allege that FirstEnergy has not undertaken the requisite hard look at commercial wind energy or solar as alternatives.146 The Joint Petitioners controvert the ERs conclusion that wind, solar, or a combination of wind and solar cannot meet the baseload output of the Davis-Besse plant by 2017.
'solar power')" for "wind power."
Section 2.309(f)(1)(i) requires a proposed contention to provide a specific statement of the issue of law or fact to be raised or controverted. Joint Petitioners provide a specific statement for Contention One as follows: The FirstEnergy . . . Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary.147 Joint Petitioners provide a specific statement for Contention Two that is identical except for the substitution of the words solar electric power or photovoltaics (hereinafter solar power) for wind power.148 For Contention Three, Joint Petitioners specific statement is that NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power.149 Section 2.309(f)(1)(ii) requires a brief explanation of the basis for the contention. Although Joint Petitioners are not particularly brief in their explanation, the basis of Contentions One, Two and Three, is that wind energy, solar photovoltaic energy, and a combination of both fulfills all of the criteria of a reasonable alternative.150 Joint Petitioners assert that these energy sources would have significantly less adverse human environmental impacts because energy alternatives like 145 Id. at 19, 73.
148 For Contention Three, Joint Petitioners' specific statement is that "NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power."
146 Id. at 98.
149 Section 2.309(f)(1)(ii) requires a brief explanation of the basis for the contention. Although Joint Petitioners are not particularly brief in their explanation, the basis of Contentions One, Two and Three, is that wind energy, solar photovoltaic energy, and a combination of both fulfills all of the criteria of a reasonable alternative.
147 Id. at 10.
150 Joint Petitioners assert that these energy sources would have "significantly less adverse human environmental impacts" because "energy alternatives like 145 Id. at 19, 73.
148 Id. at 68-69.
146 Id. at 98. 147 Id. at 10. 148 Id. at 68-69.
149 Id. at 93.
149 Id. at 93. 150 Id. at 97. wind . . . and solar . . . are abundantly available and do not have a carbon producing fuel cycle such as is the case with uranium."
150 Id. at 97.
151 Joint Petitioners deny that "wind power involves negative 'aesthetic' and 'visual' impacts."
 
152 Joint Petitioners deny also that "storage remains a cost prohibitive impediment to wind power's widespread and large-scale development,"
wind . . . and solar . . . are abundantly available and do not have a carbon producing fuel cycle such as is the case with uranium.151 Joint Petitioners deny that wind power involves negative aesthetic and visual impacts.152 Joint Petitioners deny also that storage remains a cost prohibitive impediment to wind powers widespread and large-scale development,153 thereby disputing the ERs conclusion that current energy storage technologies are too expensive for wind power to serve as a large base-load generator.154 Joint Petitioners assert that interconnectedness of renewable energy generation is another solution to baseload and intermittency issues.155 Sections 2.309(f)(1)(iii) and 2.309(f)(1)(iv) require that the issue be within the scope of the proceeding and material to the findings that the NRC must make to support the action that is involved in the proceeding. The submission of an ER is the first instance where petitioners can challenge the environmental analysis put forward by an applicant. The ER and its conclusions provide the foundation for the EIS that the agency staff is tasked with preparing. A concern that the ERs analysis pays short shrift to the possible role of wind and solar photovoltaic energy as reasonable alternatives to relicensing is within the scope of a relicensing proceeding and is material to the findings that the NRC must make under NEPA.
153 thereby disputing the ER's conclusion that "current energy storage technologies are too expensive for wind power to serve as a large base-load generator."
Section 2.309(f)(1)(v) requires a concise statement of alleged facts or expert opinions that support the petitioners position on the issue and upon which the petitioner intends to rely at the hearing. Although not particularly concise, the Joint Petitioners allege many facts and proffer expert support. They refer to materials that allegedly show that compressed air storage would 151 Id. at 15-16.
154 Joint Petitioners assert that "interconnectedness of renewable energy generation" is another "solution to baseload and intermittency issues."
155 Sections 2.309(f)(1)(iii) and 2.309(f)(1)(iv) require that the issue be within the scope of the proceeding and material to the findings that the NRC must make to support the action that is involved in the proceeding. The submission of an ER is the first instance where petitioners can challenge the environmental analysis put forward by an applicant. The ER and its conclusions provide the foundation for the EIS that the agency staff is tasked with preparing. A concern that the ER's analysis pays short shrift to the possible role of wind and solar photovoltaic energy as reasonable alternatives to relicensing is within the scope of a relicensing proceeding and is material to the findings that the NRC must make under NEPA. Section 2.309(f)(1)(v) requires a concise statement of alleged facts or expert opinions that support the petitioner's position on the issue and upon which the petitioner intends to rely at the hearing. Although not particularly concise, the Joint Petitioners allege many facts and proffer expert support. They refer to materials that allegedly show that compressed air storage would 151 Id. at 15-16.
152 Id. at 27 (emphasis omitted).
152 Id. at 27 (emphasis omitted).
153 Id. at 28.
153 Id. at 28.
154 ER at 7.2-9.
154 ER at 7.2-9.
155 Petition at 41.   "work for wind power, and at a very large scale" 156 and has "enabled wind power to surmount intermittency challenges, so much so that NREL [National Renewable Energy Laboratory] now recognizes the existence of 'baseload wind.'"
155 Petition at 41.
157 Joint Petitioners also include the declaration of Dr. Alvin Compaan, who proffers paragraphs 123 through 151 of Contention Two as his expert opinion.158 Dr. Compaan, a professor of physics at the University of Toledo, 159 notes that "[s]olar power has a CO 2 footprint that is much smaller than the full fuel chain of nuclear."
 
160 According to Dr. Compaan, "[e]conomical sources of energy storage and back-up power are available to provide good base-load power, in conjunction with solar."
work for wind power, and at a very large scale156 and has enabled wind power to surmount intermittency challenges, so much so that NREL [National Renewable Energy Laboratory] now recognizes the existence of baseload wind.157 Joint Petitioners also include the declaration of Dr.
161 Dr. Compaan further concludes that "wide-scale installation of solar power combined with a storage facility . . . is a very viable alternative" to the requested Davis-Besse license extension.
Alvin Compaan, who proffers paragraphs 123 through 151 of Contention Two as his expert opinion.158 Dr. Compaan, a professor of physics at the University of Toledo,159 notes that [s]olar power has a CO2 footprint that is much smaller than the full fuel chain of nuclear.160 According to Dr. Compaan, [e]conomical sources of energy storage and back-up power are available to provide good base-load power, in conjunction with solar.161 Dr. Compaan further concludes that wide-scale installation of solar power combined with a storage facility . . . is a very viable alternative to the requested Davis-Besse license extension.162 Joint Petitioners also allege that FirstEnergy recently purchased a compressed-air storage project, the Norton Energy Storage Project.163 In addition, Joint Petitioners have tendered numerous exhibits that contain studies and reports that they allege show that within the foreseeable future, wind power, solar power and a combination of wind and solar could be reasonable alternatives to the renewal of Davis-Besse.
162 Joint Petitioners also allege that FirstEnergy recently purchased a compressed-air storage project, the Norton Energy Storage Project.
They argue that these renewable energy sources should have been evaluated in greater detail in 156 Id. at 28 (citing id., Attach. 48, Ken Zweibel, et al., By 2050 solar power could end U.S.
163 In addition, Joint Petitioners have tendered numerous exhibits that contain studies and reports that they allege show that within the foreseeable future, wind power, solar power and a combination of wind and solar could be reasonable alternatives to the renewal of Davis-Besse. They argue that these renewable energy sources should have been evaluated in greater detail in 156 Id. at 28 (citing id., Attach. 48, Ken Zweibel, et al., By 2050 solar power could end U.S. dependence on foreign oil and slash greenhouse gas emissions, Scientific American 64 (Jan.
dependence on foreign oil and slash greenhouse gas emissions, Scientific American 64 (Jan.
2008)). 157 Id. (citing id., Attach. 11, Arjun Makhijani, Carbon-Free and Nuclear-Free: A Roadmap for U.S.
2008)).
Energy Policies (Aug. 2007)). NREL, a national laboratory of the United States Department of Energy, is "the nation's primary laboratory for renewable energy and energy efficiency research and development.NREL, Overview, http://www.nrel.gov/overview/ (last visited Apr. 22, 2011).
157 Id. (citing id., Attach. 11, Arjun Makhijani, Carbon-Free and Nuclear-Free: A Roadmap for U.S.
Energy Policies (Aug. 2007)). NREL, a national laboratory of the United States Department of Energy, is the nations primary laboratory for renewable energy and energy efficiency research and development. NREL, Overview, http://www.nrel.gov/overview/ (last visited Apr. 22, 2011).
158 Compaan Decl. at 1-2.
158 Compaan Decl. at 1-2.
159 Id. at 1. 160 Petition at 71 (sponsored by Compaan Decl. at 1-2).
159 Id. at 1.
160 Petition at 71 (sponsored by Compaan Decl. at 1-2).
161 Id. (sponsored by Compaan Decl at 1-2).
161 Id. (sponsored by Compaan Decl at 1-2).
162 Id. (sponsored by Compaan Decl. at 1-2) 163 Id. at 28-29 (quoting id., Attach. 49, Press release from FirstEnergy Corp., FirstEnergy Acquires Rights to Norton Energy Storage Project (Nov. 23, 2009)). the ER. For example, Joint Petitioners cite the following: i) A June 2010 NREL technical report that shows the offshore wind potential for the United States.
162 Id. (sponsored by Compaan Decl. at 1-2) 163 Id. at 28-29 (quoting id., Attach. 49, Press release from FirstEnergy Corp., FirstEnergy Acquires Rights to Norton Energy Storage Project (Nov. 23, 2009)).
164 Joint Petitioners allege this study shows that, within FirstEnergy's region of interest, "there is a total resource of 155.5 gigawatts (GW) of offshore and deepwater wind alone (within 50 nautical miles)."
 
165 ii) A January 2010 NREL study, from which the Joint Petitioners quote: "Greatly expanded use of wind energy has been proposed to reduce dependence on fossil and nuclear fuels for electricity generation. The large-scale deployment of wind energy is ultimately limited by its intermittent output and the remote location of high-value wind resources, particularly in the United States. Wind energy systems that combine wind turbine generation with energy storage and long-distance transmission may overcome these obstacles and provide a source of power that is functionally equivalent to a conventional baseload electric power plant. A 'baseload wind' system can produce a stable, reliable output that can replace a conventional fossil or nuclear baseload plant, instead of merely supplementing its output. This type of system could provide a large fraction of a region's electricity demand, far beyond the 10-20% often suggested as an economic upper limit for conventional wind generation deployed without storage."
the ER. For example, Joint Petitioners cite the following:
166 iii) A 2007 Stanford University study entitled "Supplying Baseload Power and Reducing Transmission Requirements by Interconnected Wind Farms."
i) A June 2010 NREL technical report that shows the offshore wind potential for the United States.164 Joint Petitioners allege this study shows that, within FirstEnergys region of interest, there is a total resource of 155.5 gigawatts (GW) of offshore and deepwater wind alone (within 50 nautical miles).165 ii) A January 2010 NREL study, from which the Joint Petitioners quote:
167 The Joint Petitioners quote from this study as follows: "A solution to improve wind power reliability is interconnected wind power. In other words, by linking multiple wind farms together it is possible to improve substantially the overall performance of the interconnected system (i.e., array) when compared with that of any individual wind farm."
Greatly expanded use of wind energy has been proposed to reduce dependence on fossil and nuclear fuels for electricity generation. The large-scale deployment of wind energy is ultimately limited by its intermittent output and the remote location of high-value wind resources, particularly in the United States. Wind energy systems that combine wind turbine generation with energy storage and long-distance transmission may overcome these obstacles and provide a source of power that is functionally equivalent to a conventional baseload electric power plant. A baseload wind system can produce a stable, reliable output that can replace a conventional fossil or nuclear baseload plant, instead of merely supplementing its output. This type of system could provide a large fraction of a regions electricity demand, far beyond the 10-20% often suggested as an economic upper limit for conventional wind generation deployed without storage.166 iii) A 2007 Stanford University study entitled Supplying Baseload Power and Reducing Transmission Requirements by Interconnected Wind Farms.167 The Joint Petitioners quote from this study as follows:
168 The Joint Petitioners quote as the study's conclusion: "'Contrary to common knowledge, an 164 Id. at 51-52 (citing id., Attach. 33, Marc Schwartz et al., Assessment of Offshore Wind Energy Resources for the United States (June 2010)).
A solution to improve wind power reliability is interconnected wind power. In other words, by linking multiple wind farms together it is possible to improve substantially the overall performance of the interconnected system (i.e., array) when compared with that of any individual wind farm.168 The Joint Petitioners quote as the studys conclusion: Contrary to common knowledge, an 164 Id. at 51-52 (citing id., Attach. 33, Marc Schwartz et al., Assessment of Offshore Wind Energy Resources for the United States (June 2010)).
165 Id. at 52 (citing Schwartz et al., supra note 164, at 3 tbl.1).
165 Id. at 52 (citing Schwartz et al., supra note 164, at 3 tbl.1).
166 Id. at 38-39 (quoting id., Attach. 20, National Renewable Energy Laboratory, United States Department of Energy, Creating Baseload Wind Power Systems (Oct. 3, 2006)).
166 Id. at 38-39 (quoting id., Attach. 20, National Renewable Energy Laboratory, United States Department of Energy, Creating Baseload Wind Power Systems (Oct. 3, 2006)).
167 Id. at 40 (citing id., Attach. 21, Cristina L. Archer & Mark Z. Jacobson, Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms , 46 J. of Appl.
167 Id. at 40 (citing id., Attach. 21, Cristina L. Archer & Mark Z. Jacobson, Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms, 46 J. of Appl.
Meteorol. & Clim. 1701 (Feb. 2007)).
Meteorol. & Clim. 1701 (Feb. 2007)).
168 Id. (quoting Archer et al., supra note 167, at 1702). average of 33% and a maximum of 47% of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power.'"
168 Id. (quoting Archer et al., supra note 167, at 1702).
169  iv)  A press release announcing FirstEnergy's acquisition of rights to the Norton Energy Storage Project in Ohio.
170  Joint Petitioners contend that "wide-scale installation of solar power combined with a storage facility such as the Norton Project, already acquired by First Energy, is a very viable alternative to the license extension for 20 more years of operation of the Davis-Besse nuclear facility."
171  The Joint Petitioners quote the press release's statement that the former limestone mine "'is ideal for energy storage technology.'"
172  Anthony J. Alexander, president and chief executive officer of FirstEnergy, is quoted in the press release as stating: "The compressed-air technology envisioned at this site would essentially operate like a large battery, storing energy at night for use during the day when it is needed . . . . Because many renewable energy sources-such as wind-are intermittent, they don't always produce power when electricity demand is high. The energy storage aspects of this project would provide a way to harness renewable energy to be used when customers need it, making this project a key component to our region's overall


renewable energy strategy."
average of 33% and a maximum of 47% of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power.169 iv) A press release announcing FirstEnergys acquisition of rights to the Norton Energy Storage Project in Ohio.170 Joint Petitioners contend that wide-scale installation of solar power combined with a storage facility such as the Norton Project, already acquired by First Energy, is a very viable alternative to the license extension for 20 more years of operation of the Davis-Besse nuclear facility.171 The Joint Petitioners quote the press releases statement that the former limestone mine is ideal for energy storage technology.172 Anthony J. Alexander, president and chief executive officer of FirstEnergy, is quoted in the press release as stating:
173 v) Lastly, a study prepared for the Department of Energy Office of Energy Efficiency and Renewable Energy, Wind and Water Power Program.
The compressed-air technology envisioned at this site would essentially operate like a large battery, storing energy at night for use during the day when it is needed . . . .
174 Joint Petitioners quote this study as stating that: "[O]ffshore wind resource data for the Great Lakes, U.S. coastal waters, and Outer Continental Shelf [including off of New Jersey's coast] up to 50 nautical miles from shore indicate that for annual average wind speeds above 8.0 m/s, the total gross resource of the United States is 2,957 GW or approximately three times the 169 Id. (quoting Archer et al., supra note 167, at 1716).
Because many renewable energy sourcessuch as windare intermittent, they dont always produce power when electricity demand is high. The energy storage aspects of this project would provide a way to harness renewable energy to be used when customers need it, making this project a key component to our regions overall renewable energy strategy.173 v) Lastly, a study prepared for the Department of Energy Office of Energy Efficiency and Renewable Energy, Wind and Water Power Program.174 Joint Petitioners quote this study as stating that:
170 Id. at 29, 88 (citing id., Attach. 54, FirstEnergy Acquires Rights to Norton Energy Storage Project, Nov. 23, 2009 [hereinafter FirstEnergy Acquires Rights to Norton
[O]ffshore wind resource data for the Great Lakes, U.S. coastal waters, and Outer Continental Shelf [including off of New Jerseys coast] up to 50 nautical miles from shore indicate that for annual average wind speeds above 8.0 m/s, the total gross resource of the United States is 2,957 GW or approximately three times the 169 Id. (quoting Archer et al., supra note 167, at 1716).
]). 171 Id. at 89. 172 Id. at 88 (quoting FirstEnergy Acquires Rights to Norton , supra note 170, at 1).
170 Id. at 29, 88 (citing id., Attach. 54, FirstEnergy Acquires Rights to Norton Energy Storage Project, Nov. 23, 2009 [hereinafter FirstEnergy Acquires Rights to Norton]).
173 FirstEnergy Acquires Rights to Norton , supra note 170, at 1.
171 Id. at 89.
174 Petition at 59 (citing id., Attach. 42, Jacques Beaudry-Losique, et al., Creating an Offshore Wind Industry in the United States: A Strategic Work Plan for the United States Department of Energy, Fiscal Years 2011-2015 (Sept. 2, 2010) (predecisional draft)). generating capacity of the current U.S. electric grid. . . . The scale of this theoretical capacity implies that under reasonable economic scenarios, offshore wind can contribute to the nation's energy mix to significant levels."
172 Id. at 88 (quoting FirstEnergy Acquires Rights to Norton, supra note 170, at 1).
175 This study refers to land-based and shallow water offshore wind platforms as "Commercially Proven Technologies."
173 FirstEnergy Acquires Rights to Norton, supra note 170, at 1.
176 Although many of the Joint Petitioners' exhibits do not specifically address FirstEnergy's region of interest, we find that they have provided the required "alleged facts" and "minimal" factual support for admitting a challenge which questions the sufficiency of the ER's examination of wind power, solar photovoltaic power, and a combination of both as alternatives to relicensing Davis-Besse. Section 2.309(f)(1)(vi) requires a showing that a genuine dispute exists with the applicant on a material issue of law or fact. FirstEnergy and the NRC Staff argue that Joint Petitioners do not show a genuine dispute under 10 C.F.R. § 2.309(f)(1)(vi) because an energy source must be single and discrete to be a reasonable alternative, and interconnected wind farms, renewable energy with storage, and a combination of wind and solar power are not single and discrete.
174 Petition at 59 (citing id., Attach. 42, Jacques Beaudry-Losique, et al., Creating an Offshore Wind Industry in the United States: A Strategic Work Plan for the United States Department of Energy, Fiscal Years 2011-2015 (Sept. 2, 2010) (predecisional draft)).
177 The Applicant and NRC Staff cite the GEIS 178 for the proposition that "a reasonable alternative energy source must . . . be a single, discrete electric generation source."
 
179 During oral argument the NRC Staff conceded that this portion of the GEIS has not been converted into a regulation and is therefore not binding on the Board.
generating capacity of the current U.S. electric grid. . . . The scale of this theoretical capacity implies that under reasonable economic scenarios, offshore wind can contribute to the nations energy mix to significant levels.175 This study refers to land-based and shallow water offshore wind platforms as Commercially Proven Technologies.176 Although many of the Joint Petitioners exhibits do not specifically address FirstEnergys region of interest, we find that they have provided the required alleged facts and minimal factual support for admitting a challenge which questions the sufficiency of the ERs examination of wind power, solar photovoltaic power, and a combination of both as alternatives to relicensing Davis-Besse.
180 Indeed, the NRC Staff stated recent NRC environmental impact documents review wind and solar in combination with 175 Id. at 59-60 (quoting Beaudry-Losique, et al., supra note 174, at 3 (emphasis by Joint Petitioners omitted)).
Section 2.309(f)(1)(vi) requires a showing that a genuine dispute exists with the applicant on a material issue of law or fact. FirstEnergy and the NRC Staff argue that Joint Petitioners do not show a genuine dispute under 10 C.F.R. § 2.309(f)(1)(vi) because an energy source must be single and discrete to be a reasonable alternative, and interconnected wind farms, renewable energy with storage, and a combination of wind and solar power are not single and discrete.177 The Applicant and NRC Staff cite the GEIS178 for the proposition that a reasonable alternative energy source must . . . be a single, discrete electric generation source.179 During oral argument the NRC Staff conceded that this portion of the GEIS has not been converted into a regulation and is therefore not binding on the Board.180 Indeed, the NRC Staff stated recent NRC environmental impact documents review wind and solar in combination with 175 Id. at 59-60 (quoting Beaudry-Losique, et al., supra note 174, at 3 (emphasis by Joint Petitioners omitted)).
176 Beaudry-Losique, et al., supra note 174, at 21.
176 Beaudry-Losique, et al., supra note 174, at 21.
177 FirstEnergy Answer at 27.
177 FirstEnergy Answer at 27.
178 GEIS, NUREG-1437, Vol. 1, § 8.1.
178 GEIS, NUREG-1437, Vol. 1, § 8.1.
179 FirstEnergy Answer at 54, accord NRC Staff Answer at 43.
179 FirstEnergy Answer at 54, accord NRC Staff Answer at 43.
180 Tr. at 50-52. fossil fuel as a reasonable alternative.
180 Tr. at 50-52.
181 The Supreme Court has recognized that the concept of "alternatives" evolves, and agencies must explore alternatives as they become better known and understood.
 
182 The GEIS is not binding law and its statements concerning the practicality of multiple alternative sources have not been revised in 15 years. The NRC is in the process of amending its environmental protection regulations by updating its 1996 findings on the environmental impacts related to the renewal of a nuclear power plant's operating license.
fossil fuel as a reasonable alternative.181 The Supreme Court has recognized that the concept of alternatives evolves, and agencies must explore alternatives as they become better known and understood.182 The GEIS is not binding law and its statements concerning the practicality of multiple alternative sources have not been revised in 15 years. The NRC is in the process of amending its environmental protection regulations by updating its 1996 findings on the environmental impacts related to the renewal of a nuclear power plants operating license.183 We are not persuaded that, as a matter of law, a distributed combination of wind farms, solar arrays, and compressed air energy storage (CAES) could not constitute a reasonable alternative.
183 We are not persuaded that, as a matter of law, a distributed combination of wind farms, solar arrays, and compressed air energy storage (CAES) could not constitute a reasonable alternative. In addition, the NRC Staff argues that Joint Petitioners have not shown "a genuine dispute with the ER's conclusion that solar power and wind power cannot replace Davis-Besse as a source of 910 MWe of baseload power by the commencement of the relicensing period, 2017."
In addition, the NRC Staff argues that Joint Petitioners have not shown a genuine dispute with the ERs conclusion that solar power and wind power cannot replace Davis-Besse as a source of 910 MWe of baseload power by the commencement of the relicensing period, 2017.184 Making the same argument, FirstEnergy contends that Joint Petitioners do not show a genuine dispute because they have not shown that baseload wind and solar power is technically feasible or commercially viable now or in the immediate future.185 A baseload power source, as the NRC Staff explains, runs continuously to produce electricity at an essentially constant rate in order to satisfy all or part of the minimum, or base, system load.186 Baseload generation is different than 181 See Tr. at 113-114. The NRC Staff considered a combination of alternatives that includes natural gas combined-cycle generation, energy conservation/energy efficiency, and wind power for several recent license applications. See, e.g., Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, NUREG-1437, Supp. 45, at iii (Mar. 2011).
184 Making the same argument, FirstEnergy contends that Joint Petitioners do not show a genuine dispute because they "have not shown that baseload wind and solar power is technically feasible or commercially viable now or in the immediate future."
185 A baseload power source, as the NRC Staff explains, "runs continuously to produce electricity at an essentially constant rate in order to satisfy all or part of the minimum, or base, system load."
186 Baseload generation is different than 181 See Tr. at 113-114. The NRC Staff considered "a combination of alternatives that includes natural gas combined-cycle generation, energy conservation/energy efficiency, and wind power" for several recent license applications. See, e.g., Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, NUREG-1437, Supp. 45, at iii (Mar. 2011).
182 Vermont Yankee v. NRDC, 435 U.S. 519, 553 (1978).
182 Vermont Yankee v. NRDC, 435 U.S. 519, 553 (1978).
183 74 Fed. Reg. 38117 (July 31, 2009).
183 74 Fed. Reg. 38117 (July 31, 2009).
Line 353: Line 307:
185 FirstEnergy Answer at 4.
185 FirstEnergy Answer at 4.
186 NRC Staff Answer at 16 n.26 (citing U.S. Energy Information Administration, Overview -
186 NRC Staff Answer at 16 n.26 (citing U.S. Energy Information Administration, Overview -
Generating Capability/Capacity, http://www.eia.doe.gov/cneaf/electricity/page/prim2/chapter2.html (last visited Apr. 22, 2011)). peaking power, which provides supplemental power during hours of the day when demand is highest.187 However, Joint Petitioners dispute the ER by claiming that interconnectedness and energy storage allow wind and solar power to provide baseload power and proffer expert support and specific references to support this claim, as discussed above. Joint Petitioners have submitted numerous exhibits and a declaration that purport to demonstrate that within the foreseeable future, an environmentally superior alternative of wind, solar or wind and solar baseload power may be technically feasible and commercially viable. We need not address the merits issue here. Further, as stated in Carolina Environmental Study Group v. United States 188 there exists an obligation to consider alternatives "as they exist and are likely to exist."
Generating Capability/Capacity, http://www.eia.doe.gov/cneaf/electricity/page/prim2/chapter2.html (last visited Apr. 22, 2011)).
189 FirstEnergy and the NRC Staff's remaining arguments against admissibility of Contentions One, Two and Three are not persuasive. First, the NRC Staff interprets Contention Three to contend that FirstEnergy omitted any discussion of a combination of wind and solar power and argue the contention is not admissible "because the information Joint Petitioners allege as omitted is in fact included in the Application."
 
190 However, it appears to this Board that Joint Petitioners' contention posits that FirstEnergy should have identified a combination of wind and solar power as a reasonable alternative and analyzed it as such.
peaking power, which provides supplemental power during hours of the day when demand is highest.187 However, Joint Petitioners dispute the ER by claiming that interconnectedness and energy storage allow wind and solar power to provide baseload power and proffer expert support and specific references to support this claim, as discussed above. Joint Petitioners have submitted numerous exhibits and a declaration that purport to demonstrate that within the foreseeable future, an environmentally superior alternative of wind, solar or wind and solar baseload power may be technically feasible and commercially viable. We need not address the merits issue here. Further, as stated in Carolina Environmental Study Group v. United States188 there exists an obligation to consider alternatives as they exist and are likely to exist.189 FirstEnergy and the NRC Staffs remaining arguments against admissibility of Contentions One, Two and Three are not persuasive. First, the NRC Staff interprets Contention Three to contend that FirstEnergy omitted any discussion of a combination of wind and solar power and argue the contention is not admissible because the information Joint Petitioners allege as omitted is in fact included in the Application.190 However, it appears to this Board that Joint Petitioners contention posits that FirstEnergy should have identified a combination of wind and solar power as a reasonable alternative and analyzed it as such.191 Accordingly, we do not agree that Contention Three should be viewed as a contention of omission.
191 Accordingly, we do not agree that Contention Three should be viewed as a contention of omission. Second, in challenging admissibility, the Applicant and the NRC Staff conflate the merits of the contention with the adequacy of its pleading. The Applicant states it "believes that various combinations of renewable and advanced energy resources with generation equivalent to that of 187 United States v. Cinergy Corp., 623 F.3d 455, 459-60 (7th Cir. 2010) (quoting Babcock & Wilcox Co. v. United Techs. Corp., 435 F. Supp. 1249, 1256 (N.D. Ohio 1977)).
Second, in challenging admissibility, the Applicant and the NRC Staff conflate the merits of the contention with the adequacy of its pleading. The Applicant states it believes that various combinations of renewable and advanced energy resources with generation equivalent to that of 187 United States v. Cinergy Corp., 623 F.3d 455, 459-60 (7th Cir. 2010) (quoting Babcock & Wilcox Co. v. United Techs. Corp., 435 F. Supp. 1249, 1256 (N.D. Ohio 1977)).
188 510 F.2d 796 (D.C. Cir. 1975).
188 510 F.2d 796 (D.C. Cir. 1975).
189 Id. at 801. 190 NRC Staff Answer at 40.
189 Id. at 801.
191 See Petition at 97 (discussing the definition of "reasonable alternative" and concluding "[c]ommercial wind and solar photovoltaic fulfill all these criteria"). Davis-Besse are not reasonable alternatives to renewal of Davis-Besse's operating license" 192 and argues that "Contention 3 provides no information to show that a combination of wind and solar power could provide baseload power of this magnitude, or that this baseload generation would be technically feasible or commercially viable."
190 NRC Staff Answer at 40.
193  But this question of whether a combination of renewable energy sources constitutes a "reasonable" alternative is the very issue on which the Joint Petitioners seek a hearing. When a contention alleges the need for further study of an alternative, from an environmental perspective, "such reasonableness determinations are the merits, and should only be decided after the contention is admitted."
191 See Petition at 97 (discussing the definition of reasonable alternative and concluding
194  To be entitled to a hearing, Joint Petitioners need not demonstrate that they will necessarily prevail, but only that there is at least some minimal factual support for their position. It is rarely appropriate to resolve complex, fact-intensive issues on the initial pleadings.
[c]ommercial wind and solar photovoltaic fulfill all these criteria).
195  Thus, many of FirstEnergy and the NRC Staff's arguments improperly address the merits of the Joint Petitioners' contention, rather than whether Joint Petitioners have provided "'a minimal showing that material facts are in dispute, thereby demonstrating that an inquiry in depth is appropriate.'"
196 We agree with the approach recently taken by the Licensing Board in the Seabrook


192 FirstEnergy Answer at 67 (quoting ER at 7.2-13).
Davis-Besse are not reasonable alternatives to renewal of Davis-Besses operating license192 and argues that Contention 3 provides no information to show that a combination of wind and solar power could provide baseload power of this magnitude, or that this baseload generation would be technically feasible or commercially viable.193 But this question of whether a combination of renewable energy sources constitutes a reasonable alternative is the very issue on which the Joint Petitioners seek a hearing. When a contention alleges the need for further study of an alternative, from an environmental perspective, such reasonableness determinations are the merits, and should only be decided after the contention is admitted.194 To be entitled to a hearing, Joint Petitioners need not demonstrate that they will necessarily prevail, but only that there is at least some minimal factual support for their position.
193 Id. at 66. 194 Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), LBP-09-10, 70 NRC 51, 86 (2009), rev'd in part on other grounds, CLI-10-02, 71 NRC__, __ (slip op. at 1-2) (Jan.
It is rarely appropriate to resolve complex, fact-intensive issues on the initial pleadings.195 Thus, many of FirstEnergy and the NRC Staffs arguments improperly address the merits of the Joint Petitioners contention, rather than whether Joint Petitioners have provided a minimal showing that material facts are in dispute, thereby demonstrating that an inquiry in depth is appropriate.196 We agree with the approach recently taken by the Licensing Board in the Seabrook 192 FirstEnergy Answer at 67 (quoting ER at 7.2-13).
193 Id. at 66.
194 Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), LBP-09-10, 70 NRC 51, 86 (2009), revd in part on other grounds, CLI-10-02, 71 NRC__, __ (slip op. at 1-2) (Jan.
7, 2010).
7, 2010).
195 Cf. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC at __ (slip op. at 21, 23) (Mar. 26, 2010) [hereinafter Pilgrim II] (declining to uphold summary dismissal of contention involving "complex, fact-intensive issues" based on factors the board did not address and develop in the record).
195 Cf. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC at __
196 Final Rule, Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. at 33,171 (quoting Connecticut Bankers Ass'n v. Board of Governors, 627 F.2d 245, 251 (D.C. Cir. 1980)). proceeding where a somewhat similar contention was admitted.
(slip op. at 21, 23) (Mar. 26, 2010) [hereinafter Pilgrim II] (declining to uphold summary dismissal of contention involving complex, fact-intensive issues based on factors the board did not address and develop in the record).
197  At this stage, it is sufficient for the Joint Petitioners to proffer some "minimal" factual support for their contention. This they have done and included both an expert's declaration and a number of alleged facts from scholarly sources. Some of the Joint Petitioners' supporting references are said to suggest that alternative energy sources, like wind or solar could be a viable source of baseload power in the region by
196 Final Rule, Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. at 33,171 (quoting Connecticut Bankers Assn v. Board of Governors, 627 F.2d 245, 251 (D.C. Cir. 1980)).


2017.198 Whether this is so remains to be seen. In the Board's view, however, Joint Petitioners have proffered sufficient "minimal" evidence to warrant further inquiry as to whether such alternatives might be "likely to exist" during the relevant time period. Although the Petition is generally unfocused and includes numerous exhibits irrelevant and immaterial to this proceeding, buried within its first 100 pages and first 171 numbered paragraphs lies a single contention concerning reasonable alternatives to the relicensing application. As stated above, a contention must satisfy each element of Section 2.309(f)(1) to be admissible. We find the following contention, as narrowed by the Board, 199 meets the requirements of § 2.309(f)(1) and is therefore admissible: The FirstEnergy Nuclear Operating Company's Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does 197 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 19, 27).
proceeding where a somewhat similar contention was admitted.197 At this stage, it is sufficient for the Joint Petitioners to proffer some minimal factual support for their contention. This they have done and included both an experts declaration and a number of alleged facts from scholarly sources.
Some of the Joint Petitioners supporting references are said to suggest that alternative energy sources, like wind or solar could be a viable source of baseload power in the region by 2017.198 Whether this is so remains to be seen. In the Boards view, however, Joint Petitioners have proffered sufficient minimal evidence to warrant further inquiry as to whether such alternatives might be likely to exist during the relevant time period.
Although the Petition is generally unfocused and includes numerous exhibits irrelevant and immaterial to this proceeding, buried within its first 100 pages and first 171 numbered paragraphs lies a single contention concerning reasonable alternatives to the relicensing application. As stated above, a contention must satisfy each element of Section 2.309(f)(1) to be admissible. We find the following contention, as narrowed by the Board,199 meets the requirements of § 2.309(f)(1) and is therefore admissible:
The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does 197 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 19, 27).
198 Tr. at 69-70, 75, 97, 109, 113.
198 Tr. at 69-70, 75, 97, 109, 113.
199 Having eliminated extraneous issues, we consolidate and rephrase Contentions One, Two, and Three to clarify their scope. See, e.g., Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-03, 65 NRC 237, 255 (2007) ("[E]xercising our authority under 10 C.F.R. §§ 2.316, 2.319, 2.329, we have acted to further define the Joint Petitioners['] admitted contentions when redrafting would clarify the scope of the contentions."); cf.
199 Having eliminated extraneous issues, we consolidate and rephrase Contentions One, Two, and Three to clarify their scope. See, e.g., Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-03, 65 NRC 237, 255 (2007) ([E]xercising our authority under 10 C.F.R.
Pennsylvania Power & Light Co.
§§ 2.316, 2.319, 2.329, we have acted to further define the Joint Petitioners[] admitted contentions when redrafting would clarify the scope of the contentions.); cf. Pennsylvania Power & Light Co.
Allegheny Elec. Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), LBP-79-6, 9 NRC 291, 295-96 (1979) (holding that although a Licensing Board "is not required to recast contentions to make them acceptable," it is "also not precluded from doing so"). not provide a substantial analysis of the potential for significant alternatives in the Region of Interest. B. Contention Four Joint Petitioners' fourth contention concerns FirstEnergy's analysis of severe accident mitigation alternatives or "SAMAs."
Allegheny Elec. Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), LBP-79-6, 9 NRC 291, 295-96 (1979) (holding that although a Licensing Board is not required to recast contentions to make them acceptable, it is also not precluded from doing so).
200  SAMA analyses identify and assess possible plant changes-such as hardware modifications and improved training or procedures-that could cost-effectively reduce the radiological risk from a severe accident.
201  Cost-effective SAMA candidates are identified by comparing the annualized cost of the mitigation measure with the benefit as determined by the averted cost of severe accidents (consequences), as weighted by the probability of the accidents' occurrence.
202 The regulation codifying the Commission's determination that the probability-weighted consequences of a severe accident (risk) are small in the context of a license renewal


proceeding 203 cannot be challenged in this proceeding.
not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.
204 Although a petitioner cannot challenge that regulation, a petitioner may argue that potential reduction in the probability-weighted consequences of severe accidents is not small when compared to the cost of mitigation measures.
B.      Contention Four Joint Petitioners fourth contention concerns FirstEnergys analysis of severe accident mitigation alternatives or SAMAs.200 SAMA analyses identify and assess possible plant changessuch as hardware modifications and improved training or proceduresthat could cost-effectively reduce the radiological risk from a severe accident.201 Cost-effective SAMA candidates are identified by comparing the annualized cost of the mitigation measure with the benefit as determined by the averted cost of severe accidents (consequences), as weighted by the probability of the accidents occurrence.202 The regulation codifying the Commissions determination that the probability-weighted consequences of a severe accident (risk) are small in the context of a license renewal proceeding203 cannot be challenged in this proceeding.204 Although a petitioner cannot challenge that regulation, a petitioner may argue that potential reduction in the probability-weighted consequences of severe accidents is not small when compared to the cost of mitigation measures.
The Commission's regulations permit rather than foreclose challenges to SAMA analyses.
The Commissions regulations permit rather than foreclose challenges to SAMA analyses.205 A SAMA analysis fulfills the requirement under NRCs NEPA-implementing regulation, 10 200 Petition at 100.
205 A SAMA analysis fulfills the requirement under NRC's NEPA-implementing regulation, 10 200 Petition at 100.
201 Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and1), CLI-02-17, 56 NRC 1, 5 (2002) [hereinafter McGuire/Catawba]; accord Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg. 28,467, 28,481 (June 5, 1996).
201 Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and1), CLI-02-17, 56 NRC 1, 5 (2002) [hereinafter McGuire/Catawba]; accord Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg. 28,467, 28,481 (June 5, 1996).
202 McGuire/Catawba , CLI-02-17, 56 NRC at 4.
202 McGuire/Catawba, CLI-02-17, 56 NRC at 4.
203 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1 ("The probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants.").
203 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1 (The probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants.).
204 See 10 C.F.R. § 2.335(a) (providing that absent a waiver, no rule or regulation of the Commission is subject to challenge in an adjudicatory proceeding).
204 See 10 C.F.R. § 2.335(a) (providing that absent a waiver, no rule or regulation of the Commission is subject to challenge in an adjudicatory proceeding).
205 Id. ("[A]lternatives to mitigate severe accidents must be considered for all plants that have not considered such alternatives." (citing 10 C.F.R. § 51.53(c)(3)(ii)(L))). C.F.R. Part 51, to provide "a consideration of alternatives to mitigate severe accidents,"
205 Id. ([A]lternatives to mitigate severe accidents must be considered for all plants that have not considered such alternatives. (citing 10 C.F.R. § 51.53(c)(3)(ii)(L))).
206 and therefore is governed by NEPA's "rule of reason."
207  NEPA requires a "reasonably complete discussion of possible mitigation measures."
208  The "ultimate concern" in a SAMA contention "is whether any additional SAMA should have been identified as potentially cost-beneficial, not whether further analysis may refine the details in the SAMA NEPA analysis."
209  Accordingly, a SAMA contention is admissible only if "it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated."
210 Joint Petitioners allege in Contention Four that: The Environmental Report (ER) is Inadequate Because It Underestimates the True Cost of a Severe Accident at Davis-Besse in Violation of 10 C.F.R. § 51.53(C)(3)(II)(L) and Further Analysis by the Applicant, [FirstEnergy], Is Called


For.211 Joint Petitioners specify several factors, assumptions, and models 212 that allegedly have, 206 10 C.F.R. § 51.53(c)(3)(ii)(L).
C.F.R. Part 51, to provide a consideration of alternatives to mitigate severe accidents,206 and therefore is governed by NEPAs rule of reason.207 NEPA requires a reasonably complete discussion of possible mitigation measures.208 The ultimate concern in a SAMA contention is whether any additional SAMA should have been identified as potentially cost-beneficial, not whether further analysis may refine the details in the SAMA NEPA analysis.209 Accordingly, a SAMA contention is admissible only if it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated.210 Joint Petitioners allege in Contention Four that:
207 McGuire/Catawba , CLI-02-17, 56 NRC at 7.
The Environmental Report (ER) is Inadequate Because It Underestimates the True Cost of a Severe Accident at Davis-Besse in Violation of 10 C.F.R.
        § 51.53(C)(3)(II)(L) and Further Analysis by the Applicant, [FirstEnergy], Is Called For.211 Joint Petitioners specify several factors, assumptions, and models212 that allegedly have, 206 10 C.F.R. § 51.53(c)(3)(ii)(L).
207 McGuire/Catawba, CLI-02-17, 56 NRC at 7.
208 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 352 (1989).
208 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 352 (1989).
209 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-09-11, 69 NRC 529, 533 (2009) [hereinafter Pilgrim I
209 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-09-11, 69 NRC 529, 533 (2009) [hereinafter Pilgrim I].
]. 210 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39).
210 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39).
211 Petition at 100.
211 Petition at 100.
212 Joint Petitioners express Contention Four's bases as follows: a. [FirstEnergy]'s use of probabilistic modeling underestimated the deaths, injuries, and economic impact likely from a severe accident by multiplying consequence values, irrespective of their amount, with very low probability numbers, the consequence figures appeared minimal. b. Minimization of the potential amount of radioactive material released in a severe accident. c. Use of an outdated and inaccurate proxy, the MACCS2 computer program, to perform its SAMA analysis. d. Use of an inappropriate air dispersion model, the straight-line Gaussian plume, and meteorological data inputs that did not accurately predict the geographic dispersion and deposition of radionuclides at Davis-Besse's Great Lake shoreline location.   "individually and together with one or more of the others, improperly minimized costs likely to result in a severe accident."
212 Joint Petitioners express Contention Fours bases as follows:
213  Joint Petitioners contend that FirstEnergy's ER underestimates the cost of a severe accident and "incorrectly discounts possible mitigation alternatives" and that, as a result, "a potentially cost effective mitigation alternative might not be considered that could prevent or
: a. [FirstEnergy]s use of probabilistic modeling underestimated the deaths, injuries, and economic impact likely from a severe accident by multiplying consequence values, irrespective of their amount, with very low probability numbers, the consequence figures appeared minimal.
: b. Minimization of the potential amount of radioactive material released in a severe accident.
: c. Use of an outdated and inaccurate proxy, the MACCS2 computer program, to perform its SAMA analysis.
: d. Use of an inappropriate air dispersion model, the straight-line Gaussian plume, and meteorological data inputs that did not accurately predict the geographic dispersion and deposition of radionuclides at Davis-Besses Great Lake shoreline location.


reduce the impacts of that accident."
individually and together with one or more of the others, improperly minimized costs likely to result in a severe accident.213 Joint Petitioners contend that FirstEnergys ER underestimates the cost of a severe accident and incorrectly discounts possible mitigation alternatives and that, as a result, a potentially cost effective mitigation alternative might not be considered that could prevent or reduce the impacts of that accident.214 The NRC Staff argues that Joint Petitioners have not shown that the factors, assumptions, and models identified in Contention Four are material.215 In addition, the NRC Staff challenges some subparts of the contention as outside the scope of the proceeding216 and some as inadequately supported by alleged facts or expert opinion.217 The NRC Staff concludes that, for these reasons, Contention Four should not be admitted.218 Similarly, FirstEnergy argues that Contention Four lacks adequate support in the form of alleged facts or expert opinion and raises issues outside the scope of this proceeding.219 FirstEnergy argues also that Joint Petitioners do not attempt to meet the materiality standard and
214 The NRC Staff argues that Joint Petitioners have not shown that the factors, assumptions, and models identified in Contention Four are material.
: e. Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, including decontamination costs, cleanup costs and health costs, and that either minimized or ignored a host of other costs.
215 In addition, the NRC Staff challenges some subparts of the contention as outside the scope of the proceeding 216 and some as inadequately supported by alleged facts or expert opinion.
: f. Use of inappropriate statistical analysis of the data specifically the Applicant chose to follow NRC practice, not NRC regulation, regarding SAMA analyses by using mean consequence values instead of, for example, 95 percentile values.
217 The NRC Staff concludes that, for these reasons, Contention Four should not be admitted.
Id. at 104.
218 Similarly, FirstEnergy argues that Contention Four "lacks adequate support in the form of alleged facts or expert opinion" and raises issues outside the scope of this proceeding.
213 Id. at 103.
219 FirstEnergy argues also that Joint Petitioners do not attempt to meet the materiality standard and
214 Id.
: e. Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, including decontamination costs, cleanup costs and health costs, and that either minimized or ignored a host of other costs. f. Use of inappropriate statistical analysis of the data - specifically the Applicant chose to follow NRC practice, not NRC regulation, regarding SAMA analyses by using mean consequence values instead of, for example, 95 percentile values.
215 NRC Staff Answer at 49.
Id. at 104. 213 Id. at 103. 214 Id. 215 NRC Staff Answer at 49.
216 Id. at 51.
216 Id. at 51.
217 E.g., id. at 58. 218 See id. at 2. 219 FirstEnergy Answer at 80. that they ignore applicable precedent and pertinent factual information in the ER.
217 E.g., id. at 58.
220 FirstEnergy concludes that "whether its subparts are viewed independently or cumulatively in combination with other subparts, Contention 4 should be rejected in its entirety for failing to meet the requirements of 10 C.F.R. § 2.309(f)(1)(iii)-(vi)."
218 See id. at 2.
221 In the analysis that follows, the Board will identify issues that: (1) are outside the scope of this license renewal proceeding; (2) are not material; (3) are unsupported by alleged fact or expert support; or (4) fail to refer to the Application to show a genuine dispute. These issues will not be considered further in this proceeding. By eliminating these extraneous issues, we will have narrowed Contention Four down to its admissible core.
219 FirstEnergy Answer at 80.
222 1. Issues that are out of scope (Small impact of severe accidents; Spent fuel pool) FirstEnergy and the NRC Staff argue that several of the issues Joint Petitioners attempt to raise in Contention Four are outside the scope of license renewal proceedings.
 
223 We agree, at least as to Joint Petitioners' challenges to (1) the Commission's determination that severe accident impacts are small 224 and (2) the Commission's exclusion of the irradiated nuclear fuel pool risk.
that they ignore applicable precedent and pertinent factual information in the ER.220 FirstEnergy concludes that whether its subparts are viewed independently or cumulatively in combination with other subparts, Contention 4 should be rejected in its entirety for failing to meet the requirements of 10 C.F.R. § 2.309(f)(1)(iii)-(vi).221 In the analysis that follows, the Board will identify issues that: (1) are outside the scope of this license renewal proceeding; (2) are not material; (3) are unsupported by alleged fact or expert support; or (4) fail to refer to the Application to show a genuine dispute. These issues will not be considered further in this proceeding. By eliminating these extraneous issues, we will have narrowed Contention Four down to its admissible core.222
225 First, as FirstEnergy and the NRC Staff have argued, 226 Joint Petitioners' claim that "the 'societal and economic impacts from severe accidents' are unlikely to be small for all plants and simply appear so by the use of methods that minimized consequences as set forth in this 220 Id. at 82-83.
: 1.     Issues that are out of scope (Small impact of severe accidents; Spent fuel pool)
FirstEnergy and the NRC Staff argue that several of the issues Joint Petitioners attempt to raise in Contention Four are outside the scope of license renewal proceedings.223 We agree, at least as to Joint Petitioners challenges to (1) the Commissions determination that severe accident impacts are small224 and (2) the Commissions exclusion of the irradiated nuclear fuel pool risk.225 First, as FirstEnergy and the NRC Staff have argued,226 Joint Petitioners claim that the societal and economic impacts from severe accidents are unlikely to be small for all plants and simply appear so by the use of methods that minimized consequences as set forth in this 220 Id. at 82-83.
221 Id. at 70-71.
221 Id. at 70-71.
222 Crow Butte, CLI-09-12, 69 NRC at 552 ("Our boards may reformulate contentions to 'eliminate extraneous issues or to consolidate issues for a more efficient proceeding.'" (quoting Shaw Areva, LBP-08-11, 67 NRC at 482)).
222 Crow Butte, CLI-09-12, 69 NRC at 552 (Our boards may reformulate contentions to eliminate extraneous issues or to consolidate issues for a more efficient proceeding. (quoting Shaw Areva, LBP-08-11, 67 NRC at 482)).
223 FirstEnergy Answer at 80; NRC Staff Answer at 51.
223 FirstEnergy Answer at 80; NRC Staff Answer at 51.
224 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58; see Petition at 105.
224 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58; see Petition at 105.
225 FirstEnergy Answer at 92-95; NRC Staff Answer at 51-55; see Petition at 108-12.
225 FirstEnergy Answer at 92-95; NRC Staff Answer at 51-55; see Petition at 108-12.
226 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58. Motion"227 is outside the scope of this proceeding because it directly challenges a Commission regulation. The statement challenges the agency regulation codifying the Commission's determination that, for any license renewal of a nuclear power plant, the probability-weighted consequences of a severe accident are small.
226 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58.
228 Unless a party first successfully petitions for a waiver or exception, it may not challenge Commission rules or regulations in an adjudicatory hearing.229 Joint Petitioners have not petitioned for a waiver or exception to the small risk determination. Accordingly, the argument that severe accident risk is not small is in contravention of 10 C.F.R. § 2.309(f)(1)(iii) and so is outside the scope of this proceeding. In addition, FirstEnergy interprets Joint Petitioners' assertion that FirstEnergy's "use of probabilistic modeling underestimated the true consequences of a severe accident" 230 as an argument that SAMAs "must ignore risk and focus only on accident consequences."
 
231 FirstEnergy asserts that such an argument "should be dismissed in its entirety" 232 as an impermissible challenge to NRC regulations outside the scope of an adjudicatory proceeding.
Motion227 is outside the scope of this proceeding because it directly challenges a Commission regulation. The statement challenges the agency regulation codifying the Commissions determination that, for any license renewal of a nuclear power plant, the probability-weighted consequences of a severe accident are small.228 Unless a party first successfully petitions for a waiver or exception, it may not challenge Commission rules or regulations in an adjudicatory hearing.229 Joint Petitioners have not petitioned for a waiver or exception to the small risk determination. Accordingly, the argument that severe accident risk is not small is in contravention of 10 C.F.R. § 2.309(f)(1)(iii) and so is outside the scope of this proceeding.
233 The NRC Staff similarly argues "Joint Petitioners' challenge to [FirstEnergy's] probabilistic approach in computing SAMAs is . . . outside the scope of the proceeding."
In addition, FirstEnergy interprets Joint Petitioners assertion that FirstEnergys use of probabilistic modeling underestimated the true consequences of a severe accident230 as an argument that SAMAs must ignore risk and focus only on accident consequences.231 FirstEnergy asserts that such an argument should be dismissed in its entirety232 as an impermissible challenge to NRC regulations outside the scope of an adjudicatory proceeding.233 The NRC Staff similarly argues Joint Petitioners challenge to [FirstEnergys] probabilistic approach in computing SAMAs is . . . outside the scope of the proceeding.234 In their final revised reply, Joint Petitioners clarify that they are not enemies of probability determinations235 and agree that probability must 227 Petition at 105.
234 In their final revised reply, Joint Petitioners clarify that they are "not 'enemies' of probability determinations" 235 and "agree that probability must 227 Petition at 105.
228 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1.
228 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1.
229 Id. § 2.335.
229 Id. § 2.335.
230 Petition at 104.
230 Petition at 104.
231 FirstEnergy Answer at 84-85.
231 FirstEnergy Answer at 84-85.
232 Id. at 86. 233 Id. at 85 (citing 10 C.F.R. § 2.335).
232 Id. at 86.
233 Id. at 85 (citing 10 C.F.R. § 2.335).
234 NRC Staff Answer at 83.
234 NRC Staff Answer at 83.
235 Reply at 45. be taken into consideration."
235 Reply at 45.
236  As clarified in the final revised reply, Joint Petitioners' argument is that FirstEnergy "has consistently underestimated risk in its SAMA calculations by inappropriately and improperly underestimating probability values" through "flawed models and methodologies."
237  As a consequence, we do not need to decide whether it would be out of scope to challenge the weighting of severe accident consequences by the probability of their occurrence in SAMA analyses, because Joint Petitioners have clarified that they are not arguing against probabilistic modeling in this proceeding. Second, FirstEnergy and the NRC Staff argue Joint Petitioners have raised an out-of-scope issue 238 by arguing that the risk of "a severe accident in the irradiated nuclear fuel pool" should have been considered in the SAMA analysis.
239  FirstEnergy contends this issue "improperly challenges the Commission's generic determination in Part 51 that the impacts of on-site spent fuel


storage are 'small.'"
be taken into consideration.236 As clarified in the final revised reply, Joint Petitioners argument is that FirstEnergy has consistently underestimated risk in its SAMA calculations by inappropriately and improperly underestimating probability values through flawed models and methodologies.237 As a consequence, we do not need to decide whether it would be out of scope to challenge the weighting of severe accident consequences by the probability of their occurrence in SAMA analyses, because Joint Petitioners have clarified that they are not arguing against probabilistic modeling in this proceeding.
240 The NRC Staff agrees that "this portion of Joint Petitioners' argument is inadmissible because it is . . . a direct attack on the Commission's regulations."
Second, FirstEnergy and the NRC Staff argue Joint Petitioners have raised an out-of-scope issue238 by arguing that the risk of a severe accident in the irradiated nuclear fuel pool should have been considered in the SAMA analysis.239 FirstEnergy contends this issue improperly challenges the Commissions generic determination in Part 51 that the impacts of on-site spent fuel storage are small.240 The NRC Staff agrees that this portion of Joint Petitioners argument is inadmissible because it is . . . a direct attack on the Commissions regulations.241 The germane Commission regulation states that, for all plants, on-site dry or pool storage can safely accommodate spent fuel accumulated from a 20-year license extension with small environmental effects, and categorizes on-site spent fuel as a Category 1 issue.242 For Category 1 issues, mitigation of adverse impacts has already been generically analyzed and it has already been determined that additional plant-specific mitigation measures are likely not to be sufficiently 236 Id. at 46.
241 The germane Commission regulation states that, for all plants, on-site dry or pool storage can "safely accommodate" spent fuel accumulated from a 20-year license extension with "small environmental effects," and categorizes on-site spent fuel as a Category 1 issue.
237 Id. at 45.
242 For Category 1 issues, mitigation of adverse impacts has already been generically analyzed and it has already been determined "that additional plant-specific mitigation measures are likely not to be sufficiently 236 Id. at 46.
238 FirstEnergy Answer at 92-93; NRC Staff Answer at 51-55.
237 Id. at 45. 238 FirstEnergy Answer at 92-93; NRC Staff Answer at 51-55.
239 Petition at 108.
239 Petition at 108.
240 FirstEnergy Answer at 92.
240 FirstEnergy Answer at 92.
241 NRC Staff Answer at 52.
241 NRC Staff Answer at 52.
242 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1. beneficial to warrant implementation."
242 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1.
243  Since Joint Petitioners have not obtained a waiver or exception to this regulation, their challenge to this rule is outside the scope of this license renewal proceeding.
244  Accordingly, spent fuel pool risk is extraneous to Joint Petitioners' SAMA contention.
245 Because spent fuel pool risk is outside the scope of SAMA analyses, we do not reach Joint Petitioners' argument that Davis-Besse's irradiated fuel storage pools contain a larger inventory of radioactive materials than its reactor core.
246  For the same reason, we need not address Joint Petitioners' interpretation of Sections 5 and 6 of the GEIS as including the irradiated nuclear fuel


pool in SAMA analyses, 247 except to note that the Commission has rejected this very argument.
beneficial to warrant implementation.243 Since Joint Petitioners have not obtained a waiver or exception to this regulation, their challenge to this rule is outside the scope of this license renewal proceeding.244 Accordingly, spent fuel pool risk is extraneous to Joint Petitioners SAMA contention.245 Because spent fuel pool risk is outside the scope of SAMA analyses, we do not reach Joint Petitioners argument that Davis-Besses irradiated fuel storage pools contain a larger inventory of radioactive materials than its reactor core.246 For the same reason, we need not address Joint Petitioners interpretation of Sections 5 and 6 of the GEIS as including the irradiated nuclear fuel pool in SAMA analyses,247 except to note that the Commission has rejected this very argument.248
248 2. Issues that are not material (Sabotage risk; Quality assurance) FirstEnergy and the NRC Staff also assert that some issues raised in Contention Four are not material to the findings NRC must make to support the requested license renewal. We agree, at least as to the treatment of the risk of sabotage and the quality assurance standards applied to the MACCS2 code. In section III(B)(5) below, we address-with reference to the potentially admissible core of this SAMA contention-FirstEnergy and the NRC Staff's arguments that the 243 Id. at tbl. B-1, n.2.
: 2.     Issues that are not material (Sabotage risk; Quality assurance)
244 See 10 C.F.R. § 2.335; see also Turkey Point, CLI-01-17, 54 NRC at 23 (holding "Part 51's license renewal provisions cover environmental issues relating to onsite spent fuel storage generically" and "[a]ll such issues, including accident risk, fall outside the scope of license renewal proceedings.").
FirstEnergy and the NRC Staff also assert that some issues raised in Contention Four are not material to the findings NRC must make to support the requested license renewal. We agree, at least as to the treatment of the risk of sabotage and the quality assurance standards applied to the MACCS2 code. In section III(B)(5) below, we addresswith reference to the potentially admissible core of this SAMA contentionFirstEnergy and the NRC Staffs arguments that the 243 Id. at tbl. B-1, n.2.
245 See Pilgrim II, CLI 10-11, 71 NRC at __ (slip op. at 33) (stating that claim that "SAMA analysis is deficient for failing to address potential spent fuel pool accidents" falls "beyond the scope of NRC SAMA analysis and impermissibly challenges [Commission] regulations").
244 See 10 C.F.R. § 2.335; see also Turkey Point, CLI-01-17, 54 NRC at 23 (holding Part 51's license renewal provisions cover environmental issues relating to onsite spent fuel storage generically and [a]ll such issues, including accident risk, fall outside the scope of license renewal proceedings.).
245 See Pilgrim II, CLI 10-11, 71 NRC at __ (slip op. at 33) (stating that claim that SAMA analysis is deficient for failing to address potential spent fuel pool accidents falls beyond the scope of NRC SAMA analysis and impermissibly challenges [Commission] regulations).
246 Petition at 112.
246 Petition at 112.
247 Id. (referring to GEIS, NUREG-1437, Vol. 1, §§ 5, 6).
247 Id. (referring to GEIS, NUREG-1437, Vol. 1, §§ 5, 6).
248 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-14, 71 NRC __, __ (slip op. at 34) (June 17, 2010) [hereinafter Pilgrim III] (clarifying that "[c]hapter six clearly is not limited to discussing only 'normal operations,' but also discusses potential accidents and other non-routine events," and that "[t]he Category 1 finding for onsite spent fuel storage (and chapter six of the GEIS upon which the finding is based) is not limited to routine or 'normal operations'" (citing GEIS, NUREG-1437, Vol. 1, at 6-19, 6-21, 6-28, 6-31, 6-34)). entire contention is inadmissible for lack of a showing that the refinements in question might make an additional SAMA candidate cost-effective. First, the Applicant argues that Joint Petitioners' "claims regarding the need to address intentional acts in a SAMA analysis . . . do not raise a material issue,"
248 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-14, 71 NRC __, __
249 and the NRC Staff agrees.250 Joint Petitioners charge FirstEnergy with failing "to model intentional acts in its analysis of external events" 251 and state that "intentional acts represent a class of accidents that should not be considered using probabilistic modeling."
(slip op. at 34) (June 17, 2010) [hereinafter Pilgrim III] (clarifying that [c]hapter six clearly is not limited to discussing only normal operations, but also discusses potential accidents and other non-routine events, and that [t]he Category 1 finding for onsite spent fuel storage (and chapter six of the GEIS upon which the finding is based) is not limited to routine or normal operations (citing GEIS, NUREG-1437, Vol. 1, at 6-19, 6-21, 6-28, 6-31, 6-34)).
252 However, as the Commission recently reiterated, "NEPA 'imposes no legal duty on the NRC to consider intentional malevolent acts . . . in conjunction with commercial power reactor license renewal applications.'"
 
253 Therefore, we conclude that intentional malevolent acts, such as sabotage and terrorism, are not material to the SAMA findings the NRC must make in deciding whether to extend the Davis-Besse license, in contravention of 10 C.F.R. § 2.309(f)(1)(iv).
entire contention is inadmissible for lack of a showing that the refinements in question might make an additional SAMA candidate cost-effective.
Second, Joint Petitioners failed to show how their claim that the MACCS2 code "is not QA'd" is material.
First, the Applicant argues that Joint Petitioners claims regarding the need to address intentional acts in a SAMA analysis . . . do not raise a material issue,249 and the NRC Staff agrees.250 Joint Petitioners charge FirstEnergy with failing to model intentional acts in its analysis of external events251 and state that intentional acts represent a class of accidents that should not be considered using probabilistic modeling.252 However, as the Commission recently reiterated, NEPA imposes no legal duty on the NRC to consider intentional malevolent acts . . . in conjunction with commercial power reactor license renewal applications.253 Therefore, we conclude that intentional malevolent acts, such as sabotage and terrorism, are not material to the SAMA findings the NRC must make in deciding whether to extend the Davis-Besse license, in contravention of 10 C.F.R. § 2.309(f)(1)(iv).
254 Joint Petitioners assert MACCS2 was developed using "the less rigorous QA guidelines of ANSI/ANS 10.4" instead of being "held to the QA requirements of NQA-a."
Second, Joint Petitioners failed to show how their claim that the MACCS2 code is not QAd is material.254 Joint Petitioners assert MACCS2 was developed using the less rigorous QA guidelines of ANSI/ANS 10.4 instead of being held to the QA requirements of NQA-a.255 FirstEnergy points out that appendix B to 10 C.F.R. Part 50 requires quality assurance, but only for safety-related functions of structures, systems, and components and not for NEPA analyses.256 249 FirstEnergy Answer at 87.
255 FirstEnergy points out that appendix B to 10 C.F.R. Part 50 requires quality assurance, but only for safety-related functions of structures, systems, and components and not for NEPA analyses.
256 249 FirstEnergy Answer at 87.
250 NRC Staff Answer at 55-56.
250 NRC Staff Answer at 55-56.
251 Petition at 108.
251 Petition at 108.
252 Id. at 107. 253 Pilgrim III, CLI-10-14, 71 NRC at __ (slip op. at 37) (quoting AmerGen Energy Co., LLC (Oyster Creek Nuclear Generation Station), CLI-07-8, 65 NRC 124, 129 (2007)).
252 Id. at 107.
253 Pilgrim III, CLI-10-14, 71 NRC at __ (slip op. at 37) (quoting AmerGen Energy Co., LLC (Oyster Creek Nuclear Generation Station), CLI-07-8, 65 NRC 124, 129 (2007)).
254 Petition at 115.
254 Petition at 115.
255 Id. 256 FirstEnergy Answer at 101. SAMA analyses are required pursuant to NEPA.
255 Id.
257 FirstEnergy admonishes Joint Petitioners for not explaining why a computer code used to evaluate SAMAs would need to meet quality assurance requirements.
256 FirstEnergy Answer at 101.
258 We agree that Joint Petitioners have not demonstrated that the issue of whether the MACCS2 was "QA'd" is material to the findings the NRC must make under NEPA to support the requested license extension, as required by 10 C.F.R. § 2.309(f)(1)(iv). 3. Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; "Myriad of other economic costs"; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties) FirstEnergy and the NRC Staff argue that Joint Petitioners have failed to provide alleged facts or expert opinions to support several of the claims they make in Contention Four. In one instance, FirstEnergy and the NRC Staff note that Joint Petitioners "provide no alleged facts or expert opinion to support" their claim that "if properly modeled, the indoor dose would increase by a factor" of 2 to 4.
 
259 In a second instance, FirstEnergy 260 and the NRC Staff 261 argue that Joint Petitioners do not provide facts or expert support for their assertion that FirstEnergy's analysis should have considered that "forests, wetlands and shorelines cannot realistically be cleaned up and decontaminated."
SAMA analyses are required pursuant to NEPA.257 FirstEnergy admonishes Joint Petitioners for not explaining why a computer code used to evaluate SAMAs would need to meet quality assurance requirements.258 We agree that Joint Petitioners have not demonstrated that the issue of whether the MACCS2 was QAd is material to the findings the NRC must make under NEPA to support the requested license extension, as required by 10 C.F.R. § 2.309(f)(1)(iv).
262 Next, the NRC Staff argues Joint Petitioners have not supported their claim that "the 'economic losses stemming from the stigma effects of a severe accident [at Davis-Besse] would be staggering.'"
: 3.     Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; Myriad of other economic costs; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties)
263 The NRC Staff also faults Joint Petitioners for not providing facts or expert support for their claim that the ER should have discussed economic infrastructure costs 257 10 C.F.R. §§ 51.1(a), 51.53(c)(3)(ii)(L).
FirstEnergy and the NRC Staff argue that Joint Petitioners have failed to provide alleged facts or expert opinions to support several of the claims they make in Contention Four. In one instance, FirstEnergy and the NRC Staff note that Joint Petitioners provide no alleged facts or expert opinion to support their claim that if properly modeled, the indoor dose would increase by a factor of 2 to 4.259 In a second instance, FirstEnergy260 and the NRC Staff261 argue that Joint Petitioners do not provide facts or expert support for their assertion that FirstEnergys analysis should have considered that forests, wetlands and shorelines cannot realistically be cleaned up and decontaminated.262 Next, the NRC Staff argues Joint Petitioners have not supported their claim that the economic losses stemming from the stigma effects of a severe accident [at Davis-Besse] would be staggering.263 The NRC Staff also faults Joint Petitioners for not providing facts or expert support for their claim that the ER should have discussed economic infrastructure costs 257 10 C.F.R. §§ 51.1(a), 51.53(c)(3)(ii)(L).
258 FirstEnergy Answer at 101.
258 FirstEnergy Answer at 101.
259 Id. at 103; NRC Staff Answer at 61; see Petition at 116.
259 Id. at 103; NRC Staff Answer at 61; see Petition at 116.
Line 484: Line 429:
261 NRC Staff Answer at 73.
261 NRC Staff Answer at 73.
262 Petition at 138.
262 Petition at 138.
263 NRC Staff Answer at 74 (quoting Petition at 141). and indirect economic effects ("multiplier effects").
263 NRC Staff Answer at 74 (quoting Petition at 141).
264 FirstEnergy and the NRC Staff argue also that Joint Petitioners did not provide alleged facts or expert opinion 265 to support their argument that FirstEnergy's "evacuation time input data" was "unrealistically low and unsubstantiated" because it did not account for certain traffic, weather, and human behavior effects.
 
266 Finally, the NRC Staff argues 267 that Joint Petitioners do not provide any facts or expert opinion to support their claim that "a myriad of other economic costs were underestimated or totally ignored."
and indirect economic effects (multiplier effects).264 FirstEnergy and the NRC Staff argue also that Joint Petitioners did not provide alleged facts or expert opinion265 to support their argument that FirstEnergys evacuation time input data was unrealistically low and unsubstantiated because it did not account for certain traffic, weather, and human behavior effects.266 Finally, the NRC Staff argues267 that Joint Petitioners do not provide any facts or expert opinion to support their claim that a myriad of other economic costs were underestimated or totally ignored.268 We agree that Joint Petitioners do not provide any alleged facts or expert opinion to support any of these claims, as required by 10 C.F.R § 2.309(f)(1)(v).
268 We agree that Joint Petitioners do not provide any alleged facts or expert opinion to support any of these claims, as required by 10 C.F.R § 2.309(f)(1)(v). The NRC Staff argues also that Joint Petitioners have also failed to support their claim regarding complex terrain.
The NRC Staff argues also that Joint Petitioners have also failed to support their claim regarding complex terrain.269 Joint Petitioners argue that the Gaussian plume model FirstEnergy used to model atmospheric dispersion is not appropriate270 because, among other reasons, it does not model the impact of terrain on wind field patterns and plume dispersion.271 The NRC Staff notes that although Joint Petitioners provide studies that suggest a user should employ caution when relying on a Gaussian plume model in areas with complex or varied terrain, they have not shown that Davis-Besse is surrounded by complex terrain.272 Joint Petitioners claim the Cuyahoga River Valley is one example of the complex topographical features in Davis-Besses 264 Id. (citing Petition at 141-42).
269 Joint Petitioners argue that the Gaussian plume model FirstEnergy used to model atmospheric dispersion is not appropriate 270 because, among other reasons, it does not model the impact of terrain on "wind field patterns and plume dispersion."
271 The NRC Staff notes that although Joint Petitioners provide studies "that suggest a user should employ caution when relying on a Gaussian plume model in areas with complex or varied terrain," they "have not shown that Davis-Besse is surrounded by complex terrain."
272 Joint Petitioners claim the Cuyahoga River Valley is "one example of the complex topographical features in Davis-Besse's 264 Id. (citing Petition at 141-42).
265 FirstEnergy Answer at 129; NRC Staff Answer at 78.
265 FirstEnergy Answer at 129; NRC Staff Answer at 78.
266 Petition at 147.
266 Petition at 147.
Line 497: Line 439:
269 NRC Staff Answer at 66.
269 NRC Staff Answer at 66.
270 Petition at 116.
270 Petition at 116.
271 Id. at 122. 272 NRC Staff Answer at 62. region,"273 but do not provide any alleged facts or expert support indicating that this river valley is within the geographical area for which FirstEnergy was required to model atmospheric dispersion. We agree that the Joint Petitioners have not supported their terrain claim with alleged facts or expert opinion, as required by 10 C.F.R. § 2.309(f)(1)(v).
271 Id. at 122.
Joint Petitioners' challenge of the $2,000/person-rem conversion factor is inadmissible because it too lacks support. They make three arguments to establish that the $2,000/person-rem factor is "based on a deeply flawed analysis and seriously underestimates the cost of the health consequences of severe accidents."
272 NRC Staff Answer at 62.
274 First, Joint Petitioners point out the conversion factor represents "only stochastic health effects (e.g., cancer)" and argue "it is inappropriate to use a conversion factor that does not include deterministic effects."
 
275 Joint Petitioners instead recommend summing the total number of early fatalities and latent cancer fatalities and multiplying by the $3 million value of a statistical life.
region,273 but do not provide any alleged facts or expert support indicating that this river valley is within the geographical area for which FirstEnergy was required to model atmospheric dispersion.
276 The NRC Staff argues that this argument "offe rs only an unsupported assertion" because Joint Petitioners "offer no estimate" of the "large number of early fatalities" they assert should be part of the analysis.
We agree that the Joint Petitioners have not supported their terrain claim with alleged facts or expert opinion, as required by 10 C.F.R. § 2.309(f)(1)(v).
277 Joint Petitioners do provide an estimate of 1,400 early fatalities and 73,000 early injuries, citing a document they refer to as "CRAC-2, Calculation of Reactor Accident Consequences, U.S. Nuclear Power Plants, Sandia National Laboratory, 1982."
Joint Petitioners challenge of the $2,000/person-rem conversion factor is inadmissible because it too lacks support. They make three arguments to establish that the $2,000/person-rem factor is based on a deeply flawed analysis and seriously underestimates the cost of the health consequences of severe accidents.274 First, Joint Petitioners point out the conversion factor represents only stochastic health effects (e.g., cancer) and argue it is inappropriate to use a conversion factor that does not include deterministic effects.275 Joint Petitioners instead recommend summing the total number of early fatalities and latent cancer fatalities and multiplying by the $3 million value of a statistical life.276 The NRC Staff argues that this argument offers only an unsupported assertion because Joint Petitioners offer no estimate of the large number of early fatalities they assert should be part of the analysis.277 Joint Petitioners do provide an estimate of 1,400 early fatalities and 73,000 early injuries, citing a document they refer to as CRAC-2, Calculation of Reactor Accident Consequences, U.S. Nuclear Power Plants, Sandia National Laboratory, 1982.278 FirstEnergy asserts, however, that it has been unable to locate a document with this title, author, and date that is readily available in the public domain and point out that Joint Petitioners did not submit this 273 Petition at 134 (citing id., Attach. 70, Website of National Park Service, U.S. Department of the Interior, Cuyahoga Valley National Park).
278 FirstEnergy asserts, however, that it "has been unable to locate a document with this title, author, and date that is readily available in the public domain" and point out that Joint Petitioners did not submit this 273 Petition at 134 (citing id., Attach. 70, Website of National Park Service, U.S. Department of the Interior, Cuyahoga Valley National Park).
274 Id. at 142-43.
274 Id. at 142-43.
275 Id. at 144. 276 Id. at 145. 277 NRC Staff Answer at 75-76.
275 Id. at 144.
278 Petition at 146. document as an attachment to the Petition.
276 Id. at 145.
279 The NRC Staff assert they also "weren't able to locate it based on [Joint Petitioners'] representation of it."
277 NRC Staff Answer at 75-76.
280 Joint Petitioners respond that the document is "a well known report within the nuclear power establishment" and "is an NRC document,"
278 Petition at 146.
281 but admitted at oral argument that they "only cite it by name" and "may not have gotten the title correct."
 
282 We thus conclude that Joint Petitioners do not provide alleged facts or expert opinion indicating that a severe accident at Davis-Besse might have deterministic effects, such as early fatalities or early injuries, that FirstEnergy did not account for in its SAMA analysis. Second, Joint Petitioners further contend that the $2,000/person-rem conversion factor "assumes that all exposed persons receive dose commitments below the threshold at which the dose and dose-rate reduction factor . . . should be applied."
document as an attachment to the Petition.279 The NRC Staff assert they also werent able to locate it based on [Joint Petitioners] representation of it.280 Joint Petitioners respond that the document is a well known report within the nuclear power establishment and is an NRC document,281 but admitted at oral argument that they only cite it by name and may not have gotten the title correct.282 We thus conclude that Joint Petitioners do not provide alleged facts or expert opinion indicating that a severe accident at Davis-Besse might have deterministic effects, such as early fatalities or early injuries, that FirstEnergy did not account for in its SAMA analysis.
283 However, Joint Petitioners do not support their assertions about dose and dose-rate reduction factors with any alleged facts or expert support.
Second, Joint Petitioners further contend that the $2,000/person-rem conversion factor assumes that all exposed persons receive dose commitments below the threshold at which the dose and dose-rate reduction factor . . . should be applied.283 However, Joint Petitioners do not support their assertions about dose and dose-rate reduction factors with any alleged facts or expert support.
Third, Joint Petitioners argue that FirstEnergy's $2000/person-rem conversion analysis "ignored a marked increase in the value of cancer mortality risk per unit of radiation at low doses (2-3 rem average)," and cite two articles in support.
Third, Joint Petitioners argue that FirstEnergys $2000/person-rem conversion analysis ignored a marked increase in the value of cancer mortality risk per unit of radiation at low doses (2-3 rem average), and cite two articles in support.284 At oral argument, Joint Petitioners explained that the person-rem conversion factor needs to undergo reevaluation, because at low doses of radiation, there is a supra-linear harm caused to people.285 However, neither of the 279 FirstEnergy Answer at 128.
284 At oral argument, Joint Petitioners explained that "the person-rem conversion factor needs to undergo reevaluation," because "at low doses of radiation, there is a supra-linear harm caused to people."
285 However, neither of the 279 FirstEnergy Answer at 128.
280 Tr. at 220.
280 Tr. at 220.
281 Reply at 72.
281 Reply at 72.
Line 520: Line 459:
283 Petition at 144-45.
283 Petition at 144-45.
284 Id. at 146 (citing E. Cardis, et al., Risk of Cancer After Low Doses of Ionising Radiation:
284 Id. at 146 (citing E. Cardis, et al., Risk of Cancer After Low Doses of Ionising Radiation:
Retrospective Cohort Study in 15 Countries, 331 Brit. Med.
Retrospective Cohort Study in 15 Countries, 331 Brit. Med. J. 77 (July 4, 2005) and L. Yu.
J. 77 (July 4, 2005) and L. Yu. Krestinina, et al., Protracted Radiation Exposure and Cancer Mortality in the Techa River Cohort , 164 Radiation Res. 602 (2005)).
Krestinina, et al., Protracted Radiation Exposure and Cancer Mortality in the Techa River Cohort, 164 Radiation Res. 602 (2005)).
285 Tr. at 209. articles cited in the Petition indicate there is a supra-linear relationship between dose and risk at low doses. The first article, entitled "Risk of Cancer After Low Doses of Ionising Radiation: Retrospective Cohort Study in 15 Countries," estimates that the risk to nuclear industry workers at low doses is "higher than, but statistically compatible with, the current bases for radiation protection
285 Tr. at 209.


standards."
articles cited in the Petition indicate there is a supra-linear relationship between dose and risk at low doses. The first article, entitled Risk of Cancer After Low Doses of Ionising Radiation:
286 The second article, entitled "Protracted Exposure and Cancer Mortality in the Techa River Cohort," estimated "the slope of the dose response for both solid cancer and leukemia" in its subject population and concluded there was "no indication of significant curvature."
Retrospective Cohort Study in 15 Countries, estimates that the risk to nuclear industry workers at low doses is higher than, but statistically compatible with, the current bases for radiation protection standards.286 The second article, entitled Protracted Exposure and Cancer Mortality in the Techa River Cohort, estimated the slope of the dose response for both solid cancer and leukemia in its subject population and concluded there was no indication of significant curvature.287 In short, the alleged facts and expert opinion the Joint Petitioners proffer do not provide support for their challenge to the $2,000/person-rem conversion factor.
287 In short, the alleged facts and expert opinion the Joint Petitioners proffer do not provide support for their challenge to the $2,000/person-rem conversion factor.
Joint Petitioners final unsupported claim is their assertion that FirstEnergy fails to consider the uncertainties in its consequence calculation.288 They assert that meteorological variations cause uncertainties in estimates of population dose, fatalities, and offsite economic costs289 and criticize FirstEnergy for inadequately dealing with uncertainty in its ER.290 The ER explains that 286 Cardis et al., supra note 284, at 5.
Joint Petitioners' final unsupported claim is their assertion that FirstEnergy "fails to consider the uncertainties in its consequence calculation."
288 They assert that meteorological variations cause uncertainties in estimates of population dose, fatalities, and offsite economic costs 289 and criticize FirstEnergy for "inadequately dealing with" uncertainty in its ER.
290 The ER explains that 286 Cardis et al., supra note 284, at 5.
287 Krestinina et al., supra note 284, at 608. At oral argument, the Joint Petitioners argued that the BEIR VII Report by the National Academy of Sciences shows the supra-linear dose-risk relationship is not reflected in the $2,000/person-rem conversion factor. Tr. at 209. The Joint Petitioners cited this report in the Petition, but not as support for the supra-linear relationship claim.
287 Krestinina et al., supra note 284, at 608. At oral argument, the Joint Petitioners argued that the BEIR VII Report by the National Academy of Sciences shows the supra-linear dose-risk relationship is not reflected in the $2,000/person-rem conversion factor. Tr. at 209. The Joint Petitioners cited this report in the Petition, but not as support for the supra-linear relationship claim.
Petition at 146-147. Instead, they cited the report to support their statement that cancer incidence and the other "potential health effects from exposure to radiation in a severe radiological event"
Petition at 146-147. Instead, they cited the report to support their statement that cancer incidence and the other potential health effects from exposure to radiation in a severe radiological event should have been considered but were not, id., confusingly contradicting their earlier statement that the $2,000/person-rem conversion accounts for stochiastic health effects. Id. at 144. The Joint Petitioners have never directed our attention to a specific page or section of the BEIR VII Report, which is over 400 pages long. Committee to Assess Health Risks from Exposure to Low Levels of Ionizing Radiation, National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase 2 (2006). Board members are not required to comb through the record seeking support for contentions. Florida Power & Light Co. (Turkey Point Units 6 and 7), LBP-11-06, 73 NRC __, __ (slip op. at 109 n.111) (Feb. 28, 2011) (citing SmithKline Beecham Corp. v. Apotex Corp., 439 F.3d 1312, 1320 (Fed. Cir. 2006)). We decline to unearth support in this report for a proposition for which it was not even cited as authority in the Petition.
 
should have been considered but were not, id., confusingly contradicting their earlier statement that the $2,000/person-rem conversion accounts for stochiastic health effects. Id. at 144. The Joint Petitioners have never directed our attention to a specific page or section of the BEIR VII Report, which is over 400 pages long. Committee to Assess Health Risks from Exposure to Low Levels of Ionizing Radiation, National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase 2 (2006). Board members are not required to comb through the record seeking support for contentions. Florida Power & Light Co. (Turkey Point Units 6 and 7), LBP-11-06, 73 NRC __, __ (slip op. at 109 n.111) (Feb. 28, 2011) (citing SmithKline Beecham Corp. v. Apotex Corp., 439 F.3d 1312, 1320 (Fed. Cir. 2006)). We decline to unearth support in this report for a proposition for which it was not even cited as authority in the Petition.
288 Petition at 148.
288 Petition at 148.
289 Id. at 148-49.
289 Id. at 148-49.
290 Id. at 149.     no explicit uncertainty analysis was performed because "the number of conservative assumptions and inputs" in the SAMA analysis "account for any uncertainties in the calculations" and because "sensitivity cases . . . showed the robustness of the SAMA cost-benefit evaluation."
290 Id. at 149.
291 Hence the ER does not report any consequences at the mean or 95th percentile values, but rather presents "conservative" point values. Joint Petitioners, however, criticize FirstEnergy for "using mean consequence values instead of, for example, 95 percentile values" 292 and complain also that FirstEnergy "has unconvincingly performed suspect sensitivity analyses."
 
293 FirstEnergy and the NRC Staff argue that Joint Petitioners have not provided alleged facts or expert support for their claim about uncertainty.
no explicit uncertainty analysis was performed because the number of conservative assumptions and inputs in the SAMA analysis account for any uncertainties in the calculations and because sensitivity cases . . . showed the robustness of the SAMA cost-benefit evaluation.291 Hence the ER does not report any consequences at the mean or 95th percentile values, but rather presents conservative point values. Joint Petitioners, however, criticize FirstEnergy for using mean consequence values instead of, for example, 95 percentile values292 and complain also that FirstEnergy has unconvincingly performed suspect sensitivity analyses.293 FirstEnergy and the NRC Staff argue that Joint Petitioners have not provided alleged facts or expert support for their claim about uncertainty.294 We agree. Although Joint Petitioners refer to two documents indicating uncertainties can arise in probabilistic risk assessment,295 neither of these citations show that FirstEnergys sensitivity cases and conservative assumptions and inputs were inadequate for dealing with uncertainty.296 Accordingly, Joint Petitioners claim about uncertainty in the consequence calculation is not supported by alleged facts or expert opinion.
294 We agree. Although Joint Petitioners refer to two documents indicating uncertainties can arise in probabilistic risk assessment, 295 neither of these citations show that FirstEnergy's sensitivity cases and conservative assumptions and inputs were inadequate for dealing with uncertainty.
In summary, for the reasons outlined above, we conclude that Joint Petitioners have failed to provide alleged facts or expert opinion to support their claims pursuant to 10 C.F.R.
296 Accordingly, Joint Petitioners' claim about uncertainty in the consequence calculation is not supported by alleged facts or expert opinion. In summary, for the reasons outlined above, we conclude that Joint Petitioners have failed to provide alleged facts or expert opinion to support their claims pursuant to 10 C.F.R.
291 ER at E-70.
291 ER at E-70.
292 Petition at 148 (capitalization omitted).
292 Petition at 148 (capitalization omitted).
293 Id. at 149. 294 FirstEnergy Answer at 131; NRC Staff Answer at 85-86.
293 Id. at 149.
295 Petition at 148-49 (citing Edwin S. Lyman, A Critique of the Radiological Consequence Assessment Conducted in Support of the Indian Point Severe Accident Mitigation Alternatives Analysis at 4 (Nov. 2007) (Accession No. ML073410093) and quoting Kamiar Jamali, Use of Risk Measures in Design and Licensing of Future Reactors, Reliability Eng'g & Safety Sys.
294 FirstEnergy Answer at 131; NRC Staff Answer at 85-86.
95 at 935-36 (2010)). 296 The Commission has suggested that a petitioner may question the "practice for SAMA analysis to utilize mean consequence values, which results in an averaging of potential consequences.Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC __, __ (slip op. at 8 n.34) (Aug. 27, 2010). However, a petitioner must support such a challenge with alleged facts or expert opinion. 10 C.F.R. § 2.309(f)(1)(v).   § 2.309(f)(1)(v) regarding: (1) indoor dose; (2) forest, wetland, and shoreline clean up; (3) stigma costs; (4) economic infrastructure costs; (5) multiplier effect; (6) evacuation times; (7) "myriad" other economic costs; (8) terrain effects; (9) the $2,000/person-rem conversion factor; and (10) consequence value uncertainties.
295 Petition at 148-49 (citing Edwin S. Lyman, A Critique of the Radiological Consequence Assessment Conducted in Support of the Indian Point Severe Accident Mitigation Alternatives Analysis at 4 (Nov. 2007) (Accession No. ML073410093) and quoting Kamiar Jamali, Use of Risk Measures in Design and Licensing of Future Reactors, Reliability Engg & Safety Sys. 95 at 935-36 (2010)).
: 4. Issues that do not dispute the Application (Fire hosing and plowing) Joint Petitioners' criticism of fire hosing and plowing decontamination methods 297 do not dispute the Application's SAMA analysis. FirstEnergy points out that Joint Petitioners quote language from the MACCS2 User's Guide that states that the code is made more conservative by its assumption that farmlands are decontaminated using these methods.
296 The Commission has suggested that a petitioner may question the practice for SAMA analysis to utilize mean consequence values, which results in an averaging of potential consequences.
298 The MACCS2 User's Guide explains that the code assumes these surface-washing methods might not move contamination out of the root zone, where radioactivity could be taken up into crops.
Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC __, __ (slip op. at 8 n.34) (Aug. 27, 2010). However, a petitioner must support such a challenge with alleged facts or expert opinion. 10 C.F.R. § 2.309(f)(1)(v).
299 Thus, the guide concludes, the code assumes that these methods would not reduce ingestion doses although they would reduce direct exposure doses to farmers.
 
300 And for their part the Joint Petitioners do not explain how the MACCS2 codes assumption about fire hosing and plowing could have caused FirstEnergy to underestimate the cost of a severe accident. Accordingly, Joint Petitioners' fire hosing and plowing claims do not dispute the Application. We will not consider these claims further, because they do not satisfy 10 C.F.R. § 2.309(f)(1)(vi). 5. Admissible contention as narrowed by the Board Having eliminated the extraneous issues, we look next at issues that we find ultimately provide an admissible core for Contention Four. Using the Joint Petitioners' own words whenever possible, we recast Contention Four as follows:
                                                    § 2.309(f)(1)(v) regarding: (1) indoor dose; (2) forest, wetland, and shoreline clean up; (3) stigma costs; (4) economic infrastructure costs; (5) multiplier effect; (6) evacuation times; (7) myriad other economic costs; (8) terrain effects; (9) the $2,000/person-rem conversion factor; and (10) consequence value uncertainties.
: 4.     Issues that do not dispute the Application (Fire hosing and plowing)
Joint Petitioners criticism of fire hosing and plowing decontamination methods297 do not dispute the Applications SAMA analysis. FirstEnergy points out that Joint Petitioners quote language from the MACCS2 Users Guide that states that the code is made more conservative by its assumption that farmlands are decontaminated using these methods.298 The MACCS2 Users Guide explains that the code assumes these surface-washing methods might not move contamination out of the root zone, where radioactivity could be taken up into crops.299 Thus, the guide concludes, the code assumes that these methods would not reduce ingestion doses although they would reduce direct exposure doses to farmers.300 And for their part the Joint Petitioners do not explain how the MACCS2 codes assumption about fire hosing and plowing could have caused FirstEnergy to underestimate the cost of a severe accident. Accordingly, Joint Petitioners fire hosing and plowing claims do not dispute the Application. We will not consider these claims further, because they do not satisfy 10 C.F.R. § 2.309(f)(1)(vi).
: 5.     Admissible contention as narrowed by the Board Having eliminated the extraneous issues, we look next at issues that we find ultimately provide an admissible core for Contention Four. Using the Joint Petitioners own words whenever possible, we recast Contention Four as follows:
297 Petition at 136, 138.
297 Petition at 136, 138.
298 FirstEnergy Answer at 117-18 (citing Petition at 136 (quoting D. Chanin & M.L. Young, Code Manual for MACCS2; User's Guide, NUREG/CR-6613, Vol. 1, at 7-10 (May 1998) (ADAMS Accession No. ML063550020) [hereinafter MACCS2 User's Guide, NUREG/CR-6613, Vol. 1])).
298 FirstEnergy Answer at 117-18 (citing Petition at 136 (quoting D. Chanin & M.L. Young, Code Manual for MACCS2; Users Guide, NUREG/CR-6613, Vol. 1, at 7-10 (May 1998) (ADAMS Accession No. ML063550020) [hereinafter MACCS2 Users Guide, NUREG/CR-6613, Vol. 1])).
299 MACCS2 User's Guide, NUREG/CR-6613, Vol. 1, at 7-10.
299 MACCS2 Users Guide, NUREG/CR-6613, Vol. 1, at 7-10.
300 Id.   "The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(II)(L) [sic] and Further Analysis by the Applicant, [FirstEnergy], is called for" 301 because of: (1) "Minimization of the potential amount of radioactive material released in a severe accident"302 by "using a source term . . . based on radionuclide release fractions . . . which are smaller for key radionuclides than the release fractions specified in NRC
300 Id.


guidance";
The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(II)(L) [sic]
303 (2) "Use of an inappropriate air dispersion model, the straight-line Gaussian plume,"
and Further Analysis by the Applicant, [FirstEnergy], is called for301 because of:
304 that "does not allow consideration for the fact that winds for a given time period may vary spatially, . . . ignores the presences of Great Lakes 'sea breeze' circulations which dramatically alter air flow patterns,"
(1) Minimization of the potential amount of radioactive material released in a severe accident302 by using a source term . . . based on radionuclide release fractions . . .
305 fails to account for "hot spots of radioactivity" caused by "plumes blowing . . . offshore over Lake Erie,"
which are smaller for key radionuclides than the release fractions specified in NRC guidance;303 (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume,304 that does not allow consideration for the fact that winds for a given time period may vary spatially, . . . ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns,305 fails to account for hot spots of radioactivity caused by plumes blowing . . . offshore over Lake Erie,306 and is based on meteorological inputs . . . collected from just one site at Davis-Besse itself;307 and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident,308 specifically particle size and clean-up costs for urban areas.
306 and is based on "meteorological inputs . . . collected from just one site - at Davis-Besse itself;"307 and (3) Use of "inputs that minimized and inaccurately reflected the economic consequences of a severe accident,"
: a.     Source terms Joint Petitioners contend that using a source term generated by the Modular Accident Analysis Progression code (MAAP code)as FirstEnergy didappears to lead to anomalously low consequences when compared to source terms generated by the NRC staff.309 Joint Petitioners allege that the MAAP code generates source terms that are consistently smaller for key radionuclides than the release fractions specified in NUREG-1465 and its recent revision for 301 Petition at 100.
308 specifically particle size and clean-up costs for urban areas. a. Source terms Joint Petitioners contend that using a source term generated by the Modular Accident Analysis Progression code (MAAP code)-as FirstEnergy did-"appears to lead to anomalously low consequences when compared to source terms generated by the NRC staff."
302 Id. at 104.
309 Joint Petitioners allege that the MAAP code generates source terms that "are consistently smaller for key radionuclides than the release fractions specified in NUREG-1465 and its recent revision for 301 Petition at 100.
303 Id. at 108.
302 Id. at 104. 303 Id. at 108. 304 Id. at 104. 305 Id. at 119. 306 Id. at 121. 307 Id. at 125. 308 Id. at 104. 309 Id. at 114. high-burnup irradiated nuclear fuel."
304 Id. at 104.
310 Joint Petitioners support their source-term claim by quoting a published draft of NUREG-1150 in which the NRC observed, in the context of the Zion Nuclear Power Plant, that "comparisons made between the Source Term Code Package results and MAAP results indicated that the MAAP estimates for environmental release fractions were significantly smaller."
305 Id. at 119.
311  Joint Petitioners also quote a Brookhaven National Laboratory study that determined that dose results reported by the applicant for license renewal at the Catawba and McGuire Plants were "less by a factor between 3 and 4" than those calculated consistent with NUREG-1150.
306 Id. at 121.
312  The NRC Staff recognizes that "Joint Petitioners have provided some support for the argument that MAAP may lead to lower consequences when compared to source terms generated by NRC Staff."
307 Id. at 125.
313  Nevertheless, the NRC Staff argues that "Joint Petitioners' reliance on NUREG-1465 is
308 Id. at 104.
309 Id. at 114.


unavailing."
high-burnup irradiated nuclear fuel.310 Joint Petitioners support their source-term claim by quoting a published draft of NUREG-1150 in which the NRC observed, in the context of the Zion Nuclear Power Plant, that comparisons made between the Source Term Code Package results and MAAP results indicated that the MAAP estimates for environmental release fractions were significantly smaller.311 Joint Petitioners also quote a Brookhaven National Laboratory study that determined that dose results reported by the applicant for license renewal at the Catawba and McGuire Plants were less by a factor between 3 and 4 than those calculated consistent with NUREG-1150.312 The NRC Staff recognizes that Joint Petitioners have provided some support for the argument that MAAP may lead to lower consequences when compared to source terms generated by NRC Staff.313 Nevertheless, the NRC Staff argues that Joint Petitioners reliance on NUREG-1465 is unavailing.314 FirstEnergy agrees, asserting that reference to NUREG-1465 . . . provides no factual or technical support for the contention.315 FirstEnergy distinguishes the release of radionuclides into containment, which is addressed in NUREG-1465, from the release of 310 Id. at 112 (referring to L. Soffer et al., Accident Source Terms for Light-Water Nuclear Power Plants, NUREG-1465 (Feb. 1995) (ADAMS Accession No. ML041040063) [hereinafter NUREG-1465]).
314 FirstEnergy agrees, asserting that "reference to NUREG-1465 . . . provides no factual or technical support for the contention."
311 Id. at 114 (quoting Office of Nuclear Regulatory Research, Draft for Comment, Reactor Risk Reference Document, NUREG-1150, Vol. 1, at 5-14 (Feb. 1987) (ADAMS Accession No.
315 FirstEnergy distinguishes "the release of radionuclides into containment," which is addressed in NUREG-1465, from "the release of 310 Id. at 112 (referring to L. Soffer et al., Accident Source Terms for Light-Water Nuclear Power Plants, NUREG-1465 (Feb. 1995) (ADAMS Accession No. ML041040063) [hereinafter NUREG-1465]). 311 Id. at 114 (quoting Office of Nuclear Regulatory Research, Draft for Comment, Reactor Risk Reference Document, NUREG-1150, Vol. 1, at 5-14 (Feb. 1987) (ADAMS Accession No. ML063540601)) [hereinafter Draft NUREG-1150] (capitaliza tion altered by Joint Petitioners). The draft of NUREG-1150 states that the Source Term Code Package is described in NUREG-0956. Draft NUREG-1150 at ES-3 (citing M. Silverberg, et al., Reassessment of the Technical Bases for Estimating Source Terms, NUREG-0956 (July 1986) (ADAMS Accession No. ML063550025)).
ML063540601)) [hereinafter Draft NUREG-1150] (capitalization altered by Joint Petitioners). The draft of NUREG-1150 states that the Source Term Code Package is described in NUREG-0956.
Draft NUREG-1150 at ES-3 (citing M. Silverberg, et al., Reassessment of the Technical Bases for Estimating Source Terms, NUREG-0956 (July 1986) (ADAMS Accession No. ML063550025)).
312 Id. at 113 (quoting John R. Lehner, et al., Brookhaven National Laboratory, Benefit Cost Analysis of Enhancing Combustible Gas Control Availability at Ice Condenser and Mark III Containment Plants at 17 (Dec. 2002) (ADAMS Accession No. ML031700011)).
312 Id. at 113 (quoting John R. Lehner, et al., Brookhaven National Laboratory, Benefit Cost Analysis of Enhancing Combustible Gas Control Availability at Ice Condenser and Mark III Containment Plants at 17 (Dec. 2002) (ADAMS Accession No. ML031700011)).
313 NRC Staff Answer at 80.
313 NRC Staff Answer at 80.
314 Id. 315 FirstEnergy Answer at 95. radionuclides into the environment during a severe accident," which SAMA analyses model.
314 Id.
316  This technical argument, from the Board's perspective, warrants exploration in further adjudicatory proceedings, so as to avoid addressing the merits of the contention at the contention-admissibility stage of this proceeding.
315 FirstEnergy Answer at 95.
FirstEnergy points out that the ER presents "[t]he release categories and their frequencies" in Section E.3.4.5 and Table E.3-20 and chides Joint Petitioners for not challenging the SAMA analysis with "any particularity."
317  However, Joint Petitioners cite pages of the ER that state that FirstEnergy used source terms generated by the MAAP code, 318 thereby demonstrating that Joint Petitioners have a genuine dispute with the Application.
FirstEnergy and the NRC Staff also point out that the Licensing Board presiding over the Indian Point license renewal case rejected a similar contention, 319 and FirstEnergy notes "the widespread use and acceptance of the MAAP code in the nuclear industry."
320  Joint Petitioners respond to the first point by arguing that a decision holding that the source term issue was not part of a contention in another proceeding "has nothing to do with whether the issues that are raised by the Joint Petitioners here must be considered."
321  They address the second point by asserting that
"[j]ust because MAAP is broadly used does not necessarily mean that it is free from the flaws . . .  


allege[d]."
radionuclides into the environment during a severe accident, which SAMA analyses model.316 This technical argument, from the Boards perspective, warrants exploration in further adjudicatory proceedings, so as to avoid addressing the merits of the contention at the contention-admissibility stage of this proceeding.
322 The Indian Point decision has persuasive rather than binding authority on us, and MAAP's widespread use does not immunize it from being challenged by a properly pled contention.
FirstEnergy points out that the ER presents [t]he release categories and their frequencies in Section E.3.4.5 and Table E.3-20 and chides Joint Petitioners for not challenging the SAMA analysis with any particularity.317 However, Joint Petitioners cite pages of the ER that state that FirstEnergy used source terms generated by the MAAP code,318 thereby demonstrating that Joint Petitioners have a genuine dispute with the Application.
FirstEnergy and the NRC Staff also point out that the Licensing Board presiding over the Indian Point license renewal case rejected a similar contention,319 and FirstEnergy notes the widespread use and acceptance of the MAAP code in the nuclear industry.320 Joint Petitioners respond to the first point by arguing that a decision holding that the source term issue was not part of a contention in another proceeding has nothing to do with whether the issues that are raised by the Joint Petitioners here must be considered.321 They address the second point by asserting that
[j]ust because MAAP is broadly used does not necessarily mean that it is free from the flaws . . .
allege[d].322 The Indian Point decision has persuasive rather than binding authority on us, and MAAPs widespread use does not immunize it from being challenged by a properly pled contention.
316 Id. (quoting NUREG-1465, at 1) (emphasis in original); accord NRC Staff Answer at 80 (quoting NUREG-1465, at 1).
316 Id. (quoting NUREG-1465, at 1) (emphasis in original); accord NRC Staff Answer at 80 (quoting NUREG-1465, at 1).
317 FirstEnergy Answer at 97.
317 FirstEnergy Answer at 97.
Line 590: Line 525:
320 FirstEnergy Answer at 98.
320 FirstEnergy Answer at 98.
321 Reply at 32.
321 Reply at 32.
322 Id. at 54. FirstEnergy and the NRC Staff further contend that the source term argument, 323 indeed the entire SAMA analysis contention, 324 is inadmissible because Joint Petitioners have not shown it is material to the findings the NRC must make to support the requested license renewal. To be material, a SAMA contention must show that "it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated."
322 Id. at 54.
325   FirstEnergy articulates a materiality standard that would require an expert affidavit and a showing that the cost-benefit conclusions for SAMA candidates would change. FirstEnergy asserts "a petitioner must provide adequate support to show that additional SAMA should have been identified as potentially cost-beneficial."
 
326 At oral argument, FirstEnergy asserted the materiality standard was "whether it would genuinely cause a change in a SAMA, identification of a SAMA, or in the ultimate cost-benefit analysis."
FirstEnergy and the NRC Staff further contend that the source term argument,323 indeed the entire SAMA analysis contention,324 is inadmissible because Joint Petitioners have not shown it is material to the findings the NRC must make to support the requested license renewal. To be material, a SAMA contention must show that it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated.325 FirstEnergy articulates a materiality standard that would require an expert affidavit and a showing that the cost-benefit conclusions for SAMA candidates would change. FirstEnergy asserts a petitioner must provide adequate support to show that additional SAMA should have been identified as potentially cost-beneficial.326 At oral argument, FirstEnergy asserted the materiality standard was whether it would genuinely cause a change in a SAMA, identification of a SAMA, or in the ultimate cost-benefit analysis.327 FirstEnergy implied at oral argument that a petitioner would need an expert affidavit to meet the genuinely plausible standard because SAMA analyses are very specialized, detailed, probabilistic analyses and require some familiarity with the MACCS2 code in order to understand why revised factors, models, or assumptions could potentially have a change without running the model.328 We believe FirstEnergy has exaggerated the materiality standard, which requires only that petitioners provide sufficient information to show that, if their proposed refinements were incorporated, it is genuinely plausible that cost-benefit 323 FirstEnergy Answer at 97 (remonstrating Joint Petitioners for having provided no facts or expert opinion to establish that . . . the use of alternative source terms would have resulted in the identification of additional potentially cost-beneficial SAMAs for Davis-Besse); NRC Staff Answer at 81 (. . . Joint Petitioners have not established that . . . the use of another source term would identify additional cost beneficial SAMAs. (citing Pilgrim I, CLI-09-11, 69 NRC at 533)).
327 FirstEnergy implied at oral argument that a petitioner would need an expert affidavit to meet the "genuinely plausible" standard because SAMA analyses are "very specialized, detailed, probabilistic analyses and require some familiarity with the MACCS2 code in order to understand why" revised factors, models, or assumptions "could potentially have a change without running the model."
328 We believe FirstEnergy has exaggerated the materiality standard, which requires only that petitioners "provide sufficient information to show that, if their proposed refinements were incorporated, it is 'genuinely plausible' that cost-benefit 323 FirstEnergy Answer at 97 (remonstrating Joint Petitioners for having "provided no facts or expert opinion to establish that . . . the use of alternative source terms would have resulted in the identification of additional potentially cost-beneficial SAMAs for Davis-Besse"); NRC Staff Answer at 81 (". . . Joint Petitioners have not established that . . . the use of another source term would identify additional cost beneficial SAMAs." (citing Pilgrim I, CLI-09-11, 69 NRC at 533)).
324 FirstEnergy Answer at 82; NRC Staff Answer at 49.
324 FirstEnergy Answer at 82; NRC Staff Answer at 49.
325 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39) (emphasis added).
325 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39) (emphasis added).
326 FirstEnergy Answer at 82 (citing Pilgrim I , CLI-09-11, 69 NRC at 533).
326 FirstEnergy Answer at 82 (citing Pilgrim I, CLI-09-11, 69 NRC at 533).
327 Tr. at 137 (emphasis added).
327 Tr. at 137 (emphasis added).
328 Tr. at 153. conclusions might change."
328 Tr. at 153.
329 Joint Petitioners have shown that a change in the SAMA candidates' cost-benefit conclusions is genuinely plausible. The Brookhaven National Laboratory study they cite shows that source term selection can change dose results by a factor of 3 to 4.
 
330 Although this study addressed different nuclear power plants, it indicates that source term selection can make a large difference in dose results.
conclusions might change.329 Joint Petitioners have shown that a change in the SAMA candidates cost-benefit conclusions is genuinely plausible. The Brookhaven National Laboratory study they cite shows that source term selection can change dose results by a factor of 3 to 4.330 Although this study addressed different nuclear power plants, it indicates that source term selection can make a large difference in dose results.
: b. Gaussian plume Joint Petitioners also contend that using the "steady-state, straight-line Gaussian plume" air dispersion model in the MACCS2 code-as FirstEnergy did-"underestimates the area likely to be affected in a severe accident and the dose likely to be received in those areas."
: b.     Gaussian plume Joint Petitioners also contend that using the steady-state, straight-line Gaussian plume air dispersion model in the MACCS2 codeas FirstEnergy didunderestimates the area likely to be affected in a severe accident and the dose likely to be received in those areas.331 Joint Petitioners assert that using this model is not appropriate for . . . Davis-Besses Great Lakes shoreline location because the model cannot model spatially and temporally varying winds and ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns.332 Another reason the model is inappropriate, Joint Petitioners assert, is that it should be applied with caution at distances greater than ten to fifteen miles, especially if meteorological conditions are likely to be different from those at the source of release.333 Joint Petitioners further maintain that the Gaussian plume model treats plumes blowing offshore over Lake Erie as though they have no impact, when in actuality a plume over water, rather than being dispersed, will remain tightly 329 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 39).
331 Joint Petitioners assert that using this model "is not appropriate for . . . Davis-Besse's Great Lakes shoreline location" because the model cannot model spatially and temporally varying winds and "ignores the presences of Great Lakes 'sea breeze' circulations which dramatically alter air flow patterns."
332 Another reason the model is inappropriate, Joint Petitioners assert, is that it "'should be applied with caution at distances greater than ten to fifteen miles, especially if meteorological conditions are likely to be different from those at the source of release.'"
333 Joint Petitioners further maintain that the Gaussian plume model treats plumes blowing offshore over Lake Erie as though they have no impact, when in actuality "a plume over water, rather than being dispersed, will remain tightly 329 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 39).
330 Lehner, et al., supra note 312, at 17.
330 Lehner, et al., supra note 312, at 17.
331 Petition at 116.
331 Petition at 116.
332 Id. at 119. 333 Id. at 124 (quoting U.S. Department of Energy, MACCS2 Computer Code Application Guidance for Documented Safety Analysis 3-8 (June 2004), available at http://hss.energy.gov/nuclearsafety/qa/sqa/central_registry/MACCS2/Final_MACCS2_Guidance
332 Id. at 119.
_Report_June_1_2004.pdf). concentrated due to the lack of turbulence . . . until winds blow it onto land."
333 Id. at 124 (quoting U.S. Department of Energy, MACCS2 Computer Code Application Guidance for Documented Safety Analysis 3-8 (June 2004), available at http://hss.energy.gov/nuclearsafety/qa/sqa/central_registry/MACCS2/Final_MACCS2_Guidance
334  According to Joint Petitioners, the behavior of plumes over water "can lead to hot spots of radioactivity in places along the . . . Great Lakes shoreline, certainly to Detroit/Windsor, Toledo, and Cleveland."
_Report_June_1_2004.pdf).
335  Finally, the Joint Petitioners contend that inputting meteorological data collected over "just three years" from "just one site"-Davis-Besse itself-"will definitely not suffice to define the Great Lakes 'sea


breeze' or capture variability."
concentrated due to the lack of turbulence . . . until winds blow it onto land.334 According to Joint Petitioners, the behavior of plumes over water can lead to hot spots of radioactivity in places along the . . . Great Lakes shoreline, certainly to Detroit/Windsor, Toledo, and Cleveland.335 Finally, the Joint Petitioners contend that inputting meteorological data collected over just three years from just one siteDavis-Besse itselfwill definitely not suffice to define the Great Lakes sea breeze or capture variability.336 Joint Petitioners point out that, to make matters worse, the third years data was deemed to be not viable as MACCS2 input.337 FirstEnergy clarifies that the Gaussian plume model is used in the ATMOS module of MACCS2338 and asserts that the straight-line Gaussian ATMOS model cannot be replaced without replacing the MACCS2 code itself.339 FirstEnergy concedes, however, that the inability to interchange ATMOS with other plume dispersion models does not immunize the Gaussian model from a properly pled contention.340 The NRC Staff asserts that Joint Petitioners have not provided adequate factual support for their assertions regarding the lake breeze effect.341 Despite acknowledging that Joint Petitioners have produced several studies that indicate the sea breeze effect plays an important 334 Id. at 121.
336 Joint Petitioners point out that, to make matters "worse," the third year's data was "'deemed to be not viable as MACCS2 input.'"
335 Id.
337 FirstEnergy clarifies that the Gaussian plume model is "used in the ATMOS module of MACCS2"338 and asserts that "the straight-line Gaussian ATMOS model cannot be replaced without replacing the MACCS2 code itself."
336 Id. at 125.
339 FirstEnergy concedes, however, that the inability to interchange ATMOS with other plume dispersion models does not immunize the Gaussian model from a properly pled contention.
337 Id. (quoting ER at E.3.4.3). Another failing of the Gaussian plume model, according to Joint Petitioners, is that it cannot model terrain effects. Id. at 122. As discussed above in section III(B)(3), the ability of a Gaussian plume to model terrain effects is an extraneous issue because Joint Petitioners have not provided alleged facts or expert opinion indicating that Davis-Besse is surrounded by complex terrain. We have eliminated this issue from this proceeding.
340 The NRC Staff asserts that Joint Petitioners "have not provided adequate factual support" for their assertions regarding the lake breeze effect.
341 Despite acknowledging that "Joint Petitioners have produced several studies that indicate the sea breeze effect plays an important 334 Id. at 121. 335 Id. 336 Id. at 125. 337 Id. (quoting ER at E.3.4.3). Another failing of the Gaussian plume model, according to Joint Petitioners, is that it cannot model terrain effects. Id. at 122. As discussed above in section III(B)(3), the ability of a Gaussian plume to model terrain effects is an extraneous issue because Joint Petitioners have not provided alleged facts or expert opinion indicating that Davis-Besse is surrounded by complex terrain. We have eliminated this issue from this proceeding.
338 FirstEnergy Answer at 106.
338 FirstEnergy Answer at 106.
339 Id. at 108. 340 Id. 341 NRC Staff Answer at 69. role at New England sites,"
339 Id. at 108.
342 the NRC Staff questions whether these studies have any applicability to Davis-Besse's Great Lakes location.
340 Id.
343 Joint Petitioners tie the Atlantic coast studies to Davis-Besse's location by citing two websites.
341 NRC Staff Answer at 69.
344 First, Joint Petitioners quote a National Weather Service webpage that states: "[w]hile the sea breeze is generally associated with the ocean, they can occur along the shore of any large body of water such as the Great Lakes."
 
345 Second, Joint Petitioners quote the website of "Weather Doctor" Keith C. Heidorn, which states: "The lake breeze is similar to the sea breeze found along sea coasts."
role at New England sites,342 the NRC Staff questions whether these studies have any applicability to Davis-Besses Great Lakes location.343 Joint Petitioners tie the Atlantic coast studies to Davis-Besses location by citing two websites.344 First, Joint Petitioners quote a National Weather Service webpage that states: [w]hile the sea breeze is generally associated with the ocean, they can occur along the shore of any large body of water such as the Great Lakes.345 Second, Joint Petitioners quote the website of Weather Doctor Keith C. Heidorn, which states: The lake breeze is similar to the sea breeze found along sea coasts.346 Together with the Atlantic coast studies, these websites provide the requisite minimal support that a lake breeze might be a factor near Davis-Besse.
346 Together with the Atlantic coast studies, these websites provide the requisite minimal support that a lake breeze might be a factor near Davis-Besse.
FirstEnergy and the NRC Staff argue in addition that Joint Petitioners have not provided adequate support for their claim regarding the behavior of plumes over water.347 The NRC Staff seems to suggest that the ER already accounts for the impact of plumes travelling across Lake Erie into Michigan and Canada, but the page of the ER the Staff cites does not address reduced turbulence over water.348 FirstEnergy points out that Joint Petitioners cite two documents by no more than their authors last nameZagar et al. and Angevine et al.and ones publication date without attaching them to the petition.349 The Board nonetheless was able to locate full citations for 342 Id. at 70.
FirstEnergy and the NRC Staff argue in addition that Joint Petitioners have not provided adequate support for their claim regarding the behavior of plumes over water.
343 Id. at 63, 70.
347 The NRC Staff seems to suggest that the ER already accounts for the impact of plumes travelling across Lake Erie into Michigan and Canada, but the page of the ER the Staff cites does not address reduced turbulence over water.
348 FirstEnergy points out that Joint Petitioners cite two documents by no more than their authors' last name-Zagar et al. and Angevine et al.-and one's publication date without attaching them to the petition.
349 The Board nonetheless was able to locate full citations for 342 Id. at 70. 343 Id. at 63, 70.
344 Petition at 117-18.
344 Petition at 117-18.
345 Id. (quoting National Weather Service, JetStream, Online School for Weather, The Sea Breeze, http://www.srh.weather.gov/srh/jetstream/ocean/seabreezes.htm (last visited Apr. 22, 2011)).
345 Id. (quoting National Weather Service, JetStream, Online School for Weather, The Sea Breeze, http://www.srh.weather.gov/srh/jetstream/ocean/seabreezes.htm (last visited Apr. 22, 2011)).
346 Id. (quoting Keith C. Heidorn, Weather Almanac for May 2000: Great Lake Breezes, http://www.islandnet.com/~see/weather/almanac/arc2000/alm00may2.htm (last visited Apr. 22, 2011)). 347 FirstEnergy Answer at 110; NRC Staff Answer at 69.
346 Id. (quoting Keith C. Heidorn, Weather Almanac for May 2000: Great Lake Breezes, http://www.islandnet.com/~see/weather/almanac/arc2000/alm00may2.htm (last visited Apr. 22, 2011)).
347 FirstEnergy Answer at 110; NRC Staff Answer at 69.
348 NRC Staff Answer at 70 (citing ER at E-49).
348 NRC Staff Answer at 70 (citing ER at E-49).
349 FirstEnergy Answer at 110. these two documents in the report by Dr. Jan Beyea that Joint Petitioners also cite, 350 and located one of them in the agency's ADAMS library.
349 FirstEnergy Answer at 110.
351 This article deals with transport of airborne pollutants over water, 352 and Dr. Beyea cited it to support his conclusion that radioactive releases from the Pilgrim power plant on the New England coastline that are "headed initially out to sea will remain tightly concentrated due to reduced turbulence until winds blow the puffs back over land."
 
353 FirstEnergy points out that Dr. Beyea's report is "second-hand" because it discusses a different reactor and that he did not perform an independent SAMA analysis.
these two documents in the report by Dr. Jan Beyea that Joint Petitioners also cite, 350 and located one of them in the agencys ADAMS library. 351 This article deals with transport of airborne pollutants over water,352 and Dr. Beyea cited it to support his conclusion that radioactive releases from the Pilgrim power plant on the New England coastline that are headed initially out to sea will remain tightly concentrated due to reduced turbulence until winds blow the puffs back over land.353 FirstEnergy points out that Dr. Beyeas report is second-hand because it discusses a different reactor and that he did not perform an independent SAMA analysis.354 Nevertheless, in the Boards estimation, Dr. Beyeas report and the article about pollutant transport provide the requisite minimal support, together with alleged facts, that the behavior of plumes over water might be a factor near Davis-Besse.
354 Nevertheless, in the Board's estimation, Dr. Beyea's report and the article about pollutant transport provide the requisite minimal support, together with alleged facts, that the behavior of plumes over water might be a factor near Davis-Besse. FirstEnergy and the NRC Staff also dispute the relevance and meaning of material Joint Petitioners proffer as support. The NRC Staff argues that studies indicating that the Gaussian model might be inappropriate in the context of source permitting do not support the claim that the model would not produce adequate SAMA results at Davis-Besse.
FirstEnergy and the NRC Staff also dispute the relevance and meaning of material Joint Petitioners proffer as support. The NRC Staff argues that studies indicating that the Gaussian model might be inappropriate in the context of source permitting do not support the claim that the model would not produce adequate SAMA results at Davis-Besse.355 Similarly, the NRC Staff 350 Petition at 122 (citing Jan Beyea, Report to the Massachusetts Attorney General on the Potential Consequences of a Spent-Fuel-Pool Fire at the Pilgrim or Vermont Yankee Nuclear Plant 11 (May 25, 2006) (ADAMS Accession No. ML071840568)).
355 Similarly, the NRC Staff 350 Petition at 122 (citing Jan Beyea, Report to the Massachusetts Attorney General on the Potential Consequences of a Spent-Fuel-Pool Fire at the Pilgrim or Vermont Yankee Nuclear Plant 11 (May 25, 2006) (ADAMS Accession No. ML071840568)).
351 Wayne M. Angevine, et al., Modeling of the Coastal Boundary Layer and Pollutant Transport in New England (Jan. 2006) (ADAMS Accession No. ML110030899). The Board points out that, if this proceeding ultimately does go to an evidentiary hearing, the record upon which it will base its decision will be limited to the testimony and documentary material admitted as evidence, which generally will require, for instance, that any technical article or other document cited in a partys prefiled testimony must be submitted for the record as an exhibit.
351 Wayne M. Angevine, et al., Modeling of the Coastal Boundary Layer and Pollutant Transport in New England (Jan. 2006) (ADAMS Accession No. ML110030899). The Board points out that, if this proceeding ultimately does go to an evidentiary hearing, the record upon which it will base its decision will be limited to the testimony and documentary material admitted as evidence, which generally will require, for instance, that any technical article or other document cited in a party's prefiled testimony must be submitted for the record as an exhibit.
352 Id. at 1.
352 Id. at 1. 353 Beyea, supra note 350, at 11.
353 Beyea, supra note 350, at 11.
354 FirstEnergy Answer at 111.
354 FirstEnergy Answer at 111.
355 NRC Staff Answer at 62, 64. argues that a study the Joint Petitioners cited in support of their terrain claim 356 establishes that "the ATMOS model is accurate at distances up to 200 miles."
355 NRC Staff Answer at 62, 64.
357 FirstEnergy also disputes the relevance of the material Joint Petitioners proffer as support.
 
358 These arguments, however, address the merits of the contention, not the adequacy of the pleading, and so provide no basis for deeming this portion of the contention inadmissible. FirstEnergy argues the merits as well in its additional assertion that "the alleged methodological shortcomings of ATMOS are as likely to result in an overly conservative result."
argues that a study the Joint Petitioners cited in support of their terrain claim356 establishes that the ATMOS model is accurate at distances up to 200 miles.357 FirstEnergy also disputes the relevance of the material Joint Petitioners proffer as support.358 These arguments, however, address the merits of the contention, not the adequacy of the pleading, and so provide no basis for deeming this portion of the contention inadmissible.
359 The validity of this and other merits-based arguments bear further exploration after the contention is admitted. FirstEnergy chides Joint Petitioners for not providing factual or expert support for their assertion that "data collected at the Davis-Besse site meteorological tower would not reflect any  
FirstEnergy argues the merits as well in its additional assertion that the alleged methodological shortcomings of ATMOS are as likely to result in an overly conservative result.359 The validity of this and other merits-based arguments bear further exploration after the contention is admitted.
'sea breeze' present in the site vicinity."
FirstEnergy chides Joint Petitioners for not providing factual or expert support for their assertion that data collected at the Davis-Besse site meteorological tower would not reflect any sea breeze present in the site vicinity.360 The NRC Staff likewise criticize Joint Petitioners for not providing any citation or expert testimony to support this claim.361 However, Joint Petitioners have provided support indicating that a lake breeze might cause spatially varying air circulation in the area surrounding Davis-Besse, and it is self-evident that a single immobile meteorological site would be unable to measure such spatially dependent circulation. Therefore, we conclude Joint Petitioners have provided adequate support for their claim that a single meteorological site is 356 Petition at 127. A source permit is an operating permit that the Clean Air Act requires major stationary sources of air pollution to obtain. Sierra Club v. Georgia Power Co., 443 F.3d 1346, 1348 (11th Cir. 2006) (citing Legal Envtl. Assistance Found., Inc. v. EPA, 400 F.3d 1278, 1279 (11th Cir. 2005)).
360 The NRC Staff likewise criticize Joint Petitioners for not providing "any citation or expert testimony to support this claim."
361 However, Joint Petitioners have provided support indicating that a lake breeze might cause spatially varying air circulation in the area surrounding Davis-Besse, and it is self-evident that a single immobile meteorological site would be unable to measure such spatially dependent circulation. Therefore, we conclude Joint Petitioners have provided adequate support for their claim that a single meteorological site is 356 Petition at 127. A source permit is an operating permit that the Clean Air Act requires major stationary sources of air pollution to obtain. Sierra Club v. Georgia Power Co., 443 F.3d 1346, 1348 (11th Cir. 2006) (citing Legal Envtl. Assistance Found., Inc. v. EPA, 400 F.3d 1278, 1279 (11th Cir. 2005)).
357 NRC Staff Answer at 65 (C. R. Molenkamp, et al., Lawrence Livermore National Laboratory, Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional and a Three-Dimensional Model, NUREG/CR-6853 (Oct. 2004) (ADAMS Accession No. ML043240034)).
357 NRC Staff Answer at 65 (C. R. Molenkamp, et al., Lawrence Livermore National Laboratory, Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional and a Three-Dimensional Model, NUREG/CR-6853 (Oct. 2004) (ADAMS Accession No. ML043240034)).
358 FirstEnergy Answer at 106.
358 FirstEnergy Answer at 106.
359 Id. at 109. 360 Id. at 114. 361 NRC Staff Answer at 72. inadequate to provide data for the complex air circulation model they assert is necessary. FirstEnergy also faults Joint Petitioners for not citing all the discussion of meteorological measurements in the ER.
359 Id. at 109.
362 At issue is Joint Petitioners' reference to the ER's statement that data was collected for the years 2006 through 2008 and that the 2008 data was deemed not to be viable.363 FirstEnergy criticizes Joint Petitioners for not mentioning that the ER also states that "the 2006 meteorological data were used as the base case, and the meteorological data from 2007 were used in one sensitivity case" and that "sensitivity cases . . . us[ing] data from the late-1990s . . . confirmed that the 2006 meteorological data were representative and typical of annual meteorological conditions."
360 Id. at 114.
364 However, this level of specificity is not required in pleading a contention to raise a genuine dispute, especially considering that the information FirstEnergy refers to is included on the very page of the ER that Joint Petitioners cite.
361 NRC Staff Answer at 72.
365 Finally, the NRC Staff and FirstEnergy argue that Joint Petitioners have not shown their challenge to the Gaussian model is a material dispute because they have not shown that the asserted errors might have masked a cost-beneficial SAMA.
 
366 Because Joint Petitioners have shown that the source term alone can alter dose results by a factor or 3 to 4, the source term and Gaussian model modifications acting together have sufficient impact to potentially make another SAMA candidate cost-beneficial.
inadequate to provide data for the complex air circulation model they assert is necessary.
: c. Particle size and clean-up costs for urban areas Joint Petitioners contend that FirstEnergy underestimated costs by using the MACCS2 code to calculate decontamination and clean-up costs likely to be incurred in the event of a 362 FirstEnergy Answer at 114.
FirstEnergy also faults Joint Petitioners for not citing all the discussion of meteorological measurements in the ER.362 At issue is Joint Petitioners reference to the ERs statement that data was collected for the years 2006 through 2008 and that the 2008 data was deemed not to be viable.363 FirstEnergy criticizes Joint Petitioners for not mentioning that the ER also states that the 2006 meteorological data were used as the base case, and the meteorological data from 2007 were used in one sensitivity case and that sensitivity cases . . . us[ing] data from the late-1990s
. . . confirmed that the 2006 meteorological data were representative and typical of annual meteorological conditions.364 However, this level of specificity is not required in pleading a contention to raise a genuine dispute, especially considering that the information FirstEnergy refers to is included on the very page of the ER that Joint Petitioners cite.365 Finally, the NRC Staff and FirstEnergy argue that Joint Petitioners have not shown their challenge to the Gaussian model is a material dispute because they have not shown that the asserted errors might have masked a cost-beneficial SAMA.366 Because Joint Petitioners have shown that the source term alone can alter dose results by a factor or 3 to 4, the source term and Gaussian model modifications acting together have sufficient impact to potentially make another SAMA candidate cost-beneficial.
: c. Particle size and clean-up costs for urban areas Joint Petitioners contend that FirstEnergy underestimated costs by using the MACCS2 code to calculate decontamination and clean-up costs likely to be incurred in the event of a 362 FirstEnergy Answer at 114.
363 Petition at 125 (citing ER § E.3.4.3).
363 Petition at 125 (citing ER § E.3.4.3).
364 FirstEnergy Answer at 114 (citing ER at E-43 to E-44).
364 FirstEnergy Answer at 114 (citing ER at E-43 to E-44).
365 Petition at 125 (citing ER § E.3.4.3).
365 Petition at 125 (citing ER § E.3.4.3).
366 NRC Staff Answer at 63; FirstEnergy Answer at 109. radioactive release.
366 NRC Staff Answer at 63; FirstEnergy Answer at 109.
367  Joint Petitioners suggest that "[i]n place of the outdated decontamination cost figure in the MACCS2 code, the SAMA analysis for Davis-Besse should incorporate, for example, the analytical framework contained in the 1996 Sandia National Laboratories report concerning site restoration costs . . . as well as Chernobyl and RDD type devices."
368  Although Joint Petitioners fail to support many of their assertions of error relating to decontamination costs, 369 they raise two claims that we conclude satisfy 10 C.F.R. § 2.309(f)(1). The first concerns particle size. Joint Petitioners point out that the MACCS2 User's Guide states that the code's economic cost model is "WASH-1400 based," and assert that relying on WASH-1400 underestimates costs because it is based on clean up after a nuclear weapon


explosion.
radioactive release.367 Joint Petitioners suggest that [i]n place of the outdated decontamination cost figure in the MACCS2 code, the SAMA analysis for Davis-Besse should incorporate, for example, the analytical framework contained in the 1996 Sandia National Laboratories report concerning site restoration costs . . . as well as Chernobyl and RDD type devices.368 Although Joint Petitioners fail to support many of their assertions of error relating to decontamination costs,369 they raise two claims that we conclude satisfy 10 C.F.R. § 2.309(f)(1).
370 According to Joint Petitioners, reactor accidents release smaller sized particles, ranging in size from a "fraction of a micron to a couple of microns," compared to particles produced in a nuclear weapon explosion, which are "ten to hundreds of microns."
The first concerns particle size. Joint Petitioners point out that the MACCS2 Users Guide states that the codes economic cost model is WASH-1400 based, and assert that relying on WASH-1400 underestimates costs because it is based on clean up after a nuclear weapon explosion.370 According to Joint Petitioners, reactor accidents release smaller sized particles, ranging in size from a fraction of a micron to a couple of microns, compared to particles produced in a nuclear weapon explosion, which are ten to hundreds of microns.371 Joint Petitioners contend the smaller particle size makes reactor accidents more difficult to clean up.372 The second concerns urban areas, which Joint Petitioners contend will be considerably more expensive and time consuming to decontaminate and clean than rural areas.373 Joint Petitioners refer to a study they allege provides estimates for different types of areas, from farm or 367 Petition at 135-36.
371 Joint Petitioners contend the smaller particle size makes reactor accidents more difficult to clean up.
372 The second concerns urban areas, which Joint Petitioners contend "will be considerably more expensive and time consuming to decontaminate and clean than rural areas."
373 Joint Petitioners refer to a study they allege "provides estimates for different types of areas, from farm or 367 Petition at 135-36.
368 Id. at 140 (citing David I. Chanin & Walter B. Murfin, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) available at http://chaninconsulting.com/downloads/sand96-0957.pdf).
368 Id. at 140 (citing David I. Chanin & Walter B. Murfin, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) available at http://chaninconsulting.com/downloads/sand96-0957.pdf).
369 See sections III(B)(3)-(4), supra. 370 Petition at 136 (citing MACCS2 User's Guide, NUREG/CR-6613, Vol. 1, at 7-10).
369 See sections III(B)(3)-(4), supra.
370 Petition at 136 (citing MACCS2 Users Guide, NUREG/CR-6613, Vol. 1, at 7-10).
371 Id. at 136-37.
371 Id. at 136-37.
372 Id. at 137. 373 Id. at 138. range land to high density urban areas."
372 Id. at 137.
374 The NRC Staff states that it "recognizes that Joint Petitioners have provided minimal support necessary for its assertion that smaller particles will create higher cleanup costs and that urban areas are more costly to clean up than rural areas."
373 Id. at 138.
375 FirstEnergy, on the other hand, argues that the Commission concluded the 1996 Sandia report was "of dubious relevance" to the Pilgrim applicant's SAMA analysis.
 
376 Joint Petitioners respond that the Pilgrim decision was "dependent on exactly what the intervenor(s) there did, or did not, plead or prove."
range land to high density urban areas.374 The NRC Staff states that it recognizes that Joint Petitioners have provided minimal support necessary for its assertion that smaller particles will create higher cleanup costs and that urban areas are more costly to clean up than rural areas.375 FirstEnergy, on the other hand, argues that the Commission concluded the 1996 Sandia report was of dubious relevance to the Pilgrim applicants SAMA analysis.376 Joint Petitioners respond that the Pilgrim decision was dependent on exactly what the intervenor(s) there did, or did not, plead or prove.377 FirstEnergy also argues that Joint Petitioners do not provide information to support their assertions about particle size because the Sandia report indicates only that certain decontamination data may not be applicable to a plutonium dispersal accident.378 FirstEnergy maintains that although the Sandia report states that most prior decontamination research has limited application to plutonium-dispersal accidents, it makes no such assertion with respect to a reactor accident.379 This aspect of Contention 4 is admissible. The statement FirstEnergy quotes does not show that the Sandia report lends no support to Joint Petitioners particle size claim. While particle size might depend on whether the radioactive substance is plutonium or reactor fuel, it also might depend on whether the dispersal is caused by a weapon explosion or a reactor accident, which is exactly the point raised by Joint Petitioners in their contention.
377 FirstEnergy also argues that Joint Petitioners do not provide information to support their assertions about particle size because the Sandia report "indicates only that certain decontamination data may not be applicable to a plutonium dispersal accident."
378 FirstEnergy maintains that although the Sandia report states that most prior decontamination research has limited application to plutonium-dispersal accidents, it "makes no such assertion with respect to a reactor accident."
379 This aspect of Contention 4 is admissible. The statement FirstEnergy quotes does not show that the Sandia report lends no support to Joint Petitioners' particle size claim. While particle size might depend on whether the radioactive substance is plutonium or reactor fuel, it also might depend on whether the dispersal is caused by a weapon explosion or a reactor accident, which is exactly the point raised by Joint Petitioners in their contention.
374 Id. at 138-39 (citing id., Reichmuth Attach., Barbara Reichmuth, et al., Economic Consequences of a Rad/Nuc Attack: Cleanup Standards Significantly Affect Costs at 6 tbl.1, 12 (Apr. 2005)).
374 Id. at 138-39 (citing id., Reichmuth Attach., Barbara Reichmuth, et al., Economic Consequences of a Rad/Nuc Attack: Cleanup Standards Significantly Affect Costs at 6 tbl.1, 12 (Apr. 2005)).
375 NRC Staff Answer at 74.
375 NRC Staff Answer at 74.
Line 684: Line 602:
377 Reply at 31-32.
377 Reply at 31-32.
378 FirstEnergy Answer at 117 (citing Chanin & Murfin, supra note 368, at App. E. at E-1).
378 FirstEnergy Answer at 117 (citing Chanin & Murfin, supra note 368, at App. E. at E-1).
379 Id. (citing Chanin & Murfin, supra note 368, at App. E. at E-1).       Regarding urban area cleanup costs, the NRC Staff argues that Joint Petitioners have not demonstrated that their challenge to the ER's decontamination and clean-up costs is material because they "have not shown that a different cost formula . . . could result in another cost-beneficial SAMA."
379 Id. (citing Chanin & Murfin, supra note 368, at App. E. at E-1).
380  Similarly, FirstEnergy contends that Joint Petitioners have not adequately explained the materiality of their general decontamination-cost assertions to the Davis-Besse SAMA analysis.
381  Because we have determined that Joint Petitioners have shown that it is genuinely plausible that FirstEnergy's source term calculation and use of the Gaussian plume model could have masked a cost-beneficial SAMA candidate, these two factors acting together with refinement to the decontamination cost analysis might have masked a candidate. Therefore, we conclude the SAMA contention as limited is material. We thus determine that Contention Four is admissible, as limited by the Board, to read as follows: The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of:
(1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are


smaller for key radionuclides than the rel ease fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes "sea breeze" circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on meteorological inputs collected from just one site-at Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas. IV. Selection of Hearing Procedures A. Legal Standards As required by 10 C.F.R. § 2.310(a), upon admission of a contention in a licensing proceeding, the Board must identify the specific hearing procedures to be used to adjudicate the 380 NRC Staff Answer at 72-73.
Regarding urban area cleanup costs, the NRC Staff argues that Joint Petitioners have not demonstrated that their challenge to the ERs decontamination and clean-up costs is material because they have not shown that a different cost formula . . . could result in another cost-beneficial SAMA.380 Similarly, FirstEnergy contends that Joint Petitioners have not adequately explained the materiality of their general decontamination-cost assertions to the Davis-Besse SAMA analysis.381 Because we have determined that Joint Petitioners have shown that it is genuinely plausible that FirstEnergys source term calculation and use of the Gaussian plume model could have masked a cost-beneficial SAMA candidate, these two factors acting together with refinement to the decontamination cost analysis might have masked a candidate. Therefore, we conclude the SAMA contention as limited is material.
381 FirstEnergy Answer at 118. contention. NRC regulations provide for a number of different procedural schemes, two of which are relevant here.
We thus determine that Contention Four is admissible, as limited by the Board, to read as follows:
382 First, there is Subpart G, 383 which is mandated for certain proceedings, 384 and establishes NRC "Rules for Formal Adjudications," in which parties are permitted to "propound interrogatories, take depositions, and cross-ex amine witnesses without leave of the Board."
The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of:
385 The other is Subpart L 386 which provides for a more "informal" proceeding in which discovery is generally prohibited (except for (1) specified mandatory disclosures under 10 C.F.R. § 2.336; and (2) the mandatory production of the hearing file under 10 C.F.R. § 2.1203(a)).
(1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are smaller for key radionuclides than the release fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on meteorological inputs collected from just one siteat Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas.
387 When utilizing Subpart L, the Board has the primary responsibility for questioning the witnesses at any evidentiary hearing.388 B. Ruling on Hearing Procedure The Board concludes that, at this juncture, the Subpart L hearing procedures will be used to adjudicate each of the contentions we have admitted. We reach this result as follows. First, we conclude that there has been no showing under 10 C.F.R. § 2.310(d) that the Subpart G procedures are mandated for any of the admitted contentions. Second, exercising our discretion under 10 C.F.R. § 2.310(a), we have seen no reason or need to apply the Subpart G procedures to either of the admitted contentions. We therefore rule that, for the time being, the procedures of 382 If the hearing on a contention is "expected to take no more than two (2) days to complete," 10 C.F.R. § 2.310(h)(1), the Board can impose the Subpart N procedures for "Expedited Proceedings with Oral Hearings" specified at 10 C.F.R. § 2.1400-1407. These procedures are highly truncated, but may prove appropriate for certain contentions at a later stage.
IV.       Selection of Hearing Procedures A.     Legal Standards As required by 10 C.F.R. § 2.310(a), upon admission of a contention in a licensing proceeding, the Board must identify the specific hearing procedures to be used to adjudicate the 380 NRC Staff Answer at 72-73.
381 FirstEnergy Answer at 118.
 
contention. NRC regulations provide for a number of different procedural schemes, two of which are relevant here.382 First, there is Subpart G,383 which is mandated for certain proceedings,384 and establishes NRC Rules for Formal Adjudications, in which parties are permitted to propound interrogatories, take depositions, and cross-examine witnesses without leave of the Board.385 The other is Subpart L386 which provides for a more informal proceeding in which discovery is generally prohibited (except for (1) specified mandatory disclosures under 10 C.F.R. § 2.336; and (2) the mandatory production of the hearing file under 10 C.F.R. § 2.1203(a)).387 When utilizing Subpart L, the Board has the primary responsibility for questioning the witnesses at any evidentiary hearing.388 B. Ruling on Hearing Procedure The Board concludes that, at this juncture, the Subpart L hearing procedures will be used to adjudicate each of the contentions we have admitted. We reach this result as follows. First, we conclude that there has been no showing under 10 C.F.R. § 2.310(d) that the Subpart G procedures are mandated for any of the admitted contentions. Second, exercising our discretion under 10 C.F.R. § 2.310(a), we have seen no reason or need to apply the Subpart G procedures to either of the admitted contentions. We therefore rule that, for the time being, the procedures of 382 If the hearing on a contention is expected to take no more than two (2) days to complete, 10 C.F.R. § 2.310(h)(1), the Board can impose the Subpart N procedures for Expedited Proceedings with Oral Hearings specified at 10 C.F.R. § 2.1400-1407. These procedures are highly truncated, but may prove appropriate for certain contentions at a later stage.
383 10 C.F.R. Part 2.
383 10 C.F.R. Part 2.
384 See, e.g., id. § 2.310(d).
384 See, e.g., id. § 2.310(d).
Line 699: Line 617:
386 10 C.F.R. Part 2.
386 10 C.F.R. Part 2.
387 Id. § 2.1203(d).
387 Id. § 2.1203(d).
388 Id. § 2.1207(b)(6). Subpart L will be used for the adjudication of each of the admitted contentions.
388 Id. § 2.1207(b)(6).
389 This determination is, of course, subject to reconsideration should there be reason to do so at a later date. V. Order Based on the foregoing, it is hereby ORDERED: A. Joint Petitioners, consisting of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan, and the Green Party of Ohio, having demonstrated standing and having submitted at least one admissible contention are admitted as parties in this proceeding. B. The following contentions are admitted as limited and reworded by the Licensing Board:
 
Subpart L will be used for the adjudication of each of the admitted contentions.389 This determination is, of course, subject to reconsideration should there be reason to do so at a later date.
V.     Order Based on the foregoing, it is hereby ORDERED:
A. Joint Petitioners, consisting of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio, having demonstrated standing and having submitted at least one admissible contention are admitted as parties in this proceeding.
B. The following contentions are admitted as limited and reworded by the Licensing Board:
Contention One:
Contention One:
The FirstEnergy Nuclear Operating Company's Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.
The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.
Contention Four:
Contention Four:
The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of: (1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are smaller for key radionuclides t han the release fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes "sea breeze" circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on 389 The selection of hearing procedures for contentions at the outset of a proceeding is not immutable because, inter alia, the availability of Subpart G procedures under 10 C.F.R. § 2.310(d) depends critically on whether the credibility of eyewitnesses is important in resolving a contention, and witnesses relevant to each contention are not identified, under 10 C.F.R. § 2.336(a)(1), until after contentions are admitted. See Entergy Nuclear Vermont Yankee, LLC (Vermont Yankee Nuclear Power Station), LBP-07-15, 66 NRC 261, 272 (2007); see also 10 C.F.R. § 2.1402(b). meteorological inputs collected from just one site-at Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas. C. Any portions of Joint Petitioners' Contentions One, Two, Three or Four not specifically included in Ordering Paragraph B are not admitted. D. A Subpart L hearing is granted with respect to the above-admitted contentions. E. The Licensing Board will hold a telephone conference with the parties in which we will discuss a schedule of further proceedings in this matter. F. This Order is subject to appeal to the Commission in accordance with the provisions of 10 C.F.R. § 2.311. Any petitions for review meeting applicable requirements set forth in that section must be filed within ten (10) days of service of this Memorandum and Order. THE ATOMIC SAFETY AND LICENSING BOARD 390 
The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of:
(1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are smaller for key radionuclides than the release fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on 389 The selection of hearing procedures for contentions at the outset of a proceeding is not immutable because, inter alia, the availability of Subpart G procedures under 10 C.F.R. § 2.310(d) depends critically on whether the credibility of eyewitnesses is important in resolving a contention, and witnesses relevant to each contention are not identified, under 10 C.F.R. § 2.336(a)(1), until after contentions are admitted. See Entergy Nuclear Vermont Yankee, LLC (Vermont Yankee Nuclear Power Station), LBP-07-15, 66 NRC 261, 272 (2007); see also 10 C.F.R. § 2.1402(b).


meteorological inputs collected from just one siteat Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas.
C. Any portions of Joint Petitioners Contentions One, Two, Three or Four not specifically included in Ordering Paragraph B are not admitted.
D. A Subpart L hearing is granted with respect to the above-admitted contentions.
E. The Licensing Board will hold a telephone conference with the parties in which we will discuss a schedule of further proceedings in this matter.
F. This Order is subject to appeal to the Commission in accordance with the provisions of 10 C.F.R. § 2.311. Any petitions for review meeting applicable requirements set forth in that section must be filed within ten (10) days of service of this Memorandum and Order.
THE ATOMIC SAFETY AND LICENSING BOARD390
                                                          /RA/
__________________________
__________________________
William J. Froehlich, Chairman ADMINISTRATIVE JUDGE  
William J. Froehlich, Chairman ADMINISTRATIVE JUDGE
 
                                                            /RA/
__________________________
__________________________
Nicholas G. Trikouros ADMINISTRATIVE JUDGE
Nicholas G. Trikouros ADMINISTRATIVE JUDGE
 
                                                            /RA/
__________________________
__________________________
Dr. William E. Kastenberg ADMINISTRATIVE JUDGE
Dr. William E. Kastenberg ADMINISTRATIVE JUDGE Rockville, Maryland April 26, 2011 390 Copies of this memorandum and order were sent this date by the agencys E-Filing system to the counsel/representatives for (1) the Joint Petitioners; (2) FirstEnergy; and (3) the NRC Staff.
 
Rockville, Maryland April 26, 2011
 
390 Copies of this memorandum and order were sent this date by the agency's E-Filing system to the counsel/representatives for (1) the Joint Petitioners; (2) FirstEnergy; and (3) the NRC Staff.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )  )
FIRST ENERGY NUCLEAR OPERATING  )
COMPANY )   
) (Davis-Besse Nuclear Power Station, Unit 1) )  Docket No. 50-346-LR  )  CERTIFICATE OF SERVICE
 
I hereby certify that copies of  the foregoing  MEMORANDUM AND ORDER (Ruling on Petition  to Intervene and Request for Hearing) (LBP-11-13) have been served upon the following persons by Electronic Information Exchange. Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: ocaamail@nrc.gov
 
U.S. Nuclear Regulatory Commission.
Atomic Safety and Licensing Board Panel Mail Stop T-3F23 Washington, DC  20555-0001
 
William J. Froehlich, Chair
 
Administrative Judge E-mail:  William.froehlich@nrc.gov
 
Nicholas G. Trikouros
 
Administrative Judge
 
E-mail: nicholas.trikouros@nrc.gov William E. Kastenberg Administrative Judge
 
E-mail: wek1@nrc.gov
 
Hillary  Cain Law Clerk E-mail: hillary.cain@nrc.gov
 
Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission
 
Mail Stop O-16C1 Washington, DC  20555-0001 Hearing Docket
 
E-mail: hearingdocket@nrc.gov
 
Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop O-15D21 Washington, DC  20555-0001 Edward L. Williamson, Esq.
 
E-mail: edward.williamson@nrc.gov Brian Harris, Esq.
E-mail: brian.harris@nrc.gov Emily Monteith, Esq E-mail:  emily.monteith@nrc.gov Brian P. Newell, Paralegal
 
E-mail: brian.newell@nrc.gov OGC Mail Center :
OGCMailCenter@nrc.gov
 
FirstEnergy Service Company.
Mailstop: A-GO-15
 
76 South Main Street  Akron, OH  44308 David W. Jenkins, Esq.  


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                              )
                                              )
FIRST ENERGY NUCLEAR OPERATING                )
COMPANY                                    )
                                              )
(Davis-Besse Nuclear Power Station, Unit 1) )              Docket No. 50-346-LR
                                              )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing) (LBP-11-13) have been served upon the following persons by Electronic Information Exchange.
Office of Commission Appellate                  Office of the Secretary of the Commission Adjudication                                  U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission              Mail Stop O-16C1 Washington, DC 20555-0001                        Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov                        Hearing Docket E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission.              Office of the General Counsel Atomic Safety and Licensing Board Panel          U.S. Nuclear Regulatory Commission Mail Stop T-3F23                                Mail Stop O-15D21 Washington, DC 20555-0001                        Washington, DC 20555-0001 Edward L. Williamson, Esq.
William J. Froehlich, Chair                      E-mail: edward.williamson@nrc.gov Administrative Judge                            Brian Harris, Esq.
E-mail: William.froehlich@nrc.gov                E-mail: brian.harris@nrc.gov Emily Monteith, Esq Nicholas G. Trikouros                            E-mail: emily.monteith@nrc.gov Administrative Judge                            Brian P. Newell, Paralegal E-mail: nicholas.trikouros@nrc.gov              E-mail: brian.newell@nrc.gov William E. Kastenberg                            OGC Mail Center : OGCMailCenter@nrc.gov Administrative Judge E-mail: wek1@nrc.gov                            FirstEnergy Service Company.
Mailstop: A-GO-15 Hillary Cain                                    76 South Main Street Law Clerk                                        Akron, OH 44308 E-mail: hillary.cain@nrc.gov                    David W. Jenkins, Esq.
E-mail : djenkins@firstenergycorp.com
E-mail : djenkins@firstenergycorp.com


Docket No. 50-346-LR MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing) (LBP-11-13) 2 Morgan, Lewis & Bockius Pennsylvania Avenue, NW Washington, D.C. 20004 Stephen Burdick, Esq.
Docket No. 50-346-LR MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)
E-mail: sburdick@morganlewis.com Alex Polonsky, Esq.  
(LBP-11-13)
 
Morgan, Lewis & Bockius                     Citizens Environmental Alliance (CEA)
E-mail: apolonsky@morganlewis.com Kathryn M. Sutton, Esq.  
Pennsylvania Avenue, NW                     of Southwestern Ontario Washington, D.C. 20004                     1950 Ottawa Street Stephen Burdick, Esq.                       Windsor, Ontario Canada N8Y 197 E-mail: sburdick@morganlewis.com Alex Polonsky, Esq.                         Green Party of Ohio E-mail: apolonsky@morganlewis.com           2626 Robinwood Avenue Kathryn M. Sutton, Esq.                     Toledo, Ohio 43610 E-mail: ksutton@morganlewis.com Martin ONeill, Esq.                       Dont Waste Michigan E-mail: martin.oneill@morganlewis.com       811 Harrison Street Timothy Matthews, Esq.                     Monroe, Michigan 48161 E-mail: tmatthews@morganlewis.com           Michael Keegan Mary Freeze, Legal Secretary               E-mail: mkeeganj@comcast.net E-mail: mfreeze@morganlewis.com Lisa Harris, Legal Secretary               Terry J. Lodge, Counsel for CEA, Dont E-mail: lisa.harris@morganlewis.com           Waste Michigan, and Green Party of Ohio 316 N. Michigan Street, Suite 520 Toledo, OH 43604-5627 E-mail: tjlodge50@yahoo.com Beyond Nuclear 6930 Carroll Avenue Suite 400 Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter E-mail : paul@beyondnuclear.org
 
[Original signed by Christine M. Pierpoint ]
E-mail: ksutton@morganlewis.com Martin O'Neill, Esq.
Office of the Secretary of the Commission Dated at Rockville, Maryland this 26th day of April 2011 2}}
E-mail: martin.oneill@morganlewis.com Timothy Matthews, Esq.  
 
E-mail: tmatthews@morganlewis.com Mary Freeze, Legal Secretary E-mail: mfreeze@morganlewis.com Lisa Harris, Legal Secretary  
 
E-mail: lisa.harris@morganlewis.com
 
Citizens Environmental Alliance (CEA)
 
of  Southwestern Ontario
 
1950 Ottawa Street
 
Windsor, Ontario Canada  N8Y 197 Green Party of Ohio 2626 Robinwood Avenue
 
Toledo, Ohio  43610
 
Don't Waste Michigan 811 Harrison Street Monroe, Michigan  48161
 
Michael Keegan
 
E-mail: mkeeganj@comcast.net Terry J. Lodge, Counsel for CEA, Don't Waste Michigan, and Green Party of Ohio  
 
316 N. Michigan Street, Suite 520  
 
Toledo, OH 43604-5627  
 
E-mail: tjlodge50@yahoo.com Beyond Nuclear 6930 Carroll Avenue Suite 400  
 
Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter  
 
E-mail : paul@beyondnuclear.org
 
[Original signed by Christine M. Pierpoint ]                                     Office of the Secretary of the Commission  
 
Dated at Rockville, Maryland  
 
this 26 th day of April 2011}}

Revision as of 00:34, 13 November 2019

Memorandum and Order Ruling on Petition to Intervene and Request for Hearing.(LBP-11-13)
ML111160428
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/26/2011
From: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
To:
Beyond Nuclear, Citizens Environmental Alliance of Southwestern Ontario, Don't Waste Michigan, Green Party of Ohio
SECY RAS
References
RAS 20027, 50-346-LR, ASLPB 11-907-01-LR-BD01, LBP-11-13
Download: ML111160428 (70)


Text

LBP-11-13 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of: Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING ASLBP No. 11-907-01-LR-BD01 COMPANY April 26, 2011 (Davis-Besse Nuclear Power Station, Unit 1)

MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)

ii TABLE OF CONTENTS I. Procedural Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II. Analysis of Timeliness, Standing and Representation . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Timeliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B. Standing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C. Representation by Member, Officer or Attorney . . . . . . . . . . . . . . . . . . . . . . . . . III. Analysis of Contention Admissibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Contentions One, Two and Three . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Legal standards for alternatives analysis in an ER . . . . . . . . . . . . . . . . 2. Treatment of wind and solar alternatives in the ER . . . . . . . . . . . . . . . . 3. Analysis of Joint Petitioners contentions. . . . . . . . . . . . . . . . . . . . . . . . . 4. Issues that are out of scope, not material or not supported . . . . . . . . . . 5. Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . . B. Contention Four . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. Issues that are out of scope (Small impact of severe accidents; Spent fuel pool) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. Issues that are not material (Sabotage risk; Quality assurance) . . . . . . . 3. Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; Myriad of other economic costs; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties) . . . . . . . . . . . . . . . 4. Issues that do not dispute the Application (Fire hosing and plowing) . . . . 5. Admissible contention as narrowed by the Board . . . . . . . . . . . . . . . . . . a. Source terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b. Gaussian plume . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . c. Particle size and clean-up costs for urban areas . . . . . . . . . . . . .

iii IV. Selection of Hearing Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Legal Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B. Ruling on Hearing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V. Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of: Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING ASLBP No. 11-907-01-LR-BD01 COMPANY April 26, 2011 (Davis-Besse Nuclear Power Station, Unit 1)

MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)

Before this Atomic Safety and Licensing Board (Board) is a petition to intervene and a request for a hearing (Petition) filed jointly by four organizations: Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario (CEA), Dont Waste Michigan, and the Green Party of Ohio (collectively, Joint Petitioners).1 The Joint Petitioners challenge the application (Application) filed by FirstEnergy Nuclear Operating Company (FirstEnergy) to extend its operating license for the Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty years from the current expiration date of April 22, 2017 to April 22, 2037, pursuant to Part 54 of Title 10 of the Code of Federal Regulations.2 Davis-Besse is located on the southwestern shore of 1

Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio Request for Public Hearing and Petition for Leave to Intervene (Dec.

27, 2010) [hereinafter Petition].

2 License Renewal Application; Davis-Besse Nuclear Power Station 1.0-1, 1.1-1 (Aug. 2010)

(ADAMS Accession Nos. ML102450567, ML102450563) [hereinafter Application]. The application also seeks renewal of the associated source material, special nuclear material, and by-product material licenses under 10 C.F.R. Parts 30, 40, and 70. Id. at 1.0-1.

Lake Erie in Ottawa County in northwestern Ohio, approximately twenty miles east of Toledo.3 The Joint Petitioners have proffered four contentions. FirstEnergy and the NRC Staff contend that CEA does not have standing and that each proffered contention is inadmissible on one or more grounds. FirstEnergy also argues the Petition should be rejected because it is untimely and that CEA has not demonstrated that it authorized any officer or member to represent it in this proceeding.

The Board grants the intervention petition because the Joint Petitioners have demonstrated standing and have collectively proffered at least one contention that is admissible, in whole or in part, pursuant to 10 C.F.R. § 2.309(f)(1). In accordance with 10 C.F.R. § 2.309(a), we therefore grant the request for public hearing and admit each petitioner as a party to this proceeding. As limited by the Board, the admitted contentions will be heard under the procedures set forth at 10 C.F.R. Part 2, Subpart L.

I. Procedural Background FirstEnergy4 filed the Application to renew its operating license for Davis-Besse5 on August 27, 2010.6 A notice published in the Federal Register on October 25, 2010 stated that the NRC Staff would review the Application and that persons whose interests might be affected by the proposed license renewal would have until December 27, 2010 to petition to intervene in the 3

Id. at 1.2-1.

4 FirstEnergy applied on its own behalf and as agent for FirstEnergy Nuclear Generation Corp., the owner and licensee. Id. at 1.1-1.

5 Davis-Besse has a pressurized water reactor nuclear steam supply system furnished by the Babcock & Wilcox Company. Id. at 1.2-1. The licensed core power level is 2817 megawatts-thermal (MWt). Id. Davis-Besses gross electrical output is 908 megawatts-electric (MWe). Id.

6 Notice of Acceptance for Docketing of the Application, Notice of Opportunity for Hearing for Facility Operating License No. NPF-003 for an Additional 20-Year Period; First[E]nergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Unit 1, 75 Fed. Reg. 65,528, 65,528-29 (Oct. 25, 2010) [hereinafter Hearing Notice]. Notice of receipt of FirstEnergys license renewal application was published in the Federal Register on September 20, 2010. FirstEnergy Nuclear Operating Company; Notice of Receipt and Availability of Application for Renewal of Davis[-]Besse Nuclear Power Station, Unit 1, Facility Operating License No. NPF-003 for an Additional 20-Year Period, 75 Fed. Reg. 57,299 (Sept. 20, 2010).

proceeding and to request a hearing.7 The Joint Petitioners filed the Petition and several exhibits on December 27.8 Between midnight and 3:10 a.m. on December 28, the Joint Petitioners filed nearly seventy more exhibits one at a time.9 They filed two final exhibits at 12:15 p.m. on December 28.10 Joint Petitioners filed an Errata to correct errors in the Petition on January 5, 2011.11 The Petitions first three contentions allege that the Applications environmental report (ER) does not adequately analyze, as reasonable baseload power alternatives, allegedly environmentally superior systems of renewable energy12respectively, wind power,13 solar power,14 and a combination of wind and solar power15with compressed air storage.16 The Petitions fourth contention concerns the ERs severe accident mitigation alternatives (SAMA) analysis.17 7

Hearing Notice, 75 Fed. Reg. at 65,529.

8 Petition; Declarations in Support of Standing from Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan and Green Party of Ohio, and Individual Organization Members (Dec. 27, 2010) [hereinafter Standing Decls.]; Exhibits in support of the Petition to Intervene in the License Renewal proceeding for Davis[-]Besse [hereinafter Petition Attachments].

9 Declaration and Curriculum Vitae of Alvin Compaan, Intervenors Expert Witness on Contention

  1. 2 (signed Dec. 27, 2010, submitted Dec. 28, 2010) [hereinafter Compaan Decl.]; Petition Attachments.

10 Petition Attachments.

11 Errata (Jan. 5, 2011).

12 Petition at 15-17, 27-28, 71, 82-83.

13 Id. at 10.

14 Id. at 68-69.

15 Id. at 93.

16 Id. at 28, 71.

17 Id. at 100.

FirstEnergy and the NRC Staff filed answers on January 21, 2011.18 Both argue that petitioner CEA lacks standing and that every proffered contention is inadmissible.19 FirstEnergy further argues that the entire petition should be dismissed as untimely and that CEA has not shown that it authorized anyone to represent it.20 Joint Petitioners filed a combined reply on January 28.21 FirstEnergy moved to strike portions of this reply on February 7, arguing that it impermissibly expanded the scope of the original Petition without satisfying the standards governing new or amended contentions.22 Joint Petitioners filed an errata to their reply on February 1023 and an opposition to the motion to strike on February 17.24 On February 18 this Board granted FirstEnergys motion to strike and ordered Joint Petitioners to re-file a revised reply with the disputed portions deleted, the errata incorporated, and the pages numbered.25 Joint Petitioners filed a revised reply on February 2326 18 FirstEnergys Answer Opposing Request for Public Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter FirstEnergy Answer]; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene (Jan. 21, 2011) [hereinafter NRC Staff Answer].

19 FirstEnergy Answer at 2-3; NRC Staff Answer at 2, 6-7. FirstEnergy argued in its answer that petitioner Dont Waste Michigan also lacks standing, id. at 2-3, but withdrew this challenge during oral argument. Tr. at 38-39.

20 FirstEnergy Answer at 2.

21 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (Jan. 28, 2011).

22 FirstEnergys Motion to Strike Portions of Petitioners Combined Reply (Feb. 7, 2011) at 1 (citing 10 C.F.R. § 2.309(c), (f)(2)).

23 Errata (Feb. 10, 2011).

24 Joint Intervenors Combined Reply in Opposition to FENOCs Motion to Strike (Feb. 17, 2011).

25 Licensing Board Order (Granting Motion To Strike and Requiring Re-filing of Reply) (Feb. 18, 2011) at 4 (unpublished).

26 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (Corrected Version) (Feb. 23, 2011).

and a final revised reply on February 24.27 This Board heard oral argument on the Petition in Port Clinton, Ohio, on March 1, 2011.28 On the eve of oral argument, Joint Petitioners submitted a notice seeking to bring to the Boards attention a recently published Licensing Board order.29 II. Analysis of Timeliness, Standing and Representation Any person or organization seeking to intervene as a party in a NRC adjudicatory proceeding addressing a proposed licensing action must: (1) establish standing; and (2) proffer at least one admissible contention.30 In addition, an officer, member or attorney representing an organization in such a proceeding must file a written notice of appearance stating, among other things, his or her basis for representing the organization.31 Before analyzing standing, representation and contention admissibility, we first address the timeliness of the Petition.

A. Timeliness FirstEnergy argues the Petition is untimely and should be rejected because Joint Petitioners filed 67 exhibits and an expert affidavit after the deadline for submitting an intervention petition challenging the Davis-Besse renewal application, which was 11:59 p.m. Eastern Time on 27 Joint Intervenors Combined Reply in Support of Petition for Leave to Intervene (2nd, Final Corrected Version) (Feb. 24, 2011) [hereinafter Reply]. Beyond Nuclears representative explained at oral argument that he filed the February 24 reply because he had inadvertently retained, in the February 23 reply, material the Board had struck. Tr. at 35-37.

28 Tr. at 1-239.

29 Joint Intervenors Notice of Additional Authority (Feb. 28, 2011) (attaching NextEra Energy Seabrook LLC (Seabrook Station, Unit 1), LBP-11-02, 73 NRC __ (slip op.) (Feb. 15, 2011)). In response to FirstEnergys objection at oral argument that Joint Petitioners inappropriately included five pages of supplemental legal argument in the notice, Tr. at 229-30, this Board stated that it is aware of the order, that the order is not binding on this Board, that it will use the order to the extent it is helpful, and that it will disregard the supplemental legal argument that came with the filing. Id.

at 230-31.

30 10 C.F.R. § 2.309(a).

31 Id. § 2.314(b).

December 27, 2010.32 FirstEnergy reasons that because an electronic filing is only complete when the filer performs the last act that it must perform to transmit a document, in its entirety, the entire Petition is untimely.33 At oral argument FirstEnergy stated the filing deadline is akin to a statute of limitations.34 Joint Petitioners assert that this was the first adjudicatory filing situation for the inexperienced, pro se coordinator35 who was the Joint Petitioners point person when the Petition was filed.36 Joint Petitioners argue that, because they were proceeding pro se at that time, they should be shown greater leeway on the question of whether they have demonstrated good cause for lateness than petitioners represented by counsel.37 The Commission has directed that pro se litigants generally be extended some latitude, although they are still expected to comply with procedural rules.38 While the petition itself was timely filed, we must balance the eight factors set forth in 10 C.F.R. § 2.309(c)(1) to determine whether we can consider Joint Petitioners late-filed exhibits.

Good cause for the failure to file on time is the most important factor.39 32 FirstEnergy Answer at 2 (citing Hearing Notice, 75 Fed. Reg. 65,528; 10 C.F.R. § 2.306(c)).

33 Id. (quoting 10 C.F.R. § 2.302(d)(1)) (emphasis added in FirstEnergy Answer).

34 Tr. at 35.

35 Reply at 5.

36 Reply, Attach., Declaration of Kevin Kamps, Beyond Nuclear ¶ 1 (Jan. 28, 2011) [hereinafter Kamps Decl.].

37 Id. at 4-5 (citing Maine Yankee Atomic Power Co. (Maine Yankee Atomic Power Station), LBP-03-23, 58 NRC 372, 378 (2003)). Joint Petitioners also argue FirstEnergy can make no credible showing of prejudice. Id. at 5. We do not consider whether FirstEnergy was prejudiced by the late filing because prejudice is not a factor in the balancing test for nontimely filings. 10 C.F.R.

§ 2.309(c)(1).

38 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-01, 71 NRC __, __ (slip op. at 5) (Jan. 7, 2010) (citations omitted).

39 Crow Butte Res., Inc. (North Trend Expansion Project), CLI-09-12, 69 NRC 535, 549 n.61 (2009)

(referring to 10 C.F.R. § 2.309(c)(1)(i)).

In their reply, Joint Petitioners assert they have good cause to have their Petition deemed timely,40 explaining that they experienced major difficulties with NRCs Electronic Information Exchange system on the night of . . . December 27, 2010.41 Allegedly, when it quickly became apparent that the EIE system was not working properly for the point person, a second representative rac[ed] to the Beyond Nuclear office after 11:00 p.m.on a day his organization observes as a holidayto successful[ly] fil[e] several key documents ahead of midnight and to submit 73 items in all, one at a time.42 Two additional documents were filed after four hours of assistance from the agencys E-Filing Help Desk once it opened for the day.43 The NRC Staff does not challenge the timeliness of the Petition.44 They suggested at oral argument, however, that it would have been helpful if the parties had not had to wait until the reply to know about the difficulties the Joint Petitioners experienced with the E-Filing system.45 In this case, the Petitioncomplete with active embedded links to most of the exhibitsthe standing declarations, and eight exhibits were submitted before the deadline.46 The balance of the exhibits was filed overnight and into the next day.47 All parties to an adjudicatory proceeding have an obligation to prepare and to file their pleadings and submissions in a timely manner and in accordance with the regulations. The Board believes thatfor lengthy documents with multiple attachmentsthis means beginning the filing process sufficiently in advance of the deadline so that if unforeseen problems arise, the document and all referenced exhibits and attachments can 40 Reply at 4.

41 Id. at 2.

42 Id. at 2-4; accord Kamps Decl. ¶¶ 4-7.

43 Kamps Decl. ¶ 11; accord Reply at 4.

44 Tr. at 33.

45 Id.

46 Petition; Standing Decls.; Petition Attachments; accord Reply at 3.

47 Compaan Decl.; Petition Attachments.

still be filed in their entirety prior to the deadline.48 If a petitioner encounters problems with a particular document or with the agencys E-Filing system so that the document cannot be filed before the deadline, it is incumbent upon that petitioner to explain the circumstances surrounding the problem as soon as possible to the Board and the parties, by promptly filing a motion seeking leave from the Board to accept the document out of time. In this situation, it appears the Joint Petitioners began the filing process approximately one hour before the deadline.49 Given the problems they encountered and the size of the filing, one hour was not sufficient time to complete the filing. However, the Joint Petitioners were able timely to file the Petition in its entirety and some of the exhibits. Most of the exhibits were filed after the deadline, and for those exhibits the Petitioners should have filed a motion seeking leave to have them accepted out of time. Given the Joint Petitioners inexperienced pro se coordinator (and first-time filer) and the apparent problems with the E-Filing system, we conclude that Joint Petitioners efforts, as outlined in their reply pleading, demonstrate the required good cause for us to accept their untimely submissions. We therefore accept the nontimely exhibits for further consideration with the timely filed Petition.

In the future Joint Petitioners are strongly advised to prepare their pleadings well in advance of any deadlines, and if any portion of a filing is untimely tendered, it must be accompanied by a motion pursuant to 10 C.F.R. §§ 2.309(c)(1) and 2.323.

B. Standing Joint Petitioners assert each has standing to intervene as the representative of its members living in geographic proximity to the Davis-Besse facility.50 When an organization seeks to intervene in a representative capacity it must: (1) show that the interests it seeks to protect are 48 10 C.F.R. § 2.302(d)(1) provides that a filing by electronic transmission is complete only when the filer performs the last act that it must perform to transmit a document, in its entirety.

49 Kamps Decl. ¶ 4.

50 Petition at 4-6.

germane to its own purpose; (2) identify, by name and address,51 at least one member who qualifies for standing in his or her own right; and (3) show that it is authorized by that member to request a hearing on his or her behalf.52 In determining whether an individual member of an organization qualifies for standing in his or her own right, the NRC generally applies traditional judicial standing concepts,53 which require a showing that the individual has suffered or might suffer a concrete and particularized injury that is:

(1) fairly traceable to the challenged action; (2) likely redressible by a favorable decision;54 and (3) arguably within zone of interests protected by the governing statutes55e.g. the Atomic Energy Act of 1954 (AEA)56 and the National Environmental Policy Act of 1969 (NEPA).57 These standing requirements are codified at 10 C.F.R. § 2.309(d)(1)(ii)-(iv).

In reactor license renewal cases, however, petitioners are entitled to invoke what has come to be known as the proximity presumption. This presumption of standing excuses petitioners from 51 Power Authority of New York (James A. FitzPatrick Nuclear Power Plant; Indian Point, Unit 3),

CLI-00-22, 52 N.R.C. 266, 293 (2000).

52 Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-18, 65 NRC 399, 409 (2007)

(citations omitted); cf. Friends of the Earth, Inc. v. Laidlaw Envtl. Servs. (TOC), Inc., 528 U.S. 167, 181 (2000) (An association has standing to bring suit on behalf of its members when its members would otherwise have standing to sue in their own right, the interests at stake are germane to the organizations purpose, and neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit. (citing Hunt v. Wash. State Apple Adver.

Commn, 432 U.S. 333, 343 (1977))).

53 Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), CLI-06-6, 63 NRC 161, 163 (2006) (citing U.S. Dept of Energy (Plutonium Export License), CLI-04-17, 59 NRC 357, 363 (2004); Sacramento Mun. Util. Dist. (Rancho Seco Nuclear Generating Station), CLI-92-2, 35 NRC 47, 56 (1992)).

54 Georgia Inst. of Tech. (Georgia Tech Research Reactor, Atlanta Georgia), CLI-95-12, 42 NRC 111, 115 (1995) (citing Lujan v. Defenders of Wildlife, 504 U.S. 555, 560-61 (1992)).

55 Yankee Atomic Elec. Co. (Yankee Nuclear Power Station), CLI-96-1, 43 NRC 1, 6 (1996) (citing Cleveland Elec. Illuminating Co. (Perry Nuclear Power Plant, Unit 1), CLI-93-21, 38 NRC 87, 92 (1993)).

56 42 U.S.C. §§ 2011-2297.

57 Id. §§ 4321-4346.

the need to show an injury. The Commission has applied this geographic proximity presumption as follows:

In practice, we have found standing based on this proximity presumption if a petitioner (or a representative of a petitioner organization) resides within approximately 50 miles of the facility in question.58 The proximity presumption also applies if a petitioner has frequent contacts with this geographic zone of potential harm.59 This presumptions rationale is that persons living within the roughly 50-mile radius of the facility face a realistic threat of harm if a release from the facility of radioactive material were to occur.60 The Joint Petitioners have each articulated how the interests it seeks to protect are germane to its own purpose. Beyond Nuclears name implies that the organization is concerned about nuclear issues. It claims to have over 6,000 members of whom a number reside, work and recreate near the Davis-Besse Nuclear Power Station.61 CEA asserts that it favor[s] the increased deployment of environmentally benign energy sources.62 Dont Waste Michigan asserts its articles of incorporation state its dedicat[ion] to educating the public about the dangers nuclear contamination poses to human health and the environment.63 The Green Party of Ohio asserts that it is concerned with the issue of alternative energy.64 Each of the Joint Petitioners also identifies at least one member qualified for standing in his or her own right based on the proximity presumption, and each of these members authorizes the 58 Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), CLI-09-20, 70 NRC 911, 915-16 (2009) (emphasis added).

59 Id. at 915.

60 Id. at 917 (quoting Calvert Cliffs 3 Nuclear Project, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), LBP-09-4, 69 NRC 170, 183 (2009)) (emphasis added).

61 Petition at 4.

62 Id. at 4.

63 Reply at 8.

64 Petition at 6.

respective organization to represent his or her interests. Beyond Nuclear relies on the declaration of member Phyllis Oster, who provides a home address that is less than forty miles from the power station and states her interests will not be adequately represented unless Beyond Nuclear participates in this proceeding, impliedly authorizing the organization to represent her interests.65 CEA provides declarations from two members, Derek and Richard Coronado (the Coronados), who state that their home is within a 50-mile radius of the Davis-Besse plant and designate CEA to represent their interests.66 Dont Waste Michigan relies on the declaration of member Michael J.

Keegan, who provides a home address that is less than twenty-five miles from the power station and designates Dont Waste Michigan to represent his interests.67 The Green Party of Ohio provides declarations from three members, Anita Rios, Joseph R. DeMare, and Sean Nestor, who each provide a home address within twenty-five miles of the power station and designate the Green Party of Ohio to represent their interests.68 FirstEnergy and the NRC Staff contest the standing of only Derek and Richard Coronado and their organization, CEA.69 FirstEnergy contends that CEA cannot rely on the proximity presumption to establish standing because the Coronados appear to live slightly more than 50 miles from Davis-Besse.70 The NRC Staff agree that CEA has not shown standing because the Coronados do not qualify for the proximity presumption and CEA has not otherwise alleged and demonstrated an appropriate 65 See Declaration of Phyllis Oster (Dec. 24, 2010).

66 Declaration of Derek Coronado (Dec. 26, 2010) [hereinafter D. Coronado Decl.]; Declaration of Richard Coronado (Dec. 26, 2010) [hereinafter R. Coronado Decl.].

67 See Declaration of Michael J. Keegan (Dec. 27, 2010).

68 See Declaration of Anita Rios (Dec. 26, 2010); Declaration of Joseph R. DeMare (Dec. 14, 2010); Declaration of Sean Nestor (Dec. 26, 2010).

69 FirstEnergy Answer at 8-9; NRC Staff Answer at 6-7.

70 FirstEnergy Answer at 9.

injury.71 The NRC Staff calculates that the Coronados residence is approximately 300 feet outside the 50-mile radius of Davis-Besse,72 measuring from the center line of the reactor to the nearest corner of the Coronados property,73 and FirstEnergy calculates the deficit as 0.024 miles.74 FirstEnergys calculations place the Coronado residence 127 feet beyond a 50-mile radius from the center line of the reactor.

The Joint Petitioners respond that the Coronados are within 49.751 miles of the containment building at Davis-Besse when they are at work or meeting in the CEA office.75 The Petition identifies the Coronados as CEAs coordinators and provides the address of the CEA office.76 If Joint Petitioners calculation is converted from miles to feet, CEAs office is 1314.7 feet within the 50-mile radius.

Following the Commissions example, we construe the petition in favor of the petitioner in determining whether a petitioner has demonstrated standing.77 As previously mentioned, a petitioner may avail himself or herself of the proximity presumption if he or she lives within approximately 50 miles of the facility or otherwise has frequent contacts within this area.78 We are satisfied that the filed pleadings and the oral argument indicate that the Coronados residence is approximately 50 miles from Davis-Besse and their work address is less than 50 miles from Davis-Besse. Further, common sense would dictate that the Coronados would have frequent contacts within the 50-mile radius of the plant because of where they live and where they work.

71 NRC Staff Answer at 6-7.

72 Id. at 6.

73 Tr. at 40-42.

74 See FirstEnergy Answer at 9 n.31.

75 Reply at 7; accord Tr. at 45-46.

76 Petition at 5.

77 Georgia Tech., CLI-95-12, 42 NRC at 115.

78 Calvert Cliffs, CLI-09-20, 70 NRC at 915-16.

Accordingly, the Coronados qualify for the proximity presumption and CEA may assert representational standing on their behalf.79 C. Representation by Member, Officer or Attorney FirstEnergy also challenges CEAs participation on the ground that Joint Petitioners fail to include documentation showing that CEA has authorized Derek Coronado or any other officer or member of the organization to represent it.80 10 C.F.R. § 2.314(b) provides that a duly authorized member or officer may represent his or her partnership, corporation, or unincorporated association even if he or she is not an attorney at law, but the representatives notice of appearance must state the basis of his or her authority to act on behalf of the party. An organizations standing can be demonstrated through the interests of its members, but if a member acts or speaks on behalf of the organization, that member must also demonstrate authorization by that organization to represent it.81 Accordingly, although the Coronados declarations show they authorize CEA to represent their interests,82 to act as CEAs representatives they would also have to demonstrate that the organization in turn has authorized them to represent it.

On February 22, 2011 Terry J. Lodge filed a notice of appearance.83 The notice of appearance indicates Mr. Lodge is a member of the bar of the Supreme Court of Ohio and further indicates that he is attorney of record in this matter for CEA, Dont Waste Michigan, and the Green 79 We note that the arguments of both the NRC Staff and FirstEnergy in this regard are approximately 1000 feet past the point from which frivolous arguments are measured.

80 FirstEnergy Answer at 8.

81 See Detroit Edison Co. (Enrico Fermi Atomic Power Plant, Unit 2), LBP-78-37, 8 NRC 575, 583 (1978) (citing Tenn. Valley Auth. (Watts Bar Nuclear Plant, Units 1 and 2), ALAB-413, 5 NRC 1418, 1421 (1977))).

82 D. Coronado Decl.; R. Coronado Decl.

83 Notice of Appearance of Counsel for Citizens Environmental Alliance of Southwestern Ontario, Dont Waste Michigan, and Green Party of Ohio (Feb. 22, 2011).

Party of Ohio.84 His notice of appearance also includes his state bar number.85 The notice of appearance and the fact that CEA is now represented by an attorney cures any possible deficiency in representation which may have existed when the Petition was filed by its pro se representative.86 We are lenient in permitting pro se petitioners the opportunity to cure procedural defects in petitions to intervene regarding standing.87 And although an allegation that a purported representative is acting without his or her organizations authorizationi.e. is acting ultra viresis distinct from a challenge to the organizations standing,88 a petitioner may cure such a defect in representation as well.89 In summary, Beyond Nuclear, CEA, Dont Waste Michigan, and the Green Party of Ohio all have shown that the interests they seek to protect are germane to their organizational purposes.

Their individual declarants all have established standing to intervene in their own right and have authorized their respective organizations to represent their interests. Accordingly, each 84 Id.

85 Id.

86 An attorney who purports to represent a client without authorization is subject to disciplinary proceedings by the state bar association. See Ohio Rules of Profl Conduct R. 3.3(a)(1) (2007)

(prohibiting lawyer from knowingly making a false statement of law or fact to a tribunal);

Disciplinary Counsel v. Bursey, 919 N.E.2d 198, 204-06 (Ohio 2009) (disbarring permanently an attorney whose violations of the Rules of Professional Conduct included negotiating a settlement for a client that had never given him settlement authority, forging clients name on settlement check, and depositing it into attorneys bank account).

87 PPL Bell Bend LLC (Bell Bend Nuclear Power Plant), LBP-09-18, 70 NRC 385, 396 (2009)

(citing Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-91-7, 33 NRC 179, 195 (1991)); see, e.g., Virgil C. Summer Nuclear Station, CLI-10-01, 71 NRC at __ (slip op. at 6-8)

(allowing petitioner to clarify standing declarations by submitting revised declarations with reply).

88 See Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-535, 9 NRC 377, 395-96 (1979) (distinguishing the authority of an officer or attorney to sign a petition from an authorization addressed to the organizations standing to intervene (emphasis omitted)).

89 See id. (stating how petitioner could have appropriately responded to an intimation of ultra vires conduct had the argument been raised).

organization has demonstrated representational standing.90 And Attorney Lodges notice of appearance cures the absence of a declaration or affidavit showing that CEA authorized any member or officer to represent it.

III. Analysis of Contention Admissibility As previously noted, to participate as a party, a petitioner must not only establish standing, but must also proffer at least one admissible contention that meets the requirements of 10 C.F.R.

§ 2.309(f)(1). An admissible contention must: (i) provide a specific statement of the issue of law or fact to be raised; (ii) provide a brief explanation of the basis for the contention; (iii) demonstrate that the issue raised is within the proceedings scope; (iv) demonstrate that the issue raised is material to the findings the NRC must make to support the action that is involved in the proceeding; (v) provide a concise statement of the alleged facts or expert opinions, including references to specific sources and documents, that support the petitioners position and upon which the petitioner intends to rely at hearing; and (vi) show that a genuine dispute exists on a material issue of law or fact by referring to specific portions of the application that the petitioner disputes or, if the application is alleged to be deficient, by identifying such deficiencies and the supporting reasons for this allegation.91 In explaining these requirements, the Commission has said the agency should not have to expend resources to support the hearing process unless there is an issue that is appropriate for, and susceptible to, resolution in an NRC hearing.92 Alternatives for reducing adverse 90 We deny Ms. Rios, Mr. DeMare, and Mr. Nestors requests in the alternative for individual standing, Tr. at 37; Petition at 6, because the Green Party of Ohio has demonstrated representational standing. Tr. at 37. An individual may not intervene in his or her own right while simultaneously being represented by another petitioner in the same proceeding. Powertech (USA), Inc. (Dewey-Burdock In Situ Uranium Recovery Facility), LBP-10-16, 72 NRC __, __ (slip op. at 21) (Aug. 5, 2010).

91 10 C.F.R. § 2.309(f)(1)(i)-(vi).

92 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2202 (Jan. 14, 2004).

environmental impacts, including impacts of severe accidents,93 are among the limited issues within the scope of a license renewal proceeding.94 A challenge to a Commission rule or regulation, however, is outside the scope of an adjudicatory hearing unless the petitioner first obtains a waiver.95 For example, the Commission has codified generic determinations for certain environmental issues, identified as Category 1 issues, for license renewal proceedings.96 Category 1 issues are not subject to challenge in a relicensing proceeding because they involve environmental effects that are essentially similar for all plants [and] need not be assessed repeatedly on a site-specific basis.97 Pursuant to 10 C.F.R. § 2.335, Category 1 issues cannot be addressed in a license renewal proceeding absent a waiver. Issues that require site-specific analysis, on the other hand, are identified as Category 2 issues.98 Category 2 issues must be reviewed on a site-specific basis because they have not been determined to be essentially similar for all plants;99 accordingly, challenges relating to these issues are properly part of a license renewal proceeding.

Although [m]ere notice pleading is insufficient in NRC proceedings,100 a petitioner does not have to prove its contentions at the admissibility stage,101 and we do not adjudicate disputed 93 10 C.F.R. § 51.53(c)(3)(ii)(L).

94 42 U.S.C. § 4332(2)(C)(iii); 10 C.F.R. §§ 54.29(b), 51.53(c)(2), 51.53(c)(3)(iii).

95 10 C.F.R. § 2.335(a).

96 10 C.F.R. Part 51, subpt. A, app. B, n.2.

97 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11 (2001).

98 10 C.F.R. Part 51, subpt. A, app. B, n.2.

99 Id.

100 Fansteel, Inc. (Muskogee, Oklahoma, Site), CLI-03-13, 58 NRC 195, 203 (2003).

101 Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 139 (2004).

facts at this juncture.102 The factual support required is a minimal showing that material facts are in dispute.103 All that is needed at this juncture is alleged facts and the factual support need not be in affidavit or formal evidentiary form and need not be of the quality necessary to withstand a summary disposition motion.104 A. Contentions One, Two and Three Although styled as separate contentions, Contentions One, Two and Three allege that FirstEnergy should have considered renewable energy sources in a more comprehensive manner in its ER. Contention One, simply titled Wind Power, states the Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse.105 Likewise, Contention Two, entitled Solar Power, alleges the Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter solar power),

to offset the loss of energy production from Davis-Besse.106 In Contention Three, Joint Petitioners state NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power.107 The essence of Contentions One, Two and Three is that FirstEnergy should have evaluated wind power, solar photovoltaic power, or a combination of both, bolstered by energy storage, in a 102 Mississippi Power & Light, Co. (Grand Gulf Nuclear Station, Units 1 & 2), ALAB-130, 6 AEC 423, 426 (1973).

103 Gulf States Utils. Co. (River Bend Station, Unit 1), CLI-94-10, 40 NRC 43, 51 (1994) (quoting Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. 33,168, 33,171 (Aug. 11, 1989) [hereinafter Procedural Changes]).

104 Procedural Changes, 54 Fed. Reg. at 33,171.

105 Petition at 10.

106 Id. at 68-69.

107 Id. at 93.

more comprehensive manner in its ER as an alternative to the renewal of Davis-Besses operating license.108

1. Legal standards for alternatives analysis in an ER The Commissions regulations require an applicant seeking a license renewal to file an ER that includes an alternatives analysis that considers and balances . . . the environmental impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding adverse environmental effects.109 An ERs adequacy is examined under the auspices of NEPA because the ER is the foundation upon which NRCs environmental impact statement (EIS) is prepared.110 Therefore, an applicants alternatives analysis must be sufficiently complete to aid the Commission in developing and exploring, pursuant to section 102(2)(E) of NEPA, appropriate alternatives to the proposed action.111 Generally, NEPA requires that an environmental review provide a sufficient discussion of alternatives to enable the decisionmaker to take a hard look at environmental factors, and to make a reasoned decision.112 An applicants alternatives analysis need not discuss every conceivable alternative to the proposed action. Rather, NEPA requires only consideration of feasible, nonspeculative, and reasonable alternatives.113 In defining the scope of alternatives that applicants must consider, the 108 Id. at 10-11, 28, 68-69, 71, 93.

109 10 C.F.R. § 51.45(c).

110 See Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), CLI 02, 71 NRC__, __ (slip op. at 8) (Jan. 7, 2010) (stating that to facilitate the NRCs compliance with NEPA, the agency requires an applicant to submit a complete environmental report with its application, which is essentially the applicants proposal for the draft environmental impact statement and that contentions that seek compliance with NEPA must be based on that environmental report (internal citations omitted)).

111 10 C.F.R. § 51.45(b)(3) (referring to 42 U.S.C. § 4332(2)(E)).

112 Tongass Conservation Socy v. Cheney, 924 F.2d 1137, 1140 (D.C. Cir. 1991) (quoting Natural Res. Def. Council, Inc. v. Hodel, 865 F.2d 288, 294 (D.C. Cir. 1988)).

113 Entergy Nuclear Operations, Inc (Indian Point, Units 2 and 3), LBP-08-13, 68 NRC 43, 95 (2008) (citing Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP-05-31, 62 NRC

Commission has indicated that an ER need only consider the range of alternatives that are capable of achieving the goals of the proposed action.114 The NRC generally defers to an applicants stated purpose so long as that purpose is not so narrow as to eliminate alternatives.115 Generation of baseload power is an acceptable purpose for a licensing action and has been determined to be broad enough to permit consideration of a host of energy generating alternatives.116 Here, the goal of the proposed license renewal is to deliver approximately 910 MWe of baseload power,117 beginning on April 22, 2017 and available for a period of 20 years.

2. Treatment of wind and solar alternatives in the ER FirstEnergys ER devotes only four paragraphs to wind power, three paragraphs to solar power, and two paragraphs to a mix of renewable energy with natural gas generation, among other things, as alternatives to the Davis-Besse license renewal.118 The ER concludes, however, that none of these alternatives is reasonable.119 According to the ER, wind power cannot serve as a large base-load generator because it has a high degree of intermittency and relatively low average annual capacity and because 735, 753 (2005)); accord City of Carmel-by-the-Sea v. Dept of Transp., 123 F.3d 1142, 1155 (9th Cir. 1997); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-91-2, 33 NRC 61, 71 (1991).

114 See Hydro Res., Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-01-4, 53 NRC 31, 55 (2001) (Agencies need only discuss those alternatives that are reasonable and will bring about the ends of the proposed action. (quoting Citizens Against Burlington, Inc. v. Busey, 938 F.2d 190, 195 (D.C. Cir. 1991))).

115 South Carolina Elec. & Gas Co. (Virgil C. Summer Nuclear Station, Units 2 and 3), LBP-09-2, 69 NRC 87, 110 (2009).

116 Envtl. Law & Policy Ctr. v. NRC, 470 F.3d 676, 684 (7th Cir. 2006).

117 Appendix E; Applicants Environmental Report; Operating License Renewal Stage; Davis-Besse Nuclear Power Station at 7.2-7 (Aug. 2010) [hereinafter ER].

118 Id. at 7.2-9 to 7.2-10, 7.2-12 to 7.2-13.

119 Id. at 7.2-12.

current energy storage technologies are too expensive.120 The ERs conclusion that wind power is not a reasonable alternative also rests in part on the large land requirements and associated aesthetic impacts of wind power.121 Similarly, the ER concludes solar power is not a reasonable alternative because: (1) it would require energy storage or supplemental energy sources because it is intermittent; (2) many solar technologies are still in the demonstration phase of development and are not competitive with fossil or nuclear-based technologies . . . due to high costs; and (3) it would require a large area of landnearly 13,000 acresto replace Davis-Besses generating capacity.122 Finally, the ER concludes that [w]hen considered in various combinations . . . , these same renewable . . . energy resources still fail to be reasonable alternatives to renewal of Davis-Besses operating license.123 Putting forward a mix of 25 percent renewable energy and 75 percent natural gas generation as an example, the ER reasons that: (1) the fluctuation of wind and solar resources would cause increased uncertainty in energy output; (2) the land-use environmental impact of siting the resources would likely exceed the environmental impacts of Davis-Besses continued operation; and (3) the natural gas plants air quality impacts would greatly exceed continued operations environmental impacts.124

3. Analysis of Joint Petitioners contentions Contention One states the ER fails to adequately evaluate the full potential for renewable 120 Id. at 7.2-9 (citing Division of Regulatory Applications, Office of Reactor Regulatory Research, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, Vol. 1, § 8.3.1 (1996) [hereinafter GEIS, NUREG-1437, Vol. 1]; Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Beaver Valley Power Station, Units 1 and 2, NUREG-1437, Supp. 36, § 8.2.5.2 (May 2009)).

121 Id.

122 Id. at 7.2-9 to 7.2-10 (citing GEIS, NUREG-1437, Vol. 1, §§ 8.3.2, 8.3.3).

123 Id. at 7.2-12.

124 Id. at 7.2-12 to 7.2-13.

energy sources, such as wind power.125 Contention Two is identical to Contention One except that it substitutes solar power for wind power.126 Contention Three alleges: NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-125 Petition at 10. The full contention reads:

Contention One: Wind Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary.

In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as wind power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the SEIS is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besses remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOCs requested license extension period (2017 to 2037).

Id. at 10-11.

126 Id. at 68. The full contention reads:

Contention Two: Solar Electric (Photovoltaic) Power. The FirstEnergy Nuclear Operating Company (hereinafter, FENOC) Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as solar electric power or photovoltaics (hereinafter solar power), to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary. In violation of the requirements of 10 C.F.R. § 51.53(c)(3)(iii) and of the GEIS § 8.1, the FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives, such as solar power, in the Region of Interest for the requested relicensing period of 2017 to 2037. The scope of the Supplemental Environment Impact Statement (SEIS) is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix that are currently underway already during this decade of Davis-Besses remaining operating license (2010 to 2017), and can especially be expected to accelerate and materialize over two decades to come covering FENOCs requested license extension period (2017 to 2037).

Id. at 68-69.

generated baseload power.127 In the introduction to the third contention the Joint Petitioners seek to incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition.128 The NRC Staff and FirstEnergy argue that all three contentions are inadmissible. They assert that the Joint Petitioners do not demonstrate the existence of a material factual dispute with the ER as required by 10 C.F.R. § 2.309(f)(1)(vi).129 The NRC Staff argues that Joint Petitioners do not succeed at demonstrating that solar power can replace the 910 MWe of baseload power that Davis-Besse provides.130 NRC Staff also argues that Joint Petitioners have not provided sufficient information to support their assertions that offshore and onshore wind energy can replace Davis-Besses baseload power generation.131 Likewise FirstEnergy posits that Petitioners have not provided sufficient alleged facts or expert opinion to support their contentions.132 We will analyze Contentions One, Two and Three as if they were a single contention that challenges the sufficiency of the ERs analysis of renewable energy sources, specifically wind, solar or a combination of wind and solar, as a reasonable alternative to the renewal of Davis-127 The full contention reads:

Contention Three: Solar and Wind in Combination. The Relicensing GEIS Is Stale, Dated and NEPA Non-Compliant; Commercial Wind And Solar Photovoltaic Baseload Power Should Be Considered Under NEPA as a Single, Combined-Source Alternative. ¶ 158.

NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power. Petitioners incorporate as though rewritten fully herein the facts, arguments, legal points and authorities and rationales contained in Contentions 1 and 2 of this Petition.

Id. at 93.

128 Petition at 93. Following Joint Petitioners lead, FirstEnergy incorporates by reference its responses to Contentions One and Two in its answer to Contention Three. FirstEnergy Answer at 64.

129 NRC Staff Answer at 20; FirstEnergy Answer at 33-34, 43, 45, 54, 59, 63-64, 65.

130 NRC Staff Answer at 26.

131 Id. at 27.

132 FirstEnergy Answer at 47-48, 61-62.

Besses operating license.133 As we review these three contentions, we will first eliminate those portions of the contention that are clearly extraneous to this proceeding, i.e. are outside the scope of this proceeding, are not material to this proceeding, or fail to raise a genuine dispute with the ER.134

4. Issues that are out of scope, not material or not supported To the extent that Contentions One135 and Two136 refer to events that would materialize over two decades to come . . . (2017 to 2037),137 we find any reference to events that will occur during that period of time not to be material to this proceeding and thus inadmissible. As conceded by Joint Petitioners,138 any reasonable alternative to be evaluated in depth must be an alternative that is available now or in the near future and in any event no later than April 22, 2017, the expiration date of the current license. The Joint Petitioners raise a second extraneous issue in their assertion that [t]he scope of the SEIS [sic] is improperly narrow, and the issue of the need for Davis-Besse as a means of satisfying demand forecasts for the relicensing period must be revisited due to dramatically-changing circumstances in the regional energy mix.139 The Joint Petitioners argument about the need for power from Davis-Besse during the license renewal period is outside the scope of this proceeding and inadmissible under 10 C.F.R. § 2.309(f)(1)(iii) because it challenges 10 C.F.R. § 51.53(c)(2), which states that a license renewal ER is not 133 Crow Butte, CLI-09-12, 69 NRC at 552 (stating boards may reformulate contentions to consolidate issues for a more efficient proceeding. (quoting Shaw Areva MOX Servs. (Mixed Oxide Fuel Fabrication Facility), LBP-08-11, 67 NRC 460, 482 (2008))).

134 Authority for narrowing the scope of a contention is found in 10 C.F.R. § 2.319(e) which authorizes the presiding officer to [r]estrict irrelevant, immaterial, unreliable, duplicative or cumulative evidence and/or arguments.

135 Petition at 10-11.

136 Id. at 69.

137 Id. at 11, 69.

138 Tr. at 69.

139 Petition at 10; accord id. at 69.

required to include discussion of need for power. Under 10 C.F.R. § 2.335(a), this and other rules and regulations of the Commission are not subject to challenge in any adjudicatory proceeding in the absence of a waiver. Joint Petitioners have neither sought nor received a waiver of Section 51.53(c)(2).

A third extraneous issue the Joint Petitioners raise is the role the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)140 should play in defining the range of alternatives to be considered in the ER. To the extent they urge that the 1996 Generic EIS parameters must be deemed legally void under NEPA[],141 the Joint Petitioners raise an issue that is both outside the scope of the proceeding and not material to any findings the NRC must make to support the requested action. Similarly, the Joint Petitioners allegation, in the introduction to Contention Three, that the relicensing GEIS is stale, dated and NEPA non-compliant142 is inadmissible because it raises issues that are beyond the scope of this proceeding and are not material, and therefore violates 10 C.F.R.

§§ 2.309(f)(1)(iii) and (iv).

5. Admissible contention as narrowed by the Board The elimination of these extraneous issues reveals the admissible core of Contentions One, Two and Three. This core is the Joint Petitioners challenge to the ERs failure to consider in a comprehensive manner combinations of wind and/or solar photovoltaic energy sources as an alternative to the Davis-Besse relicensing. Joint Petitioners charge that the ER contains a vague and superficial143 discussion of wind, solar, and other renewable energy alternatives,144 and 140 GEIS, NUREG-1437, Vol. 1.

141 Petition at 95.

142 Id. at 93 (capitalization altered).

143 Id. at 19.

144 Id. at 20-22, 36-38, 69-70.

contend this discussion is inadequate.145 Joint Petitioners allege that FirstEnergy has not undertaken the requisite hard look at commercial wind energy or solar as alternatives.146 The Joint Petitioners controvert the ERs conclusion that wind, solar, or a combination of wind and solar cannot meet the baseload output of the Davis-Besse plant by 2017.

Section 2.309(f)(1)(i) requires a proposed contention to provide a specific statement of the issue of law or fact to be raised or controverted. Joint Petitioners provide a specific statement for Contention One as follows: The FirstEnergy . . . Environmental Report fails to adequately evaluate the full potential for renewable energy sources, such as wind power, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action from 2017 to 2037 unnecessary.147 Joint Petitioners provide a specific statement for Contention Two that is identical except for the substitution of the words solar electric power or photovoltaics (hereinafter solar power) for wind power.148 For Contention Three, Joint Petitioners specific statement is that NEPA further requires in the consideration of alternatives to the license extension for Davis-Besse a combination of commercial wind-generated baseload power, combined with commercial solar photovoltaic-generated baseload power.149 Section 2.309(f)(1)(ii) requires a brief explanation of the basis for the contention. Although Joint Petitioners are not particularly brief in their explanation, the basis of Contentions One, Two and Three, is that wind energy, solar photovoltaic energy, and a combination of both fulfills all of the criteria of a reasonable alternative.150 Joint Petitioners assert that these energy sources would have significantly less adverse human environmental impacts because energy alternatives like 145 Id. at 19, 73.

146 Id. at 98.

147 Id. at 10.

148 Id. at 68-69.

149 Id. at 93.

150 Id. at 97.

wind . . . and solar . . . are abundantly available and do not have a carbon producing fuel cycle such as is the case with uranium.151 Joint Petitioners deny that wind power involves negative aesthetic and visual impacts.152 Joint Petitioners deny also that storage remains a cost prohibitive impediment to wind powers widespread and large-scale development,153 thereby disputing the ERs conclusion that current energy storage technologies are too expensive for wind power to serve as a large base-load generator.154 Joint Petitioners assert that interconnectedness of renewable energy generation is another solution to baseload and intermittency issues.155 Sections 2.309(f)(1)(iii) and 2.309(f)(1)(iv) require that the issue be within the scope of the proceeding and material to the findings that the NRC must make to support the action that is involved in the proceeding. The submission of an ER is the first instance where petitioners can challenge the environmental analysis put forward by an applicant. The ER and its conclusions provide the foundation for the EIS that the agency staff is tasked with preparing. A concern that the ERs analysis pays short shrift to the possible role of wind and solar photovoltaic energy as reasonable alternatives to relicensing is within the scope of a relicensing proceeding and is material to the findings that the NRC must make under NEPA.

Section 2.309(f)(1)(v) requires a concise statement of alleged facts or expert opinions that support the petitioners position on the issue and upon which the petitioner intends to rely at the hearing. Although not particularly concise, the Joint Petitioners allege many facts and proffer expert support. They refer to materials that allegedly show that compressed air storage would 151 Id. at 15-16.

152 Id. at 27 (emphasis omitted).

153 Id. at 28.

154 ER at 7.2-9.

155 Petition at 41.

work for wind power, and at a very large scale156 and has enabled wind power to surmount intermittency challenges, so much so that NREL [National Renewable Energy Laboratory] now recognizes the existence of baseload wind.157 Joint Petitioners also include the declaration of Dr.

Alvin Compaan, who proffers paragraphs 123 through 151 of Contention Two as his expert opinion.158 Dr. Compaan, a professor of physics at the University of Toledo,159 notes that [s]olar power has a CO2 footprint that is much smaller than the full fuel chain of nuclear.160 According to Dr. Compaan, [e]conomical sources of energy storage and back-up power are available to provide good base-load power, in conjunction with solar.161 Dr. Compaan further concludes that wide-scale installation of solar power combined with a storage facility . . . is a very viable alternative to the requested Davis-Besse license extension.162 Joint Petitioners also allege that FirstEnergy recently purchased a compressed-air storage project, the Norton Energy Storage Project.163 In addition, Joint Petitioners have tendered numerous exhibits that contain studies and reports that they allege show that within the foreseeable future, wind power, solar power and a combination of wind and solar could be reasonable alternatives to the renewal of Davis-Besse.

They argue that these renewable energy sources should have been evaluated in greater detail in 156 Id. at 28 (citing id., Attach. 48, Ken Zweibel, et al., By 2050 solar power could end U.S.

dependence on foreign oil and slash greenhouse gas emissions, Scientific American 64 (Jan.

2008)).

157 Id. (citing id., Attach. 11, Arjun Makhijani, Carbon-Free and Nuclear-Free: A Roadmap for U.S.

Energy Policies (Aug. 2007)). NREL, a national laboratory of the United States Department of Energy, is the nations primary laboratory for renewable energy and energy efficiency research and development. NREL, Overview, http://www.nrel.gov/overview/ (last visited Apr. 22, 2011).

158 Compaan Decl. at 1-2.

159 Id. at 1.

160 Petition at 71 (sponsored by Compaan Decl. at 1-2).

161 Id. (sponsored by Compaan Decl at 1-2).

162 Id. (sponsored by Compaan Decl. at 1-2) 163 Id. at 28-29 (quoting id., Attach. 49, Press release from FirstEnergy Corp., FirstEnergy Acquires Rights to Norton Energy Storage Project (Nov. 23, 2009)).

the ER. For example, Joint Petitioners cite the following:

i) A June 2010 NREL technical report that shows the offshore wind potential for the United States.164 Joint Petitioners allege this study shows that, within FirstEnergys region of interest, there is a total resource of 155.5 gigawatts (GW) of offshore and deepwater wind alone (within 50 nautical miles).165 ii) A January 2010 NREL study, from which the Joint Petitioners quote:

Greatly expanded use of wind energy has been proposed to reduce dependence on fossil and nuclear fuels for electricity generation. The large-scale deployment of wind energy is ultimately limited by its intermittent output and the remote location of high-value wind resources, particularly in the United States. Wind energy systems that combine wind turbine generation with energy storage and long-distance transmission may overcome these obstacles and provide a source of power that is functionally equivalent to a conventional baseload electric power plant. A baseload wind system can produce a stable, reliable output that can replace a conventional fossil or nuclear baseload plant, instead of merely supplementing its output. This type of system could provide a large fraction of a regions electricity demand, far beyond the 10-20% often suggested as an economic upper limit for conventional wind generation deployed without storage.166 iii) A 2007 Stanford University study entitled Supplying Baseload Power and Reducing Transmission Requirements by Interconnected Wind Farms.167 The Joint Petitioners quote from this study as follows:

A solution to improve wind power reliability is interconnected wind power. In other words, by linking multiple wind farms together it is possible to improve substantially the overall performance of the interconnected system (i.e., array) when compared with that of any individual wind farm.168 The Joint Petitioners quote as the studys conclusion: Contrary to common knowledge, an 164 Id. at 51-52 (citing id., Attach. 33, Marc Schwartz et al., Assessment of Offshore Wind Energy Resources for the United States (June 2010)).

165 Id. at 52 (citing Schwartz et al., supra note 164, at 3 tbl.1).

166 Id. at 38-39 (quoting id., Attach. 20, National Renewable Energy Laboratory, United States Department of Energy, Creating Baseload Wind Power Systems (Oct. 3, 2006)).

167 Id. at 40 (citing id., Attach. 21, Cristina L. Archer & Mark Z. Jacobson, Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms, 46 J. of Appl.

Meteorol. & Clim. 1701 (Feb. 2007)).

168 Id. (quoting Archer et al., supra note 167, at 1702).

average of 33% and a maximum of 47% of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power.169 iv) A press release announcing FirstEnergys acquisition of rights to the Norton Energy Storage Project in Ohio.170 Joint Petitioners contend that wide-scale installation of solar power combined with a storage facility such as the Norton Project, already acquired by First Energy, is a very viable alternative to the license extension for 20 more years of operation of the Davis-Besse nuclear facility.171 The Joint Petitioners quote the press releases statement that the former limestone mine is ideal for energy storage technology.172 Anthony J. Alexander, president and chief executive officer of FirstEnergy, is quoted in the press release as stating:

The compressed-air technology envisioned at this site would essentially operate like a large battery, storing energy at night for use during the day when it is needed . . . .

Because many renewable energy sourcessuch as windare intermittent, they dont always produce power when electricity demand is high. The energy storage aspects of this project would provide a way to harness renewable energy to be used when customers need it, making this project a key component to our regions overall renewable energy strategy.173 v) Lastly, a study prepared for the Department of Energy Office of Energy Efficiency and Renewable Energy, Wind and Water Power Program.174 Joint Petitioners quote this study as stating that:

[O]ffshore wind resource data for the Great Lakes, U.S. coastal waters, and Outer Continental Shelf [including off of New Jerseys coast] up to 50 nautical miles from shore indicate that for annual average wind speeds above 8.0 m/s, the total gross resource of the United States is 2,957 GW or approximately three times the 169 Id. (quoting Archer et al., supra note 167, at 1716).

170 Id. at 29, 88 (citing id., Attach. 54, FirstEnergy Acquires Rights to Norton Energy Storage Project, Nov. 23, 2009 [hereinafter FirstEnergy Acquires Rights to Norton]).

171 Id. at 89.

172 Id. at 88 (quoting FirstEnergy Acquires Rights to Norton, supra note 170, at 1).

173 FirstEnergy Acquires Rights to Norton, supra note 170, at 1.

174 Petition at 59 (citing id., Attach. 42, Jacques Beaudry-Losique, et al., Creating an Offshore Wind Industry in the United States: A Strategic Work Plan for the United States Department of Energy, Fiscal Years 2011-2015 (Sept. 2, 2010) (predecisional draft)).

generating capacity of the current U.S. electric grid. . . . The scale of this theoretical capacity implies that under reasonable economic scenarios, offshore wind can contribute to the nations energy mix to significant levels.175 This study refers to land-based and shallow water offshore wind platforms as Commercially Proven Technologies.176 Although many of the Joint Petitioners exhibits do not specifically address FirstEnergys region of interest, we find that they have provided the required alleged facts and minimal factual support for admitting a challenge which questions the sufficiency of the ERs examination of wind power, solar photovoltaic power, and a combination of both as alternatives to relicensing Davis-Besse.

Section 2.309(f)(1)(vi) requires a showing that a genuine dispute exists with the applicant on a material issue of law or fact. FirstEnergy and the NRC Staff argue that Joint Petitioners do not show a genuine dispute under 10 C.F.R. § 2.309(f)(1)(vi) because an energy source must be single and discrete to be a reasonable alternative, and interconnected wind farms, renewable energy with storage, and a combination of wind and solar power are not single and discrete.177 The Applicant and NRC Staff cite the GEIS178 for the proposition that a reasonable alternative energy source must . . . be a single, discrete electric generation source.179 During oral argument the NRC Staff conceded that this portion of the GEIS has not been converted into a regulation and is therefore not binding on the Board.180 Indeed, the NRC Staff stated recent NRC environmental impact documents review wind and solar in combination with 175 Id. at 59-60 (quoting Beaudry-Losique, et al., supra note 174, at 3 (emphasis by Joint Petitioners omitted)).

176 Beaudry-Losique, et al., supra note 174, at 21.

177 FirstEnergy Answer at 27.

178 GEIS, NUREG-1437, Vol. 1, § 8.1.

179 FirstEnergy Answer at 54, accord NRC Staff Answer at 43.

180 Tr. at 50-52.

fossil fuel as a reasonable alternative.181 The Supreme Court has recognized that the concept of alternatives evolves, and agencies must explore alternatives as they become better known and understood.182 The GEIS is not binding law and its statements concerning the practicality of multiple alternative sources have not been revised in 15 years. The NRC is in the process of amending its environmental protection regulations by updating its 1996 findings on the environmental impacts related to the renewal of a nuclear power plants operating license.183 We are not persuaded that, as a matter of law, a distributed combination of wind farms, solar arrays, and compressed air energy storage (CAES) could not constitute a reasonable alternative.

In addition, the NRC Staff argues that Joint Petitioners have not shown a genuine dispute with the ERs conclusion that solar power and wind power cannot replace Davis-Besse as a source of 910 MWe of baseload power by the commencement of the relicensing period, 2017.184 Making the same argument, FirstEnergy contends that Joint Petitioners do not show a genuine dispute because they have not shown that baseload wind and solar power is technically feasible or commercially viable now or in the immediate future.185 A baseload power source, as the NRC Staff explains, runs continuously to produce electricity at an essentially constant rate in order to satisfy all or part of the minimum, or base, system load.186 Baseload generation is different than 181 See Tr. at 113-114. The NRC Staff considered a combination of alternatives that includes natural gas combined-cycle generation, energy conservation/energy efficiency, and wind power for several recent license applications. See, e.g., Office of Nuclear Reactor Regulation, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants: Regarding Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, NUREG-1437, Supp. 45, at iii (Mar. 2011).

182 Vermont Yankee v. NRDC, 435 U.S. 519, 553 (1978).

183 74 Fed. Reg. 38117 (July 31, 2009).

184 NRC Staff Answer at 16 (internal footnote omitted).

185 FirstEnergy Answer at 4.

186 NRC Staff Answer at 16 n.26 (citing U.S. Energy Information Administration, Overview -

Generating Capability/Capacity, http://www.eia.doe.gov/cneaf/electricity/page/prim2/chapter2.html (last visited Apr. 22, 2011)).

peaking power, which provides supplemental power during hours of the day when demand is highest.187 However, Joint Petitioners dispute the ER by claiming that interconnectedness and energy storage allow wind and solar power to provide baseload power and proffer expert support and specific references to support this claim, as discussed above. Joint Petitioners have submitted numerous exhibits and a declaration that purport to demonstrate that within the foreseeable future, an environmentally superior alternative of wind, solar or wind and solar baseload power may be technically feasible and commercially viable. We need not address the merits issue here. Further, as stated in Carolina Environmental Study Group v. United States188 there exists an obligation to consider alternatives as they exist and are likely to exist.189 FirstEnergy and the NRC Staffs remaining arguments against admissibility of Contentions One, Two and Three are not persuasive. First, the NRC Staff interprets Contention Three to contend that FirstEnergy omitted any discussion of a combination of wind and solar power and argue the contention is not admissible because the information Joint Petitioners allege as omitted is in fact included in the Application.190 However, it appears to this Board that Joint Petitioners contention posits that FirstEnergy should have identified a combination of wind and solar power as a reasonable alternative and analyzed it as such.191 Accordingly, we do not agree that Contention Three should be viewed as a contention of omission.

Second, in challenging admissibility, the Applicant and the NRC Staff conflate the merits of the contention with the adequacy of its pleading. The Applicant states it believes that various combinations of renewable and advanced energy resources with generation equivalent to that of 187 United States v. Cinergy Corp., 623 F.3d 455, 459-60 (7th Cir. 2010) (quoting Babcock & Wilcox Co. v. United Techs. Corp., 435 F. Supp. 1249, 1256 (N.D. Ohio 1977)).

188 510 F.2d 796 (D.C. Cir. 1975).

189 Id. at 801.

190 NRC Staff Answer at 40.

191 See Petition at 97 (discussing the definition of reasonable alternative and concluding

[c]ommercial wind and solar photovoltaic fulfill all these criteria).

Davis-Besse are not reasonable alternatives to renewal of Davis-Besses operating license192 and argues that Contention 3 provides no information to show that a combination of wind and solar power could provide baseload power of this magnitude, or that this baseload generation would be technically feasible or commercially viable.193 But this question of whether a combination of renewable energy sources constitutes a reasonable alternative is the very issue on which the Joint Petitioners seek a hearing. When a contention alleges the need for further study of an alternative, from an environmental perspective, such reasonableness determinations are the merits, and should only be decided after the contention is admitted.194 To be entitled to a hearing, Joint Petitioners need not demonstrate that they will necessarily prevail, but only that there is at least some minimal factual support for their position.

It is rarely appropriate to resolve complex, fact-intensive issues on the initial pleadings.195 Thus, many of FirstEnergy and the NRC Staffs arguments improperly address the merits of the Joint Petitioners contention, rather than whether Joint Petitioners have provided a minimal showing that material facts are in dispute, thereby demonstrating that an inquiry in depth is appropriate.196 We agree with the approach recently taken by the Licensing Board in the Seabrook 192 FirstEnergy Answer at 67 (quoting ER at 7.2-13).

193 Id. at 66.

194 Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), LBP-09-10, 70 NRC 51, 86 (2009), revd in part on other grounds, CLI-10-02, 71 NRC__, __ (slip op. at 1-2) (Jan.

7, 2010).

195 Cf. Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC at __

(slip op. at 21, 23) (Mar. 26, 2010) [hereinafter Pilgrim II] (declining to uphold summary dismissal of contention involving complex, fact-intensive issues based on factors the board did not address and develop in the record).

196 Final Rule, Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. at 33,171 (quoting Connecticut Bankers Assn v. Board of Governors, 627 F.2d 245, 251 (D.C. Cir. 1980)).

proceeding where a somewhat similar contention was admitted.197 At this stage, it is sufficient for the Joint Petitioners to proffer some minimal factual support for their contention. This they have done and included both an experts declaration and a number of alleged facts from scholarly sources.

Some of the Joint Petitioners supporting references are said to suggest that alternative energy sources, like wind or solar could be a viable source of baseload power in the region by 2017.198 Whether this is so remains to be seen. In the Boards view, however, Joint Petitioners have proffered sufficient minimal evidence to warrant further inquiry as to whether such alternatives might be likely to exist during the relevant time period.

Although the Petition is generally unfocused and includes numerous exhibits irrelevant and immaterial to this proceeding, buried within its first 100 pages and first 171 numbered paragraphs lies a single contention concerning reasonable alternatives to the relicensing application. As stated above, a contention must satisfy each element of Section 2.309(f)(1) to be admissible. We find the following contention, as narrowed by the Board,199 meets the requirements of § 2.309(f)(1) and is therefore admissible:

The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does 197 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 19, 27).

198 Tr. at 69-70, 75, 97, 109, 113.

199 Having eliminated extraneous issues, we consolidate and rephrase Contentions One, Two, and Three to clarify their scope. See, e.g., Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), LBP-07-03, 65 NRC 237, 255 (2007) ([E]xercising our authority under 10 C.F.R.

§§ 2.316, 2.319, 2.329, we have acted to further define the Joint Petitioners[] admitted contentions when redrafting would clarify the scope of the contentions.); cf. Pennsylvania Power & Light Co.

Allegheny Elec. Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), LBP-79-6, 9 NRC 291, 295-96 (1979) (holding that although a Licensing Board is not required to recast contentions to make them acceptable, it is also not precluded from doing so).

not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.

B. Contention Four Joint Petitioners fourth contention concerns FirstEnergys analysis of severe accident mitigation alternatives or SAMAs.200 SAMA analyses identify and assess possible plant changessuch as hardware modifications and improved training or proceduresthat could cost-effectively reduce the radiological risk from a severe accident.201 Cost-effective SAMA candidates are identified by comparing the annualized cost of the mitigation measure with the benefit as determined by the averted cost of severe accidents (consequences), as weighted by the probability of the accidents occurrence.202 The regulation codifying the Commissions determination that the probability-weighted consequences of a severe accident (risk) are small in the context of a license renewal proceeding203 cannot be challenged in this proceeding.204 Although a petitioner cannot challenge that regulation, a petitioner may argue that potential reduction in the probability-weighted consequences of severe accidents is not small when compared to the cost of mitigation measures.

The Commissions regulations permit rather than foreclose challenges to SAMA analyses.205 A SAMA analysis fulfills the requirement under NRCs NEPA-implementing regulation, 10 200 Petition at 100.

201 Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and1), CLI-02-17, 56 NRC 1, 5 (2002) [hereinafter McGuire/Catawba]; accord Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, 61 Fed. Reg. 28,467, 28,481 (June 5, 1996).

202 McGuire/Catawba, CLI-02-17, 56 NRC at 4.

203 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1 (The probability weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts from severe accidents are small for all plants.).

204 See 10 C.F.R. § 2.335(a) (providing that absent a waiver, no rule or regulation of the Commission is subject to challenge in an adjudicatory proceeding).

205 Id. ([A]lternatives to mitigate severe accidents must be considered for all plants that have not considered such alternatives. (citing 10 C.F.R. § 51.53(c)(3)(ii)(L))).

C.F.R. Part 51, to provide a consideration of alternatives to mitigate severe accidents,206 and therefore is governed by NEPAs rule of reason.207 NEPA requires a reasonably complete discussion of possible mitigation measures.208 The ultimate concern in a SAMA contention is whether any additional SAMA should have been identified as potentially cost-beneficial, not whether further analysis may refine the details in the SAMA NEPA analysis.209 Accordingly, a SAMA contention is admissible only if it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated.210 Joint Petitioners allege in Contention Four that:

The Environmental Report (ER) is Inadequate Because It Underestimates the True Cost of a Severe Accident at Davis-Besse in Violation of 10 C.F.R.

§ 51.53(C)(3)(II)(L) and Further Analysis by the Applicant, [FirstEnergy], Is Called For.211 Joint Petitioners specify several factors, assumptions, and models212 that allegedly have, 206 10 C.F.R. § 51.53(c)(3)(ii)(L).

207 McGuire/Catawba, CLI-02-17, 56 NRC at 7.

208 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 352 (1989).

209 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-09-11, 69 NRC 529, 533 (2009) [hereinafter Pilgrim I].

210 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39).

211 Petition at 100.

212 Joint Petitioners express Contention Fours bases as follows:

a. [FirstEnergy]s use of probabilistic modeling underestimated the deaths, injuries, and economic impact likely from a severe accident by multiplying consequence values, irrespective of their amount, with very low probability numbers, the consequence figures appeared minimal.
b. Minimization of the potential amount of radioactive material released in a severe accident.
c. Use of an outdated and inaccurate proxy, the MACCS2 computer program, to perform its SAMA analysis.
d. Use of an inappropriate air dispersion model, the straight-line Gaussian plume, and meteorological data inputs that did not accurately predict the geographic dispersion and deposition of radionuclides at Davis-Besses Great Lake shoreline location.

individually and together with one or more of the others, improperly minimized costs likely to result in a severe accident.213 Joint Petitioners contend that FirstEnergys ER underestimates the cost of a severe accident and incorrectly discounts possible mitigation alternatives and that, as a result, a potentially cost effective mitigation alternative might not be considered that could prevent or reduce the impacts of that accident.214 The NRC Staff argues that Joint Petitioners have not shown that the factors, assumptions, and models identified in Contention Four are material.215 In addition, the NRC Staff challenges some subparts of the contention as outside the scope of the proceeding216 and some as inadequately supported by alleged facts or expert opinion.217 The NRC Staff concludes that, for these reasons, Contention Four should not be admitted.218 Similarly, FirstEnergy argues that Contention Four lacks adequate support in the form of alleged facts or expert opinion and raises issues outside the scope of this proceeding.219 FirstEnergy argues also that Joint Petitioners do not attempt to meet the materiality standard and

e. Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, including decontamination costs, cleanup costs and health costs, and that either minimized or ignored a host of other costs.
f. Use of inappropriate statistical analysis of the data specifically the Applicant chose to follow NRC practice, not NRC regulation, regarding SAMA analyses by using mean consequence values instead of, for example, 95 percentile values.

Id. at 104.

213 Id. at 103.

214 Id.

215 NRC Staff Answer at 49.

216 Id. at 51.

217 E.g., id. at 58.

218 See id. at 2.

219 FirstEnergy Answer at 80.

that they ignore applicable precedent and pertinent factual information in the ER.220 FirstEnergy concludes that whether its subparts are viewed independently or cumulatively in combination with other subparts, Contention 4 should be rejected in its entirety for failing to meet the requirements of 10 C.F.R. § 2.309(f)(1)(iii)-(vi).221 In the analysis that follows, the Board will identify issues that: (1) are outside the scope of this license renewal proceeding; (2) are not material; (3) are unsupported by alleged fact or expert support; or (4) fail to refer to the Application to show a genuine dispute. These issues will not be considered further in this proceeding. By eliminating these extraneous issues, we will have narrowed Contention Four down to its admissible core.222

1. Issues that are out of scope (Small impact of severe accidents; Spent fuel pool)

FirstEnergy and the NRC Staff argue that several of the issues Joint Petitioners attempt to raise in Contention Four are outside the scope of license renewal proceedings.223 We agree, at least as to Joint Petitioners challenges to (1) the Commissions determination that severe accident impacts are small224 and (2) the Commissions exclusion of the irradiated nuclear fuel pool risk.225 First, as FirstEnergy and the NRC Staff have argued,226 Joint Petitioners claim that the societal and economic impacts from severe accidents are unlikely to be small for all plants and simply appear so by the use of methods that minimized consequences as set forth in this 220 Id. at 82-83.

221 Id. at 70-71.

222 Crow Butte, CLI-09-12, 69 NRC at 552 (Our boards may reformulate contentions to eliminate extraneous issues or to consolidate issues for a more efficient proceeding. (quoting Shaw Areva, LBP-08-11, 67 NRC at 482)).

223 FirstEnergy Answer at 80; NRC Staff Answer at 51.

224 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58; see Petition at 105.

225 FirstEnergy Answer at 92-95; NRC Staff Answer at 51-55; see Petition at 108-12.

226 FirstEnergy Answer at 87-88; NRC Staff Answer at 57-58.

Motion227 is outside the scope of this proceeding because it directly challenges a Commission regulation. The statement challenges the agency regulation codifying the Commissions determination that, for any license renewal of a nuclear power plant, the probability-weighted consequences of a severe accident are small.228 Unless a party first successfully petitions for a waiver or exception, it may not challenge Commission rules or regulations in an adjudicatory hearing.229 Joint Petitioners have not petitioned for a waiver or exception to the small risk determination. Accordingly, the argument that severe accident risk is not small is in contravention of 10 C.F.R. § 2.309(f)(1)(iii) and so is outside the scope of this proceeding.

In addition, FirstEnergy interprets Joint Petitioners assertion that FirstEnergys use of probabilistic modeling underestimated the true consequences of a severe accident230 as an argument that SAMAs must ignore risk and focus only on accident consequences.231 FirstEnergy asserts that such an argument should be dismissed in its entirety232 as an impermissible challenge to NRC regulations outside the scope of an adjudicatory proceeding.233 The NRC Staff similarly argues Joint Petitioners challenge to [FirstEnergys] probabilistic approach in computing SAMAs is . . . outside the scope of the proceeding.234 In their final revised reply, Joint Petitioners clarify that they are not enemies of probability determinations235 and agree that probability must 227 Petition at 105.

228 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1.

229 Id. § 2.335.

230 Petition at 104.

231 FirstEnergy Answer at 84-85.

232 Id. at 86.

233 Id. at 85 (citing 10 C.F.R. § 2.335).

234 NRC Staff Answer at 83.

235 Reply at 45.

be taken into consideration.236 As clarified in the final revised reply, Joint Petitioners argument is that FirstEnergy has consistently underestimated risk in its SAMA calculations by inappropriately and improperly underestimating probability values through flawed models and methodologies.237 As a consequence, we do not need to decide whether it would be out of scope to challenge the weighting of severe accident consequences by the probability of their occurrence in SAMA analyses, because Joint Petitioners have clarified that they are not arguing against probabilistic modeling in this proceeding.

Second, FirstEnergy and the NRC Staff argue Joint Petitioners have raised an out-of-scope issue238 by arguing that the risk of a severe accident in the irradiated nuclear fuel pool should have been considered in the SAMA analysis.239 FirstEnergy contends this issue improperly challenges the Commissions generic determination in Part 51 that the impacts of on-site spent fuel storage are small.240 The NRC Staff agrees that this portion of Joint Petitioners argument is inadmissible because it is . . . a direct attack on the Commissions regulations.241 The germane Commission regulation states that, for all plants, on-site dry or pool storage can safely accommodate spent fuel accumulated from a 20-year license extension with small environmental effects, and categorizes on-site spent fuel as a Category 1 issue.242 For Category 1 issues, mitigation of adverse impacts has already been generically analyzed and it has already been determined that additional plant-specific mitigation measures are likely not to be sufficiently 236 Id. at 46.

237 Id. at 45.

238 FirstEnergy Answer at 92-93; NRC Staff Answer at 51-55.

239 Petition at 108.

240 FirstEnergy Answer at 92.

241 NRC Staff Answer at 52.

242 10 C.F.R. Part 51, subpt. A, app. B, tbl. B-1.

beneficial to warrant implementation.243 Since Joint Petitioners have not obtained a waiver or exception to this regulation, their challenge to this rule is outside the scope of this license renewal proceeding.244 Accordingly, spent fuel pool risk is extraneous to Joint Petitioners SAMA contention.245 Because spent fuel pool risk is outside the scope of SAMA analyses, we do not reach Joint Petitioners argument that Davis-Besses irradiated fuel storage pools contain a larger inventory of radioactive materials than its reactor core.246 For the same reason, we need not address Joint Petitioners interpretation of Sections 5 and 6 of the GEIS as including the irradiated nuclear fuel pool in SAMA analyses,247 except to note that the Commission has rejected this very argument.248

2. Issues that are not material (Sabotage risk; Quality assurance)

FirstEnergy and the NRC Staff also assert that some issues raised in Contention Four are not material to the findings NRC must make to support the requested license renewal. We agree, at least as to the treatment of the risk of sabotage and the quality assurance standards applied to the MACCS2 code. In section III(B)(5) below, we addresswith reference to the potentially admissible core of this SAMA contentionFirstEnergy and the NRC Staffs arguments that the 243 Id. at tbl. B-1, n.2.

244 See 10 C.F.R. § 2.335; see also Turkey Point, CLI-01-17, 54 NRC at 23 (holding Part 51's license renewal provisions cover environmental issues relating to onsite spent fuel storage generically and [a]ll such issues, including accident risk, fall outside the scope of license renewal proceedings.).

245 See Pilgrim II, CLI 10-11, 71 NRC at __ (slip op. at 33) (stating that claim that SAMA analysis is deficient for failing to address potential spent fuel pool accidents falls beyond the scope of NRC SAMA analysis and impermissibly challenges [Commission] regulations).

246 Petition at 112.

247 Id. (referring to GEIS, NUREG-1437, Vol. 1, §§ 5, 6).

248 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-14, 71 NRC __, __

(slip op. at 34) (June 17, 2010) [hereinafter Pilgrim III] (clarifying that [c]hapter six clearly is not limited to discussing only normal operations, but also discusses potential accidents and other non-routine events, and that [t]he Category 1 finding for onsite spent fuel storage (and chapter six of the GEIS upon which the finding is based) is not limited to routine or normal operations (citing GEIS, NUREG-1437, Vol. 1, at 6-19, 6-21, 6-28, 6-31, 6-34)).

entire contention is inadmissible for lack of a showing that the refinements in question might make an additional SAMA candidate cost-effective.

First, the Applicant argues that Joint Petitioners claims regarding the need to address intentional acts in a SAMA analysis . . . do not raise a material issue,249 and the NRC Staff agrees.250 Joint Petitioners charge FirstEnergy with failing to model intentional acts in its analysis of external events251 and state that intentional acts represent a class of accidents that should not be considered using probabilistic modeling.252 However, as the Commission recently reiterated, NEPA imposes no legal duty on the NRC to consider intentional malevolent acts . . . in conjunction with commercial power reactor license renewal applications.253 Therefore, we conclude that intentional malevolent acts, such as sabotage and terrorism, are not material to the SAMA findings the NRC must make in deciding whether to extend the Davis-Besse license, in contravention of 10 C.F.R. § 2.309(f)(1)(iv).

Second, Joint Petitioners failed to show how their claim that the MACCS2 code is not QAd is material.254 Joint Petitioners assert MACCS2 was developed using the less rigorous QA guidelines of ANSI/ANS 10.4 instead of being held to the QA requirements of NQA-a.255 FirstEnergy points out that appendix B to 10 C.F.R. Part 50 requires quality assurance, but only for safety-related functions of structures, systems, and components and not for NEPA analyses.256 249 FirstEnergy Answer at 87.

250 NRC Staff Answer at 55-56.

251 Petition at 108.

252 Id. at 107.

253 Pilgrim III, CLI-10-14, 71 NRC at __ (slip op. at 37) (quoting AmerGen Energy Co., LLC (Oyster Creek Nuclear Generation Station), CLI-07-8, 65 NRC 124, 129 (2007)).

254 Petition at 115.

255 Id.

256 FirstEnergy Answer at 101.

SAMA analyses are required pursuant to NEPA.257 FirstEnergy admonishes Joint Petitioners for not explaining why a computer code used to evaluate SAMAs would need to meet quality assurance requirements.258 We agree that Joint Petitioners have not demonstrated that the issue of whether the MACCS2 was QAd is material to the findings the NRC must make under NEPA to support the requested license extension, as required by 10 C.F.R. § 2.309(f)(1)(iv).

3. Issues that are not supported by alleged facts or expert opinion (Indoor dose; Forest, wetland, and shoreline clean up; Stigma costs; Economic infrastructure costs; Multiplier effect; Evacuation time input data; Myriad of other economic costs; Terrain effects on dispersion; $2,000/person-rem conversion factor; Consequence value uncertainties)

FirstEnergy and the NRC Staff argue that Joint Petitioners have failed to provide alleged facts or expert opinions to support several of the claims they make in Contention Four. In one instance, FirstEnergy and the NRC Staff note that Joint Petitioners provide no alleged facts or expert opinion to support their claim that if properly modeled, the indoor dose would increase by a factor of 2 to 4.259 In a second instance, FirstEnergy260 and the NRC Staff261 argue that Joint Petitioners do not provide facts or expert support for their assertion that FirstEnergys analysis should have considered that forests, wetlands and shorelines cannot realistically be cleaned up and decontaminated.262 Next, the NRC Staff argues Joint Petitioners have not supported their claim that the economic losses stemming from the stigma effects of a severe accident [at Davis-Besse] would be staggering.263 The NRC Staff also faults Joint Petitioners for not providing facts or expert support for their claim that the ER should have discussed economic infrastructure costs 257 10 C.F.R. §§ 51.1(a), 51.53(c)(3)(ii)(L).

258 FirstEnergy Answer at 101.

259 Id. at 103; NRC Staff Answer at 61; see Petition at 116.

260 FirstEnergy Answer at 118.

261 NRC Staff Answer at 73.

262 Petition at 138.

263 NRC Staff Answer at 74 (quoting Petition at 141).

and indirect economic effects (multiplier effects).264 FirstEnergy and the NRC Staff argue also that Joint Petitioners did not provide alleged facts or expert opinion265 to support their argument that FirstEnergys evacuation time input data was unrealistically low and unsubstantiated because it did not account for certain traffic, weather, and human behavior effects.266 Finally, the NRC Staff argues267 that Joint Petitioners do not provide any facts or expert opinion to support their claim that a myriad of other economic costs were underestimated or totally ignored.268 We agree that Joint Petitioners do not provide any alleged facts or expert opinion to support any of these claims, as required by 10 C.F.R § 2.309(f)(1)(v).

The NRC Staff argues also that Joint Petitioners have also failed to support their claim regarding complex terrain.269 Joint Petitioners argue that the Gaussian plume model FirstEnergy used to model atmospheric dispersion is not appropriate270 because, among other reasons, it does not model the impact of terrain on wind field patterns and plume dispersion.271 The NRC Staff notes that although Joint Petitioners provide studies that suggest a user should employ caution when relying on a Gaussian plume model in areas with complex or varied terrain, they have not shown that Davis-Besse is surrounded by complex terrain.272 Joint Petitioners claim the Cuyahoga River Valley is one example of the complex topographical features in Davis-Besses 264 Id. (citing Petition at 141-42).

265 FirstEnergy Answer at 129; NRC Staff Answer at 78.

266 Petition at 147.

267 NRC Staff Answer at 148.

268 Petition at 148.

269 NRC Staff Answer at 66.

270 Petition at 116.

271 Id. at 122.

272 NRC Staff Answer at 62.

region,273 but do not provide any alleged facts or expert support indicating that this river valley is within the geographical area for which FirstEnergy was required to model atmospheric dispersion.

We agree that the Joint Petitioners have not supported their terrain claim with alleged facts or expert opinion, as required by 10 C.F.R. § 2.309(f)(1)(v).

Joint Petitioners challenge of the $2,000/person-rem conversion factor is inadmissible because it too lacks support. They make three arguments to establish that the $2,000/person-rem factor is based on a deeply flawed analysis and seriously underestimates the cost of the health consequences of severe accidents.274 First, Joint Petitioners point out the conversion factor represents only stochastic health effects (e.g., cancer) and argue it is inappropriate to use a conversion factor that does not include deterministic effects.275 Joint Petitioners instead recommend summing the total number of early fatalities and latent cancer fatalities and multiplying by the $3 million value of a statistical life.276 The NRC Staff argues that this argument offers only an unsupported assertion because Joint Petitioners offer no estimate of the large number of early fatalities they assert should be part of the analysis.277 Joint Petitioners do provide an estimate of 1,400 early fatalities and 73,000 early injuries, citing a document they refer to as CRAC-2, Calculation of Reactor Accident Consequences, U.S. Nuclear Power Plants, Sandia National Laboratory, 1982.278 FirstEnergy asserts, however, that it has been unable to locate a document with this title, author, and date that is readily available in the public domain and point out that Joint Petitioners did not submit this 273 Petition at 134 (citing id., Attach. 70, Website of National Park Service, U.S. Department of the Interior, Cuyahoga Valley National Park).

274 Id. at 142-43.

275 Id. at 144.

276 Id. at 145.

277 NRC Staff Answer at 75-76.

278 Petition at 146.

document as an attachment to the Petition.279 The NRC Staff assert they also werent able to locate it based on [Joint Petitioners] representation of it.280 Joint Petitioners respond that the document is a well known report within the nuclear power establishment and is an NRC document,281 but admitted at oral argument that they only cite it by name and may not have gotten the title correct.282 We thus conclude that Joint Petitioners do not provide alleged facts or expert opinion indicating that a severe accident at Davis-Besse might have deterministic effects, such as early fatalities or early injuries, that FirstEnergy did not account for in its SAMA analysis.

Second, Joint Petitioners further contend that the $2,000/person-rem conversion factor assumes that all exposed persons receive dose commitments below the threshold at which the dose and dose-rate reduction factor . . . should be applied.283 However, Joint Petitioners do not support their assertions about dose and dose-rate reduction factors with any alleged facts or expert support.

Third, Joint Petitioners argue that FirstEnergys $2000/person-rem conversion analysis ignored a marked increase in the value of cancer mortality risk per unit of radiation at low doses (2-3 rem average), and cite two articles in support.284 At oral argument, Joint Petitioners explained that the person-rem conversion factor needs to undergo reevaluation, because at low doses of radiation, there is a supra-linear harm caused to people.285 However, neither of the 279 FirstEnergy Answer at 128.

280 Tr. at 220.

281 Reply at 72.

282 Tr. at 217-18.

283 Petition at 144-45.

284 Id. at 146 (citing E. Cardis, et al., Risk of Cancer After Low Doses of Ionising Radiation:

Retrospective Cohort Study in 15 Countries, 331 Brit. Med. J. 77 (July 4, 2005) and L. Yu.

Krestinina, et al., Protracted Radiation Exposure and Cancer Mortality in the Techa River Cohort, 164 Radiation Res. 602 (2005)).

285 Tr. at 209.

articles cited in the Petition indicate there is a supra-linear relationship between dose and risk at low doses. The first article, entitled Risk of Cancer After Low Doses of Ionising Radiation:

Retrospective Cohort Study in 15 Countries, estimates that the risk to nuclear industry workers at low doses is higher than, but statistically compatible with, the current bases for radiation protection standards.286 The second article, entitled Protracted Exposure and Cancer Mortality in the Techa River Cohort, estimated the slope of the dose response for both solid cancer and leukemia in its subject population and concluded there was no indication of significant curvature.287 In short, the alleged facts and expert opinion the Joint Petitioners proffer do not provide support for their challenge to the $2,000/person-rem conversion factor.

Joint Petitioners final unsupported claim is their assertion that FirstEnergy fails to consider the uncertainties in its consequence calculation.288 They assert that meteorological variations cause uncertainties in estimates of population dose, fatalities, and offsite economic costs289 and criticize FirstEnergy for inadequately dealing with uncertainty in its ER.290 The ER explains that 286 Cardis et al., supra note 284, at 5.

287 Krestinina et al., supra note 284, at 608. At oral argument, the Joint Petitioners argued that the BEIR VII Report by the National Academy of Sciences shows the supra-linear dose-risk relationship is not reflected in the $2,000/person-rem conversion factor. Tr. at 209. The Joint Petitioners cited this report in the Petition, but not as support for the supra-linear relationship claim.

Petition at 146-147. Instead, they cited the report to support their statement that cancer incidence and the other potential health effects from exposure to radiation in a severe radiological event should have been considered but were not, id., confusingly contradicting their earlier statement that the $2,000/person-rem conversion accounts for stochiastic health effects. Id. at 144. The Joint Petitioners have never directed our attention to a specific page or section of the BEIR VII Report, which is over 400 pages long. Committee to Assess Health Risks from Exposure to Low Levels of Ionizing Radiation, National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase 2 (2006). Board members are not required to comb through the record seeking support for contentions. Florida Power & Light Co. (Turkey Point Units 6 and 7), LBP-11-06, 73 NRC __, __ (slip op. at 109 n.111) (Feb. 28, 2011) (citing SmithKline Beecham Corp. v. Apotex Corp., 439 F.3d 1312, 1320 (Fed. Cir. 2006)). We decline to unearth support in this report for a proposition for which it was not even cited as authority in the Petition.

288 Petition at 148.

289 Id. at 148-49.

290 Id. at 149.

no explicit uncertainty analysis was performed because the number of conservative assumptions and inputs in the SAMA analysis account for any uncertainties in the calculations and because sensitivity cases . . . showed the robustness of the SAMA cost-benefit evaluation.291 Hence the ER does not report any consequences at the mean or 95th percentile values, but rather presents conservative point values. Joint Petitioners, however, criticize FirstEnergy for using mean consequence values instead of, for example, 95 percentile values292 and complain also that FirstEnergy has unconvincingly performed suspect sensitivity analyses.293 FirstEnergy and the NRC Staff argue that Joint Petitioners have not provided alleged facts or expert support for their claim about uncertainty.294 We agree. Although Joint Petitioners refer to two documents indicating uncertainties can arise in probabilistic risk assessment,295 neither of these citations show that FirstEnergys sensitivity cases and conservative assumptions and inputs were inadequate for dealing with uncertainty.296 Accordingly, Joint Petitioners claim about uncertainty in the consequence calculation is not supported by alleged facts or expert opinion.

In summary, for the reasons outlined above, we conclude that Joint Petitioners have failed to provide alleged facts or expert opinion to support their claims pursuant to 10 C.F.R. 291 ER at E-70.

292 Petition at 148 (capitalization omitted).

293 Id. at 149.

294 FirstEnergy Answer at 131; NRC Staff Answer at 85-86.

295 Petition at 148-49 (citing Edwin S. Lyman, A Critique of the Radiological Consequence Assessment Conducted in Support of the Indian Point Severe Accident Mitigation Alternatives Analysis at 4 (Nov. 2007) (Accession No. ML073410093) and quoting Kamiar Jamali, Use of Risk Measures in Design and Licensing of Future Reactors, Reliability Engg & Safety Sys. 95 at 935-36 (2010)).

296 The Commission has suggested that a petitioner may question the practice for SAMA analysis to utilize mean consequence values, which results in an averaging of potential consequences.

Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC __, __ (slip op. at 8 n.34) (Aug. 27, 2010). However, a petitioner must support such a challenge with alleged facts or expert opinion. 10 C.F.R. § 2.309(f)(1)(v).

§ 2.309(f)(1)(v) regarding: (1) indoor dose; (2) forest, wetland, and shoreline clean up; (3) stigma costs; (4) economic infrastructure costs; (5) multiplier effect; (6) evacuation times; (7) myriad other economic costs; (8) terrain effects; (9) the $2,000/person-rem conversion factor; and (10) consequence value uncertainties.

4. Issues that do not dispute the Application (Fire hosing and plowing)

Joint Petitioners criticism of fire hosing and plowing decontamination methods297 do not dispute the Applications SAMA analysis. FirstEnergy points out that Joint Petitioners quote language from the MACCS2 Users Guide that states that the code is made more conservative by its assumption that farmlands are decontaminated using these methods.298 The MACCS2 Users Guide explains that the code assumes these surface-washing methods might not move contamination out of the root zone, where radioactivity could be taken up into crops.299 Thus, the guide concludes, the code assumes that these methods would not reduce ingestion doses although they would reduce direct exposure doses to farmers.300 And for their part the Joint Petitioners do not explain how the MACCS2 codes assumption about fire hosing and plowing could have caused FirstEnergy to underestimate the cost of a severe accident. Accordingly, Joint Petitioners fire hosing and plowing claims do not dispute the Application. We will not consider these claims further, because they do not satisfy 10 C.F.R. § 2.309(f)(1)(vi).

5. Admissible contention as narrowed by the Board Having eliminated the extraneous issues, we look next at issues that we find ultimately provide an admissible core for Contention Four. Using the Joint Petitioners own words whenever possible, we recast Contention Four as follows:

297 Petition at 136, 138.

298 FirstEnergy Answer at 117-18 (citing Petition at 136 (quoting D. Chanin & M.L. Young, Code Manual for MACCS2; Users Guide, NUREG/CR-6613, Vol. 1, at 7-10 (May 1998) (ADAMS Accession No. ML063550020) [hereinafter MACCS2 Users Guide, NUREG/CR-6613, Vol. 1])).

299 MACCS2 Users Guide, NUREG/CR-6613, Vol. 1, at 7-10.

300 Id.

The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(II)(L) [sic]

and Further Analysis by the Applicant, [FirstEnergy], is called for301 because of:

(1) Minimization of the potential amount of radioactive material released in a severe accident302 by using a source term . . . based on radionuclide release fractions . . .

which are smaller for key radionuclides than the release fractions specified in NRC guidance;303 (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume,304 that does not allow consideration for the fact that winds for a given time period may vary spatially, . . . ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns,305 fails to account for hot spots of radioactivity caused by plumes blowing . . . offshore over Lake Erie,306 and is based on meteorological inputs . . . collected from just one site at Davis-Besse itself;307 and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident,308 specifically particle size and clean-up costs for urban areas.

a. Source terms Joint Petitioners contend that using a source term generated by the Modular Accident Analysis Progression code (MAAP code)as FirstEnergy didappears to lead to anomalously low consequences when compared to source terms generated by the NRC staff.309 Joint Petitioners allege that the MAAP code generates source terms that are consistently smaller for key radionuclides than the release fractions specified in NUREG-1465 and its recent revision for 301 Petition at 100.

302 Id. at 104.

303 Id. at 108.

304 Id. at 104.

305 Id. at 119.

306 Id. at 121.

307 Id. at 125.

308 Id. at 104.

309 Id. at 114.

high-burnup irradiated nuclear fuel.310 Joint Petitioners support their source-term claim by quoting a published draft of NUREG-1150 in which the NRC observed, in the context of the Zion Nuclear Power Plant, that comparisons made between the Source Term Code Package results and MAAP results indicated that the MAAP estimates for environmental release fractions were significantly smaller.311 Joint Petitioners also quote a Brookhaven National Laboratory study that determined that dose results reported by the applicant for license renewal at the Catawba and McGuire Plants were less by a factor between 3 and 4 than those calculated consistent with NUREG-1150.312 The NRC Staff recognizes that Joint Petitioners have provided some support for the argument that MAAP may lead to lower consequences when compared to source terms generated by NRC Staff.313 Nevertheless, the NRC Staff argues that Joint Petitioners reliance on NUREG-1465 is unavailing.314 FirstEnergy agrees, asserting that reference to NUREG-1465 . . . provides no factual or technical support for the contention.315 FirstEnergy distinguishes the release of radionuclides into containment, which is addressed in NUREG-1465, from the release of 310 Id. at 112 (referring to L. Soffer et al., Accident Source Terms for Light-Water Nuclear Power Plants, NUREG-1465 (Feb. 1995) (ADAMS Accession No. ML041040063) [hereinafter NUREG-1465]).

311 Id. at 114 (quoting Office of Nuclear Regulatory Research, Draft for Comment, Reactor Risk Reference Document, NUREG-1150, Vol. 1, at 5-14 (Feb. 1987) (ADAMS Accession No.

ML063540601)) [hereinafter Draft NUREG-1150] (capitalization altered by Joint Petitioners). The draft of NUREG-1150 states that the Source Term Code Package is described in NUREG-0956.

Draft NUREG-1150 at ES-3 (citing M. Silverberg, et al., Reassessment of the Technical Bases for Estimating Source Terms, NUREG-0956 (July 1986) (ADAMS Accession No. ML063550025)).

312 Id. at 113 (quoting John R. Lehner, et al., Brookhaven National Laboratory, Benefit Cost Analysis of Enhancing Combustible Gas Control Availability at Ice Condenser and Mark III Containment Plants at 17 (Dec. 2002) (ADAMS Accession No. ML031700011)).

313 NRC Staff Answer at 80.

314 Id.

315 FirstEnergy Answer at 95.

radionuclides into the environment during a severe accident, which SAMA analyses model.316 This technical argument, from the Boards perspective, warrants exploration in further adjudicatory proceedings, so as to avoid addressing the merits of the contention at the contention-admissibility stage of this proceeding.

FirstEnergy points out that the ER presents [t]he release categories and their frequencies in Section E.3.4.5 and Table E.3-20 and chides Joint Petitioners for not challenging the SAMA analysis with any particularity.317 However, Joint Petitioners cite pages of the ER that state that FirstEnergy used source terms generated by the MAAP code,318 thereby demonstrating that Joint Petitioners have a genuine dispute with the Application.

FirstEnergy and the NRC Staff also point out that the Licensing Board presiding over the Indian Point license renewal case rejected a similar contention,319 and FirstEnergy notes the widespread use and acceptance of the MAAP code in the nuclear industry.320 Joint Petitioners respond to the first point by arguing that a decision holding that the source term issue was not part of a contention in another proceeding has nothing to do with whether the issues that are raised by the Joint Petitioners here must be considered.321 They address the second point by asserting that

[j]ust because MAAP is broadly used does not necessarily mean that it is free from the flaws . . .

allege[d].322 The Indian Point decision has persuasive rather than binding authority on us, and MAAPs widespread use does not immunize it from being challenged by a properly pled contention.

316 Id. (quoting NUREG-1465, at 1) (emphasis in original); accord NRC Staff Answer at 80 (quoting NUREG-1465, at 1).

317 FirstEnergy Answer at 97.

318 Petition at 113 (citing ER § 4.20-1, E-17).

319 FirstEnergy Answer at 97; NRC Staff Answer at 81.

320 FirstEnergy Answer at 98.

321 Reply at 32.

322 Id. at 54.

FirstEnergy and the NRC Staff further contend that the source term argument,323 indeed the entire SAMA analysis contention,324 is inadmissible because Joint Petitioners have not shown it is material to the findings the NRC must make to support the requested license renewal. To be material, a SAMA contention must show that it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated.325 FirstEnergy articulates a materiality standard that would require an expert affidavit and a showing that the cost-benefit conclusions for SAMA candidates would change. FirstEnergy asserts a petitioner must provide adequate support to show that additional SAMA should have been identified as potentially cost-beneficial.326 At oral argument, FirstEnergy asserted the materiality standard was whether it would genuinely cause a change in a SAMA, identification of a SAMA, or in the ultimate cost-benefit analysis.327 FirstEnergy implied at oral argument that a petitioner would need an expert affidavit to meet the genuinely plausible standard because SAMA analyses are very specialized, detailed, probabilistic analyses and require some familiarity with the MACCS2 code in order to understand why revised factors, models, or assumptions could potentially have a change without running the model.328 We believe FirstEnergy has exaggerated the materiality standard, which requires only that petitioners provide sufficient information to show that, if their proposed refinements were incorporated, it is genuinely plausible that cost-benefit 323 FirstEnergy Answer at 97 (remonstrating Joint Petitioners for having provided no facts or expert opinion to establish that . . . the use of alternative source terms would have resulted in the identification of additional potentially cost-beneficial SAMAs for Davis-Besse); NRC Staff Answer at 81 (. . . Joint Petitioners have not established that . . . the use of another source term would identify additional cost beneficial SAMAs. (citing Pilgrim I, CLI-09-11, 69 NRC at 533)).

324 FirstEnergy Answer at 82; NRC Staff Answer at 49.

325 Pilgrim II, CLI-10-11, 71 NRC at __ (slip op. at 39) (emphasis added).

326 FirstEnergy Answer at 82 (citing Pilgrim I, CLI-09-11, 69 NRC at 533).

327 Tr. at 137 (emphasis added).

328 Tr. at 153.

conclusions might change.329 Joint Petitioners have shown that a change in the SAMA candidates cost-benefit conclusions is genuinely plausible. The Brookhaven National Laboratory study they cite shows that source term selection can change dose results by a factor of 3 to 4.330 Although this study addressed different nuclear power plants, it indicates that source term selection can make a large difference in dose results.

b. Gaussian plume Joint Petitioners also contend that using the steady-state, straight-line Gaussian plume air dispersion model in the MACCS2 codeas FirstEnergy didunderestimates the area likely to be affected in a severe accident and the dose likely to be received in those areas.331 Joint Petitioners assert that using this model is not appropriate for . . . Davis-Besses Great Lakes shoreline location because the model cannot model spatially and temporally varying winds and ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns.332 Another reason the model is inappropriate, Joint Petitioners assert, is that it should be applied with caution at distances greater than ten to fifteen miles, especially if meteorological conditions are likely to be different from those at the source of release.333 Joint Petitioners further maintain that the Gaussian plume model treats plumes blowing offshore over Lake Erie as though they have no impact, when in actuality a plume over water, rather than being dispersed, will remain tightly 329 Seabrook, LBP-11-02, 73 NRC at __ (slip op. at 39).

330 Lehner, et al., supra note 312, at 17.

331 Petition at 116.

332 Id. at 119.

333 Id. at 124 (quoting U.S. Department of Energy, MACCS2 Computer Code Application Guidance for Documented Safety Analysis 3-8 (June 2004), available at http://hss.energy.gov/nuclearsafety/qa/sqa/central_registry/MACCS2/Final_MACCS2_Guidance

_Report_June_1_2004.pdf).

concentrated due to the lack of turbulence . . . until winds blow it onto land.334 According to Joint Petitioners, the behavior of plumes over water can lead to hot spots of radioactivity in places along the . . . Great Lakes shoreline, certainly to Detroit/Windsor, Toledo, and Cleveland.335 Finally, the Joint Petitioners contend that inputting meteorological data collected over just three years from just one siteDavis-Besse itselfwill definitely not suffice to define the Great Lakes sea breeze or capture variability.336 Joint Petitioners point out that, to make matters worse, the third years data was deemed to be not viable as MACCS2 input.337 FirstEnergy clarifies that the Gaussian plume model is used in the ATMOS module of MACCS2338 and asserts that the straight-line Gaussian ATMOS model cannot be replaced without replacing the MACCS2 code itself.339 FirstEnergy concedes, however, that the inability to interchange ATMOS with other plume dispersion models does not immunize the Gaussian model from a properly pled contention.340 The NRC Staff asserts that Joint Petitioners have not provided adequate factual support for their assertions regarding the lake breeze effect.341 Despite acknowledging that Joint Petitioners have produced several studies that indicate the sea breeze effect plays an important 334 Id. at 121.

335 Id.

336 Id. at 125.

337 Id. (quoting ER at E.3.4.3). Another failing of the Gaussian plume model, according to Joint Petitioners, is that it cannot model terrain effects. Id. at 122. As discussed above in section III(B)(3), the ability of a Gaussian plume to model terrain effects is an extraneous issue because Joint Petitioners have not provided alleged facts or expert opinion indicating that Davis-Besse is surrounded by complex terrain. We have eliminated this issue from this proceeding.

338 FirstEnergy Answer at 106.

339 Id. at 108.

340 Id.

341 NRC Staff Answer at 69.

role at New England sites,342 the NRC Staff questions whether these studies have any applicability to Davis-Besses Great Lakes location.343 Joint Petitioners tie the Atlantic coast studies to Davis-Besses location by citing two websites.344 First, Joint Petitioners quote a National Weather Service webpage that states: [w]hile the sea breeze is generally associated with the ocean, they can occur along the shore of any large body of water such as the Great Lakes.345 Second, Joint Petitioners quote the website of Weather Doctor Keith C. Heidorn, which states: The lake breeze is similar to the sea breeze found along sea coasts.346 Together with the Atlantic coast studies, these websites provide the requisite minimal support that a lake breeze might be a factor near Davis-Besse.

FirstEnergy and the NRC Staff argue in addition that Joint Petitioners have not provided adequate support for their claim regarding the behavior of plumes over water.347 The NRC Staff seems to suggest that the ER already accounts for the impact of plumes travelling across Lake Erie into Michigan and Canada, but the page of the ER the Staff cites does not address reduced turbulence over water.348 FirstEnergy points out that Joint Petitioners cite two documents by no more than their authors last nameZagar et al. and Angevine et al.and ones publication date without attaching them to the petition.349 The Board nonetheless was able to locate full citations for 342 Id. at 70.

343 Id. at 63, 70.

344 Petition at 117-18.

345 Id. (quoting National Weather Service, JetStream, Online School for Weather, The Sea Breeze, http://www.srh.weather.gov/srh/jetstream/ocean/seabreezes.htm (last visited Apr. 22, 2011)).

346 Id. (quoting Keith C. Heidorn, Weather Almanac for May 2000: Great Lake Breezes, http://www.islandnet.com/~see/weather/almanac/arc2000/alm00may2.htm (last visited Apr. 22, 2011)).

347 FirstEnergy Answer at 110; NRC Staff Answer at 69.

348 NRC Staff Answer at 70 (citing ER at E-49).

349 FirstEnergy Answer at 110.

these two documents in the report by Dr. Jan Beyea that Joint Petitioners also cite, 350 and located one of them in the agencys ADAMS library. 351 This article deals with transport of airborne pollutants over water,352 and Dr. Beyea cited it to support his conclusion that radioactive releases from the Pilgrim power plant on the New England coastline that are headed initially out to sea will remain tightly concentrated due to reduced turbulence until winds blow the puffs back over land.353 FirstEnergy points out that Dr. Beyeas report is second-hand because it discusses a different reactor and that he did not perform an independent SAMA analysis.354 Nevertheless, in the Boards estimation, Dr. Beyeas report and the article about pollutant transport provide the requisite minimal support, together with alleged facts, that the behavior of plumes over water might be a factor near Davis-Besse.

FirstEnergy and the NRC Staff also dispute the relevance and meaning of material Joint Petitioners proffer as support. The NRC Staff argues that studies indicating that the Gaussian model might be inappropriate in the context of source permitting do not support the claim that the model would not produce adequate SAMA results at Davis-Besse.355 Similarly, the NRC Staff 350 Petition at 122 (citing Jan Beyea, Report to the Massachusetts Attorney General on the Potential Consequences of a Spent-Fuel-Pool Fire at the Pilgrim or Vermont Yankee Nuclear Plant 11 (May 25, 2006) (ADAMS Accession No. ML071840568)).

351 Wayne M. Angevine, et al., Modeling of the Coastal Boundary Layer and Pollutant Transport in New England (Jan. 2006) (ADAMS Accession No. ML110030899). The Board points out that, if this proceeding ultimately does go to an evidentiary hearing, the record upon which it will base its decision will be limited to the testimony and documentary material admitted as evidence, which generally will require, for instance, that any technical article or other document cited in a partys prefiled testimony must be submitted for the record as an exhibit.

352 Id. at 1.

353 Beyea, supra note 350, at 11.

354 FirstEnergy Answer at 111.

355 NRC Staff Answer at 62, 64.

argues that a study the Joint Petitioners cited in support of their terrain claim356 establishes that the ATMOS model is accurate at distances up to 200 miles.357 FirstEnergy also disputes the relevance of the material Joint Petitioners proffer as support.358 These arguments, however, address the merits of the contention, not the adequacy of the pleading, and so provide no basis for deeming this portion of the contention inadmissible.

FirstEnergy argues the merits as well in its additional assertion that the alleged methodological shortcomings of ATMOS are as likely to result in an overly conservative result.359 The validity of this and other merits-based arguments bear further exploration after the contention is admitted.

FirstEnergy chides Joint Petitioners for not providing factual or expert support for their assertion that data collected at the Davis-Besse site meteorological tower would not reflect any sea breeze present in the site vicinity.360 The NRC Staff likewise criticize Joint Petitioners for not providing any citation or expert testimony to support this claim.361 However, Joint Petitioners have provided support indicating that a lake breeze might cause spatially varying air circulation in the area surrounding Davis-Besse, and it is self-evident that a single immobile meteorological site would be unable to measure such spatially dependent circulation. Therefore, we conclude Joint Petitioners have provided adequate support for their claim that a single meteorological site is 356 Petition at 127. A source permit is an operating permit that the Clean Air Act requires major stationary sources of air pollution to obtain. Sierra Club v. Georgia Power Co., 443 F.3d 1346, 1348 (11th Cir. 2006) (citing Legal Envtl. Assistance Found., Inc. v. EPA, 400 F.3d 1278, 1279 (11th Cir. 2005)).

357 NRC Staff Answer at 65 (C. R. Molenkamp, et al., Lawrence Livermore National Laboratory, Comparison of Average Transport and Dispersion Among a Gaussian, a Two-Dimensional and a Three-Dimensional Model, NUREG/CR-6853 (Oct. 2004) (ADAMS Accession No. ML043240034)).

358 FirstEnergy Answer at 106.

359 Id. at 109.

360 Id. at 114.

361 NRC Staff Answer at 72.

inadequate to provide data for the complex air circulation model they assert is necessary.

FirstEnergy also faults Joint Petitioners for not citing all the discussion of meteorological measurements in the ER.362 At issue is Joint Petitioners reference to the ERs statement that data was collected for the years 2006 through 2008 and that the 2008 data was deemed not to be viable.363 FirstEnergy criticizes Joint Petitioners for not mentioning that the ER also states that the 2006 meteorological data were used as the base case, and the meteorological data from 2007 were used in one sensitivity case and that sensitivity cases . . . us[ing] data from the late-1990s

. . . confirmed that the 2006 meteorological data were representative and typical of annual meteorological conditions.364 However, this level of specificity is not required in pleading a contention to raise a genuine dispute, especially considering that the information FirstEnergy refers to is included on the very page of the ER that Joint Petitioners cite.365 Finally, the NRC Staff and FirstEnergy argue that Joint Petitioners have not shown their challenge to the Gaussian model is a material dispute because they have not shown that the asserted errors might have masked a cost-beneficial SAMA.366 Because Joint Petitioners have shown that the source term alone can alter dose results by a factor or 3 to 4, the source term and Gaussian model modifications acting together have sufficient impact to potentially make another SAMA candidate cost-beneficial.

c. Particle size and clean-up costs for urban areas Joint Petitioners contend that FirstEnergy underestimated costs by using the MACCS2 code to calculate decontamination and clean-up costs likely to be incurred in the event of a 362 FirstEnergy Answer at 114.

363 Petition at 125 (citing ER § E.3.4.3).

364 FirstEnergy Answer at 114 (citing ER at E-43 to E-44).

365 Petition at 125 (citing ER § E.3.4.3).

366 NRC Staff Answer at 63; FirstEnergy Answer at 109.

radioactive release.367 Joint Petitioners suggest that [i]n place of the outdated decontamination cost figure in the MACCS2 code, the SAMA analysis for Davis-Besse should incorporate, for example, the analytical framework contained in the 1996 Sandia National Laboratories report concerning site restoration costs . . . as well as Chernobyl and RDD type devices.368 Although Joint Petitioners fail to support many of their assertions of error relating to decontamination costs,369 they raise two claims that we conclude satisfy 10 C.F.R. § 2.309(f)(1).

The first concerns particle size. Joint Petitioners point out that the MACCS2 Users Guide states that the codes economic cost model is WASH-1400 based, and assert that relying on WASH-1400 underestimates costs because it is based on clean up after a nuclear weapon explosion.370 According to Joint Petitioners, reactor accidents release smaller sized particles, ranging in size from a fraction of a micron to a couple of microns, compared to particles produced in a nuclear weapon explosion, which are ten to hundreds of microns.371 Joint Petitioners contend the smaller particle size makes reactor accidents more difficult to clean up.372 The second concerns urban areas, which Joint Petitioners contend will be considerably more expensive and time consuming to decontaminate and clean than rural areas.373 Joint Petitioners refer to a study they allege provides estimates for different types of areas, from farm or 367 Petition at 135-36.

368 Id. at 140 (citing David I. Chanin & Walter B. Murfin, Site Restoration: Estimation of Attributable Costs from Plutonium-Dispersal Accidents (May 1996) available at http://chaninconsulting.com/downloads/sand96-0957.pdf).

369 See sections III(B)(3)-(4), supra.

370 Petition at 136 (citing MACCS2 Users Guide, NUREG/CR-6613, Vol. 1, at 7-10).

371 Id. at 136-37.

372 Id. at 137.

373 Id. at 138.

range land to high density urban areas.374 The NRC Staff states that it recognizes that Joint Petitioners have provided minimal support necessary for its assertion that smaller particles will create higher cleanup costs and that urban areas are more costly to clean up than rural areas.375 FirstEnergy, on the other hand, argues that the Commission concluded the 1996 Sandia report was of dubious relevance to the Pilgrim applicants SAMA analysis.376 Joint Petitioners respond that the Pilgrim decision was dependent on exactly what the intervenor(s) there did, or did not, plead or prove.377 FirstEnergy also argues that Joint Petitioners do not provide information to support their assertions about particle size because the Sandia report indicates only that certain decontamination data may not be applicable to a plutonium dispersal accident.378 FirstEnergy maintains that although the Sandia report states that most prior decontamination research has limited application to plutonium-dispersal accidents, it makes no such assertion with respect to a reactor accident.379 This aspect of Contention 4 is admissible. The statement FirstEnergy quotes does not show that the Sandia report lends no support to Joint Petitioners particle size claim. While particle size might depend on whether the radioactive substance is plutonium or reactor fuel, it also might depend on whether the dispersal is caused by a weapon explosion or a reactor accident, which is exactly the point raised by Joint Petitioners in their contention.

374 Id. at 138-39 (citing id., Reichmuth Attach., Barbara Reichmuth, et al., Economic Consequences of a Rad/Nuc Attack: Cleanup Standards Significantly Affect Costs at 6 tbl.1, 12 (Apr. 2005)).

375 NRC Staff Answer at 74.

376 FirstEnergy Answer at 116.

377 Reply at 31-32.

378 FirstEnergy Answer at 117 (citing Chanin & Murfin, supra note 368, at App. E. at E-1).

379 Id. (citing Chanin & Murfin, supra note 368, at App. E. at E-1).

Regarding urban area cleanup costs, the NRC Staff argues that Joint Petitioners have not demonstrated that their challenge to the ERs decontamination and clean-up costs is material because they have not shown that a different cost formula . . . could result in another cost-beneficial SAMA.380 Similarly, FirstEnergy contends that Joint Petitioners have not adequately explained the materiality of their general decontamination-cost assertions to the Davis-Besse SAMA analysis.381 Because we have determined that Joint Petitioners have shown that it is genuinely plausible that FirstEnergys source term calculation and use of the Gaussian plume model could have masked a cost-beneficial SAMA candidate, these two factors acting together with refinement to the decontamination cost analysis might have masked a candidate. Therefore, we conclude the SAMA contention as limited is material.

We thus determine that Contention Four is admissible, as limited by the Board, to read as follows:

The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of:

(1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are smaller for key radionuclides than the release fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on meteorological inputs collected from just one siteat Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas.

IV. Selection of Hearing Procedures A. Legal Standards As required by 10 C.F.R. § 2.310(a), upon admission of a contention in a licensing proceeding, the Board must identify the specific hearing procedures to be used to adjudicate the 380 NRC Staff Answer at 72-73.

381 FirstEnergy Answer at 118.

contention. NRC regulations provide for a number of different procedural schemes, two of which are relevant here.382 First, there is Subpart G,383 which is mandated for certain proceedings,384 and establishes NRC Rules for Formal Adjudications, in which parties are permitted to propound interrogatories, take depositions, and cross-examine witnesses without leave of the Board.385 The other is Subpart L386 which provides for a more informal proceeding in which discovery is generally prohibited (except for (1) specified mandatory disclosures under 10 C.F.R. § 2.336; and (2) the mandatory production of the hearing file under 10 C.F.R. § 2.1203(a)).387 When utilizing Subpart L, the Board has the primary responsibility for questioning the witnesses at any evidentiary hearing.388 B. Ruling on Hearing Procedure The Board concludes that, at this juncture, the Subpart L hearing procedures will be used to adjudicate each of the contentions we have admitted. We reach this result as follows. First, we conclude that there has been no showing under 10 C.F.R. § 2.310(d) that the Subpart G procedures are mandated for any of the admitted contentions. Second, exercising our discretion under 10 C.F.R. § 2.310(a), we have seen no reason or need to apply the Subpart G procedures to either of the admitted contentions. We therefore rule that, for the time being, the procedures of 382 If the hearing on a contention is expected to take no more than two (2) days to complete, 10 C.F.R. § 2.310(h)(1), the Board can impose the Subpart N procedures for Expedited Proceedings with Oral Hearings specified at 10 C.F.R. § 2.1400-1407. These procedures are highly truncated, but may prove appropriate for certain contentions at a later stage.

383 10 C.F.R. Part 2.

384 See, e.g., id. § 2.310(d).

385 Entergy Nuclear Vermont Yankee, LLC (Vermont Yankee Nuclear Power Station), LBP-06-20, 64 NRC 131, 201 (2006).

386 10 C.F.R. Part 2.

387 Id. § 2.1203(d).

388 Id. § 2.1207(b)(6).

Subpart L will be used for the adjudication of each of the admitted contentions.389 This determination is, of course, subject to reconsideration should there be reason to do so at a later date.

V. Order Based on the foregoing, it is hereby ORDERED:

A. Joint Petitioners, consisting of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio, having demonstrated standing and having submitted at least one admissible contention are admitted as parties in this proceeding.

B. The following contentions are admitted as limited and reworded by the Licensing Board:

Contention One:

The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.

Contention Four:

The Environmental Report (ER) is inadequate because it underestimates the true cost of a severe accident at Davis-Besse in violation of 10 C.F.R. § 51.53(C)(3)(ii)(L) and Further Analysis by the Applicant, FirstEnergy, is called for because of:

(1) Minimization of the potential amount of radioactive material released in a severe accident by using a source term based on radionuclide release fractions which are smaller for key radionuclides than the release fractions specified in NRC guidance; (2) Use of an inappropriate air dispersion model, the straight-line Gaussian plume, that does not allow consideration for the fact that winds for a given time period may vary spatially, ignores the presences of Great Lakes sea breeze circulations which dramatically alter air flow patterns, fails to account for hot spots of radioactivity caused by plumes blowing offshore over Lake Erie, and is based on 389 The selection of hearing procedures for contentions at the outset of a proceeding is not immutable because, inter alia, the availability of Subpart G procedures under 10 C.F.R. § 2.310(d) depends critically on whether the credibility of eyewitnesses is important in resolving a contention, and witnesses relevant to each contention are not identified, under 10 C.F.R. § 2.336(a)(1), until after contentions are admitted. See Entergy Nuclear Vermont Yankee, LLC (Vermont Yankee Nuclear Power Station), LBP-07-15, 66 NRC 261, 272 (2007); see also 10 C.F.R. § 2.1402(b).

meteorological inputs collected from just one siteat Davis-Besse itself; and (3) Use of inputs that minimized and inaccurately reflected the economic consequences of a severe accident, specifically particle size and clean-up costs for urban areas.

C. Any portions of Joint Petitioners Contentions One, Two, Three or Four not specifically included in Ordering Paragraph B are not admitted.

D. A Subpart L hearing is granted with respect to the above-admitted contentions.

E. The Licensing Board will hold a telephone conference with the parties in which we will discuss a schedule of further proceedings in this matter.

F. This Order is subject to appeal to the Commission in accordance with the provisions of 10 C.F.R. § 2.311. Any petitions for review meeting applicable requirements set forth in that section must be filed within ten (10) days of service of this Memorandum and Order.

THE ATOMIC SAFETY AND LICENSING BOARD390

/RA/

__________________________

William J. Froehlich, Chairman ADMINISTRATIVE JUDGE

/RA/

__________________________

Nicholas G. Trikouros ADMINISTRATIVE JUDGE

/RA/

__________________________

Dr. William E. Kastenberg ADMINISTRATIVE JUDGE Rockville, Maryland April 26, 2011 390 Copies of this memorandum and order were sent this date by the agencys E-Filing system to the counsel/representatives for (1) the Joint Petitioners; (2) FirstEnergy; and (3) the NRC Staff.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

FIRST ENERGY NUCLEAR OPERATING )

COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) Docket No. 50-346-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing) (LBP-11-13) have been served upon the following persons by Electronic Information Exchange.

Office of Commission Appellate Office of the Secretary of the Commission Adjudication U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Mail Stop O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Hearing Docket E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission. Office of the General Counsel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop T-3F23 Mail Stop O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson, Esq.

William J. Froehlich, Chair E-mail: edward.williamson@nrc.gov Administrative Judge Brian Harris, Esq.

E-mail: William.froehlich@nrc.gov E-mail: brian.harris@nrc.gov Emily Monteith, Esq Nicholas G. Trikouros E-mail: emily.monteith@nrc.gov Administrative Judge Brian P. Newell, Paralegal E-mail: nicholas.trikouros@nrc.gov E-mail: brian.newell@nrc.gov William E. Kastenberg OGC Mail Center : OGCMailCenter@nrc.gov Administrative Judge E-mail: wek1@nrc.gov FirstEnergy Service Company.

Mailstop: A-GO-15 Hillary Cain 76 South Main Street Law Clerk Akron, OH 44308 E-mail: hillary.cain@nrc.gov David W. Jenkins, Esq.

E-mail : djenkins@firstenergycorp.com

Docket No. 50-346-LR MEMORANDUM AND ORDER (Ruling on Petition to Intervene and Request for Hearing)

(LBP-11-13)

Morgan, Lewis & Bockius Citizens Environmental Alliance (CEA)

Pennsylvania Avenue, NW of Southwestern Ontario Washington, D.C. 20004 1950 Ottawa Street Stephen Burdick, Esq. Windsor, Ontario Canada N8Y 197 E-mail: sburdick@morganlewis.com Alex Polonsky, Esq. Green Party of Ohio E-mail: apolonsky@morganlewis.com 2626 Robinwood Avenue Kathryn M. Sutton, Esq. Toledo, Ohio 43610 E-mail: ksutton@morganlewis.com Martin ONeill, Esq. Dont Waste Michigan E-mail: martin.oneill@morganlewis.com 811 Harrison Street Timothy Matthews, Esq. Monroe, Michigan 48161 E-mail: tmatthews@morganlewis.com Michael Keegan Mary Freeze, Legal Secretary E-mail: mkeeganj@comcast.net E-mail: mfreeze@morganlewis.com Lisa Harris, Legal Secretary Terry J. Lodge, Counsel for CEA, Dont E-mail: lisa.harris@morganlewis.com Waste Michigan, and Green Party of Ohio 316 N. Michigan Street, Suite 520 Toledo, OH 43604-5627 E-mail: tjlodge50@yahoo.com Beyond Nuclear 6930 Carroll Avenue Suite 400 Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter E-mail : paul@beyondnuclear.org

[Original signed by Christine M. Pierpoint ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 26th day of April 2011 2